Control method for paving equipment, paving equipment and storage medium

The camera collects images and uses a robotic arm to install photovoltaic panels, which solves the problems of low installation efficiency and high cost of existing photovoltaic panels, and achieves efficient and accurate photovoltaic panel paving, adapting to a variety of climatic conditions.

CN118707885BActive Publication Date: 2024-11-08SHENZHEN KAIZHICHENG INTELLIGENT EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411190056.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-11-08
Estimated Expiration
2044-08-28

AI Technical Summary

Technical Problem

The existing photovoltaic panels are inefficient and costly, and are difficult to achieve efficient and automated installation due to climatic conditions.

Method used

Images are collected through the camera, and the control robot arm moves the photovoltaic panel to the target area of ​​the paving rack. The counter and mobile devices are used to achieve accurate positioning and installation of the photovoltaic panels, improving installation efficiency.

Benefits of technology

It improves the accuracy and efficiency of photovoltaic panel installation, reduces the cost and time of manual installation, and adapts to different climatic conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118707885B_ABST
    Figure CN118707885B_ABST
Patent Text Reader

Abstract

The present application discloses a control method for paving equipment, paving equipment and storage medium, the method comprising: controlling a camera to capture a first image, using the first image as a target image; controlling a mobile device to move from a current position to a gripping area of ​​a carrier; controlling a mobile device to move a photovoltaic panel to a paving frame based on the target image; controlling a first counter to count the number of photovoltaic panels on the paving frame; when the count value of the first counter is less than M, executing the step of controlling the mobile device to move from the current position to the gripping area of ​​the carrier; when the count value of the first counter is M, controlling the first counter to be cleared, controlling the camera to capture a second image, using the second image as a target image, and executing the step of controlling the mobile device to move from the current position to the gripping area of ​​the carrier. By implementing the embodiments of the present application, the paving of M photovoltaic panels can be achieved through the images captured by the camera, which can improve the accuracy and efficiency of positioning.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of artificial intelligence technology, and in particular to a control method for paving equipment, paving equipment and a storage medium. Background Art

[0002] Photovoltaic is the abbreviation of solar photovoltaic power generation system, which is a new power generation system that uses the photovoltaic effect of solar cell semiconductor materials to directly convert solar radiation energy into electrical energy. Solar photovoltaic panel components are a power generation device that generates direct current when exposed to sunlight. Photovoltaic components can be made into different shapes, and the components can be connected to each other to generate more electricity.

[0003] Most of the existing photovoltaic panels are installed manually, but this installation method is inefficient, costly, and affected by climatic conditions. Therefore, how to improve the installation efficiency of photovoltaic panels is a technical problem to be solved by those skilled in the art. Summary of the invention

[0004] The embodiments of the present disclosure provide a control method for paving equipment, paving equipment and storage medium, which can realize the paving of M photovoltaic panels through images collected by a camera, thereby improving the accuracy of positioning.

[0005] In a first aspect, an embodiment of the present disclosure provides a control method for a paving device, wherein the paving device comprises a mechanical arm, a carrier, a first counter and a second counter, wherein the mechanical arm comprises a moving device and a camera, and the carrier is used to carry N photovoltaic panels, wherein the method comprises: controlling the moving device to move to an initial position of a paving frame; controlling the camera to capture a first image, and taking the first image as a target image, wherein the first image comprises an image of the initial position; controlling the moving device to move from a current position to a grabbing area of ​​the carrier, and iteratively performing the following steps:

[0006] Based on the target image, the mobile device is controlled to move the photovoltaic panel in the grasping area to the target area of ​​the photovoltaic panel in the laying frame; the first counter and the second counter are controlled to count the number of the photovoltaic panels moved to the laying frame; when the count value of the first counter is less than M, the step of controlling the mobile device to move from the current position to the grasping area of ​​the carrier is executed; when the count value of the first counter is M, the first counter is controlled to be cleared, and the camera is controlled to capture a second image, the second image includes the image of the last photovoltaic panel that has been laid on the laying frame, and the second image is used as the target image, and the step of controlling the mobile device to move from the current position to the grasping area of ​​the carrier is executed; when the count value of the second counter is N, the iteration is ended.

[0007] In one possible implementation, the method includes: determining a position information set of the initial position based on the first image, the position information set including position information of a target area of ​​a first photovoltaic panel, the first photovoltaic panel being the first photovoltaic panel among the N photovoltaic panels to be laid on the laying frame; determining a target area of ​​the second photovoltaic panel based on the target area of ​​the first photovoltaic panel, a relative position relationship between the first photovoltaic panel and the second photovoltaic panel, and a size of the photovoltaic panel, the second photovoltaic panel being a photovoltaic panel other than the first photovoltaic panel among the first M photovoltaic panels of the N photovoltaic panels; generating an exit path for the second photovoltaic panel based on the target area of ​​the second photovoltaic panel and the grasping area; and controlling the mobile device to move the second photovoltaic panel in the grasping area to the target area of ​​the second photovoltaic panel in the laying frame according to the exit path.

[0008] In a possible implementation, the paving frame includes a first-layer paving frame and a second-layer paving frame, the first-layer paving frame includes a target area of ​​the first photovoltaic panel, the second-layer paving frame includes a target area of ​​the second photovoltaic panel, and the second-layer paving frame is higher than the first paving frame; the mechanical arm also includes a moving frame, and the moving frame is movably connected to the moving device; the moving path includes a first sub-path and a second sub-path, and the method also includes:

[0009] Control the mobile device to move the second photovoltaic panel in the grabbing area to the first position along the first sub-path; control the mobile frame to move along the second sub-path to extend the moving distance of the second photovoltaic panel, so that the mobile frame moves the second photovoltaic panel from the first position to the target area of ​​the second layer of paving frame.

[0010] In one possible implementation, the robotic arm also includes a clamping member, and the method includes: generating a return path for the mobile device based on a target area of ​​the second photovoltaic panel and the grasping area; controlling the mobile device to move from the target area of ​​the second photovoltaic panel to the grasping area along the return path, wherein the return path includes a rotation path, and the rotation path is used to rotate the clamping member according to a preset angle to shorten the moving distance of the mobile device.

[0011] In a possible implementation, the method also includes: controlling the camera to capture a third image, the third image including the image of the photovoltaic panel in the laying frame; determining the placement area of ​​the photovoltaic panel based on the third image; obtaining a deviation value between the placement area of ​​the photovoltaic panel and the target area of ​​the photovoltaic panel; if the deviation value is greater than a preset threshold, controlling the clamp to grab the photovoltaic panel from the placement area of ​​the photovoltaic panel; controlling the mobile frame to move the photovoltaic panel to the target area of ​​the photovoltaic panel based on the deviation value; and controlling the clamp to place the photovoltaic panel in the target area of ​​the photovoltaic panel.

[0012] In a possible implementation, the carrier includes a lifting device, and the method further includes: controlling the lifting device to lift the photovoltaic panel in the carrier to the gripping area.

[0013] In a possible implementation, the method further includes: controlling the camera to capture a reference image; if the reference image includes a specified image, using the reference image as the first image; if the reference image does not include the specified image, executing the step of controlling the camera to capture a reference image.

[0014] In a possible implementation, the designated image is a coded image, and the method further includes: decoding the coded image to obtain decoding information; and when the decoding information successfully matches preset information, determining that the reference image includes the designated image.

[0015] In a second aspect, an embodiment of the present disclosure provides a paving device, including a processor, a mechanical arm connected to the processor, a carrier, a first counter, and a second counter, wherein the mechanical arm includes a moving device and a camera, and the carrier is used to carry N photovoltaic panels;

[0016] The processor is used to control the mobile device to move to the initial position of the laying frame; control the camera to capture a first image, and use the first image as a target image, wherein the first image includes the image of the initial position; control the mobile device to move from the current position to the grasping area of ​​the carrier, and iteratively perform the following steps: based on the target image, control the mobile device to move the photovoltaic panel in the grasping area to the target area of ​​the photovoltaic panel in the laying frame; control the first counter and the second counter to count the number of the photovoltaic panels moved to the laying frame; when the count value of the first counter is less than M, perform the step of controlling the mobile device to move from the current position to the grasping area of ​​the carrier; when the count value of the first counter is M, control the first counter to be cleared, control the camera to capture a second image, wherein the second image includes the image of the last photovoltaic panel that has been laid on the laying frame, and use the second image as the target image, and perform the step of controlling the mobile device to move from the current position to the grasping area of ​​the carrier; when the count value of the second counter is N, end the iteration.

[0017] In one possible implementation, the processor is specifically used to determine a position information set of the initial position based on the first image, the position information set including position information of a target area of ​​a first photovoltaic panel, the first photovoltaic panel being the first photovoltaic panel among the N photovoltaic panels installed on the installing frame; determining a target area of ​​the second photovoltaic panel based on the target area of ​​the first photovoltaic panel, a relative position relationship between the first photovoltaic panel and the second photovoltaic panel, and a size of the photovoltaic panel, the second photovoltaic panel being a photovoltaic panel other than the first photovoltaic panel among the first M photovoltaic panels of the N photovoltaic panels; generating an exit path for the second photovoltaic panel based on the target area of ​​the second photovoltaic panel and the grasping area; and controlling the mobile device to move the second photovoltaic panel in the grasping area to the target area of ​​the second photovoltaic panel in the installing frame according to the exit path.

[0018] In one possible implementation, the laying frame includes a first layer of laying frame and a second layer of laying frame, the first layer of laying frame includes a target area of ​​the first photovoltaic panel, the second layer of laying frame includes a target area of ​​the second photovoltaic panel, and the second layer of laying frame is higher than the first layer of laying frame; the robotic arm also includes a moving frame, and the moving frame is movably connected to the mobile device; the removal path includes a first sub-path and a second sub-path, and the processor is also used to control the mobile device to move the second photovoltaic panel in the grasping area to the first position according to the first sub-path; control the mobile frame to move according to the second sub-path to extend the moving distance of the second photovoltaic panel, so that the mobile frame moves the second photovoltaic panel from the first position to the target area of ​​the second layer of laying frame.

[0019] In one possible implementation, the robotic arm also includes a clamping member, and the processor is specifically used to generate a return path for the mobile device based on the target area of ​​the second photovoltaic panel and the grasping area; control the mobile device to move from the target area of ​​the second photovoltaic panel to the grasping area along the return path, and the return path includes a rotation path, and the rotation path is used to rotate the clamping member according to a preset angle to shorten the moving distance of the mobile device.

[0020] In a possible implementation, the carrier includes a lifting device, and the processor is further configured to control the lifting device to lift the photovoltaic panel in the carrier to the gripping area.

[0021] In a possible implementation, the processor is also used to control the camera to capture a third image, wherein the third image includes an image of the photovoltaic panel in the laying frame; determine the placement area of ​​the photovoltaic panel based on the third image; obtain a deviation value between the placement area of ​​the photovoltaic panel and the target area of ​​the photovoltaic panel; if the deviation value is greater than a preset threshold, control the clamp to grab the photovoltaic panel from the placement area of ​​the photovoltaic panel; control the mobile frame to move the photovoltaic panel to the target area of ​​the photovoltaic panel based on the deviation value; and control the clamp to place the photovoltaic panel in the target area of ​​the photovoltaic panel.

[0022] In a possible implementation, the processor is also used to control the camera to capture a reference image; if the reference image includes a specified image, the reference image is used as the first image; if the reference image does not include the specified image, the step of controlling the camera to capture a reference image is executed.

[0023] In a possible implementation, the designated image is a coded image, and the processor is further configured to decode the coded image to obtain decoded information; when the decoded information successfully matches preset information, it is determined that the reference image includes the designated image.

[0024] In a third aspect, an embodiment of the present disclosure provides a paving device, comprising a processor and a memory, wherein the memory is used to store computer-readable instructions, and the processor is used to call the instructions stored in the memory to execute the steps in the method described in the first aspect.

[0025] Optionally, the paving equipment further includes a robotic arm, a carrier, a first counter and a second counter connected to the processor.

[0026] In a fourth aspect, an embodiment of the present disclosure provides a chip, comprising a data interface and a processor, wherein the processor is used to execute the method in the above-mentioned first aspect and any possible implementation manner of the above-mentioned first aspect.

[0027] In a fifth aspect, an embodiment of the present disclosure provides a computer-readable storage medium, which stores a computer program, and the computer program includes program instructions, which, when executed by a processor, enable the processor to execute the method of the above-mentioned first aspect and any possible implementation method of the above-mentioned first aspect.

[0028] In a sixth aspect, an embodiment of the present disclosure provides a computer program product, which includes program instructions, and when the program instructions are executed by a processor, the processor executes the method of the first aspect and any possible implementation manner of the first aspect.

[0029] Implementing the embodiments of the present disclosure has the following beneficial effects:

[0030] In the case that all N photovoltaic panels in the carrier have not been moved to the laying frame, the mobile device is controlled to move the first M photovoltaic panels in the carrier to the target area of ​​the photovoltaic panel in the laying frame one by one based on the image of the initial position captured by the camera. Then, the camera is controlled to capture a new image every time M photovoltaic panels are laid, and the mobile device is controlled to move the last M photovoltaic panels to the target area of ​​the photovoltaic panel in the laying frame one by one based on the image until the photovoltaic panels in the carrier are laid. In this way, the laying of M photovoltaic panels can be achieved through the images captured by the camera, which can improve the accuracy and efficiency of positioning. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0032] Figure 1 A schematic diagram of the architecture of a paving system provided in an embodiment of the present application;

[0033] Figure 2 A schematic diagram of the structure of a paving device provided in an embodiment of the present application;

[0034] Figure 3 A schematic diagram of the structure of a mechanical arm provided in an embodiment of the present application;

[0035] Figure 4 A flow chart of a control method for paving equipment provided in an embodiment of the present application. DETAILED DESCRIPTION

[0036] The terms "first" and "second" in the specification, claims and drawings of this application are only used to distinguish different objects, rather than to describe a specific order. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not limited to the listed steps or units, but may optionally include steps or units that are not listed, or may optionally include other steps or units that are inherent to these processes, methods, products or devices.

[0037] "At least one (item)" means one or more, "more than one" means two or more, "at least two (items)" means two or three and more than three, and "and / or" is used to describe the association relationship of associated objects, indicating that three relationships may exist. For example, "A and / or B" can mean: only A exists, only B exists, and A and B exist at the same time, where A and B can be singular or plural. The character " / " generally indicates that the previous and next associated objects are in an "or" relationship. "At least one of the following" or similar expressions refers to any combination of these items. For example, at least one of a, b or c can mean: a, b, c, "a and b", "a and c", "b and c", or "a and b and c".

[0038] In the embodiment of the present application, the paving device is used to move the photovoltaic panel to the target area of ​​the photovoltaic panel in the paving frame. Specifically, it can be applied to the cleaning scene of the photovoltaic panel, the replacement scene and other scenes of moving the photovoltaic panel, which are not limited here.

[0039] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0040] Please refer to Figure 1 , Figure 1 This is a schematic diagram of the architecture of a paving system provided in an embodiment of the present application. Figure 1 As shown, the paving system may include a paving device 10, a paving frame 20 and a photovoltaic panel 30. The paving device 10 may be used as follows Figure 1 The form shown is a vehicle, the power system of the vehicle can be an electric system, a fuel system, a hybrid system, etc. The present application does not limit the power type of the vehicle, and does not limit the driving method of the paving equipment 10.

[0041] The driving method of the paving equipment 10 is given below. Figure 1 Two forms not shown, of which:

[0042] Form 1: A driver for operating the power system is provided inside the paving device 10, and the paving device 10 is driven to move by a handheld driver or an unmanned driving strategy.

[0043] Form 2: A remote controller adapted to the paving device 10 is provided so as to control the movement of the paving device 10 through the remote controller of the paving device 10 .

[0044] Optionally, the remote controller may be a physical remote controller, on which buttons related to the operation type of the paving device 10 are arranged. For example, movement keys for controlling the paving device to turn left, turn right, move forward, move backward, etc. Another example is buttons for controlling the operation of devices such as the mechanical arm 102 and the carrier 101, etc. This application does not limit the button types of the remote controller.

[0045] Optionally, the remote controller may be a virtual remote controller of the electronic device.

[0046] Among them, the electronic devices may be smart phones, tablet computers, laptop computers, PDAs, mobile internet devices (MIDs), wearable devices (such as smart watches, smart bracelets, etc.), smart voice interaction devices, smart home appliances (such as smart TVs, etc.) and vehicle-mounted devices, etc., without limitation here.

[0047] The electronic device may be a server, which may be an independent physical server, or a server cluster or distributed system composed of multiple physical servers, or a cloud server that provides basic cloud computing services such as cloud services, cloud databases, cloud computing, cloud functions, cloud storage, network services, cloud communications, middleware services, domain name services, security services, content delivery networks (CDNs), and big data and artificial intelligence platforms, without limitation.

[0048] The virtual remote controller may be provided with virtual buttons for the above-mentioned related functions, or may be provided with trigger gestures for related functions, etc., and the present application does not limit the implementation of the virtual remote controller. It can be understood that by using the remote controller to trigger the paving device 10 to operate, the control efficiency can be improved.

[0049] It should be noted that the above two forms are only examples. In fact, there may be other forms of devices to drive the paving device 10 to move.

[0050] In the embodiment of the present application, the paving device 10 is used to place the photovoltaic panel 30 on the paving frame 20. The paving device 10 can also be used to move the photovoltaic panel 30 in the paving frame 20 to other locations, which is not limited here. The paving frame 20 is used to place at least one photovoltaic panel, and the placement area corresponding to the paving frame 20 includes the target area of ​​each photovoltaic panel 30.

[0051] The present application does not limit the location of the target area of ​​the photovoltaic panel 30, which can be determined according to a preset paving order. The preset paving order can be used to determine the placement position of the photovoltaic panel 30 on the paving frame 20. The paving order can be to pave the photovoltaic panels 30 from left to right, or to pave the photovoltaic panels 30 from right to left; or in the case where the paving frame 20 includes multiple layers of paving frames, the photovoltaic panels 30 can be laid layer by layer from left to right, and after the paving of one layer of paving frames is completed, the photovoltaic panels 30 of the next layer can be laid; or the photovoltaic panels 30 can be laid layer by layer from right to left, and after the paving of one layer of paving frames is completed, the photovoltaic panels 30 of the next layer can be laid; or one photovoltaic panel 30 can be laid on each layer and then one photovoltaic panel 30 can be laid on the next layer, etc.

[0052] Optionally, at least two paving sequences are included. For example, the photovoltaic panels 30 of the upper paving frame are paved from left to right, and the photovoltaic panels 30 of the lower paving frame are paved from right to left, so that the upper paving frame can be paved first and then the lower paving frame, or the lower paving frame can be paved first and then the upper paving frame, which is conducive to improving paving efficiency.

[0053] Optionally, the paving frame 20 can be as follows Figure 1The structure shown includes at least a first-layer paving frame 201 and a second-layer paving frame 202, so that at least two layers of photovoltaic panels can be placed.

[0054] Optionally, the paving frame 20 can be as follows Figure 1 The support member 203 is shown to keep the photovoltaic panel 30 at a certain distance from the ground. The present application does not limit the form of the support member 203, which can be as follows: Figure 1 Shown in upright position, or can be Figure 1 The form of the tripod not shown can also be in the form of wheels, etc. The paving frame 20 in the form of wheels is conducive to movement. The paving frame 20 in the form of a tripod has high stability.

[0055] It should be noted that Figure 1 The structure and number of the devices or apparatuses of the system architecture shown are only examples, and the embodiments of the present application are not limited thereto. For example, an auxiliary vehicle may also be included to assist the photovoltaic panel 30 in being placed in the paving frame 20. For the sake of simplicity, they are not described one by one in the drawings.

[0056] The structure of the paving device 10 and the working method of the paving device 10 are described in detail below.

[0057] Please refer to Figure 2 , Figure 2 Schematic diagram of the structure of a paving device provided in an embodiment of the present application. Figure 2 As shown, the paving equipment 10 may include a carrier 101, a mechanical arm 102, a first counter 103, a second counter 104, and the like.

[0058] In the embodiment of the present application, the carrier 101 is used to carry at least one photovoltaic panel 30 , and specifically, at least one photovoltaic panel 30 can be carried in a gripping area of ​​the carrier 101 .

[0059] Optionally, the carrier 101 may be Figure 2 The figure shows a first panel 1011, a second panel 1012, a third panel 1013 and a fourth panel 1014. The first panel 1011 and the second panel 1012 are arranged opposite to each other, and the third panel 1013 and the fourth panel 1014 are arranged opposite to each other.

[0060] Optionally, at least one of the first panel 1011 and the second panel 1012 moves horizontally relative to the other panel, and at least one of the third panel 1013 and the fourth panel 1014 moves horizontally relative to the other panel. For example, the first panel 1011 is fixed, the second panel 1012 moves horizontally relative to the first panel 1011, and the third panel 1013 and the fourth panel 1014 move horizontally relative to the other panel, respectively, to surround (or clamp) the photovoltaic panel 30, thereby preventing the photovoltaic panel 30 from falling when moving.

[0061] Optionally, the carrier 101 may also include Figure 2 The lifting device not shown is used to lift the photovoltaic panel 30 of the carrier 101 to the gripping area of ​​the carrier 101, so that the robot arm 102 can move the photovoltaic panel 30 from the gripping area to other areas, such as the target area of ​​the photovoltaic panel 30 in the paving frame 20.

[0062] The lifting device may be a combination of a motor and a base plate, similar to the function of an elevator. Photovoltaic panels 30 are stacked on the base plate, and the motor is used to lift the photovoltaic panels 30 on the base plate to a preset height. The preset height may be the thickness of the photovoltaic panel 30, and the area corresponding to the preset height is called the grabbing area. In this way, each time a photovoltaic panel 30 is grabbed, the motor lifts the base plate by the thickness of a photovoltaic panel 30, so that the next photovoltaic panel 30 can be grabbed in the grabbing area.

[0063] In other implementations, the photovoltaic panel 30 may be moved in other ways. For example, the carrier 101 may also include Figure 2 A not shown transport device (such as a conveyor belt) is used to move the photovoltaic panel 30 of the carrier 101 to the gripping area of ​​the carrier 101 .

[0064] The present application does not limit the number of photovoltaic panels 30 carried in the carrier 101. Optionally, the first counter 103 and / or the second counter 104 may be connected to a weighing device. The weighing device may be arranged at the bottom of the carrier 101, and the number of photovoltaic panels 30 may be determined by measuring the weight of the photovoltaic panels 30 in the carrier 101, and the number of installed photovoltaic panels 30 may be determined by the number of remaining photovoltaic panels 30.

[0065] In the embodiment of the present application, the robot arm 102 can be as follows Figure 2 As shown, the carrier 101 is arranged in the middle position of the paving device 10. Figure 2 As shown, it is arranged at both ends of the paving device 10. Or Figure 2 In a form not shown in the figure, for example, the mechanical arm 102 can be arranged at both ends of the paving equipment 10, and the carrier 101 can be arranged at the middle position of the paving equipment 10. For another example, the mechanical arm 102 and the carrier 101 are separately arranged on the body of the paving equipment 10, or the mechanical arm 102 and the carrier 101 are connected and arranged on the body of the paving equipment 10.

[0066] The present application does not limit the number of mechanical arms 102 and carriers 101. For example, the number of mechanical arms 102 is 1, and the number of carriers 101 is 2. In this way, while the photovoltaic panel 30 of one carrier 101 is used for mounting, the photovoltaic panel 30 in another carrier 101 is used for dismounting, which can improve work efficiency.

[0067] Optionally, the paving device 10 may further include Figure 2 The support member, not shown, is used to support the robot arm 102, facilitate the movement of the robot arm 102, and prevent the robot arm 102 from hitting other devices and being damaged when moving. Other devices may include a protective shell including a power system.

[0068] Please refer to Figure 3 , Figure 3 This is a schematic diagram of the structure of a mechanical arm provided in an embodiment of the present application. Figure 3 As shown, the robot arm 102 includes a mobile device 1021 and a camera 1022 provided on the mobile device 1021. The camera 1022 is used to capture images. Specifically, the first image may be captured at a reference position, or the second image may be captured when the count value of the counter is reset to zero. The embodiment of the present application does not limit the type, position, and number of the camera 1022, and the number may be at least one.

[0069] In the embodiment of the present application, the mobile device 1021 is used to move the position, specifically, it can be moved to the reference position so that the camera 1022 can collect the first image of the reference position, or it can move the photovoltaic panel 30 to the target position. For example, the photovoltaic panel 30 in the carrier 101 is moved to the target area of ​​the photovoltaic panel 30 in the paving frame 20.

[0070] Optionally, the mobile device 1021 may be Figure 3 As shown, it includes a mechanical upper arm 10211 , a mechanical lower arm 10212 , a first rotating shaft 10213 and a second rotating shaft 10214 .

[0071] The first rotating shaft 10213 connects the mechanical upper arm 10211 and the paving device 10, and is used to rotate the mechanical upper arm 10211 so that the mechanical upper arm 10211 rotates relative to the paving device 10. The second rotating shaft 10214 connects the mechanical upper arm 10211 and the mechanical lower arm 10212, and is used to rotate the mechanical lower arm 10212 so that the mechanical lower arm 10212 rotates relative to the mechanical upper arm 10211. The path formed by the first rotating shaft 10213 rotating the mechanical upper arm 10211 and / or the second rotating shaft 10214 rotating the mechanical lower arm 10212 can be called a moving path.

[0072] Optionally, the moving path of the mobile device 1021 from the photovoltaic panel 30 in the gripping area of ​​the carrier 101 to the target area of ​​the photovoltaic panel 30 in the laying frame 20 is called the moving path, and the moving path of the mobile device 1021 from the target area to the gripping area in the carrier 101 is called the moving path. The directions of the moving path and the moving path of the same photovoltaic panel 30 can be opposite to achieve a return to the original path.

[0073] Optionally, the robot arm 102 may be Figure 3 As shown, it also includes a clamping member 1023 connected to the moving device 1021. The clamping member 1023 is used to grab the photovoltaic panel 30, and can also be used to place the photovoltaic panel 30. For example, the clamping member 1023 grabs the photovoltaic panel 30 from the grabbing area of ​​the carrier 101, maintains the grabbing state until the photovoltaic panel 30 reaches its target area, and places the photovoltaic panel 30 in its target area.

[0074] The clamping member 1023 may be Figure 3 As shown, it includes a plurality of suction cups 10231, and the photovoltaic panel 30 is grasped by the suction force of the suction cups 10231. Alternatively, the clamping member 1023 may include a plurality of magnets, and the photovoltaic panel 30 is attracted by the magnetic force of the magnets, etc., which is not limited here.

[0075] Optionally, the robot arm 102 can also Figure 3 As shown, it includes a mobile frame 1024 connected to the mobile device 1021. Figure 3 In the figure, the movable frame 1024 can be connected to the clamp 1023 to fix the movable clamp 1023 relative to the movable device 1021 so that the clamp 1023 can be moved to other positions, thereby extending the moving distance of the photovoltaic panel 30 grasped by the clamp 1023.

[0076] Optionally, the robot arm 102 can also Figure 3 As shown, it includes a turntable 1025 connected to the mobile device 1021. Figure 3 In the embodiment, the turntable 1025 can be connected to the clamp 1023 and the movable frame 1024 to rotate the angle of the clamp 1023, for example, rotate 180 degrees, so that the clamp 1023 can grab the photovoltaic panel 30 from another direction.

[0077] Optionally, the outgoing path and the returning path may include a plurality of sub-paths, and the direction of each sub-path may be different.

[0078] Take the first photovoltaic panel and the second photovoltaic panel in the photovoltaic panel 30 as an example. The first photovoltaic panel is the first photovoltaic panel 30 installed on the installation frame 20, and the second photovoltaic panel is the photovoltaic panel 30 other than the first photovoltaic panel among the first M photovoltaic panels, that is, the second photovoltaic panel can be understood as the photovoltaic panel after the first photovoltaic panel among the first M photovoltaic panels.

[0079] Optionally, the second-layer paving frame 202 includes the target area of ​​the second photovoltaic panel, and the first-layer paving frame 201 includes the target area of ​​the first photovoltaic panel. The second-layer paving frame 202 is higher than the first-layer paving frame 201. In other words, the paving order of the N photovoltaic panels may be to first pave a photovoltaic panel 30 on the first-layer paving frame of the bottom layer, and then pave the photovoltaic panel 30 on the second-layer paving frame of the upper layer.

[0080] In the embodiment of the present application, the moving path from the gripping area of ​​the carrier 101 to the target area of ​​the first photovoltaic panel in the laying frame 20 is referred to as the first moving path, and the moving path from the target area of ​​the first photovoltaic panel to the gripping area of ​​the carrier 101 is referred to as the first moving path. The moving path from the gripping area of ​​the carrier 101 to the target area of ​​the second photovoltaic panel in the laying frame 20 is referred to as the second moving path, and the moving path from the target area of ​​the second photovoltaic panel to the gripping area of ​​the carrier 101 is referred to as the second moving path.

[0081] Optionally, the first removal path includes a first grabbing path, a first moving path and a first placement path, and the first return path includes a first lifting path and a second moving path; the second removal path includes a second grabbing path, a third moving path and a fourth moving path, and the second return path includes a fifth moving path, a sixth moving path and a rotation path.

[0082] Among them, the first grasping path can be realized by the movement of the second rotating shaft 10214, so that the clamping member 1023 connected to the mechanical lower arm 10212 can grasp the photovoltaic panel 30. The first moving path can be realized by the first rotating shaft 10213, so that the photovoltaic panel 30 grasped by the clamping member 1023 is moved above the target area of ​​the photovoltaic panel 30 in the paving frame 20. The first placement path can be realized by the movement of the second rotating shaft 10214, so that the photovoltaic panel 30 grasped by the clamping member 1023 can be placed in the target area of ​​the photovoltaic panel 30 in the paving frame 20.

[0083] The first lifting path can be realized by the movement of the second rotating shaft 10214, so that the clamping member 1023 can be moved from the target area of ​​the photovoltaic panel 30 in the paving frame 20 to above the target area. The second moving path can be realized by the first rotating shaft 10213, so that the clamping member 1023 can be moved from above the target area of ​​the photovoltaic panel 30 in the paving frame 20 to above the gripping area of ​​the carrier 101.

[0084] The second grasping path can be realized by the movement of the second rotating shaft 10214, so that the clamping member 1023 can grasp the photovoltaic panel 30. The third moving path can be realized by the first rotating shaft 10213, so that the photovoltaic panel 30 grasped by the clamping member 1023 is moved to the vicinity of the target area of ​​the photovoltaic panel 30 in the laying frame 20. The fourth moving path can be realized by the movement of the mobile frame 1024, so as to extend the moving distance of the photovoltaic panel 30 grasped by the clamping member 1023, so that the clamping member 1023 can be placed in the target area of ​​the photovoltaic panel 30 in the laying frame 20. In this way, when the second-layer laying frame 202 is higher than the first-layer laying frame 201, the mobile frame 1024 can be moved relative to the mobile device 1021 to extend the moving distance of the second photovoltaic panel, so that the mobile frame 1024 lays the second photovoltaic panel to the target area of ​​the second-layer laying frame 202.

[0085] The fifth moving path can be achieved by moving the moving frame 1024 so that the moving frame 1024 moves relative to the moving device 1021 to restore the relative position between the two to a fixed position. The sixth moving path can be achieved by moving the second rotating shaft 10214 so that the clamping member 1023 can move from above the paving frame 20 to above the paving device 10. The rotation path can be achieved by rotating the turntable 1025 so that the clamping member 1023 rotates a preset angle, for example, 180 degrees, to shorten the moving path of the moving device 1021, which can improve the grabbing efficiency and paving efficiency.

[0086] It should be noted that the above structural diagram is only an example, and the embodiments of the present application are not limited thereto. The diagram may also include devices or components not shown. For example, the functions of various devices or components can be realized by the control of the processor. The processor can be located at any position of the paving equipment, or be set in the above-mentioned electronic device, which is not limited here.

[0087] The processor may include, but is not limited to, a control board or a control chip. For example, the processor may include a battery management system (BMS), a micro control unit (MCU), a central processing unit (CPU), other general-purpose processors, a digital signal processor (DSP), an application specific integrated circuit (ASIC), a field-programmable gate array (FPGA), a pulse width modulator (PWM) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc.

[0088] The working mode of the paving device 10 will be described below in conjunction with the method.

[0089] Please refer to Figure 4 , Figure 4 1 is a flow chart of a control method for a paving device 10 provided in an embodiment of the present application. The control method can be executed by the paving device 10 or a processor in the paving device 10. Figure 4 As shown, the method includes steps S401 to S406, wherein:

[0090] S401: Control the moving device to move to the initial position of the laying frame.

[0091] S402: Control the camera to capture a first image, and use the first image as a target image, where the first image includes an image at an initial position.

[0092] In the embodiment of the present application, the initial position refers to the position of the first photovoltaic panel 30 placed in the paving frame 20. In this way, the position of the first photovoltaic panel 30 placed in the paving frame 20 is determined by the image captured by the camera 1022, and then the positions of other photovoltaic panels 30 are determined in sequence according to the preset paving order.

[0093] Optionally, the method further includes: controlling the camera 1022 to capture a reference image; if the reference image includes a specified image, using the reference image as the first image; if the reference image does not include the specified image, executing the step of controlling the camera 1022 to capture a reference image.

[0094] The designated image may include an image of the photovoltaic panel 30, or may be any preset image. Optionally, the designated image is a coded image. The method further includes: decoding the coded image to obtain decoded information; and when the decoded information successfully matches the preset information, determining that the reference image includes the designated image.

[0095] In the embodiment of the present application, the decoded information may be numbers or symbols, etc.

[0096] Optionally, the preset information is generated by the position information of the laying frame 20. In this way, when the decoded information matches the preset information successfully, the position information of the laying frame can be obtained from the decoded information, so that the first photovoltaic panel or the first M photovoltaic panels or N photovoltaic panels can be directly positioned based on the position information, thereby improving the positioning efficiency.

[0097] It can be understood that the decoded information is obtained by decoding the encoded image. When the decoded information matches the preset information successfully, the encoded image is used as the first image to determine the position information set of the initial position. When the encoded information fails to match the preset information, the camera 1022 is controlled to collect a new image to improve the accuracy of positioning.

[0098] Optionally, when the coding information fails to match the preset information, the method may further include: not executing the paving step. In this way, the paving of the photovoltaic panel 30 on the paving frame 20 that does not need paving can be avoided, which is conducive to improving the accuracy of positioning the paving frame 20.

[0099] In the embodiment of the present application, the reference image can be understood as the first image to be verified. When the reference image includes the specified image, it is determined that the verification is passed, the reference image is used as the first image, and no reference image is collected. Otherwise, a new reference image is collected until the reference image includes the specified image.

[0100] Optionally, the method further includes: if the reference image does not include the designated image, controlling the mobile device 1021 to move near the initial position. The present application does not limit the range near the initial position, and may be an area whose distance does not exceed a preset distance, or an area whose moving speed does not exceed a preset time, etc. In this way, the efficiency of obtaining the reference image including the designated image is improved.

[0101] S403: Control the moving device to move from the current position to the grabbing area of ​​the carrier.

[0102] S404: Based on the target image, the moving device is controlled to move the photovoltaic panel in the grasping area to the target area of ​​the photovoltaic panel in the laying frame.

[0103] S405: Control the first counter and the second counter to count the number of photovoltaic panels moved to the installation frame.

[0104] After step S405, when the count value of the first counter is less than M, step S403 is executed.

[0105] When the count value of the first counter is M, step S406 is executed: the first counter is cleared, and the camera is controlled to collect a second image, the second image includes an image of the last photovoltaic panel installed on the installation frame, and the second image is used as the target image. After step S406, step S403 is executed.

[0106] This application does not limit M, for example, M is 6, etc. M can be a fixed value, or can be determined according to the distance between the paving equipment 10 and the paving frame 20, the size of the photovoltaic panel 30, etc., or can be determined according to the deviation value between the placement position of the photovoltaic panel 30 and the target area, etc., which is not limited here.

[0107] Optionally, after step S405, it is determined whether the count value of the second counter is equal to N. If so, that is, the count value of the second counter is N, the method can be terminated. Otherwise, if the count value of the second counter is less than N, it is determined whether the count value of the first counter is equal to M. If so, that is, when the count value of the first counter is M, step S406 is executed. Otherwise, that is, when the count value of the first counter is less than M, step S403 is executed.

[0108] Among them, N can be an integer multiple of M, or an upper limit value of the photovoltaic panel 30 in the carrier 101, etc., and there is no limitation on this.

[0109] Understandably, Figure 4 In the method shown, when all the N photovoltaic panels 30 in the carrier 101 have not been moved to the laying frame 20, the mobile device 1021 is controlled to move the first M photovoltaic panels 30 in the carrier 101 one by one to the target area of ​​the photovoltaic panels 30 in the laying frame 20 based on the image of the initial position captured by the camera 1022. Then, the camera 1022 is controlled to capture a new image every time M photovoltaic panels 30 are laid, and the mobile device 1021 is controlled to move the last M photovoltaic panels 30 one by one to the target area of ​​the photovoltaic panels 30 in the laying frame 20 based on the image. In this way, the laying of M photovoltaic panels is achieved through the images captured by the camera 1022, which can improve the accuracy and efficiency of positioning.

[0110] Take the first photovoltaic panel and the second photovoltaic panel mentioned above as an example.

[0111] Optionally, the method includes: determining a position parameter set of an initial position based on the first image; determining a target area of ​​the second photovoltaic panel based on the target area of ​​the first photovoltaic panel, the relative position relationship between the first photovoltaic panel and the second photovoltaic panel, and the size of the photovoltaic panel; generating a removal path for the second photovoltaic panel based on the target area and the grasping area of ​​the second photovoltaic panel; and controlling the mobile device 1021 to move the second photovoltaic panel in the grasping area to the target area of ​​the second photovoltaic panel in the laying frame 20 according to the removal path.

[0112] The location information set includes the target area of ​​the first photovoltaic panel. The location parameter set may include at least the location parameters of the target area of ​​the first photovoltaic panel, for example, the values ​​corresponding to the x-axis, y-axis and z-axis, and the angles corresponding to the x-axis, y-axis and z-axis.

[0113] Optionally, the method includes: generating a first removal path for the first photovoltaic panel and a first return path for the mobile device 1021 based on a position parameter set and a gripping area of ​​the carrier 101; controlling the mobile device 1021 to move the first photovoltaic panel in the gripping area to a target area for the first photovoltaic panel in the laying frame 20 according to the first removal path; and controlling the mobile device 1021 to move to the gripping area based on the first return path.

[0114] In the embodiment of the present application, the gripping area of ​​the carrier 101 can be understood as the starting position of the photovoltaic panel 30, and the position corresponding to the position parameter set of the first target area can be understood as the end position of the first photovoltaic panel, so that the first moving-out path of the first photovoltaic panel and the first moving-back path of the mobile device 1021 can be generated based on the position parameter set and the gripping area of ​​the carrier 101, and the mobile device 1021 can be controlled to move according to the determined paths to achieve the paving of the first photovoltaic panel. After moving back to the gripping area, the next photovoltaic panel of the first photovoltaic panel can be prepared for paving.

[0115] The relative position relationship between the first photovoltaic panel and the second photovoltaic panel can be determined based on the aforementioned paving order. For example, when the paving order is to pave the photovoltaic panels from left to right, the second photovoltaic panel is relatively located on the right side of the first target area. Further, the relative position relationship can be related to the properties of the paving frame 20, for example, the inclination angle of the paving frame 20, the height of the paving frame 20, etc.

[0116] After obtaining the position parameter set of the initial position, the position of the target area of ​​the second photovoltaic panel can be determined based on the position parameter set, the relative position relationship between the first photovoltaic panel and the second photovoltaic panel and the size of the photovoltaic panel 30, and a removal path of the second photovoltaic panel can be generated according to the position of the target area of ​​the second photovoltaic panel and the grasping area, so that the mobile device 1021 moves the second photovoltaic panel in the grasping area to the target area of ​​the second photovoltaic panel in the laying frame 20 according to the removal path.

[0117] Optionally, the method includes: generating a return path of the mobile device 1021 based on the target area and the gripping area of ​​the second photovoltaic panel. In this way, after moving back to the gripping area, the next photovoltaic panel installation of the second photovoltaic panel can be prepared.

[0118] The first outgoing path, the second outgoing path, the first return path, and the second return path may refer to the description of the outgoing path and the return path. Optionally, the second return path includes a rotation path. The rotation path is used to rotate the clamping member 1023 according to a preset angle. In this way, the mobile device 1021 can be prevented from moving significantly, and the moving distance of the mobile device 1021 can be shortened.

[0119] Optionally, the removal path of the second photovoltaic panel includes a first sub-path and a second sub-path. The method further includes: controlling the mobile device 1021 to move the second photovoltaic panel in the grabbing area to the first position according to the first sub-path; controlling the mobile frame 1024 to move according to the second sub-path to extend the moving distance of the second photovoltaic panel, so that the mobile frame 1024 moves the second photovoltaic panel from the first position to the target area of ​​the second layer paving frame 202.

[0120] The first sub-path may include the aforementioned second grasping path and the third moving path, and the second sub-path is equivalent to the aforementioned fourth moving path.

[0121] In this way, when the second-layer paving frame 202 is higher than the first-layer paving frame 201, the mobile frame 1024 can move relative to the mobile device 1021 according to the second sub-path to extend the moving distance of the second photovoltaic panel, so that the mobile frame 1024 can lay the second photovoltaic panel to the target area of ​​the second-layer paving frame 202.

[0122] Accordingly, when the first photovoltaic panel is being laid, the movable frame 1024 is controlled to be fixed relative to the movable device 1021 , that is, the movable frame 1024 does not move.

[0123] Optionally, the method further includes: controlling the mobile device 1021 to move when the count value of the counter is 0, so that the camera 1022 can capture images. In this way, the clarity and accuracy of the image capture target area can be improved, thereby facilitating the accuracy of positioning.

[0124] Optionally, the method also includes: controlling the camera 1022 to capture a third image, controlling the mobile device 1021 to determine the placement area of ​​the photovoltaic panel 30 based on the third image; obtaining a deviation value between the placement area of ​​the photovoltaic panel 30 and the target area of ​​the photovoltaic panel 30; if the deviation value is greater than a preset threshold, controlling the clamp 1023 to grab the photovoltaic panel 30 from the placement area of ​​the photovoltaic panel 30; controlling the mobile frame 1024 to move the photovoltaic panel 30 to the target area of ​​the photovoltaic panel 30 based on the deviation value; and controlling the clamp 1023 to place the photovoltaic panel 30 in the target area of ​​the photovoltaic panel 30.

[0125] Among them, the third image includes an image of the photovoltaic panel 30 in the laying frame 20, so that the placement area of ​​the photovoltaic panel 30 can be determined based on the third image. The deviation value between the placement area of ​​the photovoltaic panel 30 and the target area is used to describe the accuracy of the mobile device 1021 placing the photovoltaic panel 30 to the target position, which can be determined based on the difference between the position parameters of the same dimension between the placement area and the target area, and can also be determined based on whether the placement area blocks other photovoltaic panels 30 or occupies the position of other photovoltaic panels 30. In the case of yes, it is determined based on the blocked or occupied position area, etc.

[0126] This application does not limit the preset threshold value, which can be 0, or 0.1, etc. It can be understood that when there is a deviation value between the placement area of ​​the photovoltaic panel 30 and the target area of ​​the photovoltaic panel 30, and when the deviation value is greater than the preset threshold value, the position of the photovoltaic panel 30 needs to be adjusted to avoid the photovoltaic panel 30 from falling and the work efficiency, which is conducive to improving the accuracy of placement. Specifically, the photovoltaic panel 30 to be adjusted can be grasped by the clamp 1023, and the position of the photovoltaic panel 30 can be adjusted by the mobile frame 1024, so that the photovoltaic panel 30 grasped by the clamp 1023 can be moved from the current position to the target area of ​​the photovoltaic panel 30, thereby realizing the position adjustment of the photovoltaic panel 30 and improving the accuracy of placement.

[0127] Optionally, the method further includes: controlling the lifting device to lift the photovoltaic panel 30 in the carrier 101 to the grabbing area. In this way, after the clamp 1023 grabs a photovoltaic panel 30, the remaining photovoltaic panels 30 can be lifted by the lifting device, so that after the moving device 1021 returns to the grabbing area, the clamp 1023 can grab the next photovoltaic panel 30, and the moving device 1021 can move the photovoltaic panel 30 grabbed by the clamp 1023 and achieve paving.

[0128] The embodiment of the present application provides a paving device, including a mechanical arm, a carrier, a first counter, a second counter, a processor and a memory. The memory is used to store computer-readable instructions, and the processor is used to call the instructions stored in the memory to execute the following steps: Figure 4 Instructions describing the steps in a method.

[0129] The embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, wherein the computer program includes program instructions, and when the program instructions are executed by the processor, the processor executes the following Figure 4 Some or all of the steps of the method described.

[0130] The present application also provides a computer program product, wherein the computer program product includes a non-transitory computer-readable storage medium storing a computer program, wherein the computer program is operable to cause a computer to execute the following Figure 4 Some or all of the steps of the method described.

[0131] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all optional embodiments, and the actions and modules involved are not necessarily required by the present application.

[0132] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0133] In the several embodiments applied for in the present application, it should be understood that the disclosed device can be implemented in other ways. For example, the device embodiments described above are only schematic, such as the division of the units, which is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, and the indirect coupling or communication connection of the device or unit can be electrical or other forms.

[0134] The units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the embodiments of the present application.

[0135] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above integrated unit may be implemented in the form of hardware or in the form of a software program module.

[0136] If the integrated unit is implemented in the form of a software program module and sold or used as an independent product, it can be stored in a computer-readable memory. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a memory and includes several instructions for a computer device (which can be a personal computer, server or network device, etc.) to execute all or part of the steps of the method described in each embodiment of the present application. The aforementioned memory includes: various media that can store program codes, such as USB flash drives, RAM, ROM, mobile hard disks, magnetic disks or optical disks.

[0137] The embodiments of the present application are introduced in detail above. Specific examples are used in this article to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the method and core idea of ​​the present application. At the same time, for general technical personnel in this field, according to the idea of ​​the present application, there will be changes in the specific implementation method and application scope. In summary, the content of this specification should not be understood as a limitation on the present application.

Claims

1. A control method for paving equipment, characterized in that: The paving equipment includes a mechanical arm, a bearing, a first counter and a second counter. The mechanical arm includes a moving device and a camera. The bearing is used to carry N photovoltaic panels, where N is the upper limit of the photovoltaic panels in the bearing. The method includes: Controlling the moving device to move to the initial position of the laying frame; Control the camera to capture a first image, and use the first image as a target image, wherein the first image includes an image at the initial position; Control the mobile device to move from the current position to the gripping area of ​​the carrier, and iteratively perform the following steps: Based on the target image, controlling the moving device to move the photovoltaic panel in the grabbing area to a target area of ​​the photovoltaic panel in the laying frame; Controlling the first counter and the second counter to count the number of the photovoltaic panels moved to the paving frame; When the count value of the first counter is less than M, executing the step of controlling the moving device to move from the current position to the grabbing area of ​​the carrier; When the count value of the first counter is M, the first counter is controlled to be cleared, and the camera is controlled to capture a second image, wherein the second image includes an image of the photovoltaic panel that has been installed on the installation frame, and the second image is used as a target image to execute the step of controlling the mobile device to move from the current position to the grabbing area of ​​the carrier; When the count value of the second counter is N, the iteration ends.

2. The method according to claim 1, characterized in that: The method comprises: Determine a position information set of the initial position based on the first image, the position information set including position information of a target area of ​​a first photovoltaic panel, the first photovoltaic panel being the first photovoltaic panel among the N photovoltaic panels to be installed on the installation frame; Determine a target area of ​​the second photovoltaic panel based on the target area of ​​the first photovoltaic panel, the relative position relationship between the first photovoltaic panel and the second photovoltaic panel, and the size of the photovoltaic panel, wherein the second photovoltaic panel is a photovoltaic panel other than the first photovoltaic panel among the first M photovoltaic panels of the N photovoltaic panels; generating a moving path of the second photovoltaic panel based on the target area of ​​the second photovoltaic panel and the grab area; The moving device is controlled to move the second photovoltaic panel in the grabbing area to a target area of ​​the second photovoltaic panel in the laying frame according to the moving-out path.

3. The method according to claim 2, characterized in that The paving frame includes a first-layer paving frame and a second-layer paving frame, the first-layer paving frame includes a target area of ​​the first photovoltaic panel, the second-layer paving frame includes a target area of ​​the second photovoltaic panel, and the second-layer paving frame is higher than the first-layer paving frame; The mechanical arm further comprises a moving frame, and the moving frame is movably connected to the moving device; The removal path includes a first sub-path and a second sub-path, and the method further includes: Controlling the moving device to move the second photovoltaic panel in the grabbing area to a first position according to the first sub-path; The mobile frame is controlled to move along the second sub-path to extend the moving distance of the second photovoltaic panel, so that the mobile frame moves the second photovoltaic panel from the first position to the target area of ​​the second layer of the paving frame.

4. The method according to claim 3, characterized in that The mechanical arm further includes a clamping member, and the method includes: generating a moving path of the mobile device based on the target area of ​​the second photovoltaic panel and the grasping area; The mobile device is controlled to move from the target area of ​​the second photovoltaic panel to the grasping area according to the return path, wherein the return path includes a rotation path, and the rotation path is used to rotate the clamp according to a preset angle to shorten the moving distance of the mobile device.

5. The method according to claim 4, characterized in that The method further comprises: Controlling the camera to collect a third image, wherein the third image includes an image of the photovoltaic panel in the mounting frame; Determining a placement area of ​​the photovoltaic panel based on the third image; Obtaining a deviation value between a placement area of ​​the photovoltaic panel and a target area of ​​the photovoltaic panel; If the deviation value is greater than a preset threshold, controlling the clamping member to grab the photovoltaic panel from the placement area of ​​the photovoltaic panel; Controlling the moving frame to move the photovoltaic panel to a target area of ​​the photovoltaic panel based on the deviation value; The clamping member is controlled to place the photovoltaic panel in a target area of ​​the photovoltaic panel.

6. The method according to any one of claims 1 to 5, characterized in that The carrier includes a lifting device, and the method further includes: The lifting device is controlled to lift the photovoltaic panel in the carrier to the gripping area.

7. The method according to any one of claims 1 to 5, characterized in that The method further comprises: Controlling the camera to collect a reference image; If the reference image includes a designated image, taking the reference image as the first image; If the reference image does not include the designated image, the step of controlling the camera to capture the reference image is performed.

8. The method according to claim 7, characterized in that The designated image is a coded image, and the method further comprises: Decoding the encoded image to obtain decoding information; When the decoded information matches the preset information successfully, it is determined that the reference image includes the designated image.

9. A paving device, characterized in that: It comprises a robotic arm, a carrier, a first counter, a second counter, a processor and a memory, wherein the memory is used to store computer-readable instructions, and the processor is used to call the instructions stored in the memory to execute the method described in any one of claims 1-8.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, wherein the computer program includes program instructions. When the program instructions are executed by a processor, the processor executes the method according to any one of claims 1 to 8.