Method for estimating setting time of bare concrete of prefabricated pier
By collecting and analyzing concrete and environmental data, the accurate setting time is calculated, which solves the problem of inaccurate estimation of fair concrete setting time in the existing technology, improves the accuracy and efficiency of construction, and ensures the quality of the bridge piers.
Patent Information
- Application Number
- CN202410795767.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-19
- Publication Date
- 2024-10-01
AI Technical Summary
The accuracy of estimating the solidification time of fair-faced concrete in the existing technology is low, which results in subsequent construction being carried out when the concrete is not completely solidified, affecting the quality of the prefabricated bridge piers.
Concrete-related data and environment-related data are collected through the data acquisition module and sent to the data processing module for analysis to obtain the estimated solidification time of concrete. Combined with concrete material data, pouring area and thickness data, as well as ambient temperature and light exposure data, the calculation Accurate setting time.
It improves the accuracy of estimating the solidification time of fair concrete, ensures that construction personnel can carry out subsequent construction at the appropriate time node, improves the construction quality and efficiency of bridge piers, and reduces construction time.
Smart Images

Figure CN118734185A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bridge construction, and in particular to a method for estimating the setting time of plain concrete of a prefabricated bridge pier. Background Art
[0002] In recent years, my country's highway network construction and urban elevated bridge construction have developed rapidly. With the development of social economy, the requirements for construction period, quality, environmental protection and energy consumption of engineering projects have become increasingly higher. Traditional construction methods have become difficult to adapt to. It is necessary to innovate the existing bridge construction methods and adopt prefabricated and assembled construction methods.
[0003] Among them, prefabricated bridge piers are one of the methods. For prefabricated bridge piers, it is necessary to lay fair-faced concrete on their surface. Fair-faced concrete (bright-faced concrete pouring achieves the best pouring effect - mirror effect) is a form of expression of architectural modernism. Because of its extremely decorative effect, it is also called decorative concrete. The basic idea is that after the concrete is poured, there is no longer any painting, tiling, stone and other materials, which is a way to express the plain appearance of concrete.
[0004] The current laying method is rather cumbersome and the laying process is relatively complicated. It is necessary to estimate the setting time of the concrete before carrying out subsequent construction. However, the current estimation of the setting time is based on the experience of the construction workers. The estimation accuracy of this method is low. If subsequent construction is carried out before the concrete is completely solidified, it will have an adverse effect on the quality of the prefabricated piers. Summary of the invention
[0005] In view of the defects existing in the prior art, the technical problem solved by the present invention is: how to improve the accuracy of estimating the setting time of plain concrete.
[0006] To achieve the above objectives, in a first aspect, the present invention provides a method for estimating the setting time of plain concrete of a prefabricated bridge pier, comprising the following steps:
[0007] pouring concrete onto the surface of the pier;
[0008] Collect concrete-related data and environment-related data through the data acquisition module;
[0009] Sending concrete related data and environment related data to a data processing module;
[0010] The concrete-related data and environment-related data are analyzed through the data processing module to obtain the estimated setting time of the concrete.
[0011] In combination with the first aspect, in one implementation, pouring concrete on the surface of the pier specifically includes:
[0012] Preset pouring areas on the pier surface;
[0013] Pour concrete into the pouring area;
[0014] The concrete in the pouring area is vibrated and compacted by a vibrating device so that the concrete is evenly distributed inside the pouring area.
[0015] In one implementation, the concrete-related data includes bridge pier construction task data and construction temperature data.
[0016] In one implementation, the bridge pier construction task data includes concrete material data, pouring area data, and pouring thickness data.
[0017] In one embodiment, the environment-related data includes environment temperature data and light exposure data.
[0018] In one embodiment, the concrete-related data and the environment-related data are analyzed by a data processing module to obtain an estimated setting time of the concrete, specifically including:
[0019] According to concrete related data and preset concrete analysis rules, the first setting sub-time is obtained;
[0020] According to the environment-related data and the preset concrete analysis rules, the second setting sub-time is obtained;
[0021] An estimated coagulation time is obtained based on the first coagulation sub-time and the second coagulation sub-time.
[0022] In one embodiment, before obtaining the estimated setting time of concrete, the method further includes the following steps:
[0023] Collect concrete maintenance data through data collection module;
[0024] Sending concrete maintenance data to the data processing module;
[0025] The concrete maintenance data is analyzed through the data processing module to obtain the data affecting the setting time of concrete.
[0026] In one embodiment, after obtaining the estimated setting time of concrete, the method further includes the following steps:
[0027] Determine subsequent treatment measures based on the estimated solidification time.
[0028] In one embodiment, the subsequent processing measures specifically include:
[0029] Grinding and polishing of concrete.
[0030] In a second aspect, the present invention provides a system for estimating the setting time of plain concrete of a prefabricated bridge pier, which comprises:
[0031] A control module, which is used to control the pouring device to pour concrete on the surface of the pier;
[0032] A data acquisition module, which is used to collect concrete-related data and environment-related data;
[0033] The data processing module is used to analyze the concrete-related data and the environment-related data to obtain the estimated setting time of the concrete.
[0034] Compared with the prior art, the advantages of the present invention are:
[0035] The present invention estimates the setting time after pouring concrete on the surface of the bridge pier and before the concrete solidifies. The data acquisition module collects concrete-related data and environment-related data, and sends the data to the data processing module. The data processing module analyzes the data to obtain the estimated setting time of the concrete. Compared with the existing estimation method, the estimation method does not rely on experience to judge, but is based on the actual construction scene and construction data, and analyzes to obtain the estimated setting time of the concrete. Therefore, the method improves the accuracy of the estimation of the setting time of the plain concrete, so that the construction personnel can continue the subsequent construction at the appropriate time node. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 The present invention is a flowchart of a method for estimating the setting time of plain concrete of a prefabricated bridge pier according to an embodiment of the present invention. DETAILED DESCRIPTION
[0037] The embodiments of the present invention are further described in detail below with reference to the accompanying drawings.
[0038] The method for estimating the setting time of the plain concrete of the prefabricated bridge pier in the embodiment of the present invention is as follows: Figure 1 As shown, the following steps are included:
[0039] 101: Pour concrete on the surface of the pier;
[0040] 102: Collecting concrete related data and environment related data through a data collection module;
[0041] 103: Sending concrete related data and environment related data to a data processing module;
[0042] 104: Analyze the concrete related data and the environment related data through the data processing module to obtain the estimated setting time of the concrete.
[0043] It can be seen that the present invention estimates the setting time after pouring concrete on the surface of the bridge pier and before the concrete solidifies, collects concrete-related data and environment-related data through the data acquisition module, and sends the data to the data processing module, and analyzes the data through the data processing module to obtain the estimated setting time of the concrete. Compared with the existing estimation method, this estimation method does not rely on experience to judge, but is based on the actual construction scene and construction data, and analyzes to obtain the estimated setting time of the concrete. Therefore, this method improves the accuracy of the estimation of the setting time of the plain concrete, so that the construction personnel can continue the subsequent construction at the appropriate time node.
[0044] Preferably, pouring concrete on the surface of the pier specifically includes:
[0045] Preset pouring areas on the pier surface;
[0046] Pour concrete into the pouring area;
[0047] The concrete in the pouring area is vibrated and compacted by a vibrating device so that the concrete is evenly distributed inside the pouring area.
[0048] Specifically, common plain concrete is first selected, and the concrete is poured evenly into the pouring area during pouring, the fluidity and leveling of the concrete are controlled, and a vibrating device is used to compact the concrete to expel bubbles and voids; wherein the vibrating device can be a vibrator or a vibrating rod; wherein, plain concrete refers to a type of concrete that is formed in one step using a cast-in-place process, and no external plastering, painting or other processes are performed after the pouring formwork is removed, and the natural color of the concrete is used as a finishing material; its characteristic is that it is formed in one step, and no chiseling, repairing or external decoration is required, which saves a lot of cost, reduces the generation of construction waste, and is very beneficial to environmental protection.
[0049] Preferably, the concrete related data include bridge pier construction task data and construction temperature data; the bridge pier construction task data include concrete material data, pouring area data and pouring thickness data.
[0050] Preferably, the environment-related data includes environment temperature data and light exposure data.
[0051] Specifically, the temperature sensor and the light sensor are used to detect and obtain the ambient temperature data and the light exposure data.
[0052] It can be understood that in the embodiment of the present application, the concrete-related data includes the material data of the concrete; and the material of the concrete is determined according to the pier construction task; the pier construction task determines what kind of concrete material should be used for paving the road surface of the pier, and the material of the concrete will affect the solidification time of the concrete; the relevant data of the pouring area can also be known through the pier construction task, including the area of the pouring area, the depth of the pouring area, etc.; and the pouring area needs to be filled with concrete, then the area of the pouring area is equivalent to the pouring area of the concrete, and the depth of the pouring area is equivalent to the pouring thickness of the concrete; similarly, the above-mentioned pouring area and pouring thickness are also one of the factors affecting the solidification time of the concrete; compared with the relevant data of the concrete, the environment-related data can be obtained by detecting through sensors, which is only an exemplary explanation here, and is not limited to the method of obtaining the environment-related data through sensors. As long as the environment-related data can be obtained, the environment-related data can also be obtained through big data and other methods; it can be understood that for the solidification of concrete, the temperature of the environment in which the concrete is located and the light exposure are both factors that affect the solidification time of the concrete.
[0053] By acquiring the above data, we can collect the relevant factors that affect the setting time of concrete, such as concrete material data, pouring area data, pouring thickness data, construction temperature data, ambient temperature data and light exposure data, which can be used to calculate the setting time of concrete later.
[0054] Preferably, the concrete-related data and the environment-related data are analyzed by a data processing module to obtain an estimated setting time of the concrete, specifically including:
[0055] According to concrete related data and preset concrete analysis rules, the first setting sub-time is obtained;
[0056] According to the environment-related data and the preset concrete analysis rules, the second setting sub-time is obtained;
[0057] An estimated coagulation time is obtained based on the first coagulation sub-time and the second coagulation sub-time.
[0058] Preferably, before obtaining the estimated setting time of concrete, the following steps are also included:
[0059] Collect concrete maintenance data through data collection module;
[0060] Sending concrete maintenance data to the data processing module;
[0061] The concrete maintenance data is analyzed through the data processing module to obtain the data affecting the setting time of concrete.
[0062] Specifically, firstly, the concrete-related data is analyzed to obtain the first solidification sub-time; then, the environment-related data is analyzed to obtain the second solidification sub-time; finally, the first solidification sub-time and the second solidification sub-time are estimated to obtain the solidification time of the concrete.
[0063] It should be noted that when analyzing based on concrete-related data and environment-related data, it is necessary to take into account the impact of various factors on the concrete setting time; including concrete material data, pouring area data, pouring thickness data, construction temperature data, ambient temperature data and light exposure data; and in the embodiment of the present application, the maintenance data of the concrete also needs to be considered, because after the concrete solidifies, the concrete still needs to be monitored and maintained, so the maintenance data of the concrete will also affect the setting time of the concrete; therefore, the concrete maintenance data is obtained, and the impact data of the concrete maintenance data on the concrete setting time is determined, and then the impact data is used to adjust the setting time.
[0064] It is understandable that after determining the solidification time, subsequent treatment measures for the concrete can be pre-arranged according to the solidification time to ensure that the pier construction work is not affected, thereby improving the pier construction efficiency and reducing the pier construction time; and by monitoring and analyzing the concrete maintenance stage, the quality of the concrete is guaranteed, thereby ensuring the construction quality of the pier.
[0065] Preferably, after obtaining the estimated setting time of concrete, the following steps are also included:
[0066] Determine subsequent treatment measures based on the estimated solidification time.
[0067] Further follow-up measures include:
[0068] Grinding and polishing of concrete.
[0069] Specifically, a metal template or a glass limit plate is placed on the concrete surface, and the concrete is ground in a predetermined order and direction; and the subsequent treatment measures determined according to the solidification time also include: polishing the surface of the concrete using a polishing machine, and protecting the concrete using a sealing machine;
[0070] After the concrete is poured, wait for it to harden but still be able to withstand heavy pressure before surface treatment, that is, place metal templates or fiberglass boards on the concrete surface and grind them in a certain order and direction; after the concrete surface is polished, it can be further polished with a polishing machine to make it brighter and more shiny, and finally apply an appropriate sealer to protect the concrete, enhance its mirror effect, and improve the concrete's wear resistance and stain resistance.
[0071] By adopting the above technical solution, the surface hardness of the prefabricated bridge piers is higher and more wear-resistant, which can effectively resist erosion by ultraviolet rays, climate change, chemicals, etc., and extend the service life of the bridge piers. In addition, the surface roughness is reduced, and the resistance to water and air flow is reduced, which helps to improve the hydraulic performance and risk resistance of the bridge piers.
[0072] The system for estimating the setting time of the plain concrete of the prefabricated bridge pier in the embodiment of the present invention comprises:
[0073] A control module, which is used to control the pouring device to pour concrete on the surface of the pier;
[0074] A data acquisition module, which is used to collect concrete-related data and environment-related data;
[0075] The data processing module is used to analyze the concrete-related data and the environment-related data to obtain the estimated setting time of the concrete.
[0076] It can be seen that the present invention estimates the setting time after pouring concrete on the surface of the bridge pier and before the concrete solidifies, collects concrete-related data and environment-related data through the data acquisition module, and sends the data to the data processing module, and analyzes the data through the data processing module to obtain the estimated setting time of the concrete. Compared with the existing estimation method, this estimation method does not rely on experience to judge, but is based on the actual construction scene and construction data, and analyzes to obtain the estimated setting time of the concrete. Therefore, this method improves the accuracy of the estimation of the setting time of the plain concrete, so that the construction personnel can continue the subsequent construction at the appropriate time node.
[0077] Specifically, the control module is further configured to select common plain concrete, pour the concrete evenly into the pouring area during pouring, control the fluidity and leveling of the concrete, and use a vibration device to compact the concrete to expel bubbles and voids; wherein the vibration device can be a vibrator or a vibrating rod.
[0078] The data acquisition module is further configured to obtain concrete-related data including: obtaining pier construction task data and construction temperature data; obtaining concrete material data, pouring area data and pouring thickness data according to the pier construction task data; integrating the material data, pouring area data, pouring thickness data and construction temperature data to obtain concrete-related; obtaining environment-related data including, using temperature sensors and light sensors to detect and obtain environment temperature data and light exposure data.
[0079] The data processing module is further configured to obtain a first solidification sub-time according to the concrete-related information and preset concrete analysis rules; obtain a second solidification sub-time according to the environment-related information and preset concrete analysis rules; estimate the solidification time of the concrete according to the first solidification sub-time and the second solidification sub-time; obtain concrete maintenance information; determine concrete solidification time influencing information according to the concrete maintenance information; and adjust the solidification time according to the concrete solidification time influencing information.
[0080] Preferably, the estimation system further comprises a determination module, which is used to determine subsequent treatment measures according to the setting time, and the subsequent treatment measures comprise grinding and polishing the concrete.
[0081] Specifically, the determination module is further configured to determine, based on the solidification time, subsequent processing measures including: placing a metal template or a glass limit plate on the concrete surface, and grinding the concrete in a predetermined order and direction; determining, based on the solidification time, subsequent processing measures also including: performing surface polishing on the concrete using a polishing machine, and protecting the concrete using a sealing machine.
[0082] Through the coordinated use of the above-mentioned modules, the surface of the prefabricated piers has a higher hardness and stronger wear resistance, which can effectively resist erosion by ultraviolet rays, climate change, chemicals, etc., and extend the service life of the piers. In addition, the surface roughness is reduced, and the resistance to water and air flow is reduced, which helps to improve the hydraulic performance and risk resistance of the piers.
[0083] In order to better execute the program of the above method, the present application also provides a terminal, which includes a memory and a processor.
[0084] The memory may be used to store instructions, programs, codes, code sets or instruction sets. The memory may include a program storage area and a data storage area, wherein the program storage area may store instructions for implementing an operating system, instructions for at least one function, and instructions for implementing the above-mentioned prefabricated bridge pier construction estimation method with a mirror effect, etc.; the data storage area may store data involved in the above-mentioned prefabricated bridge pier construction estimation method with a mirror effect, etc.
[0085] The processor may include one or more processing cores. The processor calls the data stored in the memory by running or executing the instructions, programs, code sets or instruction sets stored in the memory, performs various functions of the present application and processes data. The processor may be at least one of a special purpose integrated circuit, a digital signal processor, a digital signal processing device, a programmable logic device, a field programmable gate array, a central processing unit, a controller, a microcontroller and a microprocessor. It is understandable that for different devices, the electronic device used to implement the above-mentioned processor function can also be other, and the embodiments of the present application are not specifically limited.
[0086] In the description of the present application, it should be noted that the terms "upper", "lower", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. Unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present application can be understood according to the specific circumstances.
[0087] It should be noted that, in this application, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
[0088] The above description is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features applied for herein.
Claims
1. A method for estimating the setting time of plain concrete of a prefabricated bridge pier, characterized in that: It includes the following steps: pouring concrete onto the surface of the pier; Collect concrete-related data and environment-related data through the data acquisition module; Sending concrete related data and environment related data to a data processing module; The concrete-related data and environment-related data are analyzed through the data processing module to obtain the estimated setting time of the concrete.
2. The method for estimating the setting time of the plain concrete of the prefabricated bridge pier according to claim 1, characterized in that: Pouring concrete on the pier surface includes: Preset pouring areas on the pier surface; Pour concrete into the pouring area; The concrete in the pouring area is vibrated and compacted by a vibrating device so that the concrete is evenly distributed inside the pouring area.
3. The method for estimating the setting time of the plain concrete of the prefabricated bridge pier according to claim 1, characterized in that: The concrete related data includes bridge pier construction task data and construction temperature data.
4. The method for estimating the setting time of the plain concrete of the prefabricated bridge pier according to claim 3, characterized in that: The bridge pier construction task data includes concrete material data, pouring area data and pouring thickness data.
5. The method for estimating the setting time of the plain concrete of the prefabricated bridge pier according to claim 1, characterized in that: The environment-related data includes environment temperature data and light exposure data.
6. The method for estimating the setting time of the plain concrete of the prefabricated bridge pier according to claim 1, characterized in that: The data processing module analyzes the concrete-related data and the environment-related data to obtain the estimated setting time of the concrete, including: According to concrete related data and preset concrete analysis rules, the first setting sub-time is obtained; According to the environment-related data and the preset concrete analysis rules, the second setting sub-time is obtained; An estimated coagulation time is obtained based on the first coagulation sub-time and the second coagulation sub-time.
7. The method for estimating the setting time of the plain concrete of the prefabricated bridge pier according to claim 1, characterized in that: Before obtaining the estimated setting time of concrete, the following steps are also included: Collect concrete maintenance data through data collection module; Sending concrete maintenance data to the data processing module; The concrete maintenance data is analyzed through the data processing module to obtain the data affecting the setting time of concrete.
8. The method for estimating the setting time of the plain concrete of the prefabricated bridge pier according to claim 1, characterized in that: After obtaining the estimated setting time of concrete, the following steps are also included: Determine subsequent treatment measures based on the estimated solidification time.
9. The method for estimating the setting time of the plain concrete of the prefabricated bridge pier according to claim 8, characterized in that: Subsequent treatment measures include: Grinding and polishing of concrete.
10. A system for estimating the setting time of plain concrete of prefabricated bridge piers, characterized in that: It includes: A control module, which is used to control the pouring device to pour concrete on the surface of the pier; A data acquisition module, which is used to collect concrete-related data and environment-related data; The data processing module is used to analyze the concrete-related data and the environment-related data to obtain the estimated setting time of the concrete.
Citation Information
Patent Citations
Method for testing curing temperature curve of continuous reinforcement concrete pavement
CN108548757A
Automatic concrete setting time measuring device capable of simulating field environment and using method thereof