Product life cycle design conflict quantification and resolution method and system
By using the AND-OR tree structure and fuzzy evaluation matrix in the product life cycle design, combined with the breadth-first search algorithm, to quantify and resolve design conflicts, the problems of neglecting life cycle information and insufficient conflict quantification in the existing technology are solved. Efficient design conflict management.
Patent Information
- Application Number
- CN202411088269.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-08-09
AI Technical Summary
The existing technology lacks consideration of life cycle information in product life cycle design, which makes it difficult to identify and resolve design conflicts. It also lacks quantitative research on the degree of conflicts, resulting in increased design process time and cost.
A method of quantification and resolution of design conflicts in the product life cycle is adopted. By obtaining the preset node evaluation results of the AND or tree structure, a fuzzy evaluation matrix and a combined weight matrix are established to calculate the comprehensive score. Combined with the breadth first search algorithm, the decision-making conflict quantification is realized. and digestion.
It realizes the quantitative identification and resolution of design conflicts in the product life cycle, significantly reduces design time and cost, improves design efficiency, and is suitable for conflict resolution in product life cycle design.
Smart Images

Figure CN118627315B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of product full life cycle design, and in particular to a method and system for quantifying and resolving product full life cycle design conflicts. Background Art
[0002] The full life cycle of a product is different from the life of the product. The full life cycle of a product includes the raw material acquisition and manufacturing stage, the service use stage, and the retirement and disposal stage. At the same time, conflicts in the design process cannot be completely avoided. Design is essentially a process of continuous generation and resolution of conflicts.
[0003] Product life cycle design theory is a key technology to support the development of green products. Different from general design, product life cycle design is more likely to generate more and more complex conflicts during the design process due to the introduction of environmentally friendly requirements, the increase in design participants, and the complexity of life cycle information.
[0004] Many scholars have conducted extensive research on the identification, detection and resolution of product design conflicts (design conflicts mainly include goal conflicts and decision conflicts). In terms of design conflict identification and detection, constraint-based conflict identification is currently a hot research method.
[0005] However, the above technologies have the following problems: (1) The current identification and detection of design conflicts lacks consideration of life cycle information and cannot be applied to the conflict problems of product design throughout the entire life cycle. (2) The current detection of design conflicts mostly stays at the identification stage and lacks quantitative research on the degree of conflict. (3) The current design conflict resolution method lacks consideration of product life cycle attribute indicators, which makes design conflict resolution difficult, the optimization efficiency is low, and it significantly increases product design time and cost. Summary of the invention
[0006] In view of the above-mentioned deficiencies in the prior art, the present application provides a method and system for quantifying and resolving design conflicts throughout the product life cycle, in order to solve the existing problems that (1) the current identification and detection of design conflicts lack consideration of life cycle information and cannot be applied to the conflict problem of product full life cycle design. (2) The current detection of design conflicts mostly stays at the identification stage and lacks quantitative research on the degree of conflict. (3) The current design conflict resolution method lacks consideration of product life cycle attribute indicators, resulting in difficulty in resolving design conflicts, low optimization efficiency, and significantly increased product design time and cost.
[0007] In a first aspect, the present application provides a method for quantifying and resolving design conflicts throughout the entire life cycle of a product, the method comprising: obtaining an AND-OR tree corresponding to a product design scheme, wherein the structure of the AND-OR tree is an AND-OR tree structure with a four-layer depth and is composed of a number of preset nodes, and the four-layer depth AND-OR tree structure divides the preset nodes into a root node, a first intermediate layer node, a second intermediate layer node, and a leaf node; obtaining an evaluation result of a preset attribute indicator corresponding to the preset node at a preset domain layer; wherein the evaluation result is divided into five levels; based on the probability of occurrence of each level in the evaluation result, a fuzzy evaluation matrix corresponding to the preset node at the preset domain layer is established. ; Where n is the number of preset attribute indicators of the preset domain layer corresponding to the preset node; Get the combined weight matrix of the preset node in the corresponding preset domain layer ; Based on the combined weight matrix , fuzzy evaluation matrix , calculate the fuzzy vector of the preset node in the corresponding preset domain layer; then combine the evaluation vector corresponding to the evaluation result to calculate the comprehensive score of the preset node in the corresponding preset domain layer; S1, create OPEN table, CLOSED table, stack, preset optimal path table; S2, based on the preset level order and the level corresponding to the preset node, select the preset node from the AND / OR tree and place it in the OPEN table; S3, take out the preset node from the OPEN table, push it into the stack, and obtain the comprehensive score of the current preset node in the corresponding preset domain layer as the node value of the current level, and put the current preset node into the CLOSED table; S4, determine the latest one placed in the CLOSED Whether the preset domain layer corresponding to the preset node of the table corresponds to the termination level, when the preset node corresponds to the termination level, enter S7; when it does not correspond to the termination level, enter S5; S5, obtain the preset node corresponding to the child relationship of the current preset node in the AND or tree, and place it in the OPEN table, and determine the relationship between the preset nodes in the current OPEN table; when the preset nodes in the OPEN table are in an AND relationship, push them into the stack at the same time, based on the comprehensive scores of all preset nodes corresponding to the AND relationship, add up to obtain the node value of the current level, and put all the preset nodes into the CLOSED table, and return to S4; when the preset nodes in the OPEN table are in an OR relationship, enter S6 ; S6, randomly take out a preset node from the OPEN table and push it into the stack, obtain the comprehensive score of the current preset node in the corresponding preset domain layer as the node value of the current level, and put the preset node into the CLOSED table; determine whether the node value meets the feasibility constraint, if it does, return to S4; if it does not, execute the pruning strategy, stop the further expansion of the node, and enter S10; S7, determine the current path based on the preset nodes selected at each level, and obtain the node values corresponding to each level, and then calculate the decision conflict quantification value based on the node values of each level corresponding to the current path and the corresponding relationship between the preset domain layer and the preset indicator stage; determine the decision Whether the decision conflict quantization value meets the decision conflict constraint. If so, the objective function value under the current path is calculated based on the node values corresponding to each level, and enter S8; if not, enter S9; S8, judge the relationship between the objective function value of the current path and the objective function value of the path stored in the current preset optimal path table. If it is greater than the current preset optimal path table, update the optimal path in the preset optimal path table to the current path, otherwise enter step S9; S9, do not update the preset optimal path table; S10, judge whether the OPEN table is empty, if it is empty, stop; if the OPEN table is not empty, return to S3.
[0008] Furthermore, there is a unique correspondence between the preset node and the preset indicator stage, and there is a unique correspondence between the preset node and the preset domain layer; based on the combined weight matrix , fuzzy evaluation matrix , calculate the fuzzy vector of the preset node in the corresponding preset domain layer; then combine the evaluation vector corresponding to the evaluation result to calculate the comprehensive score of the preset node in the corresponding preset domain layer, specifically including:
[0009] pass , calculate and obtain the fuzzy vector B; through , calculate and obtain a comprehensive score to quantify the target conflict through the comprehensive score; where V represents a preset evaluation vector; Represents the combined weight matrix of the preset domain layer; represents the fuzzy evaluation matrix of the preset domain layer, and B represents the fuzzy vector of the preset domain layer.
[0010] Furthermore, when the preset nodes in the OPEN table are in an AND relationship, they are pushed into the stack at the same time, and the node value of the current level is obtained by adding up the comprehensive scores of all preset nodes corresponding to the AND relationship, which specifically includes: obtaining the comprehensive score of the preset domain layer corresponding to the preset node of the AND relationship; calculating the sum of all comprehensive scores of the preset nodes of the AND relationship, and determining the sum as the node value.
[0011] Further, judging whether the node value satisfies the feasibility constraint specifically includes: obtaining the comprehensive score of the preset domain layer corresponding to the current preset node; when the comprehensive score of the preset domain layer corresponding to the preset node is greater than or equal to the preset node threshold, the node value of the preset node satisfies the feasibility constraint; otherwise, the node value of the preset node does not satisfy the feasibility constraint.
[0012] Furthermore, the preset indicator stages include at least: raw material acquisition and production and manufacturing stage, service use stage, and retirement and disposal stage; the preset domain layers include at least: functional domain, structural domain, material domain, and process domain; the preset hierarchical order is functional domain to structural domain to material domain to process domain; the functional domain corresponds to the root node, the structural domain corresponds to the first intermediate layer node, the material domain corresponds to the second intermediate layer node, and the process domain corresponds to the leaf node; the raw material acquisition and production and manufacturing stage corresponds to the material domain + process domain, the service use stage corresponds to the functional domain, and the retirement and disposal stage corresponds to the structural domain.
[0013] Further, based on the node values of each level corresponding to the current path and the corresponding relationship between the preset domain layer and the preset indicator stage, the decision conflict quantification value is calculated; determining whether the decision conflict quantification value meets the decision conflict constraint, specifically including: obtaining the node value EF of the level corresponding to the functional domain, the node value ES of the level corresponding to the structural domain, the EM of the level corresponding to the material domain, and the EP of the level corresponding to the process domain under the current path; and then obtaining , , ;in, Represents the comprehensive evaluation results of the raw material acquisition and production and manufacturing stages. Represents the comprehensive evaluation results of the product during its service life. Represents the comprehensive evaluation results of the product during the decommissioning and disposal stage.
[0014] judge , , Whether it complies with the decision conflict constraint formula:
[0015]
[0016] Where d represents the quantitative value of decision conflict, It represents the preset ideal evaluation results of the raw material acquisition and production and manufacturing stages. Indicates the preset ideal evaluation results of the service use phase; It represents the preset ideal assessment results of the decommissioning disposal stage; Represents a preset constant, Indicates the preset initial decision conflict quantization value.
[0017] Further, based on the node values corresponding to each level, the objective function value under the current path is calculated, specifically including: using the formula E=EP+EM+ES+EF; calculating to obtain the objective function value.
[0018] Furthermore, the evaluation vector corresponding to the evaluation result is V=[100,70,50,30,0].
[0019] In the second aspect, the present application provides a system for quantifying and resolving design conflicts throughout the entire life cycle of a product, the system comprising: an initial component for obtaining an AND-OR tree corresponding to a product design scheme, wherein the structure of the AND-OR tree is an AND-OR tree structure with a four-layer depth and is composed of a number of preset nodes, and the four-layer depth AND-OR tree structure divides the preset nodes into a root node, a first intermediate layer node, a second intermediate layer node and a leaf node; obtaining preset attribute indicators corresponding to the product at the preset indicator stage; determining the preset domain layer corresponding to each preset attribute indicator; wherein the preset domain layer has a preset hierarchical order, and the preset domain layer corresponds to the nodes of the structural layer in the AND-OR tree; obtaining the evaluation results of the preset attribute indicators of the preset node at the corresponding preset indicator stage or preset domain layer; wherein the evaluation results are divided into five levels; based on the probability of occurrence of each level in the evaluation results, establishing a fuzzy evaluation matrix corresponding to each preset indicator stage and preset domain layer ; Where n is the number of preset attribute indicators corresponding to the preset indicator stage or preset domain layer; Get the combined weight matrix of the preset node in the corresponding preset indicator stage or preset domain layer ; Based on the combined weight matrix , fuzzy evaluation matrix , calculate the fuzzy vector of the preset node in the corresponding preset indicator stage or preset domain layer; then combine the evaluation vector corresponding to the evaluation result to calculate the comprehensive score of the preset node in the corresponding preset indicator stage or preset domain layer; the first component is used to create an OPEN table, a CLOSED table, a stack, and a preset optimal path table; the second component is connected to the initial component and the first component, and is used to select a preset node from the AND / OR tree based on the preset level order and the level corresponding to the preset node and place it in the OPEN table; the third component is connected to the second component, and is used to take out the preset node from the OPEN table, push it into the stack, and obtain the comprehensive score of the current preset node in the corresponding preset domain layer as the node value of the current level, and put the current preset node into the CLOSED table. ED table; the fourth component, connected to the third component, the fifth component, and the seventh component, is used to determine whether the preset domain layer corresponding to the preset node newly placed in the CLOSED table corresponds to the termination level. When the preset node corresponds to the termination level, enter the seventh component; when it does not correspond to the termination level, enter the fifth component; the fifth component, connected to the fourth component and the sixth component, is used to obtain the preset node corresponding to the child relationship of the current preset node in the AND or tree, and place it in the OPEN table to determine the relationship between the preset nodes in the current OPEN table; when the preset nodes in the OPEN table are in an AND relationship, they are pushed into the stack at the same time, and based on the comprehensive scores of all preset nodes corresponding to the AND relationship, the node value of the current level is obtained by summing up, and all the preset nodes are placed in the CL In the OSED table, the fourth component is returned; when the preset nodes in the OPEN table are in an or relationship, the sixth component is entered; the sixth component, connected to the fourth and tenth components, is used to randomly take out a preset node from the OPEN table and push it into the stack, obtain the comprehensive score of the current preset node in the corresponding preset domain layer as the node value of the current level, and put the preset node into the CLOSED table; determine whether the node value meets the feasibility constraint, if so, return to the fourth component; if not, execute the pruning strategy, stop the continued expansion of the node, and enter the tenth component; the seventh component, connected to the eighth and ninth components, is used to determine the current path based on the preset nodes selected at each level, and obtain the node values corresponding to each level, and then based on The node values of each level corresponding to the current path and the corresponding relationship between the preset domain layer and the preset indicator stage are used to calculate the decision conflict quantification value; determine whether the decision conflict quantification value meets the decision conflict constraint. If it meets the decision conflict constraint, the objective function value under the current path is calculated based on the node values corresponding to each level, and enter the eighth component; if it does not meet the decision conflict constraint, enter the ninth component; the eighth component is connected to the ninth component, and is used to determine the size relationship between the objective function value of the current path and the objective function value of the path stored in the current preset optimal path table. If it is greater than the current preset optimal path table, the optimal path in the preset optimal path table is updated to the current path, otherwise it enters the ninth component; the ninth component is used not to update the preset optimal path table;The tenth component is connected to the third component and is used to determine whether the OPEN table is empty. If it is empty, it stops; if the OPEN table is not empty, it returns to the third component. ;
[0020] Those skilled in the art can understand that the present application has at least the following beneficial effects:
[0021] The preset indicator stages involved in this application (including: raw material acquisition and production manufacturing stage, service use stage, and retirement disposal stage) realize the consideration of life cycle information in the identification and detection process of design conflicts, and solve the conflict problem that the existing solutions cannot be applied to the full life cycle design of products. In addition, this application uses a combination weight matrix based on , fuzzy evaluation matrix , calculate the fuzzy vector of the preset node in the corresponding preset indicator stage or preset domain layer; then combine the evaluation vector corresponding to the evaluation result to quantify the target conflict through the comprehensive score. This application calculates the decision conflict quantification value based on the node values of each level corresponding to the current path, and realizes the calculation of the vertical distance d (i.e., the decision conflict quantification value) from the design solution mapping point corresponding to the current path to the conflict resolution line, and realizes the quantification of decision conflicts, which solves the current detection of design conflicts that mostly stays in the identification stage and lacks quantitative research on the degree of conflict; in addition, this application uses S1-S11, a breadth-first search algorithm based on a fusion pruning strategy, to solve the design solution with the best comprehensive evaluation result in the design space, and to solve the target conflict and decision conflict respectively through node feasibility constraints and decision conflict constraint formulas. This solves the problem that the current design conflict resolution method lacks consideration of product life cycle attribute indicators, resulting in difficulty in design conflict resolution, low optimization efficiency, and significantly increases product design time and cost.
[0022] In addition, this application combines constraint theory to transform decision conflict resolution into a constraint satisfaction problem, thereby achieving the resolution of design conflicts for the entire product life cycle and the automatic generation of optimal design solutions, significantly reducing design time and costs, and has a very positive significance for promoting the sustainable development of the manufacturing industry. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Some embodiments of the present disclosure are described below with reference to the accompanying drawings, in which:
[0024] Figure 1 It is a flow chart of a method for quantifying and resolving design conflicts throughout the entire life cycle of a product provided in an embodiment of the present application.
[0025] Figure 2 It is a schematic diagram of a product life cycle conflict resolution model provided in an embodiment of the present application.
[0026] Figure 3It is a schematic diagram of the internal structure of a product full life cycle design conflict quantification and resolution system provided in an embodiment of the present application. DETAILED DESCRIPTION
[0027] It should be understood by those skilled in the art that the embodiments described below are only preferred embodiments of the present disclosure, and do not mean that the present disclosure can only be implemented through the preferred embodiments. The preferred embodiments are only used to explain the technical principles of the present disclosure, and are not used to limit the protection scope of the present disclosure. Based on the preferred embodiments provided by the present disclosure, all other embodiments obtained by ordinary technicians in this field without creative work should still fall within the protection scope of the present disclosure.
[0028] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.
[0029] The technical solution proposed in the embodiments of the present application is described in detail below with reference to the accompanying drawings.
[0030] The present application embodiment provides a method for quantifying and resolving design conflicts throughout the product life cycle, such as Figure 1 As shown, the method provided in the embodiment of the present application mainly includes the following steps:
[0031] S0. Obtain the AND / OR tree corresponding to the product design scheme; obtain the preset attribute indicators corresponding to the product at the preset indicator stage; determine the preset domain layer corresponding to each preset attribute indicator; obtain the evaluation results of the preset attribute indicators corresponding to the preset node at the preset domain layer; based on the probability of occurrence of each level in the evaluation results, establish the fuzzy evaluation matrix corresponding to the preset node at the preset domain layer ; Get the combined weight matrix of the preset node in the corresponding preset domain layer ; Based on the combined weight matrix , fuzzy evaluation matrix , calculate the fuzzy vector of the preset node in the corresponding preset domain layer; then combine the evaluation vector corresponding to the evaluation result to calculate the comprehensive score of the preset node in the corresponding preset domain layer.
[0032] It should be noted that the structure of the AND-OR tree is an AND-OR tree structure with a four-layer depth and is composed of a number of preset nodes. The four-layer depth AND-OR tree structure divides the preset nodes into root nodes, first intermediate layer nodes, second intermediate layer nodes and leaf nodes; there is a preset hierarchical order in the preset domain layer, and there is a corresponding relationship between the preset domain layer and the nodes of the structural layer in the AND-OR tree; the evaluation results are divided into five levels; n is the number of preset attribute indicators corresponding to the preset indicator stage or preset domain layer.
[0033] In addition, the preset nodes in the AND or OR tree are used to represent specific solutions that can be selected by the product at the preset domain layer (for example, when the product represents a wind turbine, the preset node corresponding to the root node can be an energy conversion component, a braking component, a power generation and transmission component, etc.). Those skilled in the art can construct an AND or tree corresponding to the current product design solution based on the specific product. This application is a direct use of the AND or tree, and the specific construction process is not limited. In addition, the preset nodes at the same level have AND relationships (for example, in the product design configuration, a product may require all of its subcomponents to exist in order to work properly) and OR relationships (for example, in the product design configuration, a product may have multiple alternative components to choose from).
[0034] Specifically, the preset indicator stages include at least: raw material acquisition and production and manufacturing stage, service use stage, and retirement and disposal stage; the preset domain layers include at least: functional domain, structural domain, material domain, and process domain; the preset hierarchical order is functional domain to structural domain to material domain to process domain; the functional domain corresponds to the root node, the structural domain corresponds to the first intermediate layer node, the material domain corresponds to the second intermediate layer node, and the process domain corresponds to the leaf node; the raw material acquisition and production and manufacturing stage corresponds to the material domain + process domain, the service use stage corresponds to the functional domain, and the retirement and disposal stage corresponds to the structural domain.
[0035] As an example, ~ is an identifier, and the corresponding relationship between all preset indicator stages and preset attribute indicators is shown in Table 1 below:
[0036] Table 1
[0037]
[0038] As an example, the correspondence between all preset domain layers and preset attribute indicators is shown in Table 2 below:
[0039] Table 2
[0040]
[0041] In the step, there is a unique correspondence between the preset node and the preset indicator stage; based on the combined weight matrix , fuzzy evaluation matrix , calculate the fuzzy vector of the preset node in the corresponding preset domain layer; then combine the evaluation vector corresponding to the evaluation result to calculate the comprehensive score of the preset node in the corresponding preset domain layer, specifically including:
[0042] pass , calculate and obtain the fuzzy vector B; through , calculate and obtain a comprehensive score to quantify the target conflict through the comprehensive score; where V represents a preset evaluation vector; Represents the combined weight matrix of the preset domain layer; represents the fuzzy evaluation matrix of the preset domain layer, and B represents the fuzzy vector of the preset domain layer.
[0043] S1. Create an OPEN table, a CLOSED table, a stack, and a preset optimal path table.
[0044] S2. Based on the preset level order and the level corresponding to the preset node, select the preset node from the AND / OR tree and place it in the OPEN table.
[0045] It should be noted that selecting a preset node from the AND / OR tree starts from the preset node corresponding to the highest level. The preset hierarchy order is from the function domain to the structure domain to the material domain to the process domain, so start from the preset node corresponding to the function domain.
[0046] S3. Take out the preset node from the OPEN table, push it into the stack, obtain the comprehensive score of the current preset node in the corresponding preset domain layer as the node value of the current level, and put the current preset node into the CLOSED table.
[0047] S4. Determine whether the preset domain layer corresponding to the preset node most recently put into the CLOSED table corresponds to the termination layer. When the preset node corresponds to the termination layer, enter S7; when it does not correspond to the termination layer, enter S5.
[0048] S5. Obtain the preset node corresponding to the child relationship of the current preset node in the AND or tree, and place it in the OPEN table to determine the relationship between the preset nodes in the current OPEN table; when the preset nodes in the OPEN table are in an AND relationship, push them into the stack at the same time, and add up the comprehensive scores of all preset nodes corresponding to the AND relationship to obtain the node value of the current level, and put all the preset nodes into the CLOSED table, and return to S4; when the preset nodes in the OPEN table are in an OR relationship, enter S6.
[0049] When the preset nodes in the OPEN table are in an AND relationship, they are pushed into the stack at the same time, and the node value of the current level is obtained by adding up the comprehensive scores of all preset nodes corresponding to the AND relationship, which can be specifically:
[0050] Obtain the comprehensive score of the preset domain layer corresponding to the preset node of the relationship; calculate the sum of all comprehensive scores of the preset nodes of the relationship, and determine the sum as the node value.
[0051] S6. Randomly take out a preset node from the OPEN table and push it into the stack, obtain the comprehensive score of the current preset node in the corresponding preset domain layer as the node value of the current level, and put the preset node into the CLOSED table; determine whether the node value meets the feasibility constraint, if so, return to S4; if not, execute the pruning strategy, stop the further expansion of the node, and enter S10.
[0052] Determine whether the node value meets the feasibility constraint, which can be:
[0053] Obtain the comprehensive score of the preset domain layer corresponding to the current preset node; when the comprehensive score of the preset domain layer corresponding to the preset node is greater than or equal to the preset node threshold, the node value of the preset node meets the feasibility constraint; otherwise, the node value of the preset node does not meet the feasibility constraint.
[0054] It should be noted that, since the preset indicator stages include raw material acquisition and manufacturing stage, service use stage, and decommissioning and disposal stage, the raw material acquisition and manufacturing stage, service use stage, and decommissioning and disposal stage each correspond to a preset ideal evaluation result; similarly, the functional domain, structural domain, material domain, and process domain each correspond to a preset node threshold.
[0055] S7. Determine the current path based on the preset nodes selected at each level, and obtain the node values corresponding to each level, and then calculate the decision conflict quantification value based on the node values of each level corresponding to the current path and the correspondence between the preset domain layer and the preset indicator stage; determine whether the decision conflict quantification value meets the decision conflict constraint. If it meets the decision conflict constraint, calculate the objective function value under the current path based on the node values corresponding to each level, and enter S8; if it does not meet the decision conflict constraint, enter S9.
[0056] In the step, the preset hierarchical order is from the functional domain to the structural domain to the material domain to the process domain; the node values corresponding to each level are obtained, and then the decision conflict quantification value is calculated based on the node values of each level corresponding to the current path and the corresponding relationship between the preset domain layer and the preset indicator stage; it is determined whether the decision conflict quantification value meets the decision conflict constraint. If it meets the decision conflict constraint, it can be specifically:
[0057] Get the node value EF of the functional domain corresponding to the level, the node value ES of the structural domain corresponding to the level, the EM of the material domain corresponding to the level, and the EP of the process domain corresponding to the level under the current path; and then get , , ;in, Represents the comprehensive evaluation results of the raw material acquisition and production and manufacturing stages. Represents the comprehensive evaluation results of the product during its service life. Represents the comprehensive evaluation results of the product during the decommissioning and disposal stage.
[0058] judge , , Whether it complies with the decision conflict constraint formula:
[0059]
[0060] Where d represents the quantitative value of decision conflict, It represents the preset ideal evaluation results of the raw material acquisition and production and manufacturing stages. Indicates the preset ideal evaluation results of the service use phase; It represents the preset ideal assessment results of the decommissioning disposal stage; ,in, Represents a preset constant, Indicates the preset initial decision conflict quantization value.
[0061] It should be noted that the preset ideal evaluation result is a preset value.
[0062] In the step, based on the node values corresponding to each level, the objective function value under the current path is calculated, which can be specifically:
[0063] The objective function value is calculated using the formula E=EP+EM+ES+EF.
[0064] S8. Determine the relationship between the objective function value of the current path and the objective function value of the path stored in the current preset optimal path table. If it is greater than the current preset optimal path table, update the optimal path in the preset optimal path table to the current path, otherwise proceed to step S9.
[0065] It should be noted that the magnitude relationship between the objective function value and the path stored in the current preset optimal path table is the magnitude relationship between the objective function value of the current path and the objective function value of the path stored in the preset optimal path table.
[0066] S9. Do not update the preset optimal path table.
[0067] S10. Determine whether the OPEN table is empty. If it is empty, stop; if the OPEN table is not empty, return to S3.
[0068] Based on the above description, the present application discloses a method for quantifying and resolving design conflicts throughout the entire life cycle of a product. Aiming at the characteristics of the product's entire life cycle design, a comprehensive evaluation index system is used to achieve the mapping of the index system and the product's multi-level model (obtaining the preset attribute indicators corresponding to the product at the preset indicator stage; determining the preset domain layer corresponding to each preset attribute indicator; obtaining the evaluation results of the preset attribute indicators of the preset node at the corresponding preset indicator stage or preset domain layer), thereby improving the comprehensiveness of the identification of design conflict information.
[0069] In addition, the method for quantifying and resolving design conflicts throughout the product life cycle proposed in this application calculates the comprehensive score of the preset node at the corresponding preset indicator stage or preset domain layer and the distance d from the design scheme mapping point to the conflict resolution line, thereby realizing the quantification of design scheme conflicts, laying the foundation for resolving design conflicts throughout the product life cycle, and improving the accuracy of design conflict quantification.
[0070] In addition, this application combines constraint theory to transform decision conflict resolution into a constraint satisfaction problem, thereby achieving the resolution of design conflicts for the entire product life cycle and the automatic generation of optimal design solutions, significantly reducing design time and costs, and has a very positive significance for promoting the sustainable development of the manufacturing industry.
[0071] In addition, the breadth-first search strategy (S1-S11) based on the fusion pruning strategy proposed in this application takes the optimal comprehensive evaluation result of the product's entire life cycle design plan as the objective function, and uses conflict resolution as a constraint condition. It searches layer by layer from top to bottom, which can quickly and accurately resolve conflicts, improve the efficiency of conflict resolution, and ensure the rationality and accuracy of the conflict resolution results.
[0072] Finally, the entire core content of this application (conflict quantification and resolution), conflict quantification includes target conflict quantification and decision conflict quantification. Since the preset attribute indicators corresponding to the preset nodes have a mapping relationship with the preset indicator stage and the preset domain layer. (Specific conversion process: the node value EF of the functional domain corresponds to the node value ES of the structure domain, the EM of the material domain, and the EP of the process domain; and then obtain , , ;in, Represents the comprehensive evaluation results of the raw material acquisition and production and manufacturing stages. Represents the comprehensive evaluation results of the product during its service life. Represents the comprehensive evaluation result of the product in the retirement and disposal stage). The design conflict quantification and elimination calculation involved in this application is a process of finding the optimal solution. This process can be mapped in a coordinate system consisting of raw material acquisition and production and manufacturing stage, service use stage, and retirement and disposal stage. Figure 2As shown in the figure, points A, B, C, and D represent the corresponding solution mapping points under different path selections. Solution mapping point = ,in, Represents the comprehensive evaluation results of the raw material acquisition and production and manufacturing stages. ; Represents the comprehensive evaluation results of the product during its service life. ; Represents the comprehensive evaluation results of the product at the decommissioning and disposal stage. . Represents the minimum boundary range of the preset design feasible domain on the X-axis in the conflict quantification model. Represents the minimum boundary range of the preset design feasible domain on the Y axis in the conflict quantification model. Represents the maximum boundary range of the preset design feasible domain on the Z axis in the conflict quantification model. Represents the maximum boundary range of the preset design feasible domain on the Y axis in the conflict quantification model. Represents the maximum boundary range of the preset design feasible domain on the Z axis in the conflict quantification model. The preset ideal evaluation results in each stage of the life cycle in the conflict quantification model can be set by technicians in this field or calculated through existing formulas. , , The preset design feasible domain (the gray area in the figure) is formed. If the solution mapping point falls outside the feasible domain, it means that the design solution represented by this solution mapping point does not meet the most basic design requirements. On the contrary, it meets the most basic design requirements. Point P represents the preset ideal optimal solution mapping point. Figure 2 In the example, the conflict resolution line is a direction vector passing through the origin, s= straight line.
[0073] besides, Figure 3 A system for quantifying and resolving design conflicts throughout the product life cycle is provided in the embodiment of the present application. Figure 3 As shown, the system provided in the embodiment of the present application mainly includes:
[0074] The initial component 200 is used to obtain an AND-OR tree corresponding to a product design solution, wherein the structure of the AND-OR tree is an AND-OR tree structure with a four-layer depth and is composed of a number of preset nodes, and the four-layer depth AND-OR tree structure divides the preset nodes into a root node, a first intermediate layer node, a second intermediate layer node and a leaf node; obtain the preset attribute indicators corresponding to the product at the preset indicator stage; determine the preset domain layer corresponding to each preset attribute indicator; wherein the preset domain layer has a preset hierarchical order, and the preset domain layer has a corresponding relationship with the nodes of the structural layer in the AND-OR tree; obtain the evaluation results of the preset attribute indicators of the preset node at the corresponding preset indicator stage or preset domain layer; wherein the evaluation results are divided into five levels; based on the probability of occurrence of each level in the evaluation results, establish a fuzzy evaluation matrix corresponding to each preset indicator stage and preset domain layer ; Where n is the number of preset attribute indicators corresponding to the preset indicator stage or preset domain layer; Get the combined weight matrix of the preset node in the corresponding preset indicator stage or preset domain layer ; Based on the combined weight matrix , fuzzy evaluation matrix , calculate the fuzzy vector of the preset node at the corresponding preset indicator stage or preset domain layer; then combine the evaluation vector corresponding to the evaluation result to calculate the comprehensive score of the preset node at the corresponding preset indicator stage or preset domain layer.
[0075] The first component 210 is used to create an OPEN table, a CLOSED table, a stack, and a preset optimal path table.
[0076] The second component 220 is connected to the initial component 200 and the first component 210, and is used to select a preset node from the AND / OR tree and place it in the OPEN table based on the preset level order and the level corresponding to the preset node.
[0077] The third component 230 is connected to the second component 220, and is used to take out the preset node from the OPEN table, push it into the stack, obtain the comprehensive score of the current preset node in the corresponding preset domain layer as the node value of the current level, and put the current preset node into the CLOSED table.
[0078] The fourth component 240 is connected to the third component 230, the fifth component 250, and the seventh component 270, and is used to determine whether the preset domain layer corresponding to the preset node most recently placed in the CLOSED table corresponds to the termination level. When the preset node corresponds to the termination level, it enters the seventh component 270; when it does not correspond to the termination level, it enters the fifth component 250.
[0079] The fifth component 250 is connected to the fourth component 240 and the sixth component 260, and is used to obtain the preset node corresponding to the child relationship of the current preset node in the AND tree, and place it in the OPEN table to determine the relationship between the preset nodes in the current OPEN table; when the preset nodes in the OPEN table are in an AND relationship, they are pushed into the stack at the same time, and the node value of the current level is obtained by adding up the comprehensive scores of all preset nodes corresponding to the AND relationship, and all the preset nodes are placed in the CLOSED table, and the fourth component 240 is returned; when the preset nodes in the OPEN table are in an OR relationship, the sixth component 260 is entered.
[0080] The sixth component 260 is connected to the fourth component 240 and the tenth component 300, and is used to randomly take out a preset node from the OPEN table and push it into the stack, obtain the comprehensive score of the current preset node in the corresponding preset domain layer as the node value of the current level, and put the preset node into the CLOSED table; determine whether the node value meets the feasibility constraint, and return to the fourth component 240 if it meets the constraint; if not, execute the pruning strategy, stop the further expansion of the node, and enter the tenth component 300.
[0081] The seventh component 270 is connected to the eighth component 280 and the ninth component 290, and is used to determine the current path based on the preset nodes selected at each level, and obtain the node values corresponding to each level, and then calculate the decision conflict quantification value based on the node values of each level corresponding to the current path and the correspondence between the preset domain layer and the preset indicator stage; determine whether the decision conflict quantification value meets the decision conflict constraint. If it meets the decision conflict constraint, calculate the objective function value under the current path based on the node values corresponding to each level, and enter the eighth component 280; if it does not meet the decision conflict constraint, enter the ninth component 290.
[0082] The eighth component 280 is connected to the ninth component and is used to determine the size relationship between the objective function value of the current path and the objective function value of the path stored in the current preset optimal path table. If it is greater than the current preset optimal path table, the optimal path in the preset optimal path table is updated to the current path, otherwise it enters the ninth component 290.
[0083] The ninth component 290 is used for not updating the preset optimal path table.
[0084] The tenth component 300 is connected to the third component and is used to determine whether the OPEN table is empty. If it is empty, stop; if the OPEN table is not empty, return to the third component 230.
[0085] So far, the technical solutions of the present disclosure have been described in combination with the above multiple embodiments, but it is easy for those skilled in the art to understand that the protection scope of the present disclosure is not limited to these specific embodiments. Without departing from the technical principles of the present disclosure, those skilled in the art can split and combine the technical solutions in the above-mentioned various embodiments, and can also make equivalent changes or replacements to the relevant technical features. Any changes, equivalent replacements, improvements, etc. made within the technical concept and / or technical principle of the present disclosure will fall within the protection scope of the present disclosure.
Claims
1. A method for quantifying and resolving design conflicts during the entire product life cycle, characterized in that: The method comprises: Obtain an AND-OR tree corresponding to the product design solution, wherein the structure of the AND-OR tree is an AND-OR tree structure with a depth of four layers and is composed of a number of preset nodes, and the AND-OR tree structure with a depth of four layers divides the preset nodes into a root node, a first intermediate layer node, a second intermediate layer node, and a leaf node; Obtaining preset attribute indicators corresponding to the product at the preset indicator stage; determining the preset domain layer corresponding to each preset attribute indicator; wherein the preset domain layer has a preset hierarchical order, and the preset domain layer has a corresponding relationship with the node of the structure layer in the AND or tree; Obtain the evaluation results of the preset attribute indicators corresponding to the preset node in the preset domain layer; the evaluation results are divided into five levels; based on the probability of occurrence of each level in the evaluation results, establish the fuzzy evaluation matrix corresponding to the preset node in the preset domain layer ; Where n is the number of preset attribute indicators of the preset domain layer corresponding to the preset node; Get the combined weight matrix of the preset node in the corresponding preset domain layer ; Based on the combination weight matrix , fuzzy evaluation matrix , calculate the fuzzy vector of the preset node in the corresponding preset domain layer; then combine the evaluation vector corresponding to the evaluation result to calculate the comprehensive score of the preset node in the corresponding preset domain layer; S1. Create OPEN table, CLOSED table, stack, and preset optimal path table; S2. Based on the preset hierarchical order and the hierarchical level corresponding to the preset node, a preset node is selected from the AND / OR tree and placed in the OPEN table; S3. Take out the preset node from the OPEN table, push it into the stack, obtain the comprehensive score of the current preset node in the corresponding preset domain layer as the node value of the current level, and put the current preset node into the CLOSED table; S4, determine whether the preset domain layer corresponding to the preset node most recently put into the CLOSED table corresponds to the termination layer. When the preset node corresponds to the termination layer, enter S7; when it does not correspond to the termination layer, enter S5; S5. Obtain the preset node corresponding to the child relationship of the current preset node in the AND or tree, and place it in the OPEN table, determine the relationship between the preset nodes in the current OPEN table; when the preset nodes in the OPEN table are in an AND relationship, push them into the stack at the same time, add the comprehensive scores of all preset nodes corresponding to the AND relationship to obtain the node value of the current level, and put all the preset nodes into the CLOSED table, and return to S4; when the preset nodes in the OPEN table are in an OR relationship, enter S6; S6. Randomly take a preset node from the OPEN table and push it into the stack, obtain the comprehensive score of the current preset node in the corresponding preset domain layer as the node value of the current level, and put the preset node into the CLOSED table; determine whether the node value meets the feasibility constraint, if so, return to S4; if not, execute the pruning strategy, stop the further expansion of the node, and enter S10; S7, determining the current path based on the preset nodes selected at each level, and obtaining the node values corresponding to each level, and then calculating the decision conflict quantification value based on the node values of each level corresponding to the current path and the corresponding relationship between the preset domain layer and the preset indicator stage; determining whether the decision conflict quantification value meets the decision conflict constraint, if it meets the decision conflict constraint, then calculating the objective function value under the current path based on the node values corresponding to each level, and entering S8; if it does not meet the decision conflict constraint, then entering S9; S8, determine the relationship between the objective function value of the current path and the objective function value of the path stored in the current preset optimal path table. If it is greater than the current preset optimal path table, update the optimal path in the preset optimal path table to the current path, otherwise proceed to step S9; S9: Do not update the preset optimal path table; S10. Determine whether the OPEN table is empty. If it is empty, stop; if the OPEN table is not empty, return to S3.
2. The method for quantifying and resolving product life cycle design conflicts according to claim 1, characterized in that: There is a unique correspondence between the preset nodes and the preset indicator stages; Based on the combination weight matrix , fuzzy evaluation matrix , calculate the fuzzy vector of the preset node in the corresponding preset domain layer; then combine the evaluation vector corresponding to the evaluation result to calculate the comprehensive score of the preset node in the corresponding preset domain layer, specifically including: pass , calculate and obtain the fuzzy vector B; pass , calculate and obtain a comprehensive score to quantify the goal conflict through the comprehensive score; Among them, V represents the preset evaluation vector; n represents the number of preset attribute indicators corresponding to the preset domain layer, Represents the combined weight matrix of the preset domain layer; represents the fuzzy evaluation matrix of the preset domain layer, and B represents the fuzzy vector of the preset domain layer.
3. The method for quantifying and resolving product life cycle design conflicts according to claim 1, characterized in that: When the preset nodes in the OPEN table are in an AND relationship, they are pushed into the stack at the same time. Based on the comprehensive scores of all preset nodes corresponding to the AND relationship, the node value of the current level is summed up, including: Obtain a comprehensive score of a preset domain layer corresponding to a preset node of the relationship; The sum of all comprehensive scores of the preset nodes of the relationship is calculated, and the sum is determined as the node value.
4. The method for quantifying and resolving product life cycle design conflicts according to claim 1, characterized in that: Determine whether the node value meets the feasibility constraints, including: Get the comprehensive score of the preset domain layer corresponding to the current preset node; When the comprehensive score of the preset domain layer corresponding to the preset node is greater than or equal to the preset node threshold, the node value of the preset node satisfies the feasibility constraint; otherwise, the node value of the preset node does not satisfy the feasibility constraint.
5. The method for quantifying and resolving product life cycle design conflicts according to claim 1, characterized in that: The preset indicator stages include at least: raw material acquisition and production and manufacturing stage, service use stage, and retirement disposal stage; the preset domain layers include at least: functional domain, structural domain, material domain, and process domain; the preset hierarchical order is from functional domain to structural domain to material domain to process domain; The function domain corresponds to the root node, the structure domain corresponds to the first intermediate layer node, the material domain corresponds to the second intermediate layer node, and the process domain corresponds to the leaf node; The raw material acquisition and production manufacturing stage corresponds to the material domain + process domain, the service use stage corresponds to the functional domain, and the decommissioning and disposal stage corresponds to the structural domain.
6. The method for quantifying and resolving product life cycle design conflicts according to claim 5, characterized in that: Calculate the decision conflict quantification value based on the node values of each level corresponding to the current path and the corresponding relationship between the preset domain layer and the preset indicator stage; Determine whether the decision conflict quantization value meets the decision conflict constraint, including: Get the node value EF of the corresponding level of the function domain, the node value ES of the corresponding level of the structure domain, the EM of the corresponding level of the material domain, and the EP of the corresponding level of the process domain under the current path; And then get , , ;in, Represents the comprehensive evaluation results of the raw material acquisition and production and manufacturing stages. Represents the comprehensive evaluation results of the product during its service use phase. The comprehensive evaluation results of the representative product at the decommissioning and disposal stage; judge , , Whether it complies with the decision conflict constraint formula: ; Where d represents the quantitative value of decision conflict, It represents the preset ideal evaluation results of the raw material acquisition and production and manufacturing stages. Indicates the preset ideal evaluation results of the service use phase; Represents the preset ideal assessment results of the decommissioning disposal stage; ,in, Represents a preset constant, Indicates the preset initial decision conflict quantization value.
7. The method for quantifying and resolving product life cycle design conflicts according to claim 6, characterized in that: Based on the node values corresponding to each level, calculate the objective function value under the current path, including: The objective function value is calculated using the formula E=EP+EM+ES+EF.
8. The method for quantifying and resolving product life cycle design conflicts according to claim 1, characterized in that: The evaluation vector corresponding to the evaluation result is V=[100,70,50,30,0].
9. A product life cycle design conflict quantification and resolution system, characterized by: The system comprises: An initial component is used to obtain an AND-OR tree corresponding to a product design solution, wherein the structure of the AND-OR tree is an AND-OR tree structure with a four-layer depth and is composed of a number of preset nodes, and the four-layer depth AND-OR tree structure divides the preset nodes into a root node, a first intermediate layer node, a second intermediate layer node, and a leaf node; obtain the preset attribute indicators corresponding to the product at the preset indicator stage; determine the preset domain layer corresponding to each preset attribute indicator; wherein the preset domain layer has a preset hierarchical order, and the preset domain layer has a corresponding relationship with the nodes of the structural layer in the AND-OR tree; obtain the evaluation results of the preset attribute indicators corresponding to the preset nodes in the preset domain layer; wherein the evaluation results are divided into five levels; based on the probability of occurrence of each level in the evaluation results, establish a fuzzy evaluation matrix corresponding to the preset nodes in the preset domain layer ; Where n is the number of preset attribute indicators of the preset domain layer corresponding to the preset node; Get the combined weight matrix of the preset node in the corresponding preset domain layer ; Based on the combined weight matrix , fuzzy evaluation matrix , calculate the fuzzy vector of the preset node in the corresponding preset domain layer; then combine the evaluation vector corresponding to the evaluation result to calculate the comprehensive score of the preset node in the corresponding preset domain layer; The first component is used to create an OPEN table, a CLOSED table, a stack, and a preset optimal path table; A second component, connected to the initial component and the first component, is used to select a preset node from the AND-OR tree and place it in the OPEN table based on a preset level order and a level corresponding to the preset node; The third component is connected to the second component, and is used to take out the preset node from the OPEN table, push it into the stack, obtain the comprehensive score of the current preset node in the corresponding preset domain layer as the node value of the current level, and put the current preset node into the CLOSED table; The fourth component is connected to the third component, the fifth component and the seventh component, and is used to determine whether the preset domain layer corresponding to the preset node newly put into the CLOSED table corresponds to the termination layer. When the preset node corresponds to the termination layer, the seventh component is entered; when it does not correspond to the termination layer, the fifth component is entered; The fifth component is connected to the fourth component and the sixth component, and is used to obtain the preset node corresponding to the child relationship of the current preset node in the AND or tree, and place it in the OPEN table to determine the relationship between the preset nodes in the current OPEN table; when the preset nodes in the OPEN table are in an AND relationship, they are pushed into the stack at the same time, and the node value of the current level is obtained by adding up the comprehensive scores of all preset nodes corresponding to the AND relationship, and all the preset nodes are placed in the CLOSED table, and the fourth component is returned; when the preset nodes in the OPEN table are in an OR relationship, the sixth component is entered; The sixth component is connected to the fourth component and the tenth component, and is used to randomly take out a preset node from the OPEN table and push it into the stack, obtain the comprehensive score of the current preset node in the corresponding preset domain layer as the node value of the current layer, and put the preset node into the CLOSED table; judge whether the node value meets the feasibility constraint, and return to the fourth component if it meets the feasibility constraint; if not, execute the pruning strategy, stop the further expansion of the node, and enter the tenth component; The seventh component is connected to the eighth component and the ninth component, and is used to determine the current path based on the preset nodes selected at each level, and obtain the node values corresponding to each level, and then calculate the decision conflict quantification value based on the node values of each level corresponding to the current path and the corresponding relationship between the preset domain layer and the preset indicator stage; determine whether the decision conflict quantification value meets the decision conflict constraint, if it meets the decision conflict constraint, then calculate the objective function value under the current path based on the node values corresponding to each level, and enter the eighth component; if it does not meet the decision conflict constraint, enter the ninth component; The eighth component is connected to the ninth component and is used to determine the relationship between the objective function value of the current path and the objective function value of the path stored in the current preset optimal path table. If it is greater than the current preset optimal path table, the optimal path in the preset optimal path table is updated to the current path, otherwise, the ninth component is entered; A ninth component, used for not updating a preset optimal path table; The tenth component is connected to the third component and is used to determine whether the OPEN table is empty. If it is empty, the process stops; if the OPEN table is not empty, the process returns to the third component.
Citation Information
Patent Citations
Mapping-based electromechanical product green design scheme generation method and system
CN112307628A
Multi-party collaboration-oriented method for service value conflict detection and resolution of stakeholders
WO2022037102A1
