Safety assessment method for underground mining induced by landslide impact during conversion from open pit to underground caving
Through non-contact measurement and discrete fracture network model, slope collapse and pit bottom shock waves during open-pit to underground mining are simulated, and the impact of slope landslides on underground mining is solved, and the underground mining is realized. Effective assessment of stability and risk control.
Patent Information
- Application Number
- CN202410726447.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-06
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-06-06
AI Technical Summary
During the process of open-pit to underground mining, the deformation and damage mechanism of the slope rock mass is complex, resulting in the loss of balance of potential landslides to form a landslide dynamic impact, affecting the structural stability of the underground mining site. The existing technology has failed to fully consider open-pit slopes and underground mining. The interrelationship of fields cannot effectively analyze landslide area prediction and pit bottom impact energy characteristics.
Non-contact measurement is used to obtain surface point cloud data of rock mass structure, build a discrete fracture network model, combine mechanical experiments and geological strength indicators, establish a discontinuous deformation analysis method, and simulate slope collapse and pit bottom shock waves during open-pit to underground mining. Assess the bottom structural stability.
By comprehensively analyzing the mutual influence of open-air slopes and underground mining sites, simulate the slope collapse process of open-air mining sites, reduce risks, ensure that slope collapse will not cause casualties and losses to personnel and equipment, and effectively evaluate the safety of underground mining.
Smart Images

Figure CN118607218B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mining, and in particular to a method for evaluating the safety of underground mining caused by landslide impact induced by open-pit to underground caving mining. Background Art
[0002] After decades of continuous high-intensity mining, most open-pit mines have entered the stage of combined open-pit and underground mining or completely underground mining. After the mine is converted from open-pit to underground mining, the slope rock mass is affected by the combined superposition of the two mining operations. The rock mass stress state and change process are completely different from the deformation and failure mechanism of the slope rock mass under single open-pit mining conditions. During the period of open-pit to underground mining, underground mining not only affects the distribution of rock mass stress field in underground mines, but also has a secondary interference and destructive effect on the equilibrium state of the high and steep slope rock mass. Therefore, the deformation and failure mechanism of the slope rock mass during the process of open-pit to underground mining is more complicated, and the deformation amount and deformation process are also larger than those of the single mining mode.
[0003] When an open-pit mine is transferred to the underground production stage, the open-pit end slope and the rock mass around the pit bottom are disturbed by the stress of excavation unloading during the open-pit mining period, resulting in stress concentration in local areas and forming potential landslide bodies in the slope. As the scale of underground mining increases, the potential landslide body eventually loses balance and forms a landslide body. The large-scale landslide dynamic impact will affect the stability of the bottom structure of natural caving mining or the mining roadway of pillarless sublevel caving mining. It is urgent to carry out targeted research to demonstrate the relationship between the caving method and the stability of the open-pit slope, spoil dump and bottom structure or mining roadway.
[0004] The process of caving mining will induce the formation of a large-scale mining area, causing safety problems such as surface collapse, water seepage in the overburden and slope landslides. During the underground mining process, the collapse of the open-pit rock slope or the slope of the spoil dump within the boundary of the surface rock layer movement will affect the underground production safety. In view of the important influence of the stress redistribution and deformation and damage changes of the open-pit slope and the rock mass around the pit bottom after being disturbed on underground mining, the hazards between the open-pit slope and the underground mining area are mutually induced, thus forming a complex dynamic change system. At present, the research on the relationship between the open-pit slope and underground mining basically separates the open-pit mining and underground mining. First, the deformation of the open-pit slope is monitored and warned by installing monitoring instruments on the open-pit slope; second, it is mainly focused on the scope of static analysis, and the stability of the open-pit slope, the bottom structure of underground mining or the stability of the mining roadway is calculated by establishing a geomechanical model based on finite elements or finite differences. The third is to prepare a physical model for analysis. For example, the patent with application number 201310334005.3 discloses a model test method and test system for open-pit to underground mining, which simulates the monitoring of the mining test process, and performs stress-strain monitoring and displacement monitoring respectively. The model needs to be prepared, and the process is complicated. At the same time, it does not involve the analysis of the impact of the dynamic impact of open-pit slope landslides on real estate production safety. At the same time, the impact of landslide area prediction, pit bottom impact energy characteristics, pit bottom impact stress wave characteristics, etc. on underground production safety is not involved.
[0005] Therefore, a safety assessment method for landslide impact induced by open-pit to underground caving mining is urgently needed, which fully considers the correlation between the open-pit slope and the underground stope structure. It is more objective and comprehensive to analyze the mutual influence of surface subsidence, open-pit slope and spoil dump during open-pit to underground mining, simulate and reproduce the gradual collapse process of open-pit slope, reduce the risk to a controllable range, and ensure that there will be no casualties and losses to personnel and equipment after the slope collapses. Summary of the invention
[0006] The purpose of the present invention is to provide a method for evaluating the safety of underground mining induced by landslide impact during the transition from open-pit to underground caving mining, so as to solve the above-mentioned technical problems.
[0007] To achieve the above object, the present invention provides a method for safety assessment of landslide impact induced by open-pit to underground caving mining, and the specific steps are as follows:
[0008] Step S1: Use non-contact measurement to measure the surface structural surface and internal structural surface of the rock mass in the open-pit mine, obtain point cloud data of the rock mass structural surface, perform intelligent identification and extraction of the rock mass structural surface, and construct a discrete fracture network model of the rock mass structural surface, that is, a geometric structure model of the structural surface;
[0009] Step S2: calculating the mechanical parameters of the structural surface;
[0010] Step S3: Conduct indoor mechanical tests on rock blocks in the mining area, and classify rock mass quality according to rock mass structural surface information parameters and mechanical parameters of rock mass structural surface, obtain RMR value, and calculate geological strength index GSI to obtain Hoek-brown strength criterion parameter value, which is then converted into Mohr-Coulomb criterion to obtain rock mass mechanical parameters;
[0011] Step S4: Based on the mechanical parameters of the rock mass structural surface and the discrete fracture network model of the rock mass structural surface, a calculation model of the discontinuous deformation analysis method is established to simulate the landslide of the stope slope and the movement of the spoil dump caused by the underground mining process, and obtain the stress wave data of the dynamic impact of the landslide on the pit bottom;
[0012] Step S5: establishing a three-dimensional geomechanical model of the entire life cycle of open-pit to underground mining, wherein the three-dimensional geomechanical model of the entire life cycle of open-pit to underground mining includes the bottom structure or the mining tunnel;
[0013] Step S6: applying a dynamic shock wave to the bottom of the pit in the three-dimensional geomechanical model of the whole life cycle of open-pit to underground mining according to the stress wave data obtained by the discontinuous deformation analysis method, and obtaining the stress, displacement, vibration velocity and plastic zone distribution of the bottom structure or mining tunnel under the impact stress load;
[0014] Step S7: Evaluate the stability of the bottom structure or the mining tunnel according to the stress, displacement, vibration velocity and plastic zone distribution of the bottom structure or the mining tunnel and the judgment criteria.
[0015] Preferably, the specific process of step S1 is as follows:
[0016] Step S11: rock mass surface structural surface measurement;
[0017] Set up a 3D laser scanner at the open-pit mine steps and conduct 3D laser scanning on the open-pit to underground mining area to obtain information on the rock surface structure;
[0018] Step S12: measuring the internal structural surface of the rock mass;
[0019] By drilling blasting holes in the step rock mass and injecting expansion slurry, the step rock mass is broken and the rock mass section is obtained. The rock mass section is scanned by 3D laser to obtain the internal structural surface information of the rock mass.
[0020] Step S13: Intelligently identify and extract the rock mass structural surface information through the rock mass surface structural surface information and the rock mass internal structural surface information, randomly generate joints based on the extracted rock mass surface structural surface information and the rock mass internal structural surface information, and import them into the discontinuous deformation analysis model to construct a discrete fracture network model of the rock mass structural surface.
[0021] Preferably, in step S12, the diameter of the blasting hole is 35-45 mm, the spacing is 15-30 cm, the row spacing is 0.3-0.8 m, the hole depth is 0.5 times the height of the open-pit step, the expansion slurry is a mixture of expansion agent and water, and the mass ratio is 0.6-0.8:1 to ensure good fluidity. The prepared slurry is poured into the borehole, and after waiting for 24 hours, the step rock mass is completely broken to obtain a fresh rock section.
[0022] Preferably, in step S13, information is extracted after data processing of the rock mass surface structural surface information and the rock mass internal structural surface information;
[0023] The data processing process includes gridding of point cloud data, determination of normal vector discrimination index, flatness detection, regional division of rock mass structural surface based on regional growth method, and determination of growth threshold and area threshold. The extracted information includes structural surface occurrence, spacing between adjacent structural surfaces, structural surface roughness, and structural surface volume density.
[0024] The process of extracting structural surface occurrence information is as follows:
[0025] Obtain all node information of each structural surface and perform linear fitting using the least squares method. The fitting matrix is expressed as:
[0026]
[0027] The coordinates of multiple points on the structural surface are (x1, y1, z1), (x2, y2, z2), ..., (xn, yn, zn), then the above formula is expressed as:
[0028]
[0029] make:
[0030]
[0031]
[0032] Then we need to fit and find the vector A so that φ(A)=||Ax-z|| reaches the minimum value, that is, to fit the plane equation and its normal vector.
[0033] Assume that the normal vector of the rock mass structural surface is (a, b, c), and the working principle of the 3D laser scanner is laser reflection, so it can only scan the surface with better exposure. Therefore, c>0 in the unit normal vector, (a, b, c) is the unit external normal vector of the rock mass structural surface. In the geodetic coordinate system, assuming that the positive Y axis is due north, the positive X axis is due east, and the positive Z axis is upward, the inclination α and the inclination β of the structural surface in the geodetic coordinate system are calculated as follows:
[0034]
[0035] The normal vector of the structural surface is (a, b, c), and the structural surface attitude information includes the strike, dip α, and dip angle β. The angle between the strike and dip is 90°. The attitude of each group of structural surfaces is obtained by equations (1)-(6).
[0036] In order to realize the intelligent information extraction, the K-means cluster analysis method is used to group the structural surfaces. The K-means cluster analysis method is used according to the normal vector data to group the structural surfaces. After clustering, the normal vector data of each cluster center is calculated and converted into dip angle data to obtain the average occurrence of each group.
[0037] The main steps of the K-means cluster analysis method are as follows:
[0038] ① The total number of clusters N is preset. In this case, three groups of structural planes are developed, including one group of gently inclined planes and two groups of steeply inclined joints. Since the intersection of the plane and the outcrop is a linear structure, it is difficult to obtain sufficient point cloud data. Therefore, the intelligent identification mainly finds two groups of steeply inclined joints (N=2). For the plane, it can be regarded as a deterministic structural plane, and the corresponding geometric parameters of the plane can be determined mainly through manual identification or field investigation;
[0039] ② Initialize cluster centers: randomly select N samples as initial cluster centers;
[0040] ③ Sample point classification: Take a sample point, classify the sample into a cluster center according to the principle of proximity, and recalculate the value of the cluster center;
[0041] ④ Repeat step ③ until all sample points are classified into the corresponding class;
[0042] ⑤ Repeat steps ③ to ④ until the value of the cluster center no longer changes. Obtain the coordinates of each center point and the classification of each node.
[0043] Through the above algorithm, combined with the on-site geological survey information, all the identified structural surfaces of the point cloud data can be divided into multiple groups, and the cluster center, that is, the average occurrence, can be calculated.
[0044] The process of extracting the distance between adjacent structural surfaces is as follows:
[0045] For the structural surfaces divided into the same group, their occurrences are similar overall, but have a certain degree of randomness. The structural surfaces of the same group are converted into ideal structural surfaces whose normal vectors are consistent with the average normal vector and pass through the geometric center of the structural surface, such as Figure 1 As shown, the dotted lines in the figure are the original state of the same group of structural surfaces, and the black solid lines are the ideal structural surface state after conversion according to the above method, so that the structural surfaces in the same group are parallel to each other. The distance between adjacent structural surfaces is calculated according to the vertical distance calculation formula between two parallel planes. The calculation formula is as follows:
[0046]
[0047] Where: P1 is the equation of plane 1, P2 is the equation of plane 2, and dp1p2 is the vertical distance between two adjacent structural planes.
[0048] The process of extracting the structural surface roughness is as follows:
[0049] First, the fractal dimension is calculated, and then the structural surface roughness is calculated through the fractal dimension.
[0050] For the rock mass structural surface, taking the three-dimensional geometric model as an example, assuming that the box is a square, boxes with different side lengths of δ are used to cover the section line. The number of boxes required for full coverage is N(δ). If the section has fractal characteristics, there is the following relationship between them:
[0051] N(δ)~δ -D (10)
[0052] The fractal dimension D can be obtained by calculating the slope of the fitting line through the double logarithmic coordinate graph of N(δ) and δ.
[0053]
[0054] The process of extracting the density of the structural surface is as follows: In the network simulation of the rock mass structural surface, the rock mass structural surface is assumed to be a thin disk plane that develops in space. Therefore, the diameter of the disk can represent the spatial size characteristics of the structural surface, and the diameter can be derived from the trace length information measured in the field (Equation 12), and the diameter and the trace length have the same probability distribution characteristics.
[0055]
[0056] In the formula, is the average diameter of the thin disk structure surface, The average trace length of the structural surface measured on site is calculated based on the trace length measured on site; f d (d) is the probability density function of the diameter of the thin disk structure surface.
[0057] The average diameter of the thin disk structure surface is calculated based on the average trace length;
[0058] In addition, based on the rock mass structural plane spacing information measured on site, the volume density λv of the rock mass structural plane (the number of structural planes developed per unit rock mass volume) can be calculated according to formula (13).
[0059]
[0060] Where λd is the structure surface line density, which is equal to the inverse of the spacing.
[0061] Preferably, step S2 specifically comprises:
[0062] Step S21: Perform mechanical tests on the rock mass structural surface in the mining area to obtain normal stiffness and shear stiffness of different normal stresses and different shear stresses, and obtain shear strength parameters, where the shear strength parameters include cohesion, internal friction angle, and compression strength;
[0063] Step S22: obtaining the roughness of the structural surface according to the three-dimensional laser scanning, and calculating the shear strength of the structural surface according to the shear stress calculation formula;
[0064] The calculation formula of the shear strength of the structural surface is as follows:
[0065]
[0066] Where, τ is the shear strength;
[0067] σ n is the cohesive force acting on the structural surface of the rock mass. is the internal friction angle of the rock mass structural surface, JRC is the structural surface roughness coefficient, JCS is the joint compression strength, σ n , and JCS are obtained from mechanical tests, and the rock mass structural surface roughness coefficient JRC is obtained by three-dimensional laser scanning and calculation.
[0068] Preferably, step S3 specifically comprises:
[0069] Step S31: Conducting indoor mechanical experiments on rock blocks in the mining area, and classifying the rock mass quality according to structural surface information parameters to obtain RMR values;
[0070] Step S32: Calculate the geological strength index GSI according to the RMR value, thereby obtaining the Hoek-brown strength criterion parameter value and obtaining the modified Hoek-Brown formula;
[0071] Step S33: The rock mass mechanical parameters are calculated by the modified Hoek-Brown formula and converted into the reduced Mohr-Coulomb criterion. The calculation formula is as follows:
[0072]
[0073] In the formula, σ1 and σ3 are the maximum and minimum principal stresses, respectively, C, are cohesion and internal friction angle, respectively, and fs is the shear stress on the principal plane of the Mohr-Coulomb criterion;
[0074] When f s When >0, the material will undergo shear failure;
[0075] Under the tensile stress state, if the tensile stress exceeds the tensile strength of the material, that is, σ1≥σ3, the material will be tensilely damaged;
[0076] According to the Hoek-Brown failure criterion, the calculation formula for the reduction of rock mass compressive strength is as follows:
[0077] σ cm =R·k·s α
[0078] Among them, σ cm is the reduced rock mass compressive strength, R is the uniaxial compressive strength of rock, s and α are the empirical parameters in the Hoek-Brown failure criterion, and the rock mass characteristic parameter k is 1.2-2.0;
[0079] The tensile strength reduction formula of rock mass is as follows:
[0080]
[0081] Among them, σ tm is the tensile strength of the rock mass, m b is the Hoek-Brown constant m value of the corresponding rock mass;
[0082] The formula for reducing the rock mass deformation modulus is as follows:
[0083]
[0084] Among them, E m is the rock mass deformation modulus, RMR 76 is the 1976 RMR classification score; GSI is the GSI scoring index of the rock mass;
[0085] Shear strength reduction: The Mohr-Coulomb failure criterion can be expressed as follows according to the linear relationship between the maximum and minimum principal stresses:
[0086] σ'1=σ cm +hσ'3
[0087] Where h is the fitted slope of the linear relationship between σ'1 and σ'3;
[0088] Internal friction angle of rock mass after reduction The calculation formula of cohesion C' is as follows:
[0089]
[0090]
[0091] DDA uses a fully implicit method, which unifies the contact and deformation problems of the block into the matrix for solution according to the principle of minimum potential energy. The DDA derivation process is rigorous and strictly abides by the conservation of energy. Therefore, it is more accurate and can unify the static and dynamic problems for solution. Typical two-dimensional discrete block systems solved by DDA are as follows: Figure 2 As shown, the grey line segments represent the internal joints of the rock mass, and the numbers 1-11 represent the block units cut by the joints.
[0092] In step S4, the discrete fracture network model of the rock mass structural surface is divided into multiple two-dimensional sections, and a discontinuous deformation analysis method is used to realize the underground mining-induced slope collapse and the landslide body acting on the pit bottom, and a monitoring point is selected at the pit bottom to record the shock wave time history curve to obtain the time history curve with the maximum impact force;
[0093] Step S41: randomly generating joints based on the structural surface information obtained by three-dimensional laser scanning and importing them into the calculation model of the discontinuous deformation analysis method;
[0094] Step S42: dividing the ore body into different two-dimensional discrete blocks according to the actual open-pit mine layout and the mining middle section;
[0095] Step S43: performing discontinuous deformation analysis iterative calculation on the divided two-dimensional discrete blocks;
[0096] A two-dimensional discrete block has six degrees of freedom, expressed as follows:
[0097] [D i ]=(u0v0r0ε x ε y ε xy ) T
[0098] Among them, u0 and v0 represent the rigid body displacement of a special point (x0, y0) inside the block, the angle r0 is the rotation angle of the block around the rotation center (x0, y0), and εx, εy and εxy are the three strain components of the block;
[0099] The displacement (u, v) of any point (x, y) in a two-dimensional discrete block is given by the following formula:
[0100]
[0101] Where [Ti] is called the displacement transformation matrix, and the subscript i represents the i-th block;
[0102] Each two-dimensional discrete block is connected and forms a block system by relying on the contact between blocks and the displacement constraint of a single two-dimensional discrete block. The expression formula is as follows:
[0103]
[0104] Where n is the number of two-dimensional discrete blocks, Di represents the deformation variable of block i, Fi is the load assigned to the six deformation variables on block i, Kii is related to the material mechanical properties of block i and Kij (i≠j), and Kij is determined by the contact relationship between blocks i and j;
[0105] Minimization of the total potential energy П generated by forces and stresses results in the equilibrium equation, the i-th column of which consists of 6 linear equations as follows:
[0106]
[0107] Where dri is the displacement variable of block i;
[0108] The equilibrium equations for all loads and contact forces acting on block i in the x and y directions are as follows:
[0109]
[0110] The moment balance equation for all loads and contact forces acting on block i is as follows:
[0111]
[0112] The equilibrium equations for all external forces and stresses acting on block i in the x and y directions are as follows:
[0113]
[0114] The total potential energy П is the sum of the potential energies of various stresses and forces. The potential energy, differentials, and partial derivatives of various stresses and forces are calculated separately.
[0115] Partial guide To minimize the total potential energy П derived with respect to the variable dri, we obtain the coefficient of the unknown term dsj in the equilibrium equation; the partial derivative is The minimization of the total potential energy П gives the free term of the equilibrium equation, the partial derivative All items of form a 6×1 submatrix, which is added to the submatrix [Fi], and the block contact relationship tracking, equation group assembly, super relaxation iterative solution, contact iteration and block motion calculation are performed in the above manner;
[0116] Step S44: Select a monitoring point at the bottom of the pit and record the shock wave time history curve.
[0117] Preferably, step S5 specifically comprises: firstly, using 3D mine software to establish a solid model for each mining method, then importing the established solid model into RS3 software for Boolean operation and meshing, and finally importing the mesh into FLAC 3D software for grouping and calculation.
[0118] Preferably, in step S7, the evaluation criteria include a displacement criterion, a stress concentration criterion, a plastic zone criterion, and a particle vibration velocity criterion;
[0119] Displacement criterion: The stability of underground surrounding rock can be characterized by the displacement deformation limit. When the underground surrounding rock is deformed and damaged, its cumulative deformation must exceed the limit displacement allowed by the surrounding rock. Therefore, there are three displacement-based criteria for underground engineering disasters as follows:
[0120] Wall convergence ratio WCR, the ratio of the deformation W1 after excavation to the original design W0.
[0121]
[0122] Roof subsidence ratio RSR, the ratio of the vertical displacement change Δs to the original design W0.
[0123]
[0124] The bottom plate heave ratio FHR is the ratio of the bottom heave amount Δh to the original design W0.
[0125]
[0126] The stress concentration criterion is characterized by the stress concentration factor SCF, which is the ratio of the principal stress σ1 to the average ground stress σ0 under the influence of mining.
[0127] After the rock mass is disturbed by excavation, the high stress area is usually expressed by the SCF value. If the SCF is evenly distributed, the tunnel is in a relatively stable state.
[0128] Plastic zone criterion is widely used to describe the yield state of rock engineering after excavation, so as to characterize whether the rock engineering is stable.
[0129] The particle vibration velocity criterion, the particle vibration velocity criterion of the bottom structure and the surrounding rock of the mining tunnel under impact load, refers to the "Explosion Safety Regulations", and adopts the peak vibration velocity and main vibration frequency of the foundation particle at the location of the protected object. Safety allowable standards such as Fig.11 shown.
[0130] Therefore, the present invention adopts the above-mentioned ground mining safety assessment method for landslide impact induced by open-pit to underground caving mining, which has the following beneficial effects: comprehensively consider the correlation between the open-pit slope and the underground mining field structure. By making the shock wave that may be generated by the open-pit slope or spoil dump landslide disaster induced by underground mining act on the bottom of the pit, and the impact disturbance effect on the bottom of the pit acts on the bottom structure model of underground mining or the mining tunnel model, the surface subsidence of open-pit to underground mining, the mutual influence of the open-pit mine slope and the spoil dump are analyzed more objectively and comprehensively, and the gradual collapse process of the open-pit mine slope is simulated and reproduced, so as to reduce the risk to a controllable range and ensure that there will be no casualties and losses to personnel and equipment after the slope collapses.
[0131] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0132] Figure 1 Obtain a two-dimensional schematic diagram of the spacing between the same group of structural surfaces of the present invention;
[0133] Figure 2 Schematic diagram of a typical two-dimensional discrete block system in the discontinuous deformation analysis of the present invention;
[0134] Figure 3 This is a schematic diagram of the calculation model of the southern high slope profile of Example 1 of the present invention;
[0135] Figure 4 The time history curve of the impact stress wave at the bottom of the pit at each mining stage;
[0136] Figure 5 This is a perspective view of the bottom structure model;
[0137] Figure 6 This is the top view of the bottom structure model:
[0138] Figure 7 This is the main view of the bottom structure model;
[0139] Figure 8 It is the displacement monitoring curve of the mine-going tunnel;
[0140] Fig. 9 It is the maximum principal stress monitoring curve of the roof of the mine-going tunnel;
[0141] Fig.10 It is the monitoring curve of the roof vibration velocity of the mine-going tunnel;
[0142] Fig.11 Allows standards for safety.
[0143] Reference numerals
[0144] 1. Boundary; 2. Open-pit mine slope; 3. Overburden; 4. Ore body; 5. Surrounding rock; 6. Collapse layer; 7. Pull-down layer; 8. Pull-down tunnel; 9. Ore-gathering ditch; 10. Ore-exit vein; 11. Ore-loading access road; DETAILED DESCRIPTION
[0145] In the description of the present invention, it should be noted that the terms "upper", "lower", "inside", "outside", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or the positions or positional relationships in which the invented product is usually placed when in use. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In the description of the present invention, it should also be noted that, unless otherwise clearly specified and limited, the terms "set", "install", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0146] The embodiments of the present invention are described in detail below in conjunction with the accompanying drawings.
[0147] Example 1
[0148] Taking the conversion of open-pit mining to underground mining in Panjiatian Iron Mine as an example, according to the engineering background of the conversion of open-pit mining to underground mining, and based on the occurrence information of the rock mass structural surface, the high slope profile of the open-pit mine in the southern part of the mining area was used as the research profile for DDA analysis, and the following was established: Figure 3 The DDA (discontinuous deformation analysis) analysis model for underground mining is shown. It includes boundary 1, open pit slope 2, overburden 3, ore body 4 and surrounding rock 5. Different physical and mechanical parameters of rock and structural surface are given to the open pit slope rock mass, overburden material and ore body of the soil-rock model. The rock mass in the illustrated model is divided by two sets of joints. The model can simulate the collapse process of the open pit slope rock mass during the bottoming process from the first year to the tenth year, analyze the impact of rock strata movement on underground mining, and reveal the influence of block movement speed, deformation and impact stress on underground mining after the bottoming of each stage.
[0149] After the landslide body slides, it accelerates from a static state under the action of gravity, and its kinetic energy gradually increases. When the landslide body slides on the cover layer of the open pit, it will generate a large sliding impact force on the bottom of the pit, and the cover layer can play a certain role in buffering the impact force. During the movement of the block, the impact force when the block moves to the cover layer will increase the stress of the surrounding rock under the cover layer. By monitoring the vertical stress at the top of the cover layer and subtracting the original rock stress without impact load, the impact force of the slope sliding can be calculated. The results are as follows: Figure 4 As the mining depth increases, the landslide scale of the open-pit slope and the spoil dump slope also increases, so the maximum impact force of the monitoring point at each mining stage also increases, among which the maximum impact force of the southern open-pit high slope is 4.32MPa.
[0150] Example 2
[0151] Taking the conversion of open-pit to underground mining at Panjiatian Iron Mine as an example, in order to explore the influence of sliding impact on the stability of the bottom structure of the natural caving stope, a Figure 5-7 The bottom structure model of the stope shown includes a caved layer 6, a bottom pull layer 7, a bottom pull tunnel 8, a ore gathering trench 9, an ore-discharging vein 10, and a loading access 11. Four ore-discharging veins and six bottom pull tunnels are arranged in the bottom structure. The loading access connects the bottom pull tunnels. The number of ore-discharging accesses and ore-collecting trenches is 15. The stage height of the ore-discharging level from the bottom pull level is 15m, and the bottom pull height is 15m. The spacing between adjacent loading accesses is 15m, and the spacing between two adjacent ore-discharging veins is 30m. The layout is a "branch herringbone layout"; the caved layer is above the bottom pull layer, and its hydraulic cave height is 30m.
[0152] The impact stress wave of the pit bottom monitoring is applied to the bottom structure model to simulate and analyze the impact of the open pit slope collapse on the stability of the bottom structure of the natural caving method mining area. The deformation of the two sides of the bottom structure (mainly the ore-exiting vein), the sinking displacement of the roof, the maximum principal stress of the roof and the vibration velocity of the roof particles are monitored. Figure 8-10 shown.
[0153] The calculation results show that the maximum deformation of the two walls of the mine-through vein tunnel is 3.92mm, the wall convergence ratio WCR>0, the maximum vertical displacement of the roof is 1.75mm, and the roof sinking ratio RSR<1. It can be seen that the bottom structure surrounding rock is relatively stable; at the same time, according to the ratio of the maximum principal stress of the mine-through vein to the average ground stress monitored, the stress concentration factor SCF is uniformly distributed, indicating that the tunnel is in a relatively stable state; the maximum vibration velocity of the roof of the mine-through vein tunnel is 0.12m / s, which is less than the safe allowable particle vibration velocity requirement of 0.18~0.25m / s required by the specification, so the bottom structure surrounding rock is judged to be in a stable state.
[0154] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that they can still modify or replace the technical solution of the present invention with equivalents, and these modifications or equivalent replacements cannot cause the modified technical solution to deviate from the spirit and scope of the technical solution of the present invention.
Claims
1. A method for safety assessment of landslide impact induced by open-pit to underground caving mining, characterized in that: The specific steps are as follows: Step S1: Use non-contact measurement to measure the surface structural surface and internal structural surface of the rock mass in the open-pit mine, obtain point cloud data of the rock mass structural surface, perform intelligent identification and extraction of the rock mass structural surface to obtain information parameters of the rock mass structural surface, and construct a discrete fracture network model of the rock mass structural surface; Step S2: Calculate the mechanical parameters of the rock mass structural surface; Step S3: Conduct indoor mechanical tests on rock blocks in the mining area, and classify rock mass quality according to rock mass structural surface information parameters and mechanical parameters of rock mass structural surface, obtain RMR value, and calculate geological strength index GSI to obtain Hoek-brown strength criterion parameter value, which is then converted into Mohr-Coulomb criterion to obtain rock mass mechanical parameters; Step S4: Based on the mechanical parameters of the rock mass structural surface and the discrete fracture network model of the rock mass structural surface, a calculation model of the discontinuous deformation analysis method is established to simulate the landslide of the stope slope and the movement of the spoil dump caused by the underground mining process, and obtain the stress wave data of the dynamic impact of the landslide on the pit bottom; Step S5: establishing a three-dimensional geomechanical model of the entire life cycle of open-pit to underground mining, wherein the three-dimensional geomechanical model of the entire life cycle of open-pit to underground mining includes the bottom structure or the mining tunnel; Step S6: applying a dynamic shock wave to the bottom of the pit in the three-dimensional geomechanical model of the whole life cycle of open-pit to underground mining according to the stress wave data obtained by the discontinuous deformation analysis method, and obtaining the stress, displacement, vibration velocity and plastic zone distribution of the bottom structure or mining tunnel under the impact stress load; Step S7: Evaluate the stability of the bottom structure or the mining tunnel according to the stress, displacement, vibration velocity and plastic zone distribution of the bottom structure or the mining tunnel and the judgment criteria.
2. The method for safety assessment of underground mining induced landslide impact during open-pit to underground caving mining according to claim 1 is characterized in that: The specific process of step S1 is as follows: Step S11: rock mass surface structural surface measurement; Set up a 3D laser scanner at the open-pit mine steps and conduct 3D laser scanning on the open-pit to underground mining area to obtain information on the rock surface structure; Step S12: measuring the internal structural surface of the rock mass; By drilling blasting holes in the step rock mass and injecting expansion slurry, the step rock mass is broken and the rock mass section is obtained. The rock mass section is scanned by 3D laser to obtain the internal structural surface information of the rock mass. Step S13: Intelligently identify and extract the rock mass structural surface information through the rock mass surface structural surface information and the rock mass internal structural surface information, randomly generate joints based on the extracted rock mass surface structural surface information and the rock mass internal structural surface information, and import them into the discontinuous deformation analysis model to construct a discrete fracture network model of the rock mass structural surface.
3. The method for safety assessment of underground mining induced landslide impact during open-pit to underground caving mining according to claim 2, characterized in that: In step S12, the diameter of the blasting holes is 35-45 mm, the spacing is 15-30 cm, the row spacing is 0.3-0.8 m, and the hole depth is 0.5 times the height of the open-pit step.
4. The method for safety assessment of underground mining induced landslide impact during open-pit to underground caving mining according to claim 2, characterized in that: In step S13, the information of the structural surface of the rock mass surface and the structural surface of the rock mass interior is processed and then extracted; the extracted information includes the occurrence of the structural surface, the distance between adjacent structural surfaces, the roughness of the structural surface and the density of the structural surface; The process of extracting structural surface occurrence information is as follows: Obtain all node information of each structural surface, and perform linear fitting through the least squares method to obtain the plane equation and its normal vector; calculate the inclination α and inclination β of the structural surface in the geodetic coordinate system, and the calculation formula is as follows: The normal vector of the structural surface is (a, b, c), and the structural surface attitude information includes the strike, dip α and dip angle β, and the angle between the strike and dip is 90°; The K-means cluster analysis method is used according to the normal vector data to divide the structural surface into groups. After clustering, the normal vector data of each cluster center is calculated and converted into dip angle data to obtain the average occurrence of each group. The process of extracting the distance between adjacent structural surfaces is as follows: The structural surfaces of the same group are converted into ideal structural surfaces whose normal vectors are consistent with the average normal vector and pass through the geometric center of the structural surfaces, so that the structural surfaces in the same group are parallel to each other, and the distance between adjacent structural surfaces is calculated according to the calculation formula of the perpendicular distance between two parallel planes; The process of extracting the structural surface roughness is as follows: First, the fractal dimension is calculated, and then the roughness of the structural surface is calculated through the fractal dimension; The process of extracting the structural surface density is as follows: Calculate the average trace length based on the trace length measured on site; The average diameter of the thin disk structure surface is calculated based on the average trace length; The structural surface density is calculated based on the average diameter and spacing.
5. The method for safety assessment of underground mining induced landslide impact during open-pit to underground caving mining according to claim 1, characterized in that: Step S2 is specifically as follows: Step S21: Perform mechanical tests on the rock mass structural surface in the mining area to obtain normal stiffness and shear stiffness of different normal stresses and different shear stresses, and obtain shear strength parameters, where the shear strength parameters include cohesion, internal friction angle, and compression strength; Step S22: obtaining the roughness of the structural surface according to the three-dimensional laser scanning, and calculating the shear strength of the structural surface according to the shear stress calculation formula; The calculation formula of the shear strength of the structural surface is as follows: Where, τ is the shear strength; σ n is the cohesive force acting on the structural surface of the rock mass. is the internal friction angle of the rock mass structural surface, JRC is the structural surface roughness coefficient, JCS is the joint compression strength, σ n , and JCS are obtained from mechanical tests, and the rock mass structural surface roughness coefficient JRC is obtained by three-dimensional laser scanning and calculation.
6. The method for safety assessment of underground mining induced landslide impact during open-pit to underground caving mining according to claim 1, characterized in that: Step S3 is specifically as follows: Step S31: Conducting indoor mechanical experiments on rock blocks in the mining area, and classifying the rock mass quality according to structural surface information parameters to obtain RMR values; Step S32: Calculate the geological strength index GSI according to the RMR value, thereby obtaining the Hoek-brown strength criterion parameter value and obtaining the modified Hoek-Brown formula; Step S33: The rock mass mechanical parameters are calculated by the modified Hoek-Brown formula and converted into the reduced Mohr-Coulomb criterion. The calculation formula is as follows: In the formula, σ1 and σ3 are the maximum and minimum principal stresses, respectively, C, are cohesion and internal friction angle, f s is the shear stress on the principal plane of the Mohr-Coulomb criterion; When f s When >0, the material will undergo shear failure; Under the tensile stress state, if the tensile stress exceeds the tensile strength of the material, that is, σ1≥σ3, the material will be tensilely damaged; According to the Hoek-Brown failure criterion, the calculation formula for the reduction of rock mass compressive strength is as follows: s cm =R·k·s α Among them, σ cm is the reduced compressive strength of rock mass, R is the uniaxial compressive strength of rock, s α is the empirical parameter in the Hoek-Brown failure criterion, and the rock mass characteristic parameter k ranges from 1.2 to 2.0; The tensile strength reduction formula of rock mass is as follows: Among them, σ tm is the tensile strength of the rock mass, m b is the Hoek-Brown constant m value of the corresponding rock mass; The formula for reducing the rock mass deformation modulus is as follows: Among them, E m is the rock mass deformation modulus, RMR 76 is the 1976 RMR classification score; GSI is the GSI scoring index of the rock mass; Shear strength reduction: The Mohr-Coulomb failure criterion can be expressed as follows according to the linear relationship between the maximum and minimum principal stresses: σ'1=σ cm +hσ'3 Where h is the fitted slope of the linear relationship between σ'1 and σ'3; Internal friction angle of rock mass after reduction The calculation formula of cohesion C' is as follows:
7. The method for safety assessment of underground mining induced landslide impact during open-pit to underground caving mining according to claim 1, characterized in that: In step S4, the discrete fracture network model of the rock mass structural surface is divided into multiple two-dimensional sections, and a discontinuous deformation analysis method is used to realize the underground mining-induced slope collapse and the landslide body acting on the pit bottom, and a monitoring point is selected at the pit bottom to record the shock wave time history curve to obtain the time history curve with the maximum impact force; Step S41: randomly generating joints based on the structural surface information obtained by three-dimensional laser scanning and importing them into the calculation model of the discontinuous deformation analysis method; Step S42: dividing the ore body into different two-dimensional discrete blocks according to the actual open-pit mine layout and the mining middle section; Step S43: performing discontinuous deformation analysis iterative calculation on the divided two-dimensional discrete blocks; A two-dimensional discrete block has six degrees of freedom, expressed as follows: [D i ]=(u0v0r0ε x e y e xy ) T Among them, u0 and v0 represent the rigid body displacement of a special point (x0, y0) inside the block, angle r0 is the rotation angle of the block around the rotation center (x0, y0), and ε x ,ε y and ε xy are the three strain components of the block; The displacement (u, v) of any point (x, y) in a two-dimensional discrete block is given by the following formula: Among them, [T i ] is called the displacement transformation matrix, and the subscript i represents the i-th block; Each two-dimensional discrete block is connected and forms a block system by relying on the contact between blocks and the displacement constraint of a single two-dimensional discrete block. The expression formula is as follows: Where n is the number of two-dimensional discrete blocks, D i represents the deformation variable of block i, F i is the load assigned to the six deformation variables on block i, K ii The material mechanical properties of block i and K ij For i≠j, K ij is determined by the contact relationship between blocks i and j; Minimization of the total potential energy П generated by forces and stresses results in the equilibrium equation, the i-th column of which consists of 6 linear equations as follows: Where d ri is the displacement variable of block i; The equilibrium equations for all loads and contact forces acting on block i in the x and y directions are as follows: The moment balance equation for all loads and contact forces acting on block i is as follows: The equilibrium equations for all external forces and stresses acting on block i in the x and y directions are as follows: The total potential energy П is the sum of the potential energies of various stresses and forces. The potential energy, differentials, and partial derivatives of various stresses and forces are calculated separately. Partial guide For the variable d ri Taking the derivative of the minimization of the total potential energy П, we obtain the unknown term d of the equilibrium equation sj The coefficient of The minimization of the total potential energy П gives the free term of the equilibrium equation, the partial derivative All entries of form a 6×1 submatrix, added to the submatrix [F i ], the block contact relationship tracking, equation group assembly, super relaxation iterative solution, contact iteration and block motion calculation are carried out in the above manner; Step S44: Select a monitoring point at the bottom of the pit and record the shock wave time history curve.
8. The method for safety assessment of underground mining induced landslide impact during open-pit to underground caving mining according to claim 1, characterized in that: Step S5 specifically includes: firstly, using 3D mine software to establish a solid model for each mining method, then importing the established solid model into RS3 software for Boolean operation and meshing, and finally importing the mesh into FLAC 3D software for grouping and calculation.
9. The method for safety assessment of underground mining induced landslide impact during open-pit to underground caving mining according to claim 1, characterized in that: In step S7, the evaluation criteria include displacement criteria, stress concentration criteria, plastic zone criteria, and particle vibration velocity criteria; The displacement criterion is characterized by the wall convergence ratio WCR, the top plate sinking ratio RSR and the bottom plate heave ratio FHR; The stress concentration criterion is characterized by the stress concentration factor SCF.
Citation Information
Patent Citations
Test method and test system used for model of transferring open pit mining into underground mining
CN103399139A
Strip mine underground goaf overlying rock mass stability dynamic evaluation method
CN112241921A
Rock burst danger evaluation method based on dynamic and static load simulation
CN113343548A
Method for controlling damage of slope rock movement of open-pit-to-underground sill-pillar-free sublevel caving hanging-wall ore
CN116104496A