A drilling plugging device for hydraulic fracturing construction

By designing a drilling sealing device including an inner extraction tube, an outer sleeve and a fixing disk, the elastic sleeve forms a grouting gap and injects the mortar and disengages, the problem of difficulty in reusing the sealing device in the prior art is solved, and the problem of the sealing device in the prior art is improved. The reusability of the drilling sealing device and the durability of the structure are provided.

CN118728314BActive Publication Date: 2024-11-15SICHUAN JIAYANG GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411226492.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-03
Publication Date
2024-11-15
Estimated Expiration
2044-09-03

AI Technical Summary

Technical Problem

The existing drilling and sealing device for hydraulic fracturing construction is difficult to completely remove the surface solidified slurry after one-time use, and the structure is easily damaged during the crushing process, which affects its secondary use.

Method used

A drilling sealing device including an inner extraction tube, an outer sleeve and a fixed disk is designed. The outer sleeve and the inner extraction tube are threadedly connected to the outer sleeve and the elastic sleeve form a grouting gap, which can be detached after being injected into the mortar. Improves the reuse rate of the device.

Benefits of technology

It realizes that the outer casing and inner casing can be effectively removed from the outer casing and inner casing tube after gas extraction, thereby improving the reuse rate of the sealing device, reducing the damage to the structure, and enhancing the sustainable use of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728314B_ABST
    Figure CN118728314B_ABST
Patent Text Reader

Abstract

The present invention provides a drilling plugging device for hydraulic fracturing construction, which belongs to the technical field of hydraulic fracturing, and includes an inner extraction pipe, an outer sleeve and a fixed disk, one end of the inner extraction pipe is connected with a perforated flower head, the end of the inner extraction pipe with the perforated flower head extends into the borehole, and the other end of the inner extraction pipe is located outside the borehole and fixedly connected to the tunnel support member; a first plugging member is movably sleeved on the inner extraction pipe, the outer sleeve is movably sleeved on the inner extraction pipe and is threadedly connected to the inner extraction pipe, a second plugging member is arranged on the outside of the outer sleeve, a grouting gap is formed between the first plugging member and the second plugging member, a grouting hole and a grouting hole are opened on the outer sleeve, and the fixed disk is used to limit the outer sleeve from moving relative to the inner extraction pipe. After the gas extraction operation is completed, the outer sleeve is rotated to separate the outer sleeve from the mortar solidified in the grouting gap, so that the outer sleeve, the inner extraction pipe and the fixed disk can be taken out from the borehole, which has the advantage of improving the reuse rate of the plugging device.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of hydraulic fracturing, and in particular to a drilling plugging device for hydraulic fracturing construction. Background Art

[0002] Hydraulic fracturing, also known as hydraulic fracturing, is the process of injecting high-pressure fluid (liquid or gas) into the target rock formation to produce cracks or restart natural cracks. By transforming the rock structure and forming a fracture network system, industrial goals such as increasing resource recovery can be achieved. As a conventional low-permeability oil and gas permeability enhancement technology, hydraulic fracturing has gradually been promoted and applied in unconventional oil and gas extraction, shale oil and gas development, geothermal resource development, nuclear fertilizer processing, CO2 storage, and underground coal mine rock control, showing a wide range of industrial application value. In recent years, hydraulic fracturing technology has gradually been used in coal mine geostress testing, coal seam permeability enhancement, roof softening, pressure relief and anti-heavy rock control, and has achieved good application results.

[0003] The patent with announcement number CN113738301B discloses an underground coal seam gas injection drilling sealing device and a displacement drilling sealing method, including a first tube, a second tube, a grouting pump, a first bag, a second bag and a bursting valve. The first tube includes a first section and a second section, the first section and the second section are detachably connected, the free end of the first section forms the inlet end of the first tube, the second tube is arranged in parallel with the first tube, the second tube is provided with a first grouting port and a second grouting port, the grouting pump is connected to the second tube, the first bag is sleeved on the outer peripheral side of the first tube, the first bag is connected to the first grouting port, the second bag is sleeved on the outer peripheral side of the first tube, the second bag is connected to the second grouting port, and the bursting valve is arranged on the second tube and is located between the first bag and the second bag. By inserting the first tube and the second tube into the borehole, injecting grout into the first bag and the second bag, and filling the borehole with the first bag and the second bag, the bursting valve ruptures and fills the gap between the first bag and the second bag with slurry. After the slurry solidifies, the borehole can be sealed and gas or shale gas extraction operations can be carried out.

[0004] However, current sealing devices are usually used once and are left directly in the borehole after use. Even if they are recovered uniformly, they need to be broken up with equipment such as pneumatic picks to break up the mortar on the outer layer. The solidified slurry on the surface of the sealing device cannot be completely removed, and the structure of the sealing device is easily damaged during the crushing process, thus affecting the secondary use of the sealing device. Summary of the invention

[0005] In view of the above problems in the prior art, the present invention provides a drilling plugging device for hydraulic fracturing construction.

[0006] In order to achieve the above-mentioned object of the invention, the technical solution adopted by the present invention is as follows:

[0007] Provided is a drilling plugging device for hydraulic fracturing construction, comprising an inner extraction pipe, an outer casing and a fixed plate, one end of the inner extraction pipe is connected with a perforated head, the end of the inner extraction pipe with the perforated head extends into the drilling hole, and the other end of the inner extraction pipe is located outside the drilling hole and fixedly connected to a tunnel support component outside the drilling hole;

[0008] The outer sleeve of the inner extraction pipe is provided with a first plugging piece, the outer sleeve is provided on the inner extraction pipe, one end of the outer sleeve extending into the borehole is threadedly connected with the inner extraction pipe, one end of the outer sleeve extending into the borehole is provided with a mounting step, one end of the first plugging piece is used to abut against the connection step in the borehole, and the other end is used to abut against the mounting step on the outer sleeve, a second plugging piece is provided on the outside of the outer sleeve, and a grouting gap is formed between the first plugging piece and the second plugging piece;

[0009] At least one grouting hole and at least one slurry outlet hole connected to the grouting gap are provided on the installation step, and an installation gap is formed between the outer sleeve and the inner extraction pipe, and the installation gap is used for the grouting pipe and the slurry outlet pipe to pass through and then be connected to the grouting hole and the slurry outlet hole respectively;

[0010] When the outer sleeve is threadedly connected to the inner extraction pipe, the first sealing member and the second sealing member are in close contact with the inner wall of the borehole to close both ends of the grouting gap. The fixed plate is fixedly connected to the opening of the borehole, and the fixed plate is used to limit the movement of the outer sleeve relative to the inner extraction pipe.

[0011] Furthermore, the outer wall of the outer sleeve is conical, and the end of the outer sleeve close to the borehole opening is the end with a larger diameter.

[0012] Furthermore, a sealing layer is sleeved on the outer walls of the first blocking member and the second blocking member.

[0013] Furthermore, the first blocking member includes a first elastic sleeve, a first protrusion formed on the outer wall of the first elastic sleeve and used to contact the inner wall of the borehole, and a first clearance groove is formed at one end of the first elastic sleeve away from the borehole opening, and the outer sleeve is moved into the borehole to squeeze the first elastic sleeve and the connecting step, and the first protrusion on the first elastic sleeve is expanded outward;

[0014] A plurality of first sealing rings are coaxially arranged on a surface of the first elastic sleeve for contacting the connecting step.

[0015] Furthermore, the second blocking member includes a second elastic sleeve, a second protrusion which is coaxially convex and used to contact the inner wall of the borehole is formed on the outer wall of the second elastic sleeve, one end of the second elastic sleeve away from the borehole opening is fixedly connected to the outer sleeve, and the other end is integrally connected to a plurality of connecting strips along its own circumference, and second clearance grooves are formed between the connecting strips. The outer sleeve is provided with a plurality of clearance openings for the connecting strips to pass through and move. An abutment portion is provided on the outer wall of the inner extraction tube, which is moved into the borehole through the outer sleeve so that the connecting strip contacts the abutment portion and pulls the second protrusion on the second elastic sleeve to expand outward.

[0016] Furthermore, a guide cone surface is provided on the outer wall of one end of the outer sleeve away from the drilling opening, and the guide cone surface is used to guide the outer sleeve to be inserted into the first elastic sleeve.

[0017] Furthermore, an external thread is provided on the outer wall of the inner extraction pipe, and at least two first limit nuts are threadedly connected to the inner extraction pipe. The inner extraction pipe passes through the tunnel support component, and the two first limit nuts are respectively abutted against two sides of the tunnel support component.

[0018] Furthermore, a first through-hole is coaxially opened on the fixed plate for the inner extraction pipe to pass through, a first positioning groove is opened on one side of the fixed plate close to the drill hole, the first positioning groove is adapted to the larger end size of the outer sleeve, and a plurality of second through-holes are hollowed out circumferentially along the first through-hole on the fixed plate and connected to the installation gap for the grouting pipe and the slurry outlet pipe to pass through.

[0019] Furthermore, a positioning step with a polygonal cross-section protruding outward is fixedly connected to one end of the outer sleeve close to the fixing plate, the first positioning groove is adapted to the shape of the positioning step, and a handle is eccentrically fixedly provided on one side of the fixing plate away from the drill hole.

[0020] Furthermore, a second sealing ring is provided on a side of the fixed plate close to the borehole along its circumference, and the second sealing ring is used to closely contact the rock wall around the drill opening. A fastening screw is threadedly connected along the axial direction of the borehole on the tunnel support component, and a plurality of fastening screws are evenly spaced along the circumference of the borehole. After passing through the tunnel support component, the fastening screws abut against a side of the fixed plate away from the borehole.

[0021] The beneficial effects of the present invention are as follows: by threading the outer sleeve onto the inner extraction tube in the borehole, squeezing the first elastic sleeve, forming a grouting gap through the first elastic sleeve and the second elastic sleeve, injecting mortar into the grouting gap, and performing gas extraction after the mortar solidifies. After the extraction is completed, the outer sleeve is rotated to separate the outer sleeve from the solidified mortar in the grouting gap, so that the outer sleeve, the inner extraction tube and the fixed plate can be removed from the borehole, leaving only the first elastic sleeve in the borehole, thereby improving the reuse rate of the plugging device. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1This is a schematic diagram of the structure of the blocking device in the use state in the embodiment of the present application;

[0023] Figure 2 for Figure 1 A magnified schematic diagram of part A;

[0024] Figure 3 for Figure 1 A magnified schematic diagram of part B;

[0025] Figure 4 This is a schematic cross-sectional structural diagram of the first elastic sleeve in the embodiment of the present application;

[0026] Figure 5 Schematic diagram of the overall structure of the outer sleeve in the embodiment of the present application.

[0027] Among them, 1. inner extraction tube; 11. perforated flower head; 12. abutment part; 13. first limiting nut; 14. abutment step; 15. third sealing ring; 2. outer sleeve; 21. installation step; 211. grouting hole; 212. grouting hole; 22. clearance port; 23. guide cone surface; 24. positioning step; 3. fixing plate; 31. first through hole; 32. second through hole; 33. handle; 34. first positioning groove; 35 , second sealing ring; 36, tightening screw; 4, grouting gap; 5, installation gap; 51, grouting pipe; 52, slurry outlet pipe; 6, sealing layer; 7, first elastic sleeve; 71, first protrusion; 72, first clearance groove; 73, first sealing ring; 8, second elastic sleeve; 81, second protrusion; 82, connecting strip; 83, second clearance groove; 9, tunnel support component; 10, drilling hole; 101, connecting step. DETAILED DESCRIPTION

[0028] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0029] The embodiment of the present invention provides a drilling plugging device for hydraulic fracturing construction, referring to Figure 1 , Figure 2 and Figure 3 , including an inner extraction pipe 1, an outer sleeve 2 and a fixed plate 3. The inner extraction pipe 1 is inserted into the borehole 10, and the part thereof extending out of the borehole 10 is connected and fixed to the tunnel support structure outside the borehole 10. The outer sleeve 2 is located in the borehole 10 and is coaxially sleeved on the outside of the inner extraction pipe 1. The fixed plate 3 is located on the outside of the borehole 10 and is used to limit the outer sleeve 2 from withdrawing from the borehole 10.

[0030] One end of the inner extraction tube 1 is fixedly connected with a perforated head 11, and a perforated hole is formed on the surface of the perforated head 11. A flow channel for medium to pass through is provided in the inner extraction tube 1. The end of the inner extraction tube 1 away from the perforated head 11 is used for external extraction equipment, and the end of the inner extraction tube 1 with the perforated head 11 extends into the borehole 10. A connecting step 101 is provided in the borehole 10. By providing the connecting step 101, the side of the borehole 10 from the connecting step 101 close to the opening of the borehole 10 is a section with a larger diameter, and the side from the connecting step 101 away from the opening of the borehole 10 is a section with a smaller diameter. The outer movable sleeve of the inner extraction tube 1 is provided with a first plugging piece, and one end of the outer sleeve 2 extending into the borehole 10 is threadedly connected to the inner extraction tube 1, and an installation step 21 is provided on the outer wall of the first end of the outer sleeve 2 extending into the borehole 10. The first plugging piece is located on the side of the outer sleeve 2 away from the opening of the borehole 10, one end of the first plugging piece is used to abut the connecting step 101 in the borehole 10, and the other end is used to abut the installation step 21 on the outer sleeve 2, and a second plugging piece is provided on the outside of the outer sleeve 2. The first and second plugging pieces are used to be in close contact with the inner wall of the borehole 10 after the outer sleeve 2 is connected and embedded in the borehole 10, thereby forming a grouting gap 4 between the first plugging piece and the second plugging piece.

[0031] An installation gap 5 is formed between the outer sleeve 2 and the inner extraction pipe 1. The installation step 21 on the outer sleeve 2 is close to the bottom of the grouting gap 4. A grouting hole 211 and a slurry outlet hole 212 connected to the grouting gap 4 are provided on the installation step 21. The grouting hole 211 and the slurry outlet hole 212 are each provided with at least one. The installation gap 5 is for the grouting pipe 51 and the slurry outlet pipe 52 to extend into. The grouting pipe 51 and the slurry outlet pipe 52 are respectively connected to the grouting hole 211 and the slurry outlet hole 212.

[0032] Reference Figure 4 Specifically, the first plugging member includes a first elastic sleeve 7, on the outer wall of which is formed a first protrusion 71 coaxially convex and used to contact the inner wall of the borehole 10, and a first clearance notch 72 is provided at one end of the first elastic sleeve 7 away from the opening of the borehole 10, and the first clearance notch 72 can make the first elastic sleeve 7 change shape smoothly when it is squeezed and deformed by force. The outer sleeve 2 is moved into the borehole 10 to squeeze the first elastic sleeve 7 and the connecting step 101, and the first protrusion on the first elastic sleeve 7 expands outward. A plurality of first sealing rings 73 are coaxially arranged on the surface of the first elastic sleeve 7 for contacting the connecting step 101, and when the first elastic sleeve 7 is elastically squeezed by the connecting step 101, the first sealing ring 73 presses the step surface of the connecting step 101 to increase the contact area between the first elastic sleeve 7 and the connecting step 101, thereby improving its sealing performance.

[0033] Furthermore, a guide cone 23 is provided on the outer wall of one end of the outer sleeve 2 away from the opening of the bore 10. When the outer sleeve 2 extends into the bore 10, the guide cone 23 on the outer sleeve 2 can be inserted into the first elastic sleeve 7 first and guide the first elastic sleeve 7 to accurately abut against the installation step 21 on the outer sleeve 2.

[0034] Furthermore, an abutment step 14 is provided on the outer wall of the inner extraction tube 1, and a third sealing ring 15 is sleeved on the abutment step 14. When the outer sleeve 2 is threadedly connected to the inner extraction tube 1, the outer sleeve 2 presses against the third sealing ring 15 to improve the sealing effect of the connection portion between the outer sleeve 2 and the inner extraction tube 1.

[0035] Reference Figure 5 The second plugging member includes a second elastic sleeve 8, on the outer wall of which is formed a second protrusion 81 which is coaxially convex and used to contact the inner wall of the borehole 10. One end of the second elastic sleeve 8 which is away from the opening of the borehole 10 is fixedly connected to the outer sleeve 2, and the other end is integrally connected with a plurality of connecting strips 82 along its own circumference, and a second paving groove 83 is formed between the connecting strips 82. The outer sleeve 2 is provided with a plurality of paving openings 22 for the connecting strips 82 to pass through and move. The outer wall of the inner extraction tube 1 is provided with an abutment 12. When the outer sleeve 2 is threadedly connected to the inner extraction tube 1, the abutment 12 extends into the outer sleeve 2 and abuts against the connecting strip 82 extending into the outer sleeve 2. As the outer sleeve 2 moves into the borehole 10, the connecting strip 82 is pushed to deform toward the opening of the borehole 10, thereby pulling the second protrusion 81 on the second elastic sleeve 8 to expand outward. In order to prevent the connection strip 82 from being unhooked from the abutment portion 12 , an anti-unhooking portion bent toward the bore 10 may be designed at the end of the connection strip 82 .

[0036] In the embodiment of the present application, an external thread is provided on the outer wall of the portion of the inner extraction tube 1 extending out of the borehole 10, and at least two first limit nuts 13 are threadedly connected to the inner extraction tube 1. The inner extraction tube 1 passes through the tunnel support member 9, and the two first limit nuts 13 are respectively abutted against the two sides of the tunnel support member 9, thereby accurately fixing the inner extraction tube 1 in the borehole 10.

[0037] A first through hole 31 is coaxially provided on the fixed plate 3 for the inner extraction tube 1 to pass through, a first positioning groove 34 is provided on one side of the fixed plate 3 close to the borehole 10, and the first positioning groove 34 is adapted to the larger end size of the outer sleeve 2, and a plurality of second through holes 32 are provided on the fixed plate 3 along the circumferential direction of the first through hole 31, which are connected to the installation gap 5 and are provided for the grouting pipe 51 and the slurry outlet pipe 52 to pass through. By adapting the first positioning groove 34 on the fixed plate 3 to the outer sleeve 2, the outer sleeve 2 in the borehole 10 can be positioned to prevent the borehole 10 from deviating during the grouting solidification process and affecting the sealing accuracy of the borehole 10.

[0038] In the embodiment of the present application, a second sealing ring 35 is provided along its own circumference on one side of the fixed disk 3 close to the borehole 10, and a fastening screw 36 is provided on one side of the fixed disk 3 away from the borehole 10, and the fixed disk 3 is fixed at the opening of the borehole 10 by the fastening screw 36. Specifically, a threaded hole is provided on the tunnel support member 9 along the axial direction of the borehole 10, and the fastening screw 36 is threadedly connected in the threaded hole on the tunnel support member 9, and one end of the fastening screw 36 close to the fixed disk 3 abuts against the fixed disk 3 to limit the movement of the fixed disk 3. Furthermore, a ring groove for the fastening screw 36 to extend into is coaxially provided on one side of the fixed disk 3 close to the fastening screw 36, so as to improve the positioning effect of the fixed disk 3. By the fastening screw 36 abutting against the fixed disk 3, the second sealing ring 35 on the fixed disk 3 can be closely contacted with the rock wall outside the borehole 10, so as to limit the rotation of the fixed disk 3 and keep the fixed disk 3 stably fitted at the borehole 10.

[0039] During the use of the borehole 10 plugging device, the inner extraction pipe 1, the first elastic sleeve 7, the outer sleeve 2 and the fixed plate 3 are first installed and fixed in place in sequence, so that the two ends of the grouting gap 4 are blocked, and the grouting pipe 51 and the grouting pipe 52 are respectively aligned with the grouting port and the grouting port connected to the outer sleeve 2. The grouting pipe 51 is connected to an external mortar pump to pump mortar. After the mortar fills the grouting gap 4, the excess mortar overflows from the grouting pipe 52. After the mortar in the grouting gap 4 solidifies, the grouting pipe 51 and the grouting pipe 52 are taken out. The gap between the outer sleeve 2 and the borehole 10 can be effectively blocked by the mortar. The threaded connection between the outer sleeve 2 and the inner extraction pipe 1 can ensure the sealed connection between the outer sleeve 2 and the inner extraction pipe 1, thereby ensuring that the inner extraction pipe 1 plays a stable and reliable sealing role between the inner extraction pipe 1 and the inner wall of the borehole 10 when extracting gas in the borehole 10. After the gas extraction work is completed, the staff can remove the fixed plate 3, reciprocate the outer sleeve 2, loosen the connection between the outer sleeve 2 and the sealing mortar in the grouting sleeve, and then remove the outer sleeve 2 and the inner extraction tube 1 from the borehole 10, and then use a separate device to seal the borehole 10, leaving only the first elastic sleeve 7 in the borehole 10, the inner extraction tube 1 and the outer sleeve 2 can be reused, which improves the reuse rate of the borehole 10 sealing device.

[0040] The plugging device in the present application is suitable for gas extraction operation in the borehole 10 on the inner side wall and the top wall of the tunnel. After the sealing mortar fills the entire grouting gap 4 from bottom to top, the excess mortar overflows from the grouting hole 212 near the top of the grouting gap 4, indicating that the grouting gap 4 is fully filled with mortar. When the device is applied to the vertically opened borehole 10, the grouting hole 212 needs to be opened on the side wall of the outer casing 2 and close to the position of the second elastic sleeve 8.

[0041] Furthermore, the outer sleeve 2 is fixedly connected with a positioning step 24 protruding outward at one end close to the fixed plate 3. The cross section of the positioning step 24 is polygonal. The shape of the first positioning groove 34 on the fixed plate 3 is consistent with the shape of the positioning step 24. A handle 33 is also fixedly connected to the side of the fixed plate 3 away from the special control. The connecting handle 33 is eccentrically arranged with the fixed plate 3. By making the positioning step 24 and the first positioning groove 34 cooperate and connect, the staff can drive the fixed plate 3 and the outer sleeve 2 to rotate by holding the handle 33, thereby increasing the torque on the outer sleeve 2 and making it easier for the outer sleeve 2 to separate from the solidified sealing mortar.

[0042] Furthermore, the outer wall of the outer sleeve 2 is conical, and the end of the outer sleeve 2 close to the opening of the borehole 10 is the end with a larger diameter, which can reduce the resistance encountered by the outer sleeve 2 during the extraction process, making it easier for the outer sleeve 2 to separate from the solidified sealing mortar. A sealing layer 6 can be sleeved on the outer wall of the first elastic sleeve and the second elastic sleeve. The sealing layer 6 can be a rubber sleeve. The sealing layer 6 covers the first protrusion 71 on the first elastic sleeve and the second protrusion 81 on the second elastic sleeve, so that the first elastic sleeve and the second elastic sleeve are in closer contact with the inner wall of the borehole 10, improving the sealing of the grouting gap 4. At the same time, the sealing layer 6 sleeved on the outside of the second elastic sleeve can reduce the direct contact between the second elastic sleeve and the sealing mortar, making it easier to separate the second elastic sleeve from the sealing mortar.

[0043] In one embodiment, the grouting hole 211 and the slurry outlet hole 212 can be designed to be spherical on the side facing the installation gap 5. The grouting pipe 51 and the slurry outlet pipe 52 can be made of disposable PC pipes. A convex ring for clamping the openings of the grouting pipe 51 and the slurry outlet pipe 52 is provided on the side of the installation step 21 facing the installation gap 5. After the grouting pipe 51 and the slurry outlet pipe 52 are used and the sealing mortar is solidified, the grouting pipe 51 and the slurry outlet pipe 52 can be shaken to break the upwind mortar located in the grouting port and the slurry outlet, thereby facilitating the detachment of the grouting pipe 51 and the slurry outlet pipe 52 relative to the outer casing 2.

[0044] In another embodiment, a movable valve is provided in the grouting hole 211 and the slurry outlet hole 212 along its own axial sliding direction, one end of the movable valve extending into the grouting gap 4 is provided with a sealing piece for closing the grouting hole 211 / slurry outlet hole 212, and the other end extends into the installation gap 5 and is connected to a spring. The spring is used to drive the movable valve to move toward the installation gap 5 so that the sealing piece blocks the grouting hole 211 / slurry outlet hole 212. When the grouting pipe 51 and the slurry outlet pipe 52 are inserted into the installation gap 5, the movable valve is pushed to move toward the grouting gap 4, so that the grouting hole 211 / slurry outlet hole 212 can be opened, and grouting can be smoothly performed into the grouting gap 4. After the grouting pipe 51 and the slurry outlet pipe 52 are loosened, the sealing piece moves again and blocks the grouting hole 211 / slurry outlet hole 212 under the push of the spring elastic force.

[0045] The present invention also provides a method for using a drilling plugging device for hydraulic fracturing construction, which uses a drilling plugging device for hydraulic fracturing construction provided by the present invention, and comprises the following steps:

[0046] S01, expanding the borehole 10, processing a connecting step 101, and cleaning the rock wall around the borehole 10;

[0047] S02, inserting the inner extraction tube 1, the first elastic sleeve 7 and the outer sleeve 2 into the borehole 10 in sequence, and overlapping the mounting plate across the outside of the borehole 10 between the tunnel support components 9 as the installation basis of the plugging device;

[0048] S03, fix the inner extraction pipe 1 on the mounting plate, and thread the outer sleeve 2 and the inner extraction pipe 1 together, so that the slurry outlet hole 212 on the outer sleeve 2 is higher than the grouting hole 211, and the first elastic sleeve 7 and the second elastic sleeve 8 squeeze and seal the two ends of the grouting gap 4;

[0049] S04, connect the grouting pipe 51 and the grouting pipe 52, inject sealing mortar into the grouting gap 4, and when mortar overflows from the grouting pipe 52, block the grouting pipe 52, maintain pressure for a short time, and remove the grouting pipe 51 and the grouting pipe 52 after the mortar solidifies;

[0050] S05, connecting the inner extraction pipe 1 to the gas extraction device to perform a gas extraction operation;

[0051] S06. After the gas extraction is completed, the limit of the fixed plate 3 is loosened, and the fixed plate 3 is rotated to separate the second elastic sleeve 8 from the solidified sealing mortar in the grouting gap 4. The fixed plate 3, the outer sleeve 2 and the inner extraction pipe 1 are successively removed from the borehole 10, leaving the second elastic sleeve 8 in the borehole 10, and the borehole 10 is completely sealed with cement mortar;

[0052] S07, replacing the new second elastic sleeve 8 in the plugging device, and applying the plugging device to the new borehole 10 to perform gas extraction operations.

[0053] It should be understood by those skilled in the art that, although preferred embodiments of the present invention have been described, additional changes and modifications may be made to these embodiments once those skilled in the art are aware of the basic inventive concepts. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention. Obviously, those skilled in the art may make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A drilling plugging device for hydraulic fracturing construction, characterized in that: It comprises an inner extraction pipe (1), an outer sleeve (2) and a fixed plate (3), one end of the inner extraction pipe (1) is connected to a perforated head (11), the end of the inner extraction pipe (1) with the perforated head (11) extends into a borehole (10), and the other end of the inner extraction pipe (1) is located outside the borehole (10) and fixedly connected to a tunnel support component (9) outside the borehole (10); The outer movable sleeve of the inner extraction pipe (1) is provided with a first plugging member, the outer sleeve (2) is sleeved on the inner extraction pipe (1), the end of the outer sleeve (2) extending into the borehole (10) is threadedly connected to the inner extraction pipe (1), the end of the outer sleeve (2) extending into the borehole (10) is provided with a mounting step (21), one end of the first plugging member is used to abut against the connection step (101) in the borehole (10), and the other end is used to abut against the mounting step (21) on the outer sleeve (2), the outer side of the outer sleeve (2) is provided with a second plugging member, and a grouting gap (4) is formed between the first plugging member and the second plugging member; At least one grouting hole (211) and at least one grouting outlet hole (212) communicating with the grouting gap (4) are provided on the installation step (21); an installation gap (5) is formed between the outer casing (2) and the inner extraction pipe (1); the installation gap (5) is used for the grouting pipe (51) and the grouting outlet pipe (52) to pass through and then be connected to the grouting hole (211) and the grouting outlet hole (212) respectively; When the outer sleeve (2) is threadedly connected to the inner extraction pipe (1), the first plugging member and the second plugging member are in close contact with the inner wall of the borehole (10) to close the two ends of the grouting gap (4), and the fixing plate (3) is fixedly connected to the opening of the borehole (10), and the fixing plate (3) is used to limit the movement of the outer sleeve (2) relative to the inner extraction pipe (1); The second sealing member comprises a second elastic sleeve (8). After the fracturing extraction is completed, the limit of the fixed disk (3) is loosened and the fixed disk (3) is removed. By reciprocating the outer sleeve (2), the connection between the outer sleeve (2) and the sealing mortar in the grouting sleeve is loosened, and the outer sleeve (2) and the inner extraction tube (1) can be taken out of the borehole (10), leaving the second elastic sleeve (8) in the borehole (10). After the outer sleeve (2), the inner extraction tube (1) and the fixed disk (3) are taken out of the borehole (10) and replaced with a new second elastic sleeve (8), the borehole sealing device can be reused.

2. A drilling plugging device for hydraulic fracturing construction according to claim 1, characterized in that: The outer wall of the outer sleeve (2) is conical, and the end of the outer sleeve (2) close to the opening of the borehole (10) is the end with a larger diameter.

3. A drilling plugging device for hydraulic fracturing construction according to claim 1, characterized in that: A sealing layer (6) is sleeved on the outer walls of the first sealing member and the second sealing member.

4. A drilling plugging device for hydraulic fracturing construction according to claim 1, characterized in that: The first blocking member comprises a first elastic sleeve (7), a first protrusion (71) which is coaxially convex and is used to contact the inner wall of the borehole (10) is formed on the outer wall of the first elastic sleeve (7), and a first clearance groove (72) is formed at one end of the first elastic sleeve (7) away from the opening of the borehole (10), so that the first elastic sleeve (7) is pressed against the connecting step (101) by the outer sleeve (2) moving into the borehole (10), and the first protrusion on the first elastic sleeve (7) is expanded outwards; A plurality of first sealing rings (73) are coaxially arranged on a surface of the first elastic sleeve (7) for contacting the connecting step (101).

5. A drilling plugging device for hydraulic fracturing construction according to claim 4, characterized in that: A second protrusion (81) which is coaxially convex and is used to contact the inner wall of the borehole (10) is formed on the outer wall of the second elastic sleeve (8); one end of the second elastic sleeve (8) away from the opening of the borehole (10) is fixedly connected to the outer sleeve (2); the other end is integrally connected to a plurality of connecting strips (82) along its own circumference; second clearance grooves (83) are formed between the connecting strips (82); a plurality of clearance openings (22) for the connecting strips (82) to pass through and move are formed on the outer sleeve (2); an abutment portion (12) is provided on the outer wall of the inner extraction tube (1); the inner extraction tube (1) is moved into the borehole (10) through the outer sleeve (2) so that the connecting strip (82) abuts against the abutment portion (12), and the second protrusion (81) on the second elastic sleeve (8) is pulled to expand outward.

6. A drilling plugging device for hydraulic fracturing construction according to claim 4, characterized in that: A guide cone (23) is provided on the outer wall of one end of the outer sleeve (2) away from the opening of the borehole (10), and the guide cone (23) is used to guide the outer sleeve (2) to be inserted into the first elastic sleeve (7).

7. A drilling plugging device for hydraulic fracturing construction according to claim 1, characterized in that: An external thread is provided on the outer wall of the inner extraction pipe (1), and at least two first limit nuts (13) are threadedly connected to the inner extraction pipe (1). The inner extraction pipe (1) passes through the tunnel support component (9), and the two first limit nuts (13) are respectively abutted against two sides of the tunnel support component (9).

8. A drilling plugging device for hydraulic fracturing construction according to claim 1, characterized in that: The fixing plate (3) is coaxially provided with a first through hole (31) for the inner extraction pipe (1) to pass through, and a first positioning groove (34) is provided on a side of the fixing plate (3) close to the borehole (10), wherein the first positioning groove (34) is adapted to the larger end size of the outer sleeve (2), and a plurality of second through holes (32) are hollowed out along the circumference of the first through hole (31) and are connected to the installation gap (5) and are provided for the grouting pipe (51) and the slurry outlet pipe (52) to pass through.

9. A drilling plugging device for hydraulic fracturing construction according to claim 8, characterized in that: A positioning step (24) with a polygonal cross section protruding outward is fixedly connected to one end of the outer sleeve (2) close to the fixing plate (3); the first positioning groove (34) is adapted to the shape of the positioning step (24); and a handle (33) is eccentrically fixedly provided on a surface of the fixing plate (3) away from the drill hole (10).

10. A drilling plugging device for hydraulic fracturing construction according to claim 9, characterized in that: A second sealing ring (35) is provided on a surface of the fixing plate (3) close to the borehole (10) along its circumference, and the second sealing ring (35) is used to be in close contact with the rock wall around the borehole opening. A fastening screw (36) is threadedly connected along the axial direction of the borehole (10) on the tunnel support member (9), and a plurality of the fastening screws (36) are evenly spaced along the circumference of the borehole (10). After passing through the tunnel support member (9), the fastening screws (36) abut against a surface of the fixing plate (3) away from the borehole (10).