Intelligent decision-making control method and system for power grid IoT products
By training decision-making models and mining fuzzy rules, the problem of insufficient flexibility in decision-making control of power grid IoT products is solved, and the processing efficiency and response accuracy of decision-making tasks are improved.
Patent Information
- Application Number
- CN202411119206.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-08-15
AI Technical Summary
The decision-making control of existing power grid IoT products is difficult to flexibly control according to complex decision-making requirements, resulting in inefficient processing of decision-making tasks, adaptability, and inaccurate responses.
The method of training decision-making models and mining fuzzy rules is used to determine the intelligent decision-making sequence by obtaining the self-decision-making characteristics and network-connection decision-making characteristics of power grid IoT products, perform clustering processing based on preset similarity, mine fuzzy logic rules, and supervise training The fuzzy decision-making model combines the grid-connected data flow for data fuzzification and decision-making analysis, determines the fuzzy strategy, and controls the response through the IoT downlink channel.
The adaptability and flexibility of decision-making control are improved, and efficient processing of decision-making tasks and accuracy of response are achieved.
Smart Images

Figure CN118626896B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to fields related to data processing technology, and specifically to intelligent decision-making control methods and systems for power grid Internet of Things products. Background Art
[0002] With the continuous growth of global energy demand and the rapid development of smart grid technology, power grid IoT products, as an important part of smart grid construction, have the ability of intelligent decision-making and control, which is particularly critical. With the rapid development of new generation information technologies such as the Internet of Things, big data, cloud computing, and artificial intelligence, power grid IoT products have more powerful data collection, processing, and analysis capabilities. However, with the transformation of energy structure and the opening of the power market, power grid operation faces more complex and changeable challenges. Traditional manual scheduling and simple rule control can no longer meet the requirements of modern power grids for efficiency, safety, and environmental protection. The decision-making control of existing IoT products is difficult to make flexible decisions based on the characteristics of the products themselves, and the scheduling and management of the power grid are not intelligent and automated enough, affecting the stability and reliability of power supply.
[0003] Therefore, at the current stage, the decision-making and control related technologies of power grid IoT products have the problem of difficulty in flexibly controlling according to the complex decision-making requirements of the products, which in turn leads to technical problems such as inefficient control processing of decision-making tasks, low adaptability and flexibility of decisions, and inaccurate decision responses. Summary of the invention
[0004] The present application provides an intelligent decision-making control method and system for power grid Internet of Things products, and adopts technical means such as training decision models and mining fuzzy rules to solve the technical problems existing in the decision-making control of existing power grid Internet of Things products, namely, the difficulty in flexibly controlling according to the complex decision-making requirements of the products, which leads to inefficient control processing of decision tasks, low adaptability and flexibility of decisions, and inaccurate decision responses. The application realizes efficient processing of decision tasks and achieves the technical effect of improving the adaptability and flexibility of decision control and the accuracy of decision responses.
[0005] The present application provides an intelligent decision-making control method for power grid Internet of Things products, the method comprising: obtaining the self-decision-making characteristics and the network access decision characteristics of the power grid Internet of Things products, and determining an intelligent decision sequence; clustering the intelligent decision sequence based on a preset similarity, fuzzifying the decision for each cluster cluster, mining fuzzy logic rules based on logical necessity and logical commonality, and there is a one-to-one correspondence between the fuzzy logic rules and the cluster clusters; based on the fuzzy logic rules, supervising the training of a fuzzy decision model, the fuzzy decision model comprising a bidirectional fuzzification block and a fuzzy decision block; reading pre-decision tasks, the pre-decision tasks comprising active decision tasks and passive decision tasks; identifying the pre-decision tasks, and reading the grid-connected data stream, combining the fuzzy decision model to perform data fuzzification and fuzzy decision analysis based on a matching decision domain, determining a fuzzy strategy and defuzzifying it, and determining a pre-control strategy; determining a response terminal based on the pre-decision task, and obtaining a downlink channel based on the Internet of Things for strategy transmission, and performing a technical architecture conversion and control response based on the response terminal for the pre-control strategy.
[0006] In a possible implementation, decision fuzzification is performed for each cluster, and the following processing is performed: a fuzzy processing method is determined, wherein the fuzzy processing method includes data sharpening processing and data passivation processing; based on the fuzzy processing method, a bidirectional fuzzification block is established, wherein the bidirectional fuzzification block includes a fuzzy processing branch and a defuzzification branch; based on the fuzzy processing branch, decision fuzzification processing is performed for each cluster.
[0007] In a possible implementation, the supervised training fuzzy decision model performs the following processing: traversing the fuzzy logic rules, supervised training decision domain, the decision domain corresponds to the fuzzy logic rules one by one; based on the decision frequency and decision operator requirements, integrating the decision domain and reallocating resources to determine the fuzzy decision block, wherein the fuzzy decision block has the ability to be expanded and updated; determining the input port based on the fuzzy processing branch and the output port based on the defuzzification branch, centrally connecting the fuzzy decision block, and generating the fuzzy decision model.
[0008] In a possible implementation, the pre-decision task includes a passive decision task, and the following processing is also performed: the passive decision task is a task type based on data flow perception self-triggering; determining an abnormal control point based on the power grid Internet of Things product, screening the abnormal control point for correlation characteristics, and determining a predecessor display feature, and the predecessor display feature satisfies the probability of abnormal occurrence; based on the predecessor display feature, a passive task trigger setting is performed, and preventive control decision analysis is performed in combination with the fuzzy decision model.
[0009] In a possible implementation, after obtaining the downlink channel based on the Internet of Things for policy transmission, the following processing is also performed: network security analysis is performed on the downlink channel to locate information confrontation points that meet the risk level, and the information confrontation points are determined based on mining the historical information confrontation records of the Internet of Things; if the information confrontation points are not an empty set, channel transmission management is performed based on the historical protection rate, wherein the historical protection rate is based on the passive protection type of the protection system, and if the historical protection rate is less than the preset protection rate, transmission management is performed based on channel switching or information desensitization.
[0010] In a possible implementation, the pre-control strategy is converted based on the technical architecture of the response terminal, and the following processing is also performed: a unified information base is established, which is a bidirectional conversion database between the product-side architecture and the unified architecture; based on the response terminal, the unified information base is traversed to match and determine the product-side architecture, which is the technical architecture of the response terminal; based on the product-side architecture, the pre-control strategy is converted to determine the terminal control strategy.
[0011] In a possible implementation, after the control response is performed, the following processing is also performed: obtaining a control data stream, performing a bias decision analysis on the control data stream, and the bias decision satisfies a preset tolerance interval; wherein the bias decision analysis includes: making a first bias decision based on a node control difference, making a second bias decision based on a control trend bias, and making a third bias decision based on a response delay, and performing feedback control management if the preset tolerance interval of the mapping is not satisfied.
[0012] This application also provides an intelligent decision-making control system for power grid IoT products, including:
[0013] An intelligent decision sequence determination module, which is used to obtain the self-decision-making characteristics and network access decision characteristics of the power grid IoT products and determine the intelligent decision sequence;
[0014] A fuzzy logic rule mining module, wherein the fuzzy logic rule mining module performs clustering processing on the intelligent decision sequence based on a preset similarity, performs decision fuzzification for each cluster, and mines fuzzy logic rules based on logical necessity and logical commonality, wherein the fuzzy logic rules and clusters have a one-to-one correspondence;
[0015] A fuzzy decision model supervision training module, wherein the fuzzy decision model supervision training module is used to supervise the training of a fuzzy decision model based on the fuzzy logic rules, wherein the fuzzy decision model includes a bidirectional fuzzification block and a fuzzy decision block;
[0016] A pre-decision task reading module, wherein the pre-decision task reading module is used to read pre-decision tasks, wherein the pre-decision tasks include active decision tasks and passive decision tasks;
[0017] A pre-control strategy determination module, the pre-control strategy determination module is used to identify the pre-decision task, read the grid-connected data stream, perform data fuzzification and fuzzy decision analysis based on matching decision domain in combination with the fuzzy decision model, determine the fuzzy strategy and perform defuzzification, and determine the pre-control strategy;
[0018] A response terminal determination module is used to determine the response terminal based on the pre-decision task, obtain the downlink channel based on the Internet of Things for policy transmission, and perform technical architecture conversion and control response based on the response terminal for the pre-control strategy.
[0019] The intelligent decision-making control method and system for power grid IoT products proposed in this application is intended to determine the intelligent decision sequence; perform clustering processing, perform decision fuzzification for each cluster, and mine fuzzy logic rules; supervise and train the fuzzy decision model based on fuzzy logic rules; read pre-decision tasks; identify pre-decision tasks, and read the grid-connected data stream to determine the pre-control strategy; obtain the downlink channel for strategy transmission, and perform technical architecture conversion and control response based on the response terminal. It solves the technical problems that the decision control of existing power grid IoT products is difficult to flexibly control according to the complex decision requirements of the product, which leads to inefficient control processing of decision tasks, low adaptability and flexibility of decisions, and inaccurate decision responses. It realizes efficient processing of decision tasks and achieves the technical effect of improving the adaptability and flexibility of decision control and the accuracy of decision responses. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the technical solution of the embodiment of the present disclosure, the accompanying drawings of the embodiment of the present disclosure will be briefly introduced below. A flow chart is used in the present application to illustrate the operations performed by the system according to the embodiment of the present application. It should be understood that the preceding or following operations are not necessarily performed accurately in order. On the contrary, various steps can be processed in reverse order or simultaneously as needed. At the same time, other operations can also be added to these processes, or one or more operations can be removed from these processes.
[0021] Figure 1 A flow chart of an intelligent decision-making control method for power grid IoT products provided in an embodiment of the present application.
[0022] Figure 2 A schematic diagram of the structure of an intelligent decision-making control system for power grid Internet of Things products provided in an embodiment of the present application.
[0023] Explanation of the accompanying drawings: intelligent decision sequence determination module 10, fuzzy logic rule mining module 20, fuzzy decision model supervision training module 30, pre-decision task reading module 40, pre-control strategy determination module 50, response terminal determination module 60. DETAILED DESCRIPTION
[0024] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below.
[0025] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application will be further described in detail below in conjunction with the accompanying drawings. The described embodiments should not be regarded as limiting the present application. All other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of this application.
[0026] In the following description, reference is made to "some embodiments", which describe a subset of all possible embodiments, but it is understood that "some embodiments" may be the same subset or different subsets of all possible embodiments, and may be combined with each other without conflict, and the terms "first\second" involved are merely to distinguish similar objects and do not represent a specific ordering of objects. The terms "including" and "having" and any variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product, or server that includes a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or modules that are not clearly listed or inherent to these processes, methods, products, or devices. Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those generally understood by technicians in the technical field of this application. The terms used herein are for the purpose of describing the embodiments of the present application only.
[0027] The present application embodiment provides an intelligent decision-making control method for power grid IoT products, such as Figure 1 As shown, the method includes:
[0028] Step S100, obtain the self-decision-making characteristics and network access decision characteristics of the power grid IoT products, and determine the intelligent decision sequence. In the smart grid, the self-decision-making characteristics of IoT products (such as sensors, smart meters, etc.) are mainly reflected in their ability to make autonomous judgments and decisions based on the collected real-time data and information. The self-decision-making characteristics rely on advanced sensor measurement technology, information communication technology, and analytical decision-making technology. For example, when a component in the power grid has a problem, the IoT product can quickly identify and determine the nature of the problem through an algorithm, and then automatically trigger the corresponding control mechanism, such as isolating the faulty component, switching to the backup power supply, etc., to ensure the stable operation of the power grid and the continuity of power supply services; the network access decision characteristics refer to a series of decision-making rules and processes that the power grid IoT products need to follow when accessing the power grid, which usually include compatibility assessment, security verification, performance testing and other links of the IoT products. In the process of IoT and During the integration of smart grids, various IoT products need to be connected in accordance with unified standards and protocols to ensure accurate transmission of information and stable operation of the system. The network access decision-making features also include remote management and control of equipment, such as remote configuration, upgrade, and fault diagnosis of equipment; the intelligent decision sequence refers to the smart grid system, in order to achieve specific goals (such as improving power supply reliability, reducing energy consumption, etc.), through a series of intelligent decision-making mechanisms, the operation status of the power grid is continuously monitored and evaluated, and corresponding control strategies are formulated and implemented based on the evaluation results, including all distributed IoT products connected to the preset regional power grid (not partially connected IoT products), determining all possible decision analysis needs under full coverage of the entire life cycle of the power grid, and finally determining the intelligent decision sequence.
[0029] Step S200, based on the preset similarity, cluster the intelligent decision sequence, perform decision fuzzification for each cluster cluster, and mine fuzzy logic rules based on logical necessity and logical commonality. The fuzzy logic rules and cluster clusters have a one-to-one correspondence. The preset similarity refers to a pre-set metric for measuring the similarity between multiple intelligent decisions, which is used to evaluate the similarity between each decision in the intelligent decision sequence. Clustering the intelligent decision sequence refers to classifying similar intelligent decisions into one category (or cluster cluster) based on the calculation of Euclidean distance or cosine similarity. Specifically, in the clustering of the intelligent decision sequence, similar decision points are clustered into the same cluster cluster by calculating the similarity of each intelligent decision and comparing and matching with the preset similarity. Each cluster cluster represents a group of intelligent decisions with similar characteristics. Fuzzification of decisions for each cluster cluster refers to converting deterministic intelligent decisions into fuzzy decisions. In the intelligent decision sequence, due to various uncertainties and ambiguities, such as data noise, model inaccuracy, etc., it is necessary to fuzzify the decisions, that is, to convert the deterministic intelligent decisions into fuzzy decisions. The logical necessity refers to that the rules are essential for achieving a certain goal or satisfying a certain condition; the logical commonality refers to the universal applicability of the rules within the clustering cluster. Specifically, the common characteristics and differences of intelligent decision-making in each clustering cluster are understood, and the key variables that have an important impact on the decision-making results are extracted from the clustering cluster. The value range of the key variables is converted into a fuzzy set to represent its uncertainty. Based on the logical necessity and logical commonality, a set of fuzzy logic rules is formulated for each clustering cluster, which describes the fuzzy decisions that should be taken under different conditions. Finally, each clustering cluster will establish a one-to-one correspondence with a set of fuzzy logic rules.
[0030] In a possible implementation, step S200 further includes step S210, determining a fuzzy processing method, wherein the fuzzy processing method includes data sharpening processing and data passivation processing. In the intelligent decision-making control of power grid IoT products, data sharpening processing refers to enhancing key information in the power grid operation data in order to more accurately identify anomalies or potential problems, that is, to improve the clarity of the data, so as to more accurately identify anomalies or potential risks in the power grid operation, so as to make more informed decisions; in the intelligent decision-making control of power grid IoT products, data passivation processing may refer to smoothing the power grid operation data to reduce the impact of random fluctuations and noise, that is, to reduce random fluctuations and noise in the power grid operation data, so that the overall information is smoother, thereby improving the stability and reliability of the decision.
[0031] Step S200 also includes step S220, based on the fuzzy processing method, establishing a bidirectional fuzzification block, the bidirectional fuzzification block includes a fuzzy processing branch and a defuzzification branch. The fuzzy processing branch is responsible for the fuzzification of the input data. Through the fuzzy algorithm, the precise input data is converted into a fuzzy set or a fuzzy value; the defuzzification branch is responsible for converting the fuzzy value or fuzzy set into a precise value or a decision output, that is, converting the result of the fuzzy reasoning into an actual control signal or a decision. In general, the fuzzy processing branch and the defuzzification branch are combined to form a complete bidirectional fuzzification block. First, the precise input data is converted into a fuzzy value or a fuzzy set through the fuzzy processing branch, and then the fuzzy value or fuzzy set is converted into a precise value or a decision output through the defuzzification branch, realizing the conversion process from precise to fuzzy and then to precise, providing a flexible solution for the intelligent decision control of power grid Internet of Things products. It also includes step S230, based on the fuzzy processing branch, the decision fuzzification processing of each cluster cluster is performed.
[0032] Step S300, supervise the training of a fuzzy decision model based on the fuzzy logic rules, the fuzzy decision model includes a bidirectional fuzzification block and a fuzzy decision block. A decision model capable of processing fuzzy input is constructed through known fuzzy logic rules. Specifically, a known data set is used for model training. For each input data, the model performs fuzzification processing, and then makes a decision based on the fuzzy logic rules to generate a fuzzy output result. The fuzzy output result is compared with the expected precise output, and an error value is calculated. The model adjusts its internal parameters (such as the weight of the fuzzy logic rules, etc.) according to the error value to reduce the error and improve the accuracy of the decision. The model is continuously iterated and optimized. The model adjusts its parameters through new input data and expected output, gradually optimizes the decision performance, and finally obtains the model. Fuzzy decision model, the fuzzy decision model includes a bidirectional fuzzification block and a fuzzy decision block, wherein the bidirectional fuzzification block is responsible for fuzzifying the input data and the expected output results, including converting the precise input data into fuzzy sets and converting the fuzzified results output in the decision-making process into specific, executable decision instructions; the fuzzy decision block refers to the core part of the fuzzy decision model that makes decisions based on fuzzy logic rules and fuzzified input data. Specifically, according to the fuzzy logic rules and fuzzified input data, fuzzy reasoning algorithms (such as fuzzy if-then rules) are applied to obtain fuzzy output results, and then formulate decision control instructions.
[0033] In a possible implementation, step S300 further includes step S310, traversing the fuzzy logic rules and supervising the training of decision domains, wherein the decision domains correspond one to one with the fuzzy logic rules. Traversing the fuzzy logic rules and supervising the training of decision domains refers to optimizing decision performance by adjusting the fuzzy logic rules and membership functions. Specifically, by traversing the fuzzy logic rules, evaluating the membership functions, and using data for training and evaluating performance, the performance of the fuzzy logic system is continuously optimized to obtain the decision domain. The decision domain is a collection of research objects in the fuzzy logic system, which may include various power grid parameters, equipment states, environmental conditions, etc. Each decision domain corresponds to a set of fuzzy logic rules.
[0034] Step S300 also includes step S320, integrating the decision domain and performing resource reallocation based on the decision frequency and decision operator requirements, and determining the fuzzy decision block, wherein the fuzzy decision block is extensible and updateable. Decision frequency refers to the number of times a power grid IoT product makes a decision within a specific time, which may be affected by multiple factors, such as fluctuations in the power grid operation state, the frequency of equipment failures, etc.; decision operator refers to the algorithm used in the decision process, different decision problems require different decision operators, and appropriate decision operators are selected based on the decision control requirements of the power grid IoT product. Integrated decision domain refers to integrating different power grid parameters, equipment states, environmental conditions, etc. in different power grid IoT products. Resource reallocation refers to reallocating resources according to the decision frequency and decision operator requirements in the fuzzy decision process, including computing resources, storage resources, communication resources, etc., through reasonable resource reallocation, ensuring that when the decision frequency is high or complex decision operators are required, there are sufficient resources to support decision control, and finally determining the fuzzy decision block, which outputs the corresponding decision result according to the input fuzzy information through fuzzy logic rules and fuzzy reasoning.
[0035] Step S300 also includes step S330, determining an input port based on the fuzzy processing branch and an output port based on the defuzzification branch, connecting the fuzzy decision block in the middle, and generating the fuzzy decision model. The input port of the fuzzy processing branch is the starting point of the fuzzy decision model, which is used to receive the precise input quantity of the power grid Internet of Things product, and the fuzzy processing branch converts the precise input quantity into a fuzzy quantity; the output port of the defuzzification branch is used to output the output result after defuzzification, and the defuzzification branch converts the fuzzy set generated by the fuzzy decision block into a precise output quantity, and finally forms a fuzzy decision model.
[0036] Step S400, read the pre-decision task, which includes active decision-making tasks and passive decision-making tasks. Pre-decision tasks refer to the relevant tasks that the power grid IoT product is about to make decisions before the decision control begins, such as evaluating the stability of the power grid system, predicting future power demand, analyzing possible risk factors, etc., including active decision-making tasks and passive decision-making tasks. Specifically, active decision-making tasks refer to the tasks of active analysis, evaluation and other decision-making behaviors when the power grid IoT product faces decision control, including the collection, organization and analysis of existing information to determine the best decision-making plan, and take corresponding actions according to the plan; passive decision-making refers to decisions made without obvious choices or forced situations, or decisions that have to be made due to external conditions or internal changes after the pre-decision stage, such as responding to emergencies, or adjusting on the basis of existing decision-making plans. In the pre-decision stage, various factors are comprehensively considered, including the possibility of active and passive decisions, to ensure the comprehensiveness and effectiveness of the decision control of the power grid IoT product.
[0037] In a possible implementation, step S400 further includes step S410, wherein the passive decision task is a task type based on data flow perception self-triggering. Data flow perception means that the system can capture, analyze and understand data flows from different sources in real time or near real time, and the passive decision task is a decision task based on external data flow changes or specific event triggering. It also includes step S420, determining an abnormal control point based on the power grid IoT product, performing correlation feature screening on the abnormal control point, and determining a predecessor display feature, wherein the predecessor display feature satisfies the probability of abnormal occurrence. The abnormal control point refers to a key position or parameter in the power grid IoT product that may cause an abnormality, which may include key indicators such as the operating status, current, voltage, and temperature of the equipment. The correlation feature screening refers to screening out features that are highly correlated with the probability of abnormal occurrence from a number of features related to the abnormal control point. The predecessor display feature refers to those features that can predict or indicate that an abnormality is about to occur. The predecessor display feature satisfies the probability of abnormal occurrence, which means that when determining the predecessor display feature, it is ensured that these features can meet certain requirements for the probability of abnormal occurrence, that is, the abnormal risks predicted by these features should be real and have sufficient credibility.
[0038] Step S400 also includes step S430, which performs passive task triggering setting based on the predecessor display feature, and performs preventive control decision analysis in combination with the fuzzy decision model. Passive task triggering setting means that when a data pattern that meets the predecessor display feature is detected, the corresponding task or response is automatically triggered, and the triggering condition is the predecessor display feature. In general, it is too late to make decisions and adjustments when the abnormality has already occurred. For the existing abnormal control point, the visual features of the previous time node that can characterize the inevitable probability of the fault occurrence are determined before the occurrence. The predecessor feature of an abnormal control point is one or more. When the data of the feature is detected as the fault direction, the passive decision is triggered to perform preventive decision control, that is, the potential abnormality is predicted and analyzed through the fuzzy decision model, so as to take measures in advance to avoid the occurrence of abnormalities or reduce their impact.
[0039] Step S500, identify the pre-decision task, read the grid-connected data stream, combine the fuzzy decision model to perform data fuzzification and fuzzy decision analysis based on matching decision domain, determine the fuzzy strategy and defuzzify, and determine the pre-control strategy. Identify the determined pre-decision task and read the grid-connected data stream. The grid-connected data stream refers to various data related to the grid-connected system, such as power production data, consumer demand data, equipment status data, etc., in order to understand the current system operation status, predict future trends, and provide support for subsequent analysis and decision-making. The predicted value of power demand, equipment failure rate and other uncertain data information are input into the fuzzy decision model for data fuzzification and converted into corresponding fuzzy sets. The decision domain refers to the variables and constraints involved in the power grid Internet of Things products. In the fuzzy decision analysis, the fuzzified data is matched with the decision domain. , analyze various possible decision-making plans and their corresponding consequences. For example, in the grid-connected system, it is necessary to analyze the impact of different power distribution plans, equipment maintenance strategies, etc. on system stability, and evaluate the advantages and disadvantages and potential risks of various plans. After fuzzy decision analysis, the fuzzy strategy is determined according to the analysis results. For example, a variety of different power distribution plans, equipment maintenance plans, etc., and each strategy has its corresponding fuzzy set. Defuzzification refers to converting the determined fuzzy strategy into specific executable decision instructions based on the maximum membership method or weighted average method, and finally determining the pre-control strategy, that is, the specific decision control plan of the grid-connected system.
[0040] Step S600, determine the response terminal based on the pre-decision task, and obtain the IoT-based downlink channel for strategy transmission, and perform technical architecture conversion and control response based on the response terminal for the pre-control strategy. According to the specific requirements of the pre-decision task, determine the response terminal that needs to receive and execute the pre-control strategy. These response terminals may be various IoT devices, such as smart meters, sensors, actuators, etc. The downlink channel refers to the communication channel used to transmit data and instructions from the central control system to the response terminal. In power grid IoT products, the downlink channel is usually based on wireless communication technology, such as narrowband IoT, LoRa, ZigBee, etc. The process of obtaining the downlink channel may include selecting appropriate communication technology, configuring network parameters, establishing a secure connection, etc., to ensure the reliability, stability and security of the downlink channel, so as to effectively transmit the pre-control strategy. The technical architecture conversion refers to converting the data formulated in the central control system to the downlink channel. The pre-control strategy whose format, communication protocol, etc. may not match the requirements of the response terminal is converted into one that matches the requirements to adapt to the reception and execution of the response terminal, for example, data conversion, communication protocol conversion, encryption and decryption and other steps. When the pre-control strategy is successfully transmitted to the response terminal and converted through the technical architecture, the response terminal will begin to execute the pre-control strategy, including adjusting device parameters, performing specific operations, sending status information, etc. The control response process needs to ensure that the response terminal can accurately execute the pre-control strategy and promptly feedback the execution results. The central control system can adjust and optimize the pre-control strategy according to the feedback results to achieve better decision-making and control effects, and realize efficient decision-making and control of power grid IoT products.
[0041] In a possible implementation, step S600 further includes step S610, performing network security analysis on the downlink channel, locating information confrontation points that meet the risk level, and the information confrontation points are determined based on mining the historical information confrontation records of the Internet of Things. Network security analysis on the downlink channel is mainly to evaluate the network security threats and potential risks that the channel may face during data transmission, such as verifying the integrity of the data (ensuring that the data has not been tampered with or damaged during transmission), confidentiality (ensuring that the data is not obtained by unauthorized third parties during transmission), access control (verifying whether the recipient has the right to receive the data), traffic analysis (analyzing the traffic pattern of the downlink channel to detect possible anomalies or attack behaviors), etc., identifying and locating information confrontation points that meet the risk level, wherein the information confrontation point refers to a key point or link that is identified as having a high risk and may become a potential attack target in the network security analysis. Specifically, based on the historical information confrontation records of the Internet of Things, data mining technology is used to extract key features related to the security of the downlink channel. By analyzing these key features, similar risk points or vulnerable links that may exist in the downlink channel are identified, and their risk levels are evaluated, and information confrontation points that meet the risk level are located.
[0042] Step S600 also includes step S620, if the information adversarial point is a non-empty set, channel transmission management is performed based on the historical protection rate, wherein the historical protection rate is based on the passive protection type of the protection system, if the historical protection rate is less than the preset protection rate, transmission management is performed based on channel switching or information desensitization. If risky or abnormal information confrontation points have been identified, channel transmission management will be performed based on the historical protection rate. No human intervention is required. The protection system automatically triggers protection for risk points in the downlink channel. The historical protection rate is based on the performance of the passive protection capability of the protection system over a period of time in the past, reflecting the effectiveness of the protection system in responding to information confrontation events. The preset protection rate is a pre-set threshold used to determine whether the performance of the current protection system reaches the expected security level. If the historical protection rate is less than the preset protection rate, the system believes that the current protection capability is insufficient to cope with potential information confrontation risks, and transmission management is performed based on channel switching or information desensitization. Specifically, channel switching refers to switching to a new communication channel to avoid continuing to transmit data on a channel that is attacked or interfered with, which can reduce the risk of data theft or tampering. Information desensitization refers to desensitizing data before information transmission, that is, removing or replacing sensitive information to reduce the risk of data leakage, which can reduce the sensitivity of data without changing the data format or function.
[0043] Step S600 further includes step S630, establishing a unified information base, which is a two-way conversion database between the product side architecture and the unified architecture. Establishing a unified information base as a two-way conversion database between the product side architecture and the unified architecture specifically refers to building an information resource database that can support data conversion and sharing between different architectures, for example, supporting the collection of multiple data sources, data conversion (such as conversion in data format, data structure, data encoding, etc.), data storage (structured database cluster and unstructured database cluster), data sharing (providing a unified data access interface and service interface), and realizing data sharing and exchange between different systems. It also includes step S640, based on the response terminal, traversing the unified information base, matching and determining the product side architecture, and the product side architecture is the technical architecture of the response terminal. Due to the differences in the manufacturers and product types of the access products, their specific control characteristics are different. Generally, based on a unified information structure, a management domain analysis is performed to avoid information isolation in the analysis process. For example, different devices under the same task strategy have different specific execution controls, data heterogeneity, etc. After determining the strategy of the unified information architecture, conversion and recovery are performed on the product side. The method further includes step S650, in which the pre-control strategy is converted based on the product side architecture to determine the terminal control strategy. The high-level, general pre-control strategy is converted into an executable terminal control strategy specific to the product side architecture, and is determined as the terminal control strategy.
[0044] In a possible implementation, step S600 further includes step S660, obtaining a control data stream, performing a bias decision analysis on the control data stream, and the bias decision meets a preset tolerance interval. The control data stream refers to a data stream used to control the execution sequence of intelligent decisions during the decision control execution process of the power grid IoT product, reflecting the control sequence and data dependency of the intelligent decision. The bias decision analysis is used to evaluate the bias degree of the decision in the control data stream, that is, the deviation between the output decision result and the expected standard. The preset tolerance interval is a pre-set, acceptable bias range, which indicates the system's tolerance for decision bias under specific circumstances, for example, the decision bias is maintained within a range of ±5%.
[0045] The bias decision analysis in step S660 further includes making a first bias decision based on the node control difference, making a second bias decision based on the control trend bias, and making a third bias decision based on the response delay. If the preset tolerance interval of the mapping is not met, feedback control management is performed. Node control difference refers to the difference between the decision result and the expected value on a specific control node. The first bias decision makes a decision based on this node control difference to adjust the control process state and reduce the difference; control trend bias refers to the trend or direction of a parameter in the decision control process over time. The second bias decision makes a decision based on this control trend bias to predict and control possible future states or results to ensure that the system or process develops as expected; response delay refers to the time required from input or request to the system or device to generate a response. The third bias decision makes a decision based on this response delay, such as optimizing system performance, improving response speed or adjusting processing priority; if the actual decision result exceeds the preset tolerance range, the system will trigger feedback regulation management, that is, compare the actual data such as response delay, node control difference, control trend bias with the expected target of the control process, and make adjustments accordingly to ensure continuous and stable operation within the expected range.
[0046] In the above, refer to Figure 1 The intelligent decision-making control method for power grid IoT products according to an embodiment of the present invention is described in detail. Figure 2 An intelligent decision-making control system for a power grid Internet of Things product according to an embodiment of the present invention is described.
[0047] The intelligent decision control system for power grid IoT products according to the embodiment of the present invention is used to solve the technical problems that the existing decision control of power grid IoT products is difficult to flexibly control according to the complex decision requirements of the products, which leads to inefficient control processing of decision tasks, low adaptability and flexibility of decisions, and inaccurate decision responses, thereby achieving efficient processing of decision tasks and achieving the technical effect of improving the adaptability and flexibility of decision control and the accuracy of decision responses. The intelligent decision control system for power grid IoT products includes: an intelligent decision sequence determination module 10, a fuzzy logic rule mining module 20, a fuzzy decision model supervision training module 30, a pre-decision task reading module 40, a pre-control strategy determination module 50, and a response terminal determination module 60.
[0048] An intelligent decision sequence determination module 10, which is used to obtain the self-decision-making characteristics and the network access decision characteristics of the power grid IoT products and determine the intelligent decision sequence;
[0049] A fuzzy logic rule mining module 20, wherein the fuzzy logic rule mining module 20 performs clustering processing on the intelligent decision sequence based on a preset similarity, performs decision fuzzification for each cluster, and mines fuzzy logic rules based on logical necessity and logical commonality, wherein the fuzzy logic rules and the clusters have a one-to-one correspondence;
[0050] A fuzzy decision model supervision training module 30, wherein the fuzzy decision model supervision training module 30 is used to supervise the training of a fuzzy decision model based on the fuzzy logic rules, wherein the fuzzy decision model includes a bidirectional fuzzification block and a fuzzy decision block;
[0051] A pre-decision task reading module 40, wherein the pre-decision task reading module 40 is used to read pre-decision tasks, wherein the pre-decision tasks include active decision tasks and passive decision tasks;
[0052] A pre-control strategy determination module 50, the pre-control strategy determination module 50 is used to identify the pre-decision task, read the grid-connected data stream, perform data fuzzification and fuzzy decision analysis based on matching decision domain in combination with the fuzzy decision model, determine the fuzzy strategy and perform defuzzification, and determine the pre-control strategy;
[0053] The response terminal determination module 60 is used to determine the response terminal based on the pre-decision task, obtain the IoT-based downlink channel for policy transmission, and perform technical architecture conversion and control response based on the response terminal for the pre-control strategy.
[0054] The specific configuration of the fuzzy logic rule mining module 20 will be described in detail below. The fuzzy logic rule mining module 20 further includes: determining a fuzzy processing method, wherein the fuzzy processing method includes data sharpening processing and data passivation processing; based on the fuzzy processing method, establishing a bidirectional fuzzification block, wherein the bidirectional fuzzification block includes a fuzzy processing branch and a defuzzification branch; based on the fuzzy processing branch, performing decision fuzzification processing of each cluster.
[0055] The specific configuration of the fuzzy decision model supervision training module 30 will be described in detail below. The fuzzy decision model supervision training module 30 may further include: traversing the fuzzy logic rules, supervising the training decision domain, the decision domain corresponding to the fuzzy logic rules one by one; integrating the decision domain and reallocating resources based on the decision frequency and the decision operator requirements, and determining the fuzzy decision block, wherein the fuzzy decision block has the ability to be expanded and updated; determining the input port based on the fuzzy processing branch and the output port based on the defuzzification branch, centrally connecting the fuzzy decision block, and generating the fuzzy decision model.
[0056] The specific configuration of the pre-decision task reading module 40 will be described in detail below. The pre-decision task reading module 40 may further include: the passive decision task is a task type based on data stream perception self-triggering; determining an abnormal control point based on the power grid IoT product, screening the abnormal control point for correlation characteristics, determining a predecessor display feature, and the predecessor display feature satisfies the probability of abnormal occurrence; based on the predecessor display feature, performing a passive task trigger setting, and combining the fuzzy decision model to perform preventive control decision analysis.
[0057] The specific configuration of the response terminal determination module 60 will be described in detail below. The response terminal determination module 60 further includes: performing network security analysis on the downlink channel, locating information confrontation points that meet the risk level, and the information confrontation points are determined based on the mining of historical information confrontation records of the Internet of Things; if the information confrontation points are not an empty set, channel transmission management is performed based on the historical protection rate, wherein the historical protection rate is based on the passive protection type of the protection system, and if the historical protection rate is less than the preset protection rate, transmission management is performed based on channel switching or information desensitization.
[0058] The specific configuration of the response terminal determination module 60 will be described in detail below. The response terminal determination module 60 further includes: establishing a unified information base, which is a bidirectional conversion database between the product side architecture and the unified architecture; based on the response terminal, traversing the unified information base, matching and determining the product side architecture, which is the technical architecture of the response terminal; based on the product side architecture, converting the pre-control strategy to determine the terminal control strategy.
[0059] The specific configuration of the response terminal determination module 60 will be described in detail below. The response terminal determination module 60 further includes: obtaining a control data stream, performing a bias decision analysis on the control data stream, and the bias decision meets a preset tolerance interval; wherein the bias decision analysis includes: performing a first bias decision based on a node control difference, performing a second bias decision based on a control trend bias, and performing a third bias decision based on a response delay, and performing feedback control management if the preset tolerance interval of the mapping is not met.
[0060] The intelligent decision-making control system for power grid Internet of Things products provided in the embodiments of the present invention can execute the intelligent decision-making control method for power grid Internet of Things products provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method.
[0061] Although the present application makes various references to certain modules in the system according to the embodiments of the present application, any number of different modules may be used and run on the user terminal and / or server, and the various units and modules included are only divided according to functional logic, but are not limited to the above division, as long as the corresponding functions can be achieved; in addition, the specific names of the functional units are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of the present invention.
[0062] The above specific implementations do not constitute a limitation on the protection scope of this application. It should be understood by those skilled in the art that various modifications, combinations and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions and improvements made within the spirit and principles of this application should be included in the protection scope of this application.
Claims
1. An intelligent decision-making control method for power grid IoT products, characterized in that: The method comprises: Obtain the self-decision-making characteristics and network access decision-making characteristics of power grid IoT products, and determine the intelligent decision sequence, wherein the self-decision-making characteristics refer to the autonomous judgment and decision-making of real-time collected data based on advanced sensor measurement technology, information communication technology, and analysis and decision-making technology, and the network access decision-making characteristics refer to a series of decision-making rules and processes that power grid IoT products need to follow when accessing the power grid; Based on the preset similarity, the intelligent decision sequence is clustered, and the decision fuzzification is performed for each cluster. Based on the logical necessity and logical commonality, fuzzy logic rules are mined, and there is a one-to-one correspondence between the fuzzy logic rules and the clusters; Based on the fuzzy logic rules, supervise the training of a fuzzy decision model, wherein the fuzzy decision model includes a bidirectional fuzzification block and a fuzzy decision block; Reading pre-decision tasks, wherein the pre-decision tasks include active decision tasks and passive decision tasks; Identify the pre-decision task, read the grid-connected data stream, perform data fuzzification and fuzzy decision analysis based on matching decision domain in combination with the fuzzy decision model, determine the fuzzy strategy and perform defuzzification, and determine the pre-control strategy; Determine a response terminal based on the pre-decision task, obtain a downlink channel based on the Internet of Things for strategy transmission, and perform technical architecture conversion and control response based on the response terminal for the pre-control strategy; Wherein, the supervised training fuzzy decision model includes: Traversing the fuzzy logic rules, supervising and training a decision domain, wherein the decision domain is a set of research objects in a fuzzy logic system, and the decision domain corresponds to the fuzzy logic rules one by one; Based on the decision frequency and the decision operator requirements, the decision domain is integrated and resources are reallocated to determine the fuzzy decision block, wherein the fuzzy decision block has extensibility and updateability, wherein the decision frequency refers to the number of times the power grid IoT product makes a decision within a specific time; Determine an input port based on a fuzzy processing branch and an output port based on a defuzzification branch, connect the fuzzy decision block, and generate the fuzzy decision model; Wherein, the pre-decision task includes a passive decision task, including: The passive decision-making task is a task type based on data flow perception and self-triggering; Determine an abnormal control point based on the power grid IoT product, perform correlation feature screening on the abnormal control point, and determine a predecessor display feature, wherein the predecessor display feature satisfies the probability of abnormal occurrence; Based on the preceding display characteristics, a passive task trigger setting is performed, and preventive control decision analysis is performed in combination with the fuzzy decision model.
2. The intelligent decision-making control method for power grid IoT products according to claim 1, characterized in that: Fuzzy decision making is performed for each cluster, including: Determine a fuzzy processing method, wherein the fuzzy processing method includes data sharpening processing and data passivation processing; Based on the fuzzy processing method, a bidirectional fuzzification block is established, wherein the bidirectional fuzzification block includes a fuzzy processing branch and a defuzzification branch; Based on the fuzzy processing branch, the decision fuzzification processing of each cluster is performed.
3. The intelligent decision-making control method for power grid IoT products according to claim 1, characterized in that: After obtaining the IoT-based downlink channel for policy transmission, it includes: Performing network security analysis on the downlink channel to locate information confrontation points that meet the risk level, wherein the information confrontation points are determined based on mining of historical information confrontation records of the Internet of Things, wherein the information confrontation points refer to key points or links that are identified as having a high risk and a probability of becoming a potential attack target in network security analysis; If the information adversarial point is a non-empty set, channel transmission management is performed based on the historical protection rate, wherein the historical protection rate is based on the passive protection type of the protection system. If the historical protection rate is less than the preset protection rate, transmission management is performed based on channel switching or information desensitization.
4. The intelligent decision-making control method for power grid IoT products according to claim 1, characterized in that: The pre-control strategy is converted into a technical architecture based on a response terminal, including: Establishing a unified information base, which is a bidirectional conversion database between the product side architecture and the unified architecture; Based on the response terminal, traverse the unified information base, match and determine the product side architecture, the product side architecture is the technical architecture of the response terminal; Based on the product-side architecture, the pre-control strategy is converted to determine the terminal control strategy.
5. The intelligent decision-making control method for power grid IoT products according to claim 1, characterized in that: After the control response, including: Acquire a control data stream, perform bias decision analysis on the control data stream, and determine whether the bias decision satisfies a preset tolerance interval, wherein the bias decision analysis is used to evaluate the bias degree of the decision in the control data stream, which refers to the deviation between the output decision result and the expected standard; The biased decision analysis includes: A first bias decision is made based on the node control difference, a second bias decision is made based on the control trend bias, and a third bias decision is made based on the response delay. If the preset tolerance interval of the mapping is not met, feedback regulation management is performed, wherein the node control difference refers to the difference between the decision result on a specific control node and the expected value.
6. Intelligent decision-making control system for power grid IoT products, characterized in that: The system is used to implement the intelligent decision-making control method for power grid Internet of Things products according to any one of claims 1 to 5, and the system includes: An intelligent decision sequence determination module, which is used to obtain the self-decision-making characteristics and network access decision characteristics of the power grid IoT product to determine the intelligent decision sequence, wherein the self-decision-making characteristics refer to autonomous judgment and decision-making on real-time collected data based on advanced sensor measurement technology, information communication technology, and analysis and decision-making technology, and the network access decision characteristics refer to a series of decision-making rules and processes that the power grid IoT product needs to follow when accessing the power grid; A fuzzy logic rule mining module, wherein the fuzzy logic rule mining module performs clustering processing on the intelligent decision sequence based on a preset similarity, performs decision fuzzification for each cluster, and mines fuzzy logic rules based on logical necessity and logical commonality, wherein the fuzzy logic rules and clusters have a one-to-one correspondence; A fuzzy decision model supervision training module, wherein the fuzzy decision model supervision training module is used to supervise the training of a fuzzy decision model based on the fuzzy logic rules, wherein the fuzzy decision model includes a bidirectional fuzzification block and a fuzzy decision block; A pre-decision task reading module, wherein the pre-decision task reading module is used to read pre-decision tasks, wherein the pre-decision tasks include active decision tasks and passive decision tasks; A pre-control strategy determination module, the pre-control strategy determination module is used to identify the pre-decision task, read the grid-connected data stream, perform data fuzzification and fuzzy decision analysis based on matching decision domain in combination with the fuzzy decision model, determine the fuzzy strategy and perform defuzzification, and determine the pre-control strategy; A response terminal determination module is used to determine the response terminal based on the pre-decision task, obtain the downlink channel based on the Internet of Things for policy transmission, and perform technical architecture conversion and control response based on the response terminal for the pre-control strategy.
Citation Information
Patent Citations
Fuzzy adaptive robot system capable of recognizing voice demand and working method thereof
CN106054602A
Integrated accident response and decision method of main and distribution networks
CN106485594A
Locus prediction method utilizing fuzzy locus sequence
CN107247961A
Charging facility utilization rate prediction model establishment method and device, equipment and medium
CN114169621A