Full-disc tearing cutter soft soil cutterhead shield diaphragm wall construction method

Through the overall tearing knife modification and screw machine modification, combined with MJS construction method reinforcement and high and low torque cycle mode, the problem of shield machine cutting and discharging steel bars in the ground connection wall was solved, and efficient and safe construction results were achieved.

CN118728404APending Publication Date: 2024-10-01CCTEB INFRASTRUCTURE CONSTR CO LTD +2
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410710779.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-03
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

When the shield machine passes through the ground connection wall, it is difficult to effectively cut and discharge the steel bars in the ground connection wall, resulting in construction difficulties and low efficiency.

Method used

Through comprehensive tearing knife modification, tool trajectory simulation, screw machine modification and increase in main drive torque, the shield machine's cutting and steel discharge capabilities are improved, and combined with MJS construction method reinforcement and high and low torque cycle modes to ensure the safety status of the cutterhead and Efficient cutting.

Benefits of technology

This enables the shield machine to efficiently and safely cut and discharge steel bars in ground-connecting walls, improves construction efficiency and quality, and avoids cutterhead jamming and construction attitude deviation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728404A_ABST
    Figure CN118728404A_ABST
Patent Text Reader

Abstract

The invention discloses a full-disc tearing cutter soft soil cutterhead shield diaphragm wall construction method which comprises the following steps: S1, modifying a full-disc tearing cutter of a cutterhead of a shield tunneling machine; s2, transforming a spiral conveyor of the shield tunneling machine; s3, main drive rated torque configuration is enhanced; s4, the stratum is reinforced before wall grinding; s5, the posture of the shield tunneling machine is adjusted to enter a reinforcing area, and shield hinging is adjusted; s6, grouting and water plugging of the shield body; s7, the shield tunneling machine cuts the reinforced concrete diaphragm wall according to the circulating mode of thrust increasing, torque rising, thrust reducing and torque reducing; and S8, the soil pressure in the soil bin of the shield tunneling machine is alternately adjusted according to the form of low, high and low, and the steel bars are discharged. The soft soil cutterhead shield is suitable for a soft soil stratum, and a reinforced concrete diaphragm wall can be safely and efficiently cut by the full-disc tearing cutter soft soil cutterhead shield.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of shield tunneling through ground-connected walls, and in particular relates to a method for constructing a shield tunneling ground-connected wall using a full-disc tearing cutter soft soil cutter disc. Background Art

[0002] In recent years, with the continuous development of subways, there are more and more subway transfer stations. In order to meet the construction of transfer stations, one subway line is often required to pass under another subway line. This kind of underpass construction is usually carried out by shield construction. Since the station enclosure structure generally extends to a deep distance under the station floor, there are more and more engineering cases where shield tunneling passes through the existing station enclosure structure, mostly in the form of passing through enclosure piles or ground-connected walls.

[0003] When constructing a shield tunnel through a ground-anchored wall, it is often necessary to determine the exact location of the next subway line before the construction of the previous subway line, and to set up plain concrete ground-anchored walls or glass fiber reinforced ground-anchored walls in advance to facilitate the cutting of steel bars. If the existing subway line does not have conditions for the shield tunnel to pass under, a shield machine will be required to cut the reinforced concrete ground-anchored wall.

[0004] The shield machine cuts the reinforced concrete ground-anchored wall in the soft soil stratum. Because there are two layers of continuously distributed main reinforcement inside and outside the ground-anchored wall, the shield machine needs to cut and discharge a large amount of reinforcement in a single penetration at the main reinforcement position before it can pass smoothly, which brings great challenges to the construction. Summary of the invention

[0005] In order to overcome the technical problems in the prior art, the present invention provides a method for constructing ground-connected wall with a full-disc tearing cutter and soft soil cutter disc shield. By means of full-disc tearing cutter modification, tool trajectory simulation, spiral machine modification, and increasing the main drive torque, the ability of the shield machine to cut and discharge the ground-connected wall steel bars is improved, thereby solving the above-mentioned technical problems.

[0006] A method for constructing a shield ground-connected wall with a full-disc tearing cutter soft soil cutter disc, the method comprising the following steps:

[0007] S1: The soft soil cutter disc of the shield machine is modified. The full-disc tearing cutters are arranged in two layers with height difference. The trajectory line of the first-layer tearing cutters is simulated so that the theoretical cutting length of the ground-connected wall steel bars matches the requirements of the screw conveyor modification steps. The scraper blade height is configured to be 10mm-20mm lower than the low tearing cutter blade height;

[0008] S2: The screw conveyor of the shield machine is modified by increasing the inner diameter of the screw machine and the distance between the blades of the screw conveyor to increase the size of the steel bars that can be output, ensuring that more than 90% of the steel bars can be discharged through the screw conveyor under the trajectory simulation;

[0009] S3: Strengthen the main drive rated torque configuration, increase the main drive rated torque by 15% to ensure that the cutter head has sufficient torque when cutting reinforced concrete ground-connected walls;

[0010] S4: Reinforce the stratum before wall grinding to improve the stratum strength and anti-seepage performance, and prevent the shield machine posture from shifting during the wall grinding process;

[0011] S5: Before the shield machine excavates to the ground-connected wall, adjust the shield machine's posture so that the shield machine is perpendicular to the reinforced concrete ground-connected wall and contacts the ground-connected wall. At the same time, adjust the shield machine's hinge to extend 50mm so that the shield machine's posture is in a "one" shape to ensure subsequent excavation construction. If the cutterhead is stuck, it can be freed by adjusting the hinge;

[0012] S6: The shield machine is stopped, and mud effect is injected through the radial grouting holes of the middle front shield. Secondary grouting is carried out through 2-3 ring segments of the shield tail. Two water stop rings are constructed to block the water coming from the rear of the shield machine.

[0013] S7: The shield machine starts cutting the reinforced concrete ground-connected wall. The shield machine cutter head torque is controlled. When the torque reaches 90% of the rated torque of the shield machine, the thrust jack is used to reduce the thrust. The cutter head continues to rotate until the torque stops decreasing. The thrust is increased and the reinforced concrete ground-connected wall is continued to be cut. The construction is carried out according to this cycle.

[0014] S8: When the shield machine is cutting the reinforced concrete ground-connected wall, the soil bin pressure is maintained according to the formation pressure, and the screw conveyor gate is closed at the same time. When the soil bin pressure increases to the formation pressure + 0.3 bar, the screw conveyor gate is opened and the screw conveyor is rotated quickly. The high soil pressure and the rotation of the screw conveyor are used to quickly discharge the mud and steel bars in the bin. After the pressure drops to the formation pressure, the screw conveyor gate is closed again, and the above steps are repeated until the ground-connected wall cutting is completed.

[0015] In the above-mentioned method for constructing a shield ground-connected wall with a full-disc tearing knife soft soil cutter disc, the soft soil cutter disc in step S1 adopts a two-layer cutter height difference arrangement, the cutter height difference is 1.2-1.5d, d is the maximum steel bar diameter of the reinforced concrete ground-connected wall, and the scraper is configured to be 10mm-20mm lower in height than the low tearing knife, and at the same time has the ability of interval excavation and cutting reinforced concrete ground-connected walls.

[0016] In the above-mentioned method for constructing a shield ground-connected wall with a full-disc tearing cutter soft soil cutter disc, a 5 mm wear-resistant layer is welded on the screw conveyor blades in step S2.

[0017] In the above-mentioned method for constructing a shield ground-connected wall with a full-disc tearing cutter and a soft soil cutter disc, large-diameter high-pressure rotary jet piles using the MJS method are used before grinding the wall in step S4. The height range of the solid pile reinforcement is 0.5D up, down, left and right of the shield tunnel, where D is the outer diameter of the shield tunnel. The length of the reinforcement area is greater than the length of the middle and front shield of the shield machine to wrap the radial grouting holes of the middle and front shield body.

[0018] In the above-mentioned method for constructing a shield ground-connected wall with a full-disc tearing cutter and a soft soil cutter disc, in the soil bin pressure control process in step S8, bentonite slurry is injected into the soil bin through the shield machine slag improvement system.

[0019] In general, the above technical solutions conceived by the present invention can achieve the following beneficial effects compared with the prior art:

[0020] 1. The invention discloses a method for constructing a ground-connected wall with a full-disc tearing cutter and a soft soil cutter disc. The method ensures the ability of the shield machine to cut and discharge the ground-connected wall steel bars by modifying the full-disc tearing cutter, simulating the tool trajectory, modifying the spiral machine, and increasing the main drive torque.

[0021] 2. The present invention uses the MJS method to reinforce large-diameter high-pressure jet grouting piles, which has good reinforcement quality for soft soil layers and effectively ensures the stability of the excavation posture during the shield wall grinding process;

[0022] 3. The present invention ensures that the shield machine cutterhead is always in a safe state by adopting a high and low torque cycle mode for cutting, thus avoiding the cutterhead from getting stuck;

[0023] 4. The present invention adopts a high-low earth pressure cycle mode to arrange the reinforcement, thereby increasing the pressure and flow during the reinforcement arrangement and improving the reinforcement arrangement efficiency. Various technical measures are coordinated to achieve the safe and efficient cutting of reinforced concrete ground-connected walls by the full-disc tearing cutter soft soil cutter disc shield. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The specific embodiments of the present invention are further described in detail below with reference to the accompanying drawings, wherein:

[0025] Figure 1 A schematic diagram of the arrangement of cutter disc tools in a construction method for cutting reinforced concrete ground-connected wall with a full-disc tearing cutter soft soil cutter disc of the present invention;

[0026] Figure 2 It is a schematic diagram of the screw conveyor modification of a construction method of cutting reinforced concrete ground-connected wall with a full-disc tearing cutter soft soil cutter disc of the present invention;

[0027] Figure 3 It is a schematic diagram of the reinforcement range of the MJS large-diameter high-pressure jet grouting piles of the present invention;

[0028] Figure 4 It is a cross-sectional schematic diagram of a construction method of cutting reinforced concrete ground-connected wall with a full-disc tearing cutter soft soil cutter disc of the present invention;

[0029] In the figure: 1-MJS method large diameter high pressure jet grouting pile, 2-soft soil cutter disc, 21-first layer tearing knife, 22-low tearing knife, 23-scraper, 3-screw conveyor, 31-screw conveyor blade, 4-hinge, 5-propelling jack, 6-reinforced concrete ground-connected wall, 7-secondary grouting. DETAILED DESCRIPTION

[0030] The invention adopts a construction method for cutting reinforced concrete ground-connected wall with a full-disc tearing cutter soft soil cutter disc shield, and the construction method comprises the following steps:

[0031] S1: The shield machine cutterhead is modified, and the full-disc tearing cutter is arranged in two layers with a height difference, so as to facilitate the cutting and layered stripping of the steel bars; Figure 1 As shown, it is a schematic diagram of the arrangement of the cutter blades of the cutter disc 2 of the present invention. The trajectory line of the first-layer tearing knife 21 is simulated so that the length of the steel bars of the reinforced concrete ground-connected wall 6 cut in the theoretical state matches the requirements of the screw machine transformation steps. The soft soil cutter disc 2 adopts a two-layer knife height difference arrangement, and the knife height difference is 1.2d-1.5d, where d is the maximum steel bar diameter of the reinforced concrete ground-connected wall 6. The scraper 23 is configured with a knife height that is 10mm-20mm lower than the low tearing knife 22. The cutter has the ability to both section excavation and cutting of the reinforced concrete ground-connected wall 6.

[0032] S2: The shield machine screw conveyor 3 is modified by appropriately increasing the inner diameter of the screw conveyor 3 and the distance between the screw conveyor blades 31 to increase the size of the steel bars that can be output, so as to ensure that more than 90% of the steel bars can be discharged through the screw conveyor 3 under the trajectory simulation. Figure 2 As shown, it is a schematic diagram of the modification of the screw conveyor 3 of the present invention. A 5mm wear-resistant layer is welded on the screw conveyor blade 31, which not only meets the steel bar output capacity, but also has good wear resistance;

[0033] S3: By adding a motor, the rated torque of the main drive is increased by about 15% to ensure that the cutter head has sufficient torque when cutting the steel bars of the ground connection wall 6;

[0034] S4: Reinforce the stratum before wall grinding to improve the stratum strength and anti-seepage performance, and prevent the shield machine posture from shifting during the wall grinding process. Before wall grinding, use MJS method large-diameter high-pressure rotary jet pile 1. The height range of the solid pile reinforcement is 0.5D up and down, left and right of the shield tunnel, D is the outer diameter of the shield tunnel, and the length of the reinforcement area is greater than the length of the middle front shield of the shield machine to wrap the radial grouting holes of the middle front shield body. The reinforcement range of MJS large-diameter high-pressure rotary jet pile 1 is as follows: Figure 3 As shown;

[0035] S5: Before the shield machine excavates to the reinforced concrete ground-connected wall 6, adjust the shield machine posture so that the shield machine is perpendicular to the reinforced concrete ground-connected wall 6 and contacts the reinforced concrete ground-connected wall 6. At the same time, adjust the extension of the shield machine hinge 4 to 50mm, so that the shield machine posture is in a "one" shape to ensure subsequent excavation construction. When the cutterhead is stuck, it can be freed by adjusting the hinge 4. Figure 4 , which is a cross-sectional schematic diagram of a shield machine cutting a reinforced concrete ground-connected wall 6;

[0036] S6: The shield machine is stopped, and mud effect is injected through the radial grouting holes of the middle front shield. Secondary grouting 7 is carried out through the 2-3 ring segments that have been removed from the shield tail. Two water stop rings are constructed to block the water coming from the rear of the shield machine.

[0037] S7: the shield machine starts cutting the reinforced concrete ground-connected wall 6, and the shield machine cutter head torque is controlled. When the torque reaches 90% of the rated torque of the shield machine, the thrust jack 5 is pushed to reduce the thrust, and the cutter head continues to rotate until the torque no longer decreases, and then the thrust is increased to continue cutting the reinforced concrete ground-connected wall 6. The construction is carried out according to this cycle;

[0038] S8: When the shield machine cuts the reinforced concrete ground-connected wall 6, the soil bin pressure is maintained according to the formation pressure, and the gate of the screw conveyor 3 is closed. When the soil bin pressure increases to the formation pressure + 0.3 bar, the gate of the screw conveyor 3 is opened and the screw conveyor 3 is rotated quickly. The high soil pressure and the rotation of the screw conveyor 3 are used to quickly discharge the mud and steel bars in the bin. After the pressure drops to the formation pressure, the gate of the screw conveyor 3 is closed again, and the above steps are repeated until the cutting of the reinforced concrete ground-connected wall 6 is completed.

[0039] During the soil bin pressure regulation process, bentonite slurry is injected into the soil bin through the shield machine slag improvement system, which can effectively maintain the pressure while cooling the cutterhead tools; and avoids the problem of gas overflow caused by injecting foam to maintain pressure, which in turn causes the ground uplift of the soft soil layer.

Claims

1. A method for constructing a shield ground-connected wall with a full-disc tearing cutter soft soil cutter disc. It is characterized in that The construction method comprises the following steps: S1: The soft soil cutterhead (2) of the shield machine is modified, the tearing cutters of the whole disc are arranged in two layers with height difference, and the trajectory line of the tearing cutters (21) of the first layer is simulated so that the length of the steel bars of the ground-connected wall (6) cut in the theoretical state matches the modification step requirements of the screw conveyor (31), and the scraper (23) is configured with a blade height 10 mm to 20 mm lower than the blade height of the low tearing cutter (22); S2: The shield machine screw conveyor (31) is modified by increasing the inner diameter of the screw conveyor and the distance between the screw conveyor blades (31) to increase the size of the steel bars that can be output, so as to ensure that more than 90% of the steel bars can be discharged through the screw conveyor (3) under the trajectory simulation; S3: Strengthen the main drive rated torque configuration, increase the main drive rated torque by 15%, and ensure that the cutter head has sufficient torque during the process of cutting the reinforced concrete ground-connected wall (6); S4: Reinforce the stratum before wall grinding to improve the stratum strength and anti-seepage performance, and prevent the shield machine posture from shifting during the wall grinding process; S5: When the shield machine excavates to the ground-connected wall, the shield machine is adjusted to make it perpendicular to the reinforced concrete ground-connected wall (6) and contact the ground-connected wall. At the same time, the shield machine hinge (4) is adjusted to extend by 50 mm so that the shield machine is in a "one" shape to ensure subsequent excavation construction. If the cutterhead is stuck, it can be freed by adjusting the hinge (4); S6: The shield machine is stopped, and mud is injected through the radial grouting holes of the middle front shield. Secondary grouting (7) is performed through the 2-3 ring segments that have been removed from the shield tail. Two water stop rings are constructed to block the water coming from the rear of the shield machine. S7: The shield machine starts cutting the reinforced concrete ground-connected wall (6). The shield machine cutter head torque is controlled. When the torque reaches 90% of the rated torque of the shield machine, the thrust jack (5) is pushed to reduce the thrust. The cutter head continues to rotate until the torque no longer decreases. The thrust is increased and the reinforced concrete ground-connected wall (6) is continued to be cut. The construction is carried out according to this cycle. S8: When the shield machine cuts the reinforced concrete ground-connected wall (6), the soil bin pressure is maintained according to the formation pressure, and the gate of the screw conveyor (3) is closed at the same time. When the soil bin pressure increases to the formation pressure + 0.3 bar, the gate of the screw conveyor (3) is opened and the screw conveyor (3) is rotated rapidly. The high soil pressure and the rotation of the screw conveyor (3) are used to quickly discharge the mud and steel bars in the bin. After the pressure drops to the formation pressure, the gate of the screw conveyor (3) is closed again. The above steps are repeated until the cutting of the ground-connected wall is completed.

2. A method for constructing a shield ground-connected wall with a full-disc tearing cutter soft soil cutter disc according to claim 1, It is characterized in that The soft soil cutter disc (2) in step S1 adopts a two-layer cutter height difference arrangement, the cutter height difference is 1.2-1.5d, d is the maximum steel bar diameter of the reinforced concrete ground-connected wall (6), and the scraper (23) is configured with a cutter height 10-20mm lower than the low tearing cutter (22), and has the ability to perform interval excavation and cut the reinforced concrete ground-connected wall (6).

3. A method for constructing a shield ground-connected wall with a full-disc tearing cutter soft soil cutter disc according to claim 1, It is characterized in that A 5 mm wear-resistant layer is built-up welded on the screw conveyor blade (31) in step S2.

4. A method for constructing a shield ground-connected wall with a full-disc tearing cutter soft soil cutter disc according to claim 1, It is characterized in that Before the wall grinding in step S4, large-diameter high-pressure jet grouting piles (1) are used by the MJS method. The height range of the solid pile reinforcement is 0.5D on the upper, lower, left and right sides of the shield tunnel, where D is the outer diameter of the shield tunnel. The length of the reinforcement area is greater than the length of the middle front shield of the shield machine, so as to cover the radial grouting holes of the middle front shield body.

5. A method for constructing a shield ground-connected wall with a full-disc tearing cutter soft soil cutter disc according to claim 1, It is characterized in that In the soil bin pressure control process in step S8, bentonite slurry is injected into the soil bin through the shield machine slag improvement system.

Citation Information

Cited By

  • Shield tunneling perturbation control method

    CN119266846A