A robot automatic control method and system based on scheduling instructions
Through the robot automatic control method based on scheduling instructions, the problem of difficult scheduling and response of traditional robot control systems in complex environments is solved, matching tasks and robots and path optimization are achieved, and operating efficiency and safety are improved.
Patent Information
- Application Number
- CN202411104666.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-08-13
AI Technical Summary
Traditional robot control systems are difficult to achieve efficient scheduling and real-time response in complex and dynamic working environments. Especially in the case of multi-robot collaboration, there are problems of poor adaptation and inaccurate control.
Adopt a robot automatic control method based on scheduling instructions, collect task requirements and robot capability data, construct a task requirement matrix and a robot capability matrix, combine the priority evaluation function for task allocation, and use the Bezier curve model and dynamic obstacle avoidance navigation function Optimize paths to ensure smooth and safe paths.
It achieves more comprehensive and accurate task priority assessment, more accurate robot path prediction, and higher operating efficiency, ensuring safe operation and path optimization in dynamic environments.
Smart Images

Figure CN118617425B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of automatic control technology, and in particular to a robot automatic control method and system based on scheduling instructions. Background Art
[0002] With the development of industrial automation and intelligent manufacturing, the application of robots in various industries has become more and more extensive. However, traditional robot control systems usually rely on pre-programming or direct control by operators, which may not be flexible and efficient in complex or changing working environments. For example, in scenarios such as warehouse logistics, manufacturing workshops or service industries, robots need to respond quickly to environmental changes and adjustments to task requirements. Existing robot systems often have difficulty in achieving efficient scheduling and real-time response, especially in the case of multi-robot collaboration. In addition, current robot control systems often require high computing resources and expertise when handling complex tasks and decisions, which limits their widespread application.
[0003] In the existing patent CN202110763230.3, a robot control system and a robot control method are proposed: a controller, an FPGA and multiple actuators; the FPGA is connected to the controller in communication; the FPGA is provided with multiple interface controllers, and the interface controllers are connected to the actuators in a one-to-one communication manner, and the interface controllers are all driven by the same clock signal; because the interface controllers are all driven by the same clock signal, when the FPGA distributes the control instructions, it will send each control sub-instruction at the same time to ensure the consistency of the control sub-instruction sending time, so as to ensure that the time difference τ between adjacent actuators reaching the target position is eliminated, thereby ensuring the stability of the center of gravity of the entire system. In the prior art, there are technical problems of poor self-adaptation and inaccurate control in the automatic control process of the robot. Summary of the invention
[0004] In order to solve the above problems existing in the prior art, the present invention proposes a robot automatic control method and system based on scheduling instructions.
[0005] The technical solution of the present invention is as follows:
[0006] On the one hand, the present invention provides a robot automatic control method based on scheduling instructions, and the specific steps include:
[0007] Collect diversified task requirements, analyze the required robot capabilities according to the relevant attributes of the target tasks, and classify all tasks; quantify the robot capabilities required for various tasks and create a task requirement matrix;
[0008] Collect historical performance data and current status information of each robot, classify and evaluate the capabilities of each robot, and build a robot capability matrix;
[0009] All target tasks are sorted according to the priority evaluation function, and robots and target tasks are allocated in an orderly manner based on the task requirement matrix and robot capability matrix;
[0010] According to the current position of the robot and the target position of the target task, the action trajectory model is constructed for initial path planning, and then the initial path is smoothed and optimized through the optimized Bezier curve model;
[0011] Finally, the real-time environmental data is obtained through the sensors carried by the robot, and the dynamic obstacle avoidance navigation function is used to make real-time adjustments to the optimized initial path based on the real-time environmental data. Then, a comprehensive evaluation function is introduced to coordinate path optimization and safe obstacle avoidance.
[0012] As a preferred implementation, the relevant attributes of the target task include task ID, task type, target location, estimated duration, and deadline.
[0013] As a preferred implementation, the current status information of the robot includes robot ID, current location, power status and task queue.
[0014] As a preferred implementation, each row in the task requirement matrix represents a target task, and each column represents a capability of the robot.
[0015] As a preferred implementation, each row in the robot capability matrix represents a target robot, and each column represents a capability of the target robot, wherein the capability score calculation formula of each element is as follows:
[0016]
[0017] In the formula, Scoring the technical parameters, give a basic score based on the robot's technical specification sheet; The historical performance adjustment factor adjusts the robot's score based on its performance in past tasks; is the current state adjustment factor, which adjusts the score according to the current state of the robot;
[0018] Then, dynamic factors are introduced to dynamically adjust the capability score of each element in the robot capability matrix according to the robot's usage frequency and maintenance history. The specific calculation formula is as follows:
[0019]
[0020] In the formula, is the adjusted score, is the usage frequency of robot i, is the attenuation coefficient.
[0021] As a preferred implementation, the specific calculation formula of the priority evaluation function is as follows:
[0022]
[0023]
[0024] In the formula, The urgency of the task; The deadline for the task; is the current time; The estimated duration required to complete the task; for resource adequacy; is the complexity of the task; is the average delay time for similar tasks in history; is the weight factor.
[0025] As a preferred implementation, the specific calculation formula for the initial path of the initial path planning step of constructing the action trajectory model according to the current position of the robot and the target position of the target task is as follows:
[0026]
[0027] In the formula, is the initial path of the robot from the current position to the target position; A coefficient that balances path length and motion characteristics; To balance the influence coefficient of path length and environmental obstacles; For the The distance from the obstacle to the robot's current path; is the total number of obstacles in the environment; is the acceleration; The time required to get from the current location to the target location; The speed at which the robot starts moving; is the horizontal coordinate of the target task location, is the horizontal coordinate of the robot's current position.
[0028] As a preferred implementation, the calculation formula for smoothing and optimizing the initial path by using the optimized Bezier curve model is specifically:
[0029]
[0030] In the formula, is the position of the point that changes with the parameter t; t is an introduced parameter, ranging from 0 to 1, indicating the progress of the curve; is the total number of control points; is the binomial coefficient, which means taking n different elements The number of combinations of elements; For the The positions of the control points are based on the initial path. to determine the key turning points; is the weight coefficient for controlling the path smoothness; is a Bezier curve.
[0031] As a preferred implementation, the specific calculation formula for real-time adjustment of the optimized initial path through the dynamic obstacle avoidance navigation function is as follows:
[0032]
[0033] In the formula, is the urgency and difficulty of avoiding obstacles when the robot is at position (x, y) at a given time t; represents the distance from the obstacle to the robot at time t; is the velocity vector of the obstacle, is the velocity vector of the robot, is a small constant; is the proportionality coefficient.
[0034] On the other hand, the present invention provides a robot automatic control system based on scheduling instructions, comprising:
[0035] The target task analysis module collects diversified task requirements, analyzes the required robot capabilities according to the relevant attributes of the target tasks, and classifies all tasks; quantifies the robot capabilities required for various tasks and creates a task requirement matrix;
[0036] The robot capability analysis module collects the historical performance data and current status information of each robot, classifies and evaluates the capabilities of each robot, and constructs a robot capability matrix;
[0037] The robot task allocation module sorts all target tasks according to the priority evaluation function, and allocates robots and target tasks in an orderly manner based on the task requirement matrix and robot capability matrix;
[0038] The motion trajectory planning module builds a motion trajectory model based on the current position of the robot and the target position of the target task to perform initial path planning, and then smoothes and optimizes the initial path through an optimized Bezier curve model;
[0039] The motion trajectory tuning module finally obtains real-time environmental data through the sensors carried by the robot, uses the dynamic obstacle avoidance navigation function to make real-time adjustments to the optimized initial path based on the real-time environmental data, and then introduces a comprehensive evaluation function to coordinate path optimization and safe obstacle avoidance.
[0040] The present invention has the following beneficial effects:
[0041] 1. The present invention introduces a priority evaluation function and takes into account multiple factors such as urgency, deadline, resource sufficiency, etc., so that the priority evaluation of tasks is more comprehensive and accurate. By creating a task requirement matrix and a robot capability matrix, specific tasks can be effectively matched with the most suitable robots to ensure that each task is performed by the most suitable robot.
[0042] 2. The present invention combines the robot's dynamic characteristics and environmental factors to construct a motion trajectory model that can more accurately predict the robot's optimal path; the Bezier curve makes the robot's motion path smoother and reduces unnecessary turns; the dynamic obstacle avoidance navigation function is designed to respond to changes in obstacles in the environment in real time, ensuring the robot's safe operation in a dynamic environment; the introduction of a comprehensive path evaluation function can effectively avoid collisions with obstacles while following the optimized path, balancing the needs of path optimization and safe obstacle avoidance.
[0043] 3. The present invention uses sensors to perceive the surrounding environmental conditions in real time, and corrects the route in real time according to the obstacles around the robot, so that the robot can operate more efficiently and the route is more accurate. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] Figure 1 is a flow chart of the steps of the present invention;
[0045] Figure 2 Provides an idea for the technical specifications of the robot parameters;
[0046] Figure 3 It is a system structure diagram of the present invention. DETAILED DESCRIPTION
[0047] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0048] It should be understood that the step numbers used in this document are only for convenience of description and are not intended to limit the order in which the steps are executed.
[0049] It should be understood that the terms used in the present specification are only for the purpose of describing specific embodiments and are not intended to limit the present invention. As used in the present specification and the appended claims, unless the context clearly indicates otherwise, the singular forms "a", "an" and "the" are intended to include plural forms.
[0050] The terms “include” and “comprising” indicate the presence of described features, integers, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or combinations thereof.
[0051] The term "and / or" means and includes any and all possible combinations of one or more of the associated listed items.
[0052] Embodiment 1:
[0053] See also Figure 1 , a robot automatic control method based on scheduling instructions, the specific steps include:
[0054] S1. Collect diversified task requirements, analyze the required robot capabilities according to the relevant attributes of the target tasks, and classify all tasks; quantify the robot capabilities required for various tasks and create a task requirement matrix;
[0055] S2. Collect historical performance data and current status information of each robot, classify and evaluate the capabilities of each robot, and build a robot capability matrix;
[0056] S3. Sort all target tasks according to the priority evaluation function, and allocate robots and target tasks in an orderly manner by combining the task requirement matrix and the robot capability matrix;
[0057] S4, constructing an action trajectory model according to the current position of the robot and the target position of the target task for initial path planning, and then smoothing and optimizing the initial path through an optimized Bezier curve model;
[0058] S5. Finally, the real-time environmental data is obtained through the sensors carried by the robot. The dynamic obstacle avoidance navigation function is used to adjust the optimized initial path in real time according to the real-time environmental data, and then a comprehensive evaluation function is introduced to coordinate path optimization and safe obstacle avoidance.
[0059] In this embodiment, the above steps are specifically as follows:
[0060] Collect diversified task requirements, and use the data analysis library to analyze the collected diversified tasks and convert them into a standard format for further processing. Each task includes information such as task type, target location, estimated time, and latest completion time;
[0061] Next, we analyze the task. The specific analysis process is as follows:
[0062] Define each task as an independent entity object, analyze the task to include all relevant attributes, such as task ID, task type (such as grasping, transportation, assembly), target location, estimated duration, deadline; identify the specific requirements of the task for the robot, such as grasping ability, transportation ability, and precision operation ability; classify the tasks into different types according to the characteristics of the tasks, such as classifying all tasks that require grasping operations into one category, and all tasks that require transporting items into another category; further, for each type of task, evaluate the level of demand for different robot capabilities of the task. For grasping tasks, robots with high-level grasping capabilities are required. For transportation tasks, more emphasis is placed on transportation capability. The demand level is represented by numbers, such as 1 for low demand and 5 for high demand. The demand level is quantified, and a demand level list is created for each task, where each element in the list corresponds to a demand level for a robot capability. For example, for a specific grasping task, its demand level list may be [5 (grasping capability), 2 (transportation capability), 1 (precision operation capability)]. Finally, a task demand matrix T is created based on the demand level list for each task, where each row represents a task, each column represents a capability of the robot, and the matrix element Tij represents the demand level of task i for capability j.
[0063] At the same time, graph theory methods are used to analyze the correlation between tasks to determine whether the tasks are dependent or can be executed in parallel;
[0064] Obtain status information of each robot from the robot control module, such as robot ID, current position, power status, and task queue; for a robot currently executing a task, calculate its estimated completion time based on the estimated remaining time of the current task and the estimated time of subsequent tasks in the task queue;
[0065] Furthermore, the robot capabilities are evaluated, and a detailed technical evaluation is performed on each robot, the technical evaluation includes the robot's handling capacity, operating accuracy, speed, and durability; the historical performance data of each robot is collected, the historical performance data includes the task completion rate, failure rate, and average operating time; the status data of each robot is monitored in real time, the status data includes the real-time position and power status; the collected data is further standardized to unify the performance indicators of different robots for fair comparison; the historical performance data is then analyzed using a machine learning algorithm to obtain data analysis results, the data analysis results include the robot's strengths and weaknesses; and based on the data analysis results, the robot's capabilities are classified and evaluated; and a robot capability matrix is further constructed. , any one of which can be express, Represents the score of robot i on capability j:
[0066]
[0067] in, It is the technical parameter score. According to the robot's technical specification sheet, each ability has a basic score; is the historical performance adjustment factor, which adjusts the robot's score based on its performance in past tasks; is the current status adjustment factor, which adjusts the score according to the current status of the robot (such as power level, maintenance status);
[0068] In this embodiment, the robot's technical specification sheet is an important reference for measuring the robot's performance and applicability, covering various technical parameters of the robot, including but not limited to arm span, load capacity, repeatability, power capacity, weight, and maximum speed, etc. Figure 2 shown.
[0069] Furthermore, the scoring indicators in the matrix are converted into comparable numerical values; data normalization and weighting techniques are applied to adjust the values in the matrix to ensure that the comparison between different capabilities and states is fair and reasonable; in order to improve the accuracy of the evaluation, dynamic factors are introduced to dynamically adjust the capability score of the robot according to its usage frequency and maintenance history;
[0070]
[0071] in, is the adjusted score, is the usage frequency of robot i, α is the attenuation coefficient;
[0072] Further, the priority of each task is calculated. This application introduces a priority evaluation function to evaluate the priority of each task. The specific implementation formula of the priority evaluation function is as follows:
[0073]
[0074]
[0075] in, It is the task urgency, indicating the urgency of the task; It is the task deadline, the final completion time of the task; is the current time, the current time when scoring; is the estimated duration, the time required to complete the task; is the resource adequacy, the adequacy of resources available to complete the task; is the task complexity, which describes how easy it is to complete the task; is the historical delay impact, which describes the average delay time of similar tasks in history and is used to reflect the historical execution efficiency; is a weight factor, which is used to balance the impact of various factors, taking into account the different degrees of influence of different factors on task priority;
[0076] In the above assessment process, the urgency and resource adequacy Directly impacts priority; deadline The closer it is, the higher the priority of the task. Use the inverse form to express this urgency; duration and task complexity The shorter / lower the task, the easier it is to complete quickly, so their inverse is positively correlated with priority; historical delays affect It reflects the historical execution efficiency of similar tasks and is used to adjust the expectations of the current task priority. The priority score can more comprehensively consider various factors that affect the urgency and importance of the task, thereby providing a more accurate and practical priority assessment. This helps the scheduling control system to arrange the task execution sequence and resource allocation more reasonably to improve overall efficiency.
[0077] In particular, if there are dependencies between tasks, the execution order of tasks is adjusted to satisfy these dependencies, and graph theory algorithms are used to handle task dependencies to ensure the rationality of the task execution order;
[0078] The task matrix T is reordered according to the priority. The higher the priority, the higher the ranking of the task. The tasks are assigned in sequence according to the reordered task matrix T, the robot capabilities required for each task, and the capability matrix of each robot.
[0079] Furthermore, based on each task evaluation and robot evaluation, map data and path planning algorithms are used to make resource matching and allocation decisions, and obtain detailed and optimized scheduling instructions;
[0080] Collect environmental data around the robot in real time, apply Kalman filter to process noise data from sensors, and improve measurement accuracy and reliability; use image processing technology such as edge detection and object recognition algorithm to identify key features in the environment on images captured by the camera; obtain accurate real-time environmental data; further build an action trajectory model based on the robot's current position, target task position and implementation environment data, and calculate the optimal action trajectory; the specific implementation process is as follows:
[0081] The process of building an action trajectory model based on the robot's current position, target task position, and real-time environmental data and calculating the optimal action trajectory can be divided into the following detailed steps:
[0082] First, locate the robot's current position and determine the target task position; use the robot's built-in positioning system to obtain its precise current position coordinates ; Receive the coordinates of the target task location from the scheduling control module ;
[0083] Further, the environment map is constructed; a grid map is created to represent the robot's working environment. In the grid map, each cell represents a small area in the environment; the map is updated using the data collected by the environment perception module (such as obstacle locations, safe areas); for dynamically changing environments, such as flowing people or moving equipment, the map is updated in real time to reflect the dynamic changes;
[0084] Furthermore, a motion trajectory model is constructed to calculate the initial planning path. The motion trajectory model takes into account the robot's dynamic characteristics and environmental factors to calculate the preliminary path; the specific expression is as follows:
[0085]
[0086] in, Represents the initial path of the robot from the current position to the target position; and is a coefficient used to balance the influence of different factors. is a coefficient that balances path length and motion characteristics, It is to balance the effect of path length and environmental obstacles; It is The distance from the obstacle to the robot's current path; is the total number of obstacles in the environment; is the acceleration, which indicates the acceleration performance of the robot; is time, which indicates the time required to reach the target location from the current location; is the initial speed, which indicates the speed at which the robot starts moving; From the robot's current position To the target location The path geometry length; Based on the kinematic formulas in classical physics, the effects of velocity and acceleration on the path are described; The impact of obstacles in the environment on path selection is considered and added based on the need for obstacle avoidance to ensure the safety of the path;
[0087] Furthermore, in order to optimize the path to reduce turns and total driving distance, the present application designs an optimized path generator to smooth the path. The optimized path generator smoothes and optimizes the initial path through an optimized Bezier curve model; specifically, it is expressed as:
[0088]
[0089] in, is the position of the point that changes with the parameter t; t is an introduced parameter, ranging from 0 to 1, indicating the progress of the curve; is the total number of control points; The binomial coefficient represents the sum of n different elements. The number of combinations of elements; Together we define control points The degree of influence on the curve varies with t; It is The positions of the control points are based on the initial path. to determine the key turning points; is the weight coefficient, which is used to control the smoothness of the path. is the curvature integral of the path, used to reduce sharp turns; is a Bezier curve;
[0090] Furthermore, the present application designs a dynamic obstacle avoidance navigator to solve the obstacle avoidance problem in a dynamic environment. The dynamic obstacle avoidance navigator combines obstacle motion prediction and robot speed adjustment to perform real-time path adjustment; specifically, it is expressed as:
[0091]
[0092] in, is the urgency and difficulty of avoiding obstacles when the robot is at position (x, y) at a given time t; represents the distance from the obstacle to the robot at time t; is the velocity vector of the obstacle, is the velocity vector of the robot, is a small constant used to ensure mathematical stability and avoid numerical errors in extreme cases; is the scaling factor used to adjust the importance of the relative speed factor in obstacle avoidance decisions; is the obstacle distance factor, which focuses on the distance between the obstacle and the robot;
[0093] The robot position after optimization by the optimized path generator The coordinates of , that is, the urgency of obstacle avoidance at this position and time; introduce a comprehensive path evaluation function S(B(t), t), which is defined according to the expert experience method, and scores the path at each time point in combination with the path optimization results and obstacle avoidance requirements, considering both following the optimized path and avoiding collisions; further, by comparing the S values at different time points, the overall optimal planned path is selected, and control instructions are generated based on the optimal planned path, and the robot is automatically controlled according to the control instructions.
[0094] Embodiment 2:
[0095] like Figure 3 As shown, a robot automatic control system based on scheduling instructions includes:
[0096] The target task analysis module collects diversified task requirements, analyzes the required robot capabilities according to the relevant attributes of the target tasks, and classifies all tasks; quantifies the robot capabilities required for various tasks and creates a task requirement matrix;
[0097] In this embodiment, diversified task requirements are collected, the details of each task are deeply analyzed, the urgency and complexity of the tasks are evaluated, the available resources and current status of the robot are taken into consideration, the tasks are prioritized, and resources are efficiently allocated to achieve optimal work efficiency and task sequence, and detailed and optimized scheduling instructions are obtained, which clearly indicate the specific tasks of each robot, the order and schedule of task execution, and the optimized scheduling instructions are transmitted to the robot control module; the task requirements are such as equipment movement, grasping, fixing, releasing and installing.
[0098] A robot capability analysis module collects historical performance data and current status information of each robot, classifies and evaluates the capabilities of each robot, and constructs a robot capability matrix; this module is used to implement the function of step S2 in the above embodiment, which will not be described in detail here;
[0099] The robot task allocation module sorts all target tasks according to the priority evaluation function, and allocates robots and target tasks in an orderly manner in combination with the task requirement matrix and the robot capability matrix; this module is used to implement the function of step S3 in the above embodiment, which will not be described in detail here;
[0100] The action trajectory planning module constructs an action trajectory model according to the current position of the robot and the target position of the target task to perform initial path planning, and then smoothes and optimizes the initial path through an optimized Bezier curve model; this module is used to implement the function of step S4 in the above embodiment, and will not be repeated here;
[0101] The motion trajectory tuning module finally obtains real-time environmental data through the sensors carried by the robot, uses the dynamic obstacle avoidance navigation function to make real-time adjustments to the optimized initial path based on the real-time environmental data, and then introduces a comprehensive evaluation function to coordinate path optimization and safe obstacle avoidance; this module is used to implement the function of step S5 in the above embodiment, which will not be repeated here.
[0102] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A robot automatic control method based on scheduling instructions, It is characterized in that The specific steps include: Collect diversified task requirements, analyze the required robot capabilities according to the relevant attributes of the target task, and classify all tasks at the same time, where the relevant attributes of the target task include task ID, task type, target location, estimated duration, and deadline; quantify the robot capabilities required for each task and create a task requirement matrix; Collect historical performance data and current status information of each robot, classify and evaluate the capabilities of each robot, and build a robot capability matrix; All target tasks are sorted according to the priority evaluation function, and robots and target tasks are allocated in an orderly manner based on the task requirement matrix and robot capability matrix; According to the current position of the robot and the target position of the target task, the action trajectory model is constructed for initial path planning, and then the initial path is smoothed and optimized through the optimized Bezier curve model. The specific calculation formula of the initial path is as follows: In the formula, is the initial path of the robot from the current position to the target position; A coefficient that balances path length and motion characteristics; To balance the influence coefficient of path length and environmental obstacles; For the The distance from the obstacle to the robot's current path; is the total number of obstacles in the environment; is the acceleration; The time required to get from the current location to the target location; The speed at which the robot starts moving; is the horizontal coordinate of the target task location, is the horizontal coordinate of the robot’s current position; The calculation formula of the optimized Bezier curve model is as follows: In the formula, is the position of the point that changes with the parameter t; t is an introduced parameter, ranging from 0 to 1, indicating the progress of the curve; is the total number of control points; is the binomial coefficient, which represents the number of combinations of i-1 elements from n different elements; is the position of the i-1th control point, according to the initial path to determine the key turning points; is the weight coefficient for controlling the path smoothness; is a Bezier curve; Finally, the real-time environmental data is obtained through the sensors carried by the robot. The optimized initial path is adjusted in real time using the dynamic obstacle avoidance navigation function according to the real-time environmental data. Then, a comprehensive evaluation function is introduced to coordinate path optimization and safe obstacle avoidance. The specific calculation formula of the dynamic obstacle avoidance navigation function is as follows: In the formula, is the urgency and difficulty of obstacle avoidance when the robot faces a specific obstacle at position (x, y) at a given time t; represents the distance from the obstacle to the robot at time t; is the velocity vector of the obstacle, is the velocity vector of the robot, is a small constant; is the proportionality coefficient.
2. A robot automatic control method based on scheduling instructions according to claim 1, It is characterized in that Each row in the task requirement matrix represents a target task, and each column represents a capability of the robot.
3. A robot automatic control method based on scheduling instructions according to claim 1, It is characterized in that Each row in the robot capability matrix represents a target robot, and each column represents a capability of the target robot. The capability score calculation formula of each element is as follows: In the formula, Scoring the technical parameters, give a basic score based on the robot's technical specification sheet; The historical performance adjustment factor adjusts the robot's score based on its performance in past tasks; is the current state adjustment factor, which adjusts the score according to the current state of the robot; Then, dynamic factors are introduced to dynamically adjust the capability score of each element in the robot capability matrix according to the robot's usage frequency and maintenance history. The specific calculation formula is as follows: In the formula, is the adjusted score, is the usage frequency of robot i, is the attenuation coefficient.
4. The robot automatic control method based on scheduling instructions according to claim 1, It is characterized in that The specific calculation formula of the priority evaluation function is as follows: In the formula, The urgency of the task; The deadline for the task; is the current time; The estimated duration required to complete the task; for resource adequacy; is the complexity of the task; is the average delay time for similar tasks in history; is the weight factor.
5. A robot automatic control system based on scheduling instructions, It is characterized in that include: The target task analysis module collects diversified task requirements, analyzes the required robot capabilities according to the relevant attributes of the target tasks, and classifies all tasks. The relevant attributes of the target tasks include task ID, task type, target location, estimated duration, and deadline. The robot capabilities required for each task are quantified and a task requirement matrix is created. The robot capability analysis module collects the historical performance data and current status information of each robot, classifies and evaluates the capabilities of each robot, and constructs a robot capability matrix; The robot task allocation module sorts all target tasks according to the priority evaluation function, and allocates robots and target tasks in an orderly manner based on the task requirement matrix and robot capability matrix; The action trajectory planning module constructs an action trajectory model according to the current position of the robot and the target position of the target task for initial path planning, and then smoothes and optimizes the initial path through the optimized Bezier curve model. The specific calculation formula of the initial path is as follows: In the formula, is the initial path of the robot from the current position to the target position; A coefficient that balances path length and motion characteristics; To balance the influence coefficient of path length and environmental obstacles; For the The distance from the obstacle to the robot's current path; is the total number of obstacles in the environment; is the acceleration; The time required to get from the current location to the target location; The speed at which the robot starts moving; is the horizontal coordinate of the target task location, is the horizontal coordinate of the robot’s current position; The calculation formula of the optimized Bezier curve model is as follows: In the formula, is the position of the point that changes with the parameter t; t is an introduced parameter, ranging from 0 to 1, indicating the progress of the curve; is the total number of control points; is the binomial coefficient, which represents the number of combinations of i-1 elements from n different elements; is the position of the i-1th control point, according to the initial path to determine the key turning points; is the weight coefficient for controlling the path smoothness; is a Bezier curve; The action trajectory tuning module finally obtains real-time environmental data through the sensors carried by the robot, uses the dynamic obstacle avoidance navigation function to adjust the optimized initial path in real time according to the real-time environmental data, and then introduces a comprehensive evaluation function to coordinate path optimization and safe obstacle avoidance. The specific calculation formula of the dynamic obstacle avoidance navigation function is as follows: In the formula, is the urgency and difficulty of obstacle avoidance when the robot faces a specific obstacle at position (x, y) at a given time t; represents the distance from the obstacle to the robot at time t; is the velocity vector of the obstacle, is the velocity vector of the robot, is a small constant; is the proportionality coefficient.
Citation Information
Patent Citations
A robot control system and robot control method
CN113400314B
Carriage quantitative selection method influenced by multiple factors
CN104463548A
Intelligent warehousing optimization method based on game theory
CN108171459A
