Deepwater sedimentary system formation simulation system

The simulation system is formed through a deep water deposition system, combining the geomorphic characteristics, turbid current flow rate, raindrops and gases, and the deposition process of turbid current in a deep water environment is simulated, solving the problem of insufficient deposition simulation in the existing technology, and realizing the deposition phenomenon detailed analysis.

CN118603831BActive Publication Date: 2025-01-14CHINA UNIV OF GEOSCIENCES (BEIJING)
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410828120.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-25
Publication Date
2025-01-14
Estimated Expiration
2044-06-25

AI Technical Summary

Technical Problem

When simulating the deep water deposition process, the turbid current is affected by a variety of external environments, but it fails to effectively combine environmental characteristics, resulting in inaccurate deposition simulation.

Method used

A deep-water deposition system forming simulation system is designed, including side plates, side plates, first substrates, turbid flow parts, guided simulation boards and compensation simulation parts. By adjusting the geomorphological characteristics, turbid flow rate, raindrop influence and gas influence, the simulation is simulated. Tumor current deposition process under different environmental conditions.

Benefits of technology

The precise simulation of the sedimentation phenomenon of turbid current in deep water environment was achieved, and the geomorphological morphology, deposition rate, sediment layer thickness and structural parameters were obtained before and after deposition, which improved the practicality and accuracy of the sedimentation simulation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118603831B_ABST
    Figure CN118603831B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of sedimentation simulation technology, and in particular to a deep-water sedimentation system formation simulation system. It includes a main body, a turbidity flow part, a guide simulation plate, and also includes a compensation simulation part. By constructing a sedimentation chamber flume experiment, the geomorphic features of different slope angles, environmental raindrop features, and the negative pressure state of the water body liquid are combined to realize the turbidity flow deposition performance state of the turbidity flow liquid in the actual water body environment under the influence of the environment, so as to obtain the geomorphic features before and after deposition, the deposition rate of the sediment, the thickness of the sediment layer, and the digital parameters of the sediment structure, so as to form an analysis and monitoring of the turbidity flow deposition.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of sedimentation simulation, and in particular to a deep-water sedimentation system formation simulation system. Background Art

[0002] Deepwater sedimentation simulation is a complex geological process that involves multiple factors such as water flow, sediment transport, and sedimentary layer formation. In experimental simulation technology, deepwater sedimentation simulation is usually used to study the deposition laws of sediments, sedimentary layer structure, and related geological processes.

[0003] For example, the Chinese patent publication number is CN108037249A, the publication date is 2018-05-15, and the invention name is: Deep-water sedimentation system formation simulation device. The invention consists of two parts (A) and (B); the (A) is located on one side of the (B); a bottom tie bar (2) is arranged at the bottom of the experimental body (1), a top tie bar (3) is arranged at the top of the experimental body (1), and a movable adjustable triangle iron (7) is arranged on the experimental body (1), and the movable adjustable triangle iron (7) is composed of a plurality of bottom angle steels (7.1) and vertical angle steels (7.2); a water flow velocity meter (6) is installed on the vertical angle steel (7.2).

[0004] In the above technical scheme, a flume experiment is set up to simulate the deep-water sedimentation system. However, in the specific flume experiment, when simulating the turbidity current deposition in deep water, the technical scheme only involves the composition and structural construction of the sedimentation body. However, when the turbidity current is actually deposited in deep water, it will also be affected by peripheral factors of the environmental characteristics associated with it. Therefore, in order to obtain the actual deposition phenomenon of the turbidity current in deep water to obtain the landform before and after deposition and the deposition state parameters, the present invention proposes a deep-water sedimentation system formation simulation system. Summary of the invention

[0005] In view of the above-mentioned shortcomings of the prior art, the present invention provides a deep-water sedimentation system formation simulation system, which can effectively solve the problem that turbidity currents are affected by various external environmental factors during the deposition process in deep water in the prior art, but currently do not involve the combination of external environmental characteristics with flume experiments, which affects the accuracy and practicality of turbidity current deposition simulation.

[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions:

[0007] The present invention provides a deep-water sedimentation system formation simulation system, which at least comprises:

[0008] The main body at least comprises a side plate and a side plate symmetrically arranged inside the side plate and movably connected to the side plate, wherein the side plate and the side plate constitute a deposition chamber;

[0009] A first base plate is movably mounted inside the side plate, and the first base plate is used to build landform features;

[0010] The first base plate is adjusted to simulate landform features with different slope angles;

[0011] A turbidity flow component disposed above the main body component, used to introduce turbidity flow liquid into the deposition chamber;

[0012] and, a guide simulation plate movably disposed inside the main body, the turbidity flow member is also used to simulate raindrops and spread them to the water surface in the deposition chamber, thereby guiding the flow direction of raindrops and the contact state with the water surface in the deposition chamber through the guide simulation plate, and combining the angle of the landform features on the first substrate to simulate deep-water turbidity flow deposition;

[0013] Also includes:

[0014] The compensation simulation member is arranged inside the main body, and the compensation simulation member includes a conductive arc rod installed at the bottom of the guide simulation plate, one end of the conductive arc rod is movably connected to a gas gathering arc tube, and one end of the gas gathering arc tube is connected to a guide simulation tube, and the guide simulation tube is connected to the deposition chamber, wherein:

[0015] The conductive arc rod simulates the deposition state of the turbidity flow in the deposition chamber when it is affected by gas or the deposition state of the turbidity flow in a negative pressure state according to the clockwise movement of the guiding simulation plate.

[0016] Furthermore, the main body also includes a main box, a slide is provided on the inner wall of the main box, and a slider slidably connected to the slide is provided at the bottom of the side plate, the slide and the main box are connected by a limiting spring, and a limiting rod is provided inside the limiting spring, and both ends of the limiting rod are respectively installed on the slider and the main box.

[0017] Furthermore, the first substrate is driven by a first motor installed on the side of the side plate, and the first substrate is controlled to rotate by the first motor to tilt the first substrate, so as to simulate deep-water deposition with geomorphic features at different angles.

[0018] Furthermore, the turbidity flow member includes a liquid box, and the liquid box is provided with a volume chamber B and a volume chamber A inside, the inside of the volume chamber A is used to store turbidity flow liquid, and the inside of the volume chamber B is used to store water, wherein:

[0019] The volume chamber A is connected with a turbidity flow tube, the bottom of which is connected with the side plate and leads into the sedimentation chamber. The turbidity flow tube is "Y" shaped, and the "Y" shaped turbidity flow tube has two independent tube bodies, and the first valve is arranged on the independent tube bodies.

[0020] Furthermore, during the rotation adjustment of the first substrate:

[0021] If the first substrate does not completely seal one of the independent tubes during rotation and only opens the independent tube that is not completely sealed, the first substrate forms a partial closure of the turbid flow tube, simulating the turbid flow deposition state of the turbid flow at different flow rates in the deposition chamber.

[0022] Furthermore, the first substrate is rotated to change the size of the deposition chamber and the water level line, so as to form a turbidity current deposition simulation in accordance with the landform features of different slope angles and the water levels of different heights.

[0023] Furthermore, a plurality of nozzles are installed on the upper side of the inner wall of the main box, and a cavity is arranged inside the upper side of the inner wall of the main box for storing liquid, the nozzle is connected with the cavity, and the volume chamber B and the cavity are connected through a drain pipe, and a second valve is arranged on the drain pipe. When the second valve is opened, the nozzle drips on the surface of the water in the sedimentation chamber in the form of droplets, simulating the turbidity current deposited in the water area on rainy days, and the surface of the water area fluctuates due to the influence of raindrops, which affects the flow of the turbidity current.

[0024] Furthermore, during the process of guiding the simulation board to adjust the inclination:

[0025] If the first substrate is synchronously tilted and adjusted, and the topographic features on the first substrate are squeezed by the tilt adjustment of the guiding simulation plate, the simulated topographic features are affected by the collision of the hard object;

[0026] At the same time, the turbidity current sedimentation state during the compression and collapse of geomorphic features is simulated.

[0027] Furthermore, a sealing block is provided at one end of the conductive arc rod sliding in the gas gathering arc tube;

[0028] The guide simulation tube is installed on the side plate and communicated with the deposition chamber, and the guide simulation tube is a bellows;

[0029] An air inlet is provided on one end surface of the gas gathering arc tube for air intake;

[0030] in:

[0031] When the guiding simulation plate moves clockwise, the conductive arc rod follows the movement of the guiding simulation plate and slides in the gas gathering arc tube, and the sealing block squeezes the gas and inputs it into the water body in the deposition chamber, simulating the deposition state of the turbidity current when it is affected by the gas in the water body;

[0032] When the simulation plate is guided to move counterclockwise, the conductive arc rod controls the sealing block to reset and the sealing block does not pass through the air inlet, and the liquid in the deposition chamber is sucked into the gas gathering arc tube, simulating the turbidity flow deposition state in which the turbidity flow is sucked by the external environment.

[0033] Further, the turbidity flow liquid includes different sediment concentrations, specifically:

[0034] Low-density turbidity currents, whose sediment concentration is 5%;

[0035] Medium-density turbidity currents, whose sediment concentration is 5-10%;

[0036] High-density turbidity currents, whose sediment concentration is 10%;

[0037] The components of the sediment in the turbidity flow liquid include kaolin, quartz sand, quartz sand and quartz sand. The technical solution provided by the present invention has the following beneficial effects compared with the known prior art:

[0038] By constructing a sedimentation chamber flume experiment, the geomorphic characteristics of different slope angles, environmental raindrop characteristics, and the characteristics of liquid in the water area under negative pressure are combined to realize the turbidity current deposition state when the turbidity current liquid is affected by the environment in the actual water environment, so as to obtain the geomorphic characteristics before and after deposition, the deposition rate of sediments, the thickness of the sedimentary layer and the digital parameters of the sedimentary structure, and form an analytical monitoring of turbidity current deposition. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0040] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0041] Figure 2 It is a cross-sectional view of the main box structure of the present invention;

[0042] Figure 3 It is a schematic diagram of the sliding cooperation structure between the side plate and the edge plate of the present invention;

[0043] Figure 4 This is a structural breakdown diagram of the compensation simulation component of the present invention.

[0044] The numbers in the figure represent:

[0045] 100. Main body;

[0046] 110, main body box; 111, slideway; 120, side plate; 130, side plate; 140, first base plate; 150, second base plate; 161, limiting rod; 162, limiting spring;

[0047] 200, turbidity flow parts;

[0048] 210, liquid tank; 220, drainage pipe; 230, turbid flow pipe; 240, nozzle;

[0049] 300, guide simulation board;

[0050] 400, compensation simulation parts;

[0051] 410, conductive arc rod; 420, gas gathering arc tube; 421, air inlet; 430, guide simulation tube; 440, receiving ring. DETAILED DESCRIPTION

[0052] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0053] The present invention will be further described below in conjunction with the embodiments.

[0054] Example 1 (see Figure 1-4 ): A simulation system for deep-water sedimentary system formation, including at least:

[0055] The main body 100 includes a main body box 110, inside which a side panel 120 in a "U"-shaped structure is installed, and the inside of the side panel 120 is symmetrically slidably connected with a side panel 130, and a rubber sealing strip is integrally formed on the side where the side panel 130 contacts the side panel 120. Thus, a sealed deposition chamber can be formed by the side panel 120 and the two side panels 130, and the spatial size of the deposition chamber can be synchronously adjusted according to the sliding displacement of the side panel 130 in the side panel 120, so as to facilitate the subsequent simulation of deep-water deposition.

[0056] Specifically, a first substrate 140 is rotatably installed inside the side plate 120 and between the symmetrical side plates 130. By stacking and building landform features in the water area on the first substrate 140, such as by stacking semi-solidified coarse sand on the first substrate 140, the landform features of the water area can be formed, and when stacking and building the landform features, the landform features can be stacked into different slope angles, thereby allowing the subsequent simulation of deep-water turbidity current deposition according to the slope surfaces at different angles to analyze the state of turbidity current deposition.

[0057] Further, a second substrate 150 is disposed at one end of the first substrate 140, and the second substrate 150 is fixedly mounted on the side plate 120, and a sealing plate is slidably connected to the inner side of one end of the second substrate 150 close to the side plate 130, and the sealing plate is connected to the inside of the second substrate 150 through a fixed spring, thereby, even when the size of the deposition chamber is adjusted by the side plate 130 in the above, the sealing plate of the second substrate 150 can be stably contacted with the side of the side plate 130, ensuring that the entire deposition chamber will not leak;

[0058] A turbidity flow member 200 is installed above the main body box 110. The turbidity flow member 200 includes a liquid box 210, and the liquid box 210 is provided with two volume chambers B and a volume chamber A. In the present invention, the interior of the volume chamber A is used to store turbidity liquid, and the interior of the volume chamber B is used to store water. The volume chamber A is connected to a turbidity flow pipe 230, and the bottom of the turbidity flow pipe 230 is connected to the side plate 120 and leads to the deposition chamber. A first valve is arranged on the turbidity flow pipe 230, so that the turbidity flow pipe 230 is opened by the first valve to discharge the turbidity liquid into the deposition chamber, and the turbidity liquid is discharged on the first substrate 140. The topographic features are set up to form a deposition simulation of turbidity liquid in deep water. It should be noted that when the turbidity liquid is not introduced, it is necessary to fill the deposition chamber with water in advance (including but not limited to sea water, river water, etc., and it should be noted that the filled water body needs to be combined with the actual water temperature data and salinity data to ensure that the subsequent turbidity deposition simulation can fit the actual water environment) so as to carry out turbidity deposition simulation, thereby testing the flow deposition state of the turbidity liquid in the water body, and recording the deposition state of the turbidity liquid at different times to clarify the deposition performance of the turbidity liquid.

[0059] When constructing the geomorphic features, the upstream slope gradient of the entire geomorphic feature can be set to 6-7°, and the downstream basin bottom gradient can be set to 0-2°, so as to accurately simulate the sedimentation state of the deep-water turbidity current. The upstream slope gradient and the downstream basin bottom gradient can be adjusted according to the actual experimental needs, and are not limited here.

[0060] Furthermore, in this solution, the first substrate 140 is driven by a first motor installed on the side (outer side) of the side plate 120. Thus, when the preset landform feature cannot change the angle of its slope, the first motor can be used to control the first substrate 140 to rotate, so that one end of the first substrate 140 is tilted, thereby achieving the change of the slope angle of the landform feature and solving the problem of the invariance of the frequently constructed landform feature.

[0061] Among them, because the second substrate 150 is not fixedly connected to the first substrate 140 , the second substrate 150 is horizontal, and the first substrate 140 and the second substrate 150 are connected and sealed to prevent water from leaking through the gap between the first substrate 140 and the second substrate 150 .

[0062] It is worth noting that by placing the first substrate 140 at different angles, the landform features can be placed at different slope angles, so as to realize a simulation test of deep-water sedimentation in combination with turbidity currents.

[0063] Furthermore, a slideway 111 is provided on the inner wall of the main box 110, and a slider 131 slidably connected to the slideway 111 is provided at the bottom of the side plate 130. The slideway 111 and the main box 110 are connected by a limiting spring 162, and a limiting rod 161 is sleeved inside the limiting spring 162. The two ends of the limiting rod 161 are respectively installed on the slider 131 and the main box 110, so that the elastic pressure of the limiting spring 162 forces the side plate 130 to contact the first substrate 140, and a deposition chamber is formed at this time. When the first substrate 140 is tilted and rotated in the above-mentioned manner, the side plate 130 is subjected to the elastic pressure of the limiting spring 162 to make the side plate 130 move in the same direction as the first substrate 140, that is, the first substrate 140 moves clockwise, and the side plate 130 in contact with the first substrate 140 moves inward, otherwise, it moves outward, thereby ensuring that a deposition chamber is formed for deposition simulation.

[0064] Among them, the turbidity flow tube 230 is in a "Y" shape. Because the "Y"-shaped turbidity flow tube 230 has two independent tube bodies, and the two independent tube bodies are at different connection positions on the side plate 120, and the outlets of the tube bodies are both connected to the deposition chamber, and the independent tube bodies are each equipped with a first valve. When the first substrate 140 is rotated and adjusted to make the deposition chamber leave one of the turbidity flow tubes 230, the first valve of the other turbidity flow tube 230 can be opened to allow turbidity to be passed in for experiments.

[0065] In this embodiment, as the first substrate 140 tilts and rotates, if the first substrate 140 does not completely seal one of the turbidity flow tubes 230 (independent tube bodies) during the rotation process, and only the turbidity flow tube 230 that is currently not completely sealed is opened, the first substrate 140 forms a partial closure of the turbidity flow tube 230, and instantly simulates the turbidity flow deposition state of the turbidity flow liquid in the deposition chamber at different flow rates, and records the deposition data of the turbidity flow deposition state, so as to clarify the specific state of the turbidity flow deposition in this case, so as to judge the deposition state of the turbidity flow liquid in the water area when the flow rate of the turbidity flow liquid is affected in the current water area.

[0066] A possible implementation method different from the above is as follows: when the first substrate 140 is tilted and rotated, it affects the size of the deposition chamber, and thus the liquid level of the water initially filled in the deposition chamber, i.e., the water level line, will change accordingly to form a turbidity current deposition simulation in accordance with the topographic features of different slope angles and the water level lines of different heights.

[0067] In order to effectively simulate deep-water deposition, the present invention introduces environmental characteristics to simulate deposition, specifically:

[0068] A plurality of nozzles 240 are installed on the upper side of the inner wall of the main box 110, and a cavity is arranged inside the upper side of the inner wall of the main box 110 for storing liquid, the nozzle 240 is connected with the cavity, and the volume chamber B and the cavity are connected through a drain pipe 220, and a second valve is arranged on the drain pipe 220 (in the present invention, the valves on different components are independent, and a valve capable of blocking the fluid can be used). Since the nozzle 240 is located directly above the sedimentation chamber, when the turbidity flow pipe 230 is passed into the turbidity flow, the second valve is opened, so that water can drip on the surface of the water body in the sedimentation chamber in the form of droplets through the nozzle 240, thereby simulating the turbidity flow being deposited in the water area on rainy days, and the surface of the water area fluctuates due to the influence of raindrops, so as to affect the flow of the turbidity flow liquid, which is convenient for analyzing the deposition performance of the turbidity flow liquid in this case.

[0069] The second motors are symmetrically fixedly installed on the side of the main box 110, and the output shaft of each second motor is fixedly connected with a guide simulation plate 300, and one end of the guide simulation plate 300 is rotatably installed on the main box 110. Initially, the guide simulation plate 300 is blocked at the bottom of the nozzle 240 in a horizontal state to seal the nozzle 240, wherein:

[0070] The second motor controls the guide simulation plate 300 to tilt downward and rotate, so that the guide simulation plate 300 does not block the nozzle 240. If the guide simulation plate 300 is tilted, the droplets discharged from some nozzles 240 will drip on the inclined surface of the guide simulation plate 300, and some nozzles 240 close to the middle of the sedimentation chamber will drip onto the surface of the water in the sedimentation chamber as droplets. At this time, through the guidance of the inclined surface of the guide simulation plate 300, the water surface near the two sides of the sedimentation chamber will be simulated to have a greater collision with the water flow guided by the guide simulation plate 300, and the water surface in the middle of the sedimentation chamber will not be affected or will be less affected, thereby simulating the deposition state of turbidity liquid when the deep water surface is affected by different degrees of water vibration and collision.

[0071] A possible implementation method different from the above: during the process of guiding the simulation plate 300 to be tilted and adjusted, if the first substrate 140 is synchronously tilted and adjusted, and the topographic features on the first substrate 140 are squeezed by the guiding simulation plate 300, it is possible to simulate the topographic features being affected by the collision of objects such as hard rocks, and at the same time simulate the turbidity current deposition state of the topographic features in the process of collapse (such as the geology being affected by harsh environment and causing vibrations, collapse, etc., or the vibrations caused by blasting operations in the water area leading to collapse), thereby realizing the analysis of the turbidity current deposition being affected by various influences.

[0072] It should be noted that in this scheme, the turbidity fluid used has different sediment concentrations, such as:

[0073] Low-density turbidity currents, whose sediment concentration is 5%;

[0074] Medium-density turbidity currents, whose sediment concentration is 5-10%;

[0075] High-density turbidity currents, whose sediment concentration is 10%;

[0076] The components of the sediments in the turbidity fluid include kaolin, quartz sand, quartz sand, and quartz sand, etc. At the same time, colored sand can be mixed into the turbidity fluid or dyed with dyes, so that the stratification in the sediments can be better observed and the sedimentation state of the turbidity fluid can be clarified.

[0077] A possible implementation method different from the above is as follows: when the first substrate 140 rotates clockwise to adjust the slope angle of the geomorphic feature, the side plate 130 slides inward (toward the inside of the deposition chamber). If the guide simulation plate 300 is synchronously tilted and rotated downward for adjustment, the guide simulation plate 300 will increase the pressure on the geomorphic feature on the first substrate 140 to simulate the geomorphic feature being subjected to different pressures, such as the influence of hard rock on turbidity current deposition.

[0078] Taking into account the stability of the movement of the guiding simulation board 300 and the comprehensiveness of the deep-water sedimentation simulation, the present invention also includes:

[0079] A compensation simulation member 400 is arranged inside the main box 110, and the compensation simulation member 400 includes a conductive arc rod 410 installed at the bottom of the guide simulation plate 300, and the conductive arc rod 410 is centered on the movable connection point between the guide simulation plate 300 and the main box 110, one end of the conductive arc rod 410 is slidably connected to a gas gathering arc tube 420, the gas gathering arc tube 420 is fixed on the main box 110, and a sealing block is arranged at one end of the conductive arc rod 410 that slides in the gas gathering arc tube 420, and one end of the gas gathering arc tube 420 is connected to a guide simulation tube 430, and the guide simulation tube 430 is installed on the side plate 130 and communicates with the deposition chamber , and the guide simulation tube 430 is a bellows, so that the conductive arc rod 410 follows the movement of the guide simulation plate 300 and slides in the gas gathering arc tube 420, and an air inlet 421 is opened on one end surface of the gas gathering arc tube 420 for air intake (initially, the sealing block is close to the port position of the gas gathering arc tube 420, and the gas enters the gas gathering arc tube 420 through the air inlet 421), that is, the sealing block of the conductive arc rod 410 will squeeze the gas into the water body in the deposition chamber, thereby simulating the deposition state of the turbidity current in the deep water under the influence of the gas in the water body (in this process, the guide simulation plate 300 moves clockwise, that is, the conductive arc rod 410 moves clockwise);

[0080] Here, the conductive arc rod 410 is slidably connected to the gas gathering arc tube 420 to reduce the vibration of the guide simulation plate 300 when it is hit by liquid, that is, the guide simulation plate 300 is more stable to facilitate turbidity flow deposition simulation.

[0081] A possible implementation method different from the above is as follows: after the sealing pressure block of the conductive arc rod 410 compresses the gas into the deposition chamber, the sealing pressure block is close to the inner end of the gas gathering arc tube 420, that is, when the guiding simulation plate 300 is reset, the conductive arc rod 410 controls the sealing pressure block to reset and when the sealing pressure block has not passed through the air inlet 421, the inside of the gas gathering arc tube 420 and the guide simulation tube 430 are in a negative pressure state, and the liquid in the deposition chamber is sucked into the gas gathering arc tube 420. At this time, the turbidity current is simulated when it is sucked by the external environment, and its turbidity current deposition state is simulated. This situation is usually caused by water workers sucking liquid in the water area through equipment, so as to conduct a practical turbidity current deposition analysis (in this process, the guiding simulation plate 300 moves counterclockwise, that is, the conductive arc rod 410 moves counterclockwise).

[0082] It is worth mentioning that the end of the guide simulation tube 430 is installed on the side plate 130 and is connected to the deposition chamber. Therefore, the installation position of the guide simulation tube 430 on the side plate 130 can be set according to the slope angle reached by the rotation of the first substrate 140 following the terrain characteristics to avoid the guide simulation tube 430 being sealed by the tilted rotation of the first substrate 140.

[0083] Finally, the gas gathering arc tube 420 is fixedly installed on the main box 110, and the air inlet 421 is exposed, so a receiving ring 440 is sleeved on the side of the main box 110 and located on the outer side of the air inlet 421 to receive the liquid when it flows out through the air inlet 421.

[0084] In the above, after the turbidity current deposition simulation is completed, water is pumped out with a water pump, and it is ensured that the sediment will not collapse due to the pumping. After it is completely drained, the sediment morphology is observed, and the landform feature data is scanned with a laser scanner to obtain the landform feature morphology before and after deposition, the sediment deposition rate, sediment layer thickness and sediment structure digital parameters of the sediment, so as to form an analysis and monitoring of turbidity current deposition.

[0085] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements will not cause the essence of the corresponding technical solutions to deviate from the protection scope of the technical solutions of the embodiments of the present invention.

Claims

1. A deep-water sedimentation system formation simulation system, comprising a main body (100), which at least comprises a side plate (120), and a side plate (130) symmetrically arranged inside the side plate (120) and movably connected to the side plate (120), wherein the side plate (120) and the side plate (130) form a sedimentation chamber; A first base plate (140) is movably mounted inside the side plate (120). The first base plate (140) is used to construct a landform feature, and is characterized in that: The first substrate (140) is movable and adjusted to simulate landform features with different slope angles; A turbidity flow component (200) disposed above the main body component (100) and used to introduce turbidity flow liquid into the sedimentation chamber; and, a guide simulation plate (300) movably arranged inside the main body (100); the turbidity flow member (200) is also used to simulate raindrops and spread them to the water surface in the deposition chamber; a plurality of nozzles (240) are installed on the upper side of the inner wall of the main body box (110); one end of the guide simulation plate (300) is rotatably installed on the main body box (110); the guide simulation plate (300) blocks the bottom of the nozzle (240) in a horizontal state; if the guide simulation plate (300) is inclined, liquid droplets discharged by some nozzles (240) fall on the inclined surface of the guide simulation plate (300), and some nozzles (240) close to the middle of the deposition chamber fall as liquid droplets to the surface of the water body in the deposition chamber; thereby, deep-water turbidity flow deposition simulation is performed based on the flow direction of raindrops guided by the guide simulation plate (300) and the contact state with the water surface in the deposition chamber, combined with the angle of the landform features on the first substrate (140); Also includes: A compensation simulation member (400) is arranged inside the main member (100), the compensation simulation member (400) comprises a conductive arc rod (410) mounted on the bottom of the guide simulation plate (300), one end of the conductive arc rod (410) is movably connected to a gas gathering arc tube (420), and one end of the gas gathering arc tube (420) is connected to a guide simulation tube (430), and the guide simulation tube (430) is connected to the deposition chamber, wherein: The conductive arc rod (410) simulates the deposition state of the turbidity flow in the deposition chamber when it is affected by gas or the deposition state of the turbidity flow in a negative pressure state according to the clockwise movement of the guiding simulation plate (300).

2. The deep water sedimentation system formation simulation system according to claim 1, characterized in that: The main body (100) further comprises a main body box (110), a slideway (111) is provided on the inner wall of the main body box (110), and a slider (131) slidably connected to the slideway (111) is provided at the bottom of the side plate (130), the slideway (111) and the main body box (110) are connected via a limiting spring (162), and a limiting rod (161) is sleeved inside the limiting spring (162), and two ends of the limiting rod (161) are respectively mounted on the slider (131) and the main body box (110).

3. The deep water sedimentation system formation simulation system according to claim 1, characterized in that: The first substrate (140) is driven by a first motor installed on the side of the side plate (120), and the first substrate (140) is controlled by the first motor to rotate, so that the first substrate (140) is tilted, and deep-water deposition simulation is performed with geomorphic features at different angles.

4. The deep water sedimentation system formation simulation system according to claim 1, characterized in that: The turbidity flow member (200) comprises a liquid box (210), wherein a volume chamber B and a volume chamber A are arranged inside the liquid box (210), wherein the interior of the volume chamber A is used to store turbidity flow liquid, and the interior of the volume chamber B is used to store water, wherein: The volume chamber A is connected to a turbid flow tube (230), the bottom of the turbid flow tube (230) is connected to the side plate (120) and leads into the sedimentation chamber, the turbid flow tube (230) is in a "Y" shape, and the "Y"-shaped turbid flow tube (230) has two independent tube bodies, and the independent tube bodies are provided with a first valve.

5. The deep water sedimentation system formation simulation system according to claim 4, characterized in that: During the rotation adjustment of the first substrate (140): If the first substrate (140) does not completely seal one of the independent tubes during rotation, and only opens the independent tube that is currently not completely sealed, the first substrate (140) forms a partial closure of the turbid flow tube (230), simulating a turbid flow deposition state in a deposition chamber at different flow rates.

6. The deep water sedimentation system formation simulation system according to claim 5, characterized in that: The first substrate (140) rotates to change the size of the deposition chamber and the water level, so as to match the landform features of different slope angles and water levels of different heights to form a turbidity current deposition simulation.

7. The deep water sedimentation system formation simulation system according to claim 4, characterized in that: A cavity is provided inside the upper side of the inner wall of the main body box (110) for storing liquid, the nozzle (240) is connected to the cavity, the volume chamber B and the cavity are connected via a drainage pipe (220), and a second valve is provided on the drainage pipe (220). When the turbidity flow pipe (230) is introduced into the turbidity flow pipe, the second valve is opened, and the nozzle (240) drips onto the surface of the water body in the deposition chamber in the form of droplets, simulating the turbidity flow being deposited in the water body under rainy conditions, and the influence of the fluctuation of the water body surface under the influence of raindrops on the flow of the turbidity flow.

8. The deep water sedimentation system formation simulation system according to claim 6, characterized in that: During the tilt adjustment of the guide simulation board (300): If the first substrate (140) is synchronously tilted and adjusted, and the topographic features on the first substrate (140) are squeezed by the tilted adjustment of the guiding simulation plate (300), the simulated topographic features are affected by the collision of the hard object; At the same time, the turbidity current sedimentation state during the compression and collapse of geomorphic features is simulated.

9. The deep water sedimentation system formation simulation system according to claim 1, characterized in that: A sealing pressing block is provided at one end of the conductive arc rod (410) that slides in the gas gathering arc tube (420); The guide simulation tube (430) is installed on the side plate (130) and communicates with the deposition chamber, and the guide simulation tube (430) is a bellows; An air inlet (421) is provided on one end surface of the air gathering arc tube (420) for air intake; in: When the guiding simulation plate (300) moves clockwise, the conductive arc rod (410) follows the movement of the guiding simulation plate (300) and slides in the gas gathering arc tube (420), and the sealing pressing block squeezes the gas and inputs it into the water body in the deposition chamber, simulating the deposition state of the turbidity current when it is affected by the gas in the water body; When the simulation plate (300) is guided to move counterclockwise, the conductive arc rod (410) controls the sealing pressing block to reset and the sealing pressing block does not pass through the air inlet (421), and the liquid in the deposition chamber is sucked into the gas gathering arc tube (420), simulating the turbidity flow deposition state in which the turbidity flow is sucked by the external environment.

10. The deep water sedimentation system formation simulation system according to claim 1, characterized in that: The turbidity flow includes different sediment concentrations, specifically: Low-density turbidity currents, whose sediment concentration is 5%; Medium-density turbidity currents, whose sediment concentration is 5-10%; High-density turbidity currents, whose sediment concentration is 10%; The components of the sediments in the turbidity current include kaolin, quartz sand, quartz sand and quartz sand.

Citation Information

Patent Citations

  • Deep water deposition system formation simulation device

    CN108037249A

  • Teaching demonstration device for turbidity sediment experiment and teaching method of teaching demonstration device

    CN110660305A

  • Loose deposit of gravity drive warp physical simulation experimental apparatus

    CN205449742U