Power data storage method, electronic device and storage medium

By collecting transformer data, calculating regional line loss coefficients and performing grid division and resource optimization allocation, the problem of low efficiency in traditional power data storage methods is solved and the efficiency and accuracy of power data storage are improved.

CN118606328BActive Publication Date: 2024-10-18STATE GRID SICHUAN ELECTRIC POWER CO +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411083379.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-10-18
Estimated Expiration
2044-08-08

AI Technical Summary

Technical Problem

Traditional power data storage methods are inefficient when it comes to the collection, processing, storage and extraction of transformer data, and cannot perform flexible grid division and data storage resource allocation based on the actual operation of the transformer.

Method used

Collect the basic information and measurement data of the transformer, calculate the regional line loss coefficient, perform grid division and optimal allocation of data storage resources, and use the data storage coefficient to guide the allocation of storage resources and the construction of data extraction branches.

Benefits of technology

The efficiency and accuracy of power data storage are improved, and transformer grid division and optimal allocation of data storage resources based on regional line loss coefficients are achieved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118606328B_ABST
    Figure CN118606328B_ABST
Patent Text Reader

Abstract

The present invention provides a method, electronic device and storage medium for storing electric power data, and relates to the technical field of data storage. The method collects basic information of transformers, generates a data set including management terminal and location information; collects regional metering and electric energy meter data; calculates regional line loss coefficients; verifies the coefficient credibility, and divides the target grid in combination with the location information; analyzes the regional line loss coefficients, and determines the data storage coefficients; allocates storage resources accordingly, creates data extraction branches; uses branches to collect transformer data, and stores them in corresponding units. The method solves the technical problems that the collection, processing, storage and extraction of transformer data in traditional electric power data storage methods are not efficient, and that the grid division and data storage resource allocation cannot be flexibly performed according to the actual operation of the transformer. The method improves the efficiency and accuracy of electric power data storage, and realizes the effect of transformer grid division and optimized allocation of data storage resources based on regional line loss coefficients.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of data storage, and in particular to a power data storage method, electronic equipment and storage medium. Background Art

[0002] With the rapid development of the power industry and the advancement of smart grids, power data storage methods play an increasingly important role in the safe, stable and efficient operation of power systems. However, with the rapid growth and complexity of power data, traditional power data storage methods face huge challenges. These methods are often inefficient in the collection, processing, storage and extraction of transformer data, and are unable to flexibly divide grids and allocate data storage resources according to the actual operation of the transformer and the regional line loss coefficient. Summary of the invention

[0003] The present application provides an electric power data storage method, an electronic device and a storage medium, which are used to solve the technical problems in traditional electric power data storage methods, such as low efficiency in collecting, processing, storing and extracting transformer data, and inability to flexibly divide grids and allocate data storage resources according to the actual operating conditions of the transformer.

[0004] In view of the above problems, the present application provides a power data storage method, an electronic device and a storage medium.

[0005] In a first aspect of the present application, a method for storing electric power data is provided, the method comprising: collecting basic information of N transformers in a target area to generate N transformer data sets, wherein the N transformer data sets include N transformer management terminal sets and N transformer location information; collecting N regional metering data of the N transformers and N electric energy metering data sets of the N transformer management terminal sets within a preset monitoring period; performing regional line loss calculation based on the N regional metering data and the N electric energy metering data sets to generate N regional line loss coefficients; performing line loss credibility verification based on the size of the N regional line loss coefficients, and verifying the credibility of the target area according to the verification result combined with the N transformer location information. The target area is grid-divided to generate K target grid-divided areas, wherein the K target grid-divided areas include K transformer sets, and the K transformer sets include K regional line loss coefficient sets; coefficient concentration analysis is performed on the K regional line loss coefficient sets, and K data storage coefficients are determined according to the analysis results; storage resources are allocated to K data storage units according to the sizes of the K data storage coefficients, and K first data extraction branches and K second data extraction branches are generated; data are collected from multiple transformer management terminals in the K transformer sets based on the K first data extraction branches and the K second data extraction branches, and the collected data is stored in the K data storage units.

[0006] According to a second aspect of the present application, an electronic device is provided, including a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the following steps are implemented:

[0007] Collect basic information of N transformers in the target area and generate N transformer data sets, wherein the N transformer data sets include N transformer management terminal sets and N transformer location information; collect N regional metering data of the N transformers and N electric energy meter metering data sets of the N transformer management terminal sets within a preset monitoring period; perform regional line loss calculation based on the N regional metering data and the N electric energy meter metering data sets to generate N regional line loss coefficients; perform line loss credibility verification based on the size of the N regional line loss coefficients, and grid the target area according to the verification result combined with the N transformer location information to generate K target areas. The target grid division areas are divided into K target grid division areas, wherein the K target grid division areas include K transformer sets, and the K transformer sets include K regional line loss coefficient sets; coefficient concentration analysis is performed on the K regional line loss coefficient sets, and K data storage coefficients are determined according to the analysis results; storage resources are allocated to K data storage units according to the sizes of the K data storage coefficients, and K first data extraction branches and K second data extraction branches are generated; based on the K first data extraction branches and the K second data extraction branches, data are respectively collected from multiple transformer management terminals in the K transformer sets, and the collected data is stored in the K data storage units.

[0008] According to a third aspect of the present application, a storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented:

[0009] Collect basic information of N transformers in the target area and generate N transformer data sets, wherein the N transformer data sets include N transformer management terminal sets and N transformer location information; collect N regional metering data of the N transformers and N electric energy meter metering data sets of the N transformer management terminal sets within a preset monitoring period; perform regional line loss calculation based on the N regional metering data and the N electric energy meter metering data sets to generate N regional line loss coefficients; perform line loss credibility verification based on the size of the N regional line loss coefficients, and grid the target area according to the verification result combined with the N transformer location information to generate K target areas. The target grid division areas are divided into K target grid division areas, wherein the K target grid division areas include K transformer sets, and the K transformer sets include K regional line loss coefficient sets; coefficient concentration analysis is performed on the K regional line loss coefficient sets, and K data storage coefficients are determined according to the analysis results; storage resources are allocated to K data storage units according to the sizes of the K data storage coefficients, and K first data extraction branches and K second data extraction branches are generated; based on the K first data extraction branches and the K second data extraction branches, data are respectively collected from multiple transformer management terminals in the K transformer sets, and the collected data is stored in the K data storage units.

[0010] One or more technical solutions provided in this application have at least the following technical effects or advantages:

[0011] The method provided in the embodiment of the present application generates N transformer data sets by collecting basic information of N transformers in the target area, wherein the N transformer data sets include N transformer management terminal sets and N transformer location information; collects N regional metering data of the N transformers and N electric energy meter metering data sets of the N transformer management terminal sets within a preset monitoring period; performs regional line loss calculation based on the N regional metering data and the N electric energy meter metering data sets to generate N regional line loss coefficients; performs line loss credibility verification based on the size of the N regional line loss coefficients, and grids the target area according to the verification result combined with the N transformer location information , generate K target grid division areas, wherein the K target grid division areas include K transformer sets, and the K transformer sets include K regional line loss coefficient sets; conduct coefficient concentration analysis on the K regional line loss coefficient sets, and determine K data storage coefficients according to the analysis results; allocate storage resources to the K data storage units according to the size of the K data storage coefficients, and generate K first data extraction branches and K second data extraction branches; based on the K first data extraction branches and the K second data extraction branches, respectively collect data from multiple transformer management terminals in the K transformer sets, and store the collected data in the K data storage units. The efficiency and accuracy of power data storage are improved, and the effect of transformer grid division and optimal allocation of data storage resources based on regional line loss coefficients is achieved. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 A schematic diagram of a power data storage method provided in this application;

[0013] Figure 2 A schematic diagram of a flow chart for calculating regional line loss in a power data storage method provided in this application;

[0014] Figure 3 This is a diagram of the internal structure of an electronic device provided in this application. DETAILED DESCRIPTION

[0015] The present application provides a power data storage method, electronic device and storage medium, which are used to solve the technical problems that the traditional power data storage method is not efficient in collecting, processing, storing and extracting transformer data, and cannot flexibly divide grids and allocate data storage resources according to the actual operation of the transformer. The efficiency and accuracy of power data storage are improved, and the transformer grid division and data storage resource optimization allocation based on the regional line loss coefficient are achieved.

[0016] Below, the technical solutions in the present invention will be clearly and completely described with reference to the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments of the present invention. It should be understood that the present invention is not limited to the example embodiments described herein. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. It should also be noted that, for the convenience of description, only the parts related to the present invention are shown in the accompanying drawings, rather than all of them.

[0017] Embodiment 1:

[0018] like Figure 1 As shown, the present application provides a method for storing power data, the method comprising:

[0019] Basic information of N transformers in a target area is collected to generate N transformer data sets, wherein the N transformer data sets include N transformer management terminal sets and N transformer location information.

[0020] In an embodiment of the present application, in the target area, the system terminal collects the basic information of N transformers, and generates N independent transformer data sets accordingly. Each data set contains in detail the transformer management terminal set and the transformer location information. Among them, each transformer management terminal in the transformer management terminal set corresponds to a transformer, which is used to monitor and manage multiple users related to the transformer. Each user is equipped with an electric energy meter terminal, which is centrally managed by the transformer management terminal. This setting allows real-time monitoring and data collection of the user's electric energy usage, thereby realizing refined management of electric energy. The transformer location information includes the latitude and longitude coordinates of the transformer, the grid area where it is located, the distance from the adjacent equipment, etc. This information is crucial for the planning, optimization and fault location of the power grid. For example, in the event of a fault, the fault point can be quickly located through the location information of the transformer, reducing the time and scope of the power outage. By collecting the basic information of N transformers and generating corresponding data sets, comprehensive data support is provided for the management and maintenance of the power grid, which helps to achieve more efficient and intelligent power management.

[0021] Collect N regional metering data of the N transformers and N electric energy meter metering data sets of N transformer management terminal sets within a preset monitoring period.

[0022] In one embodiment, within a preset monitoring period, the system terminal collects data for N transformers. This collection process involves regional metering data and electric energy metering data. First, the system terminal collects metering data from N regions. These data come from different regions covered by N transformers, and they reflect key indicators such as power consumption, voltage fluctuations, and current intensity in each region. These data are very important for understanding the operating conditions, load distribution, and possible abnormal conditions of transformers in different regions. Subsequently, N electric energy meter metering data from a set of N transformer management terminals are collected. The electric energy meter metering data mainly records detailed information such as electric energy consumption, power factor, voltage, and current of each transformer during the monitoring period. These data can directly reflect the operating efficiency, energy consumption, and whether there are faults or abnormalities of the transformer, and provide data support for functions such as fault diagnosis, performance optimization, and energy consumption management.

[0023] Regional line loss calculation is performed based on the N regional metering data and the N electric energy meter metering data sets to generate N regional line loss coefficients.

[0024] In one embodiment, after collecting N regional metering data and N transformer management terminal electric energy metering data, the system terminal performs regional line loss calculation. This process is to evaluate the energy loss caused by factors such as resistance and inductance during power transmission. By calculating the difference between the regional metering difference and the regional metering data, N regional line loss coefficients can be generated, which reflect the energy efficiency of different regions during power transmission.

[0025] Further, if Figure 2 As shown, the present application provides a method for performing regional line loss calculation based on the N regional metering data and the N electric energy meter metering data sets to generate N regional line loss coefficients, including:

[0026] The N sets of metering data of electric energy meters are added up respectively to generate total metering data of electric energy meters of N regions; the difference between the metering data of the N regions and the total metering data of electric energy meters of the N regions is calculated to generate metering differences of N regions; the ratio of the metering differences of the N regions to the metering data of the N regions is calculated traversally to generate line loss coefficients of the N regions.

[0027] Preferably, in the process of power data processing, the system terminal respectively adds up the sets of electric energy meter measurement data of N transformer management terminals to obtain the total electric energy meter measurement data of the area covered by each transformer. These total measurement data represent the total electric energy consumption of each area in a specific time period. Subsequently, the difference between the metering data of each area and the total metering data of the corresponding regional electric energy meter is calculated. This difference reflects the amount of electric energy loss caused by factors such as line loss and equipment efficiency during the power transmission process. In order to more intuitively understand the electric energy loss situation in each area, the system terminal traverses and calculates the ratio of the metering difference of each area to the metering data of the area. This ratio is the regional line loss coefficient, which represents the proportion of energy lost in the process of transmitting electric energy from the source to the user end.

[0028] Perform line loss credibility verification based on the sizes of the line loss coefficients of the N regions, and grid the target region according to the verification results combined with the location information of the N transformers to generate K target grid division regions, wherein the K target grid division regions include K transformer sets, and the K transformer sets include K regional line loss coefficient sets;

[0029] In one embodiment, the system terminal verifies the credibility of the line loss based on the calculated N regional line loss coefficients. This step is to compare the N regional line loss coefficients with the preset regional line loss coefficients, with the aim of ensuring that the calculated regional line loss coefficients are accurate and reliable, and can truly reflect the energy loss during power transmission. After the verification is completed, the system terminal divides the target area into grids based on the location information of the N transformers. The core consideration of this division is the line loss situation in each region, and transformers with similar line loss coefficients are divided into the same area, thereby forming K target grid division areas. Among them, each target grid division area contains a corresponding set of transformers, and the transformers in these sets have similar regional line loss coefficients and contain the location information of each transformer. In this way, it helps to understand the line loss characteristics of each region more clearly, and can also provide a basis for differentiated strategies for subsequent power data storage and management.

[0030] Furthermore, the present application provides a method for verifying the credibility of line loss based on the size of the line loss coefficients of the N regions, and for meshing the target region according to the verification result combined with the N transformer location information to generate K target meshing regions, including:

[0031] Traverse and determine whether the N regional line loss coefficients meet the preset regional line loss coefficients, and use the determination result as the verification result, wherein the verification result includes a trusted transformer set and an abnormal transformer set; according to the trusted transformer set and the abnormal transformer set, the target area is gridded in combination with the N transformer location information to obtain the K target grid division areas.

[0032] Optionally, when processing line loss data, the system terminal first traverses the calculated N regional line loss coefficients to determine whether these regional line loss coefficients are less than or equal to the preset regional line loss coefficients. This preset regional line loss coefficient is set based on the experience and technical specifications of the power industry and is used to measure whether the line loss is within the normal range. During the traversal process, the system terminal compares each regional line loss coefficient with the preset standard, and divides the transformers into two categories according to the comparison results, one of which is a set of credible transformers, that is, transformers whose line loss coefficients are less than or equal to the preset standard; the other is an abnormal transformer set, that is, transformers whose line loss coefficients are greater than the preset standard. Subsequently, the system terminal uses these two types of transformer sets and their location information to grid the target area. When dividing, the system terminal classifies transformers with similar regional line loss coefficients into one category to form different regional groups. The purpose of this is to be able to perform differentiated processing according to the line loss characteristics of these regional groups in subsequent data storage and management. Through such division, the system terminal obtains K target grid division areas, and the transformers in each area have similar line loss characteristics. This provides a favorable basis for subsequent power data storage and management, enabling system terminals to take more accurate and effective measures based on specific conditions in different areas to avoid wasting storage resources.

[0033] A coefficient concentration analysis is performed on the K regional line loss coefficient sets, and K data storage coefficients are determined according to the analysis results.

[0034] In one embodiment, after obtaining K target grid division areas and their corresponding regional line loss coefficient sets, the system terminal performs coefficient concentration analysis. This step mainly aggregates and compares these regional line loss coefficients to understand the degree of concentration of different areas at different stages. Through coefficient concentration analysis, it is possible to more clearly identify which areas have higher line losses and which areas have lower line losses. Based on the analysis results, the system terminal determines the corresponding data storage coefficient for each target grid division area. The data storage coefficient is set according to the concentration amount at different stages, which reflects the priority and importance of the area in data storage. For example, for areas with larger concentration amounts, the system terminal will set a higher data storage coefficient to strengthen the collection, analysis and storage of its power data, so as to better monitor and manage the power operation of the area.

[0035] Further, the present application provides a method for determining K data storage coefficients, including:

[0036] Calculate the mean of the K regional line loss coefficient sets to obtain the mean of the K regional line loss coefficients; take the mean of the K regional line loss coefficients as the starting concentration value, perform coefficient clustering in the K regional line loss coefficient sets according to a preset coefficient scale, and generate K starting clustering sets, wherein the K starting clustering sets include K starting concentration quantities.

[0037] Preferably, the system terminal first calculates the mean of the line loss coefficient set of each of the K regions, and obtains the mean of the line loss coefficient of the K regions. These means represent the average level of the line loss coefficient of each region, and are an important reference for evaluating the power loss status of the region. Subsequently, in order to optimize the storage efficiency of power data, the system terminal uses the mean of the line loss coefficient of these K regions as the starting point, that is, the starting concentration value, and performs coefficient clustering according to a preset coefficient scale. The preset coefficient scale is a standard for judging whether the regional line loss coefficient should be included in the clustering set, that is, the regional line loss coefficient whose difference with the mean of the regional line loss coefficient is within the preset coefficient scale will be included in the same starting clustering set. Through this process, the system terminal generates K starting clustering sets, each of which contains a certain number of regional line loss coefficients. The coefficients in these sets are similar in value, reflecting the power loss characteristics of their respective regions. For power data storage, such a coefficient clustering method helps to achieve differentiated storage of data, thereby optimizing the storage efficiency and management level of power data.

[0038] Extract K stage regional line loss coefficients whose differences with the mean value of the regional line loss coefficient are the maximum from the K starting clustering sets; use the K stage regional line loss coefficients as stage concentration values, perform coefficient clustering in the K regional line loss coefficient sets according to a preset coefficient scale, and generate K stage clustering sets, wherein the K stage clustering sets include K stage concentration quantities.

[0039] Preferably, the system terminal extracts K regional line loss coefficients with the largest difference from the mean of the line loss coefficients of the respective regions from the generated K starting aggregation sets, and uses these coefficients as the stage regional line loss coefficients. These coefficients represent the maximum power loss of each region in a specific stage. Such as peak period, valley period, etc. Subsequently, the system terminal uses these K stage regional line loss coefficients as new starting points, i.e., stage concentration values, and performs coefficient aggregation again in the original K regional line loss coefficient sets. The aggregation process here is similar to the above, and the difference between the line loss coefficient of each region and the corresponding stage concentration value is compared with the preset coefficient scale. If the difference is within the preset coefficient scale, the line loss coefficient of the region is classified into the corresponding stage aggregation set. Through such a process, the system terminal obtains K stage aggregation sets, and the coefficients in each set are similar to the stage concentration value, reflecting the power loss of each region in a specific stage. At the same time, each stage aggregation set also includes the corresponding stage concentration amount, i.e., the total number of regional line loss coefficients in the set, which provides the system terminal with quantitative information about the power loss situation in each stage, which helps to more accurately manage and optimize power data storage.

[0040] A coefficient concentration analysis is performed based on the K initial concentration quantities and the K stage concentration quantities to determine K data storage coefficients.

[0041] Preferably, after obtaining the starting concentration of the K starting aggregation sets and the stage concentration of the K stage aggregation sets, the system terminal will perform coefficient concentration analysis to determine K data storage coefficients. Coefficient concentration analysis is a process of evaluating the degree of power loss concentration in different regions at different stages. By comparing the starting concentration and the stage concentration, it is possible to identify which regions have a higher power loss concentration in the starting state or a specific stage, and the data in these regions may require more attention or a specific storage strategy when storing. Based on this analysis, the system terminal determines a data storage coefficient for each region. This coefficient is a number between 0 and 1, reflecting the storage priority and importance of the power loss data in the region. For example, if the starting concentration or stage concentration of a region is high, it means that the power loss data in the region has a high representativeness or variability, then a higher priority will be given when storing these data, or more frequent data backup and more stringent data integrity verification strategies will be adopted. Through the coefficient concentration analysis of the starting concentration and the stage concentration, the corresponding data storage coefficients are determined for each region, which will guide how to more effectively manage and optimize the storage of power data, ensure the integrity and reliability of the data, and provide strong data support for power management and analysis.

[0042] Further, the present application provides a method for determining whether the K initial concentration amounts are less than or equal to the K stage concentration amounts, including:

[0043] Determine whether the K starting concentrations are less than or equal to the K stage concentrations. If so, perform coefficient aggregation iteration according to the K starting aggregation sets and the K stage area line loss coefficients until the difference in concentration between two adjacent iterations meets the preset requirements, and use the K stage area line loss coefficients corresponding to the maximum concentration value during the iteration as K data storage coefficients.

[0044] Optionally, the system terminal compares the K starting concentrations and the K stage concentrations to determine whether the starting concentrations are all less than or equal to the corresponding stage concentrations. This step is to understand whether the power loss in each region shows an increasing trend from the starting state to the specific stage. If all the starting concentrations are less than or equal to the corresponding stage concentrations, it means that the concentration of power loss in all regions has increased compared to the starting state in the specific stage. At this time, the system terminal performs an iterative process of coefficient aggregation to further refine the characteristics of each region in terms of power loss. The iterative process is the same as the aforementioned generation of K stage aggregation sets. By continuously generating stage aggregation sets, the system terminal updates the concentration of each region and checks whether the difference in concentration between two adjacent iterations meets the preset requirements. This preset requirement is a threshold value used to determine whether the iteration has achieved sufficient accuracy or stability, which is determined according to the actual accuracy requirements. If the difference in concentration between two adjacent iterations still does not meet the preset requirements, the system terminal continues to the next iteration. The iterative process continues until the difference in concentration meets the preset requirements. At this time, the system terminal determines that the stable characteristics of each region in terms of power loss have been found. Afterwards, the system terminal uses the K-stage regional line loss coefficients corresponding to the maximum concentration value in the iteration process as K data storage coefficients. These data storage coefficients represent the key characteristics of each region in terms of power loss and can be used to guide the storage and management of power data.

[0045] Storage resources are allocated to the K data storage units according to the sizes of the K data storage coefficients to generate K first data extraction branches and K second data extraction branches.

[0046] In one embodiment, after determining the K data storage coefficients, the system terminal uses these coefficients to guide the storage resource allocation of the K data storage units. The size of the data storage coefficient directly reflects the criticality of the corresponding area in terms of power loss. The larger the data storage coefficient, the higher the power loss of the area, that is, the larger the corresponding line loss coefficient, so the transformer management terminal in this area needs closer monitoring and data extraction. Based on this principle, the system terminal will perform differentiated storage resource allocation for the K data storage units according to the size of the K data storage coefficients. Specifically, the system terminal calculates K resource allocation factors to allocate resources for the data storage repository of the target area. For areas with larger resource allocation factors, more storage resources will be allocated to ensure that more data can be stored. In addition, the system terminal also identifies the K data storage coefficients through an extraction frequency identifier, and constructs K first data extraction branches and K second data extraction branches to support more frequent data extraction. In this way, when it is necessary to monitor the transformer management terminal in this area, the system terminal can quickly extract the required data, providing strong support for the stable operation of the power grid.

[0047] Furthermore, the present application provides a method for allocating storage resources to K data storage units according to the sizes of the K data storage coefficients to generate K first data extraction branches and K second data extraction branches, including:

[0048] The ratios of the K data storage coefficients to the sum of the coefficients of the K data storage coefficients are respectively used as K resource allocation factors; resources are allocated to the data storage repository of the target area according to the K resource allocation factors to obtain K configured data storage units.

[0049] Preferably, when allocating resources to the data storage repository in the target area, in order to ensure that resources can be effectively allocated to each data storage unit as required, the system terminal first calculates the ratio between each data storage coefficient and the sum of all data storage coefficients, and uses this ratio as a resource allocation factor, which represents the relative weight of each data storage unit in the overall resource allocation. If a data storage coefficient is large, then the resource allocation factor will also be large, which means that the data storage unit requires more storage resources. On the contrary, if the data storage coefficient is small, then the resource allocation factor will also be small, and the corresponding storage resource allocation will be reduced. In this way, the system terminal can accurately allocate resources to the data storage repository in the target area according to the resource allocation factor, thereby obtaining K configured data storage units. These data storage units will have different storage capacities according to their respective resource allocation factors to meet the data storage requirements in different regions or under different requirements.

[0050] The K data storage coefficients are identified by using an extraction frequency identifier to generate K first data extraction frequencies and K second data extraction frequencies; and the K first data extraction branches and the K second data extraction branches are constructed based on the K first data extraction frequencies and the K second data extraction frequencies.

[0051] Preferably, in the process of data storage and management, in order to extract data from the data storage unit more effectively, the system terminal uses an extraction frequency identifier to identify the data extraction frequency corresponding to each data storage coefficient. This identifier generates a corresponding data extraction frequency for each data storage coefficient based on the size of the data storage coefficient and the preset extraction frequency rule. The preset extraction frequency rule divides the data storage unit into different levels, such as level one, level two, etc., according to the size of the data storage coefficient. This classification is determined based on a preset classification threshold. This classification threshold is set based on actual needs and expert advice. For a data storage coefficient greater than the classification threshold, the system terminal divides the corresponding data storage unit into level one and sets a higher first data extraction frequency for extracting data in situations where closer monitoring or emergency situations are required. At the same time, a higher second data extraction frequency that is less than the first data extraction frequency is also set for conventional data monitoring and analysis. For a data storage coefficient less than or equal to the classification threshold, the corresponding data storage unit is divided into level two and a lower first data extraction frequency is set to meet data extraction in special situations. At the same time, a very low frequency is set or not set to reduce unnecessary overhead. After obtaining K first data extraction frequencies and K second data extraction frequencies, the system terminal constructs K first data extraction branches and K second data extraction branches according to these frequencies. These branches are actually channels or paths for data extraction. They extract data from the corresponding data storage unit according to the set extraction frequency and provide the data to the monitoring system. In this way, not only can storage resources be reasonably allocated according to the size of the data storage coefficient, but also efficient data extraction branches can be constructed according to the data extraction frequency, thereby realizing accurate management and real-time monitoring of power data.

[0052] Furthermore, the present application provides for adjusting resource allocation, including:

[0053] Constructing a response monitoring window; extracting line loss alarm information of a target area within the response monitoring window and K response monitoring data sets of K data storage units.

[0054] Optionally, in order to dynamically allocate and adjust the resource allocation of the K data storage units, the system terminal constructs a response monitoring window. This response monitoring window is constructed to monitor and analyze the performance and status of the transformer in real time within a specific time range. In this window, the system terminal sets monitoring indicators and thresholds so that it can respond quickly when abnormal conditions occur. When the response monitoring window is activated, the system terminal extracts the line loss alarm information of the target area. These alarm messages are generated when the energy loss in the power transmission process exceeds the preset threshold, and they can indicate possible problems or potential risks in the transformer. At the same time, the system terminal also extracts K response monitoring data sets from the K data storage units. These data sets contain various data related to the monitoring target, such as voltage, current, power factor, etc., as well as the historical records and change trends of these data. These data sets are essential for analyzing the performance and response of the transformer because they can provide detailed information about the transformer in the past and present. By extracting the line loss alarm information of the target area and the response monitoring data sets of the K data storage units, abnormal conditions can be discovered in time and corresponding measures can be taken, thereby ensuring the stable operation of the system terminal and optimizing resource allocation.

[0055] Verification is performed based on the line loss alarm information and the K response monitoring data sets. If the verification fails, a feedback adjustment instruction is generated; and resource allocation of the K data storage units is adjusted according to the feedback adjustment instruction.

[0056] Optionally, when receiving the line loss alarm information, the system terminal uses the existing K response monitoring data sets for verification. These monitoring data sets contain previous records, analyses or other relevant information about the line loss situation. The purpose of verification is to confirm the accuracy of the alarm information or understand the specific situation of the current line loss problem. Specifically, the system terminal compares the key data in the alarm information with the corresponding response monitoring data sets in the K data storage units. Subsequently, the historical trends of these data are analyzed to determine whether the current alarm information is consistent with the previous trends or there are abnormalities. After that, the key data in the alarm information is compared with the preset corresponding thresholds to determine whether it exceeds the normal range. Such as regional line loss coefficients, etc. If the verification result shows that the alarm information is inaccurate or there are other problems, that is, the verification fails, then the system terminal will generate a feedback adjustment instruction. This instruction is formulated to solve the problems found during the verification process, including increasing storage space, improving data processing capabilities, etc. Then, according to this feedback adjustment instruction, the system terminal will adjust the resource allocation of the K data storage units, involving increasing or reducing storage space, increasing or reducing data processing capabilities, optimizing data transmission efficiency, etc., to ensure that the data storage unit can better meet the needs of the application and improve the reliability and performance of data storage.

[0057] In summary, the embodiments of the present application have at least the following technical effects:

[0058] The embodiment of the present application collects basic information of N transformers in the target area, including a management terminal set and location information, as well as regional metering data and electric energy meter metering data within a preset monitoring period. Based on these data, N regional line loss coefficients are calculated, and by verifying the credibility of these coefficients, the target area is grid-divided in combination with the transformer location information to generate K target grid-divided areas. Subsequently, the K regional line loss coefficient sets are centrally analyzed to determine K data storage coefficients. These data storage coefficients are used to guide the allocation of storage resources to K data storage units. According to the size of the data storage coefficient, K first data extraction branches and K second data extraction branches are generated to collect data from the transformer management terminal and store them in corresponding data storage units respectively. In the process of determining the data storage coefficient, the coefficient aggregation iteration method is adopted to calculate the mean of the regional line loss coefficient set, and this is used as the starting concentration value for coefficient aggregation to generate a starting aggregation set. Afterwards, a new round of coefficient aggregation is performed by extracting the stage regional line loss coefficient as the stage concentration value until the concentration difference between two adjacent iterations meets the preset requirements. Then, the stage regional line loss coefficient corresponding to the maximum concentration value in the iterative process is used as the data storage coefficient. In addition, by constructing a response monitoring window, the line loss alarm information of the target area and the response monitoring data set of the data storage unit are extracted for verification. If the verification fails, a feedback adjustment instruction is generated to adjust the resource allocation of the data storage unit to optimize the performance and efficiency of data storage. These technical effects jointly solve the technical problems of low efficiency in the collection, processing, storage and extraction of transformer data in traditional power data storage methods, and the inability to flexibly grid and allocate data storage resources according to the actual operation of the transformer. The efficiency and accuracy of power data storage are improved, and the transformer grid division and optimal allocation of data storage resources based on the regional line loss coefficient are achieved.

[0059] Embodiment 2:

[0060] Based on the same inventive concept as the power data storage method in the aforementioned embodiment, the present application provides an electronic device, which may be a server, and its internal structure diagram may be as follows: Figure 3As shown. The electronic device includes a processor, a memory and a network interface connected via a system bus. The processor of the electronic device is used to provide computing and control capabilities. The memory of the electronic device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the electronic device is used to store news data and data such as time attenuation factors. The network interface of the electronic device is used to communicate with an external terminal via a network connection. The computer program is executed by the processor to implement a method for storing power data.

[0061] Those skilled in the art will understand that Figure 3 The structure shown in the figure is merely a block diagram of a partial structure related to the scheme of the present application, and does not constitute a limitation on the electronic device to which the scheme of the present application is applied. The specific electronic device may include more or fewer components than shown in the figure, or combine certain components, or have a different arrangement of components.

[0062] In one embodiment, a storage medium is provided, in which a computer program is stored. When a processor executes the computer program, the following steps are implemented: basic information of N transformers in a target area is collected to generate N transformer data sets, wherein the N transformer data sets include N transformer management terminal sets and N transformer location information; N regional metering data of the N transformers and N electric energy metering data sets of the N transformer management terminal sets are collected within a preset monitoring period; regional line loss calculation is performed based on the N regional metering data and the N electric energy metering data sets to generate N regional line loss coefficients; line loss credibility is verified based on the size of the N regional line loss coefficients, and according to the verification result, the N transformers are combined with the N transformers to calculate the regional line loss coefficients. The target area is grid-divided according to the transformer position information to generate K target grid-divided areas, wherein the K target grid-divided areas include K transformer sets, and the K transformer sets include K regional line loss coefficient sets; coefficient concentration analysis is performed on the K regional line loss coefficient sets, and K data storage coefficients are determined according to the analysis results; storage resources are allocated to K data storage units according to the sizes of the K data storage coefficients, and K first data extraction branches and K second data extraction branches are generated; data are collected from multiple transformer management terminals in the K transformer sets based on the K first data extraction branches and the K second data extraction branches, and the collected data are stored in the K data storage units.

[0063] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0064] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, if these modifications and variations of the present application belong to the scope of the present application and its equivalent technology, the present application intends to include these modifications and variations.

Claims

1. A method for storing electric power data, characterized in that: The method comprises: Collect basic information of N transformers in the target area to generate N transformer data sets, wherein the N transformer data sets include N transformer management terminal sets and N transformer location information; Collecting N regional metering data of the N transformers and N electric energy meter metering data sets of N transformer management terminal sets within a preset monitoring period; Performing regional line loss calculation based on the N regional metering data and the N electric energy meter metering data sets to generate N regional line loss coefficients; Perform line loss credibility verification based on the sizes of the line loss coefficients of the N regions, and grid the target region according to the verification results combined with the location information of the N transformers to generate K target grid division regions, wherein the K target grid division regions include K transformer sets, and the K transformer sets include K regional line loss coefficient sets; Performing a coefficient concentration analysis on the K regional line loss coefficient sets, and determining K data storage coefficients according to the analysis results; Allocate storage resources to the K data storage units according to the sizes of the K data storage coefficients to generate K first data extraction branches and K second data extraction branches; Based on the K first data extraction branches and the K second data extraction branches, data is collected from a plurality of transformer management terminals in the K transformer sets respectively, and the collected data is stored in the K data storage units; The method further comprises: Calculating the mean of the K regional line loss coefficient sets to obtain the mean of the K regional line loss coefficients; Taking the mean value of the K regional line loss coefficients as the starting concentration value, performing coefficient aggregation in the K regional line loss coefficient sets according to a preset coefficient scale to generate K starting aggregation sets, wherein the K starting aggregation sets include K starting concentration quantities; Extracting K stage regional line loss coefficients whose differences from the mean value of the regional line loss coefficient are the maximum values ​​from the K starting aggregation sets; Taking the K stage area line loss coefficients as stage concentration values, performing coefficient aggregation in the K area line loss coefficient sets according to a preset coefficient scale to generate K stage aggregation sets, wherein the K stage aggregation sets include K stage concentration amounts; Perform coefficient concentration analysis based on the K initial concentration quantities and the K stage concentration quantities to determine K data storage coefficients; Among them, allocating storage resources to the K data storage units according to the sizes of the K data storage coefficients to generate K first data extraction branches and K second data extraction branches includes: respectively taking the ratios of the K data storage coefficients to the sum of the coefficients of the K data storage coefficients as K resource allocation factors; Allocate resources to the data storage library in the target area according to the K resource allocation factors to obtain K configured data storage units; Using an extraction frequency identifier to identify the K data storage coefficients, and generating K first data extraction frequencies and K second data extraction frequencies; The K first data extraction branches and the K second data extraction branches are constructed based on the K first data extraction frequencies and the K second data extraction frequencies.

2. A method for storing electric power data according to claim 1, characterized in that: Based on the N regional metering data and the N electric energy meter metering data sets, regional line loss calculation is performed to generate N regional line loss coefficients, and the method includes: Adding up the N electric energy meter measurement data sets respectively to generate total measurement data of N regional electric energy meters; Calculate the difference between the N regional metering data and the total metering data of the N regional electric energy meters to generate N regional metering differences; The ratio of the N-region measurement difference to the N-region measurement data is calculated traversally to generate the N-region line loss coefficients.

3. A method for storing electric power data according to claim 2, characterized in that: Based on the magnitude of the line loss coefficients of the N regions, line loss credibility verification is performed, and according to the verification result combined with the N transformer location information, the target region is gridded to generate K target gridded regions, and the method includes: Traversing and judging whether the N regional line loss coefficients meet the preset regional line loss coefficients, and taking the judgment result as the verification result, wherein the verification result includes a trusted transformer set and an abnormal transformer set; The target area is grid-divided according to the trusted transformer set and the abnormal transformer set in combination with the N transformer location information to obtain the K target grid-divided areas.

4. A method for storing electric power data according to claim 1, characterized in that: The method comprises: Determine whether the K starting concentrations are less than or equal to the K stage concentrations. If so, perform coefficient aggregation iteration according to the K starting aggregation sets and the K stage area line loss coefficients until the difference in concentration between two adjacent iterations meets the preset requirements, and use the K stage area line loss coefficients corresponding to the maximum concentration value during the iteration as K data storage coefficients.

5. A method for storing electric power data according to claim 1, characterized in that: The method comprises: Construct response monitoring window; Extracting line loss alarm information of the target area within the response monitoring window and K response monitoring data sets of K data storage units; Verification is performed based on the line loss alarm information and K response monitoring data sets, and if the verification fails, a feedback adjustment instruction is generated; Resource allocation of the K data storage units is adjusted according to the feedback adjustment instruction.

6. An electronic device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the power data storage method described in any one of claims 1 to 5 are implemented.

7. A storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the power data storage method described in any one of claims 1 to 5 are implemented.

Citation Information

Patent Citations

  • Data analysis application platform system based on cloud platform and micro-service framework

    CN110809017A

  • Up-down through type line loss active analysis and management method and device and computer equipment

    CN117674402A