Hybrid plug-in-based super-heterogeneous reconfigurable software and hardware scheduling system and hybrid plug-in-based super-heterogeneous reconfigurable software and hardware scheduling method
Through the combination of hybrid plug-in and Openstack/Kubernetes architecture, unified management and priority scheduling of hyper-heterogeneous software and hardware resources are realized, which solves the problem of insufficient scheduling capabilities of hyper-heterogeneous resources in the existing technology and improves resource utilization. and task processing efficiency.
Patent Information
- Application Number
- CN202410808397.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-21
- Publication Date
- 2024-10-01
AI Technical Summary
Existing technologies are difficult to effectively manage and schedule hyper-heterogeneous software and hardware resources, especially in the fields of high-performance computing, big data, and artificial intelligence. Existing methods cannot achieve unified management and efficient scheduling of underlying board-level heterogeneous resources, and Lack of priority scheduling strategy.
Use a hybrid plug-in method to build a hyper-heterogeneous software and hardware system, realize unified monitoring and management of resources through hyper-heterogeneous hardware platforms and software platforms, provide visual display of resources, and propose a resource scheduling scheme based on priority algorithms, using Openstack and Kubernetes architecture for resource discovery, allocation and scheduling.
It achieves efficient unified management and priority scheduling of hyper-heterogeneous software and hardware resources, improves task execution support and processing efficiency, expands the scope of the platform, and provides a solution for efficient management of heterogeneous resources.
Smart Images

Figure CN118733222A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of heterogeneous computing technology, and in particular to a hybrid plug-in-based ultra-heterogeneous reconfigurable software and hardware scheduling system and method. Background Art
[0002] In recent years, with the vigorous development of big data, artificial intelligence and other fields, computing resources and storage resources under the traditional technology model can no longer bring equivalent performance improvements as described by Moore's Law. At the same time, Domain Specific Architecture (DSA) has become an effective technical route to cope with the gradual slowdown of Moore's Law due to its advantages in performance, energy efficiency and flexibility. However, in order to achieve actual results in practice, it has put forward high requirements for cross-layer collaborative optimization of software and hardware. How to effectively manage the software and hardware resources on a super-heterogeneous system composed of a variety of different domain-customized chips and achieve efficient scheduling has become a key scientific problem that needs to be solved urgently.
[0003] Existing resource management and scheduling methods are mostly based on the management of virtual machines or containers in cloud environments. They are more oriented towards the flexibility of microservices, focusing on resource utilization and load balancing, while the unified management and scheduling of underlying board-level heterogeneous resources is relatively limited. System design and scheduling methods for the collaborative work of mixed-granularity heterogeneous computing resources are still very rare.
[0004] The existing patent "A microservice-based industrial edge control platform" (application number: CN202210751181.6) provides a microservice-based industrial edge control platform, which is mainly aimed at the industrial control field, and does not mention the management and scheduling of hyper-heterogeneous resources. It only describes the complete abstract business including the infrastructure layer, basic service layer, aggregation business layer, API gateway layer and user presentation layer. Through various control methods, the resource utilization of the platform is effectively improved. It does not consider the priority-based global scheduling problem under the multi-task execution of the whole system from the scheduling perspective, and cannot fundamentally improve the global resource utilization.
[0005] The existing patent "A heterogeneous system data synchronization method and system based on two-layer topology scheduling" (application number: CN202311007212.8) discloses a heterogeneous system data synchronization method and system based on two-layer topology scheduling, including a Master node and several Worker nodes. The Master node receives the data synchronization task of the business system and splits it into several subtasks, dispatches the subtask queue to the Worker node, and the Worker node executes specific subtasks and performs data synchronization serially after receiving the subtasks dispatched by the Master node. This existing invention patent mainly involves the field of data synchronization technology. The system maximizes concurrency while ensuring dependencies, improves the elasticity of the synchronization system, and dynamically senses business traffic and adjusts computing resources accordingly, balancing computing resources and synchronization efficiency. The system includes management nodes and computing nodes. The scheduling is load balancing scheduling, and the priority scheduling strategy is not considered.
[0006] In summary, existing resource management and scheduling methods have the problem of being unable to efficiently adapt to hyper-heterogeneous hardware and software environments. Summary of the invention
[0007] The purposes of the present invention are: 1. To build a set of hyper-heterogeneous hardware and software systems by hybrid plug-in, and the system has cluster expansion capability; 2. To build a resource management platform for hyper-heterogeneous environments based on the hyper-heterogeneous hardware and software systems, to achieve unified monitoring and management of underlying board-level resources, and to provide a visual display of resources; 3. To propose a resource scheduling scheme based on a priority algorithm, and to achieve control of resource scheduling through the resource management platform.
[0008] In order to achieve the above-mentioned invention object, the technical solution of the present invention is to provide a hyper-heterogeneous reconfigurable software and hardware scheduling system based on hybrid plug-in, which is oriented to the fields of high-performance computing, big data and artificial intelligence. The hyper-heterogeneous reconfigurable software and hardware scheduling system includes:
[0009] Application services for building a hyper-heterogeneous hardware platform based on the resource requirements and existing resources in the fields of high-performance computing, big data, and artificial intelligence to provide basic software and hardware support;
[0010] The hyper-heterogeneous hardware platform is provided with a high-performance computing server that deploys heterogeneous computing boards. The high-performance computing server plugs in heterogeneous computing boards through board slots that are adapted to the heterogeneous computing boards according to demand, and generates heterogeneous resource information. The construction forms here include: mixed plug-in of multiple heterogeneous computing boards in a high-performance computing server; a hyper-heterogeneous cluster environment composed of multiple high-performance computing servers contains multiple heterogeneous computing resources, among which each high-performance computing server can plug in heterogeneous computing boards in a mixed plug-in manner.
[0011] Hyper-heterogeneous software platform, including resource discovery and management, resource scheduling, resource allocation, and resource management;
[0012] Among them, resource discovery and management are based on the Openstack architecture, which is used to obtain various heterogeneous resource information from super-heterogeneous hardware platforms. The basic resource information corresponding to the heterogeneous resources is obtained through basic communication and encapsulation in the form of API, providing discovery and data transmission of different resources in different architectures; resource allocation and resource management are both based on the Kubernetes architecture. Resource allocation receives deployment requests from users through interface adaptation, and returns heterogeneous resource allocation plans to users. Users can obtain the basic situation and usage status of basic resource information; resource management obtains basic resource information from resource discovery and management, writes basic resource information into the database for classification management, creates a global image and table of resource status, and builds a resource portrait; resource scheduling is graded according to deployment requests, and a heterogeneous resource allocation plan is generated based on the graded results combined with the global image and table of resource status and resource portrait.
[0013] Preferably, the specification of the board slot matches that of the heterogeneous computing board, and PCI-E slots are widely used but not limited to.
[0014] Preferably, the hybrid plug-in-based hyper-heterogeneous reconfigurable software and hardware scheduling system further includes:
[0015] The adaptation layer is located between the hyper-heterogeneous software platform and the hyper-heterogeneous hardware platform. It performs basic interactive adaptation between the hyper-heterogeneous software platform and the hyper-heterogeneous hardware platform through data transmission / conversion, command conversion / issuance, basic communication and data aggregation.
[0016] The technical solution of the present invention also provides a method for scheduling ultra-heterogeneous reconfigurable software and hardware based on hybrid plug-in, which is applied to the above-mentioned ultra-heterogeneous reconfigurable software and hardware scheduling system based on hybrid plug-in, and includes the following steps:
[0017] The application service builds a hyper-heterogeneous hardware platform based on the resource requirements and existing resources in the fields of high-performance computing, big data, and artificial intelligence;
[0018] The high-performance computing server in the hyper-heterogeneous hardware platform inserts a heterogeneous computing board into a board slot adapted to the heterogeneous computing board according to demand, thereby generating heterogeneous resource information;
[0019] The resource discovery and management acquires the heterogeneous resource information, and performs basic communication and encapsulation in the form of an API to obtain the basic resource information;
[0020] The resource management obtains the basic resource information, writes it into a database for classification management, creates a global image and table of resource status, and constructs the resource portrait;
[0021] The resource allocation receives an application deployment request and corresponding resource demand information from a user;
[0022] The resource scheduling is graded according to the resource demand information, and the heterogeneous resource allocation scheme is generated according to the graded result combined with the resource status global image and table and the resource portrait;
[0023] The resource allocation returns the heterogeneous resource allocation solution to the user.
[0024] Preferably, the method also includes a preset cyclic timed update of the heterogeneous resource information. Whenever the timed time is reached, the resource discovery and management sends the heterogeneous resource update request to the hyper-heterogeneous hardware platform, and updates the database, the resource status global image and table, and the resource portrait based on the updated heterogeneous resources.
[0025] Preferably, when the user sends a specific resource query request through the front-end page, the hyper-heterogeneous software platform responds to the specific resource query request and performs a resource status query.
[0026] The technical solution of the present invention proposes a super-heterogeneous reconfigurable software and hardware scheduling system and method based on hybrid plug-in, which realizes the construction of a super-heterogeneous hardware platform by hybrid plug-in, effectively improves the problem of weak support for the execution of different tasks in a single computing resource environment, and expands the platform's action surface and task processing efficiency. In addition, by constructing a set of super-heterogeneous software and hardware systems, it provides unified resource management and scheduling capabilities for a super-heterogeneous software and hardware cluster environment, and provides a solution for efficient management of heterogeneous resources and a priority scheduling method. The technical solution of the present invention has a simple structure, reasonable design and is easy to implement. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 This is the architecture diagram of the hyper-heterogeneous reconfigurable hardware and software system;
[0028] Figure 2 It is a structural diagram of a hybrid plug-in heterogeneous computing server;
[0029] Figure 3 Flowchart for resource management and scheduling of hyper-heterogeneous reconfigurable hardware and software platforms;
[0030] Figure 4 This is the network diagram of the basic experimental environment. DETAILED DESCRIPTION
[0031] The present invention will be further described below in conjunction with specific embodiments. It should be understood that these embodiments are only used to illustrate the present invention and are not intended to limit the scope of the present invention. In addition, it should be understood that after reading the content taught by the present invention, those skilled in the art can make various changes or modifications to the present invention, and these equivalent forms fall within the scope limited by the appended claims of the application equally.
[0032] like Figure 1 As shown, an embodiment of the present invention provides a hybrid plug-in based ultra-heterogeneous reconfigurable software and hardware scheduling system, including the following modules:
[0033] Application service: It is the upper-layer service object of the hyper-heterogeneous software and hardware platform, adapted to the fields of high-performance computing, big data and artificial intelligence.
[0034] Hyper-heterogeneous hardware platform: It is the foundation of the hyper-heterogeneous hardware and software system, providing the basic environment required for upper-level management and scheduling. This module is built by a server with heterogeneous computing boards deployed. The server must contain board slots of different specifications, and boards can be plugged in according to actual needs to provide the required heterogeneous computing resources. The hardware platform communicates with the upper-level resource management platform through the CPU.
[0035] Hyper-heterogeneous software platform, including Openstack-based resource discovery and management, Kubernetes-based resource allocation and resource management platform. Details are as follows:
[0036] Resource discovery and management based on Openstack: Based on the Openstack architecture, basic communication and encapsulation of underlying heterogeneous resources are carried out in the form of APIs, providing discovery and data transmission of different resources in different architectures.
[0037] Resource allocation based on Kubernetes: This module is mainly based on Kubernetes, and achieves seamless connection with cloud environment requirements through interface adaptation, making the application of the present invention wider and providing a more complete hyper-heterogeneous software and hardware system.
[0038] Resource management platform: A unified resource management platform for hyper-heterogeneous environments. Based on Openstack's acquisition of basic resource information, the data is written into the database for classification management by the management platform, and resource portraits are constructed. At the same time, the resource monitoring submodule provides alarm capabilities. Users can obtain basic information and usage status of resources through the management platform.
[0039] Adaptation layer: Completes basic adaptation between the hyper-heterogeneous software platform and the underlying hyper-heterogeneous hardware platform through technologies such as data transmission / conversion, command conversion / issuance, basic communication, and data aggregation.
[0040] The embodiment of the present invention also provides a method for scheduling ultra-heterogeneous reconfigurable software and hardware based on hybrid plug-in, comprising the following steps:
[0041] Step 0: Build a super-heterogeneous hardware platform. Build a basic super-heterogeneous hardware platform through high-performance computing servers, management servers and switches. The switch is used for intercommunication between different devices, and the management server is mainly used for project management and code development. The number of high-performance computing servers is connected according to the actual situation. It is mainly used to expand heterogeneous computing resources. It can be implemented in a hybrid plug-in manner (that is, multiple heterogeneous computing resources are configured on a high-performance computing server at the same time), or a cluster deployment of multiple single computing resource servers can be adopted (suitable for large-scale heterogeneous environments). Figure 2 As shown, Figure 2 This is a structural diagram of a hybrid plug-in heterogeneous computing server, in which different computing processing boards can be replaced as needed through PCI-E slots. It should be noted that the specifications of the board slots can be one or more of ISA, PCI and AGP. With the upgrading of hardware technology, as long as the specifications of the board slots are met and matched with the heterogeneous computing boards, it will be fine.
[0042] Step 1: Resource management initialization, including:
[0043] Step 1.1: Obtain basic information of heterogeneous resources based on Openstack;
[0044] Step 1.2: Transmit basic information of heterogeneous resources to the resource management platform through API;
[0045] Step 1.3: The resource management platform creates a global resource status image and table based on the cluster resource status;
[0046] Step 1.4: The resource management platform writes the basic information of heterogeneous resources obtained through the API into the database and builds a resource profile.
[0047] Step 2: Resource status update, including:
[0048] Step 2.1: Set a timed loop to update resource status; at the same time, when the management platform triggers a new resource allocation request, trigger the resource status update;
[0049] Step 2.2: Get the real-time status and basic information of resources through API;
[0050] Step 2.3: Update the resource object status in the database (add / delete / modify);
[0051] Step 2.4: Update the resource status global image and table;
[0052] Step 2.5: Update resource profile.
[0053] Step 3: Query resource status, including:
[0054] Step 3.1: Users can send specific resource query requests through the front-end page to trigger resource status query;
[0055] Step 3.2: When the management platform sends a new resource allocation requirement, a resource status query is triggered.
[0056] Step 4: Monitor and schedule resource status, including:
[0057] Step 4.1: The user sends an application deployment request (application name) to the management platform and submits the resource information required for deployment (CPU quantity, memory, disk size, computing board type), triggering the resource scheduling thread;
[0058] Step 4.2: The management platform receives the user's resource request, allocates resources based on the user's needs, and forms a resource allocation plan. The specific implementation of the resource allocation plan is detailed in step 5;
[0059] Step 4.3: If Kubernetes is connected, the resource allocation plan is sent to Kubernetes, Kubernetes performs resource allocation, and returns the available resource information to the user through the resource management platform; if Kubernetes is not connected, the resource status acquisition thread of step 3.1 is directly triggered to return the available resource information to the user;
[0060] Step 4.4: The user performs application and resource orchestration for the application to be deployed;
[0061] Step 4.5: The resource management platform allocates resources according to the priority principle. If Kubernetes is connected, the resource management platform sends the orchestrated application deployment request to Kubernetes for automated deployment.
[0062] Step 4.6: After the deployment is completed, the application deployment results are returned to the management platform;
[0063] Step 4.7: The resource management platform regularly updates the resource status, and also updates the resource status each time a new resource allocation is completed (deployment is completed), and implements alarms for resource anomalies through the monitoring module.
[0064] Resource management and scheduling process of hyper-heterogeneous reconfigurable hardware and software platform Figure 3 shown.
[0065] Step 5: Resource scheduling and allocation principles and plans, including:
[0066] Step 5.1: In the hyper-heterogeneous hardware and software cluster environment, resource scheduling first divides resource scheduling requests into three levels: urgent, important, and general based on the principle of priority. As for the resources themselves, scheduling is performed at the board level. Regardless of the cluster form or the case of a single server, the scheduling level directly goes deep into the board level, and the mixed plug-in board is used as the smallest unit of scheduling. When the resource request received by the resource management platform is "urgent", the best resource that meets the resource requirements in the idle computing resources is scheduled and returned to the resource management platform; if the idle resources cannot meet the requirements, the system global resource status is queried, the general-level tasks being executed are suspended, and the resources are released to execute the urgent tasks first, and the interrupted general-level tasks are resumed after the urgent tasks are completed; if the important tasks being executed occupy the resources required by the urgent tasks, a secondary judgment is made based on the task execution status; if the task execution exceeds 80%, a queue waiting method is adopted; if the task execution is less than 50%, it is queried whether there are idle resources that can support the resource requirements of the important task. If yes, it is migrated to the idle resources to continue execution; otherwise, the task execution process is interrupted and execution is continued after the urgent tasks are completed.
[0067] Step 5.2: In a hyper-heterogeneous hardware and software cluster environment, when the resource request received by the resource management platform is "important", it first queries the idle computing resources in the cluster for the best resource that meets the resource requirements and returns it to the resource management platform; if the idle resources cannot meet the requirements, it queries the system's global resource status, counts the remaining time of the "general" level tasks being executed and the number of tasks above the "important" level waiting in line for execution, and queues them for execution according to the principle of load balancing.
[0068] Step 5.3: In a hyper-heterogeneous hardware and software cluster environment, when the resource request received by the resource management platform is "general", it first queries the idle computing resources in the cluster for resources that meet the resource requirements for allocation; if the idle resources cannot meet the requirements, they are queued for execution through the global resource load balancing strategy. When there is an "important" level or above task inserted into the queue, the resource scheduling algorithm is re-executed, and the queue is adjusted according to the global load balancing strategy to wait for resource release.
[0069] In this embodiment, taking the compilation stage as an example, the above steps 0-3 are mainly involved, in which the user sends a request through the management platform to trigger a resource status query and obtain basic software and hardware information for compilation and adaptation of the application and the operating environment; the compiled bitstream / image / core is sent to the management platform for subsequent deployment.
[0070] In this embodiment, taking application deployment as an example, the details are as follows:
[0071] 1) First, build a basic heterogeneous computing server according to step 0, in which one FPGA computing unit and two GPU computing units are inserted in a hybrid plug-in manner (multiple servers can be selected to access the heterogeneous cluster, and each server can be plugged with different computing units as described in step 0), and connect a management server in the same LAN through a switch to complete a set of the most basic hyper-heterogeneous software and hardware experimental environment, such as Figure 4 shown.
[0072] 2) Follow step 1 to initialize resource management.
[0073] First, basic information of heterogeneous resources is obtained based on Openstack, including resource type, resource model, resource name, resource status, resource description, etc.; then the basic information of heterogeneous resources is transmitted to the resource management platform through the API; the resource management platform creates a global image and table of resource status according to the cluster resource status; the resource management platform writes the basic information of heterogeneous resources obtained through the API into the database and builds a resource portrait.
[0074] 3) Query resource status.
[0075] After the resource management is initialized, you can query the resource status according to step 3 above. Users can send specific resource query requests through the front-end page to trigger resource status query. You can see the resource information of the basic heterogeneous environment on the front-end page, such as the included computing resources, idle resources, abnormal resource information, etc. Since the experimental environment has just been built, the resources are displayed in normal and idle states, waiting for the task to arrive.
[0076] 4) Resource status update.
[0077] According to the above step 2, the system implements the regular tracking and updating of the resource status by setting the timed cycle to update the resource status. At the same time, when the management platform triggers a new resource allocation request, it will also trigger the resource status update.
[0078] 5) Application deployment.
[0079] According to the above step 4, the application deployment is performed. The user sends an application deployment request (application name: a big data field application) to the management platform, and submits the resource information required for deployment (CPU quantity 1, memory 2G, disk size 1T, GPU computing unit required), triggering the resource scheduling thread; the management platform receives the user's resource request, allocates resources to the user's needs, and forms a resource allocation plan. The experimental situation of this embodiment is to access Kubernetes, so the resource management platform sends the resource allocation plan to Kubernetes, Kubernetes performs resource allocation, and returns the available resource information to the user through the resource management platform as two GPU computing units with the same pending tasks. The basic situation is the same and all meet the resource requirements; then the user performs application and resource orchestration for the application to be deployed; since there is only one deployment task at present, the orchestrated application deployment request is directly sent to Kubernetes for automated deployment through the resource management platform; if multiple applications are deployed at the same time, the resource management platform will allocate and deploy resources according to the priority principle described in step 5; after the deployment is completed, the application deployment result is returned to the management platform; the resource management platform regularly updates the resource status, and updates the resource status when each new resource allocation is completed (deployment is completed), writes the log, and realizes the alarm of resource abnormality through the monitoring module.
[0080] The heterogeneous resources provided by the embodiment of the present invention are not "heterogeneous" at the same level as the heterogeneous systems in the existing patents, and the embodiments of the present invention are not based on microservices, which is different from the aspects of the existing technology. The management nodes and computing nodes provided by the embodiments of the present invention have different focuses from the existing technology.
[0081] Although the embodiments of the present invention are mainly aimed at a complete system design and management scheduling solution with heterogeneous resource priority in a hyper-heterogeneous environment, it does not rule out that in actual business applications, engineers can combine certain parts of the embodiments of the present invention with other technologies. For example, in the scheduling strategy provided by the embodiments of the present invention, when an emergency resource request needs to temporarily suspend a general task being executed, if there are idle resources that can meet the execution of the general task, other technologies can be combined to perform data synchronization and continuous execution.
Claims
1. A hybrid plug-in based hyper-heterogeneous reconfigurable hardware and software scheduling system. It is characterized in that The hyper-heterogeneous reconfigurable software and hardware scheduling system is oriented to the fields of high-performance computing, big data and artificial intelligence. The hyper-heterogeneous reconfigurable software and hardware scheduling system includes: Application services for building a hyper-heterogeneous hardware platform based on the resource requirements and existing resources in the fields of high-performance computing, big data, and artificial intelligence to provide basic software and hardware support; The hyper-heterogeneous hardware platform is equipped with a high-performance computing server that deploys heterogeneous computing boards. Multiple high-performance computing servers can plug in a variety of heterogeneous computing boards through board slots that adapt to heterogeneous computing boards according to demand, generating a variety of heterogeneous resource information; Hyper-heterogeneous software platform, including resource discovery and management, resource scheduling, resource allocation, and resource management; Among them, resource discovery and management are based on the Openstack architecture, which is used to obtain various heterogeneous resource information from super-heterogeneous hardware platforms. The basic resource information corresponding to the heterogeneous resources is obtained through basic communication and encapsulation in the form of API, providing discovery and data transmission of different resources in different architectures; resource allocation and resource management are both based on the Kubernetes architecture. Resource allocation receives deployment requests from users through interface adaptation, and returns heterogeneous resource allocation plans to users. Users can obtain the basic situation and usage status of basic resource information; resource management obtains basic resource information from resource discovery and management, writes basic resource information into the database for classification management, creates a global image and table of resource status, and builds a resource portrait; resource scheduling is graded according to deployment requests, and a heterogeneous resource allocation plan is generated based on the graded results combined with the global image and table of resource status and resource portrait.
2. A hybrid plug-in based ultra-heterogeneous reconfigurable software and hardware scheduling system as claimed in claim 1, It is characterized in that The specifications of the board slot match those of the heterogeneous computing board.
3. A hybrid granularity heterogeneous resource efficient management and scheduling system as claimed in claim 2, It is characterized in that The board slot is a PCI-E slot.
4. A hybrid plug-in based ultra-heterogeneous reconfigurable software and hardware scheduling system as claimed in claim 1, It is characterized in that The hybrid granularity heterogeneous resource efficient management and scheduling system further includes: The adaptation layer is located between the hyper-heterogeneous software platform and the hyper-heterogeneous hardware platform. It performs basic interactive adaptation between the hyper-heterogeneous software platform and the hyper-heterogeneous hardware platform through data transmission / conversion, command conversion / issuance, basic communication and data aggregation.
5. A hybrid plug-in based hyper-heterogeneous reconfigurable hardware and software scheduling method, It is characterized in that A hybrid plug-in based hyper-heterogeneous reconfigurable software and hardware scheduling system as shown in claim 1 comprises the following steps: The application service builds a hyper-heterogeneous hardware platform based on the resource requirements and existing resources in the fields of high-performance computing, big data, and artificial intelligence; The high-performance computing server in the hyper-heterogeneous hardware platform inserts a heterogeneous computing board into a board slot adapted to the heterogeneous computing board according to demand, thereby generating heterogeneous resource information; The resource discovery and management acquires the heterogeneous resource information, and performs basic communication and encapsulation in the form of an API to obtain the basic resource information; The resource management obtains the basic resource information, writes it into a database for classification management, creates a global image and table of resource status, and constructs the resource portrait; The resource allocation receives an application deployment request and corresponding resource demand information from a user; The resource scheduling is graded according to the resource demand information, and the heterogeneous resource allocation scheme is generated according to the graded result combined with the resource status global image and table and the resource portrait; The resource allocation returns the heterogeneous resource allocation solution to the user.
6. A method for scheduling ultra-heterogeneous reconfigurable hardware and software based on hybrid plug-in as claimed in claim 5, It is characterized in that The method also includes updating the heterogeneous resource information in a preset cycle. Whenever the timing is reached, the resource discovery and management sends the heterogeneous resource update request to the hyper-heterogeneous hardware platform, and updates the database, the resource status global image and table, and the resource portrait based on the updated heterogeneous resources.
7. A method for scheduling ultra-heterogeneous reconfigurable hardware and software based on hybrid plug-in as claimed in claim 5, It is characterized in that When the user sends a specific resource query request through the front-end page, the hyper-heterogeneous software platform responds to the specific resource query request and performs a resource status query.
