An electrical automation management system based on big data

Through the electrical automation management system based on big data, the shortcomings of traditional electrical management methods in data collection and processing are solved, and multi-dimensional analysis and fault prediction of electrical equipment are realized, maintenance costs are reduced, and the operation efficiency of electrical systems is improved. and reliability.

CN118694003BActive Publication Date: 2024-12-03TRACE SOURCE ELECTRIC (QUANZHOU) CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411163784.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-12-03
Estimated Expiration
2044-08-23

AI Technical Summary

Technical Problem

Traditional electrical management methods are not comprehensive enough in data collection and processing, and cannot accurately grasp the operating status of the electrical system, making it difficult to conduct effective early warning analysis, fault detection and cost-effective evaluation.

Method used

An electrical automation management system based on big data was designed, including an electrical data acquisition module, a data processing center and an intelligent control module. Through multi-dimensional analysis of equipment operation data, a change line chart is constructed, and fault analysis and cost-effectiveness are combined with historical operation data. Evaluate and perform corresponding actions based on the analysis results.

Benefits of technology

It realizes multi-dimensional indicator analysis of electrical equipment, accurately identify equipment abnormalities, predict potential failures, reduce maintenance time and costs, and provides detailed fault analysis results and cost-benefit assessments to help enterprises maximize cost savings and return on investment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118694003B_ABST
    Figure CN118694003B_ABST
Patent Text Reader

Abstract

The present invention provides an electrical automation management system based on big data, which relates to the field of electrical automation technology, including a data processing center and an intelligent control module; the data processing center includes an equipment monitoring module, a fault detection module, and a cost-benefit analysis module; the intelligent control module is used to receive the analysis results output by the data processing center and perform corresponding operations according to the signaling corresponding to the results. The present invention analyzes the equipment operation data through multi-dimensional indicators, constructs a change line graph to intuitively present parameter changes, and compared with the traditional method, it no longer relies on a single parameter judgment, and can more accurately identify equipment abnormalities by combining multiple indicators. It also combines the historical operation data and real-time data of the equipment to predict potential faults and provide detailed fault analysis results, which can quickly identify situations similar to historical faults, accurately judge equipment status changes and performance degradation trends, and help to quickly locate problems and take preventive or repair measures, reducing maintenance time and costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of electrical automation technology, and in particular to an electrical automation management system based on big data. Background Art

[0002] In today's electrical systems, with the rapid development of science and technology and the acceleration of industrialization, the number of electrical equipment has exploded, and its types and functions have become increasingly diverse and complex. At the same time, the requirements for the stability and efficiency of electrical system operation have reached an unprecedented level. However, traditional electrical management methods have gradually exposed many difficult-to-overcome challenges in dealing with these changes.

[0003] Traditional management methods are often not comprehensive enough in data collection and cannot cover the key operating parameters of various electrical equipment, resulting in inaccurate grasp of the overall operating status of the electrical system. In terms of data processing, there is a lack of in-depth analysis methods, making it difficult to conduct effective early warning analysis, fault detection and cost-effectiveness evaluation of equipment operation data. Therefore, we propose an electrical automation management system based on big data to solve the above problems. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present invention provides an electrical automation management system based on big data to solve the problems raised in the above background technology.

[0005] The object of the present invention can be achieved by the following technical solution: comprising an electrical data acquisition module, a data processing center, and an intelligent control module;

[0006] The electrical data acquisition module is responsible for collecting the operating data of various equipment in the electrical system; the various equipment includes power generation equipment, transmission equipment, distribution equipment, power consumption equipment, control and protection equipment, and energy storage equipment;

[0007] Data processing center, including equipment monitoring module, fault detection module, and cost-benefit analysis module;

[0008] The equipment monitoring module is used to conduct early warning analysis on the operating data of various equipment in the electrical system and obtain the equipment analysis results corresponding to various equipment; the equipment analysis results include the standard deviation value, ramp value, standard deviation mean value, standard deviation fluctuation value, heterogeneous fluctuation value, equipment evaluation value and the corresponding change line chart of the parameters in the operating data;

[0009] A fault detection module is used to perform fault analysis based on the equipment analysis results combined with the equipment's historical operation data to obtain fault analysis results; wherein the fault analysis results include the line similarity impact value corresponding to the parameters in the operation data, the historical analysis evaluation difference value, and the fault prediction value;

[0010] The cost-benefit analysis module is used to perform cost-benefit analysis on various types of equipment in the electrical system and obtain benefit analysis results; the benefit analysis results include cost impact value, equipment usage time, equipment maintenance times, maintenance impact value and equipment benefit value;

[0011] The intelligent control module is used to receive the analysis results output by the data processing center, which include equipment, fault and benefit analysis results; set an abnormal threshold for any result in the analysis, compare each analysis result with the corresponding abnormal threshold, and generate an abnormal signal corresponding to the result if any result is greater than or equal to the abnormal threshold; and perform corresponding operations according to the signal corresponding to the result.

[0012] As a preferred method, early warning analysis is performed on the operating data of various equipment in the electrical system, specifically:

[0013] Set the standard parameter value of any parameter in the corresponding equipment operation data of various types of equipment in the electrical system; subtract the standard parameter value corresponding to any parameter value in the corresponding equipment operation data from the standard parameter value corresponding to the parameter to obtain the standard deviation value corresponding to the parameter;

[0014] According to the monitoring time zone of each device, the corresponding device is set, and the change line graph of the parameter is constructed. The standard deviation value of the parameter in the monitoring time zone and its corresponding collection time are input into the corresponding change line graph, and the position of the standard deviation value in the change line graph is marked as the parameter deviation point; the adjacent parameter deviation points are connected to obtain the parameter deviation line; the adjacent parameter deviation lines are connected to obtain the parameter deviation line;

[0015] Calculate the slope of the parameter deviation line, mark the positive slope as a positive slope value, and mark the negative slope as a negative slope value; sum up all the positive slope values ​​and negative slope values ​​in the monitoring time zone to obtain the total positive slope value and the total negative slope value; perform weighted calculation on the total positive slope value and the total negative slope value to obtain the ramp value;

[0016] Calculate the mean and standard deviation of the standard deviation value in the monitoring time zone to obtain the standard deviation mean F3 and standard deviation fluctuation value;

[0017] Set the standard deviation allowable range, match the standard deviation value of the parameter with the standard deviation allowable range, and if the standard deviation value of the parameter is not within the standard deviation allowable range, mark the generation time of the parameter as an abnormal time; calculate the time difference of adjacent abnormal times in the monitoring time zone to obtain the abnormal interval duration; calculate the standard deviation of the abnormal interval duration in the monitoring time zone to obtain the abnormal fluctuation value;

[0018] The standard deviation value, ramp value, standard deviation mean value, standard deviation fluctuation value and heterogeneous fluctuation value are weighted to obtain the equipment evaluation value;

[0019] The standard deviation value, ramp value, standard deviation mean value, standard deviation fluctuation value, heterogeneous fluctuation value, equipment evaluation value and the corresponding change line graph are marked as equipment analysis results.

[0020] Preferably, the fault analysis is performed based on the equipment analysis results combined with the equipment's historical operation data, specifically:

[0021] Identify historical operation data to obtain the operation data of any device in the monitoring time zone before any fault, and mark the operation data of the monitoring time zone before the fault as the historical fault monitoring time zone;

[0022] Identify the parameter deviation line in the parameter change line graph of the operating data in the current monitoring time zone of the equipment, perform similarity calculation on the parameter deviation line of the current monitoring time zone and the parameter deviation line in any historical fault monitoring time zone to obtain a line similarity value; perform weighted processing on the line similarity values ​​of all historical fault monitoring time zones to obtain a line similarity impact value;

[0023] Calculate the difference between the parameters corresponding to the current equipment analysis result of the equipment and the equipment analysis result corresponding to any historical fault monitoring time zone, and obtain the historical analysis evaluation difference corresponding to the parameter;

[0024] The fault prediction value is obtained by weighted calculation of the line similarity influence value and the historical analysis evaluation difference of all parameters in the operation data;

[0025] The broken line similarity impact value, historical analysis evaluation difference and fault prediction value corresponding to the parameters are marked as fault analysis results.

[0026] As a preferred method, a cost-benefit analysis is performed on various types of equipment in the electrical system, specifically:

[0027] Obtain cost information for any equipment, including purchase cost, daily operation cost, and daily maintenance cost;

[0028] Set the upper-level upgrade device corresponding to the current device, obtain the cost information of the upgrade device, perform difference calculation between the cost information of the upgrade device and the corresponding parameters in the cost information of the current device, and obtain the cost difference corresponding to the parameters; perform weighted calculation on the cost difference of all parameters in the cost information to obtain the cost impact value corresponding to the upgrade device;

[0029] Get the installation time of the current device, calculate the difference between the installation time and the current time to get the device usage time; mark the time zone between the installation time and the current time as the device usage time zone, and record the number of device maintenance times within the device usage time zone;

[0030] Record the maintenance time of each equipment maintenance, calculate the time difference between adjacent maintenance times, and obtain the maintenance time difference value; calculate the standard deviation of the maintenance time difference value within the equipment use time zone to obtain the maintenance frequency impact value;

[0031] The cost impact value, equipment usage time, equipment maintenance times, and maintenance frequency impact value are weighted to obtain the equipment benefit value corresponding to the upgraded equipment;

[0032] The cost impact value, equipment usage time, equipment maintenance times, maintenance frequency impact value, and equipment benefit value are marked as benefit analysis results.

[0033] Preferably, a corresponding operation is performed according to a signaling corresponding to the result, specifically: when an abnormal signaling corresponding to the device analysis result is received, the device operating parameters are adjusted according to the device evaluation value in the device analysis result;

[0034] When receiving the abnormal signaling corresponding to the fault analysis result, trigger the early warning notification, and send the corresponding fault analysis result and the number and location of the equipment to the fault maintenance team;

[0035] When receiving an abnormal signal corresponding to the benefit analysis result, the benefit analysis result and the recommended replacement or upgrade notification of the equipment are sent to the maintenance team.

[0036] Preferably, the data processing center further includes a remote communication module, a data storage module, a display access module, and a user registration module;

[0037] The remote communication module is used to realize data exchange between various modules in the system and allows interaction with external devices, software platforms or user terminals;

[0038] A data storage module, used to receive and store the operating data output by the electrical data acquisition module and the analysis results output by the data processing center;

[0039] A display access module, used for displaying and accessing the data stored in the data storage module;

[0040] The user registration module is used to submit the user's registration information and generate an authorized login account for the successfully registered registration information; the authorized login account is used to log in to the data processing center.

[0041] Preferably, the display access module includes an interactive report generator for allowing users to customize and generate reports according to needs; the interactive report generator has a drag and drop interface for specific data fields, predefined time periods or custom date ranges, and report formats and layouts.

[0042] Compared with the prior art, the present invention has the following beneficial effects:

[0043] 1. The present invention analyzes equipment operation data through multi-dimensional indicators and constructs a change line graph to intuitively present parameter changes. Compared with traditional methods, it no longer relies on a single parameter judgment. The combination of multiple indicators can more accurately identify equipment abnormalities, and combines the historical operation data and real-time data of the equipment to predict potential faults and provide detailed fault analysis results. It can quickly identify situations similar to historical faults, accurately judge equipment status changes and performance degradation trends, help to quickly locate problems and take preventive or repair measures, and reduce maintenance time and costs.

[0044] 2. The present invention conducts cost-benefit analysis, considers the cost of equipment purchase, operation and maintenance, evaluates the cost-effectiveness of the equipment over its entire life cycle, focuses on analyzing factors such as equipment usage time, maintenance times and frequency, provides suggestions for upgrading or replacing equipment, reduces costs, improves availability and production efficiency, and helps enterprises achieve cost savings and maximize return on investment. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.

[0046] Figure 1 It is a principle block diagram of an electrical automation management system based on big data of the present invention. DETAILED DESCRIPTION

[0047] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0048] See also Figure 1 As shown, an electrical automation management system based on big data includes an electrical data acquisition module, a data processing center, and an intelligent control module;

[0049] The electrical data acquisition module is responsible for collecting the operating data of various equipment in the electrical system; the various equipment includes power generation equipment, transmission equipment, distribution equipment, power consumption equipment, control and protection equipment, and energy storage equipment;

[0050] It should be clearly pointed out that the electrical data acquisition module is responsible for collecting data from different equipment in the electrical system, including but not limited to power generation equipment (such as wind turbines, solar panels, gas turbines, etc.), transmission equipment (such as transformers, high-voltage lines, etc.), distribution equipment (such as distribution cabinets, circuit breakers, etc.), power consumption equipment (such as motors, lighting systems, etc.), control and protection equipment (such as relays, protection devices, etc.) and energy storage equipment (such as battery energy storage systems). The specific selection of equipment will be based on the performance indicators, monitoring objectives, compatibility requirements, cost-benefit analysis and expected system scalability of the system design to ensure that the selected equipment can meet the actual operation and management needs in specific application scenarios;

[0051] It should be further explained that for power generation equipment, by accurately collecting its output voltage, current, power and other parameters, it is possible to monitor the power generation efficiency and operating status in real time, and promptly discover potential fault hazards, such as overheating of generator windings and unstable output power, to ensure stable and reliable power production;

[0052] For power transmission equipment, collecting data such as voltage level, current size, and line loss can effectively evaluate the load and health of the transmission line, and provide a basis for the reasonable arrangement of power transmission and the prevention of line failures. For example, timely detection of line overload, insulation damage and other problems can be made to avoid power outages.

[0053] For power distribution equipment, collecting operating data such as its opening and closing status, voltage fluctuation, and power factor can help achieve precise control and optimized management of power distribution, improve power distribution efficiency and reliability, for example, timely adjust reactive power compensation equipment, improve power factor, and reduce power loss;

[0054] For electrical equipment, collecting parameters such as power consumption, working current, and operating temperature can help users understand the power consumption and operating status of the equipment, and achieve energy-saving management and equipment maintenance. For example, if the power consumption of a certain electrical equipment increases abnormally, it can be checked in time to see if there is a fault or unreasonable power consumption behavior;

[0055] For control and protection equipment, collecting its action signals, protection settings and other data can ensure that protection actions can be taken promptly and accurately when a fault occurs in the electrical system, thus ensuring the safe and stable operation of the system. For example, when a short circuit occurs in the system, the protection equipment can quickly cut off the fault circuit to prevent the fault from expanding.

[0056] For energy storage equipment, collecting data such as charging and discharging current, voltage, and capacity can help achieve optimal management and control of the energy storage system and improve energy storage efficiency and reliability. For example, the charging and discharging strategy can be reasonably arranged according to the status of the energy storage equipment to improve energy utilization efficiency.

[0057] Data processing center, including equipment monitoring module, fault detection module, and cost-benefit analysis module;

[0058] The equipment monitoring module is used to conduct early warning analysis on the operating data of various equipment in the electrical system and obtain the equipment analysis results corresponding to various equipment; the equipment analysis results include the standard deviation value, ramp value, standard deviation mean value, standard deviation fluctuation value, heterogeneous fluctuation value, equipment evaluation value and the corresponding change line chart of the parameters in the operating data;

[0059] A fault detection module is used to perform fault analysis based on the equipment analysis results combined with the equipment's historical operation data to obtain fault analysis results; wherein the fault analysis results include the line similarity impact value corresponding to the parameters in the operation data, the historical analysis evaluation difference value, and the fault prediction value;

[0060] The cost-benefit analysis module is used to perform cost-benefit analysis on various types of equipment in the electrical system and obtain benefit analysis results; the benefit analysis results include cost impact value, equipment usage time, equipment maintenance times, maintenance impact value and equipment benefit value;

[0061] The intelligent control module is used to receive the analysis results output by the data processing center, which include equipment, fault and benefit analysis results; set an abnormal threshold for any result in the analysis, compare each analysis result with the corresponding abnormal threshold, and generate an abnormal signal corresponding to the result if any result is greater than or equal to the abnormal threshold; and perform corresponding operations according to the signal corresponding to the result.

[0062] In this application, early warning analysis is performed on the operating data of various equipment in the electrical system, specifically:

[0063] Set the standard parameter value of any parameter in the corresponding equipment operation data of various types of equipment in the electrical system; subtract the standard parameter value corresponding to any parameter value in the corresponding equipment operation data from the standard parameter value corresponding to the parameter to obtain the standard deviation value F1 corresponding to the parameter;

[0064] According to the monitoring time zone of each device, the corresponding device is set, and the change line graph of the parameter is constructed. The standard deviation value of the parameter in the monitoring time zone and its corresponding collection time are input into the corresponding change line graph, and the position of the standard deviation value in the change line graph is marked as the parameter deviation point; the adjacent parameter deviation points are connected to obtain the parameter deviation line; the adjacent parameter deviation lines are connected to obtain the parameter deviation line;

[0065] Calculate the slope of the parameter deviation line, mark the positive slope as a positive slope value, and mark the negative slope as a negative slope value; sum up all the positive slope values ​​and negative slope values ​​in the monitoring time zone to obtain the total positive slope value and the total negative slope value; perform weighted calculation on the total positive slope value and the total negative slope value to obtain the slope value F2;

[0066] Calculate the mean and standard deviation of the standard deviation value in the monitoring time zone to obtain the standard deviation mean F3 and standard deviation fluctuation value F4;

[0067] Set the standard deviation allowable range, match the standard deviation value of the parameter with the standard deviation allowable range, and if the standard deviation value of the parameter is not within the standard deviation allowable range, mark the generation time of the parameter as an abnormal time; calculate the time difference of adjacent abnormal times in the monitoring time zone to obtain the abnormal interval duration; calculate the standard deviation of the abnormal interval duration in the monitoring time zone to obtain the abnormal fluctuation value F5;

[0068] The standard deviation value, ramp value, standard deviation mean value, standard deviation fluctuation value and heterogeneous fluctuation value are weighted and the formula is used to calculate the standard deviation value. , and obtain the equipment evaluation value F; where f1, f2, f3, f4, and f5 represent the weights corresponding to the standard deviation value, ramp value, standard deviation mean value, standard deviation fluctuation value, and heterogeneous fluctuation value of the parameters, respectively;

[0069] The standard deviation value, ramp value, standard deviation mean value, standard deviation fluctuation value, heterogeneous fluctuation value, equipment evaluation value and the corresponding change line graph are marked as equipment analysis results.

[0070] It should be noted that the early warning analysis proposed in this application can accurately quantify the degree of difference between the equipment operating parameters and the standard state by setting standard parameter values ​​and calculating standard deviation values, so that management personnel can quickly and intuitively understand whether the current operating state of the equipment deviates from the normal range, providing a key basis for timely discovery of potential problems;

[0071] By constructing a line graph corresponding to the parameters, the changing trend of the equipment operation data over time can be clearly presented. The connection between the parameter deviation point, deviation line and deviation line helps to intuitively observe the trajectory of parameter changes, so as to better understand the dynamic change process of the equipment operation status. For example, when continuous parameter deviation points form an obvious upward or downward trend, it may indicate the gradual deterioration of equipment performance or the occurrence of some abnormal situation.

[0072] By calculating the positive and negative slope values ​​and obtaining the ramp value, the speed and direction of parameter changes can be reflected. The positive slope value indicates an upward trend in the parameter, and the negative slope value indicates a downward trend in the parameter. The ramp value comprehensively monitors all these two situations in the time zone, providing more comprehensive information for judging the changing trend of the equipment operation status. For example, if the ramp value is large and positive, it means that the equipment parameters are rising rapidly, and it may be necessary to pay attention to whether the equipment is at risk of overload or overheating.

[0073] The calculation of the standard deviation mean and standard deviation fluctuation can measure the central trend and dispersion of the standard deviation. The standard deviation mean reflects the average deviation of the equipment operating parameters over a period of time, while the standard deviation fluctuation indicates the stability of the deviation. Through these two indicators, we can understand the stability and consistency of equipment operation and detect abnormal fluctuations in time.

[0074] Setting the allowable range of standard deviation and calculating the asynchronous fluctuation value can further detect abnormal conditions in equipment operation. When the standard deviation value of the parameter exceeds the allowable range, it is marked as an abnormal moment. By calculating the abnormal interval duration and the asynchronous fluctuation value, the frequency and regularity of abnormal conditions can be analyzed, which is of great significance for predicting equipment failures and formulating preventive maintenance plans.

[0075] Finally, the equipment evaluation value is obtained through weighted processing, which takes into account multiple indicators and can evaluate the operating status of the equipment more comprehensively and accurately. The change line graph is then used together with other indicators as the equipment analysis result, providing managers with rich information to facilitate them to make scientific and reasonable decisions and ensure the safe and stable operation of the electrical system.

[0076] In this application, fault analysis is performed based on the equipment analysis results combined with the equipment's historical operating data, specifically:

[0077] Identify historical operation data to obtain the operation data of any device in the monitoring time zone before any fault, and mark the operation data of the monitoring time zone before the fault as the historical fault monitoring time zone;

[0078] Identify the parameter deviation line in the parameter change line graph of the operating data in the current monitoring time zone of the equipment, calculate the similarity between the parameter deviation line in the current monitoring time zone and the parameter deviation line in any historical fault monitoring time zone to obtain the line similarity value XS; weight the line similarity values ​​of all historical fault monitoring time zones to obtain the line similarity influence value J1, which is expressed by the formula: ; Wherein, n represents the number of the historical fault monitoring time zone, N represents the total number of historical fault monitoring time zones, nXS and na represent the similarity value of the broken line between the parameter deviation broken line of the historical fault monitoring time zone numbered n and the current monitoring time zone and its corresponding weight respectively;

[0079] Calculate the difference between the corresponding parameters of the current equipment analysis result of the equipment and the equipment analysis result corresponding to any historical fault monitoring time zone, and obtain the historical analysis evaluation difference J2 corresponding to the parameter;

[0080] The fault prediction value J is obtained by weighted calculation of the line similarity impact value and historical analysis evaluation difference of all parameters in the operation data. The formula is: ; Wherein, i represents the number of the parameter in the operating data corresponding to the device, M represents the total number of parameters in the operating data corresponding to the device, iJ1 and iu1 represent the broken line similarity impact value corresponding to parameter i in the operating data and its corresponding weight, respectively, and iJ2 and iu2 represent the historical analysis evaluation difference corresponding to parameter i in the operating data and its corresponding weight, respectively;

[0081] The broken line similarity impact value, historical analysis evaluation difference and fault prediction value corresponding to the parameters are marked as fault analysis results.

[0082] It should be noted that by calculating the similarity between the parameter deviation line of the current monitoring time zone and the parameter deviation line of the historical fault monitoring time zone through fault analysis, the potential correlation between the current equipment operation status and the historical fault status can be effectively excavated. For example, if the similarity value between the current parameter deviation line and the line of a certain historical fault period is high, then there is a high possibility of similar fault risks, so that early warning can be issued to buy more time for maintenance personnel to conduct fault investigation and processing;

[0083] The similarity values ​​of all historical fault monitoring time zones are weighted to obtain the similarity impact value of the broken line, which fully considers the importance differences of different historical fault periods. Some historical faults may be more valuable for the current situation. By setting weights, the degree of influence of historical faults on the current equipment status can be more accurately evaluated.

[0084] Calculate the parameter difference between the current equipment analysis results and the equipment analysis results in the historical fault monitoring time zone, and deeply analyze the changing trend of the equipment operation status. If the difference between the current and historical fault periods is large, it means that the equipment may have new problems or changes in these aspects.

[0085] The fault prediction value is obtained by weighted calculation of the line-like similarity impact value and historical analysis evaluation difference of all parameters in the operation data. The impact of multiple factors on equipment failure is comprehensively considered. The use of multi-dimensional analysis methods can improve the accuracy and reliability of fault prediction and reduce false alarms and missed alarms.

[0086] Finally, the similarity impact value of the broken line, the historical analysis evaluation difference, and the fault prediction value are marked as the fault analysis results, providing maintenance personnel with comprehensive and detailed fault analysis information. Targeted maintenance strategies can be formulated based on the fault analysis results to improve the efficiency and quality of fault handling and ensure the stable operation of the electrical system.

[0087] In this application, a cost-benefit analysis is performed for each type of equipment in the electrical system, specifically:

[0088] Obtain cost information for any equipment, including purchase cost, daily operation cost, and daily maintenance cost;

[0089] Set the upper-level upgrade device corresponding to the current device, obtain the cost information of the upgrade device, perform difference calculation between the cost information of the upgrade device and the corresponding parameters in the cost information of the current device, and obtain the cost difference corresponding to the parameters; perform weighted calculation on the cost difference of all parameters in the cost information to obtain the cost impact value DS1 corresponding to the upgrade device;

[0090] Get the installation time of the current device, calculate the difference between the installation time and the current time to get the device usage time DS2; mark the time zone between the installation time and the current time as the device usage time zone, and record the number of device maintenance times DS3 within the device usage time zone;

[0091] Record the maintenance time of each equipment maintenance, calculate the time difference between adjacent maintenance times, and obtain the maintenance time difference value; calculate the standard deviation of the maintenance time difference value in the equipment use time zone to obtain the maintenance frequency impact value DS4;

[0092] The cost impact value, equipment usage time, equipment maintenance times, and maintenance frequency impact value are weighted and the formula is used to calculate the impact value. , get the equipment benefit value DS corresponding to the upgraded equipment; where d1, d2, d3, and d4 represent the weighted impact factors corresponding to the cost impact value, equipment usage time, equipment maintenance times, and maintenance frequency impact value, respectively;

[0093] The cost impact value, equipment usage time, equipment maintenance times, maintenance frequency impact value, and equipment benefit value are marked as benefit analysis results.

[0094] It should be noted that by obtaining information such as the equipment purchase cost, daily operation cost and daily maintenance cost through cost-benefit analysis, we can fully understand the cost investment of the equipment throughout its life cycle. By accurately grasping these costs, we can provide a strong basis for the company's cost control and budget planning.

[0095] Setting the upper-level upgrade equipment of the current equipment and calculating the cost difference can help enterprises evaluate the potential benefits of equipment upgrades. The cost impact value DS1 obtained by weighted calculation of the cost difference can intuitively reflect the cost advantages or disadvantages of the upgraded equipment. Enterprises can use this value to determine whether it is worthwhile to upgrade the equipment, thereby achieving cost optimization while ensuring production efficiency;

[0096] Obtaining the equipment installation time and calculating the equipment usage time DS2 can measure the service life and depreciation of the equipment. The setting of the equipment usage time zone and the record of the equipment maintenance times DS3 can help enterprises understand the equipment usage frequency and maintenance needs. By analyzing the maintenance time and calculating the maintenance frequency impact value DS4, the regularity and cost-effectiveness of equipment maintenance can be further evaluated.

[0097] The equipment benefit value DS is obtained by weighting the cost impact value, equipment usage time, equipment maintenance times and maintenance frequency impact value. The impact of multiple factors on equipment benefits is comprehensively considered. The equipment benefit value can serve as an important reference for enterprise decision-making and help enterprises make more scientific and reasonable choices in equipment management and upgrading.

[0098] Finally, the cost impact value, equipment usage time, equipment maintenance times, maintenance impact value, and equipment benefit value are marked as benefit analysis results, providing enterprises with comprehensive and detailed equipment cost-benefit information, which helps enterprises maximize economic benefits and achieve sustainable development.

[0099] In the present application, corresponding operations are performed according to the signaling corresponding to the result, specifically: when receiving the abnormal signaling corresponding to the equipment analysis result, the equipment operating parameters are adjusted according to the equipment evaluation value in the equipment analysis result; it should be noted that adjusting the equipment operating parameters according to the equipment evaluation value can realize real-time dynamic optimization of the equipment, can correct the abnormal operation state of the equipment in time, avoid further deterioration of the problem, and improve the operation efficiency and stability of the equipment. For example, when the equipment evaluation value shows that a certain parameter deviates too much, the system can automatically adjust the relevant parameters to restore the equipment to normal operation as soon as possible;

[0100] When receiving the abnormal signaling corresponding to the fault analysis result, the early warning notification is triggered, and the corresponding fault analysis result and the number and location of the equipment are sent to the fault maintenance team. It should be noted that triggering the early warning notification can greatly shorten the fault response time. The maintenance team can quickly locate the faulty equipment and understand the specific situation of the fault, so as to formulate maintenance plans more efficiently, reduce equipment downtime, and reduce production losses.

[0101] When receiving abnormal signaling corresponding to the benefit analysis results, the benefit analysis results and the notification of recommended equipment replacement or upgrade are sent to the maintenance team; it should be noted that after the maintenance team receives the benefit analysis results and the notification of recommended equipment replacement or upgrade, the maintenance team can evaluate the economic performance of the equipment based on the benefit analysis results and determine whether equipment replacement or upgrade is needed to improve the company's economic benefits and competitiveness.

[0102] In this application, the data processing center also includes a remote communication module, a data storage module, a display access module, and a user registration module;

[0103] The remote communication module is used to realize data exchange between various modules in the system and allows interaction with external devices, software platforms or user terminals;

[0104] A data storage module, used to receive and store the operating data output by the electrical data acquisition module and the analysis results output by the data processing center;

[0105] A display access module, used for displaying and accessing the data stored in the data storage module;

[0106] The user registration module is used to submit the user's registration information and generate an authorized login account for the successfully registered registration information; the authorized login account is used to log in to the data processing center.

[0107] It should be noted that the remote communication module ensures efficient data exchange between various modules in the system, so that the electrical data acquisition module, intelligent control module, etc. can share information in a timely manner and work together. At the same time, it allows interaction with external devices, software platforms or user terminals, greatly expanding the application scope and convenience of the system. For example, managers can access the system anytime and anywhere through external devices such as mobile phones and tablets to understand the operating status of the electrical system and achieve remote monitoring and management;

[0108] The data storage module provides a safe and reliable storage place for the operation data and analysis results of the electrical system;

[0109] The display access module enables the data stored in the data storage module to be displayed to the user intuitively. The user can conveniently view the operation data, analysis results and other information of various equipment in the electrical system through this module, and timely grasp the operation status of the system. At the same time, it is convenient for the user to access specific data according to their needs, conduct in-depth analysis and research, and improve the utilization efficiency of data and the pertinence of management;

[0110] The user registration module provides protection for the security and personalized management of the system. Users submit registration information, and the system generates an authorized login account for the successfully registered information. Only users with valid accounts can log in to the data processing center, preventing unauthorized access and data leakage.

[0111] In the present application, the display access module includes an interactive report generator for allowing users to customize and generate reports according to their needs; the interactive report generator has a drag-and-drop interface for specific data fields, predefined time periods or custom date ranges, and the format and layout of the report.

[0112] It should be noted that by allowing users to customize and generate reports according to their needs, users can obtain the required information based on their specific purposes and concerns. Different users may be interested in different aspects of the electrical system. For example, managers may pay more attention to the overall equipment operation status and cost-benefit analysis results, while technicians may focus more on fault analysis and parameter change trends. By customizing reports, users can focus on the content they care about and improve the efficiency and pertinence of information acquisition.

[0113] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the present invention and are not intended to limit the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. An electrical automation management system based on big data, characterized in that: Including electrical data acquisition module, data processing center, and intelligent control module; The electrical data acquisition module is responsible for collecting the operating data of various equipment in the electrical system; the various equipment includes power generation equipment, transmission equipment, distribution equipment, power consumption equipment, control and protection equipment, and energy storage equipment; Data processing center, including equipment monitoring module, fault detection module, and cost-benefit analysis module; The equipment monitoring module is used to conduct early warning analysis on the operating data of various equipment in the electrical system, specifically: Set the standard parameter value of any parameter in the corresponding equipment operation data of various types of equipment in the electrical system; subtract the standard parameter value corresponding to any parameter value in the corresponding equipment operation data from the standard parameter value corresponding to the parameter to obtain the standard deviation value corresponding to the parameter; According to the monitoring time zone of each device, the corresponding device is set, and the change line graph of the parameter is constructed. The standard deviation value of the parameter in the monitoring time zone and its corresponding collection time are input into the corresponding change line graph, and the position of the standard deviation value in the change line graph is marked as the parameter deviation point; the adjacent parameter deviation points are connected to obtain the parameter deviation line; the adjacent parameter deviation lines are connected to obtain the parameter deviation line; Calculate the slope of the parameter deviation line, mark the positive slope as a positive slope value, and mark the negative slope as a negative slope value; sum up all the positive slope values ​​and negative slope values ​​in the monitoring time zone to obtain the total positive slope value and the total negative slope value; perform weighted calculation on the total positive slope value and the total negative slope value to obtain the slope wave value; calculate the mean and standard deviation of the standard deviation value in the monitoring time zone to obtain the standard deviation mean F3 and the standard deviation fluctuation value; Set the standard deviation allowable range, match the standard deviation value of the parameter with the standard deviation allowable range, if the standard deviation value of the parameter is not within the standard deviation allowable range, mark the generation time of the parameter as the abnormal time; calculate the time difference of adjacent abnormal times in the monitoring time zone to obtain the abnormal interval duration; calculate the standard deviation of the abnormal interval duration in the monitoring time zone to obtain the asynchronous fluctuation value; perform weighted processing on the standard deviation value, ramp value, standard deviation mean, standard deviation fluctuation value and asynchronous fluctuation value to obtain the equipment evaluation value; mark the standard deviation value, ramp value, standard deviation mean, standard deviation fluctuation value, asynchronous fluctuation value, equipment evaluation value and the corresponding change line graph as the equipment analysis result; The fault detection module is used to perform fault analysis based on the equipment analysis results combined with the equipment's historical operation data. Specifically: Identify historical operation data to obtain the operation data of any device in the monitoring time zone before any fault, and mark the operation data of the monitoring time zone before the fault as the historical fault monitoring time zone; identify the parameter deviation line in the parameter change line graph of the operation data of the current monitoring time zone of the device, and perform similarity calculation on the parameter deviation line of the current monitoring time zone and the parameter deviation line in any historical fault monitoring time zone to obtain the line similarity value; perform weighted processing on the line similarity values ​​of all historical fault monitoring time zones to obtain the line similarity impact value; Calculate the difference between the corresponding parameters of the current equipment analysis result of the equipment and the equipment analysis result corresponding to any historical fault monitoring time zone to obtain the historical analysis evaluation difference corresponding to the parameter; perform weighted calculation on the broken line similarity influence value and the historical analysis evaluation difference of all parameters in the operation data to obtain the fault prediction value; mark the broken line similarity influence value, the historical analysis evaluation difference and the fault prediction value corresponding to the parameter as the fault analysis result; The cost-benefit analysis module is used to perform cost-benefit analysis on various types of equipment in the electrical system, specifically: Obtain the cost information of any device, including purchase cost, daily operation cost, and daily maintenance cost; set the upper-level upgrade device corresponding to the current device, obtain the cost information of the upgrade device, calculate the difference between the cost information of the upgrade device and the corresponding parameters in the cost information of the current device, and obtain the cost difference corresponding to the parameter; perform weighted calculation on the cost difference of all parameters in the cost information to obtain the cost impact value corresponding to the upgrade device; Get the installation time of the current device, calculate the difference between the installation time and the current time to get the device usage time; mark the time zone between the installation time and the current time as the device usage time zone, and record the number of device maintenance times within the device usage time zone; record the maintenance time of each device maintenance, calculate the time difference between adjacent maintenance times, and get the maintenance time difference value; calculate the standard deviation of the maintenance time difference value within the device usage time zone to get the maintenance frequency impact value; The cost impact value, equipment usage time, equipment maintenance times, and maintenance frequency impact value are weighted to obtain the equipment benefit value corresponding to the upgraded equipment; the cost impact value, equipment usage time, equipment maintenance times, maintenance frequency impact value, and equipment benefit value are marked as benefit analysis results; The intelligent control module is used to receive the analysis results output by the data processing center, which include equipment, fault and benefit analysis results; set an abnormal threshold for any result in the analysis, compare each analysis result with the corresponding abnormal threshold, and generate an abnormal signal corresponding to the result if any result is greater than or equal to the abnormal threshold; and perform corresponding operations according to the signal corresponding to the result.

2. The electrical automation management system based on big data according to claim 1 is characterized in that: Execute corresponding operations according to the signaling corresponding to the result, specifically: when receiving the abnormal signaling corresponding to the device analysis result, adjust the device operation parameters according to the device evaluation value in the device analysis result; When receiving the abnormal signaling corresponding to the fault analysis result, trigger the early warning notification, and send the corresponding fault analysis result and the number and location of the equipment to the fault maintenance team; When receiving an abnormal signal corresponding to the benefit analysis result, the benefit analysis result and the recommended replacement or upgrade notification of the equipment are sent to the maintenance team.

3. The electrical automation management system based on big data according to claim 1 is characterized in that: The data processing center also includes a remote communication module, a data storage module, a display access module, and a user registration module; The remote communication module is used to realize data exchange between various modules in the system and allows interaction with external devices, software platforms or user terminals; A data storage module, used to receive and store the operating data output by the electrical data acquisition module and the analysis results output by the data processing center; A display access module, used for displaying and accessing the data stored in the data storage module; User registration module, used to submit user registration information and generate an authorized login account for the successfully registered registration information; The authorized login account is used to log in to the data processing center.

4. The electrical automation management system based on big data according to claim 3 is characterized in that: The Display Access Module includes an interactive report builder that allows users to customize and generate reports based on their needs; the interactive report builder has a drag-and-drop interface for specific data fields, predefined time periods or custom date ranges, and the format and layout of the report.