A four-way vehicle path planning method and system for high-rise shelves
By obtaining map information and motion status in a high-rise shelf environment, formulating constraint rules, and planning the optimal path for four-way vehicles, the problems of low efficiency and high complexity in the existing technology are solved, efficient path planning is achieved, and the efficiency is improved Inbound and outbound efficiency.
Patent Information
- Application Number
- CN202411096672.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-08-12
AI Technical Summary
The existing four-way vehicle path planning algorithm has low efficiency and high computational complexity in high-rise shelf environments, and cannot effectively handle the handover of goods between multiple four-way vehicles.
A four-way vehicle path planning method and system for high-rise shelves is proposed. By obtaining the map information of the high-rise shelves, collecting the motion status information of the four-way vehicles, and formulating constraint rules, including not allowing multiple four-way vehicles to move at the same time and predicting Assume the longest moving time, and plan the optimal path based on this information.
It effectively solves the complex path selection problem in high-rise shelf environment, shortens the vehicle driving distance, reduces energy consumption, and improves the efficiency of entering and exiting the warehouse.
Smart Images

Figure CN118618778B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of path planning, and in particular to a four-way vehicle path planning method and system for high-rise shelves. Background Art
[0002] With the rapid growth of e-commerce and logistics demand, warehouse management faces huge challenges, especially in terms of increasing storage density and improving warehousing efficiency. Traditional warehousing systems often lead to low space utilization and high operating costs due to the lack of flexibility and efficient path planning. As a new type of intelligent warehousing equipment, the four-way car can move freely in horizontal and vertical directions, greatly improving the flexibility and operating efficiency of the warehouse.
[0003] At present, there are many four-way vehicle path planning algorithms on the market that have proposed effective four-way vehicle path planning methods. These methods only have good effects on low-level shelves, but cannot make special optimizations for complex high-level shelves, so there are still problems of low efficiency and high computational complexity. In addition, the existing methods do not consider the docking of goods between four-way vehicles, and the docking of goods between multiple four-way vehicles is very common in high-level shelves. Directly using the uniform speed model for path planning is not suitable for the handover of goods between four-way vehicles.
[0004] Therefore, it is urgent to propose a four-way vehicle path planning method for high-rise shelves. Summary of the invention
[0005] To solve one of the above problems, the present invention provides a four-way vehicle path planning method and system for high-rise shelves.
[0006] To achieve the above object, the technical solution of the present invention is specifically implemented as follows:
[0007] On the one hand, the present invention provides a four-way vehicle path planning method for high-level shelves, which is applied to the path planning of four-way vehicles running in a warehouse equipped with high-level shelves, comprising: obtaining map information of the high-level shelves, the map information including the coordinates of nodes, and the nodes representing the warehouse locations of the high-level shelves; collecting the motion state information of all four-way vehicles running in the warehouse of the high-level shelves to generate a state set; obtaining constraint rules, the constraint rules including a first constraint and a second constraint, wherein the first constraint is defined as not allowing multiple four-way vehicles to appear at the same node in motion at the same time, and the second constraint is defined as that any four-way vehicle moving from one node to another adjacent node must be completed within a preset maximum moving time; obtaining operation requirements, determining the four-way vehicle to be operated according to the operation requirements, and planning the moving path of the four-way vehicle to be operated based on the map information, the state set, the constraint rules and the operation requirements.
[0008] On the other hand, the present invention provides a four-way vehicle path planning system for high-rise shelves, which is applied to the path planning of four-way vehicles running in warehouses equipped with high-rise shelves, and includes: a map construction unit, which is used to obtain map information of the high-rise shelves, and the map information includes the coordinates of nodes, and the nodes represent the warehouse locations of the high-rise shelves; a state generation unit, which is used to collect the motion state information of all four-way vehicles running in the warehouse of the high-rise shelves and generate a state set; a penalty unit, which is used to obtain constraint rules, and the constraint rules include a first constraint and a second constraint, wherein the first constraint is defined as not allowing multiple four-way vehicles to appear at the same node in motion at the same time, and the second constraint is defined as that any four-way vehicle moving from one node to another adjacent node must be completed within a preset maximum moving time; a path planning unit, which is used to obtain operation requirements, determine the four-way vehicle to be operated according to the operation requirements, and plan the moving path of the four-way vehicle to be operated based on the map information, the state set, the constraint rules and the operation requirements.
[0009] The beneficial effect of the present invention is that, through the four-way vehicle path planning method and system for high-level shelves provided by the present invention, path planning is performed for the storage system of the high-level shelves. By converting the high-level shelves into a two-dimensional grid map, constructing constraint rules, and introducing the constraint rules into path planning, the complex path selection problem in the high-level shelf environment can be effectively solved, and the optimal path planning of the vehicle can be achieved, thereby shortening the vehicle driving distance, reducing energy consumption, and improving the efficiency of entering and leaving the warehouse. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 A flow chart of the four-way vehicle path planning method provided by the present invention;
[0011] Figure 2 A schematic diagram of the locations of multiple nodes in a shelf provided by the present invention;
[0012] Figure 3 This is a schematic diagram of the four-way vehicle path planning system provided by the present invention. DETAILED DESCRIPTION
[0013] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0014] This embodiment provides a four-way vehicle path planning method for high-rise shelves, which is applied to the path planning of four-way vehicles running in a warehouse with high-rise shelves. Figure 1 As shown, the four-way vehicle path planning method includes:
[0015] Step S101, obtaining map information of the high-level shelf, the map information includes the coordinates of the nodes, and the nodes represent the warehouse locations of the high-level shelf.
[0016] In an optional embodiment, obtaining the map information of the high-level shelf includes: converting each layer of the high-level shelf to obtain a two-dimensional grid map, wherein the two-dimensional grid map contains the coordinate information of the nodes; and storing the two-dimensional grid map in the form of a picture set. Specifically, when obtaining the map information of the high-level shelf, first convert each layer of the high-level shelf into a two-dimensional grid map and store it in the form of a picture set. ,in, is a collection of graphs, elements is the 2D grid map for each layer, Indicates the number of layers of high-level shelves. Each element is ,in Represents a node collection , the specific meaning is the coordinate value; Represents the set of edges between nodes ; Nodes represent the warehouse locations of high-level shelves; edges represent the tracks connecting different warehouses. By converting high-level shelves into multiple two-dimensional network maps, high-level shelves can be managed intuitively. By accurately determining the specific coordinates of each warehouse, it is beneficial to accurately shift the four-way vehicle and reduce the error rate.
[0017] Step S102, collect the motion state information of all four-way vehicles running in the high-level shelf storage, and generate a state set; specifically, the motion state information may include speed, acceleration, motion direction, node position in the map and other information, and construct these motion state information into a state set ,in Indicates is the set of states of the car, and Contains the status at different times . By constructing a collection containing the motion status information of different four-way vehicles and at different times, the motion status of the four-way vehicle at a certain moment can be easily and quickly queried. By collecting the motion status of the four-way vehicle, it is beneficial to more accurately plan the path of the four-way vehicle. For example, knowing the speed and acceleration information of the current four-way vehicle can take into account whether the four-way vehicle needs to accelerate or decelerate when planning the path; knowing the current movement direction of the four-way vehicle can take into account whether the four-way vehicle needs to turn when planning the path.
[0018] Step S103, obtaining constraint rules, the constraint rules include a first constraint and a second constraint, wherein the first constraint is defined as not allowing multiple four-way vehicles to appear at the same node in motion at the same time, and the second constraint is defined as any four-way vehicle moving from one node to another adjacent node must be completed within the preset maximum moving time; specifically, a corresponding penalty mechanism can be set according to the constraint rules to prevent the selection of a path that violates the constraint rules. The preset maximum moving time is to prevent the moving path from being too long, and the value of the maximum moving time can be selected according to the storage site and scene. The first constraint is set to take into account that if multiple four-way vehicles arrive at a certain node in motion at the same time, on the one hand, it may force the four-way vehicles to slow down and pass through, affecting the overall traffic speed, and on the other hand, collisions may occur between the four-way vehicles, resulting in the loss of the four-way vehicles; the second constraint is to set a threshold for the maximum travel time of a path to prevent the selection of a path that takes too long, thereby improving efficiency.
[0019] In a specific implementation, when performing subsequent calculations for path planning, if a certain path violates the above-mentioned constraint rules, the path that violates the constraint rules can be prevented from being selected by applying a penalty coefficient to the path. For example, when one of the paths violates any of the above two constraints, a penalty is imposed. In this embodiment, a penalty coefficient can be set for the penalty. The coefficient is a very large value (such as 999, etc., which can be comprehensively considered according to the specific scenario and computational complexity). The penalty coefficient will be involved in the calculation of the travel time of the path, so that the final travel time of the path will be much longer than other paths that have not been penalized, so that the path is not selected as the optimal path. If the path does not violate any of the above-mentioned constraint rules, the penalty coefficient value is 1, which will not affect the subsequent calculation of the travel time of the path.
[0020] In addition, if all paths violate the second constraint rule, you can consider waiting or using multiple four-way vehicles to run in sections to deliver goods to complete the task.
[0021] In an optional implementation, the first constraint is expressed as:
[0022] ; (1)
[0023] in, It represents the process of a four-way vehicle moving to a target node in a certain direction. Indicates direction, The value 1 indicates east. The value 2 indicates south. The value 3 indicates west. The value 4 indicates north. Indicates the target node number, Indicates the four-way vehicle number. Indicates any j node;
[0024] The second constraint is expressed as:
[0025] ; (2)
[0026] in, Indicates The average moving speed of the four-way vehicles is Indicates a four-way vehicle slave node To Node The distance traveled, Represents the longest moving time. When the above constraint formula is not satisfied, it can be considered as a violation of the above constraint. Through the constraint calculation formula, it is possible to directly and quickly calculate whether the path violates the constraint rule, so as to obtain the penalty coefficient.
[0027] Step S104, obtain the operation requirements, determine the four-way vehicle to be operated according to the operation requirements, and plan the moving path of the four-way vehicle to be operated based on the map information, state set, constraint rules and operation requirements. Specifically, the operation requirements are generally determined according to the operation tasks. For example, the operation requirements may be goods out of the warehouse, goods in the warehouse, goods movement, etc. The purpose of path planning is to select a moving path that takes the shortest time and does not violate the constraint rules. Therefore, it is necessary to comprehensively select the shortest route based on map information (such as obtaining the coordinates of the starting point and the target point), motion state information (such as whether acceleration and deceleration are required, whether turning is required), etc., while also taking into account not violating the constraint rules. The path planning of this embodiment can be implemented using an adaptive path planning model. In addition, when performing path optimization, a local map can be used to implement a locally optimal adaptive path planning method. Specifically, when the coordinate distance between the starting point and the target point exceeds a preset threshold, in this embodiment, the intermediate node with a preset step length from the starting point can be traversed first, and the optimal intermediate node can be selected through the target optimization model. When the optimal intermediate node is found, the intermediate node is used as the new starting point to continue searching until the final target node is found, that is, the entire planning is completed step by step through the local map. Of course, when the coordinate distance between the starting point and the target point does not exceed the preset threshold, the target optimization model can be directly used to select the optimal path to reach the target point.
[0028] The four-way vehicle path planning method for high-rise shelves provided in this embodiment performs path planning for the storage system of high-rise shelves. By converting the high-rise shelves into a two-dimensional grid map, constructing constraint rules, and introducing the constraint rules into path planning, it can effectively solve the complex path selection problem in the high-rise shelf environment and realize the optimal path planning of the vehicle, thereby shortening the vehicle driving distance, reducing energy consumption, and improving the efficiency of entering and leaving the warehouse.
[0029] In an optional specific implementation, the moving path of the four-way vehicle to be operated is planned based on map information, state sets, constraint rules and operation requirements, including: obtaining the current coordinates of the four-way vehicle to be operated; obtaining the current motion state of the four-way vehicle to be operated according to the state set, and the current motion state includes the current driving direction; obtaining the target node coordinates according to the operation requirements and map information; performing calculations based on the map information, the current coordinates and the target node coordinates to obtain all passable paths; calculating the travel time of each passable path according to the current motion state of the four-way vehicle to be operated, the travel time of the passable path refers to the time taken for the four-way vehicle to be operated to move from the current coordinates to the target node coordinates through the passable path; and establishing the passable path that meets the constraint rules and has the shortest travel time as the optimal passable path. Specifically, the warehouse locations of the four-way vehicle to be operated and the target node can be determined according to the operation requirements, and the coordinates of the target node can be determined according to the map information. The motion state information of the four-way vehicle to be operated can be found according to the state set, and the coordinate information of the four-way vehicle to be operated can be queried; then, according to the location of each node on the map, all accessible paths can be traversed; and the motion state information (such as whether acceleration and deceleration are required, whether turning is required) can be combined to select the shortest route, while also taking into account not violating the constraint rules. By comprehensively considering multiple factors such as map information and motion state information to complete path planning, and introducing constraint rules into path planning, the algorithm can better meet the needs of high-level shelves.
[0030] In an optional specific implementation, the problem of cargo handover of four-way vehicles can also be considered. In the path planning, the movement is divided into uniform and non-uniform movement, so that the algorithm is more in line with the needs of high-level shelves. Therefore, when calculating the travel time of each passable path according to the current motion state of the four-way vehicle to be operated, whether the four-way vehicle needs to carry out cargo handover can also be taken into consideration. The specific method includes: determining whether there is a handover demand according to the operation demand; if there is no handover demand, the four-way vehicle to be operated is moved at a preset speed at a uniform speed as a condition to calculate the travel time of each passable path respectively; if there is a handover demand, the four-way vehicle to be operated is moved at a non-uniform speed as a condition to calculate the travel time of each passable path respectively. When there is no handover demand and uniform movement, the preset speed can be the current speed of the four-way vehicle, or it can be a preset speed. When there is a handover demand, due to the confluence and handover between multiple four-way vehicles, the four-way vehicle will have deceleration and acceleration during operation.
[0031] A specific calculation example is given below to illustrate how to plan the path of a four-way vehicle, but the present invention is not limited thereto.
[0032] The goal of path planning is to select the shortest route for a four-way vehicle from its starting point to its destination. The time taken for the selected route is expressed as , in, Indicates four-way vehicle The time to complete the task, It is related to both the distance and speed of movement.
[0033] Figure 2 A schematic diagram showing the locations of multiple nodes in a shelf. Figure 2 A, B, C, D, E, F, G, H and I in the figure represent a node in the rack. For a four-way vehicle running in the rack, there are multiple paths to move from one node to another. For example, to move from node B to node A, the feasible paths are as follows:
[0034] (1) B---C---I---A;
[0035] (2) B---D---E---F---G---H---I---A;
[0036] (3) B---A;
[0037] (4) B---C---I---H---G----A;
[0038] Ideally, path (3) takes the least time. However, due to the existence of the first constraint, if there are other four-way vehicles on the road between nodes B and A, path (3) may become impassable within the normal completion time. Therefore, when selecting a path, the status of other four-way vehicles in the local map including the starting point and the end point must also be considered.
[0039] In addition, for the movement speed of the four-way vehicle, if there is no handover requirement in the local map, it can move at a constant speed according to the preset speed. If handover is required, there is a deceleration and acceleration movement. Taking the above considerations into consideration, this embodiment can adopt a local optimal adaptive path planning method, and the constructed optimization objectives are as follows:
[0040] ; (3)
[0041] in, Indicates that four-way vehicles are t The state of the moment, Indicates that four-way vehicles are t Operation at all times, represents the set of operations for a four-way vehicle, Indicates in status Perform the following operations The penalty coefficient obtained is First in the state Traverse all nodes under the preset step size of the node, and take the node with the shortest straight-line distance to the end point as the local target node. All nodes under the preset step size constitute a local map. Indicates whether to carry out the handover task. If so, h The value is 1, if it does not carry any tasks h The value is 0. Value according to the bearer parameter h There are two settings: When the speed is constant, the calculation method is to divide the distance by the speed used for uniform running. , get the time .when When , first determine whether there is a four-way vehicle connecting with it in the local map. If not, still follow , if there is a four-way vehicle to be connected with it, then the four-way vehicle to be connected with it is informed to wait, and the node where the four-way vehicle is located is used as the new local target node, and the four-way vehicle handover mechanism is started:
[0042] ; (4)
[0043] in, is the braking distance, is the speed in uniform motion, is the time when the brake mechanism is activated, is the friction coefficient between the track and the tire, is the acceleration due to gravity, is the height of the vehicle's center of gravity, is the wheelbase of a four-way vehicle, is the mass of the four-way vehicle, is the deceleration during braking, is the braking time. Equal to the deceleration from the current coordinate position to the target node , perform uniform deceleration motion, calculate the time required .at last use Path time for all accessible target nodes under the local map Calculate and give the optimal operation strategy according to formula (3) , Contains the four-way car movement path and movement speed ( If uniform speed is used, Then use the result calculated by formula (4). Use formula (3) to iterate until the end point is reached, completing the path optimization.
[0044] This embodiment also provides a four-way vehicle path planning system for high-rise shelves, which is applied to the path planning of four-way vehicles running in a warehouse with high-rise shelves, and is used to execute the above-mentioned four-way vehicle path planning method. The contents already described in the above-mentioned method will not be repeated here, and only the framework of the four-way vehicle path planning system will be described. Figure 3 As shown, the four-way vehicle path planning system includes:
[0045] The map construction unit 301 is used to obtain the map information of the high-level shelf, the map information includes the coordinates of the nodes, and the nodes represent the warehouse locations of the high-level shelf; in an optional specific implementation, the map construction unit 301 obtains the map information of the high-level shelf, including: converting each layer of the high-level shelf to obtain a two-dimensional grid map, wherein the two-dimensional grid map includes the coordinate information of the nodes; and storing the two-dimensional grid map in the form of a picture set. Specifically, when obtaining the map information of the high-level shelf, the map construction unit 301 first converts each layer of the high-level shelf into a two-dimensional grid map and stores it in the form of a picture set. ,in, is a collection of graphs, elements is the 2D grid map for each layer, Indicates the number of layers of high-level shelves. Each element is ,in Represents a node collection , the specific meaning is the coordinate value; Represents the set of edges between nodes ; Nodes represent the warehouse locations of high-level shelves; edges represent the tracks connecting different warehouses. By converting high-level shelves into multiple two-dimensional network maps, high-level shelves can be managed intuitively. By accurately determining the specific coordinates of each warehouse, it is beneficial to accurately shift the four-way vehicle and reduce the error rate.
[0046] The state generation unit 302 is used to collect the motion state information of all four-way vehicles running in the high-level shelf storage and generate a state set; specifically, the motion state information may include information such as speed, acceleration, motion direction, node position in the map, etc., and these motion state information are constructed into a state set. ,in Indicates is the set of states of the car, and Contains the status at different times . By constructing a collection containing the motion status information of different four-way vehicles and at different times, the motion status of the four-way vehicle at a certain moment can be easily and quickly queried. By collecting the motion status of the four-way vehicle, it is beneficial to more accurately plan the path of the four-way vehicle. For example, knowing the speed and acceleration information of the current four-way vehicle can take into account whether the four-way vehicle needs to accelerate or decelerate when planning the path; knowing the current movement direction of the four-way vehicle can take into account whether the four-way vehicle needs to turn when planning the path.
[0047] The penalty unit 303 is used to obtain the constraint rules, which include the first constraint and the second constraint, wherein the first constraint is defined as not allowing multiple four-way vehicles to appear at the same node in the form of movement at the same time, and the second constraint is defined as any four-way vehicle moving from one node to another adjacent node must be completed within the preset maximum moving time; specifically, the penalty unit 303 can set a corresponding penalty mechanism according to the constraint rules to prevent the selection of a path that violates the constraint rules. The preset maximum moving time is to prevent the moving path from being too long, and the value of the maximum moving time can be selected according to the storage site and scene. The first constraint is set to take into account that if multiple four-way vehicles arrive at a certain node in the form of movement at the same time, on the one hand, it may force the four-way vehicles to slow down and pass through, affecting the overall traffic speed, and on the other hand, collisions may occur between the four-way vehicles, resulting in the loss of the four-way vehicles; the second constraint is to set a threshold for the maximum travel time of a path to prevent the selection of a path that takes too long, thereby improving efficiency.
[0048] In a specific implementation, when the subsequent path planning unit 304 performs path planning calculations, if a certain path violates the above-mentioned constraint rules, the penalty unit 303 can prevent the path that violates the constraint rules from being selected by applying a penalty coefficient to the path. For example, when one of the paths violates any of the above-mentioned two constraints, a penalty is imposed. In this embodiment, a penalty coefficient can be set for the penalty. The coefficient is a very large value (such as 999, etc., which can be comprehensively considered according to the specific scenario and computational complexity). The penalty coefficient will be involved in the calculation of the travel time of the path, so that the final travel time of the path will be much longer than other paths that have not been punished, so that the path is not selected as the optimal path. If the path does not violate any of the above-mentioned constraint rules, the penalty coefficient value is 1, which will not affect the subsequent calculation of the travel time of the path.
[0049] In addition, if all paths violate the second constraint rule, you can consider waiting or using multiple four-way vehicles to run in sections to deliver goods to complete the task.
[0050] In an optional specific implementation, the first constraint is expressed as:
[0051] ; (1)
[0052] in, It represents the process of a four-way vehicle moving to a target node in a certain direction. Indicates direction, The value 1 indicates east. The value 2 indicates south. The value 3 indicates west. The value 4 indicates north. Indicates the target node number, Indicates the four-way vehicle number. Indicates any j node;
[0053] The second constraint is expressed as:
[0054] ; (2)
[0055] in, Indicates The average moving speed of the four-way vehicles is Indicates a four-way vehicle slave node To Node The distance traveled, Represents the longest moving time. When the above constraint formula is not satisfied, it can be considered as a violation of the above constraint. Through the constraint calculation formula, it is possible to directly and quickly calculate whether the path violates the constraint rule, so as to obtain the penalty coefficient.
[0056] The path planning unit 304 is used to obtain the operation requirements, determine the four-way vehicle to be operated according to the operation requirements, and plan the moving path of the four-way vehicle to be operated based on the map information, state set, constraint rules and operation requirements. Specifically, the operation requirements are generally determined according to the operation tasks. For example, the operation requirements may be goods out of the warehouse, goods in the warehouse, goods movement, etc. The purpose of the path planning unit 304 to perform path planning is to select a moving path that takes the shortest time and does not violate the constraint rules. Therefore, it is necessary to comprehensively select the shortest route based on map information (such as obtaining the coordinates of the starting point and the target point), motion state information (such as whether acceleration and deceleration are required, whether turning is required), etc., while also taking into account not violating the constraint rules. The path planning unit 304 of this embodiment can be implemented using an adaptive path planning model. In addition, when performing path optimization, a local map can be used to implement a locally optimal adaptive path planning method. Specifically, when the coordinate distance between the starting point and the target point exceeds a preset threshold, in this embodiment, the intermediate node with a preset step length from the starting point can be traversed first, and the optimal intermediate node can be selected through the target optimization model. When the optimal intermediate node is found, the intermediate node is used as the new starting point to continue searching until the final target node is found, that is, the entire planning is completed step by step through the local map. Of course, when the coordinate distance between the starting point and the target point does not exceed the preset threshold, the target optimization model can be directly used to select the optimal path to reach the target point.
[0057] The four-way vehicle path planning system for high-rise shelves provided in this embodiment performs path planning for the storage system of high-rise shelves. By converting the high-rise shelves into two-dimensional grid maps, constructing constraint rules, and introducing the constraint rules into path planning, it can effectively solve the complex path selection problem in the high-rise shelf environment and realize the optimal path planning of vehicles, thereby shortening the vehicle driving distance, reducing energy consumption, and improving the efficiency of entering and leaving the warehouse.
[0058] In an optional specific embodiment, a path planning unit plans the moving path of the four-way vehicle to be operated based on map information, a state set, constraint rules and operation requirements, including: obtaining the current coordinates of the four-way vehicle to be operated; obtaining the current motion state of the four-way vehicle to be operated according to the state set, and the current motion state includes the current driving direction; obtaining the target node coordinates according to the operation requirements and map information; calculating according to the map information, the current coordinates, and the target node coordinates to obtain all passable paths; according to the current motion state of the four-way vehicle to be operated, respectively calculating the travel time of each passable path, the travel time of the passable path refers to the time consumed by the four-way vehicle to be operated to move from the current coordinates to the target node coordinates through the passable path; the passable path that does not violate the constraint rules and has the shortest travel time is established as the optimal passable path. Specifically, the warehouse locations of the four-way vehicle to be operated and the target node can be determined according to the operation requirements, and the coordinates of the target node can be determined according to the map information. The motion state information of the four-way vehicle to be operated can be found according to the state set, and the coordinate information of the four-way vehicle to be operated can be queried; then, according to the location of each node on the map, all accessible paths can be traversed; and the motion state information (such as whether acceleration and deceleration are required, whether turning is required) can be combined to select the shortest route, while also taking into account not violating the constraint rules. By comprehensively considering multiple factors such as map information and motion state information to complete path planning, and introducing constraint rules into path planning, the algorithm can better meet the needs of high-level shelves.
[0059] In an optional specific implementation, according to the current motion state of the four-way vehicle to be operated, the travel time of each passable path is calculated separately, including: determining whether there is a handover demand according to the operation demand; if there is no handover demand, the four-way vehicle to be operated is moved at a preset speed as a condition to calculate the travel time of each passable path; if there is a handover demand, the four-way vehicle to be operated is moved at a non-uniform speed as a condition to calculate the travel time of each passable path. Specifically, when there is no handover demand and the uniform speed moves, the preset speed can be the current speed of the four-way vehicle, or a preset speed set in advance. When there is a handover demand, due to the confluence and handover between multiple four-way vehicles, the four-way vehicle will have deceleration and acceleration during operation. By considering the cargo handover problem of the four-way vehicle, the movement is divided into uniform and non-uniform movement in the path planning, so that the algorithm is more in line with the needs of high-rise shelves.
[0060] In the description of the embodiments of the present invention, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "center", "top", "bottom", "top", "bottom", "inside", "outside", "inner side", "outer side" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. Among them, "inside" refers to an internal or enclosed area or space. "Periphery" refers to the area surrounding a specific component or a specific area.
[0061] In the description of the embodiments of the present invention, the terms "first", "second", "third", and "fourth" are used for descriptive purposes only and are not to be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first", "second", "third", and "fourth" may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.
[0062] In the description of the embodiments of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", and "assemble" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0063] In the description of the embodiments of the present invention, specific features, structures, materials or characteristics may be combined in a suitable manner in any one or more embodiments or examples.
[0064] In the description of the embodiments of the present invention, it should be understood that "-" and "~" represent the range between two values, and the range includes the endpoints. For example: "AB" represents a range greater than or equal to A and less than or equal to B. "A~B" represents a range greater than or equal to A and less than or equal to B.
[0065] In the description of the embodiments of the present invention, the term "and / or" herein is merely a description of the association relationship of associated objects, indicating that three relationships may exist. For example, A and / or B may represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " herein generally indicates that the associated objects before and after are in an "or" relationship.
[0066] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A four-way vehicle path planning method for high-rise shelves, characterized in that: Applied to the path planning of four-way vehicles running in warehouses with high-rise shelves, including: Acquire map information of the high-level shelf, wherein the map information includes coordinates of nodes, and the nodes represent warehouse locations of the high-level shelf; Collecting motion state information of all four-way vehicles running in the storage of the high-level shelf to generate a state set; Obtain constraint rules, the constraint rules including a first constraint and a second constraint, wherein the first constraint is defined as not allowing multiple four-way vehicles to appear at the same node in motion at the same time, and the second constraint is defined as that any four-way vehicle moving from one node to another adjacent node must be completed within a preset maximum moving time, and the first constraint is expressed as: ; in, Indicates that the four-way vehicle moves to the target node in a certain direction process, Indicates direction, The value 1 indicates east. The value 2 indicates south. The value 3 indicates west. The value 4 indicates north. Indicates the target node number, Indicates the four-way vehicle number. Indicates any j Node; the second constraint is expressed as: ; in, Indicates The average moving speed of the four-way vehicles is Indicates the four-way vehicle from the node To Node The distance traveled, Indicates the longest moving time; Acquire operation requirements, determine the four-way vehicle to be operated according to the operation requirements, and plan the moving path of the four-way vehicle to be operated based on the map information, the state set, the constraint rules and the operation requirements; Wherein, the planning of the moving path of the four-way vehicle to be operated based on the map information, the state set, the constraint rules and the operation requirements includes: Obtaining the current coordinates of the four-way vehicle to be operated; Acquire the current motion state of the four-way vehicle to be operated according to the state set, wherein the current motion state includes the current driving direction; Acquire the target node coordinates according to the operation requirements and the map information; Calculate according to the map information, the current coordinates, and the target node coordinates to obtain all traversable paths; According to the current motion state of the four-way vehicle to be operated, the travel time of each of the passable paths is calculated respectively, and the travel time of the passable path refers to the time taken by the four-way vehicle to be operated to move from the current coordinate to the target node coordinate through the passable path; The traversable path that does not violate the constraint rule and has the shortest travel time is established as the optimal traversable path.
2. The four-way vehicle path planning method according to claim 1, characterized in that: The obtaining of the map information of the high-level shelf includes: Convert each layer of the high-rise shelf to obtain a two-dimensional grid map, wherein the two-dimensional grid map contains coordinate information of the nodes; The two-dimensional grid map is stored in the form of a picture set.
3. The four-way vehicle path planning method according to claim 1, characterized in that: The method of calculating the travel time of each of the passable paths according to the current motion state of the four-way vehicle to be operated comprises: Determine whether there is a handover requirement based on the operation requirements; If there is no handover demand, the four-way vehicle to be operated moves at a preset speed uniformly as a condition to calculate the travel time of each passable path respectively; If the handover requirement exists, the non-uniform speed movement of the four-way vehicle to be operated is used as a condition to calculate the travel time of each of the passable paths respectively.
4. A four-way vehicle path planning system for high-rise shelves, characterized in that: Applied to the path planning of four-way vehicles running in warehouses with high-rise shelves, including: A map construction unit, used to obtain map information of the high-level shelf, wherein the map information includes coordinates of nodes, and the nodes represent warehouse locations of the high-level shelf; A state generating unit, used to collect motion state information of all four-way vehicles running in the storage of the high-level shelf, and generate a state set; A penalty unit is used to obtain a constraint rule, wherein the constraint rule includes a first constraint and a second constraint, wherein the first constraint is defined as not allowing multiple four-way vehicles to appear at the same node in a moving form at the same time, and the second constraint is defined as that any four-way vehicle moving from one node to another adjacent node must be completed within a preset maximum moving time, and the first constraint is expressed as: ; in, It represents the process of the four-way vehicle moving to the target node in a certain direction. Indicates direction, The value 1 indicates east. The value 2 indicates south. The value 3 indicates west. The value 4 indicates north. Indicates the target node number, Indicates the four-way vehicle number. Indicates any j Node; the second constraint is expressed as: ; in, Indicates The average moving speed of the four-way vehicles is Indicates the four-way vehicle from the node To Node The distance traveled, Indicates the longest moving time; A path planning unit, used to obtain operation requirements, determine the four-way vehicle to be operated according to the operation requirements, and plan the moving path of the four-way vehicle to be operated based on the map information, the state set, the constraint rules and the operation requirements; The path planning unit plans the moving path of the four-way vehicle to be operated based on the map information, the state set, the constraint rules and the operation requirements, including: Obtaining the current coordinates of the four-way vehicle to be operated; Acquire the current motion state of the four-way vehicle to be operated according to the state set, wherein the current motion state includes the current driving direction; Acquire the target node coordinates according to the operation requirements and the map information; Calculate according to the map information, the current coordinates, and the target node coordinates to obtain all traversable paths; According to the current motion state of the four-way vehicle to be operated, the travel time of each of the passable paths is calculated respectively, and the travel time of the passable path refers to the time taken by the four-way vehicle to be operated to move from the current coordinate to the target node coordinate through the passable path; The traversable path that does not violate the constraint rule and has the shortest travel time is established as the optimal traversable path.
5. The four-way vehicle path planning system according to claim 4, characterized in that: The map construction unit obtains the map information of the high-level shelf, including: Convert each layer of the high-rise shelf to obtain a two-dimensional grid map, wherein the two-dimensional grid map contains coordinate information of the nodes; The two-dimensional grid map is stored in the form of a picture set.
6. The four-way vehicle path planning system according to claim 4, characterized in that: The method of calculating the travel time of each of the passable paths according to the current motion state of the four-way vehicle to be operated comprises: Determine whether there is a handover requirement based on the operation requirements; If there is no handover demand, the four-way vehicle to be operated moves at a preset speed uniformly as a condition to calculate the travel time of each passable path respectively; If the handover requirement exists, the non-uniform speed movement of the four-way vehicle to be operated is used as a condition to calculate the travel time of each of the passable paths respectively.
