Coating apparatus, method and electrode

By designing the coating equipment to ensure the adhesion of each layer using shear and compression force, combined with extrusion and temperature adjustment technology, the problem of multi-layer coating continuity and adhesion in solvent-free electrode manufacturing is solved, and the conductivity and energy of the electrode are improved. density.

CN118720145APending Publication Date: 2024-10-01POWERCO SE
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410366404.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2023-03-30
Filing Date
2024-03-28
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

Existing solvent-free or dry electrode manufacturing methods are difficult to ensure the continuity and adhesion of multi-layer coatings, resulting in low electrode conductivity and energy density, and high scrap rates.

Method used

A coating equipment is designed to coat and transfer powder layers sequentially through the first and second roller devices, using shear force and compression force to ensure the adhesion and transfer of each layer, reducing boundary layers and mixing, and using extrusion gaps Increase the packing density and control the powder feeding with adjustable temperature and shielding plate.

Benefits of technology

The continuous coating of double-layer powder layers of solvent-free dry electrodes is achieved, which improves the conductivity and energy density of the electrodes, reduces the scrap rate, and the amount of materials is reasonably configured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118720145A_ABST
    Figure CN118720145A_ABST
Patent Text Reader

Abstract

The invention relates to a coating device for producing an electrode having at least one double-layer powder layer on a substrate, comprising: a feed unit for feeding the substrate into a first pressing gap; a first roller device for transferring a first powder as a first layer onto a first side of the substrate, having a first metering unit, a first coating roller, a first pressure roller unit and a second pressure roller unit, a first metering gap being arranged between the first coating roller and the first pressure roller unit, and a second metering gap being arranged between the second coating roller and the second pressure roller unit; the first pressing gap is formed between the first pressing roller unit and the second pressing roller unit; a second roller device for transferring a second powder onto the first layer on the first side of the substrate, the second roller device being arranged downstream of the first roller device and having a second metering unit, a second coating roller, a third pressure roller unit and a fourth pressure roller unit, a second metering gap being arranged between the second coating roller and the third pressure roller unit, and the second pressing gap is arranged between the third pressing roller unit and the fourth pressing roller unit.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a coating device for producing an electrode having at least one double powder layer on a substrate, a method for producing an electrode having at least one double powder layer, in particular a double cathode layer and / or anode layer, on a substrate, and an electrode. Background Art

[0002] In experiments with solvent-free or dry electrode production, electrodes with a single coating have been produced so far. In order to improve the performance of battery cells, methods are being pursued in conventional electrode production to produce electrodes with multilayer coatings (with different compositions in each layer). This is because these electrodes have a higher energy density and conductivity.

[0003] Currently, electrodes produced without solvents and having a multilayer coating are usually produced as separate films. The two powders are pressed onto a current collector in a calender gap.

[0004] However, the electrodes are still processed wet as standard and therefore contain solvents.

[0005] A kind of other method is to apply each individual layer as independent film successively on the substrate side provided for this purpose.For this reason, for example, each individual layer can be applied and pressed respectively in two calender gaps arranged in succession.

[0006] However, this usually requires an adhesion promoter or a certain powder moisture, because otherwise the adhesion of the individual layers cannot be guaranteed. This may result in the substrate or the current collector not being coated continuously. This in turn leads to a higher scrap rate or a lower electrical efficiency of the electrode produced in this way. Summary of the invention

[0007] Therefore, the technical problem to be solved by the present invention is to at least partially overcome at least one of the above disadvantages. In particular, the technical problem to be solved by the present invention is to provide a coating device that can realize dry electrode manufacturing so as to improve the conductivity or energy density of the electrode. The technical problem to be solved by the present invention is also to provide a method for dry electrode manufacturing and an electrode manufactured in this way.

[0008] The above technical problems are solved by the coating device according to the present invention, the method according to the present invention and the electrode according to the present invention. Other features and details of the present invention are derived from the description and the drawings. Here, the features and details described about the coating device according to the present invention are of course also applicable to the method according to the present invention and / or to the electrode according to the present invention, and vice versa, that is, the features and details described about the method according to the present invention are of course also applicable to the coating device according to the present invention and / or to the electrode according to the present invention, and the features and details described about the electrode according to the present invention are of course also applicable to the coating device according to the present invention and / or to the method according to the present invention, so that the individual inventive aspects are always mutually referenced or can be mutually referenced in terms of the disclosed content.

[0009] According to a first aspect of the present invention, a coating device is provided according to the present invention for manufacturing an electrode having at least one double powder layer, especially a double cathode layer and / or anode layer, on a substrate, especially a current collector, the coating device comprising: a conveying unit for inputting the substrate into a first pressing gap; a first roller device for transferring a first powder as a first layer to a first side of the substrate; and a second roller device for transferring a second powder as a second layer to the first layer on the first side of the substrate.

[0010] The first roller arrangement has a first metering unit for receiving a first powder and for filling a first metering gap with the first powder. The first roller arrangement also has a first coating roller, a first pressure roller unit and a second pressure roller unit, wherein the first metering gap is arranged between the first coating roller and the first pressure roller unit, and wherein the first pressure gap is arranged between the first pressure roller unit and the second pressure roller unit. The first metering gap is arranged for applying the first powder as a first layer onto the first pressure roller unit by means of a first coating force, and the first pressure gap is arranged for transferring the first layer from the first pressure roller unit to the first side of the substrate by means of the first pressure force.

[0011] The second roller arrangement is arranged downstream of the first roller arrangement, wherein the first roller arrangement is designed to feed the substrate coated on the first side into the second pressure nip of the second roller arrangement.

[0012] Here, the second roller arrangement has a second metering unit for receiving the second powder and for filling the second metering gap with the second powder. Here, the second roller arrangement has a second coating roller, a third pressure roller unit and a fourth pressure roller unit, wherein the second metering gap is arranged between the second coating roller and the third pressure roller unit, and wherein the second pressure gap is arranged between the third pressure roller unit and the fourth pressure roller unit. The second metering gap is arranged for applying the second powder as a second layer onto the third pressure roller unit by a second coating force, and the second pressure gap is arranged for transferring the second layer from the third pressure roller unit to the first layer of the first side of the input substrate by a second pressure force.

[0013] The coating system is based on roller coating, wherein firstly a first powder is applied as a first layer to the rollers of a first pressure roller unit, so that then one or said roller transfers or presses the first layer onto the substrate. This is followed by a further roller coating, wherein a second powder is applied as a second layer to the rollers of a third pressure roller unit, so that then this roller or another roller transfers the second layer onto the first layer. This is particularly advantageous for coating substrates with solvent-free dry powder materials, so that the coating system is extremely suitable for dry electrode production.

[0014] Furthermore, the rotation speed of the first coating roller of the first roller device and the second coating roller of the second roller device can be less than the rotation speed of the pressure rollers of the first pressure roller unit or the third pressure roller unit, which form a metering gap with the first and second coating rollers respectively. This ensures that the first powder remains attached to the first pressure roller unit as a first layer, and the second powder remains attached to the third pressure roller unit as a second layer. When the powder is applied to the corresponding coating roller, the corresponding powder is sheared in the metering gap. Therefore, the coating force can be a shear force, so that the coating roller can also be called a shear roller.

[0015] The first pressure roller unit and the second pressure roller unit can each have a pressure roller. In order to apply a pressure force for transferring the first layer, the pressure rollers of the first pressure roller unit and the second pressure roller unit that form a pressure gap rotate relative to each other at the same rotational speed in order to obtain the best coating result. The rotational speed of the first coating roller can be less than the rotational speed of the pressure roller of the first pressure roller unit that forms a metering gap with the first coating roller, thereby ensuring that the first powder is attached to the first pressure unit as a first layer so as to be carried by the first pressure unit. The same applies to the third and fourth pressure roller units of the second roller device. The third and fourth pressure roller units can also each have a pressure roller, and the pressure rollers of the third and fourth pressure roller units rotate relative to each other at the same rotational speed in order to apply a pressure force for transferring the second layer to the first layer.

[0016] The rotational speeds of the first and second pressure roller units are adapted to the rotational speeds of the third and fourth pressure roller units so that the shear forces on the already applied first layer in the second pressure nip are as low as possible in order not to damage the coating.

[0017] The sequential application of the individual layers of the double powder layer reduces the boundary layer between the first powder and the second powder, ie between the first layer and the second layer of the first double powder layer, because the first powder and the second powder do not mix.

[0018] It can be advantageous within the scope of the invention if the first roller arrangement has a third metering unit for receiving a third powder and for filling a third metering gap with the third powder, and if the first roller arrangement has a third coating roller, wherein the third metering gap is arranged between the third coating roller and the second pressure roller unit, wherein the third metering gap is arranged for applying the third powder as a third layer onto the second pressure roller unit by means of a third coating force. The first pressure gap is arranged for transferring the third layer from the second pressure roller unit to the second side of the substrate by means of the first pressure force.

[0019] This makes it possible to apply the first layer to the first side of the substrate and the third layer to the second side of the substrate in parallel in the first pressing nip by means of the first pressing force.

[0020] It is conceivable within the scope of the present invention that the second roller arrangement has a fourth metering unit for accommodating a fourth powder and for filling a fourth metering gap with the fourth powder, and that the second roller arrangement has a fourth coating roller, wherein the fourth metering gap is arranged between the fourth coating roller and the fourth pressure roller unit, wherein the fourth metering gap is arranged for applying the fourth powder as a fourth layer to the fourth pressure roller unit by means of a fourth coating force, and wherein the second pressure gap is arranged for transferring the fourth layer from the fourth pressure roller unit to the third layer on the second side of the substrate by means of a second pressure force.

[0021] This makes it possible to apply the second layer onto the first layer of the substrate and the fourth layer onto the third layer of the substrate in parallel in the second pressing nip by means of the second pressing force.

[0022] The properties and features of the coating system mentioned with respect to the first and second coating rollers apply analogously here to the properties and features with respect to the third and fourth coating rollers.

[0023] Furthermore, the rotation speed of the third coating roller of the first roller arrangement and the fourth coating roller of the second roller arrangement can be lower than the rotation speed of the pressure rollers of the second pressure roller unit or the fourth pressure roller unit, which form the metering gap with the third and fourth coating rollers, respectively. This ensures that the third powder adheres to the second pressure roller unit as a third layer and the fourth powder adheres to the fourth pressure roller unit as a fourth layer.

[0024] It can be provided within the scope of the invention that the first pressure roller unit of the first roller device has at least one first pressure roller and at least one second pressure roller, wherein at least one first pressing gap is arranged between the at least one first pressure roller and the at least one second pressure roller. Additionally or alternatively, the second pressure roller unit of the first roller device has at least one third pressure roller and at least one fourth pressure roller, wherein at least one second pressing gap is arranged between the at least one third pressure roller and the at least one fourth pressure roller. Additionally or alternatively, the third pressure roller unit of the second roller device has at least one fifth pressure roller and at least one sixth pressure roller, wherein at least one third pressing gap is arranged between the at least one fifth pressure roller and the at least one sixth pressure roller. Additionally or alternatively, the fourth pressure roller unit of the second roller device has at least one seventh pressure roller and at least one eighth pressure roller, wherein at least one fourth pressing gap is arranged between the at least one seventh pressure roller and the at least one eighth pressure roller.

[0025] Before the first layer or the second layer or the third layer or the fourth layer is transferred to the substrate, the first extrusion gap and / or the second extrusion gap and / or the third extrusion gap and / or the fourth extrusion gap extrudes the first layer or the second layer or the third layer or the fourth layer. This can produce a tighter stacking of the first double-layer powder layer, wherein the first double-layer powder layer has the first layer and the second layer. At the same time, a tighter stacking of the second double-layer powder layer can also be produced, wherein the second double-layer powder layer has the third layer and the fourth layer. This can further improve the conductivity. In addition, the extrusion gap has an additional effect, namely, the force required to act in the metering gap and in the pressing gap for coating or transfer is smaller, so the shear force acting in these gaps can be reduced. This produces uniform coating and transfer and reduces defective positions during coating or transfer.

[0026] It is also conceivable that in the region of the first metering gap, a first shielding plate is arranged in the region of the first coating roller and / or a second shielding plate is arranged in the region of the first pressure roller unit. Additionally or alternatively, it is conceivable that in the region of the second metering gap, a third shielding plate is arranged in the region of the second coating roller and / or a fourth shielding plate is arranged in the region of the third pressure roller unit. Additionally or alternatively, it is also conceivable that in the region of the third metering gap, a fifth shielding plate is arranged in the region of the third coating roller and / or a sixth shielding plate is arranged in the region of the second pressure roller unit. Additionally or alternatively, it is conceivable that in the region of the fourth metering gap, a seventh shielding plate is arranged in the region of the fourth coating roller and / or an eighth shielding plate is arranged in the region of the fourth pressure roller unit.

[0027] The shielding plate is used to prevent the powder from acting on the corresponding pressure roller unit or adhering to the coating roller assigned to the corresponding pressure roller unit before reaching the metering gap. At the same time, the powder feeding into the first metering gap and / or the second metering gap can be controlled in a simple manner by means of such a shielding plate. At the same time, it is conceivable that the shielding plate has a structure for cleaning the corresponding coating roller and / or the corresponding pressure roller unit or removing the adhering material. This can achieve the cleanest possible coating of the new first layer and / or the second layer and / or the third layer and / or the fourth layer or the clean transfer of the first layer and / or the third layer to the substrate or the clean transfer of the second layer to the first layer and / or the clean transfer of the fourth layer to the third layer.

[0028] Furthermore, in the coating device, it can be considered that the first coating roller and / or the second coating roller and / or the third coating roller and / or the fourth coating roller and / or the first pressure roller unit and / or the second pressure roller unit and / or the third pressure roller unit and / or the fourth pressure roller unit are temperature-adjustable (or can be temperature-controlled).

[0029] This can significantly simplify the application and transfer of the various powders or layers to the rollers or substrates, since the adhesion on the surface can be adapted to the material to be applied.

[0030] According to a second aspect of the present invention, the above technical problem is also solved by a method according to the present invention for producing an electrode having at least one double-layer powder layer, in particular a double-layer cathode layer and / or anode layer on a substrate, in particular a current collector, in the aforementioned coating device, the method comprising the following steps:

[0031] - feeding the substrate into the first pressing gap of the first roller device by means of a conveying unit;

[0032] - filling the first metering gap with the first powder by means of the first metering unit;

[0033] - applying the first powder as a first layer onto the first pressure roller unit in the first metering gap by means of a first coating force;

[0034] - transferring the first layer onto the first side of the substrate in the first pressing gap by means of a first pressing force;

[0035] - feeding the substrate with the transferred first layer into the second pressing gap of the second roller arrangement;

[0036] - filling the second metering gap with a second powder by means of a second metering unit;

[0037] - applying the second powder as a second layer onto the third pressure roller unit in the second metering gap by means of a second coating force;

[0038] In the second pressing nip, the second layer is transferred onto the first layer on the first side of the substrate by a second pressing force.

[0039] The sequential application of the first and second layers results in an additional compaction of the first layer, which has a favorable effect on the electrical conductivity and energy density of the electrode which can be produced in this way.

[0040] In the method, it can also be considered that the third metering unit fills a third metering gap with a third powder, wherein the third powder is applied as a third layer to the second pressure roller unit in the third metering gap by a third coating force, and the third layer is transferred to the second side of the substrate in the first pressure gap by the first pressure force.

[0041] By means of the third metering unit and the third coating roller, the third layer can be transferred to the second side of the substrate while the first layer is transferred to the first side of the substrate. This is both time-saving and efficient.

[0042] Within the scope of the present invention, it is optionally possible that the fourth metering unit fills a fourth metering gap with a fourth powder, wherein the fourth powder is applied as a fourth layer to a fourth pressure roller unit in the fourth metering gap by a fourth coating force, and the fourth layer is transferred to the third layer on the second side of the substrate in the second pressure gap by a second pressure force.

[0043] By means of the fourth metering unit and the fourth coating roller, the fourth layer can be transferred onto the third layer on the second side of the substrate while the second layer is transferred onto the first layer on the first side of the substrate. This is both time-saving and efficient.

[0044] Furthermore, within the scope of the invention it can be provided that the first metering unit continuously fills the first metering gap and / or the second metering unit continuously fills the second metering gap and / or the third metering unit continuously fills the third metering gap and / or the fourth metering unit continuously fills the fourth metering gap.

[0045] This allows particularly uniform results when the corresponding layer is produced on the pressure roller unit and is transferred from the pressure roller unit to the substrate or to a layer already applied to the substrate.

[0046] It is conceivable in the context of the invention that the first layer is pressed in at least one first pressing gap of a first pressure roller unit of a first roller device. Additionally or alternatively, it is conceivable that the third layer is pressed in at least one second pressing gap of a second pressure roller unit of the first roller device. Additionally or alternatively, it is conceivable that the second layer is pressed in at least one third pressing gap of a third pressure roller unit of the second roller device. Additionally or alternatively, it is conceivable that the fourth layer is pressed in at least one fourth pressing gap of a fourth pressure roller unit of the second roller device.

[0047] The extrusion in the corresponding extrusion gap causes the first layer and / or the second layer and / or the third layer and / or the fourth layer to be compacted, thereby producing a relatively dense stacking of the corresponding at least two-layer powder layer on the first side and / or the second side of the substrate. This can achieve a reduction in the first coating force and / or the second coating force and / or the third coating force and / or the fourth coating force and / or the first pressing force and / or the second pressing force.

[0048] It is further conceivable that the first coating roller and / or the second coating roller and / or the third coating roller and / or the fourth coating roller and / or the first pressure roller unit and / or the second pressure roller unit and / or the third pressure roller unit and / or the fourth pressure roller unit are temperature-controlled to a temperature between 80° C. and 150° C., in particular between 100° C. and 120° C.

[0049] This allows for an improved application of the first and third powders as the first and third layers to the first or second pressure roller unit and / or an improved application of the second and fourth powders as the second and fourth layers to the third or fourth pressure roller unit. Furthermore, the temperature control of the individual rollers allows for an improved transfer of the first layer to the first side of the substrate and / or the third layer to the second side of the substrate and / or the second layer to the first layer on the first side of the substrate and / or the fourth layer to the third layer on the second side of the substrate, since the individual connections of the individual powders of the respective layers are thermally enhanced.

[0050] It is also conceivable to temperature-control the transport unit in order to preheat the substrate for transferring, ie pressing, the first layer onto the first side of the substrate and / or transferring, ie pressing, the third layer onto the second side of the substrate.

[0051] Within the scope of the present invention, it can be advantageous if the first pressure roller unit and the second pressure roller unit of the first roller arrangement rotate relative to each other at the same first rotational speed, wherein the ratio of the first rotational speed of the first pressure roller unit to the second rotational speed of the first coating roller is 10:1 to 10:4, preferably 10:1.5 to 10:3, more preferably 10:2 to 10:3, and / or the ratio of the first rotational speed of the second pressure roller unit to the fifth rotational speed of the third coating roller is 10:1 to 10:4, preferably 10:1.5 to 10:3, more preferably 10:2 to 10:3. Additionally or alternatively, it is conceivable that the third pressure roller unit and the fourth pressure roller unit of the second roller device rotate relative to each other at the same third rotational speed, wherein the ratio of the third rotational speed of the third pressure roller unit to the fourth rotational speed of the second coating roller is 10:1 to 10:4, preferably 10:1.5 to 10:3, more preferably 10:2 to 10:3, and / or the ratio of the third rotational speed of the fourth pressure roller unit to the sixth rotational speed of the fourth coating roller is 10:1 to 10:4, preferably 10:1.5 to 10:3, more preferably 10:2 to 10:3.

[0052] If the first pressure roller unit of the first roller arrangement has a first and a second pressure roller and / or the second pressure roller unit of the first roller arrangement has a third and a fourth pressure roller, the first rotational speed is regarded as the rotational speed of the first pressure roller of the first pressure roller unit and the third pressure roller of the second pressure roller unit, because the first pressure roller and the third pressure roller form the first pressure gap. The rotational speed of the second pressure roller and the fourth pressure roller can each be different from the first rotational speed. For example, the ratio of the first rotational speed of the first and third pressure rollers to the rotational speed of the second and / or fourth pressure roller can be 10:5 to 10:8, preferably 10:6 to 10:8, more preferably 10:7 to 10:8.

[0053] If the third pressure roller unit of the second roller arrangement has a fifth and a sixth pressure roller and / or the fourth pressure roller unit of the second roller arrangement has a seventh and an eighth pressure roller, the third rotational speed is regarded as the rotational speed of the fifth and seventh pressure rollers, since the fifth and seventh pressure rollers form the second pressure gap. The rotational speed of the sixth and eighth pressure rollers can also be different from the third rotational speed. For example, the ratio of the third rotational speed of the fifth and seventh pressure rollers to the rotational speed of the sixth and / or eighth pressure rollers can be 10:5 to 10:8, preferably 10:6 to 10:8, more preferably 10:7 to 10:8.

[0054] It has been found that the ratio of the rotational speeds advantageously increases the stability of the first or at least double first powder layer on the current collector of the electrode and / or the stability of the second or at least double second powder layer on the current collector of the electrode.

[0055] According to the third aspect of the present invention, the above technical problem is also solved by an electrode with a double powder layer according to the present invention, which is manufactured by the above coating device and / or the above method, wherein the substrate is a current collector having a first side and a second side, wherein the first layer of the double powder layer is made of a first powder and the second layer of the double powder layer is made of a second powder.

[0056] It is conceivable within the scope of the invention that the third layer of the double powder layer is produced from a third powder and the fourth layer of the double powder layer is produced from a fourth powder.

[0057] The electrode can be used as an anode or a cathode. It is conceivable that the double powder layer of the cathode is different from the double powder layer of the anode. It is also conceivable that the current collector of the anode is different from the current collector of the cathode.

[0058] Such an electrode has an optimally compacted double powder layer, wherein the double powder layer is solvent-free. At the same time, the electrode produced in this way has a high electrical conductivity and energy density.

[0059] If the double powder layer has a layer thickness of between 40 and 150 μm, wherein the first powder of the first layer and the third powder of the third layer have a layer thickness of between 10 and 70 μm, the material quantities for the first, second, third and fourth powder of the double powder layer are particularly good in relation to the existing electrical conductivity. This also makes it possible to configure the material quantities cost-effectively.

[0060] The advantages described in detail with respect to the coating device according to the first aspect of the invention also apply to the method according to the second aspect of the invention and to the electrode according to the third aspect of the invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0061] Further advantages, features and details of the present invention are apparent from the following description, in which a number of embodiments of the present invention are described in detail with reference to the accompanying drawings. The features mentioned in the description may be important to the present invention individually or in any combination. The present invention is illustrated in the following drawings:

[0062] Figure 1 A schematic diagram showing a coating apparatus for applying and transferring a first double powder layer;

[0063] Figure 2 A schematic diagram showing a coating apparatus for applying and transferring a first and a second double powder layer;

[0064] Figure 3 Show Figure 1 A portion of a first metering gap in;

[0065] Figure 4 Show the basis for use Figure 1 A schematic diagram of a coating apparatus method;

[0066] Figure 5 Show the basis for use Figure 2 A schematic diagram of a coating apparatus method;

[0067] Figure 6 A schematic diagram showing electrodes. DETAILED DESCRIPTION

[0068] exist Figure 1 and Figure 2 1 and 2 show a coating device 10 for producing an electrode 11 having at least one double powder layer 12 , in particular a double cathode layer 13 and / or anode layer 14 , on a substrate 15 , in particular a current collector 16 . Figure 1 A coating device 10 is shown for single-sided coating of a substrate 15 by applying 130 and transferring 140 at least one first double powder layer 12, and Figure 2A coating device 10 is shown for double-sided coating of a substrate 15 by applying 130 , 180 and transferring 140 , 190 at least one first double powder layer 12 (first and second layers 26 , 34 ) and at least one second double powder layer 12 (third and fourth layers 41 , 47 ).

[0069] Figure 1 and Figure 2 The coating devices 10 all have a conveying unit 17 for inputting 110 a substrate 15 into a first pressing gap 18, a first roller device 19 for transferring 140 a first powder 21 as a first layer 26 onto a first side 27 of the substrate 15, and a second roller device 28 for transferring 140 a second powder 29 onto the first layer 26 on the first side 27 of the substrate 15.

[0070] The first roller device 19 has a first metering unit 20 for receiving a first powder 21 and for filling a first metering gap 22 with the first powder 21. In addition, the first roller device 19 has a first coating roller 23, a first pressure roller unit 24 and a second pressure roller unit 25. The first metering gap 22 is arranged between the first coating roller 23 and the first pressure roller unit 24, and the first pressure gap 18 is arranged between the first pressure roller unit 24 and the second pressure roller unit 25.

[0071] The first metering gap 22 serves to apply 130 the first powder 21 as a first layer 26 onto the first pressure roller unit 24 with a first application force FA1 , and the first pressure gap 18 serves to transfer 140 the first layer 26 from the first pressure roller unit 24 to the first side 27 of the substrate 15 with a first pressure force FP1 .

[0072] The second roller arrangement 28 is arranged downstream (or after) the first roller arrangement 19 . The first roller arrangement 19 is designed to feed the substrate 15 coated on the first side 27 into the second pressing nip 30 of the second roller arrangement 28 .

[0073] The second roller arrangement 28 has a second metering unit 31 for receiving the second powder 29 and for filling the second metering gap 32 with the second powder 29. In addition, the second roller arrangement 28 has a second coating roller 33, a third pressure roller unit 34 and a fourth pressure roller unit 35. The second metering gap 32 is arranged between the second coating roller 33 and the third pressure roller unit 34. The second pressure gap 30 is arranged between the third pressure roller unit 34 and the fourth pressure roller unit 35. The second metering gap 32 is provided for applying 130 the second powder 29 as a second layer 36 onto the third pressure roller unit 34 by a second coating force FA2, and the second pressure gap 30 is provided for transferring 140 the second layer 36 from the third pressure roller unit 34 to the first layer 26 of the first side 27 of the fed substrate 15 by a second pressure force FP2.

[0074] In order to be able to apply the double powder layer 12 to both sides of the substrate 15, Figure 2 The first roller arrangement 19 of the coating device 10 in the embodiment of the present invention has a third metering unit 37 for accommodating a third powder 38 and for filling a third metering gap 39 with the third powder 38. In addition, a third coating roller 40 is provided, wherein the third metering gap 39 is arranged between the third coating roller 40 and the second pressure roller unit 25. The third metering gap 39 is used to apply 130 the third powder 38 as a third layer 41 to the second pressure roller unit 25 by a third coating force FA3. In addition, in this case, the first pressure gap 18 is provided for transferring 140 the third layer 41 from the second pressure roller unit 25 to the second side 42 of the substrate 15 by a first pressure force FP1.

[0075] Furthermore, the second roller arrangement 28 has a fourth metering unit 43 for receiving a fourth powder 44 and for filling a fourth metering gap 45 with the fourth powder 44. For this purpose, a fourth coating roller 46 is provided, wherein the fourth metering gap 45 is arranged between the fourth coating roller 46 and the fourth pressure roller unit 35. The fourth metering gap 45 is provided for applying 130 the fourth powder 44 as a fourth layer 47 onto the fourth pressure roller unit 35 by a fourth coating force FA4. The second pressure gap 30 is provided for transferring 140 the fourth layer 47 from the fourth pressure roller unit 35 onto the third layer 41 of the second side 42 of the substrate 15 by a second pressure force FP2.

[0076] In addition, according to Figure 2 In the coating device 10 of , it is shown that the first pressure roller unit 24 of the first roller device 19 has at least one first pressure roller 48 and at least one second pressure roller 49, wherein at least one first pressing gap 50 is provided between the at least one first pressure roller 48 and the at least one second pressure roller 49, and the second pressure roller unit 25 of the first roller device 19 has at least one third pressure roller 51 and at least one fourth pressure roller 52, wherein at least one second pressing gap 53 is provided between the at least one third pressure roller 51 and the at least one fourth pressure roller 52. In addition, the third pressure roller unit 34 of the second roller device 28 has at least one fifth pressure roller 54 and at least one sixth pressure roller 55, wherein at least one third pressing gap 56 is provided between the at least one fifth pressure roller 54 and the at least one sixth pressure roller 55. In addition, the fourth pressure roller unit 35 of the second roller arrangement 28 has at least one seventh pressure roller 57 and at least one eighth pressure roller 58 , wherein at least one fourth press nip 59 is provided between the at least one seventh pressure roller 57 and the at least one eighth pressure roller 58 .

[0077] Figure 3An enlarged detail of the first metering gap 22 with the first metering unit 20 is shown, according to Figure 1 and Figure 2 Such a metering gap can be designed in all coating devices 10. Here, in the region of the first metering gap 22, in the region of the first coating roller 23, a first shielding plate 60 and / or in the region of the first pressure roller unit 24, a second shielding plate 61 is arranged.

[0078] It is conceivable that in the area of ​​the second metering gap 32, a third shielding plate 62 is arranged in the area of ​​the second coating roller 33 and / or a fourth shielding plate 63 is arranged in the area of ​​the third pressure roller unit 34, and / or in the area of ​​the third metering gap 39, a fifth shielding plate 64 is arranged in the area of ​​the third coating roller 40 and / or a sixth shielding plate 65 is arranged in the area of ​​the second pressure roller unit 25, and / or in the area of ​​the fourth metering gap 45, a seventh shielding plate 66 is arranged in the area of ​​the fourth coating roller 46 and / or an eighth shielding plate 67 is arranged in the area of ​​the fourth pressure roller unit 35.

[0079] Figure 4 and Figure 5 A method for Figure 1 or Figure 2 A method 100 for producing an electrode 11 having at least one double-layer powder layer 12, in particular a double-layer cathode layer 13 and / or anode layer 14, on a substrate 15, in particular a current collector 16, in a coating device 10 of one of the present inventions. The method comprises the following steps:

[0080] - feeding 110 the substrate 15 into the first pressing gap 18 of the first roller device 19 via the conveying unit 17;

[0081] - filling 120 the first metering gap 22 with the first powder 21 by means of the first metering unit 20 ;

[0082] - applying 130 the first powder 21 as a first layer 26 onto the first pressure roller unit 24 in the first metering gap 22 by means of a first application force FA1;

[0083] - transferring 140 the first layer 26 onto the first side 27 of the substrate 15 in the first pressing gap 18 by means of a first pressing force FP1;

[0084] - feeding 160 the substrate 15 with the transferred 140 first layer 26 into the second pressing gap 30 of the second roller arrangement 28;

[0085] - filling 170 the second metering gap 32 with the second powder 29 by means of the second metering unit 31 ;

[0086] - applying 180 the second powder 29 as a second layer 36 onto the third pressure roller unit 34 in the second metering gap 32 by means of a second coating force FA2;

[0087] In the second pressing nip 30 , the second layer 36 is transferred 190 onto the first layer 26 on the first side 27 of the substrate 15 by means of a second pressing force FP2 .

[0088] according to Figure 2 The coating device 10 has a third metering unit 37, so that Figure 5 In the method, the third metering unit 37 fills 120 a third metering gap 39 with a third powder 38, wherein the third powder 38 is coated 130 as a third layer 41 onto the second pressure roller unit 25 in the third metering gap 39 by a third coating force FA3, and the third layer 41 is transferred 140 to the second side 42 of the substrate 15 in the first pressure gap 18 by a first pressure force FP1.

[0089] In addition, according to Figure 2 The coating device 10 is also provided with a fourth metering unit 43, so that Figure 5 In the method, the fourth metering unit 43 fills 170 a fourth metering gap 45 with a fourth powder 44, wherein the fourth powder 44 is coated 180 as a fourth layer 47 onto the fourth pressure roller unit 35 in the fourth metering gap 45 by a fourth coating force FA4, and the fourth layer 47 is transferred 140 to the third layer 41 on the second side 42 of the substrate 15 in the second pressure gap 30 by a second pressure force FP2.

[0090] In order to obtain a good coating result on the substrate 15, the coating device 10 and the method 100 are designed so that the first metering unit 20 continuously fills 120 the first metering gap 22, the second metering unit 31 continuously fills 170 the second metering gap 32, the third metering unit 37 continuously fills 120 the third metering gap 39, and the fourth metering unit 43 continuously fills 170 the fourth metering gap 45.

[0091] In accordance with Figure 5 In the method 100, the first layer 26 is pressed 150 in at least one first pressing gap 50 of the first pressure roller unit 24 of the first roller device 19, and the third layer 41 is pressed 150 in at least one second pressing gap 53 of the second pressure roller unit 25 of the first roller device 19. Furthermore, the second layer 36 is pressed 200 in at least one third pressing gap 56 of the third pressure roller unit 34 of the second roller device 28, and the fourth layer 47 is pressed 200 in at least one fourth pressing gap 59 of the fourth pressure roller unit 35 of the second roller device 28.

[0092] In order to better coat the layer 130 and transfer the layer 140, Figure 1 and Figure 2 The first coating roller 23 and the second coating roller 33 shown in FIG. Figure 2 The third coating roller 40 and the fourth coating roller 46 are shown as well as Figure 1 and Figure 2 The first pressure roller unit 24 and the second pressure roller unit 25 and the third pressure roller unit 34 and the fourth pressure roller unit 35 are as shown in FIG. Figure 4 and Figure 5 As shown, the temperature is adjusted from 210 to a temperature between 80°C and 150°C.

[0093] In use according to Figure 1 The coating device 10 performs according to Figure 4 Method 100 or when using Figure 2 The coating device 10 performs according to Figure 5 During the method 100, the first pressure roller unit 24 and the second pressure roller unit 25 of the first roller device 19 rotate relative to each other at the same first rotation speed v1, wherein the ratio of the first rotation speed v1 of the first pressure roller unit 24 to the second rotation speed v2 of the first coating roller 23 is 10:1 to 10:4. At the same time, the third pressure roller unit 34 and the fourth pressure roller unit 35 of the second roller device 28 rotate relative to each other at the same third rotation speed v3, wherein the ratio of the third rotation speed v3 of the third pressure roller unit 34 to the fourth rotation speed v4 of the second coating roller 33 is 10:1 to 10:4.

[0094] In accordance with Figure 5 In the method 100, the ratio of the first rotation speed v1 of the second pressure roller unit 25 to the fifth rotation speed v5 of the third coating roller 40 is 10:1 to 10:4 and the ratio of the third rotation speed v3 of the fourth pressure roller unit 35 to the sixth rotation speed v6 of the fourth coating roller 46 is 10:1 to 10:4.

[0095] exist Figure 6 FIG. 1 shows an electrode 11 having a double powder layer 12, which is formed by Figure 1 or Figure 2 One of the coating devices 10 and / or by Figure 4 or Figure 5 Here, the substrate 15 is a current collector 16 having a first side 27 and a second side 42 , wherein the first layer 26 of the double powder layer 12 is made of the first powder 21 and the second layer 36 of the double powder layer 12 is made of the second powder 29 .

[0096] Furthermore, the third layer 41 of the double-layered powder layer 12 is made of the third powder 38 , and the fourth layer 47 of the double-layered powder layer 12 is made of the fourth powder 44 .

[0097] The first layer thickness SD1 of the double powder layer 12 on the first side 27 of the substrate 15 and the second layer thickness SD2 of the double powder layer 12 on the second side 42 of the substrate 15 are respectively between 40 and 150 μm, wherein the first layer thickness SP1 of the first powder 21 of the first layer 26 is 10 to 70 μm and the second layer thickness SP2 of the third powder 38 of the third layer 41 is 10 to 70 μm. This also enables the material usage to be configured cost-effectively.

[0098] Reference numerals list

[0099] 10Coating equipment

[0100] 11 electrodes

[0101] 12 double powder layers

[0102] 13 cathode layer

[0103] 14 Anode layer

[0104] 15 substrate

[0105] 16 current collectors

[0106] 17Conveyor unit

[0107] 18 First clamping gap

[0108] 19First roller device

[0109] 20 First metering unit

[0110] 21 First Powder

[0111] 22 First metering gap

[0112] 23. First coating roller

[0113] 24First pressure roller unit

[0114] 25 Second pressure roller unit

[0115] 26First floor

[0116] 27 First side

[0117] 28 Second roller device

[0118] 29 Second Powder

[0119] 30 Second clamping gap

[0120] 31 Second Measuring Unit

[0121] 32 Second metering gap

[0122] 33 Second coating roller

[0123] 34Third pressure roller unit

[0124] 35 Fourth pressure roller unit

[0125] 36 Second Floor

[0126] 37 The third measurement unit

[0127] 38 The Third Powder

[0128] 39 Third metering gap

[0129] 40 The third coating roller

[0130] 41 Third Floor

[0131] 42 Second side

[0132] 43 Fourth measurement unit

[0133] 44 Fourth Powder

[0134] 45 Fourth metering gap

[0135] 46 Fourth coating roller

[0136] 47Fourth Floor

[0137] 48 first pressing roller

[0138] 49 Second pressing roller

[0139] 50 First extrusion gap

[0140] 51 The third pressing roller

[0141] 52 Fourth pressing roller

[0142] 53 Second extrusion gap

[0143] 54 Fifth pressure roller

[0144] 55 Sixth pressure roller

[0145] 56 Third Extrusion Gap

[0146] 57 Seventh pressure roller

[0147] 58 Eighth pressure roller

[0148] 59 Fourth Extrusion Gap

[0149] 60 first shielding plate

[0150] 61 second shielding plate

[0151] 62 third shielding plate

[0152] 63 fourth shielding plate

[0153] 64 Fifth shielding plate

[0154] 65 Sixth shielding plate

[0155] 66 Seventh shielding plate

[0156] 67 Eighth Shielding Plate 100 Method

[0157] Production of the first and third floors: 110 input

[0158] 120 parallel filling

[0159] 130 Coating

[0160] 140 Transfer

[0161] 150 Squeeze

[0162] Production of the second and fourth layers:

[0163] 160 Input

[0164] 170 Parallel Fill

[0165] 180 coating

[0166] 190 Transfer

[0167] 200 Squeeze

[0168] 210 Temperature Control

[0169] FA1 First coating force

[0170] FA2 Second coating force

[0171] FA3 Third coating force

[0172] FA4 Fourth coating force

[0173] FP1 First pressing force

[0174] FP2 Second pressing force

[0175] SD1 The first layer thickness of the first double-layer powder layer SD2 The second layer thickness of the second double-layer powder layer SP1 The first layer thickness of the first powder of the first double-layer powder layer SP2 The second layer thickness of the third powder of the second double-layer powder layer v1 The first rotation speed

[0176] v2 second rotation speed

[0177] v3 third rotation speed

[0178] v4 fourth rotation speed

[0179] v5 fifth rotation speed

[0180] v6 sixth rotation speed

Claims

1. A coating device (10) for producing an electrode (11) having at least one double powder layer (12), in particular a double cathode layer (13) and / or an anode layer (14), on a substrate (15), in particular a current collector (16), A conveying unit (17) is provided for feeding (110) a substrate (15) into a first pressing gap (18); A first roller device (19) is provided for transferring (140) a first powder (21) as a first layer (26) onto a first side (27) of a substrate (15), in, The first roller device (19) has a first metering unit (20) for receiving a first powder (21) and for filling a first metering gap (22) with the first powder (21), and The first roller device (19) comprises a first coating roller (23), a first pressure roller unit (24) and a second pressure roller unit (25). wherein the first metering gap (22) is arranged between the first coating roller (23) and the first pressing roller unit (24), and wherein the first pressing gap (18) is arranged between the first pressing roller unit (24) and the second pressing roller unit (25), wherein the first metering gap (22) is configured to apply (130) the first powder (21) as a first layer (26) onto the first pressure roller unit (24) by means of a first application force (FA1), and wherein the first pressing gap (18) is configured to transfer (140) the first layer (26) from the first pressing roller unit (24) to the first side (27) of the substrate (15) by means of a first pressing force (FP1); having a second roller arrangement (28) for transferring (140) a second powder (29) onto the first layer (26) on the first side (27) of the substrate (15), wherein the second roller arrangement (28) is arranged downstream of the first roller arrangement (19), and wherein the first roller arrangement (19) is designed to feed the substrate (15) coated on the first side (27) into a second pressing gap (30) of the second roller arrangement (28), The second roller device (28) has a second metering unit (31) for receiving a second powder (29) and for filling a second metering gap (32) with the second powder (29). The second roller device (28) comprises a second coating roller (33), a third pressure roller unit (34) and a fourth pressure roller unit (35). The second metering gap (32) is arranged between the second coating roller (33) and the third pressing roller unit (34), and The second pressing gap (30) is arranged between the third pressing roller unit (34) and the fourth pressing roller unit (35). wherein the second metering gap (32) is configured to apply (130) the second powder (29) as a second layer (36) onto the third pressure roller unit (34) by means of a second application force (FA2), and The second pressure gap (30) is provided for transferring (140) a second layer (36) from a third pressure roller unit (34) to a first layer (26) on a first side (27) of an introduced substrate (15) by means of a second pressure force (FP2).

2. The coating device (10) according to claim 1, It is characterized in that The first roller device (19) has a third metering unit (37) for accommodating a third powder (38) and for filling a third metering gap (39) with the third powder (38), and the first roller device (19) has a third coating roller (40), wherein the third metering gap (39) is arranged between the third coating roller (40) and the second pressure roller unit (25), wherein the third metering gap (39) is arranged to apply (130) the third powder (38) as a third layer (41) to the second pressure roller unit (25) by a third coating force (FA3), and wherein the first pressure gap (18) is arranged to transfer (140) the third layer (41) from the second pressure roller unit (25) to the second side (42) of the substrate (15) by a first pressure force (FP1).

3. The coating device (10) according to claim 1 or 2, It is characterized in that The second roller arrangement (28) has a fourth metering unit (43) for accommodating a fourth powder (44) and for filling a fourth metering gap (45) with the fourth powder (44), and the second roller arrangement (28) has a fourth coating roller (46), wherein the fourth metering gap (45) is arranged between the fourth coating roller (46) and a fourth pressure roller unit (35), wherein the fourth metering gap (45) is arranged for coating (130) the fourth powder (44) as a fourth layer (47) onto the fourth pressure roller unit (35) by a fourth coating force (FA4), and wherein the second pressure gap (30) is arranged for transferring (140) the fourth layer (47) from the fourth pressure roller unit (35) to the third layer (41) on the second side (42) of the substrate (15) by a second pressure force (FP2).

4. A coating device (10) according to any one of the preceding claims, It is characterized in that The first pressure roller unit (24) of the first roller arrangement (19) comprises at least one first pressure roller (48) and at least one second pressure roller (49), wherein at least one first pressing gap (50) is arranged between the at least one first pressure roller (48) and the at least one second pressure roller (49), and / or The second pressure roller unit (25) of the first roller arrangement (19) comprises at least one third pressure roller (51) and at least one fourth pressure roller (52), wherein at least one second pressing gap (53) is arranged between the at least one third pressure roller (51) and the at least one fourth pressure roller (52), and / or The third pressure roller unit (34) of the second roller device (28) has at least one fifth pressure roller (54) and at least one sixth pressure roller (55), wherein at least one third pressing gap (56) is arranged between the at least one fifth pressure roller (54) and the at least one sixth pressure roller (55), and / or the fourth pressure roller unit (35) of the second roller device (28) has at least one seventh pressure roller (57) and at least one eighth pressure roller (58), wherein at least one fourth pressing gap (59) is arranged between the at least one seventh pressure roller (57) and the at least one eighth pressure roller (58).

5. A coating device (10) according to any one of the preceding claims, It is characterized in that In the region of the first metering gap (22), in the region of the first coating roller (23), a first shielding plate (60) is arranged and / or in the region of the first pressure roller unit (24), a second shielding plate (61) is arranged, and / or In the region of the second metering gap (32), in the region of the second coating roller (33), a third shielding plate (62) is arranged and / or in the region of the third pressure roller unit (34), a fourth shielding plate (63) is arranged, and / or In the area of ​​the third metering gap (39), a fifth shielding plate (64) is arranged in the area of ​​the third coating roller (40) and / or a sixth shielding plate (65) is arranged in the area of ​​the second pressure roller unit (25), and / or in the area of ​​the fourth metering gap (45), a seventh shielding plate (66) is arranged in the area of ​​the fourth coating roller (46) and / or an eighth shielding plate (67) is arranged in the area of ​​the fourth pressure roller unit (35).

6. A method (100) for producing an electrode (11) having at least one double-layer powder layer (12), in particular a double-layer cathode layer (13) and / or anode layer (14) on a substrate (15), in particular a current collector (16), in a coating device (10) according to any of the preceding claims, comprising the following steps: - feeding (110) the substrate (15) into a first pressing gap (18) of a first roller arrangement (19) via a conveying unit (17); - filling (120) the first metering gap (22) with the first powder (21) by means of the first metering unit (20); - applying (130) the first powder (21) as a first layer (26) onto the first pressure roller unit (24) in the first metering gap (22) by means of a first application force (FA1); - transferring (140) the first layer (26) onto the first side (27) of the substrate (15) in the first pressing gap (18) by means of a first pressing force (FP1); - feeding (160) the substrate (15) with the transferred (140) first layer (26) into a second pressing gap (30) of a second roller arrangement (28); - filling (170) the second metering gap (32) with a second powder (29) by means of a second metering unit (31); - applying (180) the second powder (29) as a second layer (36) onto the third pressure roller unit (34) in the second metering gap (32) by means of a second application force (FA2); - in the second pressing gap (30), transferring (190) the second layer (36) onto the first layer (26) on the first side (27) of the substrate (15) by means of a second pressing force (FP2).

7. The method (100) according to claim 6, It is characterized in that The third metering unit (37) fills (120) a third metering gap (39) with a third powder (38), wherein the third powder (38) is coated (130) as a third layer (41) onto the second pressure roller unit (25) in the third metering gap (39) by a third coating force (FA3), and the third layer (41) is transferred (140) to the second side (42) of the substrate (15) in the first pressure gap (18) by a first pressure force (FP1).

8. The method (100) according to claim 6 or 7, It is characterized in that The fourth metering unit (43) fills (170) a fourth metering gap (45) with a fourth powder (44), wherein the fourth powder (44) is coated (180) as a fourth layer (47) onto a fourth pressure roller unit (35) in the fourth metering gap (45) by a fourth coating force (FA4), and the fourth layer (47) is transferred (140) to the third layer (41) on the second side (42) of the substrate (15) in the second pressure gap (30) by a second pressure force (FP2).

9. The method (100) according to any one of claims 6 to 8, It is characterized in that The first metering unit (20) continuously fills (120) the first metering gap (22), and / or the second metering unit (31) continuously fills (170) the second metering gap (32), and / or the third metering unit (37) continuously fills (120) the third metering gap (39), and / or the fourth metering unit (43) continuously fills (170) the fourth metering gap (45).

10. The method (100) according to any one of claims 6 to 9, It is characterized in that The first layer (26) is pressed (150) in at least one first pressing gap (50) of a first pressure roller unit (24) of a first roller arrangement (19), and / or The third layer (41) is pressed (150) in at least one second pressing gap (53) of a second pressure roller unit (25) of the first roller arrangement (19), and / or The second layer (36) is pressed (200) in at least one third pressing gap (56) of a third pressure roller unit (34) of the second roller arrangement (28), and / or The fourth layer (47) is pressed (200) in at least one fourth pressing nip (59) of a fourth pressure roller unit (35) of the second roller arrangement (28).

11. The method (100) according to any one of claims 6 to 10, It is characterized in that The first coating roller (23) and / or the second coating roller (33) and / or the third coating roller (40) and / or the fourth coating roller (46) and / or the first pressure roller unit (24) and / or the second pressure roller unit (25) and / or the third pressure roller unit (34) and / or the fourth pressure roller unit (35) are temperature-controlled (210) to a temperature between 80°C and 150°C.

12. The method (100) according to any one of claims 6 to 11, It is characterized in that The first pressure roller unit (24) and the second pressure roller unit (25) of the first roller device (19) rotate relative to each other at the same first rotational speed (v1), wherein the ratio of the first rotational speed (v1) of the first pressure roller unit (24) to the second rotational speed (v2) of the first coating roller (23) is 10:1 to 10:4, preferably 10:1.5 to 10:3, more preferably 10:2 to 10:3, and / or the ratio of the first rotational speed (v1) of the second pressure roller unit (25) to the fifth rotational speed (v5) of the third coating roller (40) is 10:1 to 10:4, preferably 10:1.5 to 10:3, more preferably 10:2 to 10:3, and / or The third pressure roller unit (34) and the fourth pressure roller unit (35) of the second roller device (28) rotate relative to each other at the same third rotational speed (v3), wherein the ratio of the third rotational speed (v3) of the third pressure roller unit (34) to the fourth rotational speed (v4) of the second coating roller (33) is 10:1 to 10:4, preferably 10:1.5 to 10:3, more preferably 10:2 to 10:3, and / or the ratio of the third rotational speed (v3) of the fourth pressure roller unit (35) to the sixth rotational speed (v6) of the fourth coating roller (46) is 10:1 to 10:4, preferably 10:1.5 to 10:3, more preferably 10:2 to 10:

3.

13. An electrode (11) having a double powder layer (12), produced by a coating device (10) according to any one of claims 1 to 5 and / or by a method (100) according to any one of claims 6 to 12, wherein: The substrate (15) is a current collector (16) having a first side (27) and a second side (42), wherein the first layer (26) of the double powder layer (12) is made of the first powder (21), and the second layer (36) of the double powder layer (12) is made of the second powder (29).

14. The electrode (11) according to claim 13, It is characterized in that The third layer (41) of the double powder layer (12) is made of a third powder (38), and the fourth layer (47) of the double powder layer (12) is made of a fourth powder (44).