Comprehensive improvement system and method for saline-alkali soil

By combining multi-section underground pipe systems and water collection ditches with drip irrigation or sprinkler irrigation devices, the problems of high cost and low efficiency in improving saline-alkali land are solved, and efficient salt discharge and crop growth environment improvement are achieved.

CN118715920AActive Publication Date: 2024-10-01利津县农业综合服务中心(利津县农业招商招才服务中心利津县农业机械服务中心)

Patent Information

Application Number
CN202410931097.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-12
Publication Date
2024-10-01
Estimated Expiration
2044-07-12

AI Technical Summary

Technical Problem

Existing saline-alkali land improvement methods are costly and inefficient. The traditional hidden pipe structure is easily blocked and cannot effectively distinguish the position and angle of the pipe, resulting in the inability to effectively discharge salt.

Method used

A multi-section hidden pipe system is used, combined with a water collection ditch and a drip or sprinkler irrigation device. The hidden pipe is composed of a support frame, an upper branch pipe and a lower branch pipe. The upper branch pipe has a smooth arc-shaped outer wall with internal reinforcement ribs, and the lower branch pipe has no seepage holes. , the support frame shares the pressure, reduces costs and improves the drainage and salt removal effect.

Benefits of technology

It reduces the cost of improving saline-alkali land, improves the salt discharge effect, reduces the probability of siltation and blockage, and forms a wide-coverage, high-smooth drainage and salt discharge pipe network, which prevents water from flowing back into the soil and improves the crop growth environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118715920A_ABST
    Figure CN118715920A_ABST
Patent Text Reader

Abstract

The comprehensive improvement system for the saline-alkali soil comprises a farmland and water collecting ditches arranged on the two sides of the farmland, the width of the farmland ranges from 300 m to 500 m, and the water collecting ditches are dug to the underground water level; a plurality of concealed pipes are buried in the farmland from the center line to the collecting gutters on the two sides, the gradient is not smaller than 0.1%, the concealed pipes are used for discharging salt into the collecting gutters, the depth of the concealed pipes ranges from 0.7 m to 1.3 m, the concealed pipes are assembled underground in a multi-section connection mode, manual pipe laying is not needed, and huge cost is reduced. A straw layer treated by a preservative is laid above the concealed pipes, and the depth of the straw layer ranges from 0.6 m to 0.7 m; a drip irrigation or sprinkling irrigation device is arranged on the farmland. Therefore, the saline-alkali soil can be effectively improved, the salinity of a plough layer can be controlled, and crops can be planted on the saline-alkali soil by using as few water sources as possible in combination with a drip irrigation or sprinkling irrigation device.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of land improvement, and in particular to a system and method for comprehensive improvement of saline-alkali land. Background Art

[0002] Saline-alkali land is a global problem that needs to be solved urgently. People have been looking for various methods to treat saline-alkali land, such as the "agriculture above and fishing below" and freshwater leaching in the 1990s. However, these methods are all very costly, and farmers are unwilling to pay such a high cost to improve saline-alkali land.

[0003] The more economical way now is to bury underground pipes to drain salt, and use the downward flow of water to drive the salt into the pipes to drain away to improve the salinity of saline-alkali land. However, the current structure of the hidden pipe is usually a rolled double-walled threaded pipe with a filter cloth covered on the outer wall, which is laid in the saline-alkali land by a pipe laying machine. Although this method is more efficient, the cost of laying pipes is also very high, which is still a considerable expense for farmers. In addition, when using machine pipe laying, it is impossible to distinguish the position and angle of the pipes. Therefore, the pipes laid by such machines need to have seepage holes around them. However, if the seepage holes are facing downward after the hidden pipes are lowered, the salt will be discharged downward from the seepage holes during the salt drainage process instead of flowing into the ditch.

[0004] In addition, the double-wall threaded pipe can certainly increase a certain strength through the protruding threaded part, but it forms multiple bosses on the outer wall. The width of the groove between adjacent bosses gradually decreases from top to bottom, and the bottom of the groove is easily blocked. When the downward water cannot seep into the bottom of a groove, it will flow to both sides. The circular wall of the concealed pipe will allow the water to bypass the wall of the concealed pipe along both sides of the groove and then seep into the soil.

[0005] Therefore, how to reduce the cost of saline-alkali land improvement and improve the salt drainage effect has become the primary problem facing farmers. Summary of the invention

[0006] In order to solve the technical problems existing in the above-mentioned background technology, the present invention provides a comprehensive improvement system for saline-alkali land.

[0007] The technical solution of the present invention is as follows:

[0008] The comprehensive improvement system of saline-alkali land includes farmland and drainage ditches arranged on both sides. The width of the farmland is between 300 meters and 500 meters, and the drainage ditches are dug to the groundwater level.

[0009] Several concealed pipes are buried along the center line of the farmland to the drainage ditches on both sides, with a gradient of not less than 1‰. They are used to discharge salt into the drainage ditches. The depth of the concealed pipes is between 0.7 meters and 1.3 meters. The concealed pipes are assembled underground in a multi-section connection method and are laid manually without the use of pipe-laying machines, thereby reducing huge costs.

[0010] A layer of straw treated with preservatives is laid above the concealed pipe, with a depth of 0.6m-0.7m;

[0011] Set up drip irrigation or sprinkler irrigation equipment on the top of the farmland.

[0012] The depth of the water collection ditch is the same as the groundwater level, which can reduce the amount of salt brought into the cultivated layer by the evaporation of the rising groundwater and prevent the return of salt and alkali. Irrigation water and precipitation in the rainy season discharge the salt in the cultivated layer into the water collection ditch through underground pipes to achieve salt removal and alkali reduction. The straw layer above the underground pipe can further prevent the residual salt in the cultivated layer from returning upward and affecting the growth of crops. In this way, the saline-alkali land can be effectively improved and the salinity of the cultivated layer can be controlled. Combined with drip irrigation or sprinkler irrigation, crops can be grown on saline-alkali land with as little water as possible.

[0013] The intervals of the concealed pipes along the length of the farmland are between 8 meters and 12 meters. Since the concealed pipes are laid manually, no pipe-laying machine is used, and only a trenching machine is used to reduce the cost of improvement. The gradient of the concealed pipe can be higher, compared with the 0.7‰ commonly used by the pipe-laying machine, it can better drain water and salt. In addition, the cost of using a pipe-laying machine is relatively high. In order to reduce costs, farmers generally set the intervals of concealed pipes between 15 meters and 20 meters. After the concealed pipes are laid manually, a lot of equipment costs are saved, and the intervals of concealed pipes can be shortened to between 8 meters and 12 meters, increasing the density of concealed pipe layout, reducing the probability of clogging, and forming a wide-coverage, highly unobstructed drainage and salt removal pipe network.

[0014] To facilitate manual underground pipe laying, the underground pipe consists of a support frame, an upper branch pipe and a lower branch pipe, and adjacent underground pipes on one side of the center line of the farmland are connected to each other;

[0015] The support frame includes two parallel horizontal plates, at least two ends of which are connected to a first arch plate and a second arch plate respectively;

[0016] The upper branch pipe is connected to the upper part of the support frame and includes a first arc-shaped pipe;

[0017] The outer wall of the first arc-shaped pipe is a smooth arc, and the inner wall abuts against the arch plate;

[0018] The first arc-shaped pipe has first connecting parts extending outwards on both sides, respectively connected to the upper surfaces of the two horizontal plates, leaving a gap with the inner edge of the horizontal plates;

[0019] The inner wall of the first arc-shaped pipe is provided with a plurality of reinforcing ribs at intervals along the length direction, and the reinforcing ribs are partially pressed on the transverse plate;

[0020] A plurality of water seepage holes are opened on the first arc-shaped pipe, the water seepage holes avoid the positions of the reinforcing ribs, and a water-permeable filter cloth is arranged on the outer wall of the first arc-shaped pipe;

[0021] The lower branch pipe is connected to the lower part of the support frame, and comprises a second arc-shaped pipe. The second arc-shaped pipe has no water seepage holes and forms a salt discharge channel with the first arc-shaped pipe.

[0022] The concealed pipe is composed of a support frame, an upper branch pipe and a lower branch pipe, which is convenient for individual production and assembly. In particular, the upper and lower parts of the concealed pipe are designed differently, taking into full consideration the different functions they play.

[0023] On the one hand, the upper part of the concealed pipe needs to withstand soil pressure, and on the other hand, it needs to facilitate the penetration of water in the soil into the pipe. Therefore, it needs a certain strength and needs to prevent the seepage holes from being blocked. Most of the current concealed pipes are integral pipe structures, with convex ribs added to the upper part or the outer side of the whole to increase strength, such as the most commonly used double-walled threaded pipe. Although this type of structure ensures a certain strength, it compresses the seepage area. The water in the soil must reach the bottom of the groove between adjacent protrusions before it can seep into the concealed pipe. However, the structure of the groove with a larger top and a smaller bottom easily causes the soil density at the bottom of the groove to be greater than that at the top, making it easier to block the seepage holes. When the blockage problem occurs, the water flows along the sides of the groove and seeps down into the soil after bypassing the wall of the concealed pipe.

[0024] A major inventive point of the present invention is to make the outer wall of the upper branch pipe of the concealed pipe into a smooth arc shape. The soil density above the entire concealed pipe is the same, and there will be no problem of excessive local density, which makes it easy for all water to flow to the outer wall of the upper branch pipe. Then, according to the gradient of the concealed pipe, it flows along the pipe wall surface to one side of the ditch, and also flows to both sides according to the arc shape of the upper branch pipe. However, no matter how it flows, it will pass through several seepage holes on the outer wall of the upper branch pipe, thereby preventing water from flowing back into the soil.

[0025] In addition, to ensure the support strength of the upper branch pipe, the traditional protruding reinforcement ribs are moved inside. Since the upper branch pipe is semi-arc-shaped, the inner reinforcement ribs are easier to make, and water flows from the lower branch pipe, and the inner reinforcement ribs will not affect the drainage and salt removal process. The upper branch pipe is pressed on the horizontal plate through the reinforcement ribs, and the inner walls on both sides are against the arch plate, thereby improving the support strength of the upper branch pipe and preventing it from being flattened by the soil.

[0026] As a preferred technical solution, seepage holes are provided at the positions where the first arc-shaped pipe is connected to the first connection part on both sides. Even if water flows along the wall of the upper branch pipe to the first connection part at the bottom, it will inevitably pass through the above-mentioned seepage holes when flowing downward along the gradient of the concealed pipe, thereby preventing water from flowing back into the soil.

[0027] The lower branch pipe at the lower part of the concealed pipe is only used for salt and water drainage. Therefore, it is designed to be semi-arc without seepage holes to reduce costs and ensure the salt drainage effect.

[0028] Considering that the pressure exerted by the soil on the upper branch pipe will be transmitted to the lower branch pipe, the lower branch pipe cannot bear the pressure without any reinforcement structure, and adding reinforcement ribs will increase the cost. Therefore, a support frame structure is specially designed.

[0029] The support structure plays three main roles:

[0030] 1. Provide a connection medium to facilitate the connection of the upper branch pipe and the lower branch pipe to the horizontal plate. The three materials can all be plastic for easy connection, and the support frame is made of hard plastic to have sufficient strength;

[0031] 2. Support the upper branch pipe and the lower branch pipe in the trench to share the pressure. Specifically, a plurality of functional plates are arranged at intervals on the outer edge of the horizontal plate. The functional plates include an extension plate extending upward and outward and a support plate extending downward and outward. A support foot is arranged at the bottom end of the support plate. The height of the lowest point of the support foot is not higher than the height of the lowest point of the second arc-shaped pipeline.

[0032] The pressure of the upper branch pipe is all applied to the horizontal plate, and then borne by the support plate. The height of the support plate is not lower than the lowest point height of the second arc-shaped pipe, so as to avoid excessive compression and deformation between the lower branch pipe and the lower soil. The support feet increase the pressure-bearing area on the one hand, and prevent the support plate from sinking into the soil on the other hand, so as to further avoid excessive compression and deformation between the lower branch pipe and the lower soil. In this way, the lower branch pipe can be made of low-cost materials.

[0033] 3. To prevent the hidden pipe from turning over when it is manually lowered, the width of the extension plates on both sides matches the width of the trencher, which can prevent the hidden pipe from turning over when lowering the pipe and increase the lowering speed;

[0034] In addition, the vertical projection of the extension plate is located outside the support foot to prevent the support plate from excessively contacting the side wall of the groove when the concealed pipe is lowered.

[0035] In order to facilitate the connection of adjacent concealed pipes when laying concealed pipes manually, a functional board flush with the end is provided at each end of the horizontal board, and a tensioning part is provided on the extension plate of the functional board for the insertion of a hand-held tensioning tool. The tensioning tool can be used on the ground to press two adjacent concealed pipes together, and the alignment of the two functional boards at the two ends of the horizontal board can be well judged.

[0036] To facilitate the manufacture and connection of concealed pipes, the two horizontal plates of the support frame are of equal length and coplanar, and the first arc-shaped pipe and the second arc-shaped pipe are of equal length.

[0037] A connecting pipe is extended at one end of the second arc-shaped pipe, and the outer diameter of the connecting pipe is closely connected to the inner diameter of the second arc-shaped pipe;

[0038] A closed pipe is extended at one end of the first arc-shaped pipe, and the inner diameter of the closed pipe is not less than the outer diameter of the first arc-shaped pipe;

[0039] The connecting pipes and the closed pipes on each concealed pipe are arranged opposite to each other at the two ends of the support frame, and the closed pipes are pressed on the connecting pipes of the adjacent concealed pipes.

[0040] In this way, drainage from adjacent concealed pipes is achieved without leakage, and soil is prevented from entering the concealed pipes.

[0041] The present invention also provides a saline-alkali land comprehensive improvement method, which uses the saline-alkali land comprehensive improvement system, and the specific steps are:

[0042] S1. Dig a drainage ditch every 300-500 meters in the flat saline-alkali land. The ditch depth is 2.5-3 meters, flush with the groundwater level, and connected to the drainage main canal;

[0043] S2. Determine whether to perform deep plowing according to soil properties to destroy the impermeable layer in the soil;

[0044] S3. Use a trencher to dig trenches along the width of the farmland. The trench width should match the size of the concealed pipe, with the middle higher and the ends lower. The gradient from the center line of the farmland to both sides should not be less than 1‰, and the trench depth should be between 0.7m and 1.3m.

[0045] S4, artificially place underground pipes, with the upper branch pipe on top, and place several underground pipes in the trench dug in S3 from the center outward along the width of the farmland, with adjacent underground pipes close together and the outermost underground pipe extending into the water collection ditch;

[0046] S5. Backfill the soil to the top of the underground pipe until it is within 0.6m-0.7m from the surface of the farmland, and lay a 5-20cm layer of straw treated with preservatives;

[0047] S6. Continue to backfill the soil, level the farmland, and install drip or sprinkler irrigation equipment.

[0048] In step S4, when adjacent concealed pipes are close together, a handheld tightening tool is used to pull the tightening part, and the connecting pipe of the second arc pipe of the previous concealed pipe is inserted into the second arc pipe of the next concealed pipe, and the closed pipe extending from the first arc pipe of the next concealed pipe is covered on the outside of the previous first arc pipe, and the functional boards at both ends of the adjacent concealed pipe cross plates are made close together.

[0049] Through the above design, the saline-alkali land comprehensive improvement system of the present invention adopts the method of laying underground pipes manually to replace the pipe laying machine, which saves a lot of costs and enables farmers to improve saline-alkali land without losing confidence in improvement due to the profit being lower than the improvement cost. At the same time, the saved cost can be used to lay underground pipes more densely, reduce the probability of clogging, and form a wide-coverage, highly unobstructed drainage and salt removal pipe network.

[0050] In order to facilitate manual underground pipe laying, a special underground pipe structure is designed, which consists of a support frame, an upper branch pipe and a lower branch pipe. It is specially designed according to the function. The upper branch pipe and the support frame bear the soil pressure, and the lower branch pipe is only used for drainage and salt removal. The upper branch pipe has a smooth outer wall and built-in reinforcement ribs, which not only ensures strength, but also avoids the problem of easy blockage and water outflow of traditional underground pipes. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] In the attached picture:

[0052] Figure 1 A three-dimensional image of a single concealed tube Figure 1 ;

[0053] Figure 2 for Figure 1 A partial enlarged view of the X position;

[0054] Figure 3 A three-dimensional image of a single concealed tube Figure 2 ;

[0055] Figure 4 for Figure 3 A partial enlarged view of the Y position;

[0056] Figure 5 It is the side view of the concealed pipe;

[0057] Figure 6 is a three-dimensional diagram of the support frame;

[0058] Figure 7 is a side view of the support frame;

[0059] Figure 8 It is a three-dimensional diagram of the upper branch pipe;

[0060] Fig. 9 It is the side view of the upper branch pipe;

[0061] Fig.10 It is a stereoscopic diagram of the lower branch pipe;

[0062] Fig.11 for Fig.10 A partial enlarged view of the middle Z position;

[0063] The components represented by the reference numerals in the figure are:

[0064] 1. Support frame; 11. Horizontal plate; 12. First arch plate; 13. Second arch plate; 14. Support plate; 15. Extension plate; 16. Support foot; 2. Upper branch pipe; 21. First arc-shaped pipe; 22. First connecting part; 23. Reinforcing rib; 24. Seepage hole; 3. Lower branch pipe; 31. Second arc-shaped pipe; 32. Second connecting part; 33. Connecting pipe. DETAILED DESCRIPTION

[0065] Example 1

[0066] This embodiment provides a comprehensive saline-alkali land improvement system, including farmland and drainage ditches arranged on both sides thereof. The width of the farmland is between 300 meters and 500 meters, and the drainage ditch is dug to the groundwater level. For example, the width of the drainage ditch is 10 meters and the depth is 2.5 meters to 3 meters.

[0067] Several concealed pipes are buried along the center line of the farmland to the drainage ditches on both sides. The gradient is 2‰, which is significantly greater than the 0.7‰ laid by the pipe-laying machine. This can more effectively discharge salt into the drainage ditch. The depth of the concealed pipes is between 0.7 meters and 1.3 meters. The concealed pipes are assembled underground in a multi-section connection method and are laid manually without the use of a pipe-laying machine, thus reducing huge costs.

[0068] A layer of straw treated with preservatives is laid above the concealed pipe, with a depth of 0.6m-0.7m;

[0069] Install drip irrigation or sprinkler irrigation devices on the top of the farmland to save water resources and ensure that irrigation water is supplied on demand and available at any time.

[0070] The depth of the water collection ditch is the same as the groundwater level, which can reduce the amount of salt brought into the cultivated layer by the evaporation of the rising groundwater and prevent the return of salt and alkali. Irrigation water and precipitation in the rainy season discharge the salt in the cultivated layer into the water collection ditch through underground pipes to achieve salt removal and alkali reduction. The straw layer above the underground pipe can further prevent the residual salt in the cultivated layer from returning upward and affecting crop growth. In this way, the saline-alkali land can be effectively improved and the salinity of the cultivated layer can be controlled. Combined with drip irrigation or sprinkler irrigation devices, crops can be planted on saline-alkali land with as little water as possible to increase crop yields. Farmers are willing to improve saline-alkali land only when the profit of the crops they grow is higher than the cost of improving saline-alkali land.

[0071] The intervals of the concealed pipes along the length of the farmland are between 8 meters and 10 meters. Since the concealed pipes are laid manually, no pipe-laying machine is used, and only a trenching machine is used to reduce the cost of improvement. The gradient of the concealed pipe can be higher, compared with the 0.7‰ commonly used by the pipe-laying machine, it can better drain water and salt. In addition, the cost of using a pipe-laying machine is relatively high. In order to reduce costs, farmers generally set the intervals of concealed pipes between 15 meters and 20 meters. After the concealed pipes are laid manually, a lot of equipment costs are saved, and the intervals of concealed pipes can be shortened to between 8 meters and 10 meters, increasing the density of concealed pipe layout, reducing the probability of clogging, and forming a wide-coverage, highly unobstructed drainage and salt removal pipe network.

[0072] The concealed pipes laid by the traditional pipe laying machine are double-walled threaded pipe structures, and water seepage holes are arranged between the threaded protrusions on the outer side of the pipe wall, so that salt can easily enter the soil again through the water seepage holes when draining salt. The present invention adopts artificial concealed pipe laying, which makes a significant improvement on concealed pipes in terms of cost and use effect.

[0073] Combine the following Figure 1-Figure 11 Now let's introduce the structure of the concealed pipe. The concealed pipe consists of a support frame 1, an upper branch pipe 2 and a lower branch pipe 3. Adjacent concealed pipes on one side of the center line of the farmland are connected to each other.

[0074] The support frame 1 includes two parallel horizontal plates 11 , with a first arch plate 12 and a second arch plate 13 connected to both ends of the horizontal plates 11 , respectively. Both arch plates are semicircular in shape, and the diameters thereof match the spacing between the two horizontal plates 11 .

[0075] See also Figure 8 and Fig. 9 , the upper branch pipe 2 is connected to the upper part of the support frame 1, and includes a first arc-shaped pipe 21;

[0076] The outer wall of the first arc-shaped pipe 21 is a smooth arc shape, the inner wall abuts against the arch plate, and the inner diameter size matches the outer diameter size of the arch plate;

[0077] First connecting parts 22 are respectively extended outwards on both sides of the first arc-shaped pipe 21, and are respectively connected to the upper surfaces of the two transverse plates 11, leaving a gap with the inner edge of the transverse plates 11;

[0078] The inner wall of the first arc-shaped pipe 21 is provided with a plurality of reinforcing ribs 23 at intervals along the length direction, and the reinforcing ribs 23 are partially pressed on the transverse plate 11. Figure 5 As shown, the reinforcing rib 23 has sufficient thickness and a cross-sectional length greater than the width of the reserved gap. At the contact position with the transverse plate 11, a portion is pressed on the gap between the first arc-shaped pipe 21 and the inner edge of the transverse plate 11, and the other portion is suspended outside.

[0079] The first arc-shaped pipe 21 is provided with a plurality of water seepage holes 24 , which are away from the reinforcing ribs 23 . A water-permeable filter cloth, such as a commonly used geotextile, is provided on the outer wall of the first arc-shaped pipe 21 .

[0080] The lower branch pipe 3 is connected to the lower part of the support frame 1 , and comprises a second arc-shaped pipe 31 . The second arc-shaped pipe 31 has no water seepage holes 24 , and a salt discharge channel is formed between the second arc-shaped pipe 31 and the first arc-shaped pipe 21 .

[0081] Second connecting parts 32 are respectively extended outwards from both sides of the second arc-shaped pipe 31 for connecting with the supporting part 1 .

[0082] The concealed pipe is composed of a support frame 1, an upper branch pipe 2 and a lower branch pipe 3, which is convenient for individual production and assembly. In particular, the upper and lower parts of the concealed pipe are designed differently in consideration of their different functions.

[0083] On the one hand, the upper part of the concealed pipe needs to withstand the soil pressure, and on the other hand, it needs to facilitate the penetration of moisture in the soil into the pipe. Therefore, it requires a certain strength and needs to prevent the seepage holes 24 from being blocked. Most of the current concealed pipes are integral pipe structures, with convex ribs added to the upper part or the outer side of the whole to increase the strength, such as the most commonly used double-walled threaded pipe. Although this type of structure ensures a certain strength, it compresses the seepage area. The moisture in the soil must reach the bottom of the groove between adjacent protrusions before it can seep into the concealed pipe. However, the structure in which the groove is larger at the top and smaller at the bottom easily causes the soil density at the bottom of the groove to be greater than that at the top, making it easier to block the seepage holes 24. After the blockage problem occurs, the water flows along the two sides of the groove and seeps downward into the soil after bypassing the wall of the concealed pipe.

[0084] A major inventive point of the present invention is to make the outer wall of the upper branch pipe 2 of the concealed pipe into a smooth arc shape. The soil density above the entire concealed pipe is the same, and there will be no problem of excessive local density, which makes it easy for all water to flow to the outer wall of the upper branch pipe 2. Then, according to the gradient of the concealed pipe, it flows along the pipe wall surface to one side of the ditch, and also flows to both sides according to the arc shape of the upper branch pipe 2. However, no matter how it flows, it will pass through the several seepage holes 24 on the outer wall of the upper branch pipe 2, thereby preventing water from flowing back into the soil.

[0085] In addition, in order to ensure the support strength of the upper branch pipe 2, the traditional convex reinforcement ribs 23 are moved inside. Since the upper branch pipe 2 is semi-arc-shaped, the inner reinforcement ribs 23 are easier to make, and water flows from the lower branch pipe 3, and the inner reinforcement ribs 23 will not affect the drainage and salt discharge process. The upper branch pipe 2 is pressed on the horizontal plate 11 through the reinforcement ribs 23, and the inner walls on both sides are against the arch plate, thereby improving the support strength of the upper branch pipe 2 and preventing it from being deformed by soil pressure.

[0086] As a preferred technical solution, water seepage holes 24 are provided at the positions where the first arc-shaped pipe 21 and the first connecting portion 22 meet. Figure 3 and Figure 4 Even if water flows along the wall of the upper branch pipe 2 to the first connection portion 22 at the bottom, it will inevitably pass through the seepage holes 24 when flowing downward along the gradient of the concealed pipe, thereby preventing the water from flowing back into the soil.

[0087] See also Fig.10 and Fig.11 The lower branch pipe 3 at the lower part of the concealed pipe is only used for salt and water drainage. Therefore, it is designed to be semi-arc-shaped without seepage holes 24 to reduce costs and ensure the salt drainage effect.

[0088] Considering that the pressure exerted by the soil on the upper branch pipe 2 will be transmitted to the lower branch pipe 3, the lower branch pipe 3 cannot withstand the pressure without any reinforcement structure, and adding reinforcement ribs 23 and the like will increase the cost. Therefore, the support frame 1 structure is specially designed, and the following is combined with Figure 6 and Figure 7 Let me introduce it in detail.

[0089] The support frame 1 structure has three main functions:

[0090] 1. Provide a connection medium to facilitate the connection of the upper branch pipe 2 and the lower branch pipe 3 to the horizontal plate 11. The three materials can all be plastic for easy connection, and the support frame 1 is made of hard plastic to have sufficient strength;

[0091] 2. Support the upper branch pipe 2 and the lower branch pipe 3 in the trench to share the pressure. Specifically, a plurality of functional plates are arranged at intervals on the outer edge of the horizontal plate 11. The functional plates include an extension plate 15 extending upward and outward and a support plate 14 extending downward and outward. A flat support foot 16 is arranged at the bottom end of the support plate 14. The lowest point height of the support foot 16 is not higher than the lowest point height of the second arc-shaped pipeline 31.

[0092] The pressure of the upper branch pipe 2 is all applied to the horizontal plate 11, and then borne by the support plate 14. The height of the support plate 14 is not lower than the lowest point height of the second arc-shaped pipe 31, so as to avoid excessive compression deformation between the lower branch pipe 3 and the lower soil. The support legs 16 increase the pressure bearing area on the one hand, and prevent the support plate 14 from sinking into the soil on the other hand, so as to further avoid excessive compression deformation between the lower branch pipe 3 and the lower soil. In this way, the lower branch pipe 3 can be made of low-cost materials.

[0093] 3. To prevent the hidden pipe from turning over when it is manually lowered, the width of the extension plates 15 on both sides matches the width opened by the trenching machine, which can prevent the hidden pipe from turning over when the pipe is lowered and increase the lowering speed;

[0094] In addition, the vertical projection of the extension plate 15 is located outside the support foot 16, which prevents the support plate 14 from excessively frequent contact with the side wall of the groove when the blind pipe is lowered, thereby affecting the lowering speed of the pipe.

[0095] Example 2

[0096] In order to facilitate the connection of adjacent concealed pipes when laying concealed pipes manually, a functional plate flush with the end of the horizontal plate 11 is provided at each end, see Figure 1 and Figure 2 As shown, a tightening part is provided on the extension plate 15 of the functional plate, for example, a tightening hole is provided for inserting a hand-held tightening tool. The tightening tool can be used on the ground to close two adjacent concealed pipes together, and the alignment of the two functional plates at the two ends of the horizontal plate 11 can be well judged.

[0097] In order to facilitate the manufacture and connection of concealed pipes, the two horizontal plates 11 of the support frame 1 are of equal length and coplanar, and the first arc-shaped pipe 21 and the second arc-shaped pipe 31 are of equal length.

[0098] See also Figure 3 A connecting pipe 33 is extended at one end of the second arc-shaped pipe 31 , and the outer diameter of the connecting pipe 33 is closely connected to the inner diameter of the second arc-shaped pipe 31 .

[0099] A closed pipe is extended outwardly from one end of the first arc-shaped pipe 21 , and the inner diameter of the closed pipe is not less than the outer diameter of the first arc-shaped pipe 21 .

[0100] The connecting pipe 33 on each concealed pipe is arranged at both ends of the support frame 1 opposite to the closed pipe, and the closed pipe is pressed on the connecting pipe 33 of the adjacent concealed pipe.

[0101] In this way, drainage from adjacent concealed pipes is achieved without leakage, and soil is prevented from entering the concealed pipes.

[0102] Example 3

[0103] The present invention also provides a saline-alkali land comprehensive improvement method, which uses the saline-alkali land comprehensive improvement system, and the specific steps are:

[0104] S1. Dig a drainage ditch every 300-500 meters in the flat saline-alkali land. The ditch depth is 2.5-3 meters, flush with the groundwater level, and connected to the drainage main canal;

[0105] S2. Determine whether to perform deep plowing according to soil properties to destroy the impermeable layer in the soil;

[0106] S3. Use a trencher to dig trenches along the width of the farmland. The trench width matches the size of the concealed pipe, with the middle higher and the ends lower. The gradient from the center line of the farmland to both sides is 2‰, and the trench depth is between 0.7m and 1.3m.

[0107] S4, artificially place concealed pipes, with the upper branch pipe 2 on top, and place several concealed pipes in the trench dug by S3 from the center outward along the width of the farmland, with adjacent concealed pipes close together, and the outermost concealed pipe extending into the water collection ditch;

[0108] When adjacent concealed pipes are close together, use a hand-held tightening tool to pull the tightening part, and insert the connecting pipe 33 of the second arc pipe 31 of the previous concealed pipe into the second arc pipe 31 of the next concealed pipe, and cover the closed pipe extending from the first arc pipe 21 of the next concealed pipe on the outside of the previous first arc pipe 21, and make the functional boards at both ends of the adjacent concealed pipe transverse plates 11 close together;

[0109] S5. Backfill the soil to the top of the underground pipe until it is within 0.6m-0.7m from the surface of the farmland, and lay a 5-20cm layer of straw treated with preservatives;

[0110] S6. Continue to backfill the soil, level the farmland, and install drip irrigation or sprinkler irrigation equipment.

Claims

1. A comprehensive saline-alkali land improvement system, characterized in that: It includes farmland and drainage ditches arranged on both sides thereof, the width of the farmland is between 300 meters and 500 meters, and the drainage ditches are dug to the depth of the groundwater level; The farmland is provided with a plurality of concealed pipes buried along the center line to the drainage ditches on both sides, with a gradient of not less than 1‰, for discharging salt into the drainage ditches, and the depth of the concealed pipes is between 0.7 meters and 1.3 meters; A straw layer treated with a preservative is laid above the concealed pipe, and the depth of the straw layer is in the range of 0.6 m to 0.7 m; Set up drip irrigation or sprinkler irrigation equipment on the top of the farmland.

2. The saline-alkali land comprehensive improvement system according to claim 1, characterized in that: The intervals between the concealed pipes along the length of the farmland are between 8 meters and 12 meters.

3. The saline-alkali land comprehensive improvement system according to claim 1, characterized in that: The concealed pipe is composed of a support frame (1), an upper branch pipe (2) and a lower branch pipe (3), and adjacent concealed pipes on one side of the farmland center line are connected to each other; The support frame (1) comprises two parallel horizontal plates (11), and at least two ends of the horizontal plates (11) are respectively connected to a first arch plate (12) and a second arch plate (13); The upper branch pipe (2) is connected to the upper part of the support frame (1), and comprises a first arc-shaped pipe (21); The outer wall of the first arc-shaped pipe (21) is a smooth arc-shaped pipe, and the inner wall thereof abuts against the arch plate; The first arc-shaped pipe (21) has first connecting parts (22) extending outward on both sides thereof, respectively connected to the upper surfaces of the two transverse plates (11), with a gap between the first connecting parts and the inner edges of the transverse plates (11); The inner wall of the first arc-shaped pipe (21) is provided with a plurality of reinforcing ribs (23) at intervals along the length direction, and the reinforcing ribs (23) are partially pressed on the transverse plate (11); The first arc-shaped pipe (21) is provided with a plurality of water seepage holes (24), the water seepage holes (24) are away from the positions of the reinforcing ribs (23), and a water-permeable filter cloth is provided on the outer wall of the first arc-shaped pipe (21); The lower branch pipe (3) is connected to the lower part of the support frame (1), and comprises a second arc-shaped pipe (31). The second arc-shaped pipe (31) has no water seepage holes (24), and forms a salt discharge channel between the second arc-shaped pipe (31) and the first arc-shaped pipe (21).

4. The saline-alkali land comprehensive improvement system according to claim 3, characterized in that: A plurality of functional plates are arranged at intervals on the outer edge of the transverse plate (11), the functional plates comprising an extension plate (15) extending upward and outward and a support plate (14) extending downward and outward, a support foot (16) is arranged at the bottom end of the support plate (14), and the lowest point height of the support foot (16) is not higher than the lowest point height of the second arc-shaped pipe (31).

5. The comprehensive saline-alkali land improvement system according to claim 4 is characterized in that: The vertical projection of the extension plate (15) is located outside the support foot (16).

6. The saline-alkali land comprehensive improvement system according to claim 4, characterized in that: The two ends of the transverse plate (11) are respectively provided with a functional plate flush with the end thereof, and a tensioning portion is provided on the extension plate (15) of the functional plate for clamping a handheld tensioning tool.

7. The saline-alkali land comprehensive improvement system according to claim 4, characterized in that: The two transverse plates (11) are of equal length and coplanar, and the first arc-shaped pipe (21) and the second arc-shaped pipe (31) are of equal length.

8. The saline-alkali land comprehensive improvement system according to claim 7, characterized in that: A connecting pipe (33) is extended outwardly from one end of the second arc-shaped pipe (31), and the outer diameter of the connecting pipe (33) is closely connected to the inner diameter of the second arc-shaped pipe (31); A closed pipe is extended outwardly from one end of the first arc-shaped pipe (21), and the inner diameter of the closed pipe is not less than the outer diameter of the first arc-shaped pipe (21); The connecting pipe (33) on each concealed pipe is arranged at both ends of the support frame (1) opposite to the closed pipe, and the closed pipe is pressed on the connecting pipe (33) of the adjacent concealed pipe.

9. A comprehensive method for improving saline-alkali land, characterized in that: The saline-alkali land comprehensive improvement system according to any one of claims 3 to 8 is adopted, and the specific steps are as follows: S1. Dig a drainage ditch every 300-500 meters in the flat saline-alkali land. The ditch depth is 2.5-3 meters, flush with the groundwater level, and connected to the drainage main canal; S2. Determine whether to perform deep plowing according to soil properties to destroy the impermeable layer in the soil; S3. Use a trencher to dig trenches along the width of the farmland. The trench width should match the size of the concealed pipe, with the middle higher and the ends lower. The gradient from the center line of the farmland to both sides should not be less than 1‰, and the trench depth should be between 0.7m and 1.3m. S4, artificially placing underground pipes, with the upper branch pipe (2) on top, placing several underground pipes in the trench dug in S3 from the center outward along the width of the farmland, with adjacent underground pipes close together and the outermost underground pipe extending into the water collection ditch; S5. Backfill the soil to the top of the underground pipe until it is within 0.6m-0.7m from the surface of the farmland, and lay a 5-20cm layer of straw treated with preservatives; S6. Continue to backfill the soil, level the farmland, and install drip irrigation or sprinkler irrigation equipment.

10. The comprehensive improvement method for saline-alkali land according to claim 9, characterized in that: In step S4, when adjacent concealed pipes are close together, a hand-held tightening tool is used to pull the tightening part, and the connecting pipe (33) of the second arc pipe (31) of the previous concealed pipe is inserted into the second arc pipe (31) of the next concealed pipe, and the closed pipe extending from the first arc pipe (21) of the next concealed pipe is covered on the outside of the previous first arc pipe (21), and the functional boards at both ends of the adjacent concealed pipe transverse plates (11) are close together.

Citation Information

Patent Citations

  • Drainage salt-washing method for green belt of heavy saline-alkali land development region in coastal area

    CN105474823A

  • Water-draining open ditch and closed conduit combined water drainage and salinity reducing method

    CN109257990A

  • Pipeline device for improving saline-alkali soil

    CN109392343A

  • Saline-alkali soil transformation system

    CN209017411U

  • Shared support for large-diameter pipelines of soft soil groove

    CN214274717U

Cited By

  • Improvement method suitable for moderate and severe saline-alkali soil

    CN119999391A

  • Water-saving alkali-reducing salt-leaching seedling protection method for saline-alkali soil

    CN120982253A