A linkage protection circuit after arc detection

By using the CPU to identify the nature of the product under test and execute the boost drive in the linkage protection circuit after arc detection, the problem of secondary damage caused by arcs to equipment and the product under test during high-voltage testing is solved, and the intelligent containment and safety of arcs are realized. Protect.

CN118589410BActive Publication Date: 2024-10-01QINGDAO RUIJIE INTELLIGENT INSTR
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411066689.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-10-01
Estimated Expiration
2044-08-06

AI Technical Summary

Technical Problem

In high-voltage testing, the generation of arc will cause damage to the test instrument and the product under test, and since the impact of the arc on the product under test is one-way and irreversible, it is difficult for the existing technology to effectively curb the continuous arcing of the arc, and the high-voltage DC The residual strong charge after the test will cause secondary damage to the equipment and the product under test.

Method used

A linkage protection circuit after arc detection is designed, including an arc analysis and detection module, a boost drive module and a protection output module. The CPU processes the arc signal, identifies the nature of the product under test, and generates a boost drive signal based on its properties. Perform AC signal boosting operation to reduce the harm of arc to the DUT.

Benefits of technology

It realizes intelligent identification and protection after arc generation, and performs charge discharge operations at different times according to the capacitance or resistance properties of the product under test, reducing the continuous harm of arc to the equipment and the product under test, and improving the safety of use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118589410B_ABST
    Figure CN118589410B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of arc detection, and discloses a linkage protection circuit after arc detection, including an arc analysis detection module, a boost drive module, a protection output module and a product under test; the output end of the arc analysis detection module is connected to the input end of the boost drive module, the output end of the boost drive module is connected to the input end of the protection output module, the output end of the protection output module is connected to the product under test, and the product under test is connected to the arc analysis detection module. After the arc is found, the present invention can identify the properties of the product under test, perform different protections on the product under test, and reduce the continuous harm of the arc to the equipment or the product under test. The arc analysis detection module and the boost drive module can intelligently identify the load characteristics and the range of the capacitive load, trigger different time discharge charges to efficiently and quickly realize arc protection, and simultaneously monitor in real time during the protection process, so that the user can use the device safely.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of arc detection, and in particular to a linkage protection circuit after arc detection. Background Art

[0002] In high-voltage testing, due to the uneven insulation performance of the tested products, electric sparks and arcs often occur. There are already many arc detection instruments on the market to identify the generation of arcs and alarm, but the generation of arcs will damage the arc test instrument itself and the tested items, and because the impact of arcs on the tested products is unidirectional and irreversible, when an arc is generated, it is extremely necessary to effectively curb the continuous arcing of the arc according to the different characteristics of the tested products, and reduce the damage of the arc to the instruments and the tested products.

[0003] In the prior art, although arc detection is performed on high-voltage tests, only an alarm is issued and the test is stopped after the arc detection, and the test is stopped at the source. For high-voltage DC testing, since the output of the equipment has inductive characteristics, the output cannot be stopped immediately, and the inductive current cannot change suddenly. Therefore, even if the output is stopped at the source, there will be residual strong charge to continue to be output, causing secondary damage to the product or instrument under test.

[0004] From the perspective of the product under test, if the product under test has capacitive or inductive characteristics, a certain amount of charge will be stored inside and cannot be completely released. It is necessary to distinguish between the capacitive and resistive properties of the product under test. The reason for the difference is that due to high-voltage testing, the voltage is relatively high. For the capacitive product under test, there is a risk of storing charge, which poses a certain risk of shock to operators or equipment users. Therefore, different products under test (capacitive, resistive) require different linkage methods. Summary of the invention

[0005] The embodiment of the present invention provides a linkage protection circuit after arc detection to solve the problem of charge storage risk in the prior art of a capacitive product under test.

[0006] In order to have a basic understanding of some aspects of the disclosed embodiments, a brief summary is given below. This summary is not a general review, nor is it intended to identify key / important components or to describe the scope of protection of these embodiments. Its only purpose is to present some concepts in a simple form as a prelude to the detailed description that follows.

[0007] According to an embodiment of the present invention, a linkage protection circuit after arc detection is provided, comprising: an arc analysis and detection module, a boost drive module, a protection output module and a product under test; the output end of the arc analysis and detection module is connected to the input end of the boost drive module, the output end of the boost drive module is connected to the input end of the protection output module, the output end of the protection output module is connected to the product under test, and the product under test is connected to the arc analysis and detection module;

[0008] The arc analysis and detection module is used to detect the output voltage and current of the arc signal using the CPU central processor, and to generate a boost drive signal after distinguishing the properties of the tested product and the arc alarm signal according to the detection results;

[0009] The boost driving module is used to analyze the boost driving signal generated by the arc analysis and detection module, and drive the protection output module according to the analysis result;

[0010] The protection output module is used to perform an AC signal boost operation according to the driving signal of the boost driving module, and flow the high voltage current to the product under test when the high voltage current is normally output;

[0011] The product under test is used to detect properties of the product by the arc analysis and detection module after an arc occurs, and to form a linkage protection based on the boost operation result of the protection output module.

[0012] In one embodiment, the arc analysis and detection module includes a CPU, a chip U3, an operational amplifier U2, an operational amplifier U1, an operational amplifier U5, a capacitor C1, a resistor R1, a resistor R2, a resistor R3, a relay K2, a resistor R67, and a resistor R54;

[0013] The first pin of the CPU is connected to the first pin, the third pin, the fifth pin, the eighth pin and the fourth pin of the chip U3 respectively, the ninth pin of the chip U3 is connected to the sixth pin of the operational amplifier U2 and one end of the resistor R67 respectively, and the tenth pin of the chip U3 is connected to the sixth pin and the second pin of the operational amplifier U5 respectively;

[0014] The other end of the resistor R67 is connected to one end of the resistor R54 and the second pin of the operational amplifier U2 respectively, and the other end of the resistor R54 is grounded, and the third pin of the operational amplifier U2 is connected to the sixth pin and the second pin of the operational amplifier U1 respectively;

[0015] The third pin of the operational amplifier U1 is connected to one end of the capacitor C1, the other end of the capacitor C1 is respectively connected to one end of the resistor R3 and the loop end of the product under test, and the third pin of the operational amplifier U5 is connected to the loop end of the product under test;

[0016] The other end of the resistor R3 is connected to one end of the resistor R1 and grounded, the other end of the resistor R1 is connected to one end of the resistor R2, the other end of the resistor R2 is connected to one end of the relay K2, and the other end of the relay K2 is connected to the protection output module.

[0017] In one embodiment, the capacitor C1 and the resistor R3 form a high-pass filter using the characteristics of capacitor passing AC and blocking DC, and the second pin and the sixth pin of the operational amplifier U1 are connected to form a voltage follower;

[0018] The AC voltage at the resistor R3 is sampled by a voltage follower, and after being amplified in phase by the operational amplifier U2, it is transmitted to the CPU through SPI communication for processing to obtain an AC voltage value.

[0019] In one embodiment, the second pin and the sixth pin of the operational amplifier U5 are connected to form a voltage follower, and the voltage follower is used to sample the current signal on the resistor R3;

[0020] The sampled current signal is transmitted to the CPU via SPI communication for processing to obtain the loop current, and the impedance of the measured product is obtained according to the loop current and the output voltage.

[0021] In one embodiment, the property identification of the tested product includes:

[0022] The ratio is calculated by using the resistor R3 and the impedance of the measured product. k 1:

[0023] The output ripple is obtained according to the output voltage, and the ratio is calculated by using the AC voltage value and the voltage value of the output ripple to obtain the ratio k 2;

[0024] When the ratio k 2 Greater than the proportion k 1, the measured product is a capacitive load. k 2 and proportion k 1When the difference is within the preset range, the measured product is a resistive load.

[0025] In one embodiment, the first pin of the boost driving module is connected to the second pin of the CPU, and the second pin and the third pin of the boost driving module are both connected to the protection output module.

[0026] In one embodiment, the protection output module includes an AND gate U4, a relay K1, a transformer T1 and a diode D1;

[0027] The first pin of the AND gate U4 is connected to the third pin of the CPU, the second pin of the AND gate U4 is connected to one end of the relay K1, the other end of the relay K1 is respectively connected to the second pin of the boost drive module and the first pin of the transformer T1, and the second pin of the transformer T1 is connected to the third pin of the boost drive module;

[0028] The third pin of the transformer T1 is connected to one end of the resistor R3 and grounded, the fourth pin of the transformer T1 is connected to one end of the diode D1, and the other end of the diode D1 is respectively connected to one end of the relay K2 and the high voltage output end of the tested product.

[0029] In one embodiment, the arc alarm signal and the boost drive signal control the primary output relay K1 of the transformer T1 through the AND gate U4, and trigger the disconnection of the relay K1 when the arc occurrence signal is generated;

[0030] When the circuit outputs high voltage current normally, the relay K2 is disconnected, and the high voltage direct current flows to the high voltage output end, passes through the tested product, is transferred to the loop end, and then is grounded through the resistor R3.

[0031] In one embodiment, when the property of the product under test is a capacitive load, the closing time of the relay K2 is determined according to the capacitance of the product under test.

[0032] In one embodiment, when the property of the measured product is a resistive load, the closing time of the relay K2 is 1.5 seconds, and the charge discharge operation is performed after the closing is completed.

[0033] The technical solution provided by the embodiment of the present invention may have the following beneficial effects:

[0034] After an arc is discovered, the present invention can identify the properties of the product under test, perform different protections on the product under test, and reduce the continuous harm of the arc to the equipment or the product under test. The arc analysis and detection module and the boost drive module can intelligently identify the load characteristics and the range of the capacitive load, trigger different times to discharge the charge, and realize arc protection efficiently and quickly. At the same time, real-time monitoring is performed during the protection process, so that users can use the equipment more safely.

[0035] It is to be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the invention and, together with the description, serve to explain the principles of the invention.

[0037] Figure 1 is a principle block diagram of a linkage protection circuit after arc detection according to an exemplary embodiment;

[0038] Figure 2 is a circuit diagram of a linkage protection circuit after arc detection according to an exemplary embodiment;

[0039] Figure 3 is a structural diagram of a chip U3 in a linkage protection circuit after arc detection according to an exemplary embodiment.

[0040] Reference numerals:

[0041] 1. Arc analysis and detection module; 2. Boost drive module; 3. Protection output module; 4. Tested product. DETAILED DESCRIPTION

[0042] In the absence of conflict, the embodiments of the present invention and the features of the embodiments may be combined with each other.

[0043] Figure 1 An embodiment of the linkage protection circuit after arc detection of the present invention is shown.

[0044] In this optional embodiment, the linkage protection circuit after arc detection includes an arc analysis and detection module 1, a boost drive module 2, a protection output module 3 and a product under test 4; the output end of the arc analysis and detection module 1 is connected to the input end of the boost drive module 2, the output end of the boost drive module 2 is connected to the input end of the protection output module 3, the output end of the protection output module 3 is connected to the product under test 4, and the product under test 4 is connected to the arc analysis and detection module 1;

[0045] The arc analysis and detection module 1 is used to detect the output voltage and current of the arc signal using the CPU central processor, and to generate a boost drive signal after distinguishing the properties of the tested product 4 and the arc alarm signal according to the detection results;

[0046] The boost driving module 2 is used to analyze the boost driving signal generated by the arc analysis and detection module 1, and drive the protection output module 3 according to the analysis result;

[0047] The protection output module 3 is used to perform an AC signal boost operation according to the driving signal of the boost driving module 2, and flow the high voltage current to the tested product 4 when the high voltage current is normally output;

[0048] The product under test 4 is used to detect properties of the product by the arc analysis and detection module 1 after an arc occurs, and to form a linkage protection based on the boost operation result of the protection output module 3.

[0049] Specifically, when an arc or spark occurs, the arc generation signal is input into the arc analysis and detection module 1 (CPU central processor). The CPU processor is used to detect the output voltage and current, and use an algorithm to distinguish whether the product under test 4 is of a capacitive or resistive nature and identify the arc alarm signal, and achieve rapid protection and energy discharge after the arc is generated through a combination of soft and hard methods.

[0050] In this optional embodiment, the arc analysis and detection module 1 includes a CPU, a chip U3, an operational amplifier U2, an operational amplifier U1, an operational amplifier U5, a capacitor C1, a resistor R1, a resistor R2, a resistor R3, a relay K2, a resistor R67, and a resistor R54;

[0051] like Figure 2 and Figure 3 As shown, the first pin of the CPU is respectively connected to the first pin, the third pin, the fifth pin, the eighth pin and the fourth pin of the chip U3, the ninth pin of the chip U3 is respectively connected to the sixth pin of the operational amplifier U2 and one end of the resistor R67, and the tenth pin of the chip U3 is respectively connected to the sixth pin and the second pin of the operational amplifier U5;

[0052] The other end of the resistor R67 is connected to one end of the resistor R54 and the second pin of the operational amplifier U2 respectively, and the other end of the resistor R54 is grounded, and the third pin of the operational amplifier U2 is connected to the sixth pin and the second pin of the operational amplifier U1 respectively;

[0053] The third pin of the operational amplifier U1 is connected to one end of the capacitor C1, the other end of the capacitor C1 is respectively connected to one end of the resistor R3 and the loop end of the DUT 4, and the third pin of the operational amplifier U5 is connected to the loop end of the DUT 4;

[0054] The other end of the resistor R3 is connected to one end of the resistor R1 and grounded, the other end of the resistor R1 is connected to one end of the resistor R2, the other end of the resistor R2 is connected to one end of the relay K2, and the other end of the relay K2 is connected to the protection output module 3.

[0055] Specifically, the third pin of the operational amplifier U1 is connected to the lower end of the capacitor C1, and the upper end of the capacitor C1 is connected to the right end of the resistor R3. The characteristics of the capacitor are used to pass the AC and DC characteristics to form a high-pass filter. The operational amplifier U1 forms a voltage follower to sample the AC voltage on the resistor R3, and then the operational amplifier U2 performs in-phase voltage amplification, and finally enters the 14-bit high-precision digital-to-analog conversion channel 1, and is transmitted to the CPU through SPI communication for processing to obtain the AC voltage value.

[0056] The third pin of the operational amplifier U5 is connected to the right end of the resistor R3, and the second pin of the operational amplifier U5 is connected to the sixth pin to form a voltage follower, which samples the current signal on the resistor and enters the 14-bit high-precision digital-to-analog conversion channel 2. It is transmitted to the CPU through SPI communication for processing to obtain the loop current, and the impedance of the product under test is obtained based on the loop current and the output voltage.

[0057] It needs to be explained that the CPU performs algorithm analysis based on the data transmitted by the digital-to-analog converter. The CPU uses a voltage and current sampling algorithm to determine whether the output is a capacitive load or a resistive load. When an arc occurs, the relay K2 can be quickly closed for discharge and different discharge times can be given according to different properties.

[0058] In this optional embodiment, the first pin of the boost driving module 2 is connected to the second pin of the CPU, and the second pin and the third pin of the boost driving module 2 are both connected to the protection output module 3 .

[0059] In this optional embodiment, the protection output module 3 includes an AND gate U4, a relay K1, a transformer T1 and a diode D1;

[0060] The first pin of the AND gate U4 is connected to the third pin of the CPU, the second pin of the AND gate U4 is connected to one end of the relay K1, the other end of the relay K1 is respectively connected to the second pin of the boost driving module 2 and the first pin of the transformer T1, and the second pin of the transformer T1 is connected to the third pin of the boost driving module 2;

[0061] The third pin of the transformer T1 is connected to one end of the resistor R3 and grounded, the fourth pin of the transformer T1 is connected to one end of the diode D1, and the other end of the diode D1 is respectively connected to one end of the relay K2 and the high voltage output end of the DUT 4.

[0062] Specifically, when an arc occurs, the arc is first detected by the CPU to obtain an arc occurrence signal. The arc occurrence signal and the boost drive signal given by the CPU are controlled by the AND gate U4 to output the primary side relay K1 of the transformer T1. When an arc occurrence signal is generated, the relay K1 is triggered to disconnect.

[0063] When the circuit outputs high voltage current normally, relay K2 is disconnected, and the high voltage DC flows through the output end, the DUT 4, the loop end, and the resistor R3 back to the ground.

[0064] It should be explained that the basic principle of high voltage generation is that the CPU output drives the transformer T1 through the boost drive module 2 to complete the boost of the AC signal, and the high voltage is output through the half-wave rectification of the diode D1.

[0065] The CPU performs algorithm analysis based on the data transmitted by the digital-to-analog converter. The CPU uses a voltage and current sampling algorithm to determine whether to output a capacitive load or a resistive load. When an arc occurs, the relay K2 can be quickly closed for discharging, and different discharging times are given according to different natures.

[0066] Specifically, the CPU uses an algorithm to distinguish whether the tested product 4 is of capacitive or resistive nature and to identify the arc alarm signal. The specific algorithm is as follows:

[0067] Analyze the data transmitted by the digital-to-analog converter to determine whether the AC ripple signal exceeds the set ripple threshold. If it exceeds this threshold, calculations can be performed.

[0068] Calculate the loop current based on the value of the second digital-to-analog conversion channel. Since the output voltage is known, the total impedance R of the loop can be obtained according to the detected current I as R = U / I. Since R3 is the sampling resistor, the ratio of the impedance of the external tested product to the sampling resistor is: k 1 = R3 / R.

[0069] The half-wave rectified DC output ripple of the voltage output is a known quantity, which is 2% of the output voltage. If it is a pure resistive load, the ratio of the microwave also satisfies the ratio k 1.

[0070] Perform a ratio calculation based on the AC voltage value of the first digital-to-analog conversion channel and the total ripple voltage to obtain k 2. When k 2 is close to k 1, it is judged as a resistive nature load.

[0071] When k 2 is greater than k 1, it is judged as a capacitive nature load. According to the impedance formula of the capacitor: X = 1 / wxya The approximate capacitance value of the tested product 4 can be calculated C ( w represents the angular frequency).

[0072] After the CPU receives the arc alarm signal, according to the load characteristics judged by the CPU: If the judgment result is a capacitive nature load, according to different size ranges of the capacitance C, the relay K2 is closed for different times. Specifically, when C < 100 nF (nanofarad), the closing time of the relay K2 is 1.5 s; when 100 nF < C < 1 μF (microfarad), the closing time of the relay K2 is 3 s; when 1 μF < C < 10 μF, the closing time of the relay K2 is 5 s.

[0073] If the judgment result is a resistive nature load, the closing time of the relay K2 is 1.5 s and charge discharge is performed.

[0074] After the arc is generated, for the products with different characteristics (capacitive, resistive), a combination of soft and hard methods are used to judge their properties, and according to their different properties, a series of protective discharge actions are generated to make the arc disappear quickly and minimize the damage caused by the arc.

[0075] The present invention is not limited to the structures which have been described above and shown in the drawings, and various modifications and changes may be made without departing from the scope thereof. The scope of the present invention is limited only by the appended claims.

Claims

1. A linkage protection circuit after arc detection, characterized in that: include: An arc analysis and detection module, a boost drive module, a protection output module and a product under test; the output end of the arc analysis and detection module is connected to the input end of the boost drive module, the output end of the boost drive module is connected to the input end of the protection output module, the output end of the protection output module is connected to the product under test, and the product under test is connected to the arc analysis and detection module; The arc analysis and detection module is used to detect the output voltage and current of the arc signal using the CPU central processor, and to generate a boost drive signal after distinguishing the properties of the tested product and the arc alarm signal according to the detection results; The boost driving module is used to analyze the boost driving signal generated by the arc analysis and detection module, and drive the protection output module according to the analysis result; The protection output module is used to perform an AC signal boost operation according to the driving signal of the boost driving module, and flow the high voltage current to the product under test when the high voltage current is normally output; The product under test is used to detect properties of the product by the arc analysis and detection module after an arc occurs, and to form linkage protection based on the boost operation result of the protection output module; The arc analysis and detection module includes a CPU, a chip U3, an operational amplifier U2, an operational amplifier U1, an operational amplifier U5, a capacitor C1, a resistor R1, a resistor R2, a resistor R3, a relay K2, a resistor R67 and a resistor R54; The first pin of the CPU is connected to the first pin, the third pin, the fifth pin, the eighth pin and the fourth pin of the chip U3 respectively, the ninth pin of the chip U3 is connected to the sixth pin of the operational amplifier U2 and one end of the resistor R67 respectively, and the tenth pin of the chip U3 is connected to the sixth pin and the second pin of the operational amplifier U5 respectively; The other end of the resistor R67 is connected to one end of the resistor R54 and the second pin of the operational amplifier U2 respectively, and the other end of the resistor R54 is grounded, and the third pin of the operational amplifier U2 is connected to the sixth pin and the second pin of the operational amplifier U1 respectively; The third pin of the operational amplifier U1 is connected to one end of the capacitor C1, the other end of the capacitor C1 is respectively connected to one end of the resistor R3 and the loop end of the product under test, and the third pin of the operational amplifier U5 is connected to the loop end of the product under test; The other end of the resistor R3 is connected to one end of the resistor R1 and is grounded, the other end of the resistor R1 is connected to one end of the resistor R2, the other end of the resistor R2 is connected to one end of the relay K2, and the other end of the relay K2 is connected to the protection output module; The capacitor C1 and the resistor R3 form a high-pass filter by utilizing the characteristics of capacitor passing AC and blocking DC, and the second pin and the sixth pin of the operational amplifier U1 are connected to form a voltage follower; The AC voltage at the resistor R3 is sampled by a voltage follower, and after being amplified in phase by the operational amplifier U2, the sample is transmitted to the CPU through SPI communication for processing to obtain an AC voltage value; The property identification of the tested product includes: The ratio is calculated by using the resistor R3 and the impedance of the measured product. k 1: The output ripple is obtained according to the output voltage, and the ratio is calculated by using the AC voltage value and the voltage value of the output ripple to obtain the ratio k 2; When the ratio k 2 Greater than the proportion k 1, the measured product is a capacitive load. k 2 and proportion k 1When the difference is within the preset range, the product under test is a resistive load; When the property of the measured product is a capacitive load, the closing time of the relay K2 is determined according to the capacitance of the measured product; When the property of the measured product is a resistive load, the closing time of the relay K2 is 1.5 seconds, and the charge discharge operation is performed after the closing is completed.

2. The linkage protection circuit after arc detection according to claim 1, characterized in that: The second pin and the sixth pin of the operational amplifier U5 are connected to form a voltage follower, and the voltage follower is used to sample the current signal on the resistor R3; The sampled current signal is transmitted to the CPU via SPI communication for processing to obtain the loop current, and the impedance of the measured product is obtained according to the loop current and the output voltage.

3. The linkage protection circuit after arc detection according to claim 2, characterized in that: The first pin of the boost driving module is connected to the second pin of the CPU, and the second pin and the third pin of the boost driving module are both connected to the protection output module.

4. The linkage protection circuit after arc detection according to claim 3, characterized in that: The protection output module includes an AND gate U4, a relay K1, a transformer T1 and a diode D1; The first pin of the AND gate U4 is connected to the third pin of the CPU, the second pin of the AND gate U4 is connected to one end of the relay K1, the other end of the relay K1 is respectively connected to the second pin of the boost drive module and the first pin of the transformer T1, and the second pin of the transformer T1 is connected to the third pin of the boost drive module; The third pin of the transformer T1 is connected to one end of the resistor R3 and grounded, the fourth pin of the transformer T1 is connected to one end of the diode D1, and the other end of the diode D1 is respectively connected to one end of the relay K2 and the high voltage output end of the tested product.

5. The linkage protection circuit after arc detection according to claim 4, characterized in that: The arc alarm signal and the boost drive signal control the primary output relay K1 of the transformer T1 through the AND gate U4, and when the arc occurrence signal is generated, the relay K1 is triggered to disconnect; When the circuit outputs high voltage current normally, the relay K2 is disconnected, and the high voltage direct current flows to the high voltage output end, passes through the tested product, is transferred to the loop end, and then is grounded through the resistor R3.