Converter transformer output power regulation method, converter transformer and storage medium

By measuring and predicting load resistance in the converter transformer of the graphitization furnace in real time, adjusting the output power, and adopting an active current limiting mechanism, the aging and safety risks of the converter caused by changes in the material resistance in the furnace are solved, and the safety of the system is achieved Guaranteeing stable operation and production power progress.

CN118689278BActive Publication Date: 2024-11-19HUNAN HUAXIA TEBIAN CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411188725.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-11-19
Estimated Expiration
2044-08-28

AI Technical Summary

Technical Problem

During the operation of graphitization furnace, due to the unpredictable resistance changes of the materials in the furnace, the internal lines of the converter transformer will increase heat generation, aging will intensify, and may even lead to tripping or burning. It is difficult for the existing technology to accurately adjust the output power to ensure the system's Safe and stable operation.

Method used

By measuring the output voltage and current at preset time intervals in the converter transformer, predicting the load resistance, and adjusting the actual output power according to the planned curve, using the weighted sliding average method and active current limiting mechanism to ensure that the current does not exceed the limit and avoid overheating and overload.

Benefits of technology

Effectively predict and adjust the output power to ensure the safe and stable operation of the converter transformer, avoid tripping and burning, and at the same time, the user's power supply intention should be implemented as much as possible to ensure the production power consumption progress of the graphitization furnace.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118689278B_ABST
    Figure CN118689278B_ABST
Patent Text Reader

Abstract

The present invention provides a converter transformer output power regulation method, a converter transformer and a storage medium, which belongs to the technical field of control or regulation system. The method comprises: measuring and recording the current output voltage, the current output current and the current output power; based on the current output voltage and the current output current, predicting the load resistance R at the next moment; n+1 ; Based on the current output power and the planned output power in the planned curve, determine the current cumulative total power deficit value W; based on the load resistance R at the next moment n+1 The actual output power A at the next moment is calculated by the planned output power at the next moment found in the planned curve n+1 And execute the actual output power A n+1 The converter transformer output power regulation method of the present invention can not only ensure that the current value of the converter transformer does not exceed the limit, but also can timely and actively increase the output power and make up for the lack of electric power in time, thereby ensuring the progress of production power consumption.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of control or regulation systems, and in particular to a converter transformer output power regulation method, a converter transformer and a computer-readable storage medium. Background Art

[0002] As a device that uses high temperature to convert carbon materials into graphite, graphitization furnaces are widely used in the production of negative electrode materials for batteries such as lithium-ion batteries and sodium-ion batteries. In order to ensure the efficient and stable operation of the graphitization furnace and reduce interference with the power grid, the transformer and rectifier are usually combined to form a converter transformer, which transforms the AC power of the power grid and then rectifies it into DC power for transmission to the graphitization furnace. During the working process of the graphitization furnace, the required electric power is constantly changing according to the process requirements of different stages, and the resistance of the materials in the furnace during the working process also changes with the change of its own physical and chemical state. The graphitization furnace is an intermittent cycle operation, and a working cycle can last up to three days or even longer. The current industry practice is to formulate a power transmission plan curve for the graphitization furnace based on experience, that is, to input the transmission power at different times in advance and the converter transformer will execute the power transmission according to the plan, and the power transmission will be terminated when the cumulative power transmission reaches the total amount required for production. There is a problem with this approach, that is, because the charge quantity, compaction degree, composition and physical and chemical properties of the materials in the furnace may change in each production cycle, the working process cannot accurately predict the resistance change of the materials in the furnace. Once the resistance at a certain moment becomes very small, in order to execute the planned transmission power, the loop current will increase, which will increase the heat generation of the internal circuit of the converter transformer and aggravate aging. In severe cases, it may even cause the converter transformer to trip and shut down or even burn. In particular, in order to pursue low cost and high efficiency in production, the power value set in the power transmission plan curve is close to the limit and the margin is small. Once the resistance of the materials in the furnace is smaller than expected due to some factors, it is likely to cause the current value of the power supply circuit to exceed the current threshold allowed by the converter transformer.

[0003] During the operation of the graphitization furnace, how to execute the power transmission plan curve formulated by the user as much as possible according to the user's intention while ensuring the safe and stable operation of the converter transformer is a technical problem that needs to be solved urgently. Summary of the invention

[0004] The main purpose of the present invention is to provide a method for regulating the output power of a converter transformer, a converter transformer and a computer-readable storage medium, aiming to solve the technical problem of how to execute the user's power transmission plan as much as possible according to the user's intention while ensuring the safe and stable operation of the converter transformer.

[0005] To achieve the above object, the present invention provides a method for adjusting the output power of a converter transformer, wherein the converter transformer is used to transform and rectify the AC power provided by the power grid into DC power and output the required electric power to the graphitization furnace according to the power output requirements of the graphitization furnace, and the adjustment method comprises:

[0006] When the converter transformer is started, the following steps are performed in sequence at every preset time interval Δt:

[0007] Measure and record the current output voltage, current output current and current output power;

[0008] Based on the current output voltage and the current output current, the load resistance R at the next moment is predicted. n+1 :

[0009] Based on the current output power and the planned output power in the planned curve, determine the current cumulative total power deficit value W;

[0010] Based on the next moment load resistance R n+1 The actual output power A at the next moment is calculated by adding the planned output power at the next moment in the planned curve n+1 And execute the actual output power A n+1 ;

[0011] The planned curve is a curve showing changes in the planned output power over time.

[0012] Optionally, the load resistance R at the next moment is predicted based on the current output voltage and the current output current. n+1 The steps include:

[0013] Let the current moment be the nth moment, and calculate the load resistance of the current moment and the m moments before it, where the load resistance at any moment is the ratio of the output voltage to the output current at that moment;

[0014] Use the weighted moving average method to predict the load resistance R at the next moment n+1 :

[0015] (1)

[0016] Above k n-i and R n-i are the weighting coefficient and load resistance at the i-th moment before the current moment, respectively. When i=0, the two correspond to the weighting coefficient k at the current moment. n and the current load resistance R n .

[0017] Optionally, the step of determining the current cumulative total power deficit value W based on the current output power and the planned output power in the planned curve includes:

[0018] (2)

[0019] A above i and B i They are the actual output power corresponding to the i-th moment and the planned output power in the planned curve since the start of the converter transformer operation, Δt is the preset time interval, when i=n, ​​A i and B i The two correspond to the actual output power at the current moment and the planned output power in the planned curve respectively.

[0020] Optionally, the load resistance R at the next moment n+1 The actual output power A at the next moment is calculated by adding the planned output power at the next moment in the planned curve n+1 And execute the actual output power A n+1 The steps include:

[0021] Calculate the predicted current I at the next moment n+1 :

[0022] (3)

[0023] Above B n+1 is the planned output power at the next moment obtained from the planning curve, R n+1 is the predicted load resistance at the next moment;

[0024] The predicted current I at the next moment n+1 With the current threshold I max Compare:

[0025] If I n+1 ≥I max , then the actual output power A at the next moment n+1 for:

[0026] (4)

[0027] If I n+1 max , then further judgment is made based on the current accumulated total underpower value W:

[0028] If W is positive, the actual output power A at the next moment n+1 for:

[0029] (5)

[0030] The above f is an empirical coefficient between 0 and 1;

[0031] If W is not positive, the actual output power A at the next moment​n+1 Equal to B n+1 .

[0032] Optionally, the preset time interval Δt is between 10 seconds and 10 minutes.

[0033] Optionally, the value of m is between 2 and 100.

[0034] Optionally, the weighting coefficient k at each moment n-i , with a value between 1 and 100.

[0035] Optionally, if the total number of preset time intervals from the start of the converter transformer to the current moment is less than m+1, only the steps of measuring and recording the current output voltage, the current output current and the current output power are performed, and the actual output power at the current moment is the planned output power at the current moment in the planned curve.

[0036] The present invention also provides a converter transformer for supplying power to a graphitization furnace, wherein the converter transformer is used to implement the converter transformer output power regulation method as described in any one of the above items.

[0037] The present invention also provides a computer-readable storage medium, in which a converter transformer output power regulation program is stored, and the converter transformer output power regulation program is loaded and run by a processor to execute the converter transformer output power regulation method as described in any one of the above items.

[0038] The following is an introduction to the beneficial effects of the technical solution of the present invention:

[0039] Before the graphitization furnace works, the user inputs the planned power transmission curve in advance, requiring the converter transformer to perform power output in sequence at each time according to the plan. However, due to the uncontrollable and unpredictable nature of the state and physical and chemical properties of the materials in the furnace, coupled with the user's lack of experience, this will lead to excessive loop current when the power is supplied according to the planned power at certain times, because the internal resistance of the materials in the furnace is less than the user's expected value in advance, causing safety accidents such as aging of the converter transformer, tripping and power failure, and even burning.

[0040] In the technical solution of the present invention, the output voltage and output current are continuously collected at a certain time interval during the working process to calculate the load resistance, and the load resistance R at the next moment is predicted based on the historical load resistance and the load resistance at the current moment. n+1 ; According to the load resistance R at the next moment n+1 The next moment's planned output power B is obtained from the planned curve n+1 , and then determine the current cumulative total power deficit value W based on the current output power and the planned output power in the planned curve; based on the load resistance R at the next moment n+1The actual output power A at the next moment is calculated by adding the planned output power at the next moment in the planned curve n+1 And execute the actual output power A n+1 .

[0041] The technical solution of the present invention ensures that the current value of the converter transformer does not exceed the limit by predicting the internal resistance at the next moment and actively limiting the current when the internal resistance is too low, thereby ensuring the safe and stable operation of the converter transformer; and it also fully considers the actual production needs of the user and executes the user's power transmission intention as much as possible: if the predicted current at the next moment corresponding to the proposed output power in the calculated next moment plan curve still has a safety margin and there is a lack of power due to current limiting in the history of the power transmission process of this cycle, then the output power can be actively increased in time to make up for the lack of electric power in time, thereby ensuring the production power consumption progress of the graphitization furnace. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Figure 1 It is a schematic diagram of the framework flow of an embodiment of a method for adjusting the output power of a converter transformer according to the present invention;

[0043] Figure 2 The figure is a schematic diagram of a specific flow chart of an embodiment of a method for regulating the output power of a converter transformer according to the present invention. DETAILED DESCRIPTION

[0044] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0045] Please refer to Figure 1 , Figure 1 It is a schematic diagram of the framework flow of an embodiment of a method for regulating the output power of a converter transformer of the present invention.

[0046] like Figure 1 As shown, the present invention provides a method for adjusting the output power of a converter transformer, wherein the converter transformer is used to transform and rectify the AC power provided by the power grid into DC power and output the required electric power to the graphitization furnace according to the power output requirements of the graphitization furnace, and the adjustment method includes:

[0047] When the converter transformer is started, the following steps are performed in sequence at every preset time interval Δt:

[0048] Step S10, measuring and recording the current output voltage, current output current and current output power;

[0049] Step S20, predicting the load resistance R at the next moment based on the current output voltage and the current output current n+1 :

[0050] Step S30, determining the current accumulated total power deficit value W based on the current output power and the planned output power in the planned curve;

[0051] Step S40, based on the load resistance R at the next moment n+1 The actual output power A at the next moment is calculated by adding the planned output power at the next moment in the planned curve n+1 And execute the actual output power A n+1 ;

[0052] The planned curve is a curve showing changes in the planned output power over time.

[0053] The converter transformer, also known as the rectifier transformer, is a special transformer that is mainly used to convert AC power into DC power. It usually consists of two or more relatively independent windings on the high-voltage side and the low-voltage side. The high-voltage side of the converter transformer is connected to the AC power supply, and the AC voltage on the high-voltage side is converted into the required low-voltage DC voltage through the transformer ratio. In this process, the converter transformer also assumes the functions of rectification and filtering, converting the AC signal into a smooth DC signal.

[0054] Before the converter transformer works, the user inputs a planned curve, which is a curve showing changes in the planned output power over time;

[0055] about Figure 1 For the detailed development of each step, please refer to the following steps Figure 2 .

[0056] After the converter transformer starts working, the following steps are performed in sequence at a certain time interval Δt:

[0057] Step S1, measuring and recording the current output voltage, output current and output power;

[0058] Step S2: predict the load resistance R at the next moment n+1 :

[0059] Let the current moment be the nth moment, and calculate the load resistance of the current moment and the m moments before it, where the load resistance at any moment is the ratio of the output voltage to the output current at that moment;

[0060] Use the weighted moving average method to predict the load resistance R at the next moment n+1 :

[0061] (1)

[0062] Above k n-i and R n-i are the weighting coefficient and load resistance at the i-th moment before the current moment, respectively. When i=0, the two correspond to the weighting coefficient k at the current moment. n and the current load resistance R n ;

[0063] Step S3, counting the total accumulated power deficit value W at the current moment:

[0064] (2)

[0065] A above i and B i are the actual output power corresponding to the i-th moment since the start of work and the simulated output power in the planned curve, Δt is the time interval, when i=n, ​​A i and B i The two correspond to the actual output power at the current moment and the proposed output power in the planned curve respectively;

[0066] Step S4: Calculate the actual output power A at the next moment according to the following sub-steps: n+1 :

[0067] Sub-step S4.1: Calculate the predicted current I at the next moment n+1 :

[0068] (3)

[0069] Above B n+1 is the planned output power at the next moment obtained from the planning curve, R n+1 The load resistance at the next moment predicted in step S2;

[0070] Sub-step S4.2: The predicted current I at the next moment n+1 With the current threshold I max Compare:

[0071] (i) If I n+1 ≥I max , then the actual output power A at the next moment n+1 for:

[0072] (4)

[0073] (ii) If I n+1 max , then further judgment is made based on the current accumulated total underpower value W obtained in step S3:

[0074] If W is positive, the actual output power A at the next moment n+1 for:

[0075] (5)

[0076] The above f is an empirical coefficient between 0 and 1; specifically, the larger the value of the empirical coefficient f, the higher the actual output power A at the next moment. n+1 ​The closer to the current threshold I max The closer it is to the output power corresponding to the next moment, the lower it is, the closer it is to the output power expected at the next moment;

[0077] If W is not positive, the actual output power A at the next moment n+1 Equal to B n+1 ;

[0078] Step S5: Execute power output at the next moment according to the calculation result of step S4.

[0079] Preferably, in the above converter transformer output power regulation method, the time interval Δt is between 10 seconds and 10 minutes.

[0080] Preferably, in the above converter transformer output power regulation method, the value of m in step 2 is between 2 and 100.

[0081] Preferably, in the above converter transformer output power adjustment method, the weighting coefficient k at each moment in step 2 is n-i , with a value between 1 and 100. Specifically, the closer each moment is to the current moment, the larger the weight coefficient value is assigned to it, that is, the weight coefficient is continuously increased until the current moment is the maximum, thereby increasing the weight of recent data to obtain a more accurate load resistance R at the next moment. n+1 Predicted value.

[0082] It should be pointed out that in the above-mentioned converter transformer output power regulation method, if the total number of time intervals from the start of the converter transformer to the current moment is less than m+1, in this case, the subsequent steps cannot be executed due to insufficient historical data, then the execution of steps S2 to S5 is skipped at the current moment, and only step S1 is executed, and the actual output power at the current moment is the planned output power at the current moment in the planned curve.

[0083] In other words, for the time interval from the 1st to the mth time, since there are less than m+1 historical data, step S2 cannot be executed, which is a special case. Then, at these m moments, steps S2 to S5 are skipped and only step S1 is executed. The actual output power at each current moment is the proposed output power at the current moment in the planned curve.

[0084] The above converter transformer output power adjustment method can be specifically implemented by a controller, which includes a data acquisition module, a storage module, a calculation module and a communication module. The communication module calculates the actual output power A at the next moment obtained by the calculation module. n+1 The controller can be a separate hardware device such as a PLC, or it can be integrated into the converter transformer as a whole.

[0085] Furthermore, the present invention also provides a converter transformer for supplying power to a graphitization furnace, wherein the converter transformer is used to implement the converter transformer output power regulation method as described in any one of the above items.

[0086] The present invention also provides a computer-readable storage medium, in which a converter transformer output power regulation program is stored, and the converter transformer output power regulation program is loaded and run by a processor to execute the converter transformer output power regulation method as described in any one of the above items.

[0087] Among them, the method implemented when the converter transformer output power adjustment program is executed can refer to the various embodiments of the converter transformer output power adjustment method of the present invention, and will not be repeated here.

[0088] In the technical solution of the present invention, the output voltage and output current are continuously collected at a certain time interval during the working process to calculate the load resistance, and the weighted sliding average method is used to predict the load resistance R at the next moment based on the historical load resistance and the current load resistance. n+1 ; According to the load resistance R at the next moment n+1 The next moment's planned output power B is obtained from the planned curve n+1 , first preliminarily calculate the predicted current I at the next moment n+1 ; Finally, the predicted current I n+1 and the maximum current value allowed by the converter transformer, i.e., the current threshold I max Compare:

[0089] (i) If I n+1 ≥I max , then at the next moment, if the planned output power is calculated according to the planned curve, the current will be too large, so current limiting is required to reduce the current to I max , the actual output power at the next moment is A n+1 for;

[0090] (ii) If I n+1 max , then at the next moment, if the planned output power is calculated according to the planned curve, the current is less than the current threshold I max , which is safe and has a certain safety margin. At this time, further judgment is made based on the current cumulative total power deficit value W obtained in step S3:

[0091] If W is positive, it means that the actual output power at some time is less than the intended output power due to the current limiting operation in the past. At this time, the intended output power B is increased in time at the next moment. n+1 On this basis, the power output is appropriately increased to make up for the historical lack of electric power output, but the actual output power A at the next moment n+1 The current threshold I must not be exceeded max The corresponding power value;​

[0092] If W is not positive, there is no missing power output, so the actual output power A at the next moment n+1 Equal to the next moment's intended output power B n+1 .

[0093] Therefore, the technical solution of the present invention ensures that the current value of the converter transformer does not exceed the limit by predicting the internal resistance at the next moment and actively limiting the current when the internal resistance is too low, thereby ensuring the safe and stable operation of the converter transformer; and it also fully considers the actual production needs of the user and executes the user's power transmission intention as much as possible: if the predicted current at the next moment corresponding to the proposed output power in the calculated next moment plan curve still has a safety margin and there is a lack of power due to current limiting in the history of the power transmission process of this cycle, then the output power is actively increased in time to make up for the lack of electric power in time, thereby ensuring the production progress.

[0094] In a more specific embodiment:

[0095] The values ​​of the relevant parameters in this embodiment are: time interval Δt=1min, m=3, k n =4, k n-1 =3, k n-2 =2, k n-3 =1, current threshold I max =1000A, empirical coefficient f=0.8.

[0096] At a certain moment, let this moment be the current moment and count it as the nth moment. At the current moment and the three moments before it, the output voltages are 60V, 63V, 65V, and 66V respectively, the output currents are 780A, 820A, 890A, and 950A respectively, and the output powers are 46.80kW, 51.66kW, 57.85kW, and 62.70kW respectively. From the output voltages and output currents at the above four moments, the load resistances corresponding to these four moments are calculated to be 76.9mΩ, 76.8mΩ, 73.0mΩ, and 69.5mΩ respectively.

[0097] Further calculate the load resistance at the next moment

[0098] .

[0099] The total accumulated power deficit at the current moment is W=0.2kWh.

[0100] The next moment's planned output power B is obtained from the planning curve n+1 =74.5kW, then calculate the predicted current I at the next moment n+1 for:

[0101]

[0102] Therefore, the actual output power at the next moment is A n+1 for:

[0103]

[0104] At a certain moment after a period of time, calculate the load resistance R at the next moment n+1 =48.6mΩ, the total accumulated power deficit at the current moment is W=0.1kWh, and the planned output power at the next moment obtained from the planned curve is B n+1 =36.9kW, calculate the predicted current I at the next moment n+1 for:

[0105]

[0106] Since W is positive at this moment, the actual output power A at the next moment n+1 for:

[0107]

[0108] In this embodiment, the internal resistance at the next moment is predicted and the active current limiting is performed when the internal resistance is too low to ensure that the current value of the converter transformer does not exceed the limit, thereby ensuring the safe and stable operation of the converter transformer. In addition, the actual production needs of the user are fully considered to execute the user's power transmission intention as much as possible: if the predicted current at the next moment corresponding to the proposed output power in the calculated next moment plan curve still has a safety margin and there is a lack of power due to current limiting in the history of the power transmission process of this cycle, the output power is actively increased in time to make up for the lack of electric power in time, thereby ensuring the production progress.

[0109] It should be understood by those skilled in the art that embodiments of the present invention may be provided as methods, devices, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware aspects. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0110] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (apparatus), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0111] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0112] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0113] It should be noted that in the claims, any reference signs placed between brackets shall not be construed as limiting the claims. The word "comprising" does not exclude the presence of components or steps not listed in the claim. The word "a" or "an" preceding a component does not exclude the presence of a plurality of such components. The invention may be implemented by means of hardware comprising several different components and by means of a suitably programmed computer. In a unit claim enumerating several means, several of these means may be embodied by the same item of hardware. The use of the words first, second, and third etc. does not indicate any order. These words may be interpreted as names.

[0114] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.

[0115] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. All equivalent structural changes made by using the contents of the present invention specification and drawings under the inventive concept of the present invention, or directly / indirectly applied in other related technical fields are included in the patent protection scope of the present invention.

Claims

1. A method for adjusting the output power of a converter transformer, characterized in that: The converter transformer is used to transform and rectify the AC power provided by the power grid into DC power and output the required electric power to the graphitization furnace according to the power output requirements of the graphitization furnace. The adjustment method includes: When the converter transformer is started, the following steps are performed in sequence at every preset time interval Δt: Measure and record the current output voltage, current output current and current output power; Based on the current output voltage and the current output current, the load resistance R at the next moment is predicted. n+1 : Based on the current output power and the planned output power in the planned curve, determine the current cumulative total power deficit value W; Based on the next moment load resistance R n+1 The actual output power A at the next moment is calculated by adding the planned output power at the next moment in the planned curve n+1 And execute the actual output power A n+1 ; Wherein, the planned curve is a curve showing changes in the planned output power over time; Based on the current output voltage and the current output current, the load resistance R at the next moment is predicted. n+1 The steps include: Let the current moment be the nth moment, and calculate the load resistance of the current moment and the m moments before it, where the load resistance at any moment is the ratio of the output voltage to the output current at that moment; Use the weighted moving average method to predict the load resistance R at the next moment n+1 : (1) Above k n-i and R n-i are the weighting coefficient and load resistance at the i-th moment before the current moment, respectively. When i=0, the two correspond to the weighting coefficient k at the current moment. n and the current load resistance R n ; The step of determining the current cumulative total power deficit value W based on the current output power and the planned output power in the planned curve comprises: (2) A above i and B i They are the actual output power corresponding to the i-th moment and the planned output power in the planned curve since the start of the converter transformer operation, Δt is the preset time interval, when i=n, ​​A i and B i The two correspond to the actual output power at the current moment and the planned output power in the planned curve respectively; The load resistance R at the next moment n+1 The actual output power A at the next moment is calculated by adding the planned output power at the next moment in the planned curve n+1 And execute the actual output power A n+1 The steps include: Calculate the predicted current I at the next moment n+1 : (3) Above B n+1 is the planned output power at the next moment obtained from the planning curve, R n+1 is the predicted load resistance at the next moment; The predicted current I at the next moment n+1 With the current threshold I max Compare: If I n+1 ≥I max , then the actual output power A at the next moment n+1 for: (4) If I n+1 max , then further judgment is made based on the current accumulated total underpower value W:​ If W is positive, the actual output power A at the next moment n+1 for: (5) The above f is an empirical coefficient between 0 and 1; If W is not positive, the actual output power A at the next moment n+1 Equal to B n+1 .

2. The method for adjusting the output power of a converter transformer according to claim 1, characterized in that: The preset time interval Δt is between 10 seconds and 10 minutes.

3. The method for adjusting the output power of a converter transformer according to claim 1, characterized in that: The value of m is between 2 and 100.

4. The method for adjusting the output power of a converter transformer according to claim 1, characterized in that: The weighting coefficient k at each moment n-i , with a value between 1 and 100.

5. The method for adjusting the output power of a converter transformer according to claim 1, characterized in that: If the total number of preset time intervals from the start of the converter transformer to the current moment is less than m+1, only the steps of measuring and recording the current output voltage, the current output current and the current output power are performed, and the actual output power at the current moment is the planned output power at the current moment in the planned curve.

6. A converter transformer for supplying power to a graphitization furnace, characterized in that: The converter transformer is used to implement the converter transformer output power regulation method as described in any one of claims 1 to 5.

7. A computer-readable storage medium, characterized in that: A converter transformer output power regulation program is stored therein, and the converter transformer output power regulation program is loaded and run by a processor to execute the converter transformer output power regulation method described in any one of claims 1 to 5.

Citation Information

Patent Citations

  • Converter station power regulation method, device, equipment, medium and computer product

    CN118199132A

  • Series interleaved boost converter power factor correcting power supply

    CN1578078A

  • Graphitization furnace power supply device

    CN201733237U

  • Electricity supply equipment for prepn. of graphite

    CN2158399Y

  • Electrical grid transformer system

    US20230087549A1