Method for determining long-distance prediction critical value of outburst danger of working face
Through the method of cyclic testing and screening prediction indicators, the critical value of long-distance drilling for coal mine gas disaster prediction is determined, which solves the problem of multiple cycle prediction in the existing technology and improves the efficiency and safety production capacity of coal mine gas disaster prediction.
Patent Information
- Application Number
- CN202410833183.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-26
- Publication Date
- 2024-10-01
AI Technical Summary
The existing coal mine gas disaster prediction method requires multiple cycle predictions when the prediction distance of the coal seam is less than 8 meters, resulting in the occupation of outburst prevention personnel and long mining preparation time, which cannot meet the needs of safe and efficient production of mines.
By obtaining the prediction index Y and its critical value Y0 of the coal seam to be tested, design the long-distance outburst hazard prediction drilling hole, cycle test the prediction index, screen the indicators that are the same as the cycle prediction position, calculate the increment and decline rate, and determine the long-distance drilling The critical value of hole prediction index X0 reduces the number of cycle predictions and improves prediction efficiency.
It avoids multiple cycle predictions, reduces outburst prevention personnel and mining preparation time, improves mining production efficiency, and can more accurately predict the danger of coal seam outbursts at longer distances in front of the working face.
Smart Images

Figure CN118735053A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of coal mine gas disaster prevention and control, and in particular to a method for determining a critical value of long-distance prediction of working face outburst hazard. Background Art
[0002] According to national laws and regulations such as the "Coal Mine Safety Regulations" and the "Detailed Rules for Preventing and Controlling Coal and Gas Outbursts", regional and local "two-level four-in-one" comprehensive outburst prevention measures should be strictly implemented before mining in outburst coal seams. The local comprehensive outburst prevention measures require that: the outburst hazard prediction of the working face should be carried out during the advancement of the working face. When it is predicted that there is no outburst hazard working face, mining operations must be carried out under the conditions of taking safety protection measures and retaining sufficient outburst prediction advance distance or outburst prevention measure advance distance. The predicted drilling depth of the working face is 8 to 10 meters, and the predicted drilling depth of the coal mining working face is 5 to 10 meters. The minimum predicted advance distance that should be retained for coal roadway excavation and coal mining working face is 2 meters. The prediction methods for coal roadway excavation working face mainly include drill cuttings index method, composite index method, and R value index method. This type of prediction method can effectively predict the danger of the working face, avoid the occurrence of gas disasters, and provide protection for coal mine safety production. However, the advance distance of coal seam prediction using this type of prediction method is less than 8 meters. With the proactive management of mine gas disasters, the upgrading of gas prevention and control equipment, and the improvement of mining capacity, it is often necessary to conduct multiple cycles of prediction in a shift to cooperate with mine mining and production. This prediction method has many execution times, occupies personnel in the gas outburst prevention team, and requires a long mining preparation time, which can no longer meet the needs of safe and efficient production in mines. Summary of the invention
[0003] The present invention provides a method for determining a critical value for long-distance prediction of a working face outburst hazard, which avoids multiple cyclic predictions, reduces the number of outburst prevention personnel, saves mining preparation time, and improves mining production efficiency.
[0004] The present invention provides a method for determining a critical value of a long-distance prediction of a working face outburst hazard, which comprises the following steps:
[0005] S100: Obtain the prediction index Y and its critical value Y used in the coal seam to be tested 0 ;
[0006] S200: Drill holes for predicting the danger of outbursts at long distances with a design length of L at the mining face, and test A as required i Location Prediction Index X i (i=1~L);
[0007] S300: During the implementation of the prediction of the outburst hazard of the mining working face, the prediction index is tested according to the cyclic prediction method. The number of cycles n is the actual number of predictions within the distance L in front of the working face. The maximum value Y of the prediction index per cycle is taken. jmax(j=1~n), and record its position as B j ;
[0008] S400: In the prediction index X i Medium screening and B j A in the same position i The prediction index X corresponding to the position i , denoted as X i-j
[0009] S500: Comparing Long-Distance Drilling Prediction Indicators X i-j Compared with the prediction index Y of the original prediction method jmax , calculate the predicted indicator increment ΔY j =|Y jmax -X i-j |, predicted value decrease rate
[0010] S600: Critical value X of the long-distance drilling prediction index 0 =Y 0 (1-η jmax ), where η jmax is η j Maximum value;
[0011] S700: Repeat the above steps for no less than 3 times, and select X 0 The minimum value of is taken as the critical value of the long-distance drilling prediction index;
[0012] S800: When using long-distance prediction drilling to conduct pre-test of the danger of outburst at the working face, when the distance from the hole is greater than 10 meters and the critical value of the test prediction index exceeds X 0 When the working face is exposed to high pressure, it can be determined that the working face has a protruding hazard, otherwise there is no protruding hazard.
[0013] Further, in step S100, the prediction index Y includes the amount of drilling cuttings S, the drilling cuttings desorption index K 1 Value and Δh 2 , initial gas outflow velocity q.
[0014] Further, in step S100, the critical values of the prediction index are the cuttings amount S and the cuttings desorption index K obtained through on-site investigation. 1 Value and Δh 2 , critical value of initial gas outburst velocity q.
[0015] Furthermore, in the step S200, the predicted drilling length L for long-distance outburst hazard is greater than 10 meters.
[0016] Further, in step S200, the test as required includes testing the amount of drill cuttings S once every 1 meter and the desorption index K of drill cuttings once every 2 meters starting from the 2nd meter.1 Value and Δh 2 , test the initial gas outflow velocity q once every 1 meter.
[0017] Further, in step S200, A i Position is the distance between the drill hole and the orifice when testing the index, X i Yes A i The indicator value for the position test.
[0018] Further, in step S300, the cyclic prediction method refers to a drilling length of 8 to 10 meters, with a 2-meter lead distance reserved; Y jmax is the maximum value of every 1 meter or every 2 meters tested in the j-th cycle prediction, B j is the distance from the long borehole orifice.
[0019] The beneficial effects of the present invention are as follows: the method for determining the critical value for long-distance prediction of coal seam outburst hazard in the working face of the present invention can predict the coal seam outburst hazard at a longer distance ahead of the working face, avoid multiple cyclic predictions in one day, reduce the number of outburst prevention personnel, save mining preparation time, and improve mining safety production efficiency, and has wide promotion and application value. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Attached Figure 1 to Figure 5 It is a schematic diagram of the drilling construction of the present invention.
[0021] Among them: 1—excavation working face, 2—long-distance predicted drilling, 3—long-distance predicted drilling predicted point; 4—cyclic predicted drilling; 5—cyclic predicted drilling predicted point. DETAILED DESCRIPTION
[0022] In order to facilitate those skilled in the art to understand the technical solution of the present invention, further description will be given below with reference to the accompanying drawings. It should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present invention.
[0023] In the following detailed description, for ease of explanation, many specific details are set forth to provide a comprehensive understanding of embodiments of the present invention. However, it is apparent that one or more embodiments may be implemented without these specific details. In addition, in the following description, descriptions of known structures and techniques are omitted to avoid unnecessary confusion of concepts of the present invention.
[0024] The following is combined with Figure 1 to Figure 5 The present invention further describes an example of a method for determining a critical value for long-distance prediction of a working face outburst hazard.
[0025] 1. Collect and obtain the prediction index Y and its critical value Y used in the coal seam to be tested 0 .
[0026] In the specific implementation, in step (1), the prediction index Y is the drilling cuttings amount S and the drilling cuttings desorption index K required by the "Regulations on Prevention and Control of Coal and Gas Outbursts" 1 Value and Δh 2 , gas outflow initial velocity q. In step (1), the critical value of the prediction index is the amount of drilling cuttings S and the drilling cuttings desorption index K obtained through on-site investigation. 1 Value and Δh 2 , the critical value of the initial velocity of gas outburst q. If there is no investigation value, refer to the drilling cuttings volume S and drilling cuttings desorption index K provided in the "Detailed Rules for Preventing and Controlling Coal and Gas Outbursts" 1 Value and Δh 2 , critical value of initial gas outburst velocity q.
[0027] 2. If Figure 1 As shown in the figure, a long-distance outburst danger prediction borehole 2 with a length of L is designed in front of the mining working face 1, and A is tested as required. i Location Prediction Index X i (i=1~L).
[0028] In the specific implementation, in step (2), the length of the long-distance outburst danger prediction drill hole is greater than 10 meters. The required test is to test the amount of drill cuttings every 1 meter starting from the 2nd meter, the drill cuttings desorption index every 2 meters, and the initial velocity of gas outburst once every 1 meter according to the "Detailed Rules for Preventing and Controlling Coal and Gas Outbursts". i Position is the distance between the drill hole and the orifice when testing the index, X i Yes A i The indicator value for the position test.
[0029] 3. If Figure 2 As shown in the figure, during the implementation of the prediction of the outburst hazard of the mining working face 1, the prediction index is tested according to the cyclic prediction method. The number of cycles n is the actual number of predictions within the distance L in front of the working face, and the maximum value Y of the prediction index per cycle is taken. jmax (j=1~n), and record its position as B j .
[0030] In specific implementation, the cycle prediction method is that the drilling length required by the "Detailed Rules for Preventing and Controlling Coal and Gas Outbursts" is 8 to 10 meters, with a 2-meter lead distance reserved; jmax is the maximum value of every 1 meter or every 2 meters tested in the j-th cycle prediction, B j is the distance from the long borehole orifice.
[0031] 4. If Figure 3 As shown, in the prediction indicator X i Medium screening and B j A in the same position i The prediction index X corresponding to the position i , denoted as X i-j .
[0032] 5. Calculate the long-distance drilling prediction index X i-j Compared with the prediction index Y of the original prediction method jmax Increment ΔY j =|Y jmax -X i-j |, calculate the predicted value decline rate
[0033] 6. Determine the critical value of the long-distance drilling prediction index as X 0 =Y 0 (1-η jmax ), where η jmax is η j Maximum value.
[0034] 7. If Figure 4-5 Repeat steps (1) to (6) at least 3 times, and take X 0 The minimum value of is taken as the critical value of the long-distance drilling prediction index.
[0035] 8. When using long-distance prediction drilling to conduct pre-test of the danger of outburst at the working face, when the distance from the hole is greater than 10 meters and the critical value of the test prediction index exceeds X 0 When the working face is exposed to high pressure, it can be determined that the working face has a protruding hazard, otherwise there is no protruding hazard.
[0036] To sum up, the method for determining the critical value of long-distance prediction of coal face coal outburst hazard of the present invention can predict the coal outburst hazard of coal seams at a longer distance ahead of the working face, avoid multiple cyclic predictions in one day, reduce the number of coal outburst prevention personnel, save mining preparation time, and improve mining safety production efficiency, which has wide promotion and application value.
[0037] The above embodiments are merely descriptions of preferred implementation modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.
Claims
1. A method for determining a critical value for long-distance prediction of a working face outburst hazard, characterized in that: include: S100: Obtain the prediction index Y used in the coal seam to be tested and its prediction index critical value Y0; S200: Drill holes for predicting the danger of outbursts at long distances with a design length of L at the mining face, and test A as required i Location Prediction Index X i (i=1~L); S300: During the implementation of the prediction of the outburst hazard of the mining working face, the prediction index is tested according to the cyclic prediction method. The number of cycles n is the actual number of predictions within the distance L in front of the working face. The maximum value Y of the prediction index per cycle is taken. jmax (j=1~n), and record its position as B j ; S400: In the prediction index X i Medium screening and B j A in the same position i The prediction index X corresponding to the position i , denoted as X i-j ; S500: Comparing Long-Distance Drilling Prediction Indicators X i-j Compared with the prediction index Y of the original prediction method jmax , calculate the predicted indicator increment ΔY j =|Y jmax -X i-j |, predicted value decrease rate S600: The critical value of the long-distance drilling prediction index X0 = Y0 (1-η jmax ), where η jmax is η j Maximum value; S700: repeat the above steps for no less than 3 times, and take the minimum value of X0 as the critical value of the long-distance drilling prediction index; S800: When using long-distance predictive drilling to conduct pre-testing of the danger of working face outburst, when the distance from the hole mouth is greater than 10 meters and the critical value of the test prediction index exceeds X0, it can be determined that the working face has the danger of outburst, otherwise there is no danger of outburst.
2. The method for determining the critical value of long-distance prediction of working face outburst hazard according to claim 1 is characterized in that: In the step S100, the prediction index Y includes the amount of drill cuttings S, the drill cuttings desorption index K1 value and Δh2, and the initial gas outflow velocity q.
3. The method for determining the critical value of long-distance prediction of working face outburst hazard according to claim 2 is characterized in that: In the step S100, the prediction index critical value Y0 is the critical value of the cuttings amount S, the cuttings desorption index K1 value and Δh2, and the gas outflow initial velocity q obtained through on-site investigation.
4. The method for determining the critical value of long-distance prediction of working face outburst hazard according to claim 3 is characterized in that: In the step S200, the predicted drilling length L for long-distance outburst hazard is greater than 10 meters.
5. A method for determining a critical value for long-distance prediction of a working face outburst hazard according to claim 4, characterized in that: In step S200, the test as required includes testing the amount of drill cuttings S once every 1 meter starting from the 2nd meter, testing the drill cuttings desorption index K1 value and Δh2 once every 2 meters, and testing the initial gas outflow velocity q once every 1 meter.
6. The method for determining the critical value of long-distance prediction of working face outburst hazard according to claim 5 is characterized in that: In step S200, A i Position is the distance between the drill hole and the orifice when testing the index, X i Yes A i The indicator value for the position test.
7. The method for determining the critical value of long-distance prediction of working face outburst hazard according to claim 6 is characterized in that: In step S300, the cyclic prediction method refers to a drilling length of 8 to 10 meters, with a 2-meter lead distance reserved; jmax is the maximum value of every 1 meter or every 2 meters tested in the j-th cycle prediction, B j is the distance from the long borehole orifice.