A method and system for building a digital factory in the textile industry
By determining the associated production lines and fault types of production equipment in textile factories and optimizing the determination of monitoring data, the problem of differences in the impact of different textile equipment faults on production efficiency is solved, and the reliability and accuracy of monitoring management are improved.
Patent Information
- Application Number
- CN202411104669.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2044-08-13
AI Technical Summary
During the construction of a digital factory in a textile factory, the failure of different textile equipment has different impacts on production efficiency. It is difficult to accurately assess the dimensions of monitoring data with existing technology, thus affecting the reliability of monitoring management.
By determining the associated production lines of production equipment and monitoring equipment data to characterize fault types, and combining the correlation of fault types, different monitoring demand values and target data are determined, thereby optimizing the determination of monitoring data and the construction of a digital factory.
It achieves accurate assessment from the perspective of fault type correlation degree, improves the accuracy of fault identification processing and the monitoring reliability of monitoring data, and avoids problems of unsatisfactory efficiency and difficulty.
Smart Images

Figure CN118625773B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of data management, and in particular relates to a method and system for building a digital factory in the textile industry. Background Art
[0002] In order to improve the production efficiency and quality of textile factories, the invention patent application CN202310902839.3 "Abnormal Sensing Method of Textile Equipment Based on Internet of Things" matches the operating standard parameters of textile equipment of textile enterprises with production data one by one, thereby improving the production efficiency of textile factories and avoiding the impact of equipment failure on the production of textile factories. However, there are the following technical problems:
[0003] In the process of building a digital factory for a textile factory, there are differences in the production lines associated with different textile equipment, so there are differences in the degree of impact of their failures on the production efficiency of the textile factory. Therefore, if the monitoring data dimensions of the textile equipment in the digital factory are not determined by considering the degree of impact of different textile equipment on the production efficiency of the textile factory, it is impossible to improve the reliability of the monitoring and management of the textile factory while ensuring the monitoring and processing efficiency.
[0004] In response to the above technical problems, the present invention provides a method and system for building a digital factory in the textile industry. Summary of the invention
[0005] To achieve the purpose of the present invention, the present invention adopts the following technical solutions:
[0006] According to one aspect of the present invention, a method for building a digital factory in the textile industry is provided.
[0007] A method for building a digital factory in the textile industry, specifically comprising:
[0008] S1 determines the associated production line of the production equipment based on the type and setting of the production equipment in the textile factory, and proceeds to the next step when it is determined based on the production data of the associated production line that the equipment monitoring demand of the production equipment is less than the preset demand value;
[0009] S2 determines the equipment failure type represented by the monitoring equipment data of the production equipment, and uses it as the represented failure type, determines the monitoring requirement values and monitoring target data of different monitoring equipment data by using the association with different represented failure types, and uses the monitoring equipment data excluding the monitoring target data as other monitoring data;
[0010] S3 determines the recognition accuracy of the equipment failure type of the production equipment based on the monitoring target data, and determines the monitoring necessity and alternative monitoring data of the other monitoring data in combination with the correlation between the other monitoring data and different equipment failure types;
[0011] S4 determines the monitoring data of the production equipment based on the equipment monitoring requirements of the production equipment and the number of the monitoring target data and the necessity of monitoring the alternative monitoring data, and builds the digital factory of the textile factory based on the monitoring data of the production equipment.
[0012] A further technical solution is that the types of production equipment include looms, spinning machines, sizing machines, printing machines, cutting machines, and drying machines.
[0013] A further technical solution is that the associated production line of the production equipment is determined according to the production line affected when the production equipment fails.
[0014] A further technical solution is that the method for determining the equipment monitoring requirements of the production equipment is:
[0015] Based on the production data of the associated production lines, determine the average daily production volume and average daily load rate of different associated production lines;
[0016] Determine the monitoring and management requirements of different associated production lines based on their average daily production volume and average daily load rate;
[0017] The equipment monitoring requirements of the production equipment are determined by the monitoring and management requirements of different associated production lines.
[0018] A further technical solution is that the value range of the equipment monitoring requirement of the production equipment is between 0 and 1, wherein the greater the equipment monitoring requirement of the production equipment, the higher the demand for monitoring the monitoring equipment data of the production equipment.
[0019] A further technical solution is that, when the equipment monitoring requirement of the production equipment is not less than a preset requirement value, it is determined that all monitoring equipment data of the production equipment need to be monitored.
[0020] A further technical solution is that the method for determining the monitoring data of the production equipment is:
[0021] Determining the amount of monitoring data of the production equipment according to the equipment monitoring requirements of the production equipment;
[0022] Determining the monitoring quantity of the candidate monitoring data according to the quantity of the monitoring data and the quantity of the monitoring target data;
[0023] Determine the monitoring target in the candidate monitoring data based on the monitoring data volume of the candidate monitoring data and the monitoring necessity of the candidate monitoring data, and determine the monitoring data of the production equipment based on the monitoring target and monitoring target data in the candidate monitoring data
[0024] A further technical solution is to build a digital factory for the textile factory, which specifically includes:
[0025] Based on the monitoring data of the production equipment, determining the construction target of the production equipment in the digital factory;
[0026] The digital factory of the textile factory is constructed based on the construction goal of the production equipment.
[0027] On the other hand, the present application provides a digital factory construction system for the textile industry, which adopts the above-mentioned digital factory construction method for the textile industry, specifically including:
[0028] Monitoring demand assessment module, monitoring data classification module, necessity assessment module, and construction processing module;
[0029] The monitoring demand assessment module is responsible for determining the associated production line of the production equipment based on the type and setting of the production equipment in the textile factory, and determining whether the equipment monitoring demand of the production equipment is less than the preset demand value based on the production data of the associated production line;
[0030] The monitoring data classification module is responsible for determining the equipment fault type represented by the monitoring equipment data of the production equipment, and using it as the represented fault type, and determining the monitoring requirement values and monitoring target data of different monitoring equipment data by using the association with different represented fault types, and using the monitoring equipment data excluding the monitoring target data as other monitoring data;
[0031] The necessity assessment module is responsible for determining the recognition accuracy of the equipment failure type of the production equipment based on the monitoring target data, and determining the monitoring necessity and alternative monitoring data of the other monitoring data in combination with the association between other monitoring data and different equipment failure types;
[0032] The construction processing module is responsible for determining the monitoring data of the production equipment based on the equipment monitoring requirements of the production equipment, according to the number of the monitoring target data and the necessity of monitoring the alternative monitoring data, and building the digital factory of the textile factory based on the monitoring data of the production equipment.
[0033] The beneficial effects of the present invention are:
[0034] 1. In the present invention, the monitoring requirement values and monitoring target data of different monitoring equipment data are determined by utilizing the association with different characterizing fault types, thereby achieving accurate evaluation of the monitoring requirement values from the perspective of the degree of association with different characterizing fault types, which not only ensures the accuracy of the identification and processing of the characterizing fault types, but also avoids the technical problem that the efficiency and difficulty of the monitoring processing cannot meet the requirements due to monitoring all the monitoring data.
[0035] 2. In the present invention, the monitoring data of the production equipment is determined based on the equipment monitoring requirements of the production equipment and the number of monitoring target data and the necessity of monitoring the alternative monitoring data. This not only takes into account the differences in the requirements for the monitoring accuracy of the monitoring data caused by the differences in the equipment monitoring requirements of the production equipment, but also ensures the monitoring reliability of the alternative monitoring data with higher monitoring necessity by further combining the monitoring necessity of the alternative monitoring data, thereby improving the accuracy of the monitoring process of the production equipment.
[0036] Other features and advantages will be described in the following description. The objects and other advantages of the present invention are realized and obtained by the structures particularly pointed out in the description and drawings.
[0037] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] The above and other features and advantages of the present invention will become more apparent by describing in detail exemplary embodiments thereof with reference to the accompanying drawings;
[0039] Figure 1 It is a flowchart of a method for building a digital factory in the textile industry;
[0040] Figure 2 is a flow chart of a method for determining equipment monitoring requirements for production equipment;
[0041] Figure 3 is a flow chart of a method for determining a monitoring requirement value;
[0042] Figure 4 is a flow chart of a method for determining recognition accuracy;
[0043] Figure 5 It is a framework diagram of a digital factory construction system in the textile industry. DETAILED DESCRIPTION
[0044] In order to enable those skilled in the art to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below in conjunction with the drawings in the embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this specification, not all of the embodiments. Based on the embodiments of this specification, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of this specification. Example
[0045] To solve the above problems, according to one aspect of the present invention, Figure 1 As shown, a method for building a digital factory in the textile industry is provided, which specifically includes:
[0046] S1 determines the associated production line of the production equipment based on the type and setting of the production equipment in the textile factory, and proceeds to the next step when it is determined based on the production data of the associated production line that the equipment monitoring demand of the production equipment is less than the preset demand value;
[0047] Furthermore, the types of production equipment include looms, spinning machines, sizing machines, printing machines, cutting machines, and drying machines.
[0048] It can be understood that the associated production line of the production equipment is determined according to the production line affected when the production equipment fails.
[0049] Specifically, Figure 2 As shown, the method for determining the equipment monitoring requirements of the production equipment is:
[0050] Based on the production data of the associated production lines, determine the average daily production volume and average daily load rate of different associated production lines;
[0051] Determine the monitoring and management requirements of different associated production lines based on their average daily production volume and average daily load rate;
[0052] The equipment monitoring requirements of the production equipment are determined by the monitoring and management requirements of different associated production lines.
[0053] It can be understood that the value range of the equipment monitoring requirement of the production equipment is between 0 and 1, wherein the greater the equipment monitoring requirement of the production equipment, the higher the demand for monitoring the monitoring equipment data of the production equipment.
[0054] Further, when the equipment monitoring requirement of the production equipment is not less than a preset requirement value, it is determined that all monitoring equipment data of the production equipment need to be monitored.
[0055] It should also be noted that the method for determining the equipment monitoring requirements of the production equipment is:
[0056] Based on the production data of the associated production lines, the production volumes of different associated production lines are determined, and the production volume proportion of the associated production lines in the textile factory is determined according to the production volumes, and the failure influencing factors of the production equipment are determined using the production volume proportion;
[0057] Determining the production potential influencing factor of the production equipment based on the average value of the daily average load rates of different associated production lines;
[0058] The equipment monitoring requirements of the production equipment are determined by the production potential influencing factors of the production equipment and the weights of the failure influencing factors.
[0059] It should also be noted that the method for determining the equipment monitoring requirements of the production equipment is:
[0060] S11 obtains the number of associated production lines of the production equipment, determines whether the number of associated production lines is greater than the preset number of production lines, and if so, determines that the equipment monitoring demand of the production equipment is not less than the preset demand value, and if not, proceeds to the next step;
[0061] S12 determines the production volume of different associated production lines based on the production data of the associated production lines, and judges whether the total production volume of the associated production lines is greater than the preset production volume. If so, determines that the equipment monitoring demand of the production equipment is not less than the preset demand value. If not, proceeds to the next step;
[0062] S13: determining the fault impact value of the production equipment based on the number of associated production lines of the production equipment and the production volume of different associated production lines, and judging whether the fault impact value of the production equipment is greater than a preset impact threshold, if so, proceeding to the next step, if not, proceeding to step S16;
[0063] S14 determines the monitoring and management requirements of different associated production lines based on the average daily production volume and average daily load rate of different associated production lines, and determines whether there is an associated production line whose monitoring and management requirement is greater than a preset monitoring requirement value. If so, determines that the equipment monitoring requirement of the production equipment is not less than the preset requirement value, if not, proceeds to the next step;
[0064] S15 determines the production potential influencing factor of the production equipment based on the average value of the daily average load rates of different associated production lines, and judges whether the production potential influencing factor of the production equipment meets the requirements. If not, it is determined that the equipment monitoring demand of the production equipment is not less than the preset demand value. If so, proceed to the next step;
[0065] S16 determines the failure influence factor of the production equipment by using the production volume ratio, and determines the equipment monitoring requirement of the production equipment by summing the production potential influence factor of the production equipment and the weight of the failure influence factor.
[0066] S2 determines the equipment failure type represented by the monitoring equipment data of the production equipment, and uses it as the represented failure type, determines the monitoring requirement values and monitoring target data of different monitoring equipment data by using the association with different represented failure types, and uses the monitoring equipment data excluding the monitoring target data as other monitoring data;
[0067] Specifically, Figure 3 As shown, the method for determining the monitoring requirement value is:
[0068] Determine the preset correlation factors between the monitoring device data and different characterizing fault types based on the correlation conditions with different characterizing fault types;
[0069] Determine the impact of different characterizing fault types on production volume and yield rate when the fault occurs based on the fault impact data of different characterizing fault types, and determine the production volume impact rate and yield impact rate based on the impact on production volume and yield rate, and determine the production impact factors of different characterizing fault types based on the production volume impact rate and yield impact rate;
[0070] Different identification correlation factors characterizing different fault types are determined based on the product of production impact factors characterizing different fault types and preset correlation factors, and the monitoring requirement value of the monitoring equipment data is determined according to the weights of the identification correlation factors characterizing different fault types.
[0071] Furthermore, the production impact factor characterizing the similarity of the fault is an average value of the production volume impact rate and the good product impact rate.
[0072] It can be understood that when the monitoring requirement value of the monitoring device data is within a preset interval, the monitoring device data is determined to be monitoring target data.
[0073] It should also be noted that the method for determining the monitoring requirement value is:
[0074] Determine the preset correlation factors between the monitoring device data and different characterizing fault types based on the correlation conditions with different characterizing fault types;
[0075] Determine the associated fault type in the characterizing fault type by using the preset associated factor, and determine the impact of different associated fault types on production volume and yield rate when the fault occurs by using the fault impact data of the associated fault type, and determine the production volume impact rate and yield impact rate according to the impact on the production volume and yield rate, and determine the production impact factors of different associated fault types based on the production volume impact rate and yield impact rate;
[0076] The monitoring requirement value of the monitoring equipment data is determined by summing the weights of the production impact factors of different associated fault types.
[0077] It can also be understood that the method for determining the monitoring requirement value is:
[0078] S21 obtains the number of fault types represented by the monitoring device data, and determines whether the number of fault types represented by the monitoring device data is less than the preset number of fault types. If so, proceed to the next step; if not, proceed to step S25;
[0079] S22: determining the preset correlation factors of the monitoring device data and different characterizing fault types based on the correlation conditions with different characterizing fault types, judging whether the average values of the preset correlation factors with different characterizing fault types meet the requirements, if so, proceeding to the next step, if not, determining that the monitoring device data does not belong to the monitoring target data;
[0080] S23 determines the associated fault type in the characterizing fault type by using the preset association factor, and judges whether the number of the associated fault types meets the requirement, if so, proceeds to the next step, if not, determines that the monitoring device data does not belong to the monitoring target data;
[0081] S24 uses the fault impact data of different fault types when the fault occurs to determine the impact of different fault types on production volume and yield rate when the fault occurs, and determines the production volume impact rate and the yield impact rate according to the impact on production volume and yield rate, and determines the production impact factors of different fault types based on the production volume impact rate and yield impact rate, and determines whether the production impact factors of different fault types are all within the preset impact range, if not, proceeding to the next step, if yes, determining that the monitoring equipment data does not belong to the monitoring target data;
[0082] S25 determines different identification correlation factors characterizing different fault types based on the product of production impact factors characterizing different fault types and preset correlation factors, and determines the monitoring requirement value of the monitoring equipment data according to the weights of the identification correlation factors characterizing different fault types.
[0083] S3 determines the recognition accuracy of the equipment failure type of the production equipment based on the monitoring target data, and determines the monitoring necessity and alternative monitoring data of the other monitoring data in combination with the correlation between the other monitoring data and different equipment failure types;
[0084] Furthermore, the correlation between the monitoring device data and different fault characterization types is determined based on the correlation between changes in the monitoring device data and fault development conditions of different fault characterization types, and is specifically determined based on a preset correlation factor.
[0085] Specifically, Figure 4 As shown, the method for determining the recognition accuracy is:
[0086] Based on the monitoring target data, determining preset correlation factors between different monitoring target data and different equipment failure types;
[0087] Based on preset correlation factors of different monitoring target data and different equipment fault types, comprehensive correlation factors of different equipment fault types are determined, and the recognition accuracy of different equipment fault types is determined using the comprehensive correlation factors.
[0088] It can be understood that the method for determining the necessity of monitoring the other monitoring data is:
[0089] Determine preset correlation coefficients between other monitoring data and different equipment failure types based on correlation between other monitoring data and different equipment failure types;
[0090] Determine the identification requirement value of the other monitoring data for different equipment failure types by comparing the preset correlation coefficients and identification accuracy rates of different equipment failure types;
[0091] The necessity of monitoring the other monitoring data is determined based on the weights of the identification requirement values of the other monitoring data in different equipment failure types.
[0092] Furthermore, the monitoring necessity of the other monitoring data ranges from 0 to 1, wherein when the monitoring necessity of the other monitoring data is greater than a preset necessity threshold, the other monitoring data is determined to be candidate monitoring data.
[0093] It can also be understood that the method for determining the necessity of monitoring the other monitoring data is:
[0094] S31 determines the preset correlation coefficients between the other monitoring data and different equipment failure types based on the correlation between the other monitoring data and different equipment failure types, and judges whether the average value of the preset correlation coefficients with different equipment failure types is less than the correlation coefficient threshold value, if so, proceeds to the next step, if not, proceeds to step S35;
[0095] S32 determines whether there is a device fault type whose preset correlation coefficient is greater than the correlation coefficient threshold. If yes, proceed to the next step. If no, determine that the other monitoring data does not belong to the candidate monitoring data;
[0096] S33 determines the identified defect fault type in the identified fault type based on the identification accuracy of different equipment fault types, and judges whether the other monitoring data has an identified defect fault type whose preset correlation coefficient is greater than the correlation coefficient threshold. If so, proceed to the next step; if not, determine that the other monitoring data does not belong to the candidate monitoring data;
[0097] S34 determines the identification requirement values of the other monitoring data in different equipment failure types by the ratio of the preset correlation coefficient and the identification accuracy rate of different equipment failure types, and judges whether there is an equipment failure type with an identification requirement value greater than the preset requirement threshold value, if so, proceeds to the next step, if not, determines that the other monitoring data does not belong to the candidate monitoring data;
[0098] S35 determines the monitoring necessity of the other monitoring data based on the weights of the identification requirement values of the other monitoring data in different equipment failure types.
[0099] S4 determines the monitoring data of the production equipment based on the equipment monitoring requirements of the production equipment and the number of the monitoring target data and the necessity of monitoring the alternative monitoring data, and builds the digital factory of the textile factory based on the monitoring data of the production equipment.
[0100] Specifically, the method for determining the monitoring data of the production equipment is:
[0101] Determining the amount of monitoring data of the production equipment according to the equipment monitoring requirements of the production equipment;
[0102] Determining the monitoring quantity of the candidate monitoring data according to the quantity of the monitoring data and the quantity of the monitoring target data;
[0103] The monitoring targets in the alternative monitoring data are determined based on the monitoring data volume of the alternative monitoring data and the monitoring necessity of the alternative monitoring data, and the monitoring data of the production equipment are determined based on the monitoring targets and monitoring target data in the alternative monitoring data.
[0104] Furthermore, the digital factory of the textile factory is constructed, which specifically includes:
[0105] Based on the monitoring data of the production equipment, determining the construction target of the production equipment in the digital factory;
[0106] The digital factory of the textile factory is constructed based on the construction goal of the production equipment. Example
[0107] On the other hand, Figure 5 As shown, the present application provides a digital factory construction system for the textile industry, which adopts the above-mentioned digital factory construction method for the textile industry, specifically including:
[0108] Monitoring demand assessment module, monitoring data classification module, necessity assessment module, and construction processing module;
[0109] The monitoring demand assessment module is responsible for determining the associated production line of the production equipment based on the type and setting of the production equipment in the textile factory, and determining whether the equipment monitoring demand of the production equipment is less than the preset demand value based on the production data of the associated production line;
[0110] The monitoring data classification module is responsible for determining the equipment fault type represented by the monitoring equipment data of the production equipment, and using it as the represented fault type, and determining the monitoring requirement values and monitoring target data of different monitoring equipment data by using the association with different represented fault types, and using the monitoring equipment data excluding the monitoring target data as other monitoring data;
[0111] The necessity assessment module is responsible for determining the recognition accuracy of the equipment failure type of the production equipment based on the monitoring target data, and determining the monitoring necessity and alternative monitoring data of the other monitoring data in combination with the association between other monitoring data and different equipment failure types;
[0112] The construction processing module is responsible for determining the monitoring data of the production equipment based on the equipment monitoring requirements of the production equipment, according to the number of the monitoring target data and the necessity of monitoring the alternative monitoring data, and building the digital factory of the textile factory based on the monitoring data of the production equipment.
[0113] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the device, equipment, and non-volatile computer storage medium embodiments, since they are basically similar to the method embodiments, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.
[0114] The above is a description of a specific embodiment of the specification. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the processes depicted in the drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.
[0115] The above description is only one or more embodiments of this specification and is not intended to limit this specification. For those skilled in the art, one or more embodiments of this specification may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of one or more embodiments of this specification shall be included in the scope of the claims of this specification.
Claims
1. A method for building a digital factory in the textile industry. It is characterized in that Specifically include: Determine the associated production line of the production equipment based on the type and setting of the production equipment in the textile factory, and proceed to the next step when it is determined based on the production data of the associated production line that the equipment monitoring demand of the production equipment is less than the preset demand value; Determine the equipment failure type represented by the monitoring equipment data of the production equipment, and use it as the represented failure type, determine the monitoring requirement values and monitoring target data of different monitoring equipment data by using the association with different represented failure types, and use the monitoring equipment data excluding the monitoring target data as other monitoring data; Based on the monitoring target data, determine the recognition accuracy of the equipment failure type of the production equipment, and determine the monitoring necessity and alternative monitoring data of the other monitoring data in combination with the correlation between the other monitoring data and different equipment failure types; Based on the equipment monitoring requirements of the production equipment, the monitoring data of the production equipment is determined according to the quantity of the monitoring target data and the necessity of monitoring the alternative monitoring data, and the digital factory of the textile factory is built according to the monitoring data of the production equipment.
2. The method for constructing a digital factory in the textile industry as claimed in claim 1, It is characterized in that The types of production equipment include looms, spinning machines, sizing machines, printing machines, cutting machines, and drying machines.
3. The method for constructing a digital factory in the textile industry as claimed in claim 1, It is characterized in that The associated production line of the production equipment is determined according to the production line affected when the production equipment fails.
4. The method for constructing a digital factory in the textile industry as claimed in claim 1, It is characterized in that The method for determining the equipment monitoring requirements of the production equipment is: Based on the production data of the associated production lines, determine the average daily production volume and average daily load rate of different associated production lines; Determine the monitoring and management requirements of different associated production lines based on their average daily production volume and average daily load rate; The equipment monitoring requirements of the production equipment are determined by the monitoring and management requirements of different associated production lines.
5. The method for constructing a digital factory in the textile industry according to claim 1, It is characterized in that The correlation between the monitoring device data and different fault characterization types is determined according to the correlation between changes in the monitoring device data and fault development conditions of different fault characterization types, and is specifically determined according to a preset correlation factor.
6. The method for constructing a digital factory in the textile industry according to claim 1, It is characterized in that The method for determining the monitoring requirement value is: Determine the preset correlation factors between the monitoring device data and different characterizing fault types based on the correlation conditions with different characterizing fault types; Determine the impact of different characterizing fault types on production volume and yield rate when the fault occurs based on the fault impact data of different characterizing fault types, and determine the production volume impact rate and yield impact rate based on the impact on production volume and yield rate, and determine the production impact factors of different characterizing fault types based on the production volume impact rate and yield impact rate; Different identification correlation factors characterizing different fault types are determined based on the product of production impact factors characterizing different fault types and preset correlation factors, and the monitoring requirement value of the monitoring equipment data is determined according to the weights of the identification correlation factors characterizing different fault types.
7. The method for constructing a digital factory in the textile industry as claimed in claim 6, It is characterized in that The production impact factor characterizing the similarity of the fault is an average value of the production volume impact rate and the good product impact rate.
8. The method for constructing a digital factory in the textile industry as claimed in claim 1, It is characterized in that The method for determining the recognition accuracy is: Based on the monitoring target data, determining preset correlation factors between different monitoring target data and different equipment failure types; Based on preset correlation factors of different monitoring target data and different equipment fault types, comprehensive correlation factors of different equipment fault types are determined, and the recognition accuracy of different equipment fault types is determined using the comprehensive correlation factors.
9. The method for constructing a digital factory in the textile industry according to claim 1, It is characterized in that The method for determining the necessity of monitoring the other monitoring data is: Determine preset correlation coefficients between other monitoring data and different equipment failure types based on correlation between other monitoring data and different equipment failure types; Determine the identification requirement value of the other monitoring data for different equipment failure types by comparing the preset correlation coefficients and identification accuracy rates of different equipment failure types; The necessity of monitoring the other monitoring data is determined based on the weights of the identification requirement values of the other monitoring data in different equipment failure types.
10. A digital factory construction system for the textile industry, using a digital factory construction method for the textile industry as described in any one of claims 1 to 9, It is characterized in that Specifically include: Monitoring demand assessment module, monitoring data classification module, necessity assessment module, and construction processing module; The monitoring demand assessment module is responsible for determining the associated production line of the production equipment based on the type and setting of the production equipment in the textile factory, and determining whether the equipment monitoring demand of the production equipment is less than the preset demand value based on the production data of the associated production line; The monitoring data classification module is responsible for determining the equipment fault type represented by the monitoring equipment data of the production equipment, and using it as the represented fault type, and determining the monitoring requirement values and monitoring target data of different monitoring equipment data by using the association with different represented fault types, and using the monitoring equipment data excluding the monitoring target data as other monitoring data; The necessity assessment module is responsible for determining the recognition accuracy of the equipment failure type of the production equipment based on the monitoring target data, and determining the monitoring necessity and alternative monitoring data of the other monitoring data in combination with the association between other monitoring data and different equipment failure types; The construction processing module is responsible for determining the monitoring data of the production equipment based on the equipment monitoring requirements of the production equipment, according to the number of the monitoring target data and the necessity of monitoring the alternative monitoring data, and building the digital factory of the textile factory based on the monitoring data of the production equipment.