Dynamic route planning method suitable for polar region ship

CN118730123AActive Publication Date: 2024-10-01SHANGHAI MARITIME UNIVERSITY

Patent Information

Application Number
CN202411217322.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-02
Publication Date
2024-10-01
Estimated Expiration
2044-09-02

AI Technical Summary

Technical Problem

The existing dynamic graph search path planning algorithm has shortcomings in polar sea ship route planning, especially when polar ice conditions change widely and the navigable area increases during the ablation period, it cannot effectively respond to environmental changes, and the original D*Lite The algorithm is not suitable for large-scale changes in the map environment and may lead to pathfinding failure.

Method used

The D*Lite algorithm is improved, by re-formulating local node update rules, using modified ice condition data for dynamic planning, adapting to the changing characteristics of polar ice conditions, and calculating navigation based on the maximum continuous ice thickness of the ship, the average sea ice thickness and sea ice density. risk and optimize route planning.

Benefits of technology

It achieves efficient ship dynamic route planning under large-scale changes in polar ice conditions, reduces the number of node updates during dynamic planning, ensures the accuracy and efficiency of the path extraction process, and adapts to complex changes in the polar environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118730123A_ABST
    Figure CN118730123A_ABST
Patent Text Reader

Abstract

The invention provides a dynamic route planning method suitable for polar region ships. The method comprises the following steps: improving an original D * Lite algorithm, modifying a cost value updating rule and a path extraction rule of nodes, limiting node diffusion updating constraints in a local area, correctly identifying real subsequent nodes of a current node, and completing correct path extraction; according to the method, the node diffusion update constraint is limited in the local area through the modified node cost value update rule, dynamic planning is performed by modifying the local ice condition data of the bottom layer, the number of updated nodes during dynamic planning is effectively reduced, and the dynamic planning efficiency is improved. The D * Lite algorithm improved by the method can adapt to the large-range change of the polar region ice condition, and has efficient ship dynamic route planning capability in the polar region; and through a modified path extraction algorithm rule, it is ensured that interference at the junction of an updated area and a non-updated area is eliminated in the path extraction process, a real subsequent node of the current node is correctly recognized, and correct path extraction is completed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of ship navigation planning, and particularly relates to a dynamic route planning method applicable to polar ships. Background Art

[0002] Since polar ice condition data is generally provided in a grid form, most of the research on ship route planning in polar waters is mainly based on raster maps. For this reason, graph search algorithms based on node traversal are widely used in the research on ship route planning in polar waters. At the same time, considering the limitations of the search direction of the graph search algorithm, the initial planned route is serrated and does not meet the actual requirements. Therefore, smoothing the initial path is a common practice when using the graph search algorithm for path planning.

[0003] With the development of ice condition detection technology in polar waters, the geographical accuracy of ice condition data has been continuously improved. At the same time, the research on ship ice resistance has gradually deepened, and the ship icebreaking navigation performance model has become more complex. To sum up, the ice condition data release format, the complex and changeable environment, and the complexity of node cost value calculation all make it an inevitable trend to apply the dynamic graph search path planning algorithm to polar ship route planning.

[0004] However, there are still some defects in the application of the current mainstream dynamic graph search path planning algorithm in polar ship route planning. For example, the D* algorithm only triggers updates when new obstacle points are added to the current path and cannot handle the scenario where the navigable area of ships increases during the polar ablation period. The original D*Lite algorithm is not applicable to scenarios where the map environment changes greatly. When the environment changes greatly, the update of the original D*Lite algorithm is close to global replanning and there may be a possibility of pathfinding failure. Summary of the Invention

[0005] The purpose of the present invention is to solve the above problems and propose a navigation path planning method with high precision and applicable to large-scale overall changes in polar ice conditions.

[0006] To achieve the above purpose, the present invention proposes a dynamic route planning method applicable to polar ships. Based on the characteristics of the integrity and convergence of polar ice condition changes, the original D*Lite algorithm is improved, and the local node update rule is re-established. By using the modified underlying local ice condition data instead of completely using the latest ice condition data for dynamic planning, the improved D*Lite algorithm can adapt to the characteristics of polar ice condition changes. The method includes the following steps: S1: Read environmental data, construct a grid environmental map, calculate the ship navigation risk value of each grid, obtain the risk threshold , and determine the non-navigable area; S2: Determine the starting and ending positions. According to the modified edge cost function and heuristic function, minimize the estimated cost values of all nodes, and obtain the initial shipping route through the modified path extraction method. S3: Optimize the initial shipping route through a path optimization algorithm to obtain the optimal shipping route. S4: Update the non-navigable area raster set according to the latest ice condition data , and compare it with the non-navigable area raster set of the previous round ; Update the cost values of the nodes in the corresponding areas according to the updated rule of the node cost values. S5: Re-plan the shipping route and perform optimization processing to obtain the latest optimal shipping route. Repeat step S4 until the ship reaches the raster where the destination port is located.

[0007] Furthermore, step S1 is specifically as follows: S1.1: Read the environmental data, including the average sea ice thickness, sea ice concentration, and the corresponding geographical longitude and latitude data, and convert them into a rasterized form; Read the maximum continuous icebreaking thickness of the current ship and the risk threshold of the current voyage ; S1.2: Determine the area to which the waterway belongs according to the geographical locations of the starting port and the destination port, and then perform data clipping. Specifically, it can be divided into the Northeast Passage and the Northwest Passage, and only retain the environmental data of the area to which the waterway belongs. S1.3: Calculate the navigation risk value of all rasters: Calculate the navigation risk value r according to the environmental data and the maximum continuous icebreaking thickness. S1.4: Determine the non-navigable area set: Identify the raster set marked as land and islands in the environmental data , and incorporate it into the non-navigable area raster set; According to the maximum continuous icebreaking thickness of the ship, incorporate the raster set with an average sea ice thickness greater than this value into the non-navigable area raster set; Incorporate the raster set with a calculation result greater than the risk threshold into the non-navigable area raster set, so as to obtain the non-navigable area raster set in the raster environmental map as: , wherein, represents land and islands, represents the sea area where the average sea ice thickness exceeds the maximum continuous icebreaking thickness of the ship, represents the sea area where the navigation risk is higher than the risk threshold.

[0008] Furthermore, in step S1.3, the calculation method of the navigation risk value r is: , Among them, is the average sea ice thickness, is the sea ice concentration, is the maximum continuous icebreaking thickness of the ship.

[0009] In the calculation formula of the navigation analysis value r, the maximum continuous icebreaking thickness of the ship , the average sea ice thickness , and the sea ice concentration are mainly considered. For the navigable area where all average sea ice thicknesses do not exceed the maximum continuous icebreaking thickness of the ship, the calculation result of the navigation risk is between [0, 1]. The closer the calculated result r value is to 0, the lower the navigation risk; on the contrary, the closer the value is to 1, the higher the navigation risk.

[0010] Further, step S2 is specifically as follows: S2.1: Set the grid where the current ship position is located as the starting point, and the grid where the destination port is located as the end point; initialize the estimated cost value rhs(s) and the actual minimum cost value of all grid points to infinity; set the estimated cost value rhs(s) of the end point to 0 and insert it into the node update queue to complete the initialization.

[0011] S2.2: Minimize the estimated cost value rhs(s) of all nodes according to the modified edge cost function and the heuristic function ; S2.3: Obtain the initial route according to the modified path extraction algorithm. The logic of the modified path extraction algorithm is: select the node with the lowest sum of the actual minimum cost value and the cost value to the current path node from the unexplored nodes around the current path point as the next path point. The specific formula is as follows: , Among them, represents the successor node of the current node, represents the current node, represents the set of unexplored nodes, represents the unexplored nodes around the current node.

[0012] Further, in step S2.2, the modified edge cost function is: , The modified heuristic function is: , Among them, , are the weight values of the risk coefficient and the voyage, respectively and are respectively and the risk values of the nodes, and are respectively the abscissa and ordinate of point , and are respectively the abscissa and ordinate of point , and represent the abscissa and ordinate of the starting point.

[0013] Furthermore, in step S3, the specific method for optimizing the initial route through an optimization algorithm is as follows: S3.1: Calculate the cumulative cost value cost1 of the initial point of the current path point list and the subsequent target node under the initial path. The calculation formula is: , where represents the i-th node and the (i + 1)-th point the cost between them; S3.2: Calculate the cumulative cost value cost2 of the direct connection between the initial point of the current path point list and the subsequent target node. The calculation formula is: , where represents the cost value per unit distance of point , represents the length of the connection line within the grid point ; S3.3: By comparing cost1 and cost2, determine whether there is room for optimizing the route. The determination method is: If and the connection line between the two points does not pass through the obstacle point, it means that the cost value of the direct connection between the two nodes is lower than the cost value under the initial path, and there is room for optimization; Directly connect the two path nodes and use the next node of the subsequent target node as the new current point; Repeat steps S3.1 - S3.3, loop through to find the nodes with room for optimization, and directly connect and optimize them until there are no nodes to be optimized, then the optimized optimal path can be obtained to complete the route optimization.

[0014] Furthermore, the cost between the i-th node and the (i + 1)-th point is calculated by the formula: , Among them, represents the cost value per unit distance of a single node, represents the cost value per unit distance of the i-th path node; represents the cost value per unit distance of the (i + 1)-th path node.

[0015] Furthermore, step S4 is specifically as follows: S4.1: Determine the latest non-navigable area raster set according to the latest ice condition data and compare it with the non-navigable area raster set during the previous round of route update to obtain the set of all navigable change areas; S4.2: Update the cost values of the corresponding nodes according to the modified node cost value update rule. The modified node cost value update rule is: when the node triggering the local update is a newly added obstacle point, the cost values of this node and the nodes affected by it are updated using the old environmental data; if the node triggering the local update is a newly added navigable point, the cost value of this node is updated using the new environmental data, and the cost values of the nodes affected by it are updated using the old environmental data. The specific update rule is as follows: , Among them, represents the surrounding nodes affected by the change of the node triggering the update, represents the latest obtained ice condition data, represents the initial historical data after local modification.

[0016] Furthermore, step S5 is specifically as follows: S5.1: Obtain the historical movement cost k m value according to the current ship position of the ship and the last updated ship position, and perform local updates until the exit condition of the loop update is satisfied again. The exit condition of the loop update is: the key value of the node with the highest priority in the current list to be updated is greater than or equal to the key value of the starting point and the estimated cost value rhs(s) of the starting point is equal to its actual minimum cost value value; S5.2: Use the modified path extraction algorithm to search for a new initial route and perform optimization processing to obtain the latest optimal route, and repeat step S4 until the ship reaches the raster where the destination port is located.

[0017] Compared with the prior art, the advantages of the present invention are as follows: 1. The present invention utilizes the characteristics of the integrity and convergence of polar ice conditions to improve the original D*Lite algorithm. Compared with the dynamic programming using the latest ice condition data in the original method, the method of the present invention restricts the node diffusion update constraint within a local area through a modified node cost value update rule, and uses the method of modifying the underlying local ice condition data for dynamic programming, effectively reducing the number of updated nodes during dynamic programming, enabling the improved D*Lite algorithm by the method of the present invention to adapt to large-scale changes in polar ice conditions and having efficient ship dynamic route planning capabilities in the polar region.

[0018] 2. The present invention ensures the elimination of interference at the junction of the updated area and the non-updated area during the path extraction process through a modified path extraction algorithm rule, correctly identifies the true successor nodes of the current node, and completes the correct path extraction.

[0019] 3. By considering three major factors: the maximum continuous icebreaking thickness of the ship, the average sea ice thickness, and the sea ice concentration, the present invention customizes the calculation formula for the navigation risk of polar ships, making the calculation results of the navigation risk in all navigable areas where the average sea ice thickness does not exceed the maximum continuous icebreaking thickness of the ship fall between [0, 1]. The closer the value is to 0, the lower the navigation risk; conversely, the closer the value is to 1, the higher the navigation risk. The calculation is simple and the result is accurate. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic flow chart of the dynamic route planning method for polar ships proposed in the embodiment of the present invention; Figure 2 It is a comparison schematic diagram between the modified path extraction algorithm and the original path extraction algorithm in the method of the embodiment of the present invention; Figure 3 It is a flow chart of the modified path extraction algorithm in the method of the embodiment of the present invention; Figure 4 It is a schematic diagram for optimizing the calculation of the initial path cost in the method of the embodiment of the present invention; Figure 5 It is a schematic diagram of the optimized result of the initial path in the method of the embodiment of the present invention; Figure 6 It is a schematic diagram of the costs of each node of the original map and two changed maps simulated and verified by the present invention; Figure 7 It is a comparison diagram of the path planning results during the simulated ablation period before and after the modification of the algorithm of the present invention; Figure 8 It is a comparison diagram of the path planning results during the simulated freezing period before and after the modification of the algorithm of the present invention; Figure 9 It is a comparison diagram of the number of updated nodes of the paths after the modification of the algorithm of the present invention for two changes. DETAILED DESCRIPTION OF THE INVENTION

[0021] To make the objectives, technical solutions and advantages of the present invention clearer, the technical solutions of the present invention will be further described below.

[0022] This embodiment proposes a dynamic route planning method applicable to polar ships. As Figure 1 shown, a dynamic map is generated through environmental data, and then the optimal route in the ice area is obtained by running the improved D*Lite algorithm. The method includes the following steps: S1: Read environmental data; construct a grid environmental map, calculate the ship navigation risk value of each grid, and set a risk threshold , and determine the non-navigable area. The specific implementation method of this step S1 is: S1.1: Read data Read the required ice condition data, namely the average sea ice thickness, sea ice concentration and the corresponding geographical longitude and latitude data, and convert them into a rasterized form; read the maximum continuous icebreaking thickness value of the ship and the risk threshold of this voyage ; S1.2: Data clipping After determining the area to which the waterway belongs according to the geographical locations of the starting port and the destination port, data clipping is performed. Specifically, it can be divided into the Northeast Passage and the Northwest Passage, and only the environmental data of the area to which the waterway belongs is retained.

[0023] S1.3: Calculate the navigation risk value of all grids Calculate the navigation risk value according to the environmental data including the average sea ice thickness and sea ice concentration and the maximum continuous icebreaking thickness parameter of the ship , and the calculation formula is: , where is the average sea ice thickness, is the sea ice concentration, is the maximum continuous icebreaking thickness of the ship.

[0024] S1.4: Determine the non-navigable area set Identify the grid set marked as land and islands in the environmental data and include it in the non-navigable area grid set; according to the maximum continuous icebreaking thickness of the ship, include the grid set with an average sea ice thickness greater than this value in the non-navigable area grid set; include the grid set with a calculation result greater than the risk threshold in the non-navigable area grid set, and obtain the non-navigable area grid set of the grid environmental map as: , where Indicates land and islands, Indicates the sea area where the average sea ice thickness exceeds the maximum continuous icebreaking thickness of the ship, Indicates the sea area where the navigation risk is higher than the risk threshold.

[0025] S2: Determine the starting and ending positions. According to the modified edge cost function and heuristic function, minimize the estimated cost values of all nodes, and obtain the initial route through the modified path extraction method. The specific method for this step is as follows: S2.1: Determine the starting and ending positions and initialize the cost values Set the grid where the current ship position is located as the starting point, and the grid where the destination port is located as the ending point; set the estimated cost values and the actual minimum cost values of all grid points to infinity; set the estimated cost value of the ending point

[0026] to 0 and insert it into the node update queue to complete the initialization. value According to the modified edge cost function and the heuristic function minimize the estimated cost values value of all nodes. The modified edge cost function and the heuristic function are as follows: , , where: , are the risk coefficient and the weight value of the voyage respectively; and are the risk values of nodes and s respectively; and represent the abscissa and ordinate of point s; and represent the abscissa and ordinate of node ;, and represent the abscissa and ordinate of the starting point.

[0027] S2.3: Extract the initial route Obtain the initial route according to the modified path extraction algorithm. The modified path extraction logic is: select the node with the lowest sum of the actual minimum cost value and the cost value to the current path node from the unexplored nodes around the current path node as the next path point. The specific formula is as follows: , Among them, represents the successor node of the current node, represents the current node, represents the unexplored nodes around the current node.

[0028] Such as Figure 3 shown, in this embodiment, the implementation method of the modified path extraction algorithm is as follows: (1) Incorporate the starting point into the path list and use it as the current exploration point; (2) Calculate the sum of the actual minimum cost value of the unexplored nodes around the current exploration point and the cost of reaching the current exploration point; (3) Incorporate the node with the minimum sum value into the path list and use it as the new exploration point; (4) Mark the old exploration point and its surrounding nodes as explored; (5) Determine whether the current exploration point is the end point. If not, return to step (2); if so, continue with step (6); (6) Output the path list.

[0029] Compare the results of the modified path extraction algorithm and the original path extraction algorithm in the method of this embodiment. As Figure 2 shown, in subgraphs (a) and (c), different regional cost values are marked, and in subgraphs (b) and (d), the actual minimum cost values of different regions reaching the end point in the corresponding environment are marked. The orange area represents the starting point position, and the blue area represents the end point position. The cost values of each node in the figure are different. The red line in subgraph b represents the optimal path extracted by the original path extraction algorithm in the initial environment. After the environment changes and triggers the update of the local node cost value, as shown in the green area in the figure, there may be a situation where the cost value of the predecessor node is higher than that of the successor node after the update at the junction of the updated area and the non-updated area. The original path extraction algorithm will fall into an infinite loop during path extraction, as shown by the red line in subgraph d, while the improved algorithm can successfully extract the optimal path after the environment update, as shown by the blue line in subgraph d.

[0030] S3: Optimize the initial route through a path optimization algorithm to obtain the optimal route; the specific method for this step is as follows: S3.1: Calculate the cost value between two points of the initial path Calculate the cumulative cost value from the initial point of the current path point list to the subsequent target node under the initial path , and the calculation formula is: , Among them, represents the cost between point and point , and the calculation formula is: , Among them, represents the cost value per unit distance of a single node; represents the cost value per unit distance of the i-th path node; Represents the cost value per unit distance of the (i + 1)-th path node.

[0031] S3.2: Calculate the direct connection cost between two points Calculate the cumulative cost of directly connecting to subsequent target nodes starting from the initial point of the current path point list , and the calculation formula is: , where represents the length of the connection line within the grid point ; S3.3: Determine whether there is room for optimization If and the connection line between the two points does not pass through obstacle points, it means that the cost value of directly connecting the two nodes is lower than the cost value under the initial path, and there is room for optimization. Directly connect the two path nodes and use the next node of the subsequent target node as the new current point. Repeat the steps of S3-1 to S3-3, loop through to find nodes with room for optimization and directly connect them for optimization until there are no nodes to be optimized, then the optimized optimal path can be obtained to complete the route optimization; The above calculation of the cost of the initial path and its optimization results are respectively as shown in Figure 4 and Figure 5 . It can be seen from Figure 4 that the navigation cost per unit distance of different grid units is ~ . The black line represents the original path, the distance between its adjacent two points is the unit distance, and its path cost is . The blue line represents the optimized path, and its distances passing through different grids are different, which are respectively ~ , and its path cost is . Figure 5 The cost value per unit distance of each grid is marked in Figure 5 . Among them, the grids with a unit distance cost value greater than or equal to 0.7 are obstacle point grids (see the light gray area in

[0032] S4: Update the non-navigable area grid set according to the latest ice condition data , and compare it with the non-navigable area grid set of the previous round; update the cost values of the nodes in the corresponding areas according to the modified node cost value update rules; S4.1: Determine the nodes triggering the update Determine the latest non-navigable area grid set according to the latest ice condition data and compare it with the non-navigable area grid set during the previous round of route update Make a comparison to obtain the set of all navigable change regions; S4.2: Local node update Update the cost values of the corresponding nodes according to the modified node cost value update rule. The modified update rule is as follows: When the node triggering the local update is a newly added obstacle point, the cost value of this node and the nodes affected by it are updated using the old environmental data; if the node triggering the local update is a newly added navigable point, the cost value of this node is updated using the new environmental data, and the nodes affected by it are updated using the old environmental data for cost value. Its expression is as follows: , Among them, represents the surrounding nodes affected by the change of the node triggering the update, represents the latest obtained ice condition data, represents the initial historical data after local modification.

[0033] S5: Re-plan the route and perform optimization processing to obtain the latest optimal route, and repeat step S4 until the ship reaches the grid where the destination port is located.

[0034] Obtain the value (historical movement cost) based on the current ship position and the last updated ship position, and perform local updates until the exit condition for cyclic updates is re-satisfied, that is, the key value of the node with the highest priority in the current list to be updated is greater than or equal to the key value of the starting point and the value of the starting point is equal to its value. Then, use the modified path extraction algorithm to search for a new initial route and perform optimization processing to obtain the latest optimized route, repeat step S4 and obtain the latest optimal route until the ship reaches the grid where the destination port is located.

[0035] Using the method of this embodiment, simulate and verify the costs of each node in the original map and the two changed maps. The results are as Figure 6 shown. It can be seen from Figure 6 that the unit distance cost value of each grid is marked. Among them, the grids with a value greater than or equal to 0.7 are obstacle point grids, that is, the light gray areas in the figure. The dark gray grid in the upper left corner is the starting point, and the dark gray grid in the lower right corner is the end point. Subfigure (a) compared with Figure 5 , the unit distance cost value of all grids has decreased by 0.05, representing the ablation period of the Arctic Ocean. Subfigure (b) compared with Figure 5 , the unit distance cost value of all grids has increased by 0.05, representing the freezing period of the Arctic Ocean.

[0036] Use the method of this embodiment to simulate the path planning during the ablation period and make a comparison with the method before modification. The comparison results are as Figure 7 shown. It can be seen fromFigure 7 It can be seen that when the starting point and the overall map environment are improved, the number of grids (light gray grids) that need to update the cost value during the update process of the improved D*Lite algorithm represented by subfigure (a) is significantly lower than the number of grids (light gray grids) that need to update the cost value during the update process of the original D*lite algorithm represented by subfigure (b), indicating that the improved D*Lite algorithm can effectively operate in the environmental changes during the ablation period.

[0037] Use the method of this embodiment to simulate the path planning during the freezing period and compare it with the method before modification. The comparison results are as Figure 8 shown. It can be seen from Figure 8 that when the starting point and the overall map environment deteriorate, the number of grids (light gray grids) that need to update the cost value during the update process of the improved D*Lite algorithm represented by subfigure a is significantly lower than the number of grids (light gray grids) that need to update the cost value during the update process of the original D*lite algorithm represented by subfigure b, indicating that the improved D*Lite algorithm can effectively operate in the environmental changes during the freezing period.

[0038] After experiencing the above two changes in the ablation period and the freezing period, compare the number of updated nodes of the path updated by the method of this embodiment and the original method. The comparison results are as Figure 9 shown. In the simulated map, the improved D*Lite algorithm significantly reduces the number of nodes that need to be updated during path update compared with the original D*Lite algorithm, whether in the ablation period or the freezing period, by 75% and 70% respectively, indicating that the improved D*Lite algorithm can effectively cope with different ice conditions in the Arctic Sea area.

[0039] The above is only the preferred embodiment of the present invention and does not impose any limitation on the present invention. Any person skilled in the art within the technical field, without departing from the technical solution of the present invention, makes any form of equivalent replacement or modification and other changes to the technical solution and technical content disclosed by the present invention, all of which belong to the content within the technical solution of the present invention and still fall within the protection scope of the present invention.

Claims

1. A dynamic route planning method suitable for polar ships, characterized in that: The original D*Lite algorithm is improved, the cost value update rule and path extraction rule of the node are modified, the node diffusion update constraint is limited to the local area, the real successor node of the current node is correctly identified, and the correct path extraction is completed; the dynamic route planning method includes the following steps: S1: Read environmental data, build a grid environment map, calculate the ship navigation risk value of each grid, and obtain the risk threshold , determine the non-navigable area; S2: Determine the starting and ending positions, minimize the estimated cost values ​​of all nodes according to the modified edge cost function and heuristic function, and obtain the initial route through the modified path extraction method; S3: Optimizing the initial route through a path optimization algorithm to obtain an optimal route; S4: Update the unnavigable area grid set based on the latest ice data , and the non-navigable area grid set of the previous round Compare; update the cost values ​​of the nodes in the corresponding area according to the modified node cost value update rules; S5: Replan the route and perform optimization processing to obtain the latest optimal route, and repeat step S4 until the ship arrives at the grid where the destination port is located.

2. The dynamic route planning method for polar ships according to claim 1, characterized in that: Step S1 is specifically as follows: S1.1: Read environmental data, including average sea ice thickness, sea ice density and corresponding geographic longitude and latitude data, and convert them into rasterized form; read the current ship's highest continuous ice breaking thickness and the current voyage risk threshold ; S1.2: According to the geographical location of the starting port and the destination port, the area to which the waterway belongs is determined and the data is clipped, and only the environmental data of the area to which the waterway belongs is retained; S1.3: Calculate all grid navigation risk values: Calculate the navigation risk value r according to the environmental data and the highest continuous ice breaking thickness; S1.4: Determine the set of non-navigable areas: Identify the grid set marked as land and islands in the environmental data , and include it in the unnavigable area grid set; according to the highest continuous icebreaking thickness of the ship, the grid set with average sea ice thickness greater than this value Include the unnavigable area grid set; the calculated result is greater than the risk threshold A collection of grids Incorporating the non-navigable area grid set, thereby obtaining the non-navigable area grid set in the grid environment map for: , in, Indicates land and islands, Indicates sea areas where the average sea ice thickness exceeds the maximum continuous icebreaking thickness of ships. Indicates sea areas where the navigation risk is higher than the risk threshold.

3. The dynamic route planning method for polar ships according to claim 2 is characterized in that ,In step S1.3, the calculation method of the navigation risk value r is: , in, is the average sea ice thickness, is the sea ice density, It is the maximum continuous ice breaking thickness of the ship.

4. The dynamic route planning method for polar ships according to claim 1, characterized in that: Step S2 is specifically as follows: S2.1: Set the grid where the current ship position is located as the starting point and the grid where the destination port is located as the end point; calculate the estimated cost value rhs(s) and the actual minimum cost value of all grid points Initialize to infinity; set the estimated cost value rhs(s) of the endpoint to 0 and insert it into the node update queue to complete the initialization; S2.2: According to the modified edge cost function and the heuristic function , minimize the estimated cost rhs(s) of all nodes; S2.3: Obtain the initial route according to the modified path extraction algorithm. The logic of the modified path extraction algorithm is to select the node with the lowest sum of the actual minimum cost value and the cost value to the current path node from the unexplored nodes around the current path node as the next path point. The specific formula is as follows: , in, Indicates the successor node of the current node. Indicates the current node. Represents unexplored nodes around the current node.

5. The dynamic route planning method for polar ships according to claim 4, characterized in that: In step S2.2, the modified edge cost function for: , in, , are the weight values ​​of risk factor and voyage respectively; and Node and risk value of s; and Represents the horizontal and vertical coordinates of point s; and Representation Node The horizontal and vertical coordinates of The modified heuristic function for: , in, and represents the horizontal and vertical coordinates of point s, and Indicates the horizontal and vertical coordinates of the starting point.

6. The dynamic route planning method for polar ships according to claim 1, characterized in that: In step S3, the specific method of optimizing the initial route by using the optimization algorithm is: S3.1: Calculate the cumulative cost value cost1 of the initial point and subsequent target node in the current path point list under the initial path. The calculation formula is: , in, Represents the i-th node With the i+1th node The cost between S3.2: Calculate the cumulative cost value cost2 of the direct connection between the initial point of the current path point list and the subsequent target node. The calculation formula is: , in, Indicate point The cost value per unit distance, Indicates that the line is at a grid point The length of the inner S3.3: By comparing cost1 and cost2, determine whether there is room for optimization of the route. The judgment method is: 1) If When the line between two points does not pass through an obstacle, it means that the cost value of the direct connection between the two nodes is lower than the cost value under the initial path, and there is room for optimization; 2) Directly connect the two path nodes and use the next node of the subsequent target node as the new current point; Repeat steps S3.1-S3.3, loop through to find nodes with optimization space, and directly connect them for optimization until there are no nodes that can be optimized. The optimized optimal path can be obtained and the route optimization is completed.

7. The dynamic route planning method for polar ships according to claim 6, characterized in that: The i-th node and the i+1th point The cost between The calculation formula is: , in, Represents the cost value per unit distance of a single node.

8. The dynamic route planning method for polar ships according to claim 1, characterized in that: Step S4 is specifically as follows: S4.1: Determine the latest unnavigable area grid set based on the latest ice data And compare it with the unnavigable area grid set in the last round of route update By comparison, a set of all navigable change areas is obtained; S4.2: Update the cost value of the corresponding node according to the modified node cost value update rule, and the modified node cost value update rule is: when the node that triggers the local update is a newly added obstacle point, the node and the nodes affected by it use the old environmental data to update the cost value; if the node that triggers the local update is a newly added navigable point, the cost value of the node is updated using the new environmental data, and the nodes affected by it use the old environmental data to update the cost value.

9. The dynamic route planning method for polar ships according to claim 1, characterized in that: Step S5 is specifically as follows: S5.1: Calculate the historical movement cost k based on the current position of the ship and the last updated position m The key value of the node with the highest priority in the current list to be updated is updated locally until the exit condition of the cyclic update is met again. Greater than or equal to the starting point key value and the estimated cost value rhs(s) of the starting point is equal to its actual minimum cost value value; S5.2: Use the modified path extraction algorithm to search for a new initial route and optimize it to obtain the latest optimal route, and repeat step S4 until the ship arrives at the grid where the destination port is located.

Citation Information

Patent Citations

  • Autonomous ship route planning method based on D*Lite optimization algorithm

    CN111220160A

  • Efficient path planning method for dynamic mobile robot based on D*Lite algorithm

    CN115032982A

  • Polar region ship dynamic path planning method based on distance and risk dual-objective optimization

    CN117406717A

  • Method, computer program and system for controlling a movement of a moving agent within a networked environment

    US20180106628A1

Cited By

  • Path planning method based on information grid division

    CN119984292A