Information extraction and verification reply method and system based on power grid maintenance list
Through the information extraction and verification method based on machine dictionary, the verbs, equipment numbers and equipment types in the power grid maintenance order are extracted and verified, which solves the problem of time-consuming, laborious and error-prone manual verification, and achieves more efficient and accurate safety measures. check.
Patent Information
- Application Number
- CN202410823327.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-25
- Publication Date
- 2024-10-01
AI Technical Summary
In the existing technology, the safety measures for power grid maintenance orders partially rely on manual verification, which is time-consuming, labor-intensive, error-prone, and lacks an effective verification and verification mechanism.
Use the information extraction method based on machine dictionary to extract the verbs, equipment numbers and equipment types in the maintenance order, and automatically verify the safety measures by constructing a comparison between the verb and the object, including obtaining the completed maintenance order, building a machine dictionary, and extracting the verb and object are compared and stored. If they do not match, an alarm will be issued to ensure the accuracy of the verification results.
It improves the efficiency of checking the safety measures of maintenance orders, reduces manual errors, ensures the safety and accuracy of maintenance orders, and avoids the time-consuming and labor-intensive problems of manual review and verification.
Smart Images

Figure CN118733705A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of data processing, and in particular to a method and system for extracting, verifying and replying information based on a power grid maintenance list. Background Art
[0002] With the continuous development of the times, my country's market economy has also made great progress, which has made my country's power equipment face the important situation of renewal. At the same time, the rapid development of the economy has also provided an important theoretical basis and practical significance for the further renewal of power equipment. However, with the gradual increase in the number of power equipment in my country, the maintenance of power equipment has also become an important part of my country's power. In a certain sense, only scientific and effective maintenance can ensure that power equipment can maintain good application and a relatively long service life in the later use. Due to the continuous expansion of the scale of the power grid, the continuous increase in power equipment and equipment types, the maintenance of power equipment has also gradually increased, and the number of power maintenance orders has increased accordingly.
[0003] The safety measures filled in the maintenance sheet are of great significance to the personal safety of maintenance personnel. These safety measures are the basis for the operating personnel to perform the corresponding switching operations. Therefore, the content of the safety measures part of the maintenance sheet needs to be verified and checked. The maintenance sheet must be verified and approved before the maintenance work can be carried out based on it. The contents that need to be filled in the safety measures column of the maintenance sheet are: the circuit breaker that should be disconnected; the grounding knife switch that should be closed or the grounding wire installed; the barriers and signs that should be set. Among them, the part where barriers and signs should be set generally will not go wrong, and the impact of the error is not serious. Therefore, the safety measures column related to the actual operating status of the on-site equipment is the circuit breaker that should be opened and the grounding knife switch that should be closed. At present, the verification of these two parts still adopts the method of manual review, manual extraction of key content, and manual verification, which is time-consuming and labor-intensive. In addition, there is no further targeted proofreading of the verification results, which is prone to errors.
[0004] In view of this, a method and system for extracting information, verifying and approving information based on a power grid maintenance order is needed. Summary of the invention
[0005] In view of the problem that the safety measures part of the maintenance order in the prior art is still manually checked, which is time-consuming, labor-intensive and error-prone, the present invention provides an information extraction, verification and approval method and system based on the power grid maintenance order, which can extract the verbs, equipment numbers and equipment types in the safety measures content part of the maintenance order, and then perform further verification work based on this. The specific technical solution is as follows:
[0006] A method for extracting information based on a power grid maintenance list comprises the following steps:
[0007] S1: Obtain the completed power grid maintenance form and extract the statements of the safety measures part in the power grid maintenance form;
[0008] S2: Build a machine dictionary in advance, which includes verbs and their corresponding objects, and search for the sentences in the security measures based on the verbs in the machine dictionary. If the search matches, proceed to step S3, otherwise continue searching until all sentences are searched;
[0009] S3: Search for the corresponding object in the machine dictionary according to the successfully matched verb, and search the simple sentence according to the object. If the search is successful, proceed to step S4, otherwise continue searching until all sentences are searched;
[0010] S4: Obtain the attributive in the sentence and extract the device number and device type from it;
[0011] S5: The verbs, device numbers, and device types are classified and associated and stored in a database for later retrieval.
[0012] Preferably, in step S2, if no verb in the machine dictionary is matched after traversing all the sentences, an alarm operation is performed, including sound and light alarm and sending an alarm statement to the terminal.
[0013] Preferably, in step S3, if the object in the machine dictionary is still not matched after traversing all sentences, an alarm operation is performed, including sound and light alarm and sending an alarm statement to the terminal, and the alarm operation of step S3 is not exactly the same as the alarm operation of step S2.
[0014] Preferably, after executing step 1, first determine whether the statement in the safety measures part is a simple sentence based on whether the sentence contains punctuation marks, wherein a sentence with punctuation marks is not a simple sentence, and a sentence without punctuation marks is a simple sentence. Then, directly perform step S2 for the simple sentence, and for the non-simple sentence, perform step S2 after segmenting it into simple sentences based on the punctuation marks.
[0015] Preferably, step S4 is specifically as follows:
[0016] S401: Obtaining an object, which is all the words following the verb in the sentence, and searching in sequence whether there are numbers in the words. If there are numbers, extracting all the retrieved data to form a device number. If no numbers are retrieved, outputting an empty device number.
[0017] S402: After executing step S401, the remaining part of the object minus the device number is output as the device type.
[0018] A verification and approval method based on a power grid maintenance order, applied to the method as described above, comprises the following steps:
[0019] S01: Obtain a set of circuit breakers to be opened and a set of grounding switches to be closed;
[0020] S02: Compare the verbs, equipment numbers and equipment types extracted from the statements in the safety measures section with the set of circuit breakers to be opened and the set of grounding switches to be closed to see if they are consistent;
[0021] S03: If the comparison result is consistent, the consistent comparison result is sent to the terminal; if the comparison result is inconsistent, an alarm signal is sent to the terminal.
[0022] An information extraction, verification and approval system based on a power grid maintenance order, comprising:
[0023] The maintenance order acquisition unit includes a maintenance order input module and a maintenance order download module, wherein the maintenance order input module has a maintenance order collection template pre-stored therein, and generates a maintenance order by entering the content into the corresponding maintenance order collection template, and the maintenance order download module downloads the completed maintenance order from the cloud through network transmission;
[0024] The sentence extraction unit is connected to the maintenance order acquisition unit, and is used to acquire the maintenance order and extract all the contents of the safety measures part in the maintenance order, and then store the maintenance order and its corresponding safety measures part in the sentence library in a one-to-one manner;
[0025] A machine dictionary creation unit is used to create verbs and objects, and a write port is reserved for supplementing verbs and objects;
[0026] The content classification extraction unit is connected to the sentence extraction unit to obtain the sentences in the sentence library and perform a search and comparison based on the verbs and objects of the machine dictionary creation unit, and then extract the verbs, device numbers and device types in the sentences and store them;
[0027] The extraction alarm unit is used to obtain the output signal of the content classification extraction unit. If one of the verb, device number and device type output by the content classification extraction unit is empty, an alarm is issued.
[0028] Preferably, it also includes:
[0029] The safety measures verification unit is used to obtain the set of circuit breakers to be opened and the set of earthing switches to be closed, and compare the verbs, equipment numbers and equipment types extracted by the content classification extraction unit with them. If they are different, a verification alarm signal is output; if they are the same, a verification check signal is output; by outputting different signals to different units for processing, the corresponding measures after the safety measures are verified and different results are obtained are improved, and then different units are opened for processing according to different verification results, specifically: if they are different, a verification alarm signal is output to the alarm processing unit for corresponding processing; if they are the same, a verification check signal is output to the verification check unit for corresponding processing.
[0030] The alarm processing unit is used to receive the verification alarm signal from the safety measure verification unit and check the maintenance order outputting the verification alarm signal. The alarm processing unit is provided with a modification upload port for instantly modifying the maintenance order and uploading the modified maintenance order;
[0031] The verification and checking unit is connected to the alarm processing unit and the safety measures verification unit. The verification and checking unit receives the maintenance sheet of the verification and checking signal output by the safety measures verification unit and the maintenance sheet uploaded by the alarm processing unit by modifying the upload port for final verification. The verification and checking unit is provided with an upload port for uploading the maintenance sheet of the final verification and checking.
[0032] A computer-readable storage medium includes a stored program, wherein when the program is executed, a device where the computer-readable storage medium is located is controlled to execute the method as described above.
[0033] A processor is used to run a program, wherein the program executes the method as described above when it is run.
[0034] Compared with the prior art, the present invention has the following beneficial effects:
[0035] The present invention extracts the content of the safety measures part in the maintenance list, and compares it with it by constructing a machine dictionary, and then extracts three kinds of information in the maintenance list: verb, equipment number and equipment type. The operation process is mainly for the two parts of the circuit breaker that should be pulled open and the grounding knife switch that should be closed in the safety measures part. Through the verb, it can be read whether it is a disconnection or a closing operation. Since the expression of the disconnection and closing operations is not unique, it may be a variety of expressions such as opening, closing, disconnecting, opening, etc., so a machine dictionary is created to store these verbs in various forms of expression, and based on this, the operation action on the equipment is accurately identified; in addition, the object following the verb is the part that identifies the equipment and the equipment number. Through the distinction point between numbers and words, it can be distinguished to obtain the equipment number and equipment type, such as 0001 circuit breaker. After extracting the number 0001 of the equipment number, the remaining part is the equipment type circuit breaker. The statements in the security measures section are extracted and stored by type to facilitate subsequent verification and comparison, avoiding the time-consuming, labor-intensive, and error-prone process of manual review, manual extraction of key content, and manual verification. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the following is a brief introduction to the drawings required for the specific embodiments or the description of the prior art. In all the drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, the elements or parts are not necessarily drawn according to the actual scale.
[0037] Figure 1 The present invention is a flow chart of the method. DETAILED DESCRIPTION
[0038] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0039] It should be understood that when used in this specification and the appended claims, the terms "include" and "comprises" indicate the presence of described features, integers, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or combinations thereof.
[0040] It should also be understood that the terms used in the present specification are only for the purpose of describing specific embodiments and are not intended to limit the present invention. As used in the present specification and the appended claims, unless the context clearly indicates otherwise, the singular forms "a", "an" and "the" are intended to include plural forms.
[0041] It should be further understood that the term "and / or" used in the present description and the appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.
[0042] In the item of circuit breakers that should be opened, according to the filling requirements of the inspection form, the content mainly has the following forms:
[0043] (1) Disconnect XXX circuit breaker
[0044] (2) Close the XXX circuit breaker
[0045] (3) Remove the XXX fuse
[0046] (4) Put on XXX fuse
[0047] (5) Put XXX relay protection / safety automatic device into use
[0048] (6) Exit XXX relay protection / safety automatic device
[0049] Since DW structures often have three-phase transmission lines, maintenance tasks require disconnecting a series of circuit breakers with similar functions. In the actual filling of the maintenance order, these circuit breakers with similar functions are generally filled in one safety measure, and their numbers are separated by a comma to distinguish them, such as: "Disconnect XXX1, XXX2 circuit breakers".
[0050] In addition, due to different filling habits of invoice issuers, a safety measure may include a series of circuit breakers with different disconnection functions, such as "Disconnect XXX1-1, XXX1-2 circuit breakers; disconnect XXX2-1, XXX2-2 circuit breakers". The functions of circuit breakers numbered at the beginning of XXX1 are similar, the functions of circuit breakers numbered at the beginning of XXX2 are similar, and the functions of circuit breakers with different numbers at the beginning of different numbers are different.
[0051] Therefore, the understanding of the safety measures of this part of the circuit breaker mainly deals with the above-mentioned specification statements. In the item of the grounding switch to be closed or the bottom line of the installation, according to the filling specification requirements of the first type of electrical maintenance sheet in the maintenance sheet system, its content mainly has the following forms:
[0052] (1) Close the XXX grounding switch
[0053] (2) Disconnect XXX grounding switch
[0054] When installing the grounding wire in the actual process of filling out the maintenance form, this part of the safety measure may also require closing multiple grounding switches in one safety measure due to the different filling habits of the invoicing personnel. Therefore, in the understanding of this part of the safety measure, the structure of the statement that needs to be processed is very similar to the statement structure of the circuit breaker part.
[0055] According to the above analysis, it can be seen that the language of safety measures in the maintenance list is relatively standardized and has strong regularity, which is quite different from ordinary natural language. Therefore, the language can be understood and processed based on its strong regularity, so as to realize the inspection and prompt of safety measures by the maintenance list system, so as to ensure the safety of maintenance personnel during maintenance work.
[0056] Based on this, in one embodiment of the present invention, a method for extracting information based on a power grid maintenance form is provided, which mainly identifies the language of safety measures in the maintenance form. The identification of the language of safety measures in the maintenance form is mainly to obtain what kind of operation will be performed on the equipment, the number of the operated equipment and the type of the operated equipment. The maintenance form system determines whether the filled-in safety measures meet the safety requirements through the above three information obtained through language recognition.
[0057] The safety measures language of the maintenance sheet focuses on the verbs of the sentence. Different verbs determine the safety measures to be taken in actual operation. The equipment operation actions determined by the verbs in the sentence must be consistent with the actual operating status of the equipment. Only in this way can the safety measures taken be effective. The part after the verb of the sentence is generally the equipment that needs to be operated. This part consists of the equipment number and type.
[0058] According to the structure of the maintenance list safety measures language, the sentence is first divided by the verbs in the sentence, and then the object in the sentence is used to judge the remaining part, which is referred to as the verb-object combination analysis method. The basic idea of this method is: first search for the verb in the sentence, and compare the searched verb with the dictionary in the database; if it exists, search the sentence according to the corresponding object data in the data dictionary, and when the verb-object structure components are consistent with the data in the database, it is determined that the sentence segmentation is qualified; finally, the required word information is obtained for the system to perform relevant processing.
[0059] The language of safety measures in the inspection form is generally more complex than the examples above. In the actual recognition and processing process, more detailed analysis is required, but the basic principles are the same. In the actual recognition process, first determine whether the sentence is a complex sentence or a simple sentence. If it is a simple sentence, follow the steps in the example above; if it is a complex sentence, first determine the punctuation in the complex sentence, divide the complex sentence into multiple simple sentences according to the position of the punctuation, and then recognize each simple sentence after segmentation according to the recognition and analysis steps of simple sentences.
[0060] like Figure 1 As shown, the specific processing steps are as follows:
[0061] S1: Get the completed power grid maintenance form and extract the sentences of the safety measures part in the power grid maintenance form. Then determine whether the sentences of the safety measures part are simple sentences according to whether there are punctuation marks in the sentences. Among them, sentences with punctuation marks are not simple sentences, and sentences without punctuation marks are simple sentences. Then, for simple sentences, directly proceed to step S2. For non-simple sentences, split them into simple sentences according to punctuation marks and then proceed to step S2.
[0062] S2: Build a machine dictionary in advance, which includes verbs and their corresponding objects, and search for the statements in the safety measures part based on the verbs in the machine dictionary. If the search matches, proceed to step S3, otherwise continue searching until all statements are searched. If the verbs in the machine dictionary are still not matched after traversing all statements, perform an alarm operation, including sound and light alarm and sending an alarm statement to the terminal.
[0063] S3: Search for the corresponding object in the machine dictionary according to the successfully matched verb, and search the simple sentence according to the object. If the search is successful, proceed to step S4, otherwise continue searching until all sentences are searched. If the object in the machine dictionary is still not matched after traversing all sentences, perform an alarm operation, including sound and light alarm and sending an alarm statement to the terminal. The alarm operation of step S3 is not exactly the same as the alarm operation of step S2.
[0064] S4: Get the attributive in the sentence and extract the device number and device type from it. The details are as follows:
[0065] S401: Obtaining an object, which is all the words following the verb in the sentence, and searching in sequence whether there are numbers in the words. If there are numbers, extracting all the retrieved data to form a device number. If no numbers are retrieved, outputting an empty device number.
[0066] S402: After executing step S401, the remaining part of the object minus the device number is output as the device type.
[0067] S5: The verbs, device numbers, and device types are classified and associated and stored in a database for later retrieval.
[0068] In a preferred embodiment, a verification and approval method based on a power grid maintenance order is provided, which is applied to the method described above and includes the following steps:
[0069] S01: Get the set of circuit breakers that should be opened and the set of grounding switches that should be closed; these two sets contain all the circuit breakers that need to be disconnected and all the grounding switches that need to be closed in this maintenance operation. This part is the work that needs to be completed before the maintenance preparation process (maintenance form filling process). The existing technology usually manually determines the maintenance nodes of the maintenance equipment based on the power grid wiring diagram or topology diagram, and then determines the circuit breakers that should be disconnected and the grounding switches that should be closed based on the maintenance nodes. The specific acquisition method is not within the scope of the technical solution of the present invention, but belongs to the common knowledge in this field, so it will not be introduced here.
[0070] S02: Verbs, equipment numbers and equipment types extracted from the statements in the safety measures section are compared with the set of circuit breakers to be opened and the set of grounding switches to be closed to check whether they are consistent; specifically, it can be: first extract the equipment number, and compare it with the set of circuit breakers to be opened and the set of grounding switches to be closed based on the equipment number to check whether the equipment number exists. If not, an error is reported. If it exists, the verb under the equipment number is extracted to see if the verb is in the corresponding category to be opened or closed. If so, continue to compare whether the equipment type is consistent. Otherwise, an error is reported. It should be known that only one comparison order is shown here. In actual applications, the comparison order of verbs, equipment numbers and equipment types can be flexibly changed, and there is no restriction here.
[0071] S03: If the comparison result is consistent, the consistent comparison result is sent to the terminal; if the comparison result is inconsistent, an alarm signal is sent to the terminal.
[0072] In a preferred embodiment, a system for extracting information and verifying and replying information based on a power grid maintenance order is also provided, comprising:
[0073] The maintenance order acquisition unit includes a maintenance order input module and a maintenance order download module, wherein the maintenance order input module has a maintenance order collection template pre-stored therein, and generates a maintenance order by entering the content into the corresponding maintenance order collection template, and the maintenance order download module downloads the completed maintenance order from the cloud through network transmission;
[0074] The sentence extraction unit is connected to the maintenance order acquisition unit, and is used to acquire the maintenance order and extract all the contents of the safety measures part in the maintenance order, and then store the maintenance order and its corresponding safety measures part in the sentence library in a one-to-one manner;
[0075] A machine dictionary creation unit is used to create verbs and objects, and a write port is reserved for supplementing verbs and objects;
[0076] The content classification extraction unit is connected to the sentence extraction unit to obtain the sentences in the sentence library and perform a search and comparison based on the verbs and objects of the machine dictionary creation unit, and then extract the verbs, device numbers and device types in the sentences and store them;
[0077] The extraction alarm unit is used to obtain the output signal of the content classification extraction unit. If one of the verb, device number and device type output by the content classification extraction unit is empty, an alarm is issued.
[0078] Preferably, it also includes:
[0079] The safety measures verification unit is used to obtain the set of circuit breakers that should be opened and the set of grounding switches that should be closed, and compare the verbs, equipment numbers and equipment types extracted by the content classification extraction unit with them. If they are different, a verification alarm signal is output; if they are the same, a verification check signal is output; by outputting different signals to different units for processing, the corresponding measures after the safety measures are verified and different results are obtained are improved, and different units are opened for processing according to different verification results, specifically: if they are different, a verification alarm signal is output to the alarm processing unit for corresponding processing; if they are the same, a verification check signal is output to the verification check unit for corresponding processing;
[0080] The alarm processing unit is used to receive the verification alarm signal from the safety measure verification unit and check the maintenance order outputting the verification alarm signal. The alarm processing unit is provided with a modification upload port for instantly modifying the maintenance order and uploading the modified maintenance order;
[0081] The verification and checking unit is connected to the alarm processing unit and the safety measures verification unit. The verification and checking unit receives the maintenance sheet of the verification and checking signal output by the safety measures verification unit and the maintenance sheet uploaded by the alarm processing unit by modifying the upload port for final verification. The verification and checking unit is provided with an upload port for uploading the maintenance sheet of the final verification and checking.
[0082] The reason why the alarm processing unit and the verification and checking unit are set up here is that for safety measures that do not conform to the actual operating status of the equipment, the maintenance order system will give corresponding prompts so that personnel can make timely confirmation and changes; for safety measures that meet the requirements, the system will give a graphical display in combination with the graphical interface to facilitate personnel to confirm again, thereby ensuring the effectiveness of the safety measures in the maintenance order and effectively playing a role in protecting the safety of maintenance personnel.
[0083] In summary, the present invention extracts the content of the safety measures part in the maintenance list, and compares it with it by constructing a machine dictionary, and then extracts three kinds of information in the maintenance list: verb, equipment number and equipment type. The operation process is mainly for the two parts of the circuit breaker that should be pulled open and the grounding switch that should be closed in the safety measures part. Through the verb, it can be read whether it is a disconnect or close operation. Since the expression of the disconnection and closing operations is not unique, it may be a variety of expressions such as opening, closing, disconnecting, opening, etc., so a machine dictionary is created to store these verbs in various forms of expression, and based on this, the operation action on the equipment is accurately identified; in addition, the object following the verb is the part that identifies the equipment and the equipment number. Through the distinction point between numbers and words, it can be distinguished to obtain the equipment number and equipment type, such as 0001 circuit breaker. After extracting the number 0001 of the equipment number, the remaining part is the equipment type circuit breaker. The statements in the security measures section are extracted and stored by type to facilitate subsequent verification and comparison, avoiding the time-consuming, labor-intensive, and error-prone process of manual review, manual extraction of key content, and manual verification.
[0084] Those of ordinary skill in the art will appreciate that the units (or modules, steps, the same below) of the examples described in conjunction with the embodiments disclosed herein can be implemented with electronic hardware, computer software, or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the composition of each example has been generally described in terms of function in the above description. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
[0085] In the embodiments provided by the present invention, it should be understood that the division of units is only a logical function division, and there may be other division methods in actual implementation, for example, multiple units can be combined into one unit, one unit can be split into multiple units, or some features can be ignored, etc.
[0086] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0087] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-0nlyMemory), random access memory (RAM, RandomAccessMemory), mobile hard disk, magnetic disk or optical disk, etc., which can store program code.
[0088] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention, and they should all be included in the scope of the claims and specification of the present invention.
Claims
1. A method for extracting information based on power grid maintenance list, It is characterized in that The following steps are involved: S1: Obtain the completed power grid maintenance form and extract the statements of the safety measures part in the power grid maintenance form; S2: Build a machine dictionary in advance, which includes verbs and their corresponding objects, and search for the sentences in the security measures based on the verbs in the machine dictionary. If the search matches, proceed to step S3, otherwise continue searching until all sentences are searched; S3: Search for the corresponding object in the machine dictionary according to the successfully matched verb, and search the simple sentence according to the object. If the search is successful, proceed to step S4, otherwise continue searching until all sentences are searched; S4: Obtain the attributive in the sentence and extract the device number and device type from it; S5: The verbs, device numbers, and device types are classified and associated and stored in a database for later retrieval.
2. According to claim 1, a method for extracting information based on a power grid maintenance list, It is characterized in that In step S2, if no verb in the machine dictionary is matched after traversing all the sentences, an alarm operation is performed, including sound and light alarm and sending an alarm statement to the terminal.
3. The information extraction method based on the power grid maintenance list according to claim 2, It is characterized in that In step S3, if the object in the machine dictionary is still not matched after traversing all sentences, an alarm operation is performed, including sound and light alarm and sending an alarm statement to the terminal, and the alarm operation of step S3 is not exactly the same as the alarm operation of step S2.
4. The information extraction method based on the power grid maintenance list according to claim 1, It is characterized in that After executing step 1, first determine whether the statement in the safety measures part is a simple sentence based on whether the sentence contains punctuation marks. Among them, sentences with punctuation marks are not simple sentences, and sentences without punctuation marks are simple sentences. Then, step S2 is directly performed for simple sentences. For non-simple sentences, they are divided into simple sentences according to punctuation marks and then step S2 is performed.
5. The information extraction method based on the power grid maintenance list according to claim 1, It is characterized in that Step S4 is specifically as follows: S401: Obtaining an object, which is all the words following the verb in the sentence, and searching in sequence whether there are numbers in the words. If there are numbers, extracting all the retrieved data to form a device number. If no numbers are retrieved, outputting an empty device number. S402: After executing step S401, the remaining part of the object minus the device number is output as the device type.
6. A verification and approval method based on a power grid maintenance order, It is characterized in that The method applied to any one of claims 1 to 5 comprises the following steps: S01: Obtain a set of circuit breakers to be opened and a set of grounding switches to be closed; S02: Compare the verbs, equipment numbers and equipment types extracted from the statements in the safety measures section with the set of circuit breakers to be opened and the set of grounding switches to be closed to see if they are consistent; S03: If the comparison result is consistent, the consistent comparison result is sent to the terminal; if the comparison result is inconsistent, an alarm signal is sent to the terminal.
7. An information extraction, verification and approval system based on power grid maintenance orders, It is characterized in that include: The maintenance order acquisition unit includes a maintenance order input module and a maintenance order download module, wherein the maintenance order input module has a maintenance order collection template pre-stored therein, and generates a maintenance order by entering the content into the corresponding maintenance order collection template, and the maintenance order download module downloads the completed maintenance order from the cloud through network transmission; The sentence extraction unit is connected to the maintenance order acquisition unit, and is used to acquire the maintenance order and extract all the contents of the safety measures part in the maintenance order, and then store the maintenance order and its corresponding safety measures part in the sentence library in a one-to-one manner; A machine dictionary creation unit is used to create verbs and objects, and a write port is reserved for supplementing verbs and objects; The content classification extraction unit is connected to the sentence extraction unit to obtain the sentences in the sentence library and perform a search and comparison based on the verbs and objects of the machine dictionary creation unit, and then extract the verbs, device numbers and device types in the sentences and store them; The extraction alarm unit is used to obtain the output signal of the content classification extraction unit. If one of the verb, device number and device type output by the content classification extraction unit is empty, an alarm is issued.
8. The information extraction, verification and approval system based on the power grid maintenance list according to claim 7, It is characterized in that Also includes: A safety measure verification unit is used to obtain a set of circuit breakers that should be opened and a set of grounding switches that should be closed, and compare the verbs, equipment numbers and equipment types extracted by the content classification extraction unit with them. If they are different, a verification alarm signal is output to the alarm processing unit for corresponding processing; if they are the same, a verification check signal is output to the verification check unit for corresponding processing; The alarm processing unit is used to receive the verification alarm signal from the safety measure verification unit and check the maintenance order outputting the verification alarm signal. The alarm processing unit is provided with a modification upload port for instantly modifying the maintenance order and uploading the modified maintenance order; The verification and checking unit is connected to the alarm processing unit and the safety measures verification unit. The verification and checking unit receives the maintenance sheet of the verification and checking signal output by the safety measures verification unit and the maintenance sheet uploaded by the alarm processing unit by modifying the upload port for final verification. The verification and checking unit is provided with an upload port for uploading the maintenance sheet of the final verification and checking.
9. A computer-readable storage medium, It is characterized in that The computer-readable storage medium includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute the method according to any one of claims 1 to 6.
10. A processor, It is characterized in that The processor is used to run a program, wherein the program executes the method according to any one of claims 1 to 6 when running.
Citation Information
Patent Citations
Security measure auditing method, device and equipment
CN111222313A
Power grid work ticket auxiliary filling and auditing method and system based on KMP algorithm
CN116862183A