Method for calculating maximum climbing height of viscous debris flow

Through on-site investigation and flow velocity calculation formulas, combined with the energy conservation equation, the limitations of the calculation of the maximum climbing height of debris flows in the existing technology have been solved, more accurate calculations have been achieved, and the safety and economy of prevention and control projects have been improved.

CN118733929APending Publication Date: 2024-10-01BEIJING FORESTRY UNIVERSITY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410827266.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-25
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

The empirical flow velocity method used to calculate the maximum climbing height of debris flows in the existing technology has limitations and cannot be accurately calculated, resulting in the failure of prevention measures or increased project costs.

Method used

Obtain data through on-site surveys, determine the flow velocity and surface maximum flow velocity based on the flow depth, calculate the maximum climbing height based on the energy conservation equation, consider the turbulence effect and the characteristics of the debris flow itself, and use specific formulas for accurate calculations.

Benefits of technology

It achieves accurate calculation of the maximum climbing height of debris flow, provides more reasonable prevention and control engineering design, and improves safety and economy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118733929A_ABST
    Figure CN118733929A_ABST
Patent Text Reader

Abstract

The invention discloses a method for calculating the maximum climbing height of viscous debris flow, and belongs to the technical field of debris flow disaster prevention and control, and the method comprises the following steps: S1, obtaining debris flow related data through on-site investigation; s2, determining the debris flow depth based on the debris flow related data, and determining the debris flow velocity of different debris flow depths based on the debris flow depth; s3, determining the surface maximum flow velocity of the flow depth of the debris flow based on the flow velocity of the flow depth of the debris flow; s4, determining the maximum climbing height of the debris flow based on the maximum surface flow velocity of the debris flow depth; according to the method, the maximum climbing height of the debris flow is calculated based on the vertical flow velocity, the turbulence effect in the debris flow movement and process and the characteristics and channel properties of the debris flow are fully considered, the flow velocity of the debris flow movement can be reflected more truly, and the calculation value accuracy is high, so that the maximum climbing height of the debris flow can be calculated during debris flow prevention engineering design. And the maximum flushing height of the debris flow is accurately calculated, so that the protection height of the prevention and control project is more reasonably designed from the safety and economic angles.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of debris flow disaster prevention and control, and in particular relates to a method for calculating the maximum climbing height of a viscous debris flow. Background Art

[0002] A debris flow refers to a special torrent of water caused by precipitation in valleys or hillsides, carrying large amounts of solid materials such as mud, sand, stones and boulders. It is one of the major natural disasters that affects the economic development of mountainous areas and threatens the safety of people's lives and property, and seriously threatens the sustainable development of the national economy and society.

[0003] Retaining dams are a commonly used method for disaster prevention and control of gully debris flows. However, debris flows have high speeds and great energy during their movement. When encountering a retaining dam, their high inertia will cause them to climb the slope and overturn the dam, making the debris flow disaster prevention and control ineffective and destroying the buildings and facilities behind the retaining dam.

[0004] The maximum climbing height of debris flow is an important parameter of debris flow prevention and control projects. It determines the safe design of debris flow barrier facilities in the ditch. The accurate calculation of its climbing height provides a theoretical basis for debris flow disaster prevention and control.

[0005] At present, the flow velocity used in the calculation method of the maximum climbing height of debris flow is the empirical flow velocity, which has limitations and cannot accurately calculate the maximum climbing height of debris flow, resulting in the calculated value being too low to provide effective protection against debris flow, causing the debris flow to overturn the dam and lose the retaining dam, resulting in greater secondary disasters. If the calculated value is too high, it will increase the engineering design cost, increase the engineering cost, and cause unnecessary waste.

[0006] In view of this, a method for calculating the maximum climbing height of viscous debris flow is designed to solve the above problem. Summary of the invention

[0007] In order to solve the problems raised in the above background technology, the present invention provides a method for calculating the maximum climbing height of a viscous debris flow, which has the characteristics of being able to more truly reflect the flow velocity of the debris flow and having a high calculation value accuracy.

[0008] To achieve the above object, the present invention provides the following technical solution: a method for calculating the maximum climbing height of a viscous debris flow, comprising the following steps:

[0009] S1: Obtain debris flow related data through on-site investigation;

[0010] S2: Determine the depth of debris flow based on debris flow related data, and determine the debris flow velocity at different debris flow depths based on the debris flow depth, in m / s;

[0011] S3: Determine the maximum surface velocity of the debris flow depth based on the debris flow velocity of the debris flow depth, in m / s;

[0012] S4: Determine the maximum slope height of the debris flow based on the maximum surface velocity of the debris flow depth, in meters.

[0013] Furthermore, in step S2, the calculation formula for determining the debris flow velocity based on the debris flow depth is:

[0014]

[0015] Where: u is the velocity, in m / s; η is the viscosity coefficient, in Pa·S; ρ m is the density of the mixture, in kg / m 3 ;κ is the Karman constant, u * is the flow velocity of the ditch bed, in m / s; y B is the velocity variation layer, in m; a B is the Bagnold number; ρ s is the density of solid particles, in kg / m 3 ; λ is the linear mixing length; D is the particle size, in m; y is perpendicular to the ditch bed, in m; y0 is the value of y when u = 0, in m; h is the mud depth, in m; τ B is the yield stress, in Pa; τ0=ρ m hsinθ, θ is the slope of the ditch bed.

[0016] Furthermore, in step S3, the calculation formula for determining the maximum surface velocity of the debris flow depth based on the debris flow velocity of the debris flow depth is:

[0017]

[0018] Where: U0 is the maximum surface velocity, which is equivalent to the maximum debris flow velocity u max , unit is m / s; η is the viscosity coefficient, unit is Pa·S; ρ m is the density of the mixture, in kg / m 3 ;κ is the Karman constant, u * is the flow velocity of the ditch bed, in m / s; y B is the velocity variation layer, in m; a B is the Bagnold number; ρ s is the density of solid particles, in kg / m 3 ; λ is the linear mixing length; D is the particle size, in m; h is the mud depth, in m; y0 is the value of y when u = 0, in m; u is the velocity, in m / s; y is perpendicular to the ditch bed, in m; τ B is the yield stress, in Pa; τ0=ρ m hsinθ, θ is the slope of the ditch bed.

[0019] Furthermore, in step S4, the maximum slope height of the debris flow is determined based on the maximum surface velocity of the debris flow depth and the energy conservation equation, and the calculation formula is:

[0020]

[0021] Where: h0 is the height of the debris flow before climbing the slope, in m; U0 is the initial climbing speed, in m / s; g is the gravitational acceleration, in m / s 2 ; R u is the climbing height, in meters; U1 is the speed at the maximum climbing height, in meters per second; K l is the head loss coefficient;

[0022] When the debris flow reaches its highest point, the speed is U1=0, and the above formula can be expressed as:

[0023]

[0024] Where: R u is the climbing height, in m; h0 is the height of the debris flow before climbing, in m; K l is the head loss coefficient; U0 is the initial climbing speed, in m / s; g is the gravitational acceleration, in m / s 2 ;

[0025] Ignoring the slope loss of debris flow, that is, K l =0, R u To reach the maximum, the above formula can be expressed as:

[0026]

[0027] Where: R umax is the maximum climbing height, in m; h0 is the height of the debris flow before climbing, in m; U0 is the initial climbing speed, in m / s; g is the gravitational acceleration, in m / s 2 .

[0028] Compared with the prior art, the present invention has the following beneficial effects:

[0029] The present invention calculates the maximum climbing height of debris flow based on the vertical flow velocity. The method fully considers the turbulence effect during the movement and process of debris flow and the characteristics of the debris flow itself and the channel properties, and can more truly reflect the flow velocity of the debris flow movement. The calculated value has high accuracy. Therefore, when designing debris flow prevention and control projects, the maximum rushing height of the debris flow can be accurately calculated, so as to more reasonably design the protection height of the prevention and control project from the perspective of safety and economy. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1The schematic diagram of the flow of debris flow after encountering an obstacle in the present invention, wherein h0 is the height of the debris flow before climbing the slope, U0 is the initial speed of climbing the slope, β is the slope angle, R u is the climbing height. DETAILED DESCRIPTION

[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0032] See also Figure 1 The present invention provides the following technical solution: a method for calculating the maximum climbing height of a viscous debris flow, comprising the following steps:

[0033] S1: Obtain debris flow related data through on-site investigation;

[0034] S2: Determine the depth of debris flow based on debris flow related data, and determine the debris flow velocity at different debris flow depths based on the debris flow depth, in m / s;

[0035] S3: Determine the maximum surface velocity of the debris flow depth based on the debris flow velocity of the debris flow depth, in m / s;

[0036] S4: Determine the maximum slope height of the debris flow based on the maximum surface velocity of the debris flow depth, in meters.

[0037] Specifically, in step S2, the calculation formula for determining the debris flow velocity based on the debris flow depth is:

[0038]

[0039] Where: u is the velocity, in m / s; η is the viscosity coefficient, in Pa·S; ρ m is the density of the mixture, in kg / m 3 ;κ is the Karman constant, u * is the flow velocity of the ditch bed, in m / s; yB is the velocity change layer, in m; a B is the Bagnold number; ρ s is the density of solid particles, in kg / m 3 ; λ is the linear mixing length; D is the particle size, in m; y is perpendicular to the ditch bed, in m; y0 is the value of y when u = 0, in m; h is the mud depth, in m; τ B is the yield stress, in Pa; τ0=ρ m hsinθ, θ is the slope of the ditch bed.

[0040] Specifically, in step S3, the calculation formula for determining the maximum surface velocity of the debris flow depth based on the debris flow velocity of the debris flow depth is:

[0041]

[0042] Where: U0 is the maximum surface velocity, which is equivalent to the maximum debris flow velocity u max , unit is m / s; η is the viscosity coefficient, unit is Pa·S; ρ m is the density of the mixture, in kg / m 3 ;κ is the Karman constant, u * is the flow velocity of the ditch bed, in m / s; y B is the velocity variation layer, in m; a B is the Bagnold number; ρ s is the density of solid particles, in kg / m 3 ; λ is the linear mixing length; D is the particle size, in m; h is the mud depth, in m; y0 is the value of y when u = 0, in m; u is the velocity, in m / s; y is perpendicular to the ditch bed, in m; τ B is the yield stress, in Pa; τ0=ρ m hsinθ, θ is the slope of the ditch bed.

[0043] Specifically, in step S4, the maximum slope height of the debris flow is determined based on the maximum surface velocity of the debris flow depth and the energy conservation equation, and the calculation formula is:

[0044]

[0045] Where: h0 is the height of the debris flow before climbing the slope, in m; U0 is the initial climbing speed, in m / s; g is the gravitational acceleration, in m / s 2 ; R u is the climbing height, in m; U1 is the speed at the maximum climbing height, in m / s; K l is the head loss coefficient;

[0046] When the debris flow reaches its highest point, the speed is U1=0, and the above formula can be expressed as:

[0047]

[0048] Where: R u is the climbing height, in m; h0 is the height of the debris flow before climbing, in m; K l is the head loss coefficient; U0 is the initial climbing speed, in m / s; g is the gravitational acceleration, in m / s 2 ;

[0049] Ignoring the slope loss of debris flow, that is, K l =0, R u To reach the maximum, the above formula can be expressed as:

[0050]

[0051] Where: R umax is the maximum climbing height, in m; h0 is the height of the debris flow before climbing, in m; U0 is the initial climbing speed, in m / s; g is the gravitational acceleration, in m / s 2 .

[0052] Implementation case 1:

[0053] The following viscous debris flow parameters are obtained from the paper "Experimental calculation of maximum climbing height of debris flow":

[0054] η is 0.49Pa·S, ρ m 1938kg / m 3 , a B is 0.035, ρ s 2300kg / m 3 , λ is 28.18, y0 is -0.045m, D is 0.001m, h is 0.048m, θ is 0.12°, τ0 is 2.1Pa, K l is 0.4;

[0055] Substitute the following formula:

[0056]

[0057] Calculate R umax is 0.4116m, and the measured R umax It is 0.4m, with higher accuracy.

[0058] Implementation case 2:

[0059] A debris flow gully in Gansu Province has experienced multiple debris flows. The following parameters were found in the on-site investigation:

[0060] η is 24.6Pa·S, ρ m 2143kg / m 3 , a B is 0.035, ρ s 2650kg / m 3 , λ is 28.18, y0 is -0.057m, D is 0.001m, h is 0.3m, θ is 0.21°, τ0 is 2.4Pa, K l is 0.4;

[0061] Substitute the following formula:

[0062]

[0063] Calculate R umax is 0.7282m, and the measured R umax It is 0.7m, with higher accuracy.

[0064] The above description is only a preferred example of the present invention and does not limit the present invention. Various changes and variations may be made to the technology in the field. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the present invention.

[0065] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A method for calculating the maximum climbing height of a viscous debris flow, characterized in that: The following steps are involved: S1: Obtain debris flow related data through on-site investigation; S2: Determine the depth of debris flow based on debris flow related data, and determine the debris flow velocity at different debris flow depths based on the debris flow depth, in m / s; S3: Determine the maximum surface velocity of the debris flow depth based on the debris flow velocity of the debris flow depth, in m / s; S4: Determine the maximum slope height of the debris flow based on the maximum surface velocity of the debris flow depth, in meters.

2. The method for calculating the maximum climbing height of a viscous debris flow according to claim 1, characterized in that: In step S2, the calculation formula for determining the debris flow velocity based on the debris flow depth is: Where: u is the speed, the unit is m / s; η is the viscosity coefficient, the unit is Pa·S; ρ m is the density of the mixture, in kg / m 3 ;κ is the Karman constant, u * is the flow velocity of the ditch bed, in m / s; y B is the velocity variation layer, in m; a B is the Bagnold number; ρ s is the density of solid particles, in kg / m 3 ; λ is the linear mixing length; D is the particle size, in m; y is perpendicular to the trench bed, in m; y0 is the value of y when u = 0, in m; h is the mud depth, in m; τ B is the yield stress, in Pa; τ0=ρ m hsinθ, θ is the slope of the ditch bed.

3. The method for calculating the maximum climbing height of a viscous debris flow according to claim 1, characterized in that: In step S3, the calculation formula for determining the maximum surface velocity of the debris flow depth based on the debris flow velocity of the debris flow depth is: Where: U0 is the maximum surface velocity, which is equivalent to the maximum debris flow velocity u max , unit is m / s; η is the viscosity coefficient, the unit is Pa·S; ρ m is the density of the mixture, in kg / m 3 ;κ is the Karman constant, u * is the flow velocity of the ditch bed, in m / s; y B is the velocity variation layer, in m; a B is the Bagnold number; ρ s is the density of solid particles, in kg / m 3 ; λ is the linear mixing length; D is the particle size, in m; h is the mud depth in m; y0 is the value of y when u=0 in m; u is the speed in m / s; y is perpendicular to the ditch bed, in meters; τ B is the yield stress, in Pa; τ0=ρ m hsinθ, θ is the slope of the ditch bed.

4. The method for calculating the maximum climbing height of a viscous debris flow according to claim 1, characterized in that: In step S4, the maximum slope height of the debris flow is determined based on the maximum surface velocity of the debris flow depth and the energy conservation equation, and the calculation formula is: Where: h0 is the height of the debris flow before climbing the slope, in m; U0 is the initial climbing speed, in m / s; g is the gravitational acceleration, in m / s 2 ; R u is the climbing height, in meters; U1 is the speed at the maximum climbing height, in meters per second; K l is the head loss coefficient; When the debris flow reaches its highest point, the speed is U1=0, and the above formula can be expressed as: Where: R u is the climbing height, in m; h0 is the height of the debris flow before climbing, in m; K l is the head loss coefficient; U0 is the initial climbing speed, in m / s; g is the gravitational acceleration, in m / s 2 ; Ignoring the slope loss of debris flow, that is, K l =0, R u To reach the maximum, the above formula can be expressed as: Where: R umax is the maximum climbing height, in m; h0 is the height of the debris flow before climbing, in m; U0 is the initial climbing speed, in m / s; g is the acceleration due to gravity, in m / s 2 .