Air quality management system matched with clean workshop
By installing process waste gas treatment modules and air-conditioning modules on the roof of the core clean production area, the space constraints and pollution problems caused by the layout of process waste gas system facilities in electronic industrial plants have been solved, and a more efficient space utilization and clean room production environment have been achieved.
Patent Information
- Application Number
- CN202410980314.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2024-10-01
AI Technical Summary
The arrangement of process exhaust gas system facilities in electronic industrial plants leads to tight roof space in the support area, difficulty in maintenance, difficulty in drainage during rainy seasons, and problems such as pollutants affecting clean room production.
The special waste gas treatment module and the general waste gas treatment module are fixedly installed on the roof of the core clean production area. The central return air channel is used as the boundary to set up the handling line and clean air conditioning module. The process waste gas pipeline passes through the lower technical mezzanine to the core area roof. , set up an independent chimney to reduce the area occupied by the support area, and adopt a steel truss + DECK board roof structure.
It achieves abundant installation and maintenance space, reduces the area requirement of the support area, improves the utilization rate of the clean room area, reduces the energy consumption of the fan and the risk of typhoon resistance, avoids pollutants from entering the clean room, and improves the project image and operation and maintenance convenience. sex.
Smart Images

Figure CN118729403A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of electronic industrial production, and in particular to an air quality management system for a clean workshop. Background Art
[0002] Electronic industrial plants produce a wide variety of process waste gases, and the output is generally large. In particular, special waste gas treatment modules have a very large demand for the width and area of the support area, which has become a common phenomenon in the industry. At the same time, the production plant requires a clean environment and air, so an air quality management system needs to be set up. The process waste gas system includes general waste gas treatment modules and special waste gas treatment modules (including acid, alkaline, CVD dust, organic, special waste gas, etc.). The process waste gas system facilities are generally arranged on the concrete roof of the production plant support area. The process waste gas system facilities include: general waste gas fans, special waste gas spray washing towers and fans, zeolite turbine units + heat storage / direct-fired incinerators, roof process waste gas pipelines, high-space steel structure pipe racks, chimneys and steel structure support frames, filler cleaning pools, daily dosing barrels, etc., maintenance passages, inspection platforms, waste gas electrical rooms, etc.
[0003] In the existing technical solutions, the process exhaust system facilities are generally arranged on the supporting area roof of the production plant, and the general exhaust gas treatment modules and special exhaust gas treatment modules are arranged on the supporting area roofs on different sides of the production plant. For example, the typical process exhaust system design technical solution for the new display device project is as follows: Figure 1-Figure 3 The figure shows the schematic diagram of the air quality management system of a typical double-layer core clean workshop in the electronics industry. It is a typical clean workshop structure composed of a two-layer core clean production workshop and a double-sided support area. The special exhaust gas treatment module is arranged on the roof of the north support area of the production workshop ( Figure 5 for Figure 4 The exhaust gas treatment module is generally arranged on the roof of the south support area of the production plant ( Figure 6 for Figure 4 southern support area).
[0004] All special exhaust gas treatment modules are arranged on the roof of the north support area. At the same time, a large number of emergency exhaust fans, smoke exhaust fans, machine rooms, and ventilation ducts must be arranged on the roof of the support area. In addition, the support area roof must reserve the movement line position of the process equipment in the four-story core clean production area. The support area roof is crowded and tight, and the space management and construction difficulty of the overall support area roof facilities are quite complicated. At the same time, the support area roof has many facilities and crowded facility space, which also affects the drainage of the support area roof during the rainy season. The area and width requirements of the production plant support area are relatively large, which is bound to reduce the area and width of the core clean production area, affect the process production capacity, and waste a lot of space. For example, for high-generation new display device projects and semiconductor projects, the support area roof for the arrangement of special exhaust gas treatment modules generally needs to be 24m-30m.
[0005] In order to ensure that the area and width of the support area are not further expanded, the industry currently changes the special exhaust ducts originally laid on the roof at a low position to be installed above the tall steel structure pipe rack, with the special exhaust gas treatment module directly below the pipe rack. This method requires the addition of tall steel structure pipe racks, which increases the cost, and also increases the typhoon risk of tall steel structure pipe racks and high-position exhaust ducts. Finally, after the project construction is completed, the space for equipment and pipeline installation on the roof of the support area is often very crowded, and there is basically no space for maintenance channels, making later operation and maintenance very difficult.
[0006] like Figure 1-Figure 4 As shown in the figure, all the special exhaust pipes in the lower technical mezzanine of the first and third floors of the clean room need to pass through the return air passage on the side close to the special exhaust main system to the roof of the support area and connect to the special exhaust treatment module, resulting in 1 / 2 of the exhaust pipes spanning the entire core production area, making the pipe path very long, increasing the cost of the exhaust pipes and supports, increasing the pipe resistance of the special exhaust treatment module, increasing the fan energy consumption of the special exhaust treatment module, and increasing the difficulty of space management of the lower technical mezzanine. The lower technical mezzanine has a higher floor height requirement, which increases the civil construction cost of the lower technical mezzanine. The general setting method of the exhaust pipe has the same problem.
[0007] The exhaust chimney air of the special waste gas treatment module contains acidic, alkaline, organic, CVD dust, toxic and other pollutants. In order to prevent the outdoor air in the factory from being exhausted from the chimney due to wind direction factors, the clean fresh air unit (MAU) is sucked into the fresh air treatment unit through the fresh air rainproof shutters, and then enters the clean room through the fresh air duct, thereby polluting the clean room, affecting the clean room production and affecting the product yield.
[0008] To solve this problem, when conditions permit, the clean fresh air air conditioning room and the general waste gas treatment module are usually set up in the same support area on the same side of the construction project production plant, and the special waste gas treatment module is set up in the support area on the other side. For large-scale electronic industrial plant projects, the production plant is generally large in size and the clean room area is large. The clean fresh air air conditioning unit (MAU) is set up in the support area on one side, resulting in a long path for the fresh air duct to be sent to the large clean area, increasing the resistance of the fresh air duct and the fan energy consumption of the clean fresh air air conditioning unit (MAU). At the same time, it is more difficult to balance the fresh air volume of each process zone in the clean room.
[0009] When the production plant area is limited and there is no condition to set up support areas on both sides, or only one side support area can be set up, the special exhaust gas treatment module and the clean fresh air air-conditioning room must be in the same side support area. The pollutant components of the exhaust gas from the special exhaust gas chimney have a very high risk of being sucked into the clean fresh air unit (MAU) through the fresh air rainproof shutters, and then enter the clean room through the fresh air duct, thereby polluting the clean room, affecting clean room production, and affecting product yield.
[0010] In the prior art, in order to reduce or even find installation space, exhaust chimneys of the same type are often concentrated and merged into one, and the diameter of the merged chimney is very large; because the sampling point location for monitoring particulate matter or gaseous pollutants in the exhaust chimney should meet the requirements of the specifications, it should be set in the vertical pipe, and should be set at a distance of not less than 6 times the diameter downstream of the elbow, valve, and reducer and not less than 3 times the diameter upstream of the above components, the installation height of the merged chimney must be more than 9 times the diameter of the merged chimney, resulting in a very high installation height of the chimney, which makes the design of the steel structure support frame of the chimney difficult and the typhoon risk very high.
[0011] In addition, special exhaust gas treatment modules should be arranged on the roofs of the corresponding support areas away from the main facade of the production plant, the main municipal road, the scientific industrial park, the living supporting area, and the adjacent residential area. Some projects simply cannot meet this condition, which ultimately affects the overall construction image and attracts complaints from nearby residents. Summary of the invention
[0012] In view of the above analysis, an embodiment of the present invention aims to provide an air quality management system for a clean workshop, so as to solve the problems of crowded and tight installation space and difficult maintenance of special exhaust gas treatment modules, difficulty in setting up space for process equipment transportation channels, and difficulty in drainage of support areas on rainy days.
[0013] On the one hand, the present invention provides an air quality management system for a clean workshop, comprising a special exhaust gas treatment module, a general exhaust gas treatment module, a first moving line, a second moving line and a clean air-conditioning module; wherein the special exhaust gas treatment module and the general exhaust gas treatment module are fixedly arranged on the top of the roof of the core clean production area of the clean workshop, with the roof position of the central return air aisle as the boundary, and the special exhaust gas treatment module and the general exhaust gas treatment module are respectively located on both sides of the roof position of the central return air aisle; the first moving line is arranged next to the special exhaust gas treatment module, and the second moving line is arranged at the roof position close to the central return air aisle or the roof position of the central return air aisle; the clean fresh air unit of the clean air-conditioning module is arranged in the air-conditioning room of the support area of the clean workshop.
[0014] Furthermore, the special exhaust gas treatment module includes multiple special exhaust gas treatment devices, special exhaust gas fans, roof special exhaust gas treatment front air collecting pipes, roof special exhaust gas treatment front branches, special exhaust gas chimneys, roof special exhaust gas treatment rear branches, special exhaust gas chimney steel structure support frames, filler cleaning tanks, daily dosing barrels, maintenance passages and exhaust gas electrical rooms.
[0015] Furthermore, the general exhaust gas treatment module includes a plurality of general exhaust gas fans, a general exhaust gas air collecting pipe, a general exhaust gas branch pipe, a general exhaust gas chimney, a general exhaust gas chimney steel structure support, a detection platform and an exhaust gas electrical room.
[0016] Furthermore, it also includes a process waste gas pipeline, which is arranged in the lower technical mezzanine below the core clean production area, and passes through the central return air alley and the roof above to transport the process waste gas to the special waste gas treatment module and the general waste gas treatment module respectively.
[0017] Furthermore, the process waste gas pipeline includes a general waste gas pipeline and a special waste gas pipeline.
[0018] Furthermore, the process waste gas ducts are concentratedly passed through a central return air passage on one side, and the second moving line is arranged at a roof position of the central return air passage that does not pass through the process waste gas ducts.
[0019] Furthermore, the general exhaust duct and the special exhaust duct pass through the central return air ducts on both sides respectively, and the second moving line is set at the roof position between the central return air duct and the special exhaust gas treatment module.
[0020] Furthermore, the load-bearing range of the first moving line is 20-25KN.
[0021] Furthermore, the load-bearing range of the second moving line is greater than or equal to 20KN.
[0022] Furthermore, a dog house is provided at the pipe penetration position on the roof of the central return air duct, and an emergency smoke exhaust window that meets the requirements of fire protection regulations is installed on the side of the dog house where the exhaust air duct is not penetrated.
[0023] Furthermore, the roof where the special exhaust gas treatment module is arranged adopts a steel truss + DECK board roof.
[0024] Furthermore, the clean air conditioning module fresh air unit is arranged in the air conditioning room of the support area on one side or both sides of the clean workshop.
[0025] Compared with the prior art, the present invention can achieve at least one of the following beneficial effects:
[0026] (1) The special waste gas treatment module is arranged on the roof of the core clean production area. The roof area of the clean core area is large, and there is plenty of space for the installation of numerous waste gas treatment devices, waste gas air collecting pipes and connecting branches, chimneys and steel structure support frames, filler cleaning tanks, daily dosing tanks, handling passages, waste gas electrical rooms and other facilities. The maintenance space is spacious, which is convenient for future operation and maintenance.
[0027] (2) The special exhaust gas treatment module is installed on the roof of the core clean production area, which not only does not occupy any supporting area of the production plant, but also saves the original traditional technical solution to meet the installation space of the special exhaust gas treatment module. The required width and area of the supporting area are required; the technical solution of the present invention only needs to consider the width and area required by the auxiliary room of the supporting area. According to the experience of multiple previous projects, the width of the supporting area can be compressed by at least 4m-8m. Expand the area of the clean room, increase the number of clean room process equipment, improve the utilization rate of the clean room, and increase the production capacity of the project.
[0028] (3) The roof of the support area reduces the space for special exhaust gas treatment modules, which is beneficial to the drainage of the roof of the support area during the rainy season and to the reservation of space for the transportation channel of process equipment in the fourth-floor clean room.
[0029] (4) There is enough space on the roof of the core clean production area, and all special exhaust gas collection pipes can be laid at a low position on the roof of the core area, saving the high-space steel structure pipe rack of the traditional technical solution. There is no construction cost of the high-space steel structure pipe rack, and there is no design difficulty and typhoon risk of the high-space steel structure pipe rack and high-position exhaust gas ducts.
[0030] (5) There is enough space on the roof of the core clean production area to independently set up the chimney of the special exhaust gas treatment module for each set of exhaust gas treatment equipment, solving the problem of the traditional technical solution that the chimney height is too high and there is no installation space due to the merging of chimneys. At the same time, it reduces the design difficulty and typhoon risk of the centralized chimney and steel structure support frame.
[0031] (6) The special exhaust gas treatment module is installed on the roof of the core clean production area. The special exhaust gas duct runs from the central return air duct to the special exhaust gas treatment module on the roof of the core clean production area, saving nearly 1 / 3 of the special exhaust gas duct and its support brackets in the traditional technical solution, reducing the resistance of the special exhaust gas treatment module and the energy consumption of the fan.
[0032] (7) The general exhaust gas treatment module is installed on the roof of the core clean production area. The general exhaust gas duct runs from the central return air duct to the general exhaust gas treatment module on the roof of the core clean production area, saving nearly 1 / 3 of the special exhaust gas ducts and their supports and hangers in the traditional technical solution, reducing the resistance of the general exhaust gas treatment module and the energy consumption of the fan.
[0033] (8) All special waste gas and general waste gas pipelines are connected from the technical mezzanine under the clean room through the central return air aisle to the roof of the core clean production area and connected to the corresponding waste gas treatment module. A dog house is installed at the pipe penetration point on the roof of the central return air aisle. Emergency smoke exhaust windows that meet the requirements of fire protection regulations can be installed on the side (or other positions) of the dog house that does not pass through the waste gas duct. This can avoid the need to specially set up a raised roof or a separate dog house in a part of the production plant with a steel structure roof in order to set up an emergency smoke exhaust window on the roof.
[0034] (9) For electronic industrial plants with double-sided support areas, special exhaust gas treatment modules are installed on the roof of the core clean production area, and the exhaust chimney is far away from the support areas on both sides of the production plant. According to the characteristics of the clean room process zoning and the distance of the fresh air system air duct path, the clean fresh air air-conditioning room can be set up in the double-sided support area. This can completely avoid the pollution of the exhaust chimney to the clean fresh air air-conditioning unit, thereby completely avoiding pollution of the clean room production; at the same time, the fresh air duct path is reduced, the cost is reduced, the air volume balance adjustment of the clean fresh air system is simple, and the duct resistance of the clean fresh air air-conditioning system is reduced, thereby reducing the energy consumption of the fan.
[0035] (10) For electronic industrial plants with limited production plant area and only one side support area, the chimney exhaust of special waste gas should be far away from the support area of the production plant and away from the clean fresh air air-conditioning room, which can completely avoid contaminating the clean fresh air air-conditioning unit and thus completely avoid contaminating the clean room production.
[0036] (11) The process waste gas system facilities are installed on the roof of the core clean production area, away from the main facade of the building, the main municipal road, the scientific industrial park, the living supporting area, and the nearby residential areas, so as to enhance the image of the project plant construction and reduce the risk of residents' complaints.
[0037] (12) The process waste gas system facilities are installed on the roof of the core clean production area. The roof of the core clean production area needs to be equipped with a large number of process waste gas equipment foundations, waste gas electrical machine rooms, and waste gas duct strip foundations or piers; such civil construction facilities can have the same practical effect as anti-slip piers and can solve the side slip phenomenon of the roof surface.
[0038] In the present invention, the above-mentioned technical solutions can also be combined with each other to achieve more preferred combination solutions. Other features and advantages of the present invention will be described in the subsequent description, and some advantages can become obvious from the description, or can be understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained through the contents particularly pointed out in the description and the drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] The drawings are only for the purpose of illustrating particular embodiments and are not to be considered limiting of the present invention. Like reference symbols denote like components throughout the drawings.
[0040] Figure 1 It is a structural schematic diagram of a double-layer core area clean workshop air quality management system in the prior art;
[0041] Figure 2 for Figure 1 A partial enlarged view of the upper left corner;
[0042] Figure 3 for Figure 1The upper right partial enlarged image;
[0043] Figure 4 for Figure 1 A top view of
[0044] Figure 5 for Figure 4 One of the partial enlarged pictures;
[0045] Figure 6 for Figure 4 The second partial enlarged picture;
[0046] Figure 7 A schematic diagram of the structure of an air quality management system for a clean workshop according to an embodiment of the present invention;
[0047] Figure 8 for Figure 7 A partial enlarged view of
[0048] Fig. 9 A schematic structural diagram of an air quality management system for a clean workshop according to a second embodiment of the present invention;
[0049] Fig.10 A schematic structural diagram of an air quality management system for a clean workshop according to a third embodiment of the present invention;
[0050] Fig.11 for Figure 7 A top view of
[0051] Fig.12 for Fig.11 One of the partial enlarged pictures;
[0052] Fig.13 for Fig.11 The second partial enlarged picture;
[0053] Fig.14 for Fig.11 The third partial enlarged picture;
[0054] Fig.15 for Fig. 9 A top view of
[0055] Fig.16 for Fig.15 One of the partial enlarged pictures;
[0056] Fig.17 for Fig.15 The second partial enlarged image.
[0057] Reference numerals:
[0058] 1-concrete roof of the north support area; 2-special exhaust gas treatment device (multiple); 3-special exhaust gas fan (multiple); 4-smoke exhaust fan or emergency ventilation fan; 5-high space steel structure pipe rack; 6-front air collecting pipe of special exhaust gas treatment on the roof (multiple); 7-front branch pipe of special exhaust gas treatment on the roof; 8-special exhaust chimney (multiple); 9-rear branch pipe of special exhaust gas treatment on the roof; 10-rear air collecting pipe of special exhaust gas treatment on the roof; 11-steel structure support frame of special exhaust gas chimney; 12-smoke exhaust room; 13-concrete roof of the south support area; 14-general exhaust fan; 15-general exhaust gas collecting pipe on the roof; 16-general exhaust chimney (multiple); 17-steel structure support and detection platform of general exhaust chimney; 18-general exhaust branch pipe on the roof ; 19- Clean fresh air unit (MAU); 20- Fresh air collecting duct; 21- Fresh air rainproof shutters; 22- General exhaust pipes (multiple) on the north lower mezzanine of the first floor; 23- Special exhaust pipes (multiple) on the north lower mezzanine of the first floor; 24- General exhaust pipes (multiple) on the south lower mezzanine of the first floor; 25- Special exhaust pipes (multiple) on the south lower mezzanine of the first floor; 26- General exhaust pipes (multiple) on the north lower mezzanine of the third floor; 27- Special exhaust pipes (multiple) on the north lower mezzanine of the third floor; 28- General exhaust pipes (multiple) on the south lower mezzanine of the third floor; 29- Special exhaust pipes (multiple) on the south lower mezzanine of the third floor; 30- Exhaust riser in the north return air aisle of the first / second floor; 31- Exhaust riser in the north return air aisle of the third / fourth floor; 32- Exhaust in the south return air aisle of the first / second floor Air riser; 33-exhaust riser in the south return air passage on the third / fourth floor; 34-fresh air duct; 35-FFU (fan filter unit); 36-dry coil unit (DCC); 37-core area of the north clean room on the second floor; 38-north lower technical mezzanine on the first floor; 39-north upper technical mezzanine on the second floor; 40-north return air passage on the first / second floor; 41-central return air passage of the north clean room on the first / second floor; 42-core area of the south clean room on the second floor; 43-south lower technical mezzanine on the first floor; 44-south upper technical mezzanine on the second floor; 45-south return air passage on the first / second floor; 46-central return air passage of the south clean room on the first / second floor; 47-core area of the north clean room on the fourth floor; 48-north lower technical mezzanine on the third floor; 49-north upper technical mezzanine on the fourth floor; 50-north return air passage on the third / fourth floor; 5 1-Central return air alley of the third / fourth floor north clean room; 52-Core area of the fourth floor south clean room; 53-South technical mezzanine of the third floor; 54-South technical mezzanine of the fourth floor; 55-South return air alley of the third / fourth floor; 56-Central return air alley of the third / fourth floor south clean room; 57-Steel beam + DECK board roof of the core production area; 58-Exhaust gas pipe well in the third / fourth floor return air alley (under the roof); 59-Exhaust gas electrical room; 60-Maintenance passage; 61-Facility ellipsis (representing the unreflected part); 62-Daily dosing barrel trough (arranged above the exhaust gas electrical room); 63-Fresh air room; 64-Clean fresh air air conditioning room (MAU room); 65-Exhaust gas electrical room air conditioning; 66-Location of special exhaust gas sampling port; 69-25t roof-mounted crane;70-truss + DECK board roof; 71-dog house; 72-emergency smoke exhaust window; 73-movement line (20-25KN / m2), 74-roadblock protection concrete pier;
[0059] 201-zeolite turbine unit + direct-fired combustion furnace (multiple units); 202-zeolite turbine unit + regenerative combustion furnace (multiple units); 203-CVD dust three-stage vertical spray tower (multiple units); 204-acid waste gas spray tower (multiple units); 205-alkaline waste gas spray tower (multiple units); 206-stripping liquid waste gas spray tower (multiple units); 301-HMDS organic waste gas primary fan (multiple units); 302-HMDS organic waste gas secondary fan (multiple units); 303-organic waste gas primary fan (multiple units); 304-organic waste gas secondary fan (multiple units); 305-CVD dust waste gas primary fan (multiple units); 306-CVD dust secondary fan (multiple units); 307-acid waste gas fan; 308-alkaline waste gas fan; 309-stripping liquid waste gas fan; 401-pressurized air supply duct machine; 402-smoke exhaust fan; 403-fire-fighting air supply fan; 601-CVD dust waste gas collecting duct; 602-stripping liquid waste gas collecting duct; 603-HMDS organic waste gas collecting duct; 604-organic waste gas duct; 605-alkaline waste gas collecting duct; 606-acid waste gas collecting duct; 801-CVD dust waste gas and centralized chimney; 802-stripping liquid waste gas centralized chimney; 803-HMDS organic waste gas centralized chimney; 804-organic waste gas centralized chimney; 805-alkaline waste gas centralized chimney; 806-acid waste gas centralized chimney. DETAILED DESCRIPTION
[0061] The preferred embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings, wherein the accompanying drawings constitute a part of the present invention and are used together with the embodiments of the present invention to illustrate the principles of the present invention, but are not used to limit the scope of the present invention.
[0062] Example 1
[0063] A specific embodiment of the present invention discloses an air quality management system for a clean workshop.
[0064] See also Figure 1 , Figure 7 , Fig. 9 as well as Fig.10 A cleanroom generally includes a core clean production area and support areas on both sides. The core clean production area can be one or two floors. Taking two floors as an example, each floor is provided with two clean room core areas, namely, the second floor north clean room core area 37, the fourth floor north clean room core area 47, the second floor south clean room core area 42, and the fourth floor south clean room core area 52. Production equipment is set in these clean room core areas.
[0065] An upper technical mezzanine is arranged above the core area of each clean room, specifically including a second-floor north-upper technical mezzanine 39, a second-floor south-upper technical mezzanine 44, a fourth-floor north-upper technical mezzanine 49 and a fourth-floor south-upper technical mezzanine 54, which are used to set up a fresh air duct 34 to evenly transport the clean air generated by the fresh air system to each clean room core area.
[0066] A lower technical mezzanine is arranged below the core area of each clean room, specifically including a north-down technical mezzanine 38, a south-down technical mezzanine 43, a third north-down technical mezzanine 48 and a third south-down technical mezzanine 53, which are used to set up process waste gas pipes, specifically including a north-down mezzanine general waste gas pipe (multiple) 22, a north-down mezzanine special waste gas pipe (multiple) 23, a south-down mezzanine general waste gas pipe (multiple) 24, a south-down mezzanine special waste gas pipe (multiple) 25, a third north-down mezzanine general waste gas pipe (multiple) 26, a third north-down mezzanine special waste gas pipe (multiple) 27, a third south-down mezzanine general waste gas pipe (multiple) 28 and a third south-down mezzanine special waste gas pipe (multiple) 29, so as to collect and centrally treat the process waste gas generated in the core area of the clean room.
[0067] The side of the adjacent support area of each clean room core area is provided with a side return air alley, including the north return air alley 40 on the first / second floor, the south return air alley 45 on the first / second floor, the north return air alley 50 on the third / fourth floor, and the south return air alley 55 on the third / fourth floor. In the prior art, the side return air alley is used to set up exhaust gas risers, specifically including the exhaust gas riser 30 in the north return air alley on the first / second floor, the exhaust gas riser 31 in the north return air alley on the third / fourth floor, the exhaust gas riser 32 in the south return air alley on the first / second floor, and the exhaust gas riser 33 in the south return air alley on the third / fourth floor. These exhaust gas risers can transport process exhaust gas to the exhaust gas treatment systems set up in the support areas on both sides. In the technical solution of the present invention, the side return air alley is only used to set up the fresh air duct 34.
[0068] A central return air duct is arranged on the side of the central position of the factory building near the core area of each clean room, including the central return air duct 41 of the first / second floor north clean room, the central return air duct 46 of the first / second floor south clean room, the central return air duct 51 of the third / fourth floor north clean room and the central return air duct 56 of the third / fourth floor south clean room. In the prior art, only a fresh air duct 34 is arranged in the central return air duct. In the technical solution of the present invention, an exhaust gas riser is also arranged in the central return air duct, specifically including an exhaust gas riser 30 in the first / second floor north return air duct, an exhaust gas riser 31 in the third / fourth floor north return air duct, an exhaust gas riser 32 in the first / second floor south return air duct and an exhaust gas riser 33 in the third / fourth floor south return air duct. These exhaust gas risers pass upward through the central return air duct and through the roof, and can transport the process exhaust gas to the exhaust gas treatment system arranged in the roof of the core clean production area.
[0069] Correspondingly, the roof of the clean workshop includes the roof of the core clean production area and the roofs of the supporting areas on both sides, namely the concrete roof 1 of the north supporting area and the concrete roof 13 of the south supporting area.
[0070] The air quality management system for the clean workshop of the present invention includes a general waste gas treatment module, a special waste gas treatment module, a first handling line, a second handling line and a clean air conditioning module. Among them, the general waste gas treatment module and the special waste gas treatment module are all arranged on the roof of the core clean production area (see Figure 7 to Figure 17 ). With the roof position of the central return air passage 41, 46, 51, 56 as the boundary, the special exhaust gas treatment module and the general exhaust gas treatment module are respectively arranged on both sides of the central return air passage; at the same time, two moving lines 73 are arranged for moving process exhaust gas equipment and process exhaust gas ducts and other facilities. The first moving line is arranged next to the special exhaust gas treatment module, and the second moving line can be selected to be arranged near the central return air passage 41, 46, 51, 56. For details, see Fig. 9 , Fig.10 , Fig.17 ; It can also be directly arranged above the central return air duct 41, 46, 51, 56, see Figure 7 , Fig.11 At the same time, the roof of the local core clean production area where the special exhaust gas treatment module and the moving line are arranged adopts steel truss + DECK board roof. Because the special exhaust gas treatment module and the general exhaust gas treatment module are set on the roof of the core clean production area, they are far away from the support areas on both sides. Therefore, the clean fresh air air conditioning room (MAU room) in the clean air conditioning module can be set up in the double-side support area (see Figure 7 , Fig. 9 ); You can also choose to set the single-side support area centrally (see Fig.10 The process exhaust gas duct of the lower technical mezzanine can be selected to pass through the central return air duct on one side (41, 51 or 46, 56, see Figure 7 ), or through the central return air ducts 41, 46, 51, 56 on both sides to connect to the main exhaust gas treatment system on the roof (see Fig. 9 , Fig.10 ).
[0071] The detailed technical scheme of the present invention is as follows:
[0072] The special waste gas treatment module includes many special waste gas treatment devices 2, special waste gas fans 3, roof special waste gas treatment front air collecting pipes 6 and roof special waste gas treatment front branches 7, special waste gas chimneys 8, roof special waste gas treatment rear branches 9, special waste gas chimney steel structure support frames 11, filler cleaning pools 67, daily dosing tanks 62, maintenance passages 60, waste gas electrical rooms, etc., all of which are set on the roof of the core clean production area. The special waste gas treatment module is used to treat special waste gases, including acidic, alkaline, CVD dust, organic, special waste gases, etc.
[0073] The front air collecting duct 6 for special waste gas treatment on the roof includes a CVD dust waste gas collecting duct 601, a stripping liquid waste gas collecting duct 602, an HMDS organic waste gas collecting duct 603, an organic waste gas duct 604, an alkaline waste gas collecting duct 605, and an acid waste gas collecting duct 606, all of which are laid at a low position on the roof of the core area, eliminating the high-space steel structure pipe rack 5 of the existing technical solution.
[0074] The special waste gas chimney 8 includes a CVD dust waste gas centralized chimney 801, a stripping liquid waste gas centralized chimney 802, a HMDS organic waste gas centralized chimney 803, an organic waste gas centralized chimney 804, an alkaline waste gas centralized chimney 805, and an acid waste gas centralized chimney 806, all of which are independently arranged to solve the problem in the prior art that the chimney height is too high and there is no installation space due to the merging of chimneys.
[0075] The technical solution of the present invention can reduce the width of the support area for arranging special exhaust gas treatment modules in the existing technical solution by 4m-8m, thereby expanding the area of the clean room, increasing the number of clean room process equipment, improving the utilization rate of the clean room, and increasing the production capacity of the project.
[0076] The general waste gas treatment module of the present invention includes a general waste gas fan 14, a roof general waste gas collecting pipe 15, a roof general waste gas branch pipe 18, a general waste gas chimney 16, a general waste gas chimney steel structure support and a detection platform 17, a waste gas electrical room 59, etc., all of which are arranged on the roof of the core clean production area. The general waste gas treatment module is used to treat general waste gas except special waste gas.
[0077] In the technical solution of the present invention, two moving lines 73 are set on the roof of the core clean production area, wherein the first moving line is arranged near the position of the special exhaust gas treatment equipment, and is mainly used to transport the special exhaust gas treatment device 2, including a variety of spray system towers 203-206, zeolite rotor unit + direct-fired combustion furnace 201, zeolite rotor unit + regenerative combustion furnace 202, and special exhaust gas blower 3 and other main special exhaust gas equipment. The civil construction bearing load of this moving line is 20KN / m2-25KN / m2; two 25t cranes can travel in opposite directions on the first moving line.
[0078] The second moving line can be set up on the roof of the central return air duct 41, 46, 51, 56, or on the roof between the central return air duct 41, 46, 51, 56 and the special exhaust air collecting duct. It is mainly used to transport general exhaust fans 14 and process exhaust air ducts and other facilities 6-11, 15-18. The civil engineering bearing load of this moving line is 20KN / m2; two 25t cranes can travel in opposite directions on the moving line.
[0079] See also Figure 9-11 , Fig.14 At the edges of both sides of the two moving lines, safety warning roadblocks and protective concrete piers 74 must be set up. At the same time, the roof waterproofing layer, insulation layer (extruded board), and fine stone concrete protective layer at the moving line location should be strengthened.
[0080] In the technical solution of the present invention, the clean air conditioning module includes a clean fresh air unit (MAU) 19, a fresh air collecting pipe 20, a fresh air rainproof shutter 21, a fresh air duct 34, a FFU (fan filter unit) 35, a dry coil (DCC) 36, a fresh air chamber 63, and a clean fresh air air conditioning machine room (MAU machine room) 64. Among them, the fresh air chamber 63 and the clean fresh air air conditioning machine room (MAU machine room) 64 are arranged in the station building of the support area on both sides, that is, in the station building under the concrete roof 1 of the north support area and the concrete roof 13 of the south support area, the clean fresh air unit (MAU) 19 is arranged in the clean fresh air air conditioning machine room (MAU machine room) 64, and the fresh air rainproof shutter 21 is arranged on the outer wall of the fresh air chamber 63. The fresh air collecting duct 20 connects the clean fresh air unit (MAU) 19 and the fresh air duct 34. The fresh air duct 34 is arranged in the upper technical mezzanine, the side return air aisle and the central return air aisle. The FFU (fan filter unit) 35 is arranged in the upper technical mezzanine, and the dry coil unit (DCC) 36 is arranged in the return air aisle of the lower technical mezzanine.
[0081] In the construction of large-scale electronic industrial plants, the layout of process equipment and the utilization rate of the clean room process machine area are taken into consideration. The current industry trend is to develop large column grid spacing characteristics. Combined with factors such as project practicability, construction progress and investment cost, large-scale electronic industrial plants generally use steel beams + DECK board roofs.
[0082] In the technical solution of the present invention, since the special waste gas treatment module equipment has a heavy load, the special waste gas treatment module equipment and the concrete foundation are generally around 20KN / m2 to 25KN / m2. The present invention adopts steel truss + DECK board roof for the roof position of the core clean production area where the special waste gas treatment module is set, and the rest still maintains steel beam + DECK board roof.
[0083] In the technical solution of the present invention, the process waste gas pipeline includes all special waste gas and general waste gas pipelines, all of which are arranged in the lower technical mezzanine below the core area of the clean room, and are connected to the corresponding waste gas treatment module by passing through the central return air ducts 41, 46, 51, 56 to the roof of the core clean production area. Compared with the existing technical solution, nearly 1 / 3 of the process waste gas pipeline and its support and hanger are saved. At the same time, a dog house 71 is set at the roof of the central return air duct 41, 46, 51, 56. The side (or other position) of the dog house 71 that does not pass through the waste gas duct can be installed with an emergency smoke exhaust window 72 that meets the requirements of the fire protection regulations, avoiding the need to specially set a raised roof or set up a dog house in the production plant with a steel structure roof in order to set up an emergency smoke exhaust window on the roof.
[0084] In this embodiment 1, see Figure 7 , Figure 8 , Figure 11-Figure 14 As shown in the figure, general waste gas treatment modules and special waste gas treatment modules are all arranged on the roof of the core clean production area. The clean fresh air air conditioning room (MAU room) in the clean air conditioning module is arranged in the air conditioning room of the double-side support area. The partial roof where the special waste gas treatment module and the moving line are set adopts steel truss + DECK board roof, and the rest of the roof is steel beam + DECK board roof. The process exhaust gas pipelines (including general exhaust gas pipelines 22, 24, 26, 28 and special exhaust gas pipelines 23, 25, 27, 29) are concentrated through the central return air aisles 51, 56 on one side to the roof exhaust gas treatment module. A dog house 71 is set at the pipe penetration point on the roof of the central return air aisle. The side (or other position) of the dog house 71 that does not pass through the exhaust gas duct can be installed with an emergency smoke exhaust window 72 that meets the requirements of fire protection regulations. A first moving line with a load-bearing capacity of 20-25KN (two 25t cranes running in opposite directions) is set next to the special exhaust gas treatment module, and another second moving line with a load-bearing capacity of 20KN (two 25t cranes running in opposite directions) is set on the roof position of the central return air aisles 41, 51 that do not pass through the process exhaust gas pipeline.
[0085] Example 2
[0086] See also Fig. 9 , Figure 15-17In the present embodiment 2, based on the technology of the first embodiment, the special exhaust pipes 23, 25, 27, 29 and the general exhaust pipes 22, 24, 26, 28 respectively pass through the central return air passages 41, 46, 51, 56 on both sides to the corresponding exhaust gas treatment modules on the roof, and a dog house 71 is arranged at the pipe-penetrating place on the roof of the central return air passage. The side (or other position) of the dog house 71 that does not pass through the exhaust air duct can be installed with an emergency smoke exhaust window 72 that meets the requirements of the fire protection regulations. A first moving line with a load-bearing capacity of 20 to 25 KN (two 25 t cranes running in opposite directions) is arranged next to the special exhaust gas treatment module, and another second moving line with a load-bearing capacity of 20 KN (two 25 t cranes running in opposite directions) is arranged on the roof position between the central return air passage and the front air collecting pipe 6 of the special exhaust gas treatment on the roof.
[0087] Example 3
[0088] See also Fig.10 Based on the technology of Example 2, in this Example 3, the clean fresh air air conditioning room (MAU room) in the clean air conditioning module is concentrated in the single-side support area.
[0089] Example 4
[0090] On the basis of Example 1, it is also possible to choose to arrange only the special exhaust gas treatment module on the roof of the core clean production area, while retaining the general exhaust gas treatment module on the roof of the support area.
[0091] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily conceived by any technician familiar with the technical field within the technical scope disclosed by the present invention should be covered within the protection scope of the present invention.
Claims
1. An air quality management system for a clean workshop, characterized in that: It includes a special exhaust gas treatment module, a general exhaust gas treatment module, a first moving line, a second moving line and a clean air-conditioning module; wherein, the special exhaust gas treatment module and the general exhaust gas treatment module are arranged on the top of the roof of the core clean production area of the clean workshop, with the roof position of the central return air aisle as the boundary, and the special exhaust gas treatment module and the general exhaust gas treatment module are respectively located on both sides of the roof position of the central return air aisle; the first moving line is arranged next to the special exhaust gas treatment module, and the second moving line is arranged at the roof position close to the central return air aisle or the roof position of the central return air aisle; the clean fresh air unit of the clean air-conditioning module is arranged in the air-conditioning room of the support area of the clean workshop.
2. The air quality management system for a clean workshop according to claim 1 is characterized in that: The special exhaust gas treatment module includes multiple special exhaust gas treatment devices, special exhaust gas fans, roof special exhaust gas treatment front air collecting pipes, roof special exhaust gas treatment front branches, special exhaust gas chimneys, roof special exhaust gas treatment rear branches, special exhaust gas chimney steel structure support frames, filler cleaning tanks, daily dosing barrels, maintenance passages, detection platforms and exhaust gas electrical rooms.
3. The air quality management system for a clean workshop according to claim 2 is characterized in that: The general exhaust gas treatment module includes a plurality of general exhaust gas fans, a general exhaust gas air collecting pipe, a general exhaust gas branch pipe, a general exhaust gas chimney, a general exhaust gas chimney steel structure support, a detection platform and an exhaust gas electrical room.
4. An air quality management system for a clean workshop according to any one of claims 1 to 3, characterized in that: It also includes a process waste gas pipeline, which is arranged in the lower technical interlayer below the core clean production area and passes through the central return air channel to transport the process waste gas to the special waste gas treatment module or the general waste gas treatment module accordingly.
5. The air quality management system for a clean workshop according to claim 4 is characterized in that: The process waste gas pipeline includes a general waste gas pipeline and a special waste gas pipeline.
6. The air quality management system for a clean workshop according to claim 5, characterized in that: The process waste gas pipelines are concentratedly passed through a central return air passage on one side, and the second moving line is arranged at a roof position of the central return air passage that does not pass through the process waste gas pipelines.
7. The air quality management system for a clean workshop according to claim 5, characterized in that: The general exhaust duct and the special exhaust duct pass through the central return air passages on both sides respectively, and the second moving line is arranged on the roof position between the central return air passage and the special exhaust gas treatment module.
8. The air quality management system for a clean workshop according to claim 1, characterized in that: The load-bearing range of the first moving line is 20-25KN; the load-bearing range of the second moving line is greater than or equal to 20KN.
9. The air quality management system for a clean workshop according to claim 1, characterized in that: A dog house is arranged at the pipe penetration place on the roof of the central return air duct, and an emergency smoke exhaust window meeting the requirements of fire protection regulations is installed on the side of the dog house where the exhaust air duct is not penetrated.
10. The air quality management system for a clean workshop according to claim 1, characterized in that: The roof where the special exhaust gas treatment module is arranged adopts steel truss + DECK board roof.
