Dry dock water stop system, construction method and water stop system three-axis mixing pile construction method

By adopting a precise three-axis mixing pile construction method and a multi-level protection system in the dry docking system, the safety and water-stopping problems of construction in complex geological areas are solved, the construction efficiency and quality are improved, and the immersed tube tunnel under complex geological conditions is improved. The project provides safety.

CN118581895BActive Publication Date: 2024-10-25NO 1 ENG COMPANY CO LTD OF CCCC FIRST HARBOR ENG COMPANY +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411072435.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-10-25
Estimated Expiration
2044-08-06

AI Technical Summary

Technical Problem

The existing dry docking system is difficult to cope with construction in soft soil areas with complex geology, especially in soil layers with low bearing capacity and low water permeability, and cannot effectively ensure construction safety and water-stopping effect.

Method used

Provide a three-axis mixing pile construction method. Through precise process parameters and automatic monitoring system, the pile penetration depth and cement slurry preparation are determined. The 'two spraying and two stirring' construction technology and high-pressure rotary grouting piles are combined with the plastic concrete wall under the high-pressure line. Build a multi-level protection system.

Benefits of technology

It improves construction efficiency and quality, enhances the water-stopping and seepage-proofing capabilities of the dry dock, solves technical difficulties in construction in soft soil areas, and provides safety guarantee for immersed tunnel projects under complex geological conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118581895B_ABST
    Figure CN118581895B_ABST
Patent Text Reader

Abstract

The present invention relates to a dry dock water stop system, a construction method and a three-axis mixing pile construction method of the water stop system, and belongs to the technical field of immersed tube tunnel construction. The three-axis mixing pile construction method is suitable for soft soil layers with low bearing capacity. According to the permeability coefficient of the soft soil layer, the pile insertion depth of the three-axis mixing pile is determined. The three-axis mixing pile construction method includes measurement and lofting, trench excavation, pile driver positioning, cement slurry preparation and grouting, drilling, mixing and lifting steps; in the cement slurry preparation and grouting steps, the water-cement ratio of the cement slurry is 0.7, the cement content is 20%, and the grouting pressure is 0.6-0.8MPa; in the drilling, mixing and lifting steps, the real-time injection amount of the spraying pump is monitored by an automatic monitoring system during spraying, and the real-time injection amount is not less than the minimum injection amount. The construction method monitors the operation of the injection pump through precise process parameters and an automatic monitoring system, and provides a feasible construction scheme for soft soil layers.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of immersed tube tunnel construction, and in particular relates to a dry dock water-stopping system, a construction method and a three-axis mixing pile construction method for the water-stopping system. Background Art

[0002] In immersed tube tunnel engineering, dry dock is one of the key processes. As the prefabrication site for immersed tube sections, the dry dock requires a stable support structure to ensure safety during construction, as well as a reliable water stop system and flood control system to prevent the impact of groundwater, river water and floods.

[0003] Dry dock construction needs to fully consider the regional characteristics of the project site to ensure the smooth progress of the immersed tube tunnel project. This is especially true for inland river immersed tube tunnels with more complex hydrogeological conditions, such as projects located in the Pearl River Delta region of my country. The region has the Shawan Fault Zone, a mild climate, abundant rainfall, and complex soil distribution, especially the widespread distribution of soft soil layers such as silt and silty soil. The region has complex geological conditions, low soil bearing capacity, low permeability, and high water content, which makes dry dock construction very difficult. At present, there is little construction experience in such areas, and the existing dry dock system is difficult to cope with dry dock construction with such complex geology. The dry dock water stop system is crucial to the success of dry dock construction.

[0004] The waterstop curtain is an important component of the dry dock waterstop system. In the prior art, Chinese invention patent CN106894430A discloses a method for constructing a waterstop curtain using three-axis mixing piles. In a foundation pit in a water-rich silty soft soil layer with a large difference in hydrological conditions, it provides a method for constructing a waterstop curtain using three-axis mixing piles. In the construction of three-axis mixing piles, especially in construction under special geological conditions, the preparation of cement slurry is very important. However, the patent does not provide cement slurry preparation parameters. Considering the construction quality, the method provided by the patent cannot be directly applied.

[0005] Therefore, how to provide a three-axis mixing pile water-stop curtain construction method suitable for soft soil layers is a technical problem that urgently needs to be solved. Summary of the invention

[0006] In view of the shortcomings in the prior art, the present invention provides a dry dock waterstop system, a construction method and a three-axis mixing pile construction method for the waterstop system, which provides a feasible construction solution for soft soil areas with low bearing capacity through precise process parameters.

[0007] In a first aspect, the present invention provides a three-axis mixing pile construction method for a water stop system, which is suitable for a soft soil layer area with low bearing capacity. The insertion depth of the three-axis mixing pile is determined according to the permeability coefficient of the soft soil layer. The three-axis mixing pile construction method comprises the following steps:

[0008] Pile driver positioning: The on-site construction personnel and the pile driver team leader shall command the pile driver to position. Before moving, check the front, back, left and right positions clearly. If any obstacles are found, they shall be removed in time. After the movement is completed, the positioning shall be checked and corrected in time. After the pile is formed, the center deviation of the pile shall not exceed 50mm, the elevation deviation of the pile bottom shall not exceed 100mm, and the verticality deviation of the pile body shall not exceed 0.5%;

[0009] Preparation of cement slurry and grouting: automatic mixing system and cement tank are equipped at the construction site to ensure the quality of slurry; the water-cement ratio of cement slurry is 0.7, the cement content is 20%, and the grouting pressure is 0.6-0.8MPa; the 28-day unconfined compressive strength of the reinforced solid is required to be no less than 1.2MPa; after the cement slurry is prepared, the stagnation time of cement slurry shall not exceed 2 hours, and cement slurry that has been left for more than 2 hours shall be treated as waste slurry;

[0010] Drilling, mixing and lifting: The three-axis mixing pile adopts the "two spraying and two mixing" construction process, and adopts the full set of re-mixing pile construction sequence of alternate pile jumping and double-hole drilling; cement and original soil are evenly mixed, and the sinking speed is 0.5-0.6m / min. The drill bit is sprayed and sunk to the designed depth. After mixing and spraying at the bottom of the pile for 1 minute, it is uniformly mixed and lifted and sprayed. The lifting speed is 0.9-1.0m / min. When the drill bit is lifted to 0.5m below the ground, the spraying is stopped; during the spraying, the automatic monitoring system is used to monitor the real-time spraying volume of the spraying pump. The real-time spraying volume is not less than the minimum spraying volume. The minimum spraying volume is calculated using formula (1), and the expression of formula (1) is:

[0011] (1);

[0012] In formula (1), is the minimum injection amount, is the pile diameter, is the cement content, is the soil bulk density, is the water-cement ratio, It is the real-time sinking speed or the real-time lifting speed.

[0013] This technical solution provides a feasible construction solution for soft soil areas with low bearing capacity through precise process parameters.

[0014] In some of the embodiments, during the drilling, mixing and lifting steps, the cement slurry sprayed by the shotcrete pump is delivered by a slurry pump. When the real-time injection amount is less than the minimum injection amount, the delivery amount is adjusted by adjusting the control valve of the slurry pump to adjust the real-time injection amount.

[0015] This technical solution accurately controls the delivery volume of cement slurry by adjusting the control valve of the slurry pump, ensuring that the real-time injection volume reaches the minimum injection volume requirement, thereby ensuring construction quality.

[0016] In some of the embodiments, the drilling, mixing and lifting steps further include monitoring the cement consumption by an automatic monitoring system, and the cement consumption per unit time is calculated using formula (2), which is expressed as:

[0017] (2);

[0018] In formula (2), is the cement consumption per unit time, is the bulk density of cement.

[0019] This technical solution ensures that the cement consumption of each work shift meets the design requirements by accurately calculating the cement consumption per unit time.

[0020] In some of the embodiments, each work shift calculates the cement consumption for the day based on the cement consumption per unit time to ensure that the cement consumption meets the design requirements.

[0021] In some of the embodiments, in the pile driver placement step, the pile overlap of the triaxial mixing pile is calculated using formula (3), and the expression of formula (3) is:

[0022] (3);

[0023] In formula (3), is the pile overlap amount; is the pile length; is the allowable deviation of the verticality of the pile body, which is taken as 0.5% here.

[0024] This technical solution ensures construction quality through accurate calculation of the overlap amount of pile positions.

[0025] In some of the embodiments, during the construction of three-axis mixing piles, each work shift works continuously. When the rest time between shifts exceeds the final setting time of the mixed soil in the pile, the overlap amount of the pile position is increased by at least 100 mm.

[0026] In a second aspect, the present invention further provides a dry dock water stop system, wherein the dry dock is constructed near a river, and the dry dock water stop system comprises:

[0027] Steel pipe pile wall, which is built at the dock entrance;

[0028] Underground continuous wall, which is built at both ends of the steel pipe pile wall and extends along the river direction, and the underground continuous wall and the steel pipe pile wall are detachably connected;

[0029] The anti-seepage wall is built close to the steel pipe pile wall on the river side of the steel pipe pile wall;

[0030] A water-stop curtain is constructed around the dry dock and connected to the underground continuous wall; the water-stop curtain includes three-axis mixing piles constructed around the dry dock, and the three-axis mixing piles are constructed using the three-axis mixing pile construction method of the water-stop system as described above; high-pressure rotary jet piles are constructed at the connection between the water-stop curtain and the underground continuous wall for water-stopping.

[0031] This technical solution greatly improves the water-stopping and anti-seepage capabilities of the dry dock through comprehensive protection at multiple levels and by multiple means, providing a strong guarantee for the safe construction of the immersed tube tunnel project.

[0032] In some of these embodiments, in areas where construction height is limited, the waterstop curtain is constructed using a plastic concrete wall under a high-voltage wire.

[0033] In a second aspect, the present invention further provides a dry dock water stop system construction method, which is applied to the above-mentioned dry dock water stop system and comprises the following steps:

[0034] Bank protection and water stopping construction: carry out the construction of underground continuous wall, steel pipe pile wall and anti-seepage wall in sequence; determine the pile insertion depth of underground continuous wall, steel pipe pile wall and anti-seepage wall according to the permeability coefficient and bearing capacity of the soft soil layer;

[0035] Waterstop curtain construction: Three-axis mixing piles are used for waterstop curtain construction. High-pressure rotary jet piles are used for waterstopping at the connection between the three-axis mixing piles and the underground continuous wall. The bottom elevation of the high-pressure rotary jet piles is consistent with the bottom elevation of the three-axis mixing piles.

[0036] In some embodiments, in areas where construction height is limited, the water-stop curtain is constructed using a plastic concrete wall under a high-voltage line. The construction of the plastic concrete wall under the high-voltage line includes the following steps:

[0037] Lower the construction surface elevation: The construction surface elevation of the three-axis mixing pile is , excavate the foundation pit in the area with limited construction height to meet the construction height of the plastic concrete wall. The construction surface elevation of the plastic concrete wall is , ;

[0038] One-time grooving: Use a grooving machine at an elevation of The construction surface is to be grooved;

[0039] Backfilling the foundation pit: Backfill the foundation pit excavated in the step of lowering the construction surface elevation to the elevation ;

[0040] Secondary trenching: Use an excavator to dig at an elevation of Trench construction is carried out on the construction surface.

[0041] This technical solution overcomes the limitation of construction height, can ensure the structural stability and waterproofness of plastic concrete walls, and provides an effective solution for the construction of water-stop curtains under special conditions.

[0042] Based on the above scheme, the dry dock waterstop system, construction method and three-axis mixing pile construction method of the waterstop system in the embodiment of the present invention provide a feasible construction scheme for soft soil areas with low bearing capacity through precise process parameters, and monitor the operation of the jet pump through an automatic monitoring system to ensure that the required injection volume is achieved; the three-axis mixing pile construction method provided in this embodiment improves construction efficiency and quality, solves a major technical problem of dry dock construction in soft soil areas, and has important practical application value for immersed tube tunnel projects with similar geological conditions. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0044] Figure 1 It is a plan view of the three-axis mixing pile in Example 1 of the present invention;

[0045] Figure 2 This is a schematic diagram of the overlapping piles between the three-axis mixing piles in Example 1 of the present invention;

[0046] Figure 3 It is a plan view of the dry dock water stopping system in Example 1 of the present invention;

[0047] Figure 4 It is an enlarged plan view of the dock opening of the dry dock water stop system in Example 1 of the present invention;

[0048] Figure 5 for Figure 3 Schematic diagram of enlarged portion A and portion B;

[0049] Figure 6 This is a schematic diagram of the construction process of the plastic concrete wall under the high-voltage line in Example 1 of the present invention;

[0050] Figure 7 This is a plan view of the three-axis mixing pile of the test pile in Example 1 of the present invention.

[0051] In the figure:

[0052] 1. Steel pipe pile wall; 2. Anti-seepage wall; 3. Underground continuous wall; 4. Water-stop curtain; 401. Three-axis mixing pile; 402. Plastic concrete wall under high-voltage line. DETAILED DESCRIPTION

[0053] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0054] In the description of the present invention, it should be understood that the terms "center", "lateral", "longitudinal", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0055] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0056] like Figure 1 As shown, in one embodiment of the dry dock water-stopping system, construction method and water-stopping system three-axis mixing pile construction method of the present invention, the water-stopping system three-axis mixing pile construction method is suitable for soft soil layer areas with low bearing capacity. According to the permeability coefficient of the soft soil layer, the pile insertion depth of the three-axis mixing pile 401 is determined. The three-axis mixing pile construction method includes measurement and setting out, trench excavation, pile driver positioning, cement slurry preparation and grouting, drilling mixing and lifting steps; specifically,

[0057] Survey and set out: lay out the driving width according to the design data, measure the ground elevation on site, and determine the pile top elevation;

[0058] Trench excavation: Use an excavator to excavate the trench according to the center line of the three-axis mixing pile 401 pile position, and remove underground obstacles. The remaining soil in the trench should be processed in time to ensure that the pile driver can move horizontally;

[0059] Pile driver positioning: The on-site construction personnel and the pile driver team leader shall command the pile driver to position. Before moving, check the front, back, left and right positions clearly. If any obstacles are found, they shall be removed in time. After the movement is completed, the positioning shall be checked and corrected in time. After the pile is formed, the center deviation of the pile shall not exceed 50mm, the elevation deviation of the pile bottom shall not exceed 100mm, and the verticality deviation of the pile body shall not exceed 0.5%;

[0060] Preparation of cement slurry and grouting: automatic mixing system and cement tank are equipped at the construction site to ensure the quality of slurry; the water-cement ratio of cement slurry is 0.7, the cement content is 20%, and the grouting pressure is 0.6-0.8MPa; the 28-day unconfined compressive strength of the reinforced solid is required to be no less than 1.2MPa; after the cement slurry is prepared, the stagnation time of cement slurry shall not exceed 2 hours, and cement slurry that has been left for more than 2 hours shall be treated as waste slurry;

[0061] Drilling, mixing and lifting: The three-axis mixing pile 401 adopts the construction process of "two spraying and two mixing". Figure 1 As shown in the figure, the construction sequence of double-hole full-set remixing pile formation with alternate piles is adopted; cement and original soil are evenly mixed, and the sinking speed is 0.5-0.6 m / min. The drill bit is sprayed and mixed to the designed depth. After mixing and spraying at the bottom of the pile for 1 minute, the drill bit is uniformly mixed and lifted and sprayed. The lifting speed is 0.9-1.0 m / min. When the drill bit is lifted to 0.5 m below the ground, the spraying is stopped; during the spraying, the automatic monitoring system is used to monitor the real-time injection volume of the spraying pump. The real-time injection volume is not less than the minimum injection volume. The minimum injection volume is calculated using formula (1). The expression of formula (1) is:

[0062] (1);

[0063] In formula (1), is the minimum injection amount, is the pile diameter, is the cement content, is the soil bulk density, is the water-cement ratio, It is the real-time sinking speed or the real-time lifting speed.

[0064] Furthermore, the triaxial mixing pile 401 should be driven into the pile until the permeability coefficient is no more than 5.2*10 -4 cm / s rock formation.

[0065] In the above-mentioned schematic embodiment, the three-axis mixing pile construction method provided in the embodiment of the present invention provides a feasible construction plan for soft soil areas with low bearing capacity through precise process parameters, and monitors the operation of the jet pump through an automatic monitoring system to ensure that the required injection volume is achieved; the three-axis mixing pile construction method provided in this embodiment improves construction efficiency and quality, solves a major technical problem of dry dock construction in soft soil areas, and has important practical application value for immersed tube tunnel projects with similar geological conditions.

[0066] In some embodiments, during the drilling, mixing and lifting steps, the cement slurry sprayed by the spray pump is transported by the slurry pump. When the real-time spraying amount is less than the minimum spraying amount, the transport amount is adjusted by adjusting the control valve of the slurry pump to adjust the real-time spraying amount. By adjusting the control valve of the slurry pump, the transport amount of the cement slurry is accurately controlled to ensure that the real-time spraying amount reaches the minimum spraying amount requirement, thereby ensuring the construction quality.

[0067] In some embodiments, the drilling, mixing and lifting steps further include monitoring the cement consumption by an automatic monitoring system. The cement consumption per unit time is calculated using formula (2), which is expressed as:

[0068] (2);

[0069] In formula (2), is the cement consumption per unit time, is the bulk density of cement. By accurately calculating the cement consumption per unit time, it is ensured that the cement consumption of each work shift meets the design requirements.

[0070] In some embodiments, each work shift calculates the daily cement consumption based on the cement consumption per unit time to ensure that the cement consumption meets the design requirements.

[0071] In some embodiments, during the pile driver placement step, Figure 2 As shown, the pile overlap of the triaxial mixing pile 401 is calculated using formula (3), and the expression of formula (3) is:

[0072] (3);

[0073] In formula (3), is the pile overlap amount; is the pile length; is the allowable deviation of the verticality of the pile body, which is 0.5% here. The construction quality is guaranteed by accurately calculating the overlap of the pile positions.

[0074] In some embodiments, during the construction of the three-axis mixing pile 401, each work shift works continuously, and when the shift alternation rest time exceeds the final setting time of the mixed soil in the pile, the pile position overlap is increased by at least 100 mm. It can be understood that in this embodiment, the mixed soil refers to the mixed mixture of cement and original soil.

[0075] Based on the above-mentioned three-axis mixing pile construction method, the present invention also provides a dry dock water stop system constructed using the three-axis mixing pile 401. The dry dock is built near the river. Figure 3As shown, the dry dock water stop system includes a steel pipe pile wall 1, an underground continuous wall 3, an anti-seepage wall 2 and a water stop curtain 4; wherein the steel pipe pile wall 1 is built at the dock entrance; the underground continuous wall 3 is built at both ends of the steel pipe pile wall 1 and extends along the river channel direction, and the underground continuous wall 3 is detachably connected to the steel pipe pile wall 1; Figure 4 As shown, the anti-seepage wall 2 is built close to the steel pipe pile wall 1 on the river side of the steel pipe pile wall 1; the water-stop curtain 4 is built around the dry dock and connected to the underground continuous wall 3; the water-stop curtain 4 includes a three-axis mixing pile 401 built around the dry dock, and the three-axis mixing pile 401 is constructed using the above-mentioned three-axis mixing pile construction method; Figure 5 As shown, high-pressure jet grouting piles are constructed at the connection between the water-stop curtain 4 and the underground continuous wall 3 to stop water.

[0076] In the above-mentioned schematic embodiment, the dry dock water-stopping system provided in the embodiment of the present invention, which is constructed by using three-axis mixing piles 401, provides a solid physical barrier for the dock entrance through the steel pipe pile wall 1, effectively preventing the direct intrusion of river water; the integrity of the water-stopping system is enhanced by the underground continuous wall 3, and the detachable connection between the underground continuous wall 3 and the steel pipe pile wall 1 not only ensures the stability of the structure, but also facilitates the removal of the steel pipe pile wall 1 in the future; the anti-seepage effect of the steel pipe pile wall 1 is further enhanced by the anti-seepage wall 2, especially on the side facing the river, to resist the penetration pressure of the river water; the water-stopping curtain 4 adopts the three-axis mixing pile construction method to provide a solid waterproof barrier around the dry dock, effectively preventing the penetration of groundwater and river water; the high-pressure rotary jet piles at the connection between the water-stopping curtain 4 and the underground continuous wall 3 further seal the potential leakage points, ensuring the tightness of the entire water-stopping system. In summary, the dry dock water-stopping system provided in this embodiment greatly improves the water-stopping and anti-seepage capabilities of the dry dock through comprehensive protection with multiple levels and multiple means, and provides a strong guarantee for the safe construction of the immersed tube tunnel project.

[0077] In some embodiments, Figure 3 As shown, in the area where the construction height is limited, the water-stop curtain 4 is constructed using a plastic concrete wall 402 under a high-voltage line. Compared with the three-axis mixing pile 401, the height and thickness of the plastic concrete wall can be more flexibly adjusted according to the site conditions.

[0078] Furthermore, in the water-stop curtain 4, high-pressure rotary jet piles are added at the joints between the three-axis mixing piles 401 and the plastic concrete wall for cold seam treatment. Through the cold seam treatment, potential water leakage channels are effectively closed, further improving the sealing and waterproofing effect of the water-stop curtain 4.

[0079] Based on the above-mentioned dry dock waterstop system constructed by using the three-axis mixing pile 401, the present invention also provides a construction method of the dry dock waterstop system constructed by using the three-axis mixing pile 401, which is applied to the above-mentioned dry dock waterstop system constructed by using the three-axis mixing pile 401, including revetment waterstop construction and waterstop curtain construction; specifically,

[0080] Bank protection and water stopping construction: carry out the construction of underground continuous wall 3, steel pipe pile wall 1, and anti-seepage wall 2 in sequence; determine the pile insertion depth of underground continuous wall 3, steel pipe pile wall 1, and anti-seepage wall 2 according to the permeability coefficient and bearing capacity of the soft soil layer; specifically, the underground continuous wall 3, steel pipe pile wall 1, and anti-seepage wall 2 should be inserted until the permeability coefficient is not greater than 4.0*10 -4 cm / s and the bearing capacity is not less than 2200Kpa.

[0081] Waterstop curtain construction: Three-axis mixing pile 401 is used to construct waterstop curtain 4. High-pressure rotary jet pile is used to stop water at the connection between three-axis mixing pile 401 and underground continuous wall 3. The bottom elevation of high-pressure rotary jet pile is consistent with the bottom elevation of three-axis mixing pile 401.

[0082] In some embodiments, Figure 3 As shown, in the area where the construction height is limited, the water-stop curtain 4 is constructed using a plastic concrete wall 402 under a high-voltage line, such as Figure 6 As shown, the construction of the plastic concrete wall 402 under the high-voltage line includes the following steps:

[0083] Lower the construction surface elevation: The construction surface elevation of the three-axis mixing pile 401 is , excavate the foundation pit in the area with limited construction height to meet the construction height of the plastic concrete wall. The construction surface elevation of the plastic concrete wall is , ;

[0084] One-time grooving: Use a grooving machine at an elevation of The construction surface is to be grooved;

[0085] Backfilling the foundation pit: Backfill the foundation pit excavated in the step of lowering the construction surface elevation to the elevation ;

[0086] Secondary trenching: Use an excavator to dig at an elevation of Trench construction is carried out on the construction surface.

[0087] In the above-mentioned schematic embodiment, since the existing excavators are unable to perform operations at a great depth, the elevation of the construction surface is lowered by excavating the foundation pit. A trenching machine is first used to perform trenching construction, and then an excavator is used to perform trenching operations at a small depth. This overcomes the limitation of the construction height, ensures the structural stability and waterproofness of the plastic concrete wall, and provides an effective solution for the construction of the water-stop curtain 4 under special conditions.

[0088] It should be noted that the connection between the three-axis mixing pile 401 and the plastic concrete wall 402 under the high-voltage line is treated with a high-pressure jet grouting pile for cold joint treatment. Each group of cold joint treatments uses three high-pressure jet grouting piles, which are arranged in a "pin" shape. Through the cold joint treatment, potential water leakage channels are effectively sealed, further improving the sealing performance and waterproof effect of the cut-off wall 4.

[0089] Embodiment 1

[0090] The following describes the dry dock construction process for the precast of inland river immersed tubes provided by the present invention in combination with the dry dock construction of an inland river immersed tube tunnel project in the Pearl River Delta region:

[0091] In this embodiment, the geological conditions at the project location are complex, the groundwater level is high, and there is a high-voltage line passing through, making the project construction very difficult. After investigation, the soil layers in the field area are distributed as follows: artificial fill, silt, silty clay, silty fine sand, fine sand, medium sand, strongly weathered argillaceous siltstone, moderately weathered argillaceous siltstone. The properties such as the cohesion, internal friction angle, and water content of the soil between the rock layers vary greatly, and it is difficult to control the uniformity and verticality of the pile body, and it is difficult to control the construction quality; among them,

[0092] Artificial fill layer: The layer thickness is 0.50 - 5.00 m, with an average layer thickness of 1.65 m, and it is class I loose soil;

[0093] Silt layer: The layer thickness is 1.00 - 18.30 m, with an average layer thickness of 7.29 m, and it is class I loose soil;

[0094] Silty clay layer: The buried depth is 10.80 - 36.80 m, the layer thickness is 0.80 - 13.90 m, with an average layer thickness of 4.44 m, and it is class II ordinary soil;

[0095] Silty fine sand layer: The buried depth is 0.40 - 27.80 m, the layer thickness is 2.20 - 24.50 m, with an average layer thickness of 9.87 m, and it is class I loose soil;

[0096] Fine sand layer: The buried depth is 1.80 - 33.40 m, the layer thickness is 2.20 - 32.10 m, with an average layer thickness of 10.22 m, and it is class I loose soil;

[0097] Medium sand layer: The buried depth is 1.60 - 40.60 m, the layer thickness is 1.70 - 17.30 m, with an average layer thickness of 6.01 m, and it is class I loose soil;

[0098] Strongly weathered argillaceous siltstone layer: Most of the buried depth is 17.40 - 38.70 m, the layer thickness is 1.40 - 16.90 m, with an average layer thickness of 7.92 m, and some boreholes are not penetrated, and it is class IV soft rock;

[0099] Moderately weathered muddy siltstone layer: The rock is relatively soft, RQD=40%~80%, buried at a depth of 20.40~45.60m, and this layer has not been exposed, it is a Grade V secondary hard rock.

[0100] According to the survey, the permeability coefficient of the above soft soil and rock layers from top to bottom is no more than 5.2*10 -4 The rock layer with a permeability of less than 4.0*10 -4 The rock layer with a bearing capacity of not less than 2200Kpa is a medium-weathered muddy siltstone layer.

[0101] The construction method of the dry dock water stop system constructed by using the three-axis mixing pile 401 in this embodiment is used to illustrate the three-axis mixing pile construction method, the dry dock water stop system constructed by using the three-axis mixing pile 401, and the dry dock water stop system construction method constructed by using the three-axis mixing pile 401 provided by the present invention, including the following construction steps:

[0102] 1. Bank protection and water stopping construction: Figure 4 As shown, the construction of underground continuous wall 3, steel pipe pile wall 1 and anti-seepage wall 2 is carried out in sequence; the underground continuous wall 3, steel pipe pile wall 1 and anti-seepage wall 2 are piled until the permeability coefficient is not greater than 4.0*10 -4 cm / s, and a rock layer with a bearing capacity of not less than 2200Kpa, that is, a medium-weathered muddy siltstone layer in this embodiment;

[0103] It should be noted that a detachable lock is provided at the connection between the underground continuous wall 3 and the steel pipe pile wall 1. During construction, a lock is embedded at the connection between the underground continuous wall 3 and the steel pipe pile wall 1. During the construction of the steel pipe pile wall 1, a lock matching the embedded lock is connected. When the underground continuous wall 3 and the steel pipe pile wall 1 are trenched, the trenching construction of the steel pipe pile wall 1 is carried out in two stages, including trenching of the surface soft soil and trenching of the rock layer, taking into account the particularity of the geological conditions; specifically, the trenching of the surface soft soil is constructed to the silty clay, and the trench is excavated using a hydraulic grab. For the upper silt layer, an excavator can be used to first clean the trench, clean the exposed guide wall contour, and fully trim the current trench section dividing line, and then use a hydraulic grab to trench; the trenching of the rock layer is constructed to the medium-weathered mud siltstone layer, and a double-wheel trenching machine is used for trenching. The anti-seepage wall 2 is constructed with plastic concrete wall, which is cast in sections during construction, and the length of each section is divided according to the length of the slot section. The slot sections are connected by joint pipes, which are inserted into the slot in advance and close to the edge of the slot section.

[0104] 2. Water-stop curtain construction: Figure 1 As shown, a three-axis mixing pile 401 is used to construct the water-stop curtain 4. Figure 5As shown, the connection between the three-axis mixing pile 401 and the underground continuous wall 3 is sealed with a high-pressure rotary jet pile, and the bottom elevation of the high-pressure rotary jet pile is consistent with the bottom elevation of the three-axis mixing pile 401. In this embodiment, the three-axis mixing pile 401 is constructed to a permeability coefficient of no more than 5.2*10 -4 cm / s, namely, the strongly weathered muddy siltstone layer in this embodiment.

[0105] 2-1. Before the construction of triaxial mixing pile 401, a trial pile is carried out to summarize the construction parameters suitable for the geological conditions of the project site, such as Figure 3 As shown in the figure, a straight-line test pile is arranged at the test pile location on the east side of the dry dock. Figure 7 As shown, the diameter of the three-axis mixing pile 401 is 850mm, the pile spacing is 600mm, the inter-pile bite length is 250mm, the pile top elevation is +1.00m, and the pile bottom elevation is -17m; there are 4 groups of test piles, 3 sections in each group, and a total of 12 sections. The cement slurry water-cement ratio of the test pile is prepared according to 0.7, and the cement content and construction process are controlled by variables. The statistical table of the test pile process and cement content of the 12 piles is shown in Table 1;

[0106] Table 1 Pile test process and cement content statistics

[0107]

[0108] 28 days after the completion of the trial pile construction, the pile body shall be drilled and cored to detect the strength of the pile body; the number of inspections shall not be less than 1% of the total number of piles, and shall not be less than 3 points. According to the design requirements of this project, the 28-day unconfined compressive strength of the three-axis mixing pile 401 shall not be less than 1.2MPa. After testing, the quality of the piles of group 1 trial piles is the best. Therefore, the cement content of the cement slurry in this embodiment should be 20%, and the three-axis mixing pile 401 should be constructed using a two-spraying and two-mixing process.

[0109] 2-2. The construction of the three-axis mixing pile 401 includes the following steps:

[0110] Survey and set out: lay out the driving width according to the design data, measure the ground elevation on site, and determine the pile top elevation;

[0111] Trench excavation: Use an excavator to excavate a trench according to the center line of the three-axis mixing pile 401. The trench width is 1.0m and the depth is 0.5-1.0m. Remove underground obstacles and deal with the remaining soil in the trench in time to ensure the pile driver can move horizontally.

[0112] Pile driver in position: The on-site construction personnel and the pile driver team leader shall command the pile driver in position. Before moving, check the front, back, left and right positions clearly. If any obstacles are found, they shall be removed in time. After the movement is completed, check the positioning and correct them in time. After the pile is formed, the center deviation of the pile shall not exceed 50mm, the pile length deviation shall be controlled within the range of +100mm and -50mm, the pile top elevation deviation shall be controlled within the range of +100mm and -50mm, the pile bottom elevation deviation shall not exceed 100mm, the pile diameter deviation shall be less than 0.04D, and the pile body verticality deviation shall not exceed 0.5%. The pile overlap of the three-axis mixing pile 401 is calculated using formula (3). The expression of formula (3) is:

[0113] (3);

[0114] In formula (3), is the pile overlap amount; is the pile length; is the allowable deviation of the verticality of the pile body, which is taken as 0.5% here;

[0115] Preparation of cement slurry and grouting: automatic mixing system and cement tank are equipped at the construction site to ensure the quality of slurry; the cement for the pile body adopts P.0 42.5 grade ordinary Portland cement, the water-cement ratio of cement slurry is 0.7, the cement content is 20%, and the grouting pressure is 0.6-0.8MPa; the 28-day unconfined compressive strength of the reinforced solid is required to be no less than 1.2MPa; after the cement slurry is prepared, the stagnation time of the cement slurry shall not exceed 2 hours, and the cement slurry that has been left for more than 2 hours shall be treated as waste slurry;

[0116] Drilling, mixing and lifting: The three-axis mixing pile 401 adopts the construction process of "two spraying and two mixing". Figure 1 As shown in the figure, the construction sequence of double-hole full-set remixing pile formation with alternate piles is adopted; cement and original soil are uniformly mixed, and the sinking speed is 0.5-0.6 m / min. The drill bit sprays and sinks to the designed depth. After mixing and spraying at the bottom of the pile for 1 minute, it is uniformly mixed and lifted and sprayed at a lifting speed of 0.9-1.0 m / min. When the drill bit is lifted to 0.5 m below the ground, the spraying is stopped; during the spraying, the automatic monitoring system is used to monitor the real-time injection volume of the spraying pump, and the real-time injection volume is not less than the minimum injection volume. The cement slurry sprayed by the spraying pump is transported by the slurry pump. When the real-time injection volume is less than the minimum injection volume, the delivery volume is adjusted by adjusting the control valve of the slurry pump to adjust the real-time injection volume; the minimum injection volume is calculated using formula (1). During the construction of three-axis mixing pile 401, each work shift works continuously. When the shift alternation stop time exceeds the final setting time of the mixed soil in the pile, the pile position overlap is increased by at least 100 mm. The expression of formula (1) is:

[0117] (1);

[0118] In formula (1), is the minimum injection amount, is the pile diameter, is the cement content, is the soil bulk density, is the water-cement ratio, is the real-time sinking speed or the real-time lifting speed; in this embodiment, Take 20%, Take the survey average value of 1.8, Take 0.7;

[0119] The cement consumption is monitored by the automatic monitoring system. Each work shift calculates the cement consumption for the day based on the cement consumption per unit time to ensure that the cement consumption meets the design requirements. The cement consumption per unit time is calculated using formula (2), which is expressed as:

[0120] (2);

[0121] In formula (2), is the cement consumption per unit time, is the cement bulk density; in this embodiment, the cement bulk density is 2.0-2.2.

[0122] It should also be noted that if the slurry is stopped for some reason during construction, the mixer head should be raised or lowered 0.5m before resuming the slurry spraying and mixing construction. The time interval for the overlapping construction of mixing piles should not be greater than 24 hours. If it exceeds 24 hours, the mixing speed should be slowed down during the overlapping construction. If the overlap is impossible or the overlap is poor, cold joint treatment should be performed. Once a cold joint appears during the construction process, a new pile should be added on the outside of the mixing pile at the cold joint. The new pile should be added before the original mixing pile reaches a certain strength to prevent eccentric drilling and ensure the overlapping effect. The overlapping thickness of the new pile and the original mixing pile should not be less than 100mm. Figure 2 As shown, in this embodiment, the overlap thickness between the supplementary pile and the original mixing pile is 250mm.

[0123] 2-3. The high-pressure jet grouting pile construction at the connection between the three-axis mixing pile 401 and the underground continuous wall 3 includes the following steps:

[0124] Measurement and positioning: After the site is leveled, use GPS to locate the center of the high-pressure jet grouting pile, and use bamboo poles to mark the specific location of the point;

[0125] Drilling rig in place: install the drilling rig on the designed hole position, align the axis of the drill rod vertically with the center of the hole, the actual pile position deviation is no more than 50mm, and the verticality deviation is no more than 0.5%;

[0126] Drilling: The purpose of drilling is to insert the jet grouting pipe into the predetermined stratum. Use XY-150 geological drilling machine for drilling. Drill to 0.5m below the pile bottom elevation. During the drilling process, core extraction is performed at regular intervals to determine whether the drilled hole has entered the predetermined depth of the impermeable layer at the bottom of the foundation pit as required by the design. When drilling, the vertical deviation of the drilled hole is controlled to be no more than 1%;

[0127] Preparation of cement slurry: The slurry for high-pressure jet grouting piles uses cement slurry with a water-cement ratio of 0.8. The cement must be sieved, and in order to prevent cement segregation, it should be stirred continuously in the mortar machine. In order to ensure the concentration of the slurry, the slurry should be prepared by secondary mixing, that is, the cement slurry should be prepared and mixed in the mixer according to the determined water-cement ratio. After mixing for 3 to 5 minutes, put it into the second mixing bucket for use; it is forbidden to use one mixing bucket to prepare the slurry while pumping the slurry, otherwise it will be difficult to control the water-cement ratio of the slurry;

[0128] Jet grouting: Start the drill while rotating and drilling, and stop drilling when the design elevation is reached. When the double-tube nozzle reaches the predetermined depth of the soil layer, a coaxial double nozzle on the side of the bottom of the tube simultaneously sprays high-pressure slurry and air and two medium jets to impact and cut the soil. That is, a high-pressure generating device such as a high-pressure grouting pump sprays slurry with a pressure of about 25Mpa from the inner nozzle. And the compressed air is sprayed from the outer nozzle at a pressure of 0.65Mpa. Under the combined effect of the high-pressure slurry flow and the surrounding airflow, the energy of cutting the soil is significantly increased, and the nozzle sprays and rotates while lifting, and finally a cylindrical solid structure is formed in the soil.

[0129] It should be noted that when spraying, the predetermined spraying pressure should be reached first, and the spraying should be rotated for about 10 seconds until the grouting at the hole mouth is normal before spraying and lifting. After the cement slurry and the soil at the pile end are fully mixed, the grouting pipe is lifted by rotating in the reverse direction at a uniform speed while spraying until it is 2 to 3 meters away from the top of the pile. The low-pressure grouting method is adopted to prevent the occurrence of grouting. When a fault occurs in the middle, the lifting and rotary spraying should be stopped to prevent the pile body from being interrupted. At the same time, the fault should be checked and eliminated immediately. The overlap between the hole section and the previous section when the spraying grouting is restarted should be not less than 1m to prevent the consolidation body from being disconnected. In order to ensure that the soil within the reinforcement range can be mixed evenly before effective cutting and the pile diameter reaches the required parameters, when the construction of the same pile is stopped for some reason, the pile connection measures must be well prepared. Generally, the length of the pile connection is greater than 0.5m. When the pile driver drill rod is removed, it sinks to 0.2m below the grouting stop surface. After the grouting supply is restored, the grouting and lifting are sprayed to ensure that every depth within the reinforcement range is fully sprayed.

[0130] 2-4, such as Figure 3 As shown, in the area where the construction height is limited, the water-stop curtain 4 is constructed using a plastic concrete wall 402 under a high-voltage line. If necessary, the trenching machine is modified to reduce the height of the trenching machine boom to meet the construction height. Figure 6As shown in the figure, the construction of the plastic concrete wall 402 under the high-voltage line includes the following steps:

[0131] Lower the construction surface elevation: Denote the construction surface elevation of the three-axis mixing pile 401 as , and excavate the foundation pit in the area with limited construction height to meet the construction height of the plastic concrete wall. Denote the construction surface elevation of the plastic concrete wall as , ;

[0132] First trench forming: Use a trench-forming machine to perform trench-forming construction on the construction surface with an elevation of ;

[0133] Foundation pit backfilling: Backfill the foundation pit excavated in the step of lowering the construction surface elevation to the elevation of ;

[0134] Second trench forming: Use an excavator to perform trench-forming construction on the construction surface with an elevation of ;

[0135] It should be noted that the connection between the three-axis mixing pile 401 and the plastic concrete wall 402 under the high-voltage line is treated with cold joints using high-pressure jet grouting piles. Each group of cold joint treatments uses three high-pressure jet grouting piles, and the high-pressure jet grouting piles are arranged in a "pin" shape.

[0136] Through the description of multiple embodiments of the dry dock water stop system, construction method and construction method of the three-axis mixing pile of the water stop system of the present invention, it can be seen that the embodiments of the dry dock water stop system, construction method and construction method of the three-axis mixing pile of the water stop system of the present invention have at least one or more of the following advantages:

[0137] 1. The construction method of the three-axis mixing pile provided by the present invention provides a feasible construction plan for the soft soil layer area with low bearing capacity through precise process parameters;

[0138] 2. The construction method of the three-axis mixing pile provided by the present invention monitors the operation of the injection pump through an automatic monitoring system to ensure that the required injection volume is reached;

[0139] 3. The construction method of the three-axis mixing pile provided by the present invention improves the construction efficiency and quality, solves a major technical problem in the dry dock construction in the soft soil layer area, and has important practical application value for the immersed tube tunnel project under similar geological conditions;

[0140] 4. The dry dock water stop system and construction technology using the three-axis mixing pile 401 provided by the present invention greatly improve the water stop and anti-seepage ability of the dry dock through multi-level and multi-means comprehensive protection, providing a strong guarantee for the safe construction of the immersed tube tunnel project.

[0141] Finally, it should be noted that: the various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.

[0142] The above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the specific implementation methods of the present invention can still be modified or some technical features can be replaced by equivalents without departing from the spirit of the technical solution of the present invention, which should be included in the scope of the technical solution for protection of the present invention.

Claims

1. The three-axis mixing pile construction method of the water-stop system is suitable for soft soil areas with low bearing capacity. It is characterized in that According to the permeability coefficient of the soft soil layer, the depth of the three-axis mixing pile is determined. The construction method of the three-axis mixing pile includes the following steps: Pile driver positioning: The on-site construction personnel and the pile driver team leader shall command the pile driver to position. Before moving, check the front, back, left and right positions clearly. If any obstacles are found, they shall be removed in time. After the movement is completed, check the positioning and correct them in time. After the pile is formed, the center deviation of the pile shall not exceed 50mm, the elevation deviation of the pile bottom shall not exceed 100mm, and the verticality deviation of the pile body shall not exceed 0.5%. The pile overlap of the three-axis mixing pile is calculated using formula (3), which is expressed as follows: (3); In formula (3), is the pile overlap amount; is the pile length; is the allowable deviation of the verticality of the pile body, which is taken as 0.5% here; Preparation of cement slurry and grouting: automatic mixing system and cement tank are equipped at the construction site to ensure the quality of slurry; the water-cement ratio of cement slurry is 0.7, the cement content is 20%, and the grouting pressure is 0.6-0.8MPa; the 28-day unconfined compressive strength of the reinforced solid is required to be no less than 1.2MPa; after the cement slurry is prepared, the stagnation time of cement slurry shall not exceed 2 hours, and cement slurry that has been left for more than 2 hours shall be treated as waste slurry; Drilling, mixing and lifting: The three-axis mixing pile adopts the "two spraying and two mixing" construction process, and adopts the full set of re-mixing pile construction sequence of alternate pile jumping and double-hole drilling; the cement and original soil are evenly mixed, and the sinking speed is 0.5-0.6m / min. The drill bit is sprayed and sunk to the designed depth. After mixing and spraying at the bottom of the pile for 1 minute, it is uniformly mixed and lifted and sprayed. The lifting speed is 0.9-1.0m / min. When the drill bit is lifted to 0.5m below the ground, the spraying is stopped; the cement slurry sprayed by the spraying pump is transported by the slurry pump. During the spraying, the automatic monitoring system is used to monitor the real-time spraying volume of the spraying pump, and the real-time spraying volume is not less than the minimum spraying volume; when the real-time spraying volume is less than the minimum spraying volume, the delivery volume is adjusted by adjusting the control valve of the slurry pump to adjust the real-time spraying volume; the cement consumption is monitored by the automatic monitoring system; The minimum injection amount is calculated using formula (1), which is expressed as: (1); In formula (1), is the minimum injection amount, is the pile diameter, is the cement content, is the soil bulk density, is the water-cement ratio, It is the real-time sinking speed or the real-time lifting speed; The cement consumption per unit time is calculated using formula (2), which is expressed as: (2); In formula (2), is the cement consumption per unit time, is the bulk density of cement.

2. The water-stop system three-axis mixing pile construction method according to claim 1, It is characterized in that Each work shift calculates the daily cement consumption based on the cement consumption per unit time to ensure that the cement consumption meets the design requirements.

3. The water-stop system three-axis mixing pile construction method according to claim 1, It is characterized in that During the construction of three-axis mixing piles, each work shift works continuously. When the rest time between shifts exceeds the final setting time of the mixed soil in the pile, the overlap of the pile position shall be increased by at least 100mm.

4. Dry dock water stop system, dry dock is built near the river, It is characterized in that include: Steel pipe pile wall, which is built at the dock entrance; Underground continuous wall, which is built at both ends of the steel pipe pile wall and extends along the river direction, and the underground continuous wall and the steel pipe pile wall are detachably connected; The anti-seepage wall is built close to the steel pipe pile wall on the river side of the steel pipe pile wall; A water-stop curtain is constructed around a dry dock and connected to an underground continuous wall; the water-stop curtain comprises three-axis mixing piles constructed around the dry dock, and the three-axis mixing piles are constructed using the three-axis mixing pile construction method for a water-stop system as described in any one of claims 1 to 3; high-pressure rotary jet piles are constructed at the connection between the water-stop curtain and the underground continuous wall for water-stopping.

5. The dry dock water stopping system according to claim 4, It is characterized in that In areas where construction height is restricted, water-stop curtains are constructed using plastic concrete walls.

6. Construction method of dry dock water stop system, It is characterized in that The dry dock water stopping system as claimed in claim 5 comprises the following steps: Bank protection and water stopping construction: carry out the construction of underground continuous wall, steel pipe pile wall and anti-seepage wall in sequence; determine the pile insertion depth of underground continuous wall, steel pipe pile wall and anti-seepage wall according to the permeability coefficient and bearing capacity of the soft soil layer; Waterstop curtain construction: Three-axis mixing piles are used for waterstop curtain construction. High-pressure rotary jet piles are used for waterstopping at the connection between the three-axis mixing piles and the underground continuous wall. The bottom elevation of the high-pressure rotary jet piles is consistent with the bottom elevation of the three-axis mixing piles.

7. The dry dock water stop system construction method according to claim 6, It is characterized in that In areas where construction height is limited, the water-stop curtain is constructed using plastic concrete walls. The construction of the plastic concrete wall includes the following steps: Lower the construction surface elevation: The construction surface elevation of the three-axis mixing pile is , excavate the foundation pit in the area with limited construction height to meet the construction height of the plastic concrete wall. The construction surface elevation of the plastic concrete wall is , ; One-time grooving: Use a grooving machine at an elevation of The construction surface is to be grooved; Backfilling the foundation pit: Backfill the foundation pit excavated in the step of lowering the construction surface elevation to the elevation ; Secondary trenching: Use an excavator to dig at an elevation of Trench construction is carried out on the construction surface.