A foundation pit safety early warning method based on adaptive entropy weight fuzzy analytic hierarchy process
Through the adaptive entropy weight fuzzy hierarchical analysis method, the problem that the foundation pit safety warning method in the existing technology cannot be analyzed from an overall perspective, and the accurate assessment and early warning of the overall stability of the foundation pit is achieved, which improves the accuracy of the warning. degree and objectivity.
Patent Information
- Application Number
- CN202411195718.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-29
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-08-29
AI Technical Summary
Existing foundation pit safety warning methods usually only focus on a single monitoring point, fail to conduct safety warnings from the overall perspective of foundation pits, and lack a recognized standard evaluation index model, resulting in inaccurate index weights.
The fuzzy hierarchical analysis method is adopted based on the adaptive entropy weight fuzzy hierarchy method to establish the foundation pit index stability hierarchical chart and the overall foundation pit safety warning hierarchical structure diagram. The weight is calculated through the adaptive entropy weight hierarchical analysis method, and combined with fuzzy comprehensive evaluation and quantitative analysis, the weight is realized. Warning of the overall stability of the foundation pit.
Accurate assessment and early warning of the overall stability of foundation pits is achieved, the problem of inaccurate index weights is avoided, the dynamic changes of different foundation pit monitoring projects are met, and the accuracy and objectivity of early warning are improved.
Smart Images

Figure CN118691102B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of building engineering construction, and relates to a foundation pit safety early warning method based on an adaptive entropy weight fuzzy hierarchical analysis method. Background Art
[0002] The deformation rate and cumulative deformation of the foundation pit itself and the surrounding environment monitoring items will have different degrees of impact on the overall stability of the foundation pit system. If the foundation pit is excessively deformed, it may cause serious damage and lead to major engineering accidents. Therefore, it is extremely important to establish a reliable foundation pit safety early warning method.
[0003] In actual projects, it is a more practical method to directly use monitoring data for safety warning. Although the existing safety warning methods can realize the early warning of foundation pit deformation, there are still some shortcomings. For example, many methods often only focus on the damage analysis of a single monitoring point, but fail to study and discuss its safety warning issues from the perspective of the foundation pit as a whole; because the current research on deep foundation pit construction has not yet established a recognized standard evaluation index model, the entropy weight-hierarchy analysis method needs to adjust the foundation pit hierarchy diagram when applied to different foundation pits, and reconstruct the judgment matrix according to the evaluation index, which is more troublesome and leads to inaccurate weights of the indicators. Summary of the invention
[0004] In order to solve the problems existing in the above-mentioned prior art, the present invention proposes a foundation pit safety early warning method based on adaptive entropy weight fuzzy analytic hierarchy process. It not only targets each measuring point, but also includes the stability of the foundation pit as a whole; at the same time, the method can also be adaptively applied to different foundation pits of the monitoring project, making the indicator weight more accurate.
[0005] The technical solution adopted by the present invention to achieve the above-mentioned purpose is:
[0006] A foundation pit safety early warning method based on adaptive entropy weight fuzzy analytic hierarchy process, characterized in that it specifically includes the following steps:
[0007] Step 1: Establish a foundation pit index stability classification table;
[0008] Step 2: Establish an overall foundation pit safety warning hierarchy diagram;
[0009] Taking the overall stability of the foundation pit as the target layer, the first-level indicators are the stability of the foundation pit itself and the stability of the surrounding environment, and setting all monitoring items as second-level indicators to form an overall indicator system and establish an overall foundation pit safety early warning hierarchy diagram;
[0010] Step 3, calculate the weights using the adaptive entropy weight analytic hierarchy process;
[0011] (1) Construct a judgment matrix;
[0012] Using the 1-9 scale method, the factors were compared with each other to obtain the relationship of relative importance, and then the corresponding judgment matrix was constructed;
[0013] (2) Consistency test;
[0014] The judgment matrix undergoes a consistency test to determine whether the weight vector obtained by the judgment matrix is reliable, that is, the random consistency ratio CR is calculated. When CR is less than 0.1, the requirement is met. Otherwise, the judgment matrix is reconstructed until it meets the consistency test;
[0015] (3) Calculate weights;
[0016] After the judgment matrix is determined, the matrix eigenvalue method is used to calculate the weights of each layer;
[0017] (4) Correction of weights using entropy weight method;
[0018] The judgment matrix is dimensionless, and the probability matrix, information entropy and entropy weight are calculated in sequence, and the weights obtained by the hierarchical analysis method are corrected with the entropy weight;
[0019] (5) Adaptive weight adjustment;
[0020] The weight adaptive matrix A is proposed, and the product of the weight W of the overall secondary index corresponding to the primary index and the weight adaptive matrix A is calculated to obtain the adjusted weight w, and then w is normalized to obtain the adaptive weight , That is, the weight of the monitoring items included in the secondary indicators of the specific project:
[0021] Construct the weight adaptation matrix A:
[0022] (1);
[0023] Calculate the adaptive weight w:
[0024] (2) ;
[0025] Normalized adaptive weights :
[0026] (3);
[0027] Where: is 0 or 1. When the specific project has the monitoring items in the secondary indicators of the overall foundation pit safety early warning hierarchy diagram, the corresponding is 1, otherwise it is 0;
[0028] Step 4: Fuzzy comprehensive evaluation;
[0029] (1) Determine the factor set, comment set, and factor set weight vector;
[0030] (2) Constructing fuzzy relationship matrix:
[0031] The monitoring data is processed by data fusion method to obtain the overall deformation of the foundation pit under the monitoring project and establish the assignment-type membership function; the data fusion result is substituted into the bottom-level single-factor fuzzy relationship matrix;
[0032] (3) Select the fuzzy synthesis operator;
[0033] (4) Fuzzy comprehensive evaluation:
[0034] Comprehensively evaluate the factors at the bottom layer to obtain a fuzzy evaluation vector; synthesize the obtained fuzzy evaluation vector into a fuzzy relationship matrix, and comprehensively evaluate the factors at the previous layer; successively upward, obtain the comprehensive evaluation vector at the highest layer and determine the safety and stability of the foundation pit according to the maximum membership principle;
[0035] Step 5: Quantitative evaluation and analysis;
[0036] Corresponding scores are set for each state of the foundation pit, and a reference table of alarm levels and management measures is established. According to the established standards, if the score is above 75 points, the foundation pit has good stability; if the score is below 75 points, the stability of the foundation pit is poor. The comment set scores of the foundation pit are defined as The final scores of foundation pit stability at each level are , and determine the foundation pit alarm level based on the alarm level and management measures reference table.
[0037] The foundation pit index stability grading table established in step 1 includes the foundation pit itself stability early warning grading table as shown in Table 1 and the foundation pit surrounding environment stability early warning grading table as shown in Table 2.
[0038] The 1-9 scale method used in step 3 is shown in Table 4.
[0039] The three-level indicator fuzzy relationship matrix established in step 4 is shown in Table 5.
[0040] The reference table of alarm levels and management measures established in step 5 is shown in Table 7.
[0041] Beneficial effects of the present invention:
[0042] (1) The present invention proposes a weight adaptive matrix A and an overall indicator system including all monitoring items, so that the relationship between each monitoring item is clearer, and based on the weight adaptive matrix A, the overall indicator weight corrected by the entropy weight method is adapted according to different indicators required in actual projects, so as to obtain the indicator weight for a specific project, which effectively meets the dynamically changing safety evaluation requirements of foundation pit automatic monitoring of different foundation pit monitoring projects, avoids the need to construct different judgment matrices according to different indicators, and at the same time, the weight vector corrected by the entropy weight method is more objective and has higher accuracy.
[0043] (2) The present invention monitors and warns the early warning value according to the Technical Standard for Monitoring Construction Foundation Pit Engineering, establishes an appropriate stability classification table for foundation pit indicators, and distinguishes the stability status of each monitoring point. At the same time, it combines the membership function and the hierarchical analysis method to realize the early warning of the overall stability of the foundation pit, and realizes safety early warning at both the level of each measuring point and the foundation pit as a whole. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] Figure 1 is a flow chart of the method of the present invention;
[0045] Figure 2 It is a general foundation pit safety early warning hierarchy diagram established by the present invention;
[0046] Figure 3 It is a diagram of the foundation pit safety early warning hierarchy of the Qianwan foundation pit project in Example 2; DETAILED DESCRIPTION
[0047] The technical solution of the present invention is described in detail below in conjunction with the accompanying drawings and implementation plans: Example 1
[0048] A foundation pit safety early warning method based on adaptive entropy weight fuzzy analytic hierarchy process, the specific process diagram is as follows Figure 1 As shown, the steps are as follows:
[0049] Step 1: Establish a foundation pit index stability classification table;
[0050] Step 2: Establish the overall early warning hierarchy diagram of the overall foundation pit;
[0051] Step 3, calculate the weights using the adaptive entropy weight analytic hierarchy process;
[0052] Step 4: Fuzzy comprehensive evaluation;
[0053] Step 5: Quantitative evaluation.
[0054] In specific implementation, the above five steps can be divided into two parts. Step 1 is an early warning for a single measuring point, and steps 2 to 5 are safety early warnings for the entire foundation pit. The specific implementation process is as follows:
[0055] Step 1: Establish a foundation pit index stability classification table;
[0056] According to the monitoring and early warning values of the "Technical Standards for Monitoring of Construction Foundation Pit Engineering" as well as soil characteristics and surrounding environmental protection requirements, an appropriate foundation pit index stability classification table is established to determine the stability status of each monitoring point and carry out timely maintenance of dangerous measuring point areas.
[0057] Step 2: Establish an overall foundation pit safety warning hierarchy diagram;
[0058] According to previous research results, the overall stability of the foundation pit is taken as the target layer, the first-level indicators are the stability of the foundation pit itself and the stability of the surrounding environment, and according to the foundation pit engineering instrument monitoring project table in the "Technical Standards for Monitoring of Construction Foundation Pit Engineering", all monitoring items are set as second-level indicators to form an overall indicator system and establish an overall foundation pit safety early warning hierarchy diagram.
[0059] Step 3, calculate the weights using the adaptive entropy weight analytic hierarchy process;
[0060] (1) Construct a judgment matrix;
[0061] The 1-9 scaling method was used to compare the two factors to obtain the relative importance relationship, and then the corresponding judgment matrix was constructed.
[0062] (2) Consistency test;
[0063] In order to ensure consistent judgment standards when making judgments and avoid subjective bias or inconsistency, the judgment matrix must undergo a consistency test to determine whether the weight vector obtained from the judgment matrix is reliable, that is, the random consistency ratio CR is calculated. When CR is less than 0.1, the requirements are met, otherwise the judgment matrix is reconstructed until it meets the consistency test.
[0064] (3) Calculate weights;
[0065] After the judgment matrix is determined, the matrix eigenvalue method is used to calculate the weights of each layer, and the maximum eigenvalue of the judgment matrix is The corresponding eigenvector w is normalized to obtain the weight vector.
[0066] (4) Correction of weights using entropy weight method;
[0067] The judgment matrix is constructed by the 1-9 scaling method. Therefore, the assignment of each scale in the judgment matrix is very arbitrary, which will make the weight vectors of indicators at each level inaccurate. Therefore, the entropy weight method is used to correct the weight vectors obtained by the hierarchical analysis method: the judgment matrix is dimensionless, and the probability matrix, information entropy and entropy weight are calculated in turn. The entropy weight is used to correct the weights obtained by the hierarchical analysis method to ensure the rationality of the evaluation system.
[0068] (5) Adaptive weight adjustment;
[0069] Since the safety level of foundation pit engineering is different in different actual projects, the monitoring items of foundation pit, that is, the secondary indicators, will be different. The weight adaptive matrix A is proposed to calculate the product of the weight W of the overall secondary indicator corresponding to the primary indicator and the weight adaptive matrix A to obtain the adjusted weight w, and then normalize w to obtain the adaptive weight , That is, the weight of the monitoring items included in the secondary indicators of the specific project:
[0070] Construct the weight adaptation matrix A:
[0071] (1);
[0072] Calculate the adaptive weight w:
[0073] (2) ;
[0074] Normalized adaptive weights :
[0075] (3);
[0076] Where: is 0 or 1. When the specific project has the monitoring items in the secondary indicators of the overall foundation pit safety early warning hierarchy diagram, the corresponding is 1 if the value is true, otherwise it is 0.
[0077] Step 4: Fuzzy comprehensive evaluation;
[0078] (1) Determine the factor set, comment set, and factor set weight vector; factor set: , n is the number of influencing factors; Comment set: , m is the number of evaluation results; factor set weight vector: see step 3 adaptive entropy weighted analytic hierarchy process;
[0079] (2) Constructing fuzzy relationship matrix:
[0080] The monitoring data is processed by data fusion method. According to the specific needs of the actual engineering project and combined with the foundation pit index stability classification table, the overall deformation of the foundation pit under the monitoring project is obtained to establish an assignable membership function; the data fusion result is substituted into the bottom single factor fuzzy relationship matrix;
[0081] (4);
[0082] Where: Indicates that the object being evaluated is from the factors Check out the ratings The degree of membership;
[0083] (3) Select the fuzzy synthesis operator; here we use Weighted average operator:
[0084] (5);
[0085] (4) Fuzzy comprehensive evaluation:
[0086] Comprehensively evaluate the factors at the bottom level and obtain the fuzzy evaluation vector: ; The obtained fuzzy evaluation vector is synthesized into a fuzzy relationship matrix, and the comprehensive evaluation is performed on each factor of the previous layer; and the comprehensive evaluation vector of the highest layer is obtained in sequence upward: , where: is the weight of the first-level indicator, is the fuzzy composition operator, It is a fuzzy relationship matrix of the first-level indicators, and the safety and stability of the foundation pit is determined according to the maximum membership principle.
[0087] Step 5: Quantitative evaluation and analysis;
[0088] In order to ensure accurate assessment and analysis of foundation pit stability, corresponding scores are set for each state of the foundation pit to achieve quantitative analysis of stability. At the same time, a reference table of alarm levels and management measures is established to subdivide each state and give corresponding measures. According to the established standards, if the score is relatively high, it means that the foundation pit has good stability; on the contrary, if the score is low, it means that the stability of the foundation pit is poor. The comment set scores of the foundation pit are defined as The final scores of foundation pit stability at each level are , and determine the foundation pit alarm level based on the alarm level and management measures reference table. Example 2
[0089] In this embodiment, the method described in Embodiment 1 is used to perform calculations using the Qianwan Information Hub Center project in a certain city as an example.
[0090] The project covers a total area of 7,683 square meters, with a planned three-story basement and a foundation pit depth of 19.1-25.1 meters. The northwest side is close to the subway, with the closest distance to the red line being 15.0 meters. The southwest side is adjacent to the high-speed viaduct, with the closest distance to the pile foundation being about 30.0 meters. Now a foundation pit safety warning is issued based on the monitoring data of a certain day.
[0091] Step 1: Establish a foundation pit index stability classification table;
[0092] According to the monitoring warning values of the "Technical Standards for Monitoring of Construction Foundation Pit Engineering", combined with the two-level warning mechanism combining warning values with control values, a foundation pit index stability classification table is established as shown in Table 1 and Table 2.
[0093] Table 1 Early warning classification table of foundation pit stability
[0094] ;
[0095] Table 2 Early warning classification table of environmental stability around foundation pit
[0096] .
[0097] According to Table 1 and Table 2, the stability status of each monitoring point can be judged. It is found that the deformation rate of the monitoring items on that day is less than the warning value and is in a safe state; however, the cumulative deformation value of some monitoring items exceeds the warning value and even reaches the control value, as shown in Table 3. Therefore, the monitoring and management of these monitoring points should be strengthened and maintenance work should be done well.
[0098] Table 3 Dangerous conditions of measuring points
[0099] .
[0100] Step 2: Establish an overall foundation pit safety warning hierarchy diagram;
[0101] According to previous research results, the overall stability of the foundation pit is taken as the target layer, the first-level indicators are the stability of the foundation pit itself and the stability of the surrounding environment, and according to the foundation pit engineering instrument monitoring project table in the "Technical Standards for Monitoring of Building Foundation Pit Engineering", all monitoring items that should be measured, suitable for measurement, and measurable are set as second-level indicators, a total of 21 items, of which 14 are second-level indicators corresponding to the foundation pit itself and 7 are second-level indicators corresponding to the surrounding environment; the third-level indicators are the deformation rate and cumulative deformation of each monitoring item, forming an overall indicator system, and establishing Figure 2 The overall foundation pit safety warning hierarchy diagram is shown.
[0102] Step 3, calculate the weights using the adaptive entropy weight analytic hierarchy process;
[0103] Taking the secondary indicators as an example, the indicator weight calculation process is explained:
[0104] (1) Construct a judgment matrix;
[0105] Using the 1-9 scale method shown in Table 4, all the monitoring items of the foundation pit are compared pairwise to obtain the relationship of relative importance, and then the corresponding judgment matrix is constructed.
[0106] Table 4 1-9 scaling method
[0107] .
[0108] (2) Consistency test;
[0109] In order to ensure consistent judgment standards when making judgments and avoid subjective bias or inconsistency, the judgment matrix must undergo a consistency test to determine whether the weight vector obtained from the judgment matrix is reliable, that is, the random consistency ratio CR is calculated. When CR is less than 0.1, the requirements are met, otherwise the judgment matrix is reconstructed until it meets the consistency test.
[0110] (3) Calculate weights;
[0111] After the judgment matrix is determined, the matrix eigenvalue method is used to calculate the weights of each layer, and the maximum eigenvalue of the judgment matrix is The corresponding eigenvector w is normalized to obtain the weight vector.
[0112] (4) Correction of weights using entropy weight method;
[0113] The judgment matrix is constructed by the 1-9 scaling method. Therefore, the assignment of each scale in the judgment matrix is very arbitrary, which will make the weight vectors of indicators at each level inaccurate. Therefore, the entropy weight method is used to correct the weight vectors obtained by the hierarchical analysis method: the judgment matrix is dimensionless, and the probability matrix, information entropy and entropy weight are calculated in turn. The entropy weight is used to correct the weights obtained by the hierarchical analysis method to ensure the rationality of the evaluation system.
[0114] (5) Adaptive weight adjustment;
[0115] In this project, there are 2 first-level indicators, 13 second-level indicators, and 22 third-level indicators, such as Figure 3 As shown in the figure, there are 8 types of foundation pit self-monitoring items. Based on this, the weight adaptive matrix A is constructed. In the overall indicator system of the foundation pit itself, the 8 secondary indicators of the foundation pit self-monitoring of this project correspond to is 1, and the rest is 0. Therefore, the indicator weights of the foundation pit monitoring project of this project are: ;in is the indicator weight of the overall foundation pit monitoring project, and then Normalization can obtain the adaptive weight vector of the foundation pit monitoring project of this project:
[0116] =[0.2746 0.0674 0.0404 0.2737 0.0404 0.0337 0.0674 0.2023 0 0 0 00 0]. Similarly, the adaptive weight vector of the surrounding environment (5 monitoring items) of this project can be obtained.
[0117] =[0.2065 0.1032 0.0466 0.0466 0.5971 0 0 ].
[0118] Step 4: Fuzzy comprehensive evaluation;
[0119] (1) Determine the factor set, comment set, and factor set weight vector; factor set: , n is the number of influencing factors; Comment set: , m is the number of evaluation results; factor set weight vector: see step 3 adaptive entropy weighted analytic hierarchy process;
[0120] (2) Constructing fuzzy relationship matrix:
[0121] The weighted average data fusion method is used to obtain the overall deformation of the foundation pit under this monitoring project, and the data fusion results are substituted into the assigned membership function to obtain the bottom-level single-factor fuzzy relationship matrix as shown in Table 5;
[0122] Table 5 Fuzzy relationship matrix of three-level indicators
[0123] ;
[0124] (3) Select the fuzzy synthesis operator; here we use Weighted average operator:
[0125] (5);
[0126] (4) Fuzzy comprehensive evaluation:
[0127] Take the horizontal displacement of the column LZ (C1) as an example: the fuzzy relationship matrix: ;
[0128] Weight vector: ;
[0129] So its fuzzy judgment vector :
[0130] (6);
[0131] Similarly, the single factor fuzzy evaluation is carried out one level higher, and the fuzzy relationship matrix of the first-level index is obtained as follows: , and obtain the comprehensive evaluation vector of the target layer Therefore, according to the maximum membership principle, the foundation pit safety level can be determined to be level I, that is, a safe state.
[0132] Step 4: Quantitative evaluation and analysis;
[0133] The scores of safety state, warning state and damage state are defined as q1=90 points, q2=60 points and q3=20 points respectively. Finally, the scores of foundation pit stability at each level are , as shown in Table 6. At the same time, the alarm level of each level of the foundation pit can be determined by the reference table of alarm levels and management measures shown in Table 7. Finally, the safety early warning results of deep foundation pits are shown in Table 8. According to the table data, it can be found that when the cumulative deformation of pipeline settlement, trench settlement and surrounding road settlement exceeds the warning value, it will have a greater impact on the stability of the surrounding environment of the foundation pit. Combined with the results of the early warning of a single measuring point and the early warning of the foundation pit as a whole, these three types of monitoring points need to be maintained in a timely manner. After comparison with the actual situation, it was found that the early warning results were basically consistent with the actual stability state of the foundation pit, indicating the effectiveness of this method.
[0134] Table 6 Evaluation scores at each level
[0135] ;
[0136] Table 7 Alarm levels and management measures reference table
[0137] ;
[0138] Table 8 Results of safety warning for deep foundation pit
[0139] .
Claims
1. A foundation pit safety early warning method based on adaptive entropy weight fuzzy analytic hierarchy process, It is characterized in that The specific steps include: Step 1, establish a foundation pit index stability classification table; including the foundation pit itself stability early warning classification table as shown in Table 1 and the foundation pit surrounding environment stability early warning classification table as shown in Table 2; Table 1 Early warning classification table of foundation pit stability ; Table 2 Early warning classification table of environmental stability around foundation pit ; Step 2: Establish an overall foundation pit safety warning hierarchy diagram; Taking the overall stability of the foundation pit as the target layer, the first-level indicators are the stability of the foundation pit itself and the stability of the surrounding environment, and setting all monitoring items as second-level indicators to form an overall indicator system and establish an overall foundation pit safety early warning hierarchy diagram; Step 3, calculate the weights using the adaptive entropy weight analytic hierarchy process; (1) Construct a judgment matrix; Using the 1-9 scale method, the factors were compared with each other to obtain the relationship of relative importance, and then the corresponding judgment matrix was constructed; (2) Consistency test; The judgment matrix undergoes a consistency test to determine whether the weight vector obtained by the judgment matrix is reliable, that is, the random consistency ratio CR is calculated. When CR is less than 0.1, the requirement is met. Otherwise, the judgment matrix is reconstructed until it meets the consistency test; (3) Calculate weights; After the judgment matrix is determined, the matrix eigenvalue method is used to calculate the weights of each layer; (4) Correction of weights using entropy weight method; The judgment matrix is dimensionless, and the probability matrix, information entropy and entropy weight are calculated in sequence, and the weights obtained by the hierarchical analysis method are corrected with the entropy weight; (5) Adaptive weight adjustment; The weight adaptive matrix A is proposed, and the product of the weight W of the overall secondary index corresponding to the primary index and the weight adaptive matrix A is calculated to obtain the adjusted weight w, and then w is normalized to obtain the adaptive weight , That is, the weight of the monitoring items included in the secondary indicators of the specific project: Construct the weight adaptation matrix A: (1); Calculate the adaptive weight w: (2) ; Normalized adaptive weights : (3); Where: is 0 or 1. When the specific project has the monitoring items in the secondary indicators of the overall foundation pit safety early warning hierarchy diagram, the corresponding is 1, otherwise it is 0; Step 4: Fuzzy comprehensive evaluation; (1) Determine the factor set, comment set, and factor set weight vector; (2) Constructing fuzzy relationship matrix: The monitoring data is processed by data fusion method to obtain the overall deformation of the foundation pit under the monitoring project and establish the assignment-type membership function; the data fusion result is substituted into the bottom-level single-factor fuzzy relationship matrix; (3) Select the fuzzy synthesis operator; (4) Fuzzy comprehensive evaluation: Comprehensively evaluate the factors at the bottom layer to obtain a fuzzy evaluation vector; synthesize the obtained fuzzy evaluation vector into a fuzzy relationship matrix, and comprehensively evaluate the factors at the previous layer; successively upward, obtain the comprehensive evaluation vector at the highest layer and determine the safety and stability of the foundation pit according to the maximum membership principle; Step 5: Quantitative evaluation and analysis; Corresponding scores are set for each state of the foundation pit, and a reference table of alarm levels and management measures is established. According to the established standards, if the score is above 75 points, the foundation pit has good stability; if the score is below 75 points, the stability of the foundation pit is poor. The comment set scores of the foundation pit are defined as Finally, the scores of foundation pit stability at each level are , and determine the foundation pit alarm level based on the alarm level and management measures reference table.
2. According to claim 1, a foundation pit safety early warning method based on adaptive entropy weight fuzzy analytic hierarchy process, It is characterized in that The 1-9 scale method used in step 3 is shown in Table 4. Table 4 1-9 scaling method 。 3. According to claim 1, a foundation pit safety early warning method based on adaptive entropy weight fuzzy analytic hierarchy process, It is characterized in that The three-level indicator fuzzy relationship matrix established in step 4 is shown in Table 5; Table 5 Fuzzy relationship matrix of three-level indicators 。 4. According to claim 1, a foundation pit safety early warning method based on adaptive entropy weight fuzzy analytic hierarchy process, It is characterized in that The reference table of alarm levels and management measures established in step 5 is shown in Table 7; Table 7 Alarm levels and management measures reference table 。