Power grid equipment problem demand identification method and device based on artificial intelligence, and medium

By establishing a database of power grid equipment risk issues and real-time monitoring of operation data, potential hidden dangers are identified and solved, which solves the problem of inability to timely identify hidden dangers in power grid equipment in the existing technology and achieves long-term stable operation of the equipment.

CN118735503AActive Publication Date: 2024-10-01GUANGDONG POWER GRID CORP ZHAOQING POWER SUPPLY BUREAU
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411234508.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-04
Publication Date
2024-10-01
Estimated Expiration
2044-09-04

AI Technical Summary

Technical Problem

Existing technology cannot promptly identify and eliminate potential hazards during normal operation of power grid equipment, resulting in unstable long-term operation of the equipment.

Method used

Using methods based on artificial intelligence, a database of risk problems for power grid equipment is established. Through real-time monitoring of operation data, hidden danger data are filtered and diverted to form a problem database to identify and solve upcoming problems in a timely manner.

Benefits of technology

It effectively eliminates hidden dangers in the normal operation of power grid equipment, prevents them before they occur, and ensures long-term normal operation of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118735503A_ABST
    Figure CN118735503A_ABST
Patent Text Reader

Abstract

The invention provides a power grid equipment problem demand identification method and device based on artificial intelligence, and a medium. The method comprises the following steps: establishing a risk problem database of power grid equipment; monitoring the operation data of the power grid equipment in real time, screening out hidden danger data from the operation data, and converting the hidden danger data into hidden danger risk problems corresponding to the hidden danger data; and carrying out shunting treatment on the hidden danger and risk problems, and clearing the hidden danger and risk problems subjected to shunting treatment. Through the technical scheme provided by the invention, the technical problem that the hidden danger problem of the power grid equipment in the normal operation process cannot be effectively eliminated in the prior art can be solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power grid equipment fault detection, and in particular to a method, device and medium for identifying power grid equipment problem requirements based on artificial intelligence. Background Art

[0002] At present, as people's demand for electricity is increasing day by day, electricity is applied to all walks of life, which not only leads to increasing demand, but also makes power grid equipment more complex. In daily use, power grid equipment is no longer just a tool for transmitting electricity, but also assumes various feedback functions of the power system. In order to ensure the normal operation of power grid equipment, it is often necessary to monitor the power grid equipment.

[0003] However, the existing technology for monitoring power grid equipment mainly stays in the mode of "solving problems when problems occur", that is, solving problems after discovering problems in the operation of power grid equipment. However, it is impossible to timely eliminate problems that are about to occur before they occur during the normal operation of power grid equipment, so as to ensure the long-term normal operation of power grid equipment. Summary of the invention

[0004] The main purpose of the present invention is to provide a method, device and medium for identifying power grid equipment problem needs based on artificial intelligence, so as to solve the technical problem that the prior art cannot effectively eliminate the hidden dangers of power grid equipment during normal operation.

[0005] In order to achieve the above object, according to one aspect of the present invention, a method for identifying power grid equipment problem requirements based on artificial intelligence is provided, comprising:

[0006] Establish a risk database for power grid equipment;

[0007] Monitor the operation data of power grid equipment in real time, filter out hidden danger data from the operation data, and convert the hidden danger data into hidden danger risk issues corresponding to the hidden danger data;

[0008] Hidden dangers and risk issues shall be diverted and handled, and hidden dangers and risk issues after diversion shall be cleaned up.

[0009] Furthermore, a risk database of power grid equipment is established, including:

[0010] Collect problem data of power grid equipment;

[0011] Combining and classifying the problem data according to at least two different classification methods to obtain problem data packets of different categories;

[0012] Different categories of question data packets are aggregated to obtain a question database.

[0013] Furthermore, the problem data are combined and classified according to at least two different classification methods to obtain problem data packets of different categories, including:

[0014] The power grid equipment is classified according to its application scenarios and administrative levels. The application scenarios of power grid equipment include production operation, power consumption planning, infrastructure power consumption, business expansion and manual customer service. The administrative levels of power grid equipment include district and county level, site level, branch line level, substation level and meter level.

[0015] Any link in the application scenario of the power grid equipment and any level in the administrative hierarchy of the power grid equipment are combined to form a combination category, and the problem data are divided into different categories of problem data packets according to the combination category.

[0016] Furthermore, problem data of power grid equipment is collected, including:

[0017] Collect problem data of power grid equipment during production operation, power consumption planning, infrastructure power consumption, business expansion and manual customer service, and store it in the cloud or storage devices.

[0018] Furthermore, different types of question data packets are aggregated to obtain a question database, including:

[0019] The problem data is defined as ,in, =y means that the power grid equipment is classified according to the administrative level, which includes district and county level, site level, branch line level, substation level and meter level; y means that the power grid equipment is classified according to the production link, which includes production operation, power consumption planning, infrastructure power consumption, business expansion and manual customer service;

[0020] The data corresponding to the production operation link in the problem data is defined as ;

[0021] The data corresponding to the power consumption planning link in the problem data is defined as ;

[0022] The data corresponding to the infrastructure electricity consumption in the problem data is defined as ;

[0023] The data corresponding to the business expansion link in the problem data is defined as ;

[0024] The data corresponding to the manual customer service link in the problem data is defined as ;

[0025] The data corresponding to the district and county level in the problem data is defined as ;

[0026] The data corresponding to the site level in the problem data is defined as ;

[0027] The data corresponding to the branch level in the problem data is defined as ;

[0028] The data corresponding to the substation level in the problem data is defined as ;

[0029] The data corresponding to the meter level in the problem data is defined as ;

[0030] Arrange the problem data in a matrix form to form a problem database;

[0031] Among them, the matrix form of the problem data is:

[0032] .

[0033] Furthermore, the operation data of the power grid equipment is monitored, hidden danger data is screened out from the operation data, and the hidden danger data is converted into hidden danger risk problems corresponding to the hidden danger data, including:

[0034] Monitor the operating data of power grid equipment during operation;

[0035] Perform correction calculation on the operating data to generate corrected operating data; perform comparative calculation on the corrected operating data and the problem data in the problem database;

[0036] Identify the hidden danger data in the corrected operation data, and convert the hidden danger data into hidden danger risk issues corresponding to the hidden danger data;

[0037] According to the group to which the problem data corresponding to the hidden danger data belongs, the group to which the hidden danger risk problem belongs is identified.

[0038] Further, the operation data is corrected and calculated to generate corrected operation data, including:

[0039] Call running data;

[0040] The operation data calculation is corrected to the corrected operation data; the operation data calculation is corrected to the corrected operation data calculation formula as follows:

[0041] Define the running data as ;

[0042] Define the modified running data as ;

[0043] ;

[0044] ;

[0045] ;

[0046] in, is the correction factor; is the total number of question data; for and The difference between .

[0047] Furthermore, the corrected operation data is compared with the problem data in the problem database, including:

[0048] Will and Perform comparative calculations and define A as the risk parameter value corresponding to the risk problem. The calculation method is as follows:

[0049] ;

[0050] When A≥0, the corresponding corrected operation data is determined to be hidden danger data;

[0051] When A<0, it is determined that the corresponding corrected operating data is not hidden danger data.

[0052] According to another aspect of the present invention, there is provided a device for identifying power grid equipment problem requirements based on artificial intelligence, comprising:

[0053] A problem database module is used to store power grid risk problems and form a power grid risk problem database;

[0054] The analysis and calculation module is used to monitor the operation data of the power grid equipment in real time, filter out the hidden danger data from the operation data, and convert the hidden danger data into the hidden danger risk problems corresponding to the hidden danger data;

[0055] The diversion module is used to divert risk issues and then clean up the risk issues after diversion.

[0056] According to another aspect of the present invention, a non-volatile storage medium is provided, wherein the non-volatile storage medium stores a plurality of instructions, wherein the instructions are suitable for being loaded by a processor and executing the above-mentioned artificial intelligence-based power grid equipment problem demand identification method.

[0057] By applying the technical solution of the present invention, a complete grid risk problem database is established, and then the data generated during the actual operation of the grid equipment is monitored, and the hidden danger data is converted into corresponding hidden danger risk problems. The hidden danger risk problems are compared with the data in the grid risk problem database, and the upcoming hidden danger problems are diverted and solved in time to achieve the technical effect of preventing them before they occur. BRIEF DESCRIPTION OF THE DRAWINGS

[0058] The drawings constituting a part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0059] Figure 1 A schematic diagram of a process of a method for identifying power grid equipment problem requirements based on artificial intelligence according to an embodiment of the present invention is shown;

[0060] Figure 2 A schematic diagram of a process for establishing a risk database for power grid equipment according to an embodiment of the present invention is shown;

[0061] Figure 3 A schematic diagram of a process for real-time monitoring of operation data of power grid equipment, screening hidden danger data from the operation data, and converting the hidden danger data into hidden danger risk problems corresponding to the hidden danger data is shown according to an embodiment of the present invention;

[0062] Figure 4 A schematic diagram of a device for identifying power grid equipment problem requirements based on artificial intelligence according to an embodiment of the present invention is shown;

[0063] Figure 5 A schematic diagram of a system for identifying power grid equipment problem requirements based on artificial intelligence provided according to an embodiment of the present invention is shown. DETAILED DESCRIPTION

[0064] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0065] like Figure 1 As shown, an embodiment of the present invention provides a method for identifying problem needs of power grid equipment based on artificial intelligence, including: S1: establishing a risk problem database of power grid equipment; S2: real-time monitoring of operating data of power grid equipment, screening out hidden danger data from the operating data, and converting the hidden danger data into hidden danger risk problems corresponding to the hidden danger data; S3: diverting hidden danger risk problems, and cleaning up the hidden danger risk problems after diversion processing.

[0066] The artificial intelligence grid equipment problem demand identification method provided by this embodiment is adopted. By establishing a complete grid risk problem database, the data appearing in the actual operation of the grid equipment is monitored, and the hidden danger data is converted into corresponding hidden danger risk problems. The hidden danger risk problems are compared with the data in the grid risk problem database, and the upcoming hidden danger problems are diverted and solved in time to achieve the technical effect of preventing them before they occur. Therefore, the technical solution provided by this embodiment can solve the technical problem that the existing technology cannot effectively eliminate the hidden danger problems of grid equipment during normal operation.

[0067] It should be noted that diversion processing can be understood as classifying the corresponding problems and diverting them to the corresponding specific production links and administrative levels, and then processing them through the corresponding staff or operating system.

[0068] Specifically, the process of establishing a risk problem database for power grid equipment includes obtaining risk problems of power grid equipment and problem data corresponding to the risk problems (including parameter values ​​such as voltage, current, temperature, no-load, overload, etc.).

[0069] Furthermore, the risk problem database includes specific risk parameters and risk problems corresponding to the corresponding risk parameters (such as overload problems). The risk problem database also includes the processing methods corresponding to the corresponding problem data, so that after finding the corresponding problem data, the corresponding processing method suggestions can be quickly obtained, so that the staff can confirm whether to clean up according to the corresponding processing method, which is convenient for the staff to perform corresponding operations.

[0070] Furthermore, in a preferred embodiment, the corresponding problem data in the risk problem database may correspond to multiple processing methods. For example, the same problem data may correspond to multiple processing methods.

[0071] like Figure 2 As shown, in this embodiment, establishing a risk problem database of power grid equipment includes: S11: collecting problem data of power grid equipment; S12: combining and classifying the problem data according to at least two different classification methods to obtain problem data packets of different categories; S13: summarizing the problem data packets of different categories to obtain a problem database. This method can facilitate the classification of risk problem data, so as to facilitate subsequent comparison with hidden danger data, thereby facilitating the accuracy of the judgment of hidden danger data.

[0072] Specifically, the problem data is combined and classified according to at least two different classification methods to obtain different categories of problem data packets, including: combined classification according to the application scenario of the power grid equipment and the administrative level to which the power grid equipment belongs; the application scenario of the power grid equipment includes: production operation, power consumption planning, infrastructure power consumption, business expansion and manual customer service, and the administrative level of the power grid equipment includes the district and county level, site level, branch line level, substation level and meter level; any link in the application scenario of the power grid equipment and any level in the administrative level of the power grid equipment are combined to form a combined category, and the problem data is divided into different categories of problem data packets according to the combined category. In this way, it is convenient to combine and classify according to the application scenario of the power grid equipment and the administrative level to which it belongs, so as to improve the classification accuracy of the risk problem data, and to quickly determine the category of the risk problem in the subsequent process, so as to perform the corresponding cleaning operation.

[0073] It should be noted that manual customer service is a separate scenario, and it is parallel to production operation, power consumption planning, etc. Because the use of power grid equipment will generate different data sets in different scenarios, we count the data in the form of data sets, and therefore list the manual customer service scenario separately.

[0074] In this embodiment, collecting problem data of power grid equipment includes: collecting problem data of power grid equipment in production operation, power consumption planning, infrastructure power consumption, business expansion and manual customer service, and storing it in the cloud or storage device. This method can effectively ensure the breadth of problem data collection, so as to fully collect enough problem data, so as to provide accurate basis for subsequent analysis and judgment.

[0075] Specifically, after collecting problem data of power grid equipment in the processes of production operation, power consumption planning, infrastructure power consumption, business expansion and manual customer service, the problem data in the processes of production operation, power consumption planning, infrastructure power consumption, business expansion and manual customer service can be screened and marked separately, and the problem data can be divided into different groups according to the processes of production operation, power consumption planning, infrastructure power consumption, business expansion and manual customer service.

[0076] It should be noted that the production and operation link mainly refers to the issues involved in the power grid equipment in the fields of factory industrial electricity consumption, household electricity consumption, and commercial electricity consumption; the electricity consumption planning link refers to the planning stage for future electricity consumption, which mainly involves the issues involved in the monitoring, regulation, and operation of the entire power system; the infrastructure electricity consumption refers to the issues involved in the electricity consumption link at construction sites during urban construction; the business expansion electricity consumption refers to the new electricity consumption scenarios involved, such as the issues involved in the power grid equipment in the field of new energy vehicles; the manual customer service mainly refers to the problems that are fed back during the operation of the power grid equipment.

[0077] It should be noted that the district and county-level power grid equipment involves the following problematic data:

[0078] Asset scale information, including the number of substations, number of transformers, transformer capacity, number of switches at each voltage level, number of 10kV feeders, etc.;

[0079] Load and user information, including current load, peak load this year, load during the same period, number of users, number and list of important and sensitive users, etc.;

[0080] Heavy overload information, including the number and list of heavy overload main transformers, 35kV and above, the number and list of heavy overload lines, the number and list of 10kV heavy overload lines, the number and list of 10kV heavy overload distribution transformers, etc.; low voltage information, mainly reflected in the number and list of low voltage buses, the number and list of low voltage areas, the number and list of low voltage customers, and the number and list of low voltage demands, etc.;

[0081] Power outage information; mainly reflected in the number and list of main power outage variables, the number and list of power outage lines, the number and list of 10kV power outage feeders, the number and list of 10kV power outage distribution variables, the number and list of power outage requests, etc.

[0082] It should be noted that the site-level problem data includes:

[0083] Asset scale information, mainly reflected in the number of transformers, transformer capacity, number of switches at each voltage level, number of 10kV feeders, etc.;

[0084] Load and user information, mainly reflected in the current load, peak load of this year, load during the same period, number of users, number and list of important and sensitive users, etc.;

[0085] Heavy overload information, including whether the main transformer is heavily overloaded, list, number and list of heavily overloaded lines of 35kV and above, number and list of heavily overloaded lines of 10kV, number and list of heavily overloaded distribution transformers of 10kV, number of days of heavy overload, maximum load, duration, etc.;

[0086] Low voltage information, mainly reflected in the number and list of low voltage buses, the number and list of low voltage areas, the number and list of low voltage customers, and the number and list of low voltage demands, etc.;

[0087] Project status, mainly reflected in the project status, etc.; Operation volume information, mainly reflected in the number of infrastructure and production construction ((in-station + lower-level line distribution transformer);

[0088] The power outage information is mainly reflected in the number and list of main power outage variables, the number and list of power outage lines, the number and list of 10kV power outage feeders, the number and list of 10kV power outage distribution variables, the number and list of power outage requests, etc.

[0089] It should be noted that the branch line-level problem data includes:

[0090] Asset scale information, mainly reflected in the name of the upper-level substation, line details, number of lower-level distribution transformers, etc.; load and user information, mainly reflected in the current load, peak load this year, load in the same period, number of users, number and list of important and sensitive users, etc.;

[0091] Heavy overload information, including whether the upper main transformer is heavily overloaded, whether the feeder is heavily overloaded, the number and list of 10kV heavily overloaded distribution transformers, the number of heavy overload days and the maximum load, duration, etc.; low voltage information, mainly reflected in whether the connected busbar is under voltage, the number and list of low voltage substations, the number and list of low voltage customers, low voltage demands and lists, etc.;

[0092] Project status, mainly reflected in the project status, etc.; Operation volume information, mainly reflected in the number of infrastructure and production construction ((in-station + lower-level line distribution transformer);

[0093] The power outage information is mainly reflected in the number and list of main power outage variables, the number and list of power outage lines, the number and list of 10kV power outage feeders, the number and list of 10kV power outage distribution variables, the number and list of power outage requests, etc.

[0094] It should be noted that the substation-level problem data includes:

[0095] Equipment ledger information, mainly reflected in the years of operation, branch switches, branch lines, line diameters, line lengths, switch settings, reactive power compensation devices, etc.;

[0096] Equipment monitoring information is mainly reflected in voltage and current data, load rate, three-phase imbalance rate, etc. Customer information is mainly reflected in customer files, customer demand information, power information, etc.

[0097] Project information, mainly reflected in project basic information, project progress information, etc.;

[0098] Supplementary information mainly includes operation information, line loss information, key user locations, etc.

[0099] Specifically, different types of problem data packets are aggregated to obtain a problem database, including: defining the problem data as ,in, =y means that the power grid equipment is classified according to the administrative level, which includes district and county level, site level, branch line level, substation level and meter level; y means that the power grid equipment is classified according to the production link, which includes production operation, power consumption planning, infrastructure power consumption, business expansion and manual customer service;

[0100] The data corresponding to the production operation link in the problem data is defined as ;

[0101] The data corresponding to the power consumption planning link in the problem data is defined as ;

[0102] The data corresponding to the infrastructure electricity consumption in the problem data is defined as ;

[0103] The data corresponding to the business expansion link in the problem data is defined as ;

[0104] The data corresponding to the manual customer service link in the problem data is defined as ;

[0105] The data corresponding to the district and county level in the problem data is defined as ;

[0106] The data corresponding to the site level in the problem data is defined as ;

[0107] The data corresponding to the branch level in the problem data is defined as ;

[0108] The data corresponding to the substation level in the problem data is defined as ;

[0109] The data corresponding to the meter level in the problem data is defined as ;

[0110] Arrange the problem data in a matrix form to form a problem database;

[0111] Among them, the matrix form of the problem data is:

[0112] .

[0113] This method can facilitate the classification and organization of problem data, so as to facilitate subsequent rapid judgment and classification.

[0114] like Figure 3 As shown, in this embodiment, the operation data of the power grid equipment is monitored, hidden danger data is screened out from the operation data, and the hidden danger data is converted into hidden danger risk problems corresponding to the hidden danger data, including: S21: monitoring the operation data of the power grid equipment during operation; S22: performing correction calculation on the operation data to generate corrected operation data; performing comparative calculation on the corrected operation data and the problem data in the problem database; S23: identifying the hidden danger data existing in the corrected operation data, and converting the hidden danger data into hidden danger risk problems corresponding to the hidden danger data; S24: identifying the group where the hidden danger risk problem is located according to the group where the problem data corresponding to the hidden danger data is located. Using such a method, it is convenient to accurately judge the hidden danger data, the hidden danger risk problems corresponding to the hidden danger data, and the groups corresponding to the hidden danger risk problems, so as to facilitate subsequent targeted and rapid processing.

[0115] Specifically, the operation data is corrected and calculated to generate corrected operation data, including:

[0116] Call running data;

[0117] The operation data calculation is corrected to the corrected operation data; the operation data calculation is corrected to the corrected operation data calculation formula as follows:

[0118] Define the running data as ;

[0119] Define the modified running data as ;

[0120] ;

[0121] ;

[0122] ;

[0123] in, is the correction factor; is the total number of question data; for and In this way, it is convenient to correct the operating data so as to obtain actual and accurate operating data, that is, corrected operating data.

[0124] It should be noted that the operating data here may be real-time data.

[0125] In this embodiment, the correction operation data and the problem data in the problem database are compared and calculated, including:

[0126] Will and Perform comparative calculations and define A as the risk parameter value corresponding to the risk problem. The calculation method is as follows:

[0127] ;

[0128] When A≥0, the corresponding corrected operation data is determined to be hidden danger data;

[0129] When A<0, it is determined that the corresponding corrected operating data is not hidden danger data. This method can facilitate accurate judgment of whether the corrected operating data is hidden danger data, thereby improving the accuracy of the judgment.

[0130] like Figure 4 As shown, the second embodiment of the present invention provides a device for identifying power grid equipment problem needs based on artificial intelligence, including a problem database module 01, an analysis and calculation module 02 and a diversion module 03. The problem database module 01 is used to store power grid risk problems and form a power grid risk problem database. The analysis and calculation module 02 is used to monitor the operation data of the power grid equipment in real time, filter out hidden danger data from the operation data, and convert the hidden danger data into hidden danger risk problems corresponding to the hidden danger data. The diversion module 03 is used to divert risk problems and then clean up the risk problems after diversion.

[0131] Specifically, the question database module 01 includes:

[0132] A collection unit, used to collect problem data of the power grid equipment during production operation, power consumption planning, infrastructure power consumption, business expansion and manual customer service, and store it in the cloud or storage device;

[0133] A screening and grouping unit, used to screen and mark problem data in the process of the production operation, the power consumption planning, the power consumption of the infrastructure, the business expansion and the manual customer service; used to divide the problem data into different groups according to the production operation, the power consumption planning, the power consumption of the infrastructure, the business expansion and the manual customer service;

[0134] A packaging unit, used for packaging the problem data in different groups to form a problem data packet;

[0135] The integration unit is used to form the problem database from a plurality of the problem data packets.

[0136] It should be noted that the screening and grouping unit includes:

[0137] A link classification subunit, which is used to classify the problem data according to different links of the production operation, the power consumption planning, the infrastructure power consumption, the business expansion and the manual customer service;

[0138] A level classification subunit, which is used to classify the problem data according to different administrative levels of the power grid equipment, into district and county level, site level, branch line level, substation level and meter level;

[0139] A definition subunit is used to define the problem data as ;

[0140] The matrix subunit arranges the problem data in a matrix as follows:

[0141] ;

[0142] Among them, the It represents the district and county level, the site level, the branch line level, the substation level and the meter level according to the administrative level division; y represents the different production links of the production operation, power consumption planning, infrastructure power consumption, business expansion and manual customer service that appear according to the different production links of the power grid equipment.

[0143] It should be noted that the district and county-level power grid equipment involves the following problematic data:

[0144] Asset scale information, including the number of substations, number of transformers, transformer capacity, number of switches at each voltage level, number of 10kV feeders, etc.;

[0145] Load and user information, including current load, peak load this year, load during the same period, number of users, number and list of important and sensitive users, etc.;

[0146] Heavy overload information, including the number and list of heavy overload main transformers, 35kV and above, the number and list of heavy overload lines, the number and list of 10kV heavy overload lines, the number and list of 10kV heavy overload distribution transformers, etc.; low voltage information, mainly reflected in the number and list of low voltage buses, the number and list of low voltage areas, the number and list of low voltage customers, and the number and list of low voltage demands, etc.;

[0147] Power outage information; mainly reflected in the number and list of main power outage variables, the number and list of power outage lines, the number and list of 10kV power outage feeders, the number and list of 10kV power outage distribution variables, the number and list of power outage requests, etc.

[0148] It should be noted that the site-level problem data includes:

[0149] Asset scale information, mainly reflected in the number of transformers, transformer capacity, number of switches at each voltage level, number of 10kV feeders, etc.;

[0150] Load and user information, mainly reflected in the current load, peak load of this year, load during the same period, number of users, number and list of important and sensitive users, etc.;

[0151] Heavy overload information, including whether the main transformer is heavily overloaded, list, number and list of heavily overloaded lines of 35kV and above, number and list of heavily overloaded lines of 10kV, number and list of heavily overloaded distribution transformers of 10kV, number of days of heavy overload, maximum load, duration, etc.;

[0152] Low voltage information, mainly reflected in the number and list of low voltage buses, the number and list of low voltage areas, the number and list of low voltage customers, and the number and list of low voltage demands, etc.;

[0153] Project status, mainly reflected in the project status, etc.; Operation volume information, mainly reflected in the number of infrastructure and production construction ((in-station + lower-level line distribution transformer);

[0154] The power outage information is mainly reflected in the number and list of main power outage variables, the number and list of power outage lines, the number and list of 10kV power outage feeders, the number and list of 10kV power outage distribution variables, the number and list of power outage requests, etc.

[0155] It should be noted that the branch line-level problem data includes:

[0156] Asset scale information, mainly reflected in the name of the upper-level substation, line details, number of lower-level distribution transformers, etc.; load and user information, mainly reflected in the current load, peak load this year, load in the same period, number of users, number and list of important and sensitive users, etc.;

[0157] Heavy overload information, including whether the upper main transformer is heavily overloaded, whether the feeder is heavily overloaded, the number and list of 10kV heavily overloaded distribution transformers, the number of heavy overload days and the maximum load, duration, etc.; low voltage information, mainly reflected in whether the connected busbar is under voltage, the number and list of low voltage substations, the number and list of low voltage customers, low voltage demands and lists, etc.;

[0158] Project status, mainly reflected in the project status, etc.; Operation volume information, mainly reflected in the number of infrastructure and production construction ((in-station + lower-level line distribution transformer);

[0159] The power outage information is mainly reflected in the number and list of main power outage variables, the number and list of power outage lines, the number and list of 10kV power outage feeders, the number and list of 10kV power outage distribution variables, the number and list of power outage requests, etc.

[0160] It should be noted that the substation-level problem data includes:

[0161] Equipment ledger information, mainly reflected in the years of operation, branch switches, branch lines, line diameters, line lengths, switch settings, reactive power compensation devices, etc.;

[0162] Equipment monitoring information is mainly reflected in voltage and current data, load rate, three-phase imbalance rate, etc. Customer information is mainly reflected in customer files, customer demand information, power information, etc.

[0163] Project information, mainly reflected in project basic information, project progress information, etc.;

[0164] Supplementary information mainly includes operation information, line loss information, key user locations, etc.

[0165] Wherein, y represents the different production links of the production operation, the power consumption planning, the power consumption of infrastructure, the business expansion and the manual customer service that appear according to the different production links of the power grid equipment;

[0166] The data corresponding to the production operation link in the problem data is defined as ;

[0167] The data corresponding to the power consumption planning link in the problem data is defined as ;

[0168] The data corresponding to the infrastructure electricity consumption in the problem data is defined as ;

[0169] The data corresponding to the business expansion link in the problem data is defined as ;

[0170] The data corresponding to the manual customer service link in the problem data is defined as ;

[0171] The data corresponding to the district and county level in the problem data is defined as ;

[0172] The data corresponding to the site level in the problem data is defined as ;

[0173] The data corresponding to the branch level in the problem data is defined as ;

[0174] The data corresponding to the substation level in the problem data is defined as ;

[0175] The data corresponding to the meter level in the problem data is defined as .

[0176] Specifically, the analysis and calculation module 02 includes: a monitoring unit, a correction and comparison unit, a conversion unit and an identification unit. The monitoring unit is used to monitor the real-time data of the power grid equipment during operation; the correction and comparison unit is used to perform correction calculations on the real-time data to generate corrected real-time data; and is used to perform comparison calculations on the corrected real-time data and the problem data in the problem database; the conversion unit is used to identify the hidden danger data existing in the corrected real-time data and convert the hidden danger data into risk problems; the identification unit is used to identify the group where the risk problem is located based on the group where the problem data is located.

[0177] Specifically, the workflows of the correction unit and the comparison unit are as follows:

[0178] calling the operation data;

[0179] The operation data is calculated and corrected to the corrected operation data; the operation data is calculated and corrected to the corrected operation data by the following calculation formula:

[0180] The real-time data is defined as ;

[0181] Define the modified real-time data as ;

[0182] = * ;

[0183] =1- ;

[0184] ;

[0185] in, is the correction factor; The total number of times the problem data is mentioned; for and The difference between

[0186] It should be noted that, due to inaccurate measurement or real-time error of the operating data, a correction system is introduced to correct the size of the operating data, so that the corrected operating data is more stable and accurate.

[0187] Will and For comparative calculation, define A as the risk problem, and the calculation method is as follows:

[0188] A= ;

[0189] When A , then identifying the hidden danger data;

[0190] When A When the data is found to be no hidden dangers, it is determined that there is no hidden danger data.

[0191] It should be noted that the modified real-time data is used here to compare with four-fifths of the problem data, so that when the modified real-time data is close to the problem data, an alarm or reminder is generated, so that problems can be discovered in time before they occur, so as to prevent them from happening. The * in the formula represents a multiplication sign.

[0192] like Figure 5 As shown, embodiment three of the present invention provides a system for identifying problems and needs of power grid equipment based on artificial intelligence, which includes: an apparatus 0331 for identifying problems and needs of power grid equipment based on artificial intelligence and a terminal device 0332, the terminal device 0332 is electrically connected to the apparatus 0331 for identifying problems and needs of power grid equipment based on artificial intelligence; the terminal device 0332 includes a display 03321 and a processor 03322, the display 03321 is used to display risk problems; the processor 03322 is electrically connected to the display 03321, and the processor 03322 is used to call the analysis and calculation module.

[0193] Embodiment 4 of the present invention provides a non-volatile storage medium, which stores a plurality of instructions, and the instructions are suitable for being loaded by a processor and executing the above-mentioned artificial intelligence-based power grid equipment problem demand identification method.

[0194] From the above description, it can be seen that the above embodiments of the present invention achieve the following technical effects: by establishing a complete grid risk problem database, the data generated during the actual operation of the grid equipment is monitored and converted into risk problems. The risk problems are compared with the data in the grid risk problem database, and the upcoming problems are solved in time, achieving the technical effect of preventing problems before they occur.

[0195] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.

[0196] Unless otherwise specifically stated, the relative arrangement, numerical expressions and numerical values ​​of the parts and steps set forth in these embodiments do not limit the scope of the application. Meanwhile, it should be understood that, for ease of description, the sizes of the various parts shown in the accompanying drawings are not drawn according to actual proportional relationships. The technology, methods and equipment known to those of ordinary skill in the relevant art may not be discussed in detail, but in appropriate cases, the technology, methods and equipment should be considered as a part of the specification. In all examples shown and discussed here, any specific value should be interpreted as being merely exemplary, rather than as a limitation. Therefore, other examples of exemplary embodiments may have different values. It should be noted that similar reference numerals and letters represent similar items in the following drawings, and therefore, once a certain item is defined in an accompanying drawing, it does not need to be further discussed in subsequent drawings.

[0197] In the description of the present application, it should be understood that the directions or positional relationships indicated by directional words such as "front, back, up, down, left, right", "lateral, vertical, perpendicular, horizontal" and "top, bottom" are usually based on the directions or positional relationships shown in the drawings, and are only for the convenience of describing the present application and simplifying the description. Unless otherwise specified, these directional words do not indicate or imply that the device or element referred to must have a specific direction or be constructed and operated in a specific direction, and therefore cannot be understood as limiting the scope of protection of the present application; the directional words "inside and outside" refer to the inside and outside relative to the contours of each component itself.

[0198] For ease of description, spatially relative terms such as "above", "above", "on the upper surface of", "above", etc. may be used here to describe the spatial positional relationship between a device or feature and other devices or features as shown in the figure. It should be understood that spatially relative terms are intended to include different orientations of the device in use or operation in addition to the orientation described in the figure. For example, if the device in the accompanying drawings is inverted, the device described as "above other devices or structures" or "above other devices or structures" will be positioned as "below other devices or structures" or "below other devices or structures". Thus, the exemplary term "above" can include both "above" and "below". The device can also be positioned in other different ways (rotated 90 degrees or in other orientations), and the spatially relative descriptions used here are interpreted accordingly.

[0199] In addition, it should be noted that the use of terms such as "first" and "second" to limit components is only for the convenience of distinguishing the corresponding components. Unless otherwise stated, the above terms have no special meaning and therefore cannot be understood as limiting the scope of protection of this application.

[0200] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for identifying power grid equipment problem requirements based on artificial intelligence, characterized in that: include: Establish a risk database for power grid equipment; Performing real-time monitoring on the operation data of the power grid equipment, screening out hidden danger data from the operation data, and converting the hidden danger data into hidden danger risk problems corresponding to the hidden danger data; The hidden danger risk problems are diverted and processed, and the hidden danger risk problems after the diversion processing are cleared.

2. The method for identifying power grid equipment problem requirements based on artificial intelligence according to claim 1 is characterized in that: The step of establishing a risk database for power grid equipment includes: Collecting problem data of the power grid equipment; Combining and classifying the problem data according to at least two different classification methods to obtain problem data packets of different categories; The problem data packets of different categories are aggregated to obtain the risk problem database.

3. The method for identifying power grid equipment problem requirements based on artificial intelligence according to claim 2 is characterized in that: The step of combining and classifying the problem data according to at least two different classification methods to obtain problem data packets of different categories includes: The power grid equipment is classified according to its application scenarios and the administrative levels to which it belongs; the application scenarios of the power grid equipment include: production operation, power consumption planning, infrastructure power consumption, business expansion and manual customer service; the administrative levels of the power grid equipment include district and county level, site level, branch line level, substation level and meter level; Any link in the application scenario of the power grid device and any level in the administrative hierarchy of the power grid device are combined to form a combination category, and the problem data are divided into different categories of problem data packets according to the combination category.

4. The method for identifying power grid equipment problem requirements based on artificial intelligence according to claim 2 is characterized in that: The collecting of problem data of the power grid equipment includes: Collect problem data of the power grid equipment during production operation, power consumption planning, infrastructure power consumption, business expansion and manual customer service, and store it in the cloud or storage device.

5. The method for identifying power grid equipment problem requirements based on artificial intelligence according to claim 3 is characterized in that: The step of aggregating the problem data packets of different categories to obtain the risk problem database includes: The problem data is defined as ,in, =y indicates that the power grid equipment is classified according to the administrative level, which includes the district and county level, the site level, the branch line level, the substation level and the meter level; y indicates that the power grid equipment is classified according to the production link, which includes the production operation, the power consumption planning, the infrastructure power consumption, the business expansion and the manual customer service; The data corresponding to the link of the production operation in the problem data is defined as ; The data in the problem data corresponding to the link of the power consumption planning is defined as ; The data corresponding to the infrastructure electricity consumption in the problem data is defined as ; The data corresponding to the business expansion link in the problem data is defined as ; The data corresponding to the manual customer service link in the problem data is defined as ; The data corresponding to the district and county level in the problem data is defined as ; The data corresponding to the site level in the problem data is defined as ; The data corresponding to the branch level in the problem data is defined as ; The data corresponding to the substation level in the problem data is defined as ; The data corresponding to the meter level in the problem data is defined as ; Arranging the question data in a matrix form to form the question database; Among them, the matrix form of the problem data is: 。 6. The method for identifying power grid equipment problem requirements based on artificial intelligence according to claim 5 is characterized in that: The step of monitoring the operation data of the power grid equipment, screening out hidden danger data from the operation data, and converting the hidden danger data into hidden danger risk problems corresponding to the hidden danger data includes: Monitoring the operation data of the power grid equipment during operation; Performing correction calculation on the operating data to generate corrected operating data; performing comparative calculation on the corrected operating data and the problem data in the problem database; Identifying hidden danger data existing in the corrected operation data, and converting the hidden danger data into hidden danger risk problems corresponding to the hidden danger data; According to the group to which the problem data corresponding to the hidden danger data belongs, the group to which the hidden danger risk problem belongs is identified.

7. The method for identifying power grid equipment problem requirements based on artificial intelligence according to claim 6 is characterized in that: The performing correction calculation on the operating data to generate corrected operating data includes: calling the operation data; The operation data is calculated and corrected to the corrected operation data; the operation data is calculated and corrected to the corrected operation data by the following calculation formula: The operating data is defined as ; The modified operation data is defined as ; ; ; ; in, is the correction factor; The total number of times the problem data is mentioned; For the and stated The difference between .

8. The method for identifying power grid equipment problem requirements based on artificial intelligence according to claim 7 is characterized in that: The comparing and calculating the corrected operation data with the problem data in the problem database includes: Will and Perform comparative calculations and define A as the risk parameter value corresponding to the risk problem. The calculation method is as follows: ; When A≥0, the corresponding corrected operating data is determined to be the hidden danger data; When A<0, it is determined that the corresponding corrected operating data is not hidden danger data.

9. A device for identifying power grid equipment problem requirements based on artificial intelligence, characterized in that: include: A problem database module is used to store power grid risk problems and form a power grid risk problem database; An analysis and calculation module, used to monitor the operation data of the power grid equipment in real time, filter out hidden danger data from the operation data, and convert the hidden danger data into hidden danger risk problems corresponding to the hidden danger data; The diversion module is used to perform diversion processing on the risk issues and then clean up the risk issues after the diversion processing.

10. A non-volatile storage medium, characterized in that: The non-volatile storage medium stores a plurality of instructions, and the instructions are suitable for being loaded by a processor and executing the artificial intelligence-based power grid equipment problem demand identification method described in any one of claims 1 to 8.

Citation Information

Patent Citations

  • Data-driven power distribution network engineering whole-process management and control method

    CN110110963A

  • Intensive marketing data processing method and system

    CN117291649A

  • Intelligent monitoring and early warning method for operation state of power grid

    CN117595504A

  • Decision-making assistance system, decision-making assistance method

    WO2021152894A1