A drilling and coring device for pavement layer calibration based on sensing technology

By using sensing technology and automatic switching and auxiliary crushing functions of drilling knives driven by servo motor in the drilling core collection device, the problems of waste of resources and excessive temperature during the drilling process are solved, and efficient drilling and flexible adaptation to different Core extraction operation with geological characteristics.

CN118730624BActive Publication Date: 2024-11-01SHANDONG DONGQING HIGHWAY +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411232136.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-04
Publication Date
2024-11-01
Estimated Expiration
2044-09-04

AI Technical Summary

Technical Problem

The existing drilling core extraction devices are difficult to adapt according to the properties of different materials during the drilling process, resulting in waste of resources and excessive temperatures.

Method used

A drilling core device for pavement layer calibration based on sensing technology is designed, using frame and drilling equipment, including an adjustable mounting rotor frame, a servo motor-driven drive ring and a rotating cylinder, and a variety of drilling knives And auxiliary core extraction structure, through electromagnetic ring and permanent magnet to detect pressure, realize automatic switching and auxiliary crushing of drilling knives, adapting to different geological characteristics.

Benefits of technology

It improves the operating efficiency of drilling cores, reduces water consumption and engine power, avoids damage caused by excessive temperature, and realizes flexible supporting and efficient drilling based on geological characteristics.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118730624B_ABST
    Figure CN118730624B_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of drilling and coring devices, and specifically to a drilling and coring device for pavement layer calibration based on sensing technology, which is convenient for switching and matching use of a first drilling tool, a second drilling tool and a third drilling tool according to different materials, optimizes the use of the equipment, has good operating effect and good practicality, and includes a frame and a drilling device. The frame includes a supporting mounting frame, a mounting rotating frame is rotatably connected to the supporting mounting frame, and an electric adjustment structure is installed on the supporting mounting frame, the electric adjustment structure is used for rotation regulation of the mounting rotating frame relative to the supporting mounting frame, a center hole is opened on the mounting rotating frame, a driving ring is rotatably connected in the center hole, and a first servo motor and a second servo motor are installed on the mounting rotating frame, the first servo motor is used for rotational driving of the driving ring, a rotating cylinder is slidably matched in the driving ring, a lifting frame is slidably connected to the mounting rotating frame, and a threaded rod is threadedly connected to the lifting frame.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coring devices, in particular to a coring device for road surface layer calibration based on sensing technology. Background Art

[0002] As we all know, in geological exploration, concrete pouring and even pavement pouring, in order to test the inner layer material, it is usually necessary to drill and coring. To facilitate the drilling and coring operation, we propose a drilling and coring device for pavement layer calibration based on sensing technology.

[0003] After searching, the invention patent with Chinese patent application number CN202111167064.7 discloses a drilling machine for mining, which is roughly described as including a handle, a crankcase, a side handle, a head guard, an angle spring device, a drill rod, a solenoid valve, and an oil tank. The handle is connected to the crankcase, the crankcase is connected to the oil tank, the crankcase, the oil tank and the head guard are connected, a side handle is fixed on the left side of the head guard, a solenoid valve is provided inside the head guard, the bottom of the head guard is connected to the angle spring device, the drill rod and the crankcase are transitionally matched, the head guard includes an inflation device, a guard shell, a linkage device, and a guard shell A water cavity is provided inside the body, and an inflation device which cooperates with the clearance of the shield shell is provided on the top of the water cavity. An air intake cavity is provided on the right side of the shield shell, and an impeller group is installed inside the air intake cavity. The impeller group is connected to the inflation device through a linkage device, and the linkage device is meshed with the drill pipe. When in use, the double screw rod and the transmission shaft are connected through the linkage device and can rotate at the same time. The bevel gear on the drill pipe drives the No. 1 bevel gear on both sides to rotate, and the connecting wheel and the No. 1 bevel gear on both sides are movably matched, and the two do not affect each other. The No. 1 bevel gear on the left side drives the double screw rod, and the No. 1 bevel gear on the right side drives the transmission shaft to make the impeller rotate to inhale air.

[0004] Although the above-mentioned existing technical solutions can complete the drilling work, generally speaking, drilling itself is a method of drilling a hole in the depth direction of the detection location through a high-speed rotating tool, and coring is to extract the material in the hole after the hole is formed. During the drilling process, water needs to be supplied by a water pump to absorb the heat generated by the tool and the detection location during drilling and cutting to prevent the temperature of the instrument from being too high. However, the internal structure of the detection location is different. When drilling and coring, different drilling and coring parameters are required for different layers of materials to match the properties of different materials. This can avoid the waste of resources caused by the use of a unified and excessive water consumption and engine power for different materials, avoid damage to the drilling rig caused by excessive temperature due to low water consumption, and improve the efficiency of drilling and coring. Summary of the invention

[0005] In view of the problems in the prior art, the present invention provides a drilling and coring device for pavement layer calibration based on sensing technology.

[0006] The technical solution adopted by the present invention to solve the technical problem is: a drilling and coring device for pavement layer calibration based on sensing technology, comprising a frame and a drilling device;

[0007] The frame includes a supporting mounting frame, a mounting rotating frame is rotatably connected to the supporting mounting frame, and an electric adjustment structure is installed on the supporting mounting frame, the electric adjustment structure is used for the rotation regulation of the mounting rotating frame relative to the supporting mounting frame, a center hole is opened on the mounting rotating frame, a driving ring is rotatably connected in the center hole, and a first servo motor and a second servo motor are installed on the mounting rotating frame, the first servo motor is used for the rotation drive of the driving ring, a rotating cylinder is slidably matched in the driving ring, a lifting frame is slidably connected to the mounting rotating frame, a threaded rod is threadedly connected to the lifting frame, the threaded rod is drivingly connected to the output shaft of the second servo motor, and the lifting frame matches the rotating cylinder;

[0008] The drilling equipment includes a drilling probe tube and a spacing bracket, the top of the drilling probe tube is detachably connected to the bottom end of the rotating cylinder, the bottom end of the spacing bracket is provided with four first mounting ports, four second mounting ports and four third mounting ports, the four first mounting ports are slidably connected with a first drilling knife, the top ends of the four first drilling knives are fixedly connected with a first synchronizing ring, the four second mounting ports are slidably connected with a second drilling knife, the top ends of the four second drilling knives are fixedly connected with a second synchronizing ring, the four third mounting ports are slidably connected with a third drilling knife, the top ends of the four third drilling knives are fixedly connected with a third synchronizing ring, the drilling probe tube is provided with a stepped annular cavity, and the stepped annular cavity is fixedly connected with a first synchronizing ring. A first electromagnetic ring, a second electromagnetic ring and a third electromagnetic ring are fixedly connected, and a first permanent magnet, a second permanent magnet and a third permanent magnet are fixedly connected in the first synchronization ring, the second synchronization ring and the third synchronization ring respectively. The first permanent magnet, the second permanent magnet and the third permanent magnet are matched with the first electromagnetic ring, the second electromagnetic ring and the third electromagnetic ring respectively, and a plurality of first pressure detectors are arranged between the first permanent magnet and the first electromagnetic ring, a plurality of second pressure detectors are arranged between the second permanent magnet and the second electromagnetic ring, and a plurality of third pressure detectors are arranged between the third permanent magnet and the third electromagnetic ring. The top end of the spacing bracket is fixedly connected to the bottom end of the drilling probe tube, and an auxiliary coring structure is installed in the drilling probe tube.

[0009] Preferably, the electric adjustment structure includes an axle frame and an electric telescopic rod, the axle frame is fixedly connected to the mounting rotation frame, a driving head and a mounting head are respectively installed at both ends of the electric telescopic rod, the driving head is rotatably connected to the axle frame through a linkage shaft, and the mounting head is rotatably connected to the supporting mounting frame.

[0010] Preferably, the auxiliary coring structure comprises a crushing tool holder, a side mounting opening is opened in the drilling probe tube, the crushing tool holder is rotatably connected in the side mounting opening, and a magnetic component is installed between the side mounting opening and the crushing tool holder.

[0011] Preferably, the magnetic assembly includes a movable column and an electromagnetic component, a column groove is opened on the inner top wall of the side mounting port, the movable column is slidably connected in the column groove, the electromagnetic component is fixedly installed in the column groove, the electromagnetic component is equipped with a permanent magnet component, the permanent magnet component is fixedly connected to the movable column, a linkage frame is hinged on the movable column, and the linkage frame is hinged to the crushing tool holder.

[0012] Preferably, a plurality of crushing cutter heads are fixedly connected to the crushing cutter frame and the linkage frame.

[0013] Preferably, a plurality of conductor posts are fixedly connected in the first electromagnetic ring, the second electromagnetic ring, the third electromagnetic ring and the electromagnetic member, and a spiral conductor is wound around the plurality of conductor posts.

[0014] Preferably, a water diversion cavity is provided in the drilling probe tube, and a plurality of outflow holes and a plurality of inflow holes are opened on the drilling probe tube, the plurality of outflow holes and the plurality of inflow holes are all connected with the water diversion cavity, a water inlet hole connected with the water diversion cavity is provided in the drilling probe tube, and a water diversion hole matching the water inlet hole is provided in the rotating cylinder.

[0015] Preferably, a rotating disk is rotatably connected inside the lifting frame, an external guide pipe is rotatably connected on the rotating disk, the external guide pipe is fixedly connected to the lifting frame, and a semi-annular groove for connecting the external guide pipe with the water guide hole is provided in the rotating disk.

[0016] Preferably, a contact electrode is fixedly connected to the bottom end of the rotating disk, the contact electrode is electrically connected to a conductor ring, the conductor ring is equipped with an electrical connection ring, the electrical connection ring is fixedly connected to the lifting frame, a threading hole is provided in the drilling probe tube, a lead-in hole is provided in the rotating cylinder, wire conductors are provided in the threading hole and the lead-in hole, the bottom end of a wire conductor located on the lower side is electrically connected to the multiple spiral wire conductors, the top ends of the two wire conductors are electrically connected to elastic electrodes, the bottom end of a wire conductor located on the upper side is electrically connected to an access electrode, and the two elastic electrodes are matched with the contact electrode and the access electrode, respectively.

[0017] Preferably, two raised ridges are fixedly connected inside the driving ring, and two recessed grooves are provided on the rotating cylinder, and the two raised ridges are slidably connected in the two recessed grooves respectively.

[0018] The beneficial effects of the present invention are:

[0019] (1) The drilling and coring device for pavement layer calibration based on sensing technology described in the present invention forms a functional structure of the borehole through the design of the drilling equipment and the matching of the location to be detected. In addition, the first drilling tool, the second drilling tool and the third drilling tool can be selected according to the geological characteristics of the drilling location, and the practicality is good.

[0020] (2) The drilling and coring device for pavement layer calibration based on sensing technology described in the present invention forms a structure for mounting a drilling equipment bracket and rotating drive through a frame design, thereby facilitating the normal operation of the drilling equipment.

[0021] (3) The drilling and coring device for pavement layer calibration based on sensing technology described in the present invention, through the design of an auxiliary coring structure, can break and cut off the columnar material drilled by the drilling equipment to facilitate the coring operation after drilling. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0023] Figure 1 It is a schematic diagram of the overall three-dimensional structure of the present invention;

[0024] Figure 2 For the present invention Figure 1 A schematic diagram of the local enlarged structure at point A in the middle;

[0025] Figure 3 A schematic diagram of an exploded three-dimensional structure of the rotating frame, the first servo motor and the lifting frame etc. installed in the present invention;

[0026] Figure 4 It is a schematic diagram of the exploded three-dimensional structure of the driving ring, the rotating cylinder and the raised ridges of the present invention;

[0027] Figure 5 For the present invention Figure 4 A schematic diagram of the local enlarged structure at B in the middle;

[0028] Figure 6 It is a partially cutaway three-dimensional structural schematic diagram of the cooperation of the drilling probe tube, the spacer bracket and the third synchronization ring of the present invention;

[0029] Figure 7 It is a schematic diagram of the three-dimensional structure of the spacer bracket of the present invention;

[0030] Figure 8 It is a schematic diagram of the three-dimensional structure of the cooperation of the first drilling tool, the first synchronization ring and the second drilling tool of the present invention;

[0031] Fig. 9 It is a partially cutaway three-dimensional structural schematic diagram of the cooperation of the first electromagnetic ring, the second electromagnetic ring and the third electromagnetic ring of the present invention;

[0032] Fig.10 For the present invention Fig. 9 A schematic diagram of the local enlarged structure at C in the middle;

[0033] Fig.11 It is a partially cutaway three-dimensional structural schematic diagram of the cooperation of the drilling head pipe, linkage frame and crushing cutter head of the present invention;

[0034] Fig.12 It is a schematic diagram of a partially exploded three-dimensional structure of the electromagnetic component, the permanent magnetic component and the spiral conductor of the present invention;

[0035] Fig.13 It is a schematic diagram of the overall three-dimensional structure of the present invention when viewed from above;

[0036] Fig.14 For the present invention Figure 1 A schematic diagram of the local enlarged structure at F in the middle;

[0037] Fig.15 It is a schematic diagram of a cross-sectional three-dimensional structure of the rotating cylinder, the wire conductor and the access electrode of the present invention;

[0038] Fig.16 It is a schematic diagram of the three-dimensional structure of the lifting frame, contact electrode and power connection ring of the present invention.

[0039] In the figure: 1, support mounting frame; 2, mounting rotating frame; 3, driving ring; 4, first servo motor; 5, second servo motor; 6, rotating cylinder; 7, lifting frame; 8, threaded rod; 9, drilling probe tube; 10, spacing bracket; 11, first drilling knife; 12, first synchronization ring; 13, second drilling knife; 14, second synchronization ring; 15, third drilling knife; 16, third synchronization ring; 17, first electromagnetic ring; 18, second electromagnetic ring; 19, third electromagnetic ring; 20, first permanent magnet; 21, second permanent magnet; 22, third permanent magnet; 23, shaft frame; 24, electric telescopic rod ; 25. Driving head; 26. Mounting head; 27. Crushing tool holder; 28. Side mounting port; 29. ​​Moving column; 30. Electromagnetic component; 31. Permanent magnet component; 32. Linkage frame; 33. Crushing tool head; 34. Conductor column; 35. Spiral conductor; 36. Water diversion cavity; 37. Outflow hole; 38. Inflow hole; 39. Water inlet hole; 40. Water diversion hole; 41. Rotating disk; 42. External lead pipe; 43. Contact electrode; 44. Conductor ring; 45. Electric connection ring; 46. Wire conductor; 47. Elastic electrode; 48. Access electrode; 49. Semi-ring groove; 50. Raised ridge; 51. Concave strip groove. DETAILED DESCRIPTION

[0040] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods. Example

[0041] See also Figure 1-Figure 16 A drilling and coring device for pavement layer calibration based on sensing technology includes a frame and a drilling device. The frame includes a support mounting frame 1, and a mounting rotating frame 2 is rotatably connected to the support mounting frame 1. An electric adjustment structure is installed on the support mounting frame 1. The electric adjustment structure includes an axis frame 23 and an electric telescopic rod 24. The axis frame 23 is fixedly connected to the mounting rotating frame 2. A driving head 25 and a mounting head 26 are respectively installed at both ends of the electric telescopic rod 24. The driving head 25 is rotatably connected to the axis frame 23 through a linkage shaft, and the mounting head 26 is rotatably connected to the support mounting frame 1. The electric adjustment structure is used for rotating and regulating the mounting rotating frame 2 relative to the support mounting frame 1. A center hole is opened on the mounting rotating frame 2, and the rotating frame 2 in the center hole is rotated. A driving ring 3 is connected, and a first servo motor 4 and a second servo motor 5 are installed on the mounting rotating frame 2. The first servo motor 4 is used for driving the driving ring 3. A rotating cylinder 6 is slidably matched in the driving ring 3. Two raised ridges 50 are fixedly connected in the driving ring 3. Two recessed grooves 51 are provided on the rotating cylinder 6. The two raised ridges 50 are respectively slidably connected in the two recessed grooves 51. A lifting frame 7 is slidably connected to the mounting rotating frame 2. A threaded rod 8 is threadedly connected to the lifting frame 7. The threaded rod 8 is drivingly connected to the output shaft of the second servo motor 5. The lifting frame 7 is matched with the rotating cylinder 6. Through the design of the frame, a structure for mounting and rotating the drilling equipment bracket is formed, which is convenient for the normal operation of the drilling equipment.

[0042] It should be further explained that the drilling equipment includes a drilling probe tube 9 and a spacing bracket 10. The top of the drilling probe tube 9 is detachably connected to the bottom of the rotating cylinder 6. The bottom of the spacing bracket 10 is provided with four first mounting ports, four second mounting ports and four third mounting ports. The four first mounting ports are all slidably connected with a first drilling knife 11, and the tops of the four first drilling knives 11 are fixedly connected with a first synchronizing ring 12. The four second mounting ports are all slidably connected with a second drilling knife 13, and the tops of the four second drilling knives 13 are fixedly connected with a second synchronizing ring 14. The four third mounting ports are all slidably connected with a third drilling knife 15, and the tops of the four third drilling knives 15 are fixedly connected with a third synchronizing ring 16. The drilling probe tube 9 is provided with a stepped annular cavity, and the stepped annular cavity is fixedly connected with a first electromagnetic ring 17, a second electromagnetic ring 18 and a third electromagnetic ring 19. The first synchronizing ring 12, the second synchronizing ring 14 and the third synchronizing ring 15 are fixedly connected with a third synchronizing ring 16. 4 and the third synchronous ring 16 are respectively fixedly connected with the first permanent magnet 20, the second permanent magnet 21 and the third permanent magnet 22, the first permanent magnet 20, the second permanent magnet 21 and the third permanent magnet 22 are matched with the first electromagnetic ring 17, the second electromagnetic ring 18 and the third electromagnetic ring 19 respectively, and a plurality of first pressure detectors are arranged between the first permanent magnet 20 and the first electromagnetic ring 17, a plurality of second pressure detectors are arranged between the second permanent magnet 21 and the second electromagnetic ring 18, and a plurality of third pressure detectors are arranged between the third permanent magnet 22 and the third electromagnetic ring 19. The top end of the spacing bracket 10 is fixedly connected with the bottom end of the drilling probe tube 9. Through the design of the drilling equipment, the location to be detected is matched to form a functional structure of the borehole, and the first drilling knife 11, the second drilling knife 13 and the third drilling knife 15 can be matched and selected according to the geological characteristics of the drilling location, which has good practicality.

[0043] It is also necessary to further explain that an auxiliary coring structure is installed in the drilling probe tube 9, and the auxiliary coring structure includes a crushing tool holder 27. A side mounting port 28 is opened in the drilling probe tube 9, and the crushing tool holder 27 is rotatably connected in the side mounting port 28. A magnetic component is installed between the side mounting port 28 and the crushing tool holder 27. The magnetic component includes a moving column 29 and an electromagnetic component 30. A column groove is opened on the inner top wall of the side mounting port 28, and the moving column 29 is slidably connected in the column groove. The electromagnetic component 30 is fixedly installed in the column groove. The electromagnetic component 30 is equipped with a permanent magnet 31, and the permanent magnet 31 is installed in the column groove. 1 is fixedly connected to the moving column 29, a linkage frame 32 is hinged on the moving column 29, the linkage frame 32 is hinged to the crushing tool frame 27, a plurality of crushing cutter heads 33 are fixedly connected to the crushing tool frame 27 and the linkage frame 32, a plurality of conductor columns 34 are fixedly connected in the first electromagnetic ring 17, the second electromagnetic ring 18, the third electromagnetic ring 19 and the electromagnetic member 30, a plurality of conductor columns 34 are wound with spiral conductors 35, and the column material drilled by the drilling equipment is crushed and cut off through the design of the auxiliary coring structure, so as to facilitate the coring operation after drilling.

[0044] It should be further explained that a water diversion cavity 36 is provided in the drilling probe tube 9, and a plurality of outflow holes 37 and a plurality of inflow holes 38 are provided on the drilling probe tube 9, and the plurality of outflow holes 37 and the plurality of inflow holes 38 are all connected to the water diversion cavity 36, a water inlet hole 39 connected to the water diversion cavity 36 is provided in the drilling probe tube 9, a water diversion hole 40 matching the water inlet hole 39 is provided in the rotating cylinder 6, a rotating disk 41 is rotatably connected in the lifting frame 7, an external guide pipe 42 is rotatably connected to the rotating disk 41, and the external guide pipe 42 is fixedly connected to the lifting frame 7, and a semi-annular groove 49 for connecting the external guide pipe 42 with the water diversion hole 40 is provided in the rotating disk 41, so as to form water injection and cooling during the drilling process, and the bottom end of the rotating disk 41 is fixedly connected A contact electrode 43 is connected, the contact electrode 43 is electrically connected to a conductor ring 44, the conductor ring 44 is equipped with an electrical connection ring 45, the electrical connection ring 45 is fixedly connected in the lifting frame 7, a threading hole is provided in the drilling probe tube 9, a lead-in hole is provided in the rotating cylinder 6, and wire conductors 46 are provided in the threading hole and the lead-in hole. The bottom end of a wire conductor 46 located on the lower side is electrically connected to a plurality of spiral wire conductors 35, and the top ends of the two wire conductors 46 are electrically connected to elastic electrodes 47, and the bottom end of a wire conductor 46 located on the upper side is electrically connected to an access electrode 48. The two elastic electrodes 47 are matched with the contact electrode 43 and the access electrode 48 respectively, so as to form a necessary power supply line in the drilling probe tube 9.

[0045] The first servo motor 4, the second servo motor 5, the first pressure detector and the electric telescopic rod 24 in this embodiment are all conventional devices purchased on the market and known to those skilled in the art. They need to be selected or customized according to actual needs. In this patent, we only use them and do not improve their structure and function. For those skilled in the art, their setting method, installation method and electrical connection method only need to be debugged according to the requirements of their instruction manual, and will not be described in detail here.

[0046] To sum up, the working principle of the drilling and coring device for pavement layer calibration based on sensor technology is as follows: before use, the drilling and coring device for pavement layer calibration based on sensor technology is first placed as a whole at the location where it is required to be used. When in use, it can be installed relative to an external vehicle or bracket through the support mounting frame 1, or it can be fixed relative to the drilling surface at the location of use. Then, the electric telescopic rod 24 is powered on to realize the rotation adjustment of the installation rotating frame 2 relative to the support mounting frame 1, so that the spacing bracket 10 and the drilling position are adjusted to a corresponding angle. Then, the power supply of the first servo motor 4 is turned on, so that the first servo motor 4 is powered on to realize the rotation drive of the drive ring 3, and the rotation of the drive ring 3 realizes the rotation drive of the rotating cylinder 6, and the rotation of the rotating cylinder 6 realizes the rotation drive of the drilling probe tube 9 and the spacing bracket 10. In this way, the synchronous rotation drive of the four first drilling knives 11, the four second drilling knives 13 and the four third drilling knives 15 can be realized, and then the second servo motor 5 is controlled to be powered on to realize the rotation drive of the threaded rod 8. The rotation of the threaded rod 8 can realize the height adjustment of the lifting frame 7 relative to the mounting rotating frame 2, and then the downward driving of the rotating cylinder 6 is realized to realize the auxiliary downward pressing of the drilling probe tube 9 and the spacing bracket 10, and then the synchronous downward driving of the four first drilling knives 11, the four second drilling knives 13 and the four third drilling knives 15 in the spacing bracket 10 is realized. Since the surface material of the drilling surface at the place of use is exposed, the material hardness of the initial drilling operation target can be preliminarily judged by visual inspection and knocking, and the corresponding first drilling knife 11, the second drilling knife 13 or the third drilling knife 15 can be selected according to the specific situation.

[0047] Furthermore, taking the sequential hardening of the materials of the first drilling blade 11, the second drilling blade 13 and the third drilling blade 15 as an example, the selection of the first drilling blade 11, the second drilling blade 13 and the third drilling blade 15 is explained in the case where the surface material of the drilling surface at the use location is of medium hardness. The second drilling blade 13 with moderate hardness should be selected, and the spiral conductor 35 in the second electromagnetic ring 18 is controlled to be energized so that it combines with the conductor column 34 wound with it to form an electromagnetic field surrounding the second electromagnetic ring 18, and the direction of the electromagnetic pole of the electromagnetic field is controlled by controlling the direction of the current in the spiral conductor, so that the magnetic pole directions of the second electromagnetic ring 18 and the second permanent magnet 21 that are close to each other are opposite, so as to promote the A mutually repulsive force is formed between the second electromagnetic ring 18 and the second synchronous ring 14, which causes the second synchronous ring 14 to be pushed downward in the stepped annular cavity, thereby pushing out the four second drilling knives 13 connected to the second synchronous ring 14 downward. At the same time, the first permanent magnet 20 and the first electromagnetic ring 17 and the third permanent magnet 22 and the third electromagnetic ring 19 are controlled to form a magnetic attraction force of mutual magnetic attraction, so that the four third drilling knives 15 and the four first drilling knives 11 are moved up and collected relative to the spacing bracket 10. The pushed out four second drilling knives 13 drill relative to the surface of the drilling surface at the use location in two forms of rotation accompanied by the downward movement and rotation of the spacing bracket 10. In this process, the uniform speed of the drilling process is controlled by the third servo motor. During drilling, the interaction pressure between the second synchronization ring 14 and the second electromagnetic ring 18 is detected in real time by the second pressure detector. When the pressure remains stable within a certain range, it means that the material drilled by the second drilling tool 13 has not changed. If the pressure value detected by the second pressure detector in real time becomes smaller, it means that the material drilled by the second drilling tool 13 has become softer. Thereafter, the first permanent magnet 20 and the first electromagnetic ring 17 are controlled to form a mutual magnetic repulsion effect, so that the four first drilling tools 11 are pushed downward, and the second permanent magnet 21 and the second electromagnetic ring 18 form a mutual magnetic attraction effect, so that the second drilling tool 13 is received in the spacing bracket 10, and then the second drilling tool 13 withdraws from the drilling. The first drilling tool 11 enters the working surface. Similarly, during the drilling process, the first pressure detector detects the interaction pressure between the first synchronization ring 12 and the first electromagnetic ring 17 in real time. When the pressure remains stable within a certain range, it means that the material drilled by the first drilling tool 11 has not changed. If the pressure value detected by the first pressure detector in real time increases, it means that the material drilled by the second drilling tool 13 has hardened. Then, the magnetic poles of the first electromagnetic ring 17 and the second electromagnetic ring 18 are converted to realize the upward movement of the first drilling tool 11 and the downward push of the second drilling tool 13, thereby realizing the conversion and use of the first drilling tool 11, the second drilling tool 13 and the third drilling tool 15 according to the change of the drilling material.

[0048] Furthermore, as the drilling progresses, a columnar drilling sample structure will be formed in the drilling probe tube 9. When the sampling depth is not reached, the electromagnetic component 30 is controlled to generate an electromagnetic field to act on the permanent magnet component 31, so that the moving column 29 is pushed downward. The downward movement of the moving column 29 will cause the crushing tool holder 27 and the linkage frame 32 to rotate out from the side mounting opening 28, thereby interfering with the columnar drilling sample structure. The crushing of the columnar drilling sample structure is achieved through the relative rotation of the crushing tool head 33 relative to the columnar drilling sample structure. The outer guide tube 42 is used throughout the entire drilling cycle. The cooling water is fed in, and the crushed body of the drilling sample structure of the column is discharged from the borehole along with the flow of cooling water. For the flow of cooling water, in order to ensure the good operation and economy of the equipment, the first drilling tool 11, the second drilling tool 13 and the third drilling tool 15 are matched to realize the corresponding feeding of cooling water flow, that is, the harder the drilling tool material, the greater the cooling water feeding flow. When the depth required for sampling is reached, the magnetic pole direction of the electromagnetic part 30 is switched first, so that the crushing tool holder 27 and the linkage frame 32 are cooperatively received in the side mounting port 28, and the crushing tool holder 27 and the linkage frame 32 are connected to the side mounting port 28. The drilling and coring device for pavement layer calibration using sensing technology continues to drill, which will cause the crushing tool holder 27 and the linkage frame 32 to pass over a certain distance of the unbroken columnar drilling sample structure. When the distance of the columnar drilling sample structure is sufficient, the second servo motor 5 stops and does not feed in the depth direction, while the first servo motor 4 continues to run to keep the drilling equipment as a whole in a rotating state, and the electromagnetic component 30 is controlled to generate an electromagnetic field to act on the permanent magnet component 31, so that the moving column 29 is pushed downward again. The downward movement of the moving column 29 will cause the crushing tool holder 27 and the linkage frame 32 to pass over a certain distance of the unbroken columnar drilling sample structure. When the distance of the columnar drilling sample structure is sufficient, the second servo motor 5 stops and does not feed in the depth direction, while the first servo motor 4 continues to run to keep the drilling equipment as a whole in a rotating state, and the electromagnetic component 30 is controlled to generate an electromagnetic field to act on the permanent magnet component 31, so that the moving column 29 is pushed downward again. The rack 32 rotates out from the side mounting opening 28, forming interference with the drilling sample structure of the column, and the crushing and cutting of the drilling sample structure of the column is achieved through the relative rotational movement of the crushing cutter head 33 relative to the drilling sample structure of the column, thereby achieving the cutting of the drilling sample structure of the column. After that, the crushing cutter rack 27 and the linkage rack 32 are kept rotated out from the side mounting opening 28, and the drilling probe tube 9 is controlled to withdraw relative to the borehole, so that the crushed and cut drilling sample structure of the column can be lifted out of the borehole, and finally the lifted drilling sample structure of the column can be taken out from the drilling probe tube 9.

[0049] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

[0050] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A drilling and coring device for pavement layer calibration based on sensing technology, characterized in that: Includes framework and drilling equipment; The frame comprises a support mounting frame (1), a mounting rotating frame (2) is rotatably connected to the support mounting frame (1), and an electric adjustment structure is installed on the support mounting frame (1), the electric adjustment structure is used for rotational regulation of the mounting rotating frame (2) relative to the support mounting frame (1), a center hole is opened on the mounting rotating frame (2), a driving ring (3) is rotatably connected in the center hole, and a first servo motor (4) and a second servo motor (5) are installed on the mounting rotating frame (2), the first servo motor (4) is used for rotational driving of the driving ring (3), a rotating cylinder (6) is slidably matched in the driving ring (3), a lifting frame (7) is slidably connected to the mounting rotating frame (2), a threaded rod (8) is threadedly connected to the lifting frame (7), the threaded rod (8) is drivingly connected to the output shaft of the second servo motor (5), and the lifting frame (7) matches the rotating cylinder (6); The drilling equipment comprises a drilling probe tube (9) and a spacing bracket (10), the top end of the drilling probe tube (9) being detachably connected to the bottom end of the rotating cylinder (6), the bottom end of the spacing bracket (10) being provided with four first mounting openings, four second mounting openings and four third mounting openings, the four first mounting openings being slidably connected with a first drilling knife (11), the top ends of the four first drilling knives (11) being fixedly connected with a first synchronizing ring (12), the four second mounting openings being slidably connected with a second drilling knife (13), the top ends of the four second drilling knives (13) being fixedly connected with a second synchronizing ring (14), the four third mounting openings being slidably connected with a third drilling knife (15), the top ends of the four third drilling knives (15) being fixedly connected with a third synchronizing ring (16), and the drilling probe tube (9) being provided with a stepped annular cavity, the stepped annular cavity being fixedly connected with a first electromagnetic ring (17), a second electromagnetic ring (17) and a second electromagnetic ring (17). (18) and a third electromagnetic ring (19), a first permanent magnet (20), a second permanent magnet (21) and a third permanent magnet (22) are fixedly connected in the first synchronization ring (12), the second synchronization ring (14) and the third synchronization ring (16), respectively, the first permanent magnet (20), the second permanent magnet (21) and the third permanent magnet (22) are matched with the first electromagnetic ring (17), the second electromagnetic ring (18) and the third electromagnetic ring (19), respectively, and a plurality of first pressure detectors are arranged between the first permanent magnet (20) and the first electromagnetic ring (17), a plurality of second pressure detectors are arranged between the second permanent magnet (21) and the second electromagnetic ring (18), and a plurality of third pressure detectors are arranged between the third permanent magnet (22) and the third electromagnetic ring (19), the top end of the spacing bracket (10) is fixedly connected to the bottom end of the drilling probe tube (9), and an auxiliary coring structure is installed in the drilling probe tube (9).

2. The drilling and coring device for pavement layer calibration based on sensing technology according to claim 1 is characterized in that: The electric adjustment structure comprises an axle frame (23) and an electric telescopic rod (24); the axle frame (23) is fixedly connected to the mounting rotating frame (2); a driving head (25) and a mounting head (26) are respectively mounted on both ends of the electric telescopic rod (24); the driving head (25) is rotatably connected to the axle frame (23) via a linkage shaft; and the mounting head (26) is rotatably connected to the supporting mounting frame (1).

3. The drilling and coring device for pavement layer calibration based on sensing technology according to claim 2 is characterized in that: The auxiliary coring structure comprises a crushing tool holder (27), a side mounting opening (28) is provided in the drilling probe tube (9), the crushing tool holder (27) is rotatably connected in the side mounting opening (28), and a magnetic component is installed between the side mounting opening (28) and the crushing tool holder (27).

4. The drilling and coring device for pavement layer calibration based on sensing technology according to claim 3 is characterized in that: The magnetic assembly comprises a movable column (29) and an electromagnetic component (30); a column groove is provided on the inner top wall of the side mounting opening (28); the movable column (29) is slidably connected in the column groove; the electromagnetic component (30) is fixedly installed in the column groove; the electromagnetic component (30) is equipped with a permanent magnet component (31); the permanent magnet component (31) is fixedly connected to the movable column (29); a linkage frame (32) is hingedly connected to the movable column (29); and the linkage frame (32) is hingedly connected to the crushing tool holder (27).

5. The drilling and coring device for pavement layer calibration based on sensing technology according to claim 4 is characterized in that: A plurality of crushing cutter heads (33) are fixedly connected to the crushing cutter frame (27) and the linkage frame (32).

6. The drilling and coring device for pavement layer calibration based on sensing technology according to claim 5 is characterized in that: A plurality of conductor posts (34) are fixedly connected inside the first electromagnetic ring (17), the second electromagnetic ring (18), the third electromagnetic ring (19) and the electromagnetic component (30), and a spiral conductor (35) is wound around the plurality of conductor posts (34).

7. The drilling and coring device for pavement layer calibration based on sensing technology according to claim 6 is characterized in that: The drilling probe tube (9) is provided with a water diversion cavity (36), and a plurality of outflow holes (37) and a plurality of inflow holes (38) are provided on the drilling probe tube (9), the plurality of outflow holes (37) and the plurality of inflow holes (38) are all connected to the water diversion cavity (36), a water inlet hole (39) connected to the water diversion cavity (36) is provided in the drilling probe tube (9), and a water diversion hole (40) matching the water inlet hole (39) is provided in the rotating cylinder (6).

8. The drilling and coring device for pavement layer calibration based on sensing technology according to claim 7 is characterized in that: A rotating disk (41) is rotatably connected inside the lifting frame (7), an external guide tube (42) is rotatably connected to the rotating disk (41), the external guide tube (42) is fixedly connected to the lifting frame (7), and a semi-annular groove (49) is provided inside the rotating disk (41) for connecting the external guide tube (42) with the water guide hole (40).

9. The drilling and coring device for pavement layer calibration based on sensing technology according to claim 8, characterized in that: A contact electrode (43) is fixedly connected to the bottom end of the rotating disk (41), the contact electrode (43) is electrically connected to a conductor ring (44), the conductor ring (44) is equipped with an electric connection ring (45), the electric connection ring (45) is fixedly connected to the lifting frame (7), a threading hole is provided in the drilling probe tube (9), a lead-in hole is provided in the rotating cylinder (6), and wire conductors (46) are provided in the threading hole and the lead-in hole, the bottom end of a wire conductor (46) located on the lower side is electrically connected to the plurality of spiral wire conductors (35), the top ends of the two wire conductors (46) are electrically connected to elastic electrodes (47), the bottom end of a wire conductor (46) located on the upper side is electrically connected to an access electrode (48), and the two elastic electrodes (47) are matched with the contact electrode (43) and the access electrode (48), respectively.

10. The drilling and coring device for pavement layer calibration based on sensing technology according to claim 9, characterized in that: Two raised ridges (50) are fixedly connected inside the driving ring (3), and two recessed grooves (51) are provided on the rotating cylinder (6). The two raised ridges (50) are slidably connected in the two recessed grooves (51) respectively.