A safety monitoring alarm method and system for on-site construction
By constructing a spatial model of power lines and simulating the pre-operation trajectory of the hoisting machinery, and monitoring its actual movement trajectory in real time, the problem of insufficient safety in monitoring the distance between the hoisting machinery and the high-voltage line in the existing technology is solved and safety is improved.
Patent Information
- Application Number
- CN202411125074.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-08-16
AI Technical Summary
Existing monitoring and alarm devices monitor the distance between hoisting machinery and high-voltage lines, which are greatly affected by human operations and environmental information. As a result, the actual distance may be smaller than the safe distance, and an accident may have occurred when the alarm is triggered, resulting in insufficient safety.
By setting the model of the hoisting machinery, a spatial model of the power line is constructed based on its characteristics and environmental information, simulating the pre-operation trajectory of the hoisting machinery, guiding its movement, and comparing the actual operation trajectory with the pre-operation trajectory in real time to determine whether it is qualified and timely Sounds the alarm and activates the blocking function.
It greatly improves the maintenance of safe distance between hoisting machinery and high-voltage lines, reduces sudden distance reduction or contact caused by human operation and environmental factors, and improves safety.
Smart Images

Figure CN118637496B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a monitoring alarm system, and in particular to a safety monitoring alarm method and system for on-site construction. Background Art
[0002] Monitoring and alarm devices that keep the safe distance between lifting machinery and live wires play a vital role in modern construction, power maintenance and various hoisting operations. Such devices ensure safety during operations and prevent accidents such as electric shock by monitoring the distance between lifting machinery and high-voltage wires in real time.
[0003] In the known prior art, such monitoring and alarm devices are usually based on advanced electromagnetic field induction technology or Beidou precise positioning system, which can accurately measure the actual distance between lifting machinery (such as cranes, hoists, etc.) and high-voltage lines. When the lifting machinery approaches the preset safety distance, the device will immediately trigger an alarm to remind the operator to take timely measures to ensure that the safety distance is not further reduced.
[0004] However, in actual use, human operations and environmental information have a greater impact on the same lifting machinery. The lifting machinery does not have a predetermined operation plan, and the actual distance between the lifting machinery and the high-voltage line is easily less than the safe distance. When the alarm is triggered, an accident may have already occurred. Summary of the invention
[0005] The purpose of the present invention is to provide a safety monitoring alarm method and system for on-site construction to overcome the shortcomings of the background technology.
[0006] In order to achieve the above-mentioned purpose, the present invention provides the following technical solutions: a safety monitoring and alarm method for on-site construction, comprising the following steps: setting a lifting machinery model, determining a lifting operation range based on the lifting machinery model, collecting power line information based on the lifting operation range, the power line information including: environmental information, time information, point height information, and constructing a power line space model based on the power line information.
[0007] The safe distance between the lifting machinery and the power lines is determined by the voltage level of the power lines and the characteristics of the lifting machinery.
[0008] A trajectory interface is constructed based on the spatial model of the power lines, and a discrimination interface is constructed based on the trajectory interface and the safe distance between the lifting machinery and the power lines.
[0009] Simulate the pre-operation trajectory of the lifting machinery based on the trajectory interface and guide the movement of the lifting machinery;
[0010] The actual operation trajectory of the lifting machinery is obtained, and whether the actual operation trajectory is qualified is judged based on the trajectory interface and the judgment interface. The unqualified information is transmitted to the alarm in real time, and the alarm immediately sounds an alarm and starts the locking function.
[0011] In a preferred embodiment, the construction of the power line space model includes: virtually setting environmental information, wherein the environmental information includes temperature information and wind information, and the wind information includes wind level and wind direction.
[0012] The power line route is composed of continuous points, and the point height information is the height information of each point of the power line from the ground.
[0013] A three-dimensional model of the power line is constructed based on the lifting operation range and point height information. The three-dimensional model of the power line is provided with a position coordinate system, which includes a horizontal coordinate and a vertical coordinate. The horizontal coordinate is marked with the position information of each point on the power line, and the vertical coordinate is marked with the height information of each point on the power line.
[0014] Obtain the predicted temperature information, wind level, and wind direction during the working time period, adjust the length of the three-dimensional model of the power line based on the predicted temperature information, adjust the swing direction of the three-dimensional model of the power line based on the predicted wind direction, adjust the swing amplitude of the three-dimensional model of the power line based on the predicted wind level, and construct a power line space model based on the three-dimensional model of the power line.
[0015] In a preferred embodiment, the characteristics of the lifting machinery include the height of the lifting machinery, the arm length of the lifting machinery, and the working radius of the lifting machinery. The formula for the safe distance between the lifting machinery and the power line is:
[0016] in, is the safe distance between the lifting machinery and the power lines, h is the height of the lifting machinery, is the arm length of the lifting machinery, r is the working radius of the lifting machinery, is the voltage level of the power line, is a constant term, A= , A is the weight coefficient of the lifting machinery in the safety distance, B= , B is the weight coefficient of voltage level in safety distance.
[0017] In a preferred embodiment, the steps of simulating the pre-operation trajectory of the lifting machinery based on the trajectory interface and guiding the movement of the lifting machinery include: obtaining a space model of the power line in the working time period, obtaining the occupied space of the trajectory during the movement of the power line in the working time period based on the power line space model, constructing a trajectory interface based on the bottom surface of the occupied space of the trajectory, and translating the trajectory interface downward Each unit obtains a discrimination interface, and a safety space is formed between the discrimination interface and the ground.
[0018] The operation trajectory of the crane is simulated based on the lifting operation range of the crane, and the operation trajectory of the crane is adjusted based on the trajectory interface. The crane simulates movement in a safe space and obtains a pre-operation trajectory of the crane.
[0019] The crane moves based on the pre-running trajectory.
[0020] In a preferred embodiment, the actual operation trajectory of the lifting machinery is obtained, and whether the operation trajectory is qualified is determined based on the pre-operation trajectory and the discrimination interface, and the unqualified actual distance information is transmitted to the alarm in real time, and the alarm immediately sounds an alarm and starts the locking function. The steps include: sensors and encoders are installed on the lifting machinery, the operating parameters of the lifting machinery are obtained based on the sensors and encoders, the actual operation trajectory of the lifting machinery is constructed based on the operating parameters, and the starting point of the actual operation trajectory of the lifting machinery coincides with the starting point of the pre-operation trajectory of the lifting machinery.
[0021] The actual operation trajectory of the lifting machinery is compared with the pre-operation trajectory of the lifting machinery through the first-level discrimination, and the points where the actual operation trajectory of the lifting machinery and the pre-operation trajectory of the lifting machinery do not overlap are marked as the first-level discrimination information.
[0022] Based on the primary discrimination information, the positional relationship between the point trajectory on the actual operation trajectory of the lifting machinery and the discrimination interface is compared through the secondary discrimination, and the feature points on the actual operation trajectory of the lifting machinery that coincide with the discrimination interface or are located above the discrimination interface are marked as the secondary discrimination information.
[0023] Based on the secondary judgment information, it is determined that the distance between the lifting machinery and the power line is unqualified and the unqualified information is obtained, the unqualified information is transmitted to the alarm, and an alarm message is immediately issued. The alarm information includes voice alarm and light alarm, and the locking function is immediately started to complete the locking of the lifting machinery operation interface.
[0024] In a preferred embodiment, feature points are set, and the feature points are located at the corners, protrusions and rotating parts of the lifting machinery. The feature points are set on the upper surface of the lifting machinery, and a sensor or encoder is installed on each feature point. The operating parameters of the feature points are obtained based on the sensors or encoders. A motion curve is constructed for each feature point, and the actual operating trajectory of the lifting machinery is constructed based on all the motion curves. A group of feature points at the same position of the actual operating trajectory of the lifting machinery and the pre-operating trajectory of the lifting machinery are corresponding feature points. The corresponding feature points are compared, and the non-overlapping corresponding feature points are marked as primary discrimination information. Based on the primary discrimination information, the operating trajectory of the corresponding feature points on the actual operating trajectory of the lifting machinery is compared with the positional relationship of the discrimination interface through secondary discrimination.
[0025] A safety monitoring and alarm system for on-site construction includes: a setting module for setting a lifting machinery model, determining a lifting operation range based on the lifting machinery model, collecting power line information based on the lifting operation range, the power line information including: environmental information, time information, point height information, and building a power line space model based on the power line information.
[0026] The acquisition module is connected with the setting module, and determines the safe distance between the lifting machinery and the power line according to the voltage level of the power line and the characteristics of the lifting machinery.
[0027] The building module is connected with the acquisition module, and a trajectory interface is built based on the safety distance between the lifting machinery and the power line and the power line model. The pre-operation trajectory of the lifting machinery is simulated based on the trajectory interface and the movement of the lifting machinery is guided.
[0028] The module is selected and connected to the construction module to measure the actual distance information between the lifting machinery and the power lines in real time based on the pre-operation trajectory.
[0029] The judgment module is connected to the selection module, and judges whether the distance information is qualified in real time based on the safe distance between the lifting machinery and the power line, and transmits the unqualified distance information to the alarm in real time. The alarm immediately sounds an alarm and starts the locking function.
[0030] In the above technical scheme, the technical effects and advantages provided by the present invention are as follows: the present invention pre-virtually sets the moving track of the power line and the space occupied by the power line when it moves, constructs a track interface based on the bottom surface of the occupied space, and translates the track interface downward. Each unit obtains a discrimination interface, and the trajectory interface is a curved surface. The pre-operation trajectory of the lifting equipment is simulated between the trajectory interface and the ground, so that the lifting machinery moves according to the pre-operation trajectory. This can reduce the sudden reduction or contact between the distance between the lifting machinery and the power lines caused by human operation, environmental information and other factors, and greatly improve safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0032] Figure 1 The present invention is a flow chart of the method.
[0033] Figure 2 It is a system block diagram of the present invention. DETAILED DESCRIPTION
[0034] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0035] Example 1, please refer to Figure 1 As shown, the safety monitoring and alarm method for on-site construction described in this embodiment includes the following steps:
[0036] S1. Set the model of the lifting machinery, determine the lifting operation range based on the model of the lifting machinery, collect power line information based on the lifting operation range, the power line information includes: environmental information, time information, point height information, and build a power line space model based on the power line information.
[0037] S2. Determine the safe distance between the lifting machinery and the power lines based on the voltage level of the power lines and the characteristics of the lifting machinery.
[0038] S3. Construct a trajectory interface based on the spatial model of the power lines, and construct a judgment interface based on the trajectory interface and the safe distance between the lifting machinery and the power lines.
[0039] S4. Based on the trajectory interface, simulate the pre-operation trajectory of the lifting machinery and guide the movement of the lifting machinery to obtain the actual operation trajectory of the lifting machinery. Based on the trajectory interface and the judgment interface, judge whether the operation trajectory is qualified, and transmit the unqualified actual distance information to the alarm in real time. The alarm immediately sounds an alarm and starts the locking function.
[0040] As described in the above steps S1-S4, the monitoring and alarm device for maintaining a safe distance between the lifting machinery and the live wire plays a vital role in modern construction, power maintenance and various hoisting operations. Such devices ensure safety during the operation process and prevent accidents such as electric shock by monitoring the distance between the lifting machinery and the high-voltage wire in real time. However, in actual use, the influence of personnel operation and environmental information on the same lifting machinery is relatively large. The lifting machinery does not have a predetermined operation plan. The actual distance between the lifting machinery and the high-voltage wire is easily less than the safe distance. When the alarm is triggered, an accident may have occurred. The present application can predict the movement trajectory of the power line during the working time period, determine the safe space based on the movement trajectory and the safe distance, simulate the pre-operation trajectory of the lifting machinery in the safe space, provide guidance for the subsequent actual movement of the lifting machinery, improve the purposefulness of the operation of the lifting machinery, reduce the influence of human and environmental factors on the lifting machinery and / or the power line, keep the lifting machinery at a safe distance from the high-voltage wire, and can perform a double comparison with the pre-operation trajectory and the discrimination interface according to the actual operation trajectory of the lifting machinery, so as to improve the accuracy of judging whether the safe distance between the lifting machinery and the power line is qualified.
[0041] In one embodiment, the step of constructing the power line space model S1 includes:
[0042] S11. Virtually set environmental information, wherein the environmental information includes temperature information and wind force information, and the wind force information includes wind level and wind direction.
[0043] S12. The power line route is composed of continuous points. The point height information is the height information of each point of the power line from the ground. A three-dimensional model of the power line is constructed based on the lifting operation range and the point height information. The three-dimensional model of the power line is provided with a position coordinate system. The position coordinate system includes a horizontal coordinate and a vertical coordinate. The horizontal coordinate is marked with the position information of each point of the power line, and the vertical coordinate is marked with the height information of each point of the power line.
[0044] S13. Obtain the predicted temperature information, wind level, and wind direction during the working time period, adjust the length of the three-dimensional model of the power line based on the predicted temperature information, adjust the swing direction of the three-dimensional model of the power line based on the predicted wind direction, adjust the swing amplitude of the three-dimensional model of the power line based on the predicted wind level, and construct a power line space model based on the three-dimensional model of the power line.
[0045] A first comparison library is set up, in which temperature information, model of power lines, height of power lines, and length of power lines are stored. By determining the model of power lines, height of power lines, and temperature information, the corresponding length of power lines can be obtained from the comparison library, thereby adjusting the length of the three-dimensional model of the power lines.
[0046] A second comparison library is set up, which stores the model of the power line, the height of the power line, the wind level, the wind direction, the swing direction of the three-dimensional model, and the swing amplitude of the three-dimensional model. The swing direction of the three-dimensional model is determined by the model of the power line, the height of the power line, and the wind direction, and the swing amplitude of the three-dimensional model is determined by the model of the power line, the height of the power line, and the wind level.
[0047] As described in the above steps S11-S13, first, the temperature information and wind force information in the future working time period are obtained according to the forecast. The slackness of the power line and the length within the construction range are mainly determined by the temperature (thermal expansion and contraction), which is particularly obvious in areas with large temperature changes. The swing direction of the power line is mainly determined by the wind direction, and the swing amplitude of the power line is mainly determined by the wind force. A three-dimensional model of the power line is constructed based on the lifting operation range and point height information. The length of the three-dimensional model of the power line under the influence of temperature is obtained through the first comparison library, and the swing direction and swing amplitude of the power line are obtained through the second comparison library, so as to construct a three-dimensional model of the power line. Constructing the power line space model can more intuitively display the trajectory and occupied space of the power line during the working time period. Based on the environmental information in the forecast, the variable of environmental information is converted into a quantitative value, and the influence of environmental information on the safe distance between the power line and the lifting machinery is not ignored. On this basis, the power line space model is more accurate.
[0048] In one embodiment S2, the characteristics of the lifting machinery include the height of the lifting machinery, the arm length of the lifting machinery, and the working radius of the lifting machinery. The formula for the safe distance between the lifting machinery and the power line is:
[0049]
[0050] in, is the safe distance between the lifting machinery and the power lines, h is the height of the lifting machinery, is the arm length of the lifting machinery, r is the working radius of the lifting machinery, is the voltage level of the power line, is a constant term, A= , A is the weight coefficient of the lifting machinery in the safety distance, B= , The unit is kV, B is the weight coefficient of voltage level and safety distance. The most important factors affecting the safety distance between lifting machinery and power lines are the voltage level of live lines, environmental information, human operation, and the characteristics of lifting machinery. Environmental information has a great impact on power lines, and has a small impact on lifting machinery. The power line space model is constructed based on environmental information, so the safety distance between lifting machinery and power lines ignores the impact of environmental information. Subsequent lifting machinery needs to run according to a certain trajectory, which can also be ignored because of the restrictions on human operation.
[0051] As described in the above steps, the safe distance between the lifting machinery and the power lines is obtained through the voltage level of the power lines, the height of the lifting machinery, the arm length of the lifting machinery, and the working radius of the lifting machinery.
[0052] In one embodiment, step S3 of simulating the pre-operation trajectory of the lifting machinery based on the trajectory interface and guiding the movement of the lifting machinery includes:
[0053] S31, obtaining a spatial model of the power lines in the working time period, obtaining the occupied space of the trajectory of the power lines during the moving process in the working time period based on the spatial model of the power lines, constructing a trajectory interface based on the bottom surface of the occupied space of the trajectory, and moving the trajectory interface downward Each unit obtains a discrimination interface, and a safety space is formed between the discrimination interface and the ground.
[0054] S32. Adjust the operation trajectory of the lifting machinery based on the trajectory interface. The lifting machinery simulates movement in the safe space and obtains the pre-operation trajectory of the lifting machinery. A motion database is provided. The motion database collects a large number of motion trajectories of the lifting machinery at different heights. First, the power line [1] is regarded as a straight line. A large number of motion trajectories of the lifting machinery are screened according to the construction requirements of different stages, the construction heights of different stages, and the environment of the lifting operation range. The discrimination interface is introduced into the motion trajectory model of the lifting machinery that meets the requirements. Since the discrimination interface is a curved surface, the discrimination interface and the motion trajectory of the lifting machinery overlap to some extent. The motion trajectory of the lifting machinery that does not overlap with the discrimination interface or has the least overlap with the discrimination interface is selected. The motion trajectory of the selected lifting machinery is fine-tuned so that the lifting machinery does not touch the discrimination interface on the basis of meeting the construction requirements. At this time, the operation trajectory of the lifting machinery generated is the pre-operation trajectory of the lifting machinery.
[0055] S33. The lifting machinery moves based on the pre-operation trajectory.
[0056] As described in the above steps S31-S33, the occupied space of the track of the power line during the working time period is obtained through the power line space model, and the track interface is constructed through the bottom surface of the occupied space of the track. A unit obtains a discrimination interface, and a pre-operation trajectory of the lifting machinery is obtained based on the discrimination interface and the operation trajectory of the simulated lifting machinery, so that the lifting machinery moves according to the pre-operation trajectory. The discrimination interface is set as a dividing interface to limit the movement of the lifting machinery, so that the operation trajectory of the lifting machinery can move on the basis of satisfying the safety distance between the lifting machinery and the power lines.
[0057] In one embodiment, the actual running track of the lifting machinery is obtained, and whether the running track is qualified is determined based on the pre-running track and the judgment interface, and the unqualified actual distance information is transmitted to the alarm in real time, and the alarm immediately sounds an alarm and starts the locking function step S4, including:
[0058] S41. The lifting machinery is equipped with sensors and encoders. The operating parameters of the lifting machinery are obtained based on the sensors and encoders. The actual operating trajectory of the lifting machinery is constructed based on the operating parameters. Feature points are set. The feature points are located at the corners, protrusions and rotating parts of the lifting machinery. The feature points are set on the upper surface of the lifting machinery. Sensors or encoders are installed on each feature point. The operating parameters of the feature points are obtained based on the sensors or encoders. The actual operating trajectory of the lifting machinery and the set of feature points at the same position of the pre-operating trajectory of the lifting machinery are corresponding feature points. The starting point of the actual operating trajectory of the lifting machinery coincides with the starting point of the pre-operating trajectory of the lifting machinery. Encoders or sensors are installed on the top or key parts of the lifting machinery, such as rotary encoders to monitor the boom angle and displacement sensors to measure the lifting height, so as to directly obtain the operating parameters.
[0059] S42, comparing the actual operation trajectory of the lifting machinery with the pre-operation trajectory of the lifting machinery through the first-level discrimination, comparing the corresponding feature points, and marking the non-overlapping corresponding feature points as the first-level discrimination information. The points where the actual operation trajectory of the lifting machinery does not overlap with the pre-operation trajectory of the lifting machinery are deviation points.
[0060] S43. Based on the primary discrimination information, the positional relationship between the running trajectory of the corresponding feature points on the actual running trajectory of the lifting machinery and the discrimination interface is compared through secondary discrimination, and the feature points on the actual running trajectory of the lifting machinery that overlap with the discrimination interface or are located above the discrimination interface are marked as secondary discrimination information.
[0061] S44. Based on the secondary discrimination information, it is determined that the distance between the lifting machinery and the power line is unqualified and unqualified information is obtained.
[0062] Several cameras are fixedly installed on a platform far away from the lifting machinery. The cameras are used to capture images of the lifting machinery from different angles in real time and construct an image of the top contour of the lifting machinery. The image of the top contour of the lifting machinery at the time node corresponding to the secondary judgment is collected, and the judgment interface is loaded into the image of the top contour of the lifting machinery. The judgment curve is covered with sensing points. When the image of the top contour of the lifting machinery touches or crosses the sensing point on the judgment interface, the actual distance between the lifting machinery and the power line is judged to be unqualified, and the unqualified information is transmitted to the alarm, and an alarm message is immediately issued. The alarm message includes voice alarm and light alarm, and the locking function is immediately started to complete the locking of the lifting machinery operation interface.
[0063] As described in the above steps S41-S44, the actual operation trajectory of the lifting machinery is compared with the pre-operation trajectory of the lifting machinery. Since the lifting machinery may be disturbed by other factors (such as human operation, unexpected factors, etc.) during use, the lifting machinery cannot move according to the pre-operation trajectory. The first-level discrimination information is used to simply determine whether there is a deviation between the actual operation trajectory of the lifting machinery and the pre-operation trajectory of the lifting machinery. The second-level discrimination information is used to determine whether the deviation point on the actual operation trajectory of the lifting machinery is located below the discrimination interface. If the deviation point is located below, the distance between the lifting machinery and the power line is greater than the safety distance, which meets the requirements. If the deviation point is located on the discrimination interface or above the discrimination interface, it does not meet the requirements and is unqualified information. An alarm message is immediately issued and the operation interface of the lifting machinery is locked. The operation interface of the lifting machinery will be unlocked only after the subsequent operation plan is determined or it is safe. Multiple judgments are used to distinguish the judgment type and simplify the judgment process. And the discrimination interface and the pre-operation trajectory are used as reference systems, which can be obtained in advance, without real-time measurement during the work process. It is only necessary to measure the actual operation trajectory of the lifting machinery for comparison.
[0064] Example 2, please refer to Figure 2 , a safety monitoring and alarm system for on-site construction, comprising:
[0065] The setting module is used to set the lifting machinery model, determine the lifting operation range based on the lifting machinery model, collect power line information based on the lifting operation range, the power line information includes: environmental information, time information, point height information, and build a power line space model based on the power line information.
[0066] The acquisition module is connected with the setting module, and determines the safe distance between the lifting machinery and the power line according to the voltage level of the power line and the characteristics of the lifting machinery.
[0067] The building module is connected with the acquisition module, and a trajectory interface is built based on the safety distance between the lifting machinery and the power line and the power line model. The pre-operation trajectory of the lifting machinery is simulated based on the trajectory interface and the movement of the lifting machinery is guided.
[0068] The module is selected and connected to the construction module to measure the actual distance information between the lifting machinery and the power lines in real time based on the pre-operation trajectory.
[0069] The judgment module is connected to the selection module, and judges whether the distance information is qualified in real time based on the safe distance between the lifting machinery and the power line, and transmits the unqualified distance information to the alarm in real time. The alarm immediately sounds an alarm and starts the locking function.
[0070] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A safety monitoring and alarm method for on-site construction, characterized in that: The following steps are involved: Set the lifting machinery model, determine the lifting operation range based on the lifting machinery model, collect power line information based on the lifting operation range, the power line information includes: environmental information, time information, point height information, environmental information includes temperature information, wind information, wind information includes wind level and wind direction, and build a power line space model based on the power line information; Determine the safe distance between the lifting machinery and the power lines based on the voltage level of the power lines and the characteristics of the lifting machinery ; Based on the power line space model, the occupied space of the track during the movement of the power line during the working time period is obtained, and the track interface is constructed based on the bottom surface of the occupied space of the track. The track interface is translated downward Each unit gets the discrimination interface; Simulate the pre-operation trajectory of the lifting machinery based on the trajectory interface and guide the movement of the lifting machinery; The actual operation trajectory of the lifting machinery is obtained, and whether the actual operation trajectory is qualified is judged based on the trajectory interface and the judgment interface. The unqualified information is transmitted to the alarm in real time, and the alarm immediately sounds an alarm and starts the locking function.
2. A safety monitoring and alarm method for on-site construction according to claim 1, characterized in that: The construction of the power line space model includes: The power line route is composed of continuous points, and the point height information is the height information of each point of the power line from the ground; Based on the lifting operation range and point height information, a three-dimensional model of the power line is constructed. The three-dimensional model of the power line is provided with a position coordinate system. The position coordinate system includes a horizontal coordinate and a vertical coordinate. The horizontal coordinate is marked with the position information of each point of the power line, and the vertical coordinate is marked with the height information of each point of the power line. Obtain the predicted temperature information, wind level, and wind direction during the working time period, adjust the length of the three-dimensional model of the power line based on the predicted temperature information, adjust the swing direction of the three-dimensional model of the power line based on the predicted wind direction, adjust the swing amplitude of the three-dimensional model of the power line based on the predicted wind level, and construct a power line space model based on the three-dimensional model of the power line.
3. A safety monitoring and alarm method for on-site construction according to claim 1, characterized in that: The characteristics of the lifting machinery include the height of the lifting machinery, the arm length of the lifting machinery, the working radius of the lifting machinery, the safe distance between the lifting machinery and the power lines The formula is: in, is the safe distance between the lifting machinery and the power lines, h is the height of the lifting machinery, is the arm length of the lifting machinery, r is the working radius of the lifting machinery, is the voltage level of the power line, is a constant term, A= , A is the weight coefficient of the lifting machinery in the safety distance, B= , B is the weight coefficient of voltage level in safety distance.
4. A safety monitoring and alarm method for on-site construction according to claim 1, characterized in that: The track interface is constructed based on the bottom surface of the track's occupied space, and the track interface is translated downward The steps for obtaining the discrimination interface for each unit include: Obtain the power line space model during the working time period, obtain the occupied space of the track during the movement of the power line during the working time period based on the power line space model, build the track interface based on the bottom surface of the occupied space of the track, and move the track interface downward Each unit obtains a discrimination interface, and a safety space is formed between the discrimination interface and the ground; The operation trajectory of the crane is simulated based on the lifting operation range of the crane, and the operation trajectory of the crane is adjusted based on the trajectory interface. The crane simulates movement in a safe space and obtains a pre-operation trajectory of the crane; The crane moves based on the pre-running trajectory.
5. The safety monitoring and alarm method for on-site construction according to claim 1 is characterized in that: The steps of obtaining the actual running track of the lifting machinery, judging whether the running track is qualified based on the pre-running track and the discrimination interface, transmitting the unqualified actual distance information to the alarm in real time, and the alarm immediately sounds an alarm and starts the locking function include: The lifting machinery is equipped with sensors and encoders, and the operating parameters of the lifting machinery are obtained based on the sensors and encoders. The actual operating trajectory of the lifting machinery is constructed based on the operating parameters, and the starting point of the actual operating trajectory of the lifting machinery coincides with the starting point of the pre-operating trajectory of the lifting machinery; By comparing the actual running track of the lifting machinery with the pre-running track of the lifting machinery through the first-level discrimination, the points where the actual running track of the lifting machinery and the pre-running track of the lifting machinery do not overlap are marked as the first-level discrimination information; Based on the primary discrimination information, the positional relationship between the point trajectory on the actual operation trajectory of the lifting machinery and the discrimination interface is compared through the secondary discrimination, and the characteristic points on the actual operation trajectory of the lifting machinery that coincide with the discrimination interface or are located above the discrimination interface are marked as the secondary discrimination information; Based on the secondary judgment information, it is determined that the distance between the lifting machinery and the power line is unqualified and the unqualified information is obtained, the unqualified information is transmitted to the alarm, and an alarm message is immediately issued. The alarm information includes voice alarm and light alarm, and the locking function is immediately started to complete the locking of the lifting machinery operation interface.
6. A safety monitoring and alarm method for on-site construction according to claim 5, characterized in that: Feature points are set. The feature points are located at the corners, protrusions and rotating parts of the lifting machinery. The feature points are set on the upper surface of the lifting machinery. A sensor or encoder is installed on each feature point. The operating parameters of the feature points are obtained based on the sensor or encoder. A motion curve is constructed for each feature point. The actual operating trajectory of the lifting machinery is constructed based on all the motion curves. A group of feature points at the same position of the actual operating trajectory of the lifting machinery and the pre-operating trajectory of the lifting machinery are corresponding feature points. The corresponding feature points are compared, and the non-overlapping corresponding feature points are marked as primary discrimination information. Based on the primary discrimination information, the operating trajectory of the corresponding feature points on the actual operating trajectory of the lifting machinery is compared with the positional relationship of the discrimination interface through secondary discrimination.
7. A safety monitoring and alarm system for on-site construction, used to implement a safety monitoring and alarm method for on-site construction according to any one of claims 1 to 6, characterized in that: include: A setting module is used to set the lifting machinery model, determine the lifting operation range based on the lifting machinery model, collect power line information based on the lifting operation range, and the power line information includes: environmental information, time information, point height information, and construct a power line space model based on the power line information; The acquisition module is connected with the setting module, and determines the safe distance between the lifting machinery and the power line according to the voltage level of the power line and the characteristics of the lifting machinery; A construction module is connected with the acquisition module, and a trajectory interface is constructed based on the safety distance between the lifting machinery and the power line and the power line model, and a pre-operation trajectory of the lifting machinery is simulated based on the trajectory interface to guide the movement of the lifting machinery; The selection module is connected with the construction module to measure the actual distance information between the lifting machinery and the power line in real time based on the pre-operation trajectory; The judgment module is connected to the selection module, and judges whether the distance information is qualified in real time based on the safe distance between the lifting machinery and the power line, and transmits the unqualified distance information to the alarm in real time. The alarm immediately sounds an alarm and starts the locking function.
Citation Information
Patent Citations
Polar region ship unmanned crane intelligent operation track planning system and working method thereof
CN114237048A
Near electric distance detection and hoisting machinery active early warning brake control method
CN118439521A