A two-layer optimization method for distribution network and photovoltaic energy storage station based on electric energy and reserve coupling

By adopting a double-layer optimization method of electrical energy and backup coupling in power grid management, the problem of insufficient output prediction and backup resource allocation of photoelectric energy storage power plants is solved, more efficient energy utilization and system reliability are achieved, and renewable energy is promoted. integration.

CN118572796BActive Publication Date: 2024-11-12国网甘肃省电力公司甘南供电公司
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411041410.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-11-12
Estimated Expiration
2044-07-31

AI Technical Summary

Technical Problem

In the existing power grid management, the output prediction of photoelectric power stations depends on historical data and simple statistical methods, which is difficult to accurately reflect the changes in actual output. The allocation of spare resources does not fully consider the actual needs of distribution networks and photoelectric power stations, resulting in Issues of wasted or insufficient resources.

Method used

Using the dual-layer optimization method of distribution network and optical energy storage power station based on electrical energy and backup coupling, we use the topology model and output model to collect key data, predict the output of optical energy storage power stations, formulate output scheduling plans, and establish a backup coupling optimization model. , optimize the allocation of spare resources of the overall system and realize the coordinated optimization of the distribution network and the optical energy storage power station.

Benefits of technology

It improves the efficiency of power utilization in photoelectric energy storage power plants, reduces energy waste, optimizes the allocation of backup resources, enhances the reliability and response capabilities of the power system, and promotes the efficient integration of renewable energy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118572796B_ABST
    Figure CN118572796B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of smart distribution network, and particularly relates to a double-layer optimization method for distribution network and photovoltaic energy storage power station based on electric energy and standby coupling. It includes collecting key data of the distribution network, using the collected key data to construct a topological model of the distribution network and an output model of the photovoltaic energy storage power station, and predicting the output of the photovoltaic energy storage power station; formulating an output dispatching plan of the photovoltaic energy storage power station according to the predicted output of the photovoltaic energy storage power station and the power demand of the distribution network, and defining an electric energy optimization model according to the formulated output dispatching plan of the photovoltaic energy storage power station; establishing a coupling model according to the electric energy optimization result; and realizing coordinated optimization of the distribution network and the photovoltaic energy storage power station through a double-layer optimization strategy. It solves the problem that in the existing power grid management, the output prediction of the photovoltaic energy storage power station relies on historical data and simple statistical methods, which is difficult to accurately reflect the actual output changes; and the allocation of standby resources fails to fully consider the actual needs of the distribution network and the photovoltaic energy storage power station.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of smart distribution networks, and in particular relates to a double-layer optimization method for distribution networks and photovoltaic energy storage power stations based on electric energy and standby coupling. Background Art

[0002] In the current power system, the coordinated optimization of distribution networks and photovoltaic energy storage power stations is a key technical challenge. With the widespread application of renewable energy, especially solar photovoltaic power generation, how to efficiently integrate these energy resources into the existing distribution network while ensuring the stability and economy of power supply has become an urgent problem to be solved.

[0003] Current state of the art: Traditional distribution network management focuses on load balancing and the stability of power supply. However, with the access of renewable energy, the volatility of power demand and supply increases, requiring more flexible scheduling strategies. As an important renewable energy generation facility, the output of photovoltaic energy storage power stations is greatly affected by weather conditions. Output fluctuations and uncertainties pose challenges to the stable operation of the power system. In existing power systems, the allocation of backup resources is often based on experience or simple rules, lacking refinement and dynamic optimization.

[0004] To this end, we propose a two-layer optimization method for distribution network and photovoltaic energy storage power station based on electric energy and backup coupling. Summary of the invention

[0005] In view of the above deficiencies in the prior art, the technical problem to be solved by the present invention is to provide a double-layer optimization method for distribution network and photovoltaic energy storage power station based on electric energy and backup coupling, so as to solve the problem that in the existing power grid management, the output prediction of photovoltaic energy storage power station relies on historical data and simple statistical methods, which is difficult to accurately reflect the actual output changes; the allocation of backup resources fails to fully consider the actual needs of distribution network and photovoltaic energy storage power station, resulting in waste or shortage of resources.

[0006] In order to achieve the above objectives, the present invention adopts the following technical solutions:

[0007] The method for collaborative optimization of a distribution network and a photovoltaic energy storage power station based on electric energy and backup coupling includes the following steps:

[0008] S1. Output prediction of the solar energy storage power station, collect key data of the distribution network, use the collected key data to build a topological model of the distribution network and an output model of the solar energy storage power station, and predict the output of the solar energy storage power station;

[0009] S2. Formulate an output dispatch plan. According to the predicted output of the photovoltaic energy storage power station and the power demand of the distribution network, formulate an output dispatch plan for the photovoltaic energy storage power station, and define a model for power energy optimization using the formulated output dispatch plan for the photovoltaic energy storage power station;

[0010] S3. The backup coupling optimization model calculates the backup demand of the distribution network in different time periods according to the power optimization results of step S2, and uses the backup demand to establish a coupling model. The coupling model considers the backup demand of the distribution network and the photovoltaic energy storage power station at the same time, and optimizes the backup resource allocation of the overall system;

[0011] S4. Double-layer optimization strategy: Through the double-layer optimization strategy, the coordinated optimization of the distribution network and the photovoltaic energy storage power station is achieved.

[0012] Furthermore, in step S1, the key data include: real-time load data of the distribution network including real-time load values ​​of load data nodes, load change trends, etc.; output data of the photovoltaic energy storage power station including real-time output, historical output data, output fluctuations, etc. of the power station; topological structure data of the distribution network including connection relationships between nodes (such as substations, load points) and branches (such as transmission lines); equipment parameters including rated capacity of transformers, impedance parameters of lines, capacity of capacitors, etc.

[0013] Furthermore, in step S1, the method for constructing a distribution network topology model includes:

[0014] Step S111. Define the nodes and branches of the distribution network. Define the nodes and branches in the distribution network. Use the adjacency matrix to represent the connection relationship between the nodes, where the nodes represent the substations, load points, etc. in the distribution network, and the branches represent the transmission lines connecting the nodes. The adjacency matrix is ​​expressed as:

[0015] ;

[0016] in, Representation Node and nodes Is it directly connected? Representation Node and nodes Not connected. In practical applications, the adjacency matrix needs to be filled according to the actual situation of the distribution network. , to reflect the actual connection status between nodes. and nodes Connected ;

[0017] Step S112: Calculate the node voltage level. According to the equipment parameters, determine the voltage level of each node. The formula is:

[0018] ;

[0019] ;

[0020] Is a node The voltage, is the rated voltage of the transformer, is the transformation ratio of the transformer, is the voltage drop of the line, is the load factor, is the load capacity of the transformer;

[0021] Step S113. Construct a power flow model: According to the node and branch definitions, establish a power flow model, calculate the injected power and load of each node, and the power flow model is expressed as:

[0022] ;

[0023] in, Is a node The injected power, and Node and nodes The voltage, Is a node and nodes The line reactance between and The nodes are and nodes The voltage phase angle, Is a node The load, is an element in the adjacency matrix, representing the node and nodes Whether connected.

[0024] Furthermore, in step S1, the method for constructing a photovoltaic energy storage power station output model includes:

[0025] S121. Collect historical output data and related influencing factors of the solar energy storage power station, which mainly include historical output data, weather conditions, equipment status, etc.;

[0026] S122. Analyze the output characteristics, calculate the average output using statistical analysis methods, understand the daily and seasonal changes in output, analyze the time series of output data through the results of average output, identify the periodic changes in output (such as daily and seasonal changes) and any trend changes, draw the time series graph and seasonal decomposition graph of output data through the time series, and intuitively display the change trend and periodicity of output. The formula for calculating the average output is:

[0027] ;

[0028] For average output, is the total number of observation time points, Indicates at a point in time The historical output value.

[0029] Furthermore, using the results of the characteristic analysis in step S1, an output prediction model is established to predict the output in the future.

[0030] The method for establishing the output prediction model comprises:

[0031] S21. Data preprocessing: use average output to standardize the data to reduce the impact of different dimensions. The standardization formula is:

[0032] ;

[0033] ;

[0034] In the formula, is the standardized output value, is the standard deviation of the output, is the average output, Indicates at a point in time The historical output value, is the total number of time points observed;

[0035] S22. Feature selection: Select features that are highly correlated with output prediction. Based on the features that are highly correlated with output prediction and the average output, construct a deviation feature relative to the average output. Among them, features that are highly correlated with output prediction include historical output, weather conditions, and equipment status.

[0036] Deviation characteristics It is expressed as:

[0037] ;

[0038] ;

[0039] is the deviation characteristic, is the deviation from the mean output, Indicates at a point in time The historical output value, is the average output, It's time point The predicted output of It's time point The device status;

[0040] S23. Define the objective function. Use the linear regression model and take the deviation from the average output as one of the features to define the objective function. The objective function is defined as:

[0041] ;

[0042] It's time point Output forecast; is the intercept term; The influence coefficient of the deviation of historical output relative to the average output on the predicted output, It's weather conditions The influence coefficient on the predicted output is Is the device status The influence coefficient on the predicted output; is the error term;

[0043] S24. Construct an electric energy optimization model. Through the electric energy optimization model, the optimal predicted output of the photovoltaic energy storage power station in different time periods is obtained. The electric energy optimization model is expressed as:

[0044] ;

[0045] ;

[0046] The constraints are:

[0047] ;

[0048] ;

[0049] In the formula, It's time point Output forecast; and Respectively represent the minimum and maximum output of the power station; It's time point The optimal predicted output of It's time The weight coefficient is adjusted according to the urgency of the demand or the importance of the time period;

[0050] It's time forecast electricity demand; are characteristics that affect electricity demand, such as time of day, weather conditions, etc.; are model parameters, representing the features the extent of the impact on forecast electricity demand; is the error term, which represents the random error or noise that cannot be explained by the model. The error term takes into account the randomness in the data and other factors not included in the model.

[0051] Furthermore, according to the electric energy optimization result solved in step S2, the method for establishing the coupling model includes:

[0052] S31. Calculate the backup demand of the distribution network. According to the power optimization result solved in step S2, calculate the backup demand at each time point. The calculation formula is:

[0053] ;

[0054] It's time point The spare demand, It's time point The optimal prediction output of It's time The forecast electricity demand, It's time point The current output of the distribution network, It reflects the power that the distribution network can provide without the output of the solar energy storage station. When calculating the backup demand, it needs to be subtracted from the total demand. and to determine whether additional electricity is needed to meet demand;

[0055] S32. Establish a coupling model, consider the backup requirements of the distribution network and the solar energy storage power station, and establish a coupling model. The coupling model is expressed as:

[0056] ;

[0057] is the total cost of the entire power system over a certain period of time, Represents operating costs, including regular operating expenses of the power system, such as equipment maintenance, staff salaries, and management expenses; It's time point The unit cost of backup power, expressed as the cost at a specific point in time The unit cost paid for backup power, which is a resource that can be quickly put into use in case of peak or unexpected electricity demand; It's time point spare demand.

[0058] Furthermore, in step S4, the construction method of the double-layer optimization strategy includes:

[0059] S41. Initialization: using the parameters of the distribution network topology model and the photovoltaic energy storage power station output model collected in step S1, the optimization model is initialized;

[0060] S42. Define the objective function of the upper layer optimization, and use the result of the coupling model in step S3 as the input of the lower layer optimization. The formula is expressed as:

[0061] ;

[0062] is the total cost of the entire power system over a certain period of time, Represents operating costs, including regular operating expenses of the power system, such as equipment maintenance, staff salaries, and management expenses; It's time point The unit cost of backup power, expressed as the cost at a specific point in time The unit cost paid for backup power, which is a resource that can be quickly put into use in case of peak or unexpected electricity demand; It's time point The spare demand;

[0063] S43. According to the upper-level optimization goal, the lower-level optimization problem is constructed, and the optimization model of output scheduling and backup resource allocation is defined. The formula is expressed as follows:

[0064] ;

[0065] is the total cost of the entire power system over a certain period of time, Represents operating costs, including regular operating expenses of the power system, such as equipment maintenance, staff salaries, and management expenses; It's time point The unit cost of backup power, expressed as the cost at a specific point in time The unit cost paid for backup power, which is a resource that can be quickly put into use in case of peak or unexpected electricity demand; It's time point The spare demand; It's time point The current output of the distribution network;

[0066] S43. Iterative optimization, feeding back the output scheduling plan and backup resource allocation plan obtained by the lower-level optimization to the upper-level optimization, and evaluating the achievement of the upper-level optimization goals (such as whether the total cost is within an acceptable range).

[0067] If the goal of the upper-level optimization is not fully achieved, the parameters or constraints of the upper-level optimization are adjusted according to the feedback, and steps S42 and S43 are iteratively executed until a satisfactory solution is found.

[0068] In summary, due to the adoption of the above technical solution, the beneficial technical effects of the invention are:

[0069] The two-layer optimization method of distribution network and photovoltaic energy storage station based on electric energy and backup coupling can more efficiently utilize the electric energy generated by photovoltaic energy storage station by coordinating the optimization of the electric energy of distribution network and photovoltaic energy storage station, thus reducing energy waste and improving energy utilization efficiency.

[0070] A two-layer optimization method of distribution network and photovoltaic energy storage power station based on electric energy and reserve coupling is proposed. By establishing a reserve coupling optimization model, the reserve requirements of distribution network and photovoltaic energy storage power station are considered at the same time to achieve the optimal allocation of reserve resources.

[0071] The two-layer optimization method of distribution network and photovoltaic energy storage power station based on electric energy and reserve coupling improves the power system's ability to cope with demand peaks or unexpected situations and enhances the system's reliability by optimizing the use of reserve resources.

[0072] The two-layer optimization method of distribution network and photovoltaic energy storage power station based on electric energy and reserve coupling makes the output scheduling plan more accurate and better meets actual needs by predicting the output of photovoltaic energy storage power stations and analyzing the power demand of distribution networks.

[0073] The two-layer optimization method of distribution network and photovoltaic energy storage power station based on electric energy and reserve coupling helps to better integrate renewable energy and promote the green transformation of energy structure through output prediction and optimal scheduling of photovoltaic energy storage power stations.

[0074] The two-layer optimization method of distribution network and photovoltaic energy storage power station based on electric energy and reserve coupling combines the needs of modern power systems and advanced optimization technologies to achieve optimal scheduling of distribution network and photovoltaic energy storage power station, which has many beneficial effects such as improving energy efficiency, reducing costs, and enhancing system reliability and adaptability.

[0075] Instruction Manual

[0076] Figure 1 It is a flow chart of a double-layer optimization method of distribution network and photovoltaic energy storage power station based on electric energy and reserve coupling;

[0077] Figure 2 A flow chart of a method for constructing a distribution network topology model;

[0078] Figure 3 A flow chart of a method for constructing an output model of a photovoltaic energy storage power station;

[0079] Figure 4 A flow chart of the method for establishing an output prediction model;

[0080] Figure 5 A flow chart of the method for establishing a standby coupling optimization model;

[0081] Figure 6 A flowchart of the construction method of the two-layer optimization strategy; DETAILED DESCRIPTION

[0082] In order to make the purpose, technical solution and advantages of the invention more clear, the invention is further described in detail below in combination with the embodiments. It should be understood that the specific embodiments described here are only used to explain the invention and are not used to limit the invention.

[0083] The double-layer optimization method of the distribution network and the photovoltaic energy storage power station based on the coupling of electric energy and reserve includes the following steps:

[0084] S1. Output prediction of the solar energy storage power station, collect key data of the distribution network, use the collected key data to build a topological model of the distribution network and an output model of the solar energy storage power station, and predict the output of the solar energy storage power station;

[0085] In step S1, the real-time load data of the distribution network includes the real-time load value of the load data node, the load change trend, etc.; the output data of the photovoltaic energy storage power station includes the real-time output of the power station, historical output data, output fluctuation, etc.; the topological structure data of the distribution network includes the connection relationship between nodes (such as substations, load points) and branches (such as transmission lines); the equipment parameters include the rated capacity of the transformer, the impedance parameters of the line, the capacity of the capacitor, etc.

[0086] like Figure 2 As shown, in step S1, the method for constructing a distribution network topology model includes:

[0087] Step S111. Define the nodes and branches of the distribution network. Define the nodes and branches in the distribution network. Use the adjacency matrix to represent the connection relationship between the nodes, where the nodes represent the substations, load points, etc. in the distribution network, and the branches represent the transmission lines connecting the nodes. The adjacency matrix is ​​expressed as:

[0088] ;

[0089] in, Representation Node and nodes Is it directly connected? Representation Node and nodes In practical applications, this matrix needs to be filled according to the actual situation of the distribution network to reflect the actual connection status between nodes. For example, if node 1 and node 2 are directly connected, then in the adjacency matrix and The value of will be 1;

[0090] Step S112: Calculate the node voltage level. According to the equipment parameters, determine the voltage level of each node. The formula is:

[0091] ;

[0092] ;

[0093] node The voltage, is the rated voltage of the transformer, is the transformation ratio of the transformer, is the voltage drop of the line, is the load factor, is the load capacity of the transformer;

[0094] Step S113. Construct a power flow model: According to the node and branch definitions, establish a power flow model, calculate the injected power and load of each node, and the power flow model is expressed as:

[0095] ;

[0096] in, Is a node The injected power, and Node and nodes The voltage, Is a node and nodes The line reactance between and The nodes are and nodes The voltage phase angle, Is a node The load, is an element in the adjacency matrix, representing the node and nodes Whether connected.

[0097] like Figure 3 As shown, in step S1, the method for constructing a photovoltaic energy storage power station output model includes:

[0098] S121. Collect historical output data and related influencing factors of the solar energy storage power station, which mainly include historical output data, weather conditions, equipment status, etc.;

[0099] S122. Analyze the output characteristics, calculate the average output using statistical analysis methods, understand the daily and seasonal changes in output, analyze the time series of output data through the results of average output, identify the periodic changes in output (such as daily and seasonal changes) and any trend changes, draw the time series graph and seasonal decomposition graph of output data through the time series, and intuitively display the change trend and periodicity of output. The formula for calculating the average output is:

[0100] ;

[0101] For average output, is the total number of observation time points, Indicates at a point in time The historical output value.

[0102] In step S1, the real-time load data of the distribution network includes the real-time load value of the load data node, the load change trend, etc.; the output data of the photovoltaic energy storage power station includes the real-time output of the power station, historical output data, output fluctuation, etc.; the topological structure data of the distribution network includes the connection relationship between nodes (such as substations, load points) and branches (such as transmission lines); the equipment parameters include the rated capacity of the transformer, the impedance parameters of the line, the capacity of the capacitor, etc.

[0103] S2. Formulate an output dispatch plan. According to the predicted output of the photovoltaic energy storage power station and the power demand of the distribution network, formulate an output dispatch plan for the photovoltaic energy storage power station, and define a model for power energy optimization according to the formulated output dispatch plan for the photovoltaic energy storage power station;

[0104] Using the results of the characteristic analysis in step S1, an output prediction model is established to predict the output in the future.

[0105] like Figure 4 As shown, the model for establishing electric energy optimization includes:

[0106] S21. Data preprocessing: use average output to standardize the data to reduce the impact of different dimensions. The standardization formula is:

[0107] ;

[0108] ;

[0109] In the formula, is the standardized output value, is the standard deviation of the output, is the average output, Indicates at a point in time The historical output value, is the total number of time points observed;

[0110] S22. Feature selection: Select features that are highly correlated with output prediction. Based on the features that are highly correlated with output prediction and the average output, construct a deviation feature relative to the average output. Among them, features that are highly correlated with output prediction include historical output, weather conditions, and equipment status.

[0111] Deviation characteristics It is expressed as:

[0112] ;

[0113] ;

[0114] is the deviation characteristic, is the deviation from the mean output, Indicates at a point in time The historical output value, is the average output, It's time point The predicted output of It's time point The device status;

[0115] S23. Define the objective function. Use the linear regression model and take the deviation from the average output as one of the features to define the objective function. The objective function is defined as:

[0116] ;

[0117] It's time point Output forecast; is the intercept term; The influence coefficient of the deviation of historical output relative to the average output on the predicted output, It's weather conditions The influence coefficient on the predicted output is Is the device status The influence coefficient on the predicted output; is the error term;

[0118] S24. Construct an electric energy optimization model. The optimal predicted output of the photovoltaic energy storage power station in different time periods is obtained through the constructed electric energy optimization model. The electric energy optimization model is expressed as:

[0119] ;

[0120] ;

[0121] The constraints are:

[0122] ;

[0123] ;

[0124] In the formula, It's time point Output forecast; and Respectively represent the minimum and maximum output of the power station; It's time point The optimal predicted output of It's time The weight coefficient is adjusted according to the urgency of the demand or the importance of the time period;

[0125] It's time forecast electricity demand; are characteristics that affect electricity demand, such as time of day, weather conditions, etc.; are model parameters, representing the features the extent of the impact on forecast electricity demand; is the error term, which represents the random error or noise that cannot be explained by the model. The error term takes into account the randomness in the data and other factors not included in the model;

[0126] S3. A backup coupling optimization model is used to calculate the backup demand of the distribution network in different time periods according to the power optimization results of step S2, and a coupling model is established using the backup demand. The coupling model considers the backup demand of the distribution network and the photovoltaic energy storage power station at the same time, and optimizes the backup resource allocation of the overall system;

[0127] like Figure 5 As shown, the method for establishing the standby coupling optimization model includes:

[0128] S31. Calculate the backup demand of the distribution network. According to the power optimization result solved in step S2, calculate the backup demand at each time point. The calculation formula is:

[0129] ;

[0130] It's time point The spare demand, It's time point The optimal prediction output of It's time The forecast electricity demand, It's time point The current output of the distribution network, It reflects the power that the distribution network can provide without the output of the solar energy storage station. When calculating the backup demand, it needs to be subtracted from the total demand. and to determine whether additional electricity is needed to meet demand;

[0131] S32. Establish a coupling model, consider the backup requirements of the distribution network and the solar energy storage power station, and establish a coupling model. The coupling model is expressed as:

[0132] ;

[0133] is the total cost of the entire power system over a certain period of time, Represents operating costs, including regular operating expenses of the power system, such as equipment maintenance, staff salaries, and management expenses; It's time point The unit cost of backup power, expressed as the cost at a specific point in time The unit cost paid for backup power, which refers to power resources that can be quickly put into use in case of peak power demand or unexpected circumstances; It's time point spare demand.

[0134] S4. Double-layer optimization strategy: Through the double-layer optimization strategy, the coordinated optimization of the distribution network and the photovoltaic energy storage power station is realized, ensuring that the system optimizes the use of backup resources and reduces the total system cost while meeting the power demand;

[0135] like Figure 6 As shown, in step S4, the method for constructing a two-layer optimization strategy includes:

[0136] S41. Initialization: using the parameters of the distribution network topology model and the photovoltaic energy storage power station output model collected in step S1, the optimization model is initialized;

[0137] S42. Define the objective function of the upper layer optimization, and use the result of the coupling model in step S3 as the input of the lower layer optimization. The formula is expressed as:

[0138] ;

[0139] is the total cost of the entire power system over a certain period of time, Represents operating costs, including regular operating expenses of the power system, such as equipment maintenance, staff salaries, and management expenses; It's time point The unit cost of backup power, expressed as the cost at a specific point in time The unit cost paid for backup power, which is a resource that can be quickly put into use in case of peak or unexpected electricity demand; It's time point The spare demand;

[0140] S43. According to the upper-level optimization goal, the lower-level optimization problem is constructed, and the optimization model of output scheduling and backup resource allocation is defined. The formula is expressed as follows:

[0141] ;

[0142] is the total cost of the entire power system after optimization within a certain period of time, Represents operating costs, including regular operating expenses of the power system, such as equipment maintenance, staff salaries, and management expenses; It's time point The unit cost of backup power, expressed as the cost at a specific point in time The unit cost paid for backup power, which is a resource that can be quickly put into use in case of peak or unexpected electricity demand; It's time point The spare demand; It's time point The current output of the distribution network;

[0143] S43. Iterative optimization, feeding back the output scheduling plan and backup resource allocation plan obtained by the lower-level optimization to the upper-level optimization, and evaluating the achievement of the upper-level optimization goals (such as whether the total cost is within an acceptable range).

[0144] If the goal of the upper-level optimization is not fully achieved, the parameters or constraints of the upper-level optimization are adjusted according to the feedback, and steps S42 and S43 are iteratively executed until a satisfactory solution is found.

[0145] The above description is a preferred embodiment of the invention and is not intended to limit the invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the invention should be included in the protection scope of the invention.

Claims

1. A method for collaborative optimization of distribution network and photovoltaic energy storage power station based on electric energy and backup coupling, characterized in that: The following steps are involved: S1. Output prediction of the solar energy storage power station, collect key data of the distribution network, use the collected key data to build a topological model of the distribution network and an output model of the solar energy storage power station, and predict the output of the solar energy storage power station; S2. Formulate an output dispatch plan. According to the predicted output of the photovoltaic energy storage station and the power demand of the distribution network, formulate an output dispatch plan for the photovoltaic energy storage station, and define a model for power energy optimization using the formulated output dispatch plan for the photovoltaic energy storage station; S3. The backup coupling optimization model calculates the backup demand of the distribution network in different time periods according to the power optimization results of step S2, and uses the backup demand to establish a coupling model. The coupling model considers the backup demand of the distribution network and the solar energy storage power station at the same time, and optimizes the backup resource allocation of the overall system; S4. Double-layer optimization strategy, through which the coordinated optimization of the distribution network and the photovoltaic energy storage power station is achieved; Key data include: real-time load data of distribution network, including real-time load value and load change trend of load data nodes; output data of photovoltaic energy storage power station, including real-time output, historical output data and output fluctuation of power station; topological structure data of distribution network, including connection relationship between nodes and branches; equipment parameters, including rated capacity of transformer, impedance parameters of line and capacity of capacitor; The method for establishing the coupling model comprises: S31. Calculate the backup demand of the distribution network. According to the power optimization result solved in step S2, calculate the backup demand at each time point. The calculation formula is: ; It's time point The spare demand, It's time point The optimal prediction output of It's time The forecast electricity demand, It's time point The current output of the distribution network; S32. Establish a coupling model, consider the backup requirements of the distribution network and the solar energy storage power station, and establish a coupling model. The coupling model is expressed as: ; is the total cost of the entire power system over a certain period of time, represents operating costs, including the regular operating expenses of the power system; It's time point The unit cost of backup power, expressed as the cost at a specific point in time The unit cost paid for backup power, which refers to power resources that can be quickly put into use in case of peak power demand or unexpected circumstances; It's time point The spare demand; The method for constructing the two-layer optimization strategy includes: S41. Initialization: using the parameters of the distribution network topology model and the photovoltaic energy storage power station output model collected in step S1, the optimization model is initialized; S42. Define the objective function of the upper layer optimization, and use the result flow chart of the coupling model in step S3 as the input of the lower layer optimization, and the formula is expressed as: ; is the total cost of the entire power system over a certain period of time, represents operating costs, including the regular operating expenses of the power system; It's time point The unit cost of backup power, expressed as the cost at a specific point in time unit cost paid for backup power; It's time point The spare demand; S43. According to the upper-level optimization goal, the lower-level optimization problem is constructed, and the optimization model of output scheduling and backup resource allocation is defined. The formula is expressed as follows: ; is the total cost of the entire power system after optimization within a certain period of time, represents operating costs, including the regular operating expenses of the power system; It's time point The unit cost of backup power, expressed as the cost at a specific point in time The unit cost paid for backup power, which is a resource that can be quickly put into use in case of peak or unexpected electricity demand; It's time point The spare demand; It's time point The current output of the distribution network; S44. Iterative optimization, feed back the output scheduling plan and backup resource allocation plan obtained by the lower-level optimization to the upper-level optimization, evaluate the achievement of the upper-level optimization goals, and if the goals of the upper-level optimization are not fully achieved, adjust the parameters or constraints of the upper-level optimization according to the feedback, and iterate steps 42 and 43 until a satisfactory solution is found.

2. The method for collaborative optimization of distribution network and photovoltaic energy storage power station based on electric energy and backup coupling according to claim 1 is characterized in that: In step S1, the method for constructing a distribution network topology model includes: Step S111. Define the nodes and branches of the distribution network. Define the nodes and branches in the distribution network. Use the adjacency matrix to represent the connection relationship between the nodes, where the nodes represent the substations and load points in the distribution network, and the branches represent the transmission lines connecting the nodes. The adjacency matrix is ​​expressed as: ; in, Representation Node and nodes Is it directly connected? Representation Node and nodes Not connected; Step S112: Calculate the node voltage level. According to the equipment parameters, determine the voltage level of each node. The formula is: ; ; is the rated voltage of the transformer, is the transformation ratio of the transformer, is the voltage drop of the line, is the load factor, is the load capacity of the transformer; Step S113. Construct a power flow model: According to the node and branch definitions, establish a power flow model, calculate the injected power and load of each node, and the power flow model is expressed as: ; in, Is a node The injected power, and Node and nodes The voltage, Is a node and nodes The line reactance between and The nodes are and nodes The voltage phase angle, Is a node The load, is an element in the adjacency matrix, representing the node and nodes Whether connected.

3. The method for collaborative optimization of distribution network and photovoltaic energy storage power station based on electric energy and backup coupling according to claim 1 is characterized in that: In step S1, the method for constructing a photovoltaic energy storage power station output model includes: S121. Collect historical output data and related influencing factors of the solar energy storage power station, which mainly include historical output data, weather conditions, and equipment status; S122. Analyze the output characteristics, calculate the average output using statistical analysis methods, understand the daily and seasonal changes in output, analyze the time series of output data through the results of average output, identify the periodic changes and any trend changes in output, draw a time series graph and seasonal decomposition graph of output data through the time series, and intuitively display the change trend and periodicity of output. The formula for calculating the average output is: ; For average output, is the total number of observation time points, Indicates at a point in time The historical output value.

4. The method for collaborative optimization of distribution network and photovoltaic energy storage power station based on electric energy and backup coupling according to claim 1 is characterized in that: The method for defining an electric energy optimization model comprises: S21. Data preprocessing: use average output to standardize the data to reduce the impact of different dimensions. The standardization formula is: ; ; In the formula, is the standardized output value, is the standard deviation of the output, is the average output, Indicates at a point in time The historical output value, is the total number of time points observed; S22. Feature selection: Select features that are highly correlated with output prediction. Based on the features that are highly correlated with output prediction and the average output, construct a deviation feature relative to the average output. Among them, the features that are highly correlated with output prediction include historical output, weather conditions, and equipment status. Deviation characteristics It is expressed as: ; ; is the deviation characteristic, is the deviation from the mean output, Indicates at a point in time The historical output value, is the average output, It's time point The predicted output of It's time point The device status; S23. Define the objective function. Use the linear regression model and take the deviation from the average output as one of the features to define the objective function. The objective function is defined as: ; It's time point Output forecast; is the intercept term; The influence coefficient of the deviation of historical output relative to the average output on the predicted output, It's weather conditions The influence coefficient on the predicted output is Is the device status The influence coefficient on the predicted output; is the error term; S24. Construct an electric energy optimization model. Through the electric energy optimization model, the optimal predicted output of the photovoltaic energy storage power station in different time periods is obtained. The electric energy optimization model is expressed as: ; ; The constraints are: ; ; In the formula, It's time point Output forecast; and Respectively represent the minimum and maximum output of the power station; It's time point The optimal predicted output of It's time The weight coefficient is adjusted according to the urgency of the demand or the importance of the time period; It's time forecast electricity demand; are characteristics that affect electricity demand; are model parameters, representing the features the extent of the impact on forecast electricity demand; is the error term, which represents the random error or noise that cannot be explained by the model. The error term takes into account the randomness in the data and other factors not included in the model.

Citation Information

Patent Citations

  • Capacity configuration optimization method of hydropower-photo-electricity-stored energy multi-energy complementary power generation system

    CN110661301A

  • Flexible standby distribution method and system for power grid containing high-proportion renewable energy sources

    CN111162528A

  • Optical storage system operation method and device based on residual demand curve

    CN115441516A

  • Power load scheduling method and system based on big data

    CN116646933A

  • Optical storage integrated electric energy scheduling method and system, electronic equipment and storage medium

    CN118412863A