Construction method for flatness of ultrahigh gradient top plate of prefabricated box girder

By adjusting the track elevation of the slurry leveling machine and using the same track as the roughening machine, the problem of flatness control of the ultra-high gradient box girder roof during highway construction was solved, achieving efficient construction and quality improvement, reducing costs and improving traffic efficiency. Comfort.

CN118727601APending Publication Date: 2024-10-01THE 3RD ENG CO LTD OF CHINA RAILWAY 16TH BUREAU GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410855037.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-28
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

During expressway construction, especially in sea sections, it is difficult to control the flatness of the roofs of ultra-high gradient box beams, which results in poor quality asphalt paving on the top layer and poor connection between the front and rear box beams, causing highway diseases and driving comfort problems.

Method used

The adjustment device changes the track elevation of the pulp lifting and leveling machine, controls the walking slope of the pulp lifting and leveling machine, and uses the same track in conjunction with the napping machine to ensure uniform napping quality and depth, thereby achieving the flatness requirements of the ultra-high gradient box girder roof.

Benefits of technology

It effectively reduces the number of sets of beam prefabricated formwork used, improves the precise control of the flatness of the box girder roof, simplifies the construction process, improves the quality and efficiency of concrete construction, reduces construction costs, and improves driving comfort.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118727601A_ABST
    Figure CN118727601A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of expressway construction, in particular to a prefabricated box girder ultrahigh gradient roof flatness construction method, which changes the track elevation of a slurry lifting and leveling machine through an adjusting device to control the walking gradient of the slurry lifting and leveling machine so as to meet the requirement of accurate control on the ultrahigh gradient of a box girder roof. And meanwhile, the napping machine adopts the same track, so that the napping quality and the napping depth are uniform, and the flatness requirement of the top plate of the ultrahigh gradient box girder is further met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of highway construction, in particular to a method for constructing the flatness of a super-high gradient top plate of a prefabricated box beam. Background Art

[0002] In recent years, expressways have developed rapidly. Expressway construction in coastal areas, especially the upper and lower structures of the sea section, is characterized by complicated approval procedures, difficult construction, high cost and high safety risks due to offshore operations. Large-scale prefabricated box girders can greatly reduce the number of upper and lower structures of bridges, which is in line with the development trend of offshore expressways.

[0003] During the construction of large-scale full-hole prefabricated box girders, controlling the flatness of the top plate of the super-high gradient box girder in the small curve section of the route is one of the key and difficult points of the construction. It not only directly affects the paving quality of the top asphalt, but also causes the phenomenon of vehicle jumping due to the poor connection between the front and rear box girders, which can easily cause highway diseases and restrict the final appearance and driving comfort of the highway.

[0004] Therefore, the present application proposes a method for constructing the flatness of a prefabricated box girder super-elevation gradient top plate. By adjusting the track elevation of the slurry lifting and leveling machine through an adjusting device to control the walking slope of the slurry lifting and leveling machine, the requirement for precise control of the super-elevation gradient slope of the box girder top plate is achieved, which facilitates the construction of small curves and super-elevation gradient positions. At the same time, the roughening machine will use the same track, which also meets the roughening quality and uniform roughening depth, thereby achieving the flatness requirement of the super-elevation gradient box girder top plate. Summary of the invention

[0005] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a method for constructing the flatness of a prefabricated box girder super-elevated gradient top plate. The elevation of the slurry lifting and leveling machine track is changed by an adjusting device to control the walking slope of the slurry lifting and leveling machine, thereby achieving the requirement of precise control of the super-elevated gradient slope of the box girder top plate, providing convenience for the construction of small curves and super-elevated gradient positions. At the same time, the roughening machine will use the same track, and the roughening quality and uniform roughening depth will also be met, thereby achieving the flatness requirement of the super-elevated gradient box girder top plate.

[0006] In order to achieve the above object, the present invention provides a method for constructing the flatness of a prefabricated box beam super-high gradient top plate, comprising the following steps:

[0007] S1, ultra-high gradient beam structure design:

[0008] S1-1, 0%~2% and 2%~0% box girder structure design:

[0009] For the gradual change of superelevation slope of the curved section from 0% to 2%, 2% to 0% and the opposite slope, the slope of the webs on both sides is consistent with the standard beam cross slope of 2% to 2% box section. When the box girder is erected, the box girder is rotated by 1% to 1% and 1% with the longitudinal center line of the bottom plate as the axis. The erection slope is 0% to 2%, 2% to 0%, that is, the top plate of the box girder changes to 1% to 3% and 3% to 1% during prefabrication. The top plate of the box girder is gradually thickened at both ends, from 0% to 2% and 2% to 0% to 1% to 3% and 3% to 1%, and the box girder is gradually thickened by 1% in the symmetrical direction;

[0010] S1-2, 1%~3% and 3%~1% box girder structure design:

[0011] For box girders with transverse slopes of 2% to 3% and 3% to 2%, the slopes of the webs on both sides are consistent with the standard beam section with a transverse slope of 2% to 2% in the box, and the corresponding top plate is gradually thickened so that the transverse slope gradually changes from 2% to 2% to 2% to 3% and 3% to 2%.

[0012] S2, super-high gradient section box girder construction: box girder construction process control from bottom to top to ensure that the flatness of the box girder top plate meets the specification requirements;

[0013] S2-1, Formwork construction preparation:

[0014] Comprehensively retest and adjust the template: Check whether the elevation of the bottom template meets the design and whether the welding strength of the embedded angle iron between the bottom template and the beam pedestal strip is qualified, and deal with the unqualified parts; check whether the outer slope of the two webs of the side template is consistent with the slope of the beam slab, and whether the slope and elevation of the flange plate are consistent with the slope of the beam slab. If the design slope and elevation are inconsistent, it is necessary to adjust the upper and lower adjustment screws on the template support truss to maintain the matching degree between the template and the box beam;

[0015] S2-2, installation of steel mesh for thickening top plate:

[0016] S2-2-1, Steel Mesh Elevation Calculation:

[0017] S2-2-1-1, the top plate elevation coordinate system is designed with the lowest point of the box girder concrete surface as the origin, the box girder along the bridge as the horizontal axis, and the box girder transverse direction as the vertical axis, which is used to solve the steel bar slope and elevation of the thickened section of the box girder;

[0018] S2-2-1-2, according to the gradual slope of the box girder, calculate the corresponding positioning coordinate system of the box girder concrete surface elevation, and obtain the concrete elevation of the top plate of the different super-elevated gradual box girders;

[0019] S2-2-1-3, make elevation strips at the midpoint of the concrete surface of the top slab of the box girder and the edges of the flanges on both sides according to the elevation. When measuring the elevation strips, weld reinforcement steel bars at the elevation coordinate points of the steel mesh to avoid stepping on them during measurement, which may cause the top slab steel bars to be recovered after measurement, resulting in a smaller concrete surface elevation.

[0020] S2-2-1-4, the elevation of the concrete surface minus the thickness of the protective layer and the upper and lower thicknesses of the steel mesh is the elevation of the steel mesh support bar. Each coordinate point is welded with a corresponding U-shaped support bar. According to the length and width of the steel mesh, the positioning support bar is pulled horizontally and vertically, and then encrypted to lay and reinforce the steel mesh;

[0021] S2-2-2, laying of steel mesh:

[0022] S2-2-2-1, calculate the top elevation of the steel mesh support bar as the distance of the concrete elevation downward adjustment, position the steel mesh support bar according to the concrete surface elevation belt and the width of the steel mesh, weld the support bar near the steel mesh support bar and add pads to connect with the inner mold to minimize the compression deformation caused by the top plate steel bar;

[0023] S2-2-2-2, after the welding of the steel mesh support bar is completed, the thickened steel mesh can be laid. During the laying process, it is strictly ensured that the lap length is greater than 28d to meet the specification requirements and the mesh reinforcement strength meets the design requirements;

[0024] S2-3, box girder casting leveler and track adjustment:

[0025] Use leveling machines and roughing machines with the same track spacing to complete the finishing work after the box beam is poured;

[0026] S2-3-1, Slurry leveling machine track design:

[0027] According to the box girder top plate rule obtained from the concrete surface elevation data of the super-elevation gradient section, the distance between the two tracks is obtained by measuring the rollers of the grouting and leveling machine. The elevation of the lowest point on the high side of the track is set as A, and the elevation of the lowest point on the low side of the track is set as B. The track measurement and reinforcement are carried out every 5m to obtain the elevation of the leveling machine track.

[0028] After adjusting the leveling machine track, the reinforcement measures are increased, with reinforcement every 0.5m to prevent the track from deflecting during the leveling machine's movement.

[0029] S2-3-2, adjustment of the pulping and leveling machine:

[0030] After the top plate steel mesh is installed, the elevation of the slurry leveling machine drum needs to be adjusted before pouring begins; according to the width of the beam surface, the leveling machine drum needs to avoid the box beam guardrail steel bars;

[0031] According to the plane coordinate system of the top plate of the box beam, assuming that the elevation of the origin is C and the transverse slope at the origin is M, the elevation of the midpoint of the concrete surface is calculated; according to the elevation data of the concrete surface of the superelevation gradient section, the transverse slope of the corresponding position, that is, the slope of the leveler, is obtained; the elevation of the midpoint of the drum, the elevation of the high side end, and the elevation of the low side end are calculated; according to the elevation data of the concrete surface of the superelevation gradient section, the elevation data of the slurry leveler drum are obtained; according to the elevation data of the slurry leveler drum, the height of the leveler drum is adjusted before the box beam is poured, and a trial run is carried out to deal with the inappropriate top plate steel bars, and then the box beam can be poured. When pouring the top plate, the leveler can be directly hoisted and used;

[0032] S2-4, top plate flatness control at the lifting hole:

[0033] The length of the mold was adjusted according to the concrete of the top slab, so that its length was slightly lower than the concrete surface by 10mm. The positioning frame was redesigned to maintain the original size, and the positioning frame was assembled in sections using angle irons. After the positioning frame was used to position and reinforce the mold, it was removed to allow the leveling machine to pass through the entire top slab to ensure the flatness of the top slab.

[0034] In S2-2-1, the unit length of the horizontal axis is 5m, and the unit length of the vertical axis is 8.15m.

[0035] The roof rule in S2-3-1 is:

[0036] S2-3-1-1, 0%~2% gradient box girder production: the top plate slope is 1%~3%, the low side thickening method is to gradually thicken from large mileage to small mileage to 1% of the beam width, and the high side thickening method is to gradually thicken from small mileage to large mileage to 1% of the beam width;

[0037] S2-3-1-2, when producing 2%~0% gradient box beam, the top plate slope is 3%~1%, which is just the opposite of 0%~2% gradient box beam. The low side thickening method is to gradually thicken to 1% of the beam width from small mileage to large mileage, and the high side thickening method is to gradually thicken to 1% of the beam width from large mileage to small mileage.

[0038] S2-3-1-3, 2% to 3% gradient box girder. When producing, the top plate slope remains unchanged, the low side is not thickened, and the high side is thickened gradually from small mileage to large mileage to 1% of the beam width;

[0039] S2-3-1-4, the top plate slope remains unchanged during the production of 3% to 2% gradient box girders. In contrast to the 2% to 3% gradient box girders, the lower side is not thickened, and the high side is thickened gradually from large mileage to small mileage to 1% of the beam width.

[0040] Compared with the prior art, the present invention can adapt to the continuous change of the top elevation of the super-elevated gradient beam by adjusting the track of the leveling equipment. Since there are many types of beam pieces in the project, including 8 types of box beams with cross slopes on the top plate, the use of the present invention reduces the number of sets of beam prefabricated templates used. The elevation of the slurry leveling machine track is changed by an adjustment device to control the walking slope of the slurry leveling machine, thereby achieving the requirement of precise control of the super-elevated gradient slope of the box beam top plate. Relevant content is considered in the early stage of template production, and the box beam top plate or flange plate can be adjusted according to the standard cross-section of the box beam. The present invention is suitable for the prefabrication construction of box beams with cross slopes on the top plates of large and small curved sections in prefabricated beam yards and the construction during on-site casting to meet the driving conditions of the leveling equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] Figure 1 It is a schematic diagram of the overall method flow of the present invention.

[0042] Figure 2 It is a schematic diagram of 0% to 2% super-high gradient box girder thickening of the present invention.

[0043] Figure 3 It is a schematic diagram of 2% to 0% super-high gradient box girder thickening of the present invention.

[0044] Figure 4 It is a schematic diagram of 2% to 3% super-high gradient box girder thickening of the present invention.

[0045] Figure 5 It is the internal cross-sectional view of the box beam template of the present invention.

[0046] Figure 6 This is the standard cross-sectional view of the box girder template of the present invention.

[0047] Figure 7 It is the plane coordinate diagram of the box girder top plate of the present invention.

[0048] Figure 8 It is a schematic diagram of a concrete roughening machine according to the present invention.

[0049] Fig. 9 It is a working diagram of the concrete slurry leveling machine of the present invention.

[0050] Fig.10 This is the casting diagram of the super-high gradient box girder of the present invention.

[0051] Fig.11 It is the design drawing of the lifting hole of the present invention.

[0052] Fig.12 This is the finishing position design diagram of the present invention.

[0053] Fig.13 This is the positioning diagram of the old version of the lifting holes and the finishing mold of the present invention.

[0054] Fig.14 This is the positioning diagram of the new version of the lifting holes and the finishing mold of the present invention. DETAILED DESCRIPTION

[0055] The present invention will now be further described with reference to the accompanying drawings.

[0056] See also Figure 1 to Figure 14 The present invention provides a method for constructing the flatness of the super-high gradient top plate of a prefabricated box beam. This embodiment takes the first phase of the Hangzhou-Ningbo project as an example. The detailed process is as follows: Figure 1 As shown:

[0057] 1. Information on the type and structural design of the box girder with super-high gradient section:

[0058] The prefabricated dimensions of the 50m box girder within the scope of the first phase of the Hangzhou-Ningbo project are 16.3m in top width and 6.8m in bottom width, 3.2m in center height, R2500m, R4200m and R6000m respectively. The transverse slopes of the bridge deck are various, including 2%-2%, 2%-0%, 0%-2%, 2%-3%, 3%-3%, 3%-2% and corresponding transverse slope beams in the opposite direction. Among them, the super-high gradient box girder has 8 types of beams with slopes of 2%-0%, 0%-2%, 2%-3%, 3%-2% and their corresponding reverse slopes. Since the production process of beams with slopes of 2%-0%, 0%-2%, 2%-3%, 3%-2% and their reverse slopes is the same, except that the left and right sides are separated during erection, only the four beam types of 2%-0%, 0%-2%, 2%-3% and 3%-2% will be analyzed below.

[0059] 1.1 Design of super high gradient beam structure:

[0060] The template design is for the production of 2% to 2% cross slope box beams. The 0% to 2% and 2% to 0% super-high gradient beam types will cause the top plate on one side of the box beam to be thickened by 2%. The weight difference between the two sides of the box beam is too large, and the beam lifting, transportation and erection are more dangerous. Considering the rationality of the box beam structure itself, the versatility of the multi-beam type later construction template, and the safety of the box beam lifting, transportation and erection construction, the project has made design changes to the box beam structure.

[0061] (1) 0%~2%, 2%~0% box girder structure design

[0062] For the gradual change of superelevation slope of curved section from 0% to 2%, 2% to 0% and the opposite slope, the slope of webs on both sides is consistent with the standard beam cross slope 2% to 2% box section. When the box girder is erected, the box girder rotates by 1% to 1% and 1% with the longitudinal center line of the bottom plate as the axis, and the erection slope remains at 0% to 2%, 2% to 0%. That is, the top plate of the box girder needs to change to 1% to 3% and 3% to 1% during prefabrication. The top plate of the box girder needs to be gradually thickened at both ends, from 0% to 2% and 2% to 0% to 1% to 3% and 3% to 1%. The box girder can be gradually thickened by 1% in the symmetrical direction, such as Figure 2 , Figure 3 shown.

[0063] (2) 1%~3% and 3%~1% box girder structure design

[0064] For box girders with transverse slopes of 2% to 3% and 3% to 2%, the web slopes on both sides are consistent with the standard beam cross slope of 2% to 2% box section. Compared with 0% to 2% and 2% to 0%, there is no need to rotate the bottom plate. It is only necessary to gradually thicken the corresponding top plate so that the transverse slope changes from 2% to 2% to 2% to 3% and 3% to 2%. Figure 4 shown.

[0065] 2. Construction of super-high gradient box girder:

[0066] Since the super-high box girder is on the top surface of the box girder structure, its construction process needs to be controlled from bottom to top to ensure that the flatness of the box girder top plate meets the specification requirements, such as Figure 5 shown.

[0067] 2.1 Formwork construction preparation:

[0068] Before the construction of the box girder, the formwork should be fully re-measured and adjusted. The bottom formwork is set with a mid-span of 18.83mm and a side span of 16.79mm pre-arch according to the design drawings. Its linear shape is a quadratic parabola with high ends and low middle. Check whether its elevation meets the design and whether the welding strength of the embedded angle iron with the beam pedestal strip is qualified, and deal with the unqualified parts; the side formwork needs to be checked for the following items: whether the outer slope of the two webs is consistent with the slope of the beam, and whether the slope and elevation of the flange are consistent with the slope of the beam. If the design slope and elevation are inconsistent, it is necessary to adjust the upper and lower adjustment screws on the formwork support truss to maintain the matching degree between the formwork and the box girder. Adjustment standards such as Figure 6 shown.

[0069] 2.2 Installation of steel mesh for thickened top plate:

[0070] The order of the super-high gradient box girder reinforcement construction in this section is: first, tie the reinforcement of the standard slope box girder reinforcement cage on the tire frame, and then lay the top plate thickening section reinforcement mesh after the reinforcement is put into the mold. After laying the reinforcement mesh, adjust the box girder track elevation and adjust the grouting and leveling machine track elevation in advance, and finally pour the box girder concrete. Since there is no tire frame template as a standard and the top plate reinforcement will be compressed and rebound after being stressed, the elevation and slope control of the thickened reinforcement mesh has become a major difficulty in the construction of super-high gradient box girders.

[0071] 2.2.1 Calculation of steel mesh elevation:

[0072] In order to solve the steel bar slope and elevation of the thickened box girder section, the project department designed a top plate elevation coordinate system. The lowest point of the box girder concrete surface is taken as the origin, the box girder along the bridge is the horizontal axis, the box girder transverse direction is the vertical axis, the horizontal axis coordinate unit length is 5m, the vertical axis coordinate unit length is 8.15m, and the plane coordinate system is as follows: Figure 7 shown.

[0073] According to the gradual slope of the box girder, the concrete surface elevation of the box girder corresponding to the positioning coordinate system can be calculated to obtain the concrete elevation of the top plate of different super-elevated gradual box girders as shown in the following table:

[0074] 2%~0% box beam (top plate 3%~1%) top plate concrete elevation coordinate table:

[0075] 2%~0% box beam (top plate 3%~1%) top plate concrete high side coordinate table

[0076]

[0077] 2%~0% box beam (top plate 3%~1%) top plate concrete low side coordinate table

[0078]

[0079]

[0080] 0%~2% box beam (top plate 1%~3%) top plate concrete elevation coordinate table 0%~2% box beam (top plate 1%~3%) top plate concrete height side coordinate table

[0081]

[0082] 0%~2% box beam (top plate 1%~3%) top plate concrete low side coordinate table

[0083]

[0084] 2%~3% box girder (top plate 2%~3%) top plate concrete elevation coordinate table 2%~3% box girder (top plate 2%~3%) top plate concrete high side coordinate table

[0085]

[0086] 2%~3% box beam (top plate 2%~3%) top plate concrete low side coordinate table

[0087]

[0088] 3%~2% box beam (top plate 3%~2%) top plate concrete elevation coordinate table

[0089] 3%~2% box beam (top plate 3%~2%) top plate concrete high side coordinate table

[0090]

[0091] 3%~2% box beam (top plate 3%~2%) top plate concrete high side coordinate table

[0092]

[0093] According to the table above, the elevation belt of the midpoint of the concrete surface of the top plate of the box beam and the flange edges on both sides can be made. The DS05 level is used for measurement. When measuring the elevation belt, the reinforcement steel bars should be welded in advance at the coordinate points of the steel mesh elevation to avoid stepping on the top plate steel bars after measurement, which will cause the concrete surface elevation to be too small. According to the box beam design, the protective layer is 40mm, and the thickened section of the top plate of the box beam is a φ12mm steel mesh with an upper and lower thickness of 24mm. The elevation of the concrete surface minus the thickness of the protective layer and the upper and lower thickness of the steel mesh is the elevation of the steel mesh support bar. Each coordinate point is welded with the corresponding elevation U-shaped support bar. According to the length and width of the steel mesh, the positioning support bar is pulled horizontally and vertically, and then the steel mesh can be laid and reinforced.

[0094] 2.2.2 Laying of steel mesh:

[0095] The thickened section of the top plate of the box beam is a steel mesh with support bars of φ12@10mm, with a thickness of 24mm from top to bottom. Adding the thickness of the top plate design protective layer of 40mm, it can be calculated that the top surface elevation of the steel mesh support bars is 59mm lower than the concrete elevation. Based on this, the steel mesh support bars can be positioned according to the concrete surface elevation belt and the width of the steel mesh. It is also necessary to note that the compression of the top plate steel bars requires welding of support bars and adding pads near the steel mesh support bars to connect with the inner mold to minimize the compression deformation caused by the top plate steel bars.

[0096] After the welding of the steel mesh support bars is completed, the thickened section of the steel mesh can be laid. During the laying process, it is strictly ensured that the lap length is greater than 28d to meet the specification requirements and the mesh reinforcement strength meets the design requirements.

[0097] 2.3. Box girder casting leveler and track adjustment:

[0098] After the box beam of this project is cast, the finishing work is completed by the automatic grouting leveling machine and the roughing machine. The project department purchased the leveling machine and the roughing machine with the same track spacing, such as Figure 8 , Fig. 9 As shown;

[0099] Due to the constant change in the transverse slope of the top plate of the super-elevated gradual section box girder, it is basically impossible to manually adjust the roller slope of the leveling machine and the height of the roughening brush of the roughening machine to adapt to the slope of the beam plate. Moreover, due to the large area of ​​the box girder top plate, manual finishing and other auxiliary facilities cannot ensure that the flatness of the box girder top plate meets the requirements. The quality of the top plate finishing restricts the construction quality of the box girder. After the box girder is cast, the elevation control of the working surface of the slurry leveling machine and the roughening machine is another control difficulty for the super-elevated gradual section box girder. After many discussions and experiments, the project department designed a strategy in which the box girder leveling machine and the roughening machine share a track slope to control the horizontal slope of the leveling machine and the height of the roughening brush of the roughening machine to automatically change with the slope of the box girder top plate, and control the initial slope of the leveling machine according to the box girder top plate elevation table. The specific operations are as follows:

[0100] 2.3.1 Slurry leveling machine track design:

[0101] According to the super-elevation gradient section concrete surface elevation data table, the box girder top plate rules are as follows:

[0102] When producing a 0% to 2% gradient box girder, the top plate slope is 1% to 3%, and the low side thickening method is to gradually thicken to 1% of the beam width from large mileage to small mileage, and the high side thickening method is to gradually thicken to 1% of the beam width from small mileage to large mileage; When producing a 2% to 0% gradient box girder, the top plate slope is 3% to 1%, which is exactly the opposite of the 0% to 2% gradient box girder. The low side thickening method is to gradually thicken to 1% of the beam width from small mileage to large mileage, and the high side thickening method is to gradually thicken to 1% of the beam width from large mileage to small mileage. When producing 2% to 3% gradient box girders, the top plate slope remains unchanged, the low side is not thickened, and the high side is thickened gradually from small mileage to large mileage to 1% of the beam width; when producing 3% to 2% gradient box girders, the top plate slope remains unchanged. Contrary to the 2% to 3% gradient box girders, the low side is not thickened, and the high side is thickened gradually from large mileage to small mileage to 1% of the beam width. According to the measurement of the rollers of the grouting and leveling machine, it can be concluded that the distance between the two tracks is 17.3m. The elevation of the lowest point on the high side of the track is set as A, and the elevation of the lowest point on the low side is set as B. The track measurement and reinforcement are carried out every 5m, and the elevation of the leveling machine track can be obtained as shown in the following table. After adjusting the leveling machine track, its reinforcement measures need to be encrypted, and reinforcement is carried out every 0.5m to avoid downward deflection of the track during the movement of the leveling machine.

[0103] Track elevation table for super-high gradient section box beam leveling machine

[0104]

[0105] 2.3.2 Adjustment of slurry lifting and leveling machine:

[0106] After the top plate steel mesh is installed, the elevation of the grouting and leveling machine drum needs to be adjusted before pouring. According to the beam width of 16.3m, the leveling machine drum needs to avoid the box beam guardrail steel bars. The length of the leveling machine drum is 15.3m and the drum diameter is 0.215m. According to the plane coordinate system of the box beam top plate, assuming that the origin elevation is C, the transverse slope at the origin is M, and the elevation of the midpoint of the concrete surface is C+16.3M / 2. According to the super-elevation gradient section concrete surface elevation data table, the transverse slope at the corresponding position can be obtained. That is, the slope of the leveling machine. In this way, the midpoint elevation of the drum can be calculated as C+16.3M / 2+0.215, the high side end elevation C+16.3M / 2+0.215+15.3M / 2 can be simplified to C+15.8M+0.215, and the low side end elevation is C+16.3M / 2+0.215~15.3M / 2, which can be simplified to C~0.5M+0.215. According to the super-high gradient section concrete surface elevation data table, the slurry leveling machine drum elevation data table can be obtained as follows:

[0107] Initial elevation table of roller of super-high gradient section box beam leveler

[0108]

[0109] According to the above table, the height of the leveling machine roller can be adjusted before pouring the box beam, and a trial run can be carried out to deal with the inappropriate top plate steel bars, and then the box beam can be poured. When pouring the top plate, the leveling machine can be directly hoisted and used. Fig.10 The napping machine can be hung up and the position of the napping brush can be adjusted manually to ensure that the napping depth is about 3mm.

[0110] 2.4 Top plate flatness control at the lifting hole:

[0111] According to the design requirements, the main line box girder of this project has reserved hoisting holes and finishing holes. Fig.11 , as shown in 12.

[0112] like Fig.13 As shown, in order to ensure the verticality of the installation of the lifting hole mold and the finishing mold, a positioning frame is designed to position them, but the positioning frame will block the route of the leveling machine. The positioning frame range can only be used for manual finishing operations, and the accurate slope change of the top surface of the box girder cannot be guaranteed.

[0113] like Fig.14As shown, the project department carried out a redesign, adjusted the length of the mold according to the top slab concrete, so that its length was slightly lower than the concrete surface by 10mm, and redesigned the positioning frame, maintaining the original size, and assembled the positioning frame in sections using angle irons. After the positioning frame was positioned and reinforced, it was removed to allow the leveling machine to pass through the entire top slab to ensure the flatness of the top slab.

[0114] The effects of the present invention applied to the S1 contract section of the first phase of the highway construction project of the Hangzhou Bay area ring line parallel line G92N (Hangzhou-Ningbo Expressway Double Line) Ningbo section are as follows:

[0115] The present invention is proposed based on the S1 section of the first phase of the Hangzhou-Ningbo Expressway double-track Ningbo section. The project is located in Zhenhai District, Ningbo City, Zhejiang Province, connecting the Jintang Bridge and the southern connection of the Hangzhou Bay Bridge respectively. The route is about 40.518km long. By adopting the present invention, the following effects are achieved in construction:

[0116] The progress of box girder erection has been greatly improved, which saves construction time and increases the free time difference for subsequent work.

[0117] By using mechanical equipment instead of manual finishing and roughening, a lot of manpower, financial resources and material resources can be saved.

[0118] The erection quality has been significantly improved, the difficulty of erecting small curves has been reduced, and the construction safety has been strongly guaranteed. It has received unanimous praise from the construction unit and the supervision unit.

[0119] The above are only preferred embodiments of the present invention, which are only used to help understand the method and core idea of ​​the present application. The protection scope of the present invention is not limited to the above embodiments. All technical solutions under the idea of ​​the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should also be regarded as the protection scope of the present invention.

[0120] The present invention solves the problems in the prior art as a whole, such as the vehicle jumping phenomenon and asphalt paving quality caused by poor control of the flatness of the top slab of the super-high gradient box girder in the small curve section of the route, which in turn causes highway diseases and restricts the final appearance and driving comfort of the highway. The elevation of the slurry leveling machine track is changed by an adjusting device to control the walking slope of the slurry leveling machine. At the same time, the roughening machine will use the same track to also meet the roughening quality and uniform roughening depth. Ultimately, the flatness control of the beam and slab is relatively simple, the construction is convenient, and the appearance and quality control are convenient, which effectively reduces the construction cost of the box girder, significantly improves the concrete construction quality and work efficiency, and greatly improves the driving comfort, with obvious social and economic benefits.

Claims

1. A method for constructing the flatness of a prefabricated box beam super-high gradient top plate, characterized in that: The following steps are involved: S1, ultra-high gradient beam structure design: S1-1, 0%~2% and 2%~0% box girder structure design: For the gradual change of superelevation slope of the curved section from 0% to 2%, 2% to 0% and the opposite slope, the slope of the webs on both sides is consistent with the standard beam cross slope of 2% to 2% box section. When the box girder is erected, the box girder is rotated by 1% to 1% and 1% with the longitudinal center line of the bottom plate as the axis. The erection slope is 0% to 2%, 2% to 0%, that is, the top plate of the box girder changes to 1% to 3% and 3% to 1% during prefabrication. The top plate of the box girder is gradually thickened at both ends, from 0% to 2% and 2% to 0% to 1% to 3% and 3% to 1%, and the box girder is gradually thickened by 1% in the symmetrical direction; S1-2, 1%~3% and 3%~1% box girder structure design: For box girders with transverse slopes of 2% to 3% and 3% to 2%, the slopes of the webs on both sides are consistent with the standard beam section with a transverse slope of 2% to 2% in the box, and the corresponding top plate is gradually thickened so that the transverse slope gradually changes from 2% to 2% to 2% to 3% and 3% to 2%. S2, super-high gradient section box girder construction: box girder construction process control from bottom to top to ensure that the flatness of the box girder top plate meets the specification requirements; S2-1, Formwork construction preparation: Comprehensively retest and adjust the template: Check whether the elevation of the bottom template meets the design and whether the welding strength of the embedded angle iron between the bottom template and the beam pedestal strip is qualified, and deal with the unqualified parts; check whether the outer slope of the two webs of the side template is consistent with the slope of the beam slab, and whether the slope and elevation of the flange plate are consistent with the slope of the beam slab. If the design slope and elevation are inconsistent, it is necessary to adjust the upper and lower adjustment screws on the template support truss to maintain the matching degree between the template and the box beam; S2-2, installation of steel mesh for thickening top plate: S2-2-1, Steel Mesh Elevation Calculation: S2-2-1-1, the top plate elevation coordinate system is designed with the lowest point of the box girder concrete surface as the origin, the box girder along the bridge as the horizontal axis, and the box girder transverse direction as the vertical axis, which is used to solve the steel bar slope and elevation of the thickened section of the box girder; S2-2-1-2, according to the gradual slope of the box girder, calculate the corresponding positioning coordinate system of the box girder concrete surface elevation, and obtain the concrete elevation of the top plate of the different super-elevated gradual box girders; S2-2-1-3, make elevation strips at the midpoint of the concrete surface of the top slab of the box girder and the edges of the flanges on both sides according to the elevation. When measuring the elevation strips, reinforced steel bars are welded at the elevation coordinate points of the steel mesh to avoid stepping on them during measurement, which may cause the top slab steel bars to be recovered after measurement, resulting in a smaller concrete surface elevation. S2-2-1-4, the elevation of the concrete surface minus the thickness of the protective layer and the upper and lower thicknesses of the steel mesh is the elevation of the steel mesh support bar. Each coordinate point is welded with a corresponding U-shaped support bar. According to the length and width of the steel mesh, the positioning support bar is pulled horizontally and vertically, and then encrypted to lay and reinforce the steel mesh; S2-2-2, laying of steel mesh: S2-2-2-1, calculate the top elevation of the steel mesh support bar as the distance of the concrete elevation downward adjustment, position the steel mesh support bar according to the concrete surface elevation belt and the width of the steel mesh, weld the support bar near the steel mesh support bar and add pads to connect with the inner mold to minimize the compression deformation caused by the top plate steel bar; S2-2-2-2, after the welding of the steel mesh support bar is completed, the thickened steel mesh can be laid. During the laying process, it is strictly ensured that the lap length is greater than 28d to meet the specification requirements and the mesh reinforcement strength meets the design requirements; S2-3, box girder casting leveler and track adjustment: Use leveling machines and roughing machines with the same track spacing to complete the finishing work after the box beam is poured; S2-3-1, Slurry leveling machine track design: According to the box girder top plate rule obtained from the concrete surface elevation data of the super-elevation gradient section, the distance between the two tracks is obtained by measuring the rollers of the grouting and leveling machine. The elevation of the lowest point on the high side of the track is set as A, and the elevation of the lowest point on the low side of the track is set as B. The track measurement and reinforcement are carried out every 5m to obtain the elevation of the leveling machine track. After adjusting the leveling machine track, the reinforcement measures are increased, with reinforcement every 0.5m to prevent the track from deflecting during the leveling machine's movement. S2-3-2, adjustment of the pulping and leveling machine: After the top plate steel mesh is installed, the elevation of the slurry leveling machine drum needs to be adjusted before pouring begins; according to the width of the beam surface, the leveling machine drum needs to avoid the box beam guardrail steel bars; According to the plane coordinate system of the top plate of the box beam, assuming that the elevation of the origin is C and the transverse slope at the origin is M, the elevation of the midpoint of the concrete surface is calculated; according to the elevation data of the concrete surface of the superelevation gradient section, the transverse slope of the corresponding position, that is, the slope of the leveler, is obtained; the elevation of the midpoint of the drum, the elevation of the high side end, and the elevation of the low side end are calculated; according to the elevation data of the concrete surface of the superelevation gradient section, the elevation data of the slurry leveler drum are obtained; according to the elevation data of the slurry leveler drum, the height of the leveler drum is adjusted before the box beam is poured, and a trial run is carried out to deal with the inappropriate top plate steel bars, and then the box beam can be poured. When pouring the top plate, the leveler can be directly hoisted and used; S2-4, top plate flatness control at the lifting hole: The length of the mold was adjusted according to the concrete of the top slab, so that its length was slightly lower than the concrete surface by 10mm. The positioning frame was redesigned to maintain the original size, and the positioning frame was assembled in sections using angle irons. After the positioning frame was used to position and reinforce the mold, it was removed to allow the leveling machine to pass through the entire top slab to ensure the flatness of the top slab.

2. The method for constructing the flatness of the super-high gradient top plate of the prefabricated box beam according to claim 1 is characterized in that: The unit length of the horizontal axis coordinate in S2-2-1 is 5m, and the unit length of the vertical axis coordinate is 8.15m.

3. The method for constructing the flatness of the super-high gradient top plate of the prefabricated box beam according to claim 1 is characterized in that: The roof rule in S2-3-1 is: S2-3-1-1, 0%~2% gradient box girder production: the top plate slope is 1%~3%, the low side thickening method is to gradually thicken from large mileage to small mileage to 1% of the beam width, and the high side thickening method is to gradually thicken from small mileage to large mileage to 1% of the beam width; S2-3-1-2, when producing 2%~0% gradient box beam, the top plate slope is 3%~1%, which is just the opposite of 0%~2% gradient box beam. The low side thickening method is to gradually thicken to 1% of the beam width from small mileage to large mileage, and the high side thickening method is to gradually thicken to 1% of the beam width from large mileage to small mileage. S2-3-1-3, 2% to 3% gradient box girder. When producing, the top plate slope remains unchanged, the low side is not thickened, and the high side is thickened gradually from small mileage to large mileage to 1% of the beam width; S2-3-1-4, the top plate slope remains unchanged during the production of 3% to 2% gradient box girders. In contrast to the 2% to 3% gradient box girders, the lower side is not thickened, and the high side is thickened gradually from large mileage to small mileage to 1% of the beam width.