Project budget management method, system and equipment for project supervision and medium

The decision tree model and genetic algorithm are used to analyze the budget document of the engineering project and generate a budget cost comparison table, which solves the problems of inefficient budget management and inaccurate cost control in the existing technology, and achieves efficient cost control and budget adjustment of the project.

CN118735701APending Publication Date: 2024-10-01ZHONGZI HIGHWAY ENGINEERING SUPERVISION CONSULTING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410812791.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-22
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

Existing project budget management methods rely on manual preparation of budget forms and manual tracking of cost data, resulting in a heavy workload, error-prone, difficulty in achieving real-time monitoring and dynamic adjustment, and inability to adapt to complex and ever-changing engineering environments, resulting in insufficient cost control accuracy.

Method used

Using a decision tree model combined with a genetic algorithm, the project budget is obtained for analysis, a budget cost comparison table is generated, and the budget plan is adjusted based on actual costs to ensure that the project is completed within the budget.

Benefits of technology

It improves the accuracy and efficiency of project budget management, can detect and resolve cost deviations in a timely manner, ensures that the project is completed within a controllable cost range, and provides targeted cost optimization measures and budget adjustment plans.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118735701A_ABST
    Figure CN118735701A_ABST
Patent Text Reader

Abstract

The invention relates to a project budget management method, system and device for project supervision and a medium. The method comprises the steps of obtaining a budget book of an engineering project; transmitting the budget book to the trained decision tree model for analysis and calculation to obtain a corresponding budget cost; acquiring actual cost, and generating an engineering cost comparison table based on the budget cost and the actual cost; and generating a project budget adjustment scheme according to the project cost comparison table. The method has the effect of improving the project budgeting efficiency and precision.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of engineering supervision, and in particular to a project budget management method, system, equipment and medium for engineering supervision. Background Art

[0002] At present, with the rapid development of the engineering construction industry, engineering supervision plays an increasingly important role in ensuring engineering quality, controlling engineering progress and costs. As the core link of engineering supervision, project budget management is directly related to the economic benefits and success of engineering projects. Existing project budget management methods mainly rely on manual preparation of budget tables and manual tracking of cost data. These methods are not only labor-intensive and error-prone, but also difficult to achieve real-time monitoring and dynamic adjustment of budget data.

[0003] The above-mentioned existing technical solutions have the following defects: the budget preparation process is cumbersome and inefficient, the cost control accuracy is insufficient, the data processing capacity is limited, and it cannot adapt to the complex and changing engineering environment. Therefore, there is room for improvement. Summary of the invention

[0004] In order to improve the efficiency and accuracy of project budget preparation, the present application provides a project budget management method, system, device and medium for engineering supervision.

[0005] The above-mentioned invention objective of the present application is achieved through the following technical solutions: A project budget management method for engineering supervision, the project budget management method for engineering supervision comprising: Obtain budget for engineering projects; The budget is transferred to the trained decision tree model for analysis and calculation to obtain the corresponding budget cost; Acquire the actual cost, and generate a project cost comparison table based on the budget cost and the actual cost; A project budget adjustment plan is generated based on the project cost comparison table.

[0006] By adopting the above technical solution, obtaining the budget of the engineering project can help understand the economic status, cost structure and financial plan of the project, so as to make a decision on whether to continue to promote the project. The budget can also serve as an important reference for project management, helping the project team to control the budget and manage costs, ensuring that the project proceeds as planned and is completed within the budget; the budget contains a large amount of data and information, and the decision tree model can use this information for analysis and calculation. The model will predict the budget cost of the project based on the various cost estimates, financial plans and other information in the budget, helping relevant parties understand the economic status and cost structure of the project, thereby improving the accuracy and efficiency of budget management, and facilitating the smooth implementation and cost control of the project; by generating an engineering cost comparison table, you can clearly understand the budget execution and cost control of the project. If the actual cost exceeds the budgeted cost, it may be necessary to adjust the project or take measures to control the cost to ensure the smooth implementation of the project and its completion within the budget. This comparative analysis can also provide lessons and reference for the budget formulation of similar projects in the future, helping to improve the accuracy and effectiveness of the budget; based on the engineering cost comparison table that has been generated, according to the differences and analysis results in the cost comparison table, formulate targeted cost optimization measures, re-evaluate the allocation of various project costs based on the actual cost situation, and reallocate the budget to ensure that funds are used more reasonably and efficiently.

[0007] In a preferred example, the present application may be further configured as follows: before transmitting the budget to the trained decision tree model for analysis and calculation to obtain the corresponding budget cost, obtaining the trained decision tree model includes: Acquire historical project data, the historical project data including information such as historical budget cost, historical project scale, historical project region, historical project industry type, etc., and clean the historical project data to obtain an initial data set; Using a decision tree algorithm to build a basic model, using the initial data set to train the basic model, to obtain a decision tree model learned by the data; The decision tree model learned through data is optimized by using a genetic algorithm to obtain the trained decision tree model.

[0008] By adopting the above technical solution, it is necessary to first obtain historical project data, including historical budget costs, project scale, project region, industry type and other information, and then clean these data, including processing missing values, outliers and duplicate values, to obtain a clean initial data set; use the decision tree algorithm to build a basic model. The decision tree is a classification algorithm based on a tree structure. By selecting the best features in the data set for segmentation, a series of decision rules are constructed to achieve classification or regression prediction of samples; the constructed basic decision tree model is trained using the initial data set. During the training process, the model will learn the characteristics and laws of historical project data, so that it can accurately predict or classify new project data; the decision tree model that has been learned from the data is optimized using a genetic algorithm. The genetic algorithm is an optimization algorithm that simulates the biological evolution process. By iterating the decision tree model in the evolution process, the structure and parameters of the model are optimized, thereby improving the performance and generalization ability of the model.

[0009] In a preferred example, the present application can be further configured as follows: the budget is transmitted to a trained decision tree model for analysis and calculation, and the corresponding budget cost is obtained, including: The budget is transmitted to the trained decision tree model, and project parameters are obtained from the budget, wherein the project parameters include project engineering quantity, project cost, project type and the region where the project is located; The trained decision tree model is used to query and analyze the project parameters to obtain the corresponding budget cost and generate a budget cost analysis report.

[0010] By adopting the above technical solution, first, the project budget data is transferred to the trained decision tree model. These budget data include parameters such as project engineering volume, project cost, project type and location; the project parameters are queried and analyzed using the trained decision tree model. In this process, the model will predict the corresponding budget cost based on the characteristics and rules of the project parameters and the historical data information learned previously. According to the prediction results of the decision tree model, a budget cost analysis report is generated, so that the budget cost of the project can be predicted quickly and accurately, and a decision reference can be provided for project managers.

[0011] In a preferred example, the present application may be further configured as follows: the obtaining of the actual cost, based on the budget cost and the actual cost, generating a project cost comparison table includes: Compare the actual cost with the budgeted cost, analyze the deviation value of each cost, and obtain the cost comparison result; The cost comparison results are formed into a table using a data visualization tool, namely the engineering cost comparison table.

[0012] By adopting the above technical solution, first of all, it is necessary to collect and organize the actual project cost data, including various fees, expenditures and expenses, and then compare these actual costs with the budget costs previously predicted by the decision tree model. By comparing the actual costs and the budget costs, the deviation values ​​between the various costs can be calculated, that is, the difference between the actual costs and the budget costs. Using data visualization tools, the cost comparison results are presented in the form of a table to form an engineering cost comparison table, which helps to timely discover and solve problems in project cost management, optimize cost control strategies, and ensure that the project is efficiently executed within the budget.

[0013] In a preferred example, the present application may be further configured as follows: generating a project budget adjustment plan according to the project cost comparison table includes: Analyze the cost comparison results and determine the specific items and amounts of cost deviations; The project budget adjustment plan is generated based on the specific items and amounts of the cost deviation, combined with market conditions and construction environment data.

[0014] By adopting the above technical solution and analyzing the project cost comparison table, it is possible to determine which specific projects’ actual costs deviate from the budgeted costs, as well as the amount of the deviation. The actual market conditions and construction environment, such as fluctuations in raw material prices, labor supply and demand, weather conditions and other factors can be considered. According to the cost deviation of specific projects and amounts, combined with market conditions and construction environment data, a project budget adjustment plan can be formulated, which will help to respond to cost deviations in a timely manner, avoid cost overruns or waste, and ensure that the project is completed within a controllable cost range.

[0015] In a preferred example, the present application can be further configured as follows: the project budget management method for engineering supervision also includes: Adjusting the trained decision tree model according to the progress of the engineering project and the actual cost; Acquire user feedback information, adjust the project budget adjustment plan according to the user's authority level, and transmit the adjusted project budget adjustment plan to the user end.

[0016] By adopting the above technical solution, the previously trained decision tree model is adjusted according to the actual progress and actual cost data of the engineering project, which includes updating the input parameters and weights of the model to enable it to more accurately predict future project costs, thereby better guiding project management and budget control, interacting with users, and collecting their feedback on the current engineering budget adjustment plan. Users may provide feedback on the effectiveness of the plan, the feasibility of implementation, and the degree of compliance with project goals. The engineering budget adjustment plan is adjusted according to the user's authority level and feedback information, which helps to improve the implementation effect of the plan and user satisfaction, and promote the smooth progress of the project.

[0017] The second object of the invention is achieved by the following technical solutions: A project budget management system for engineering supervision, the project budget management system for engineering supervision comprising: The module for obtaining the budget is used to obtain the budget of the engineering project; A budget cost calculation module is used to transfer the budget to a trained decision tree model for analysis and calculation to obtain the corresponding budget cost; A cost table generation module is used to obtain the actual cost and generate a project cost comparison table based on the budget cost and the actual cost; The adjustment plan generation module is used to generate a project budget adjustment plan based on the project cost comparison table.

[0018] By adopting the above technical solution, obtaining the budget of the engineering project can help understand the economic status, cost structure and financial plan of the project, so as to make a decision on whether to continue to promote the project. The budget can also serve as an important reference for project management, helping the project team to control the budget and manage costs, ensuring that the project proceeds as planned and is completed within the budget; the budget contains a large amount of data and information, and the decision tree model can use this information for analysis and calculation. The model will predict the budget cost of the project based on the various cost estimates, financial plans and other information in the budget, helping relevant parties understand the economic status and cost structure of the project, thereby improving the accuracy and efficiency of budget management, and facilitating the smooth implementation and cost control of the project; by generating an engineering cost comparison table, you can clearly understand the budget execution and cost control of the project. If the actual cost exceeds the budgeted cost, it may be necessary to adjust the project or take measures to control the cost to ensure the smooth implementation of the project and its completion within the budget. This comparative analysis can also provide lessons and reference for the budget formulation of similar projects in the future, helping to improve the accuracy and effectiveness of the budget; based on the engineering cost comparison table that has been generated, according to the differences and analysis results in the cost comparison table, formulate targeted cost optimization measures, re-evaluate the allocation of various project costs based on the actual cost situation, and reallocate the budget to ensure that funds are used more reasonably and efficiently.

[0019] The third objective of the present application is achieved through the following technical solutions: A computer device includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the steps of the project budget management method for engineering supervision are implemented.

[0020] The fourth objective of the present application is achieved through the following technical solutions: A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the project budget management method for engineering supervision.

[0021] In summary, the present application includes at least one of the following beneficial technical effects: 1. Obtaining the budget of the engineering project can help understand the economic status, cost structure and financial plan of the project, so as to make a decision on whether to continue to promote the project. The budget can also serve as an important reference for project management, helping the project team to control the budget and manage costs, and ensure that the project proceeds as planned and is completed within the budget. The budget contains a large amount of data and information, and the decision tree model can use this information for analysis and calculation. The model will predict the budget cost of the project based on the cost estimates, financial plans and other information in the budget, and help relevant parties understand the economic status and cost structure of the project, thereby improving the accuracy and efficiency of budget management, and facilitating the smooth implementation of the project and cost control. By generating an engineering cost comparison table, you can clearly understand the budget execution and cost control of the project. If the actual cost exceeds the budget cost, it may be necessary to adjust the project or take measures to control the cost to ensure that the project is implemented smoothly and completed within the budget. This comparative analysis can also provide lessons and reference for the budget formulation of similar projects in the future, helping to improve the accuracy and effectiveness of the budget; based on the generated engineering cost comparison table, according to the differences and analysis results in the cost comparison table, formulate targeted cost optimization measures, re-evaluate the allocation of various project costs according to the actual cost situation, and reallocate the budget to ensure that the funds are used more reasonably and efficiently; 2. By analyzing the project cost comparison table, we can determine which specific projects’ actual costs deviate from the budgeted costs, as well as the amount of the deviation. Taking into account the actual market conditions and construction environment, such as raw material price fluctuations, labor supply and demand, weather conditions and other factors, we can formulate a project budget adjustment plan based on the cost deviation of specific projects and amounts, combined with market conditions and construction environment data, so as to help respond to cost deviations in a timely manner, avoid cost overruns or waste, and ensure that the project is completed within a controllable cost range; 3. According to the actual progress and actual cost data of the engineering project, the previously trained decision tree model is adjusted, which includes updating the input parameters and weights of the model to enable it to more accurately predict future project costs, thereby better guiding project management and budget control, interacting with users, and collecting their feedback on the current engineering budget adjustment plan. Users may provide feedback on the effectiveness of the plan, the feasibility of implementation, and the degree of compliance with project goals. The engineering budget adjustment plan is adjusted according to the user's authority level and feedback information, which helps to improve the implementation effect of the plan and user satisfaction, and promote the smooth progress of the project. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 is a flow chart of a project budget management method for engineering supervision in one embodiment of the present application; Figure 2is another implementation flow chart of step S20 in the project budget management method for engineering supervision in one embodiment of the present application; Figure 3 is a flowchart for implementing step S20 in a project budget management method for engineering supervision in an embodiment of the present application; Figure 4 is a flowchart for implementing step S30 in a project budget management method for engineering supervision in an embodiment of the present application; Figure 5 is a flowchart for implementing step S40 in a project budget management method for engineering supervision in an embodiment of the present application; Figure 6 is another implementation flow chart of a project budget management method for engineering supervision in one embodiment of the present application; Figure 7 This is a principle block diagram of a project budget management system for engineering supervision in one embodiment of the present application; Figure 8 It is a schematic diagram of a device in an embodiment of the present application. DETAILED DESCRIPTION

[0023] The present application is further described in detail below in conjunction with the accompanying drawings.

[0024] In one embodiment, if Figure 1 As shown, the present application discloses a project budget management method for engineering supervision, which specifically includes the following steps: S10: Obtain the budget of the project.

[0025] Specifically, obtain a budget report or document for a project. The budget usually contains the financial details of the project, such as the type of project, budget allocation for each stage or part, source of funds, expected expenditures, etc. It provides a detailed overview of the financial planning of the project to help quickly understand and analyze the content and plan of the project.

[0026] S20: The budget is transferred to the trained decision tree model for analysis and calculation to obtain the corresponding budget cost.

[0027] Specifically, the data in the budget is input into a trained decision tree model. The trained decision tree model makes predictions or classifications by learning the patterns in the training data. The decision tree model has been trained by analyzing historical budget data and actual expenditure data to learn how to predict budget costs based on the content of the budget. Finally, the trained decision tree model obtains the budget costs of the corresponding projects by analyzing the project parameters in the budget to improve the accuracy and efficiency of budget management.

[0028] S30: Obtain the actual cost and generate a project cost comparison table based on the budget cost and the actual cost.

[0029] Specifically, list each stage or cost item of the project, such as material costs, labor costs, equipment costs, etc. List the budget cost of each stage or cost item, that is, the cost planned when the project started, list the actual cost of each stage or cost item, that is, the actual cost incurred by the project, compare the budget cost and the actual cost, calculate the cost difference of each stage or cost item, that is, the difference between the actual cost and the budgeted cost, and generate an engineering cost comparison table.

[0030] S40: Generate a project budget adjustment plan based on the project cost comparison table.

[0031] Specifically, based on the differences and analysis results in the cost comparison table, formulate targeted cost optimization measures, such as optimizing resource utilization, adjusting procurement methods, cost control strategies, etc.; based on the actual cost situation, re-evaluate the allocation of various project costs, and reallocate the budget to ensure that funds are used more reasonably and efficiently. If the actual cost exceeds the original budget, project change management may be required, such as adjusting the project scope, re-evaluating project goals, etc., to adapt to the new budget situation.

[0032] By adopting the above technical solution, obtaining the budget of the engineering project can help understand the economic status, cost structure and financial plan of the project, so as to make a decision on whether to continue to promote the project. The budget can also serve as an important reference for project management, helping the project team to control the budget and manage costs, ensuring that the project proceeds as planned and is completed within the budget; the budget contains a large amount of data and information, and the decision tree model can use this information for analysis and calculation. The model will predict the budget cost of the project based on the various cost estimates, financial plans and other information in the budget, helping relevant parties understand the economic status and cost structure of the project, thereby improving the accuracy and efficiency of budget management, and facilitating the smooth implementation and cost control of the project; by generating an engineering cost comparison table, you can clearly understand the budget execution and cost control of the project. If the actual cost exceeds the budgeted cost, it may be necessary to adjust the project or take measures to control the cost to ensure the smooth implementation of the project and its completion within the budget. This comparative analysis can also provide lessons and reference for the budget formulation of similar projects in the future, helping to improve the accuracy and effectiveness of the budget; based on the engineering cost comparison table that has been generated, according to the differences and analysis results in the cost comparison table, formulate targeted cost optimization measures, re-evaluate the allocation of various project costs based on the actual cost situation, and reallocate the budget to ensure that funds are used more reasonably and efficiently.

[0033] In one embodiment, if Figure 2 As shown, in step S10, that is, before the budget is transmitted to the trained decision tree model for analysis and calculation to obtain the corresponding budget cost, obtaining the trained decision tree model specifically includes: S201: Acquire historical project data, which includes information such as historical budget cost, historical project scale, historical project region, and historical project industry type, and clean the historical project data to obtain an initial data set.

[0034] Specifically, historical project data is obtained, including information such as historical budget costs, project scale, project region, industry type, etc., and then these data are cleaned, including processing missing values, outliers, and duplicate values, to obtain a clean initial data set so that it can be effectively used in subsequent steps.

[0035] S202: Build a basic model using a decision tree algorithm, and train the basic model using an initial data set to obtain a decision tree model learned from the data.

[0036] Specifically, a decision tree algorithm is used to build a basic model. The decision tree is a classification algorithm based on a tree structure. It selects the best features in the data set for segmentation and constructs a series of decision rules to achieve classification or regression prediction of samples. The constructed basic decision tree model is trained using the acquired initial data set. During the training process, the model will learn the characteristics and rules of historical project data, and finally obtain a decision tree model learned by data.

[0037] S203: Optimizing the decision tree model learned through data using a genetic algorithm to obtain a trained decision tree model.

[0038] Specifically, a genetic algorithm is used to optimize the decision tree model that has been learned through data. The genetic algorithm is an optimization algorithm that simulates the biological evolution process. By iterating the decision tree model in the evolutionary process, the structure and parameters of the model are optimized. After the decision tree model is optimized, the performance and generalization ability of the decision tree model can be improved, so that the model can process data more quickly and accurately.

[0039] In one embodiment, if Figure 3 As shown, in step S20, the budget is transmitted to the trained decision tree model for analysis and calculation to obtain the corresponding budget cost, which specifically includes: S21: The budget is transferred to the trained decision tree model, and project parameters are obtained from the budget. The project parameters include project quantity, project cost, project type, and the region where the project is located.

[0040] Specifically, the budget containing project information is input into the trained decision tree model, and project parameters are obtained from the budget. The project parameters include project workload, project cost, project type, and the region where the project is located, such as the scale of the project, the amount of materials used, labor, materials, machinery usage fees, etc.

[0041] S22: Use the trained decision tree model to query and analyze the project parameters, obtain the corresponding budget cost, and generate a budget cost analysis report.

[0042] Specifically, when the project parameters are obtained, the decision tree model will query and analyze the project parameters, make decisions and predictions based on the given input parameters, analyze the relationships and patterns between the parameters, predict the budget cost of the project, and generate a budget cost analysis report based on the analysis results of the decision tree model. The cost analysis report includes the predicted value of the budget cost and the specific cost regulations corresponding to each project.

[0043] In one embodiment, if Figure 4 As shown, in step S30, the actual cost is obtained, and a project cost comparison table is generated based on the budget cost and the actual cost, which specifically includes: S31: Compare the actual cost with the budget cost, analyze the deviation value of each cost, and obtain the cost comparison result.

[0044] Specifically, the actual costs incurred, including various fees, expenditures and expenses, are collected, and then these actual costs are compared with the budget costs previously predicted by the decision tree model. By comparing the actual costs with the budget costs, the deviation values ​​between the various costs can be calculated, that is, the difference between the actual costs and the budget costs. These deviation values ​​can reflect the cost control situation during the project execution process, indicating which aspects deviate from expectations and which aspects perform well, and obtain cost comparison results.

[0045] S32: Use data visualization tools to form a table of cost comparison results, i.e., a project cost comparison table.

[0046] Specifically, data visualization tools are used to present the cost comparison results in a table to form an engineering cost comparison table. The table will clearly show the actual value, budget value and corresponding deviation value of each cost, helping managers to intuitively understand the execution of project costs, thereby helping to promptly discover and solve problems in project cost management, optimize cost control strategies, and ensure efficient execution of projects within the budget.

[0047] In one embodiment, if Figure 5 As shown, in step S40, a project budget adjustment plan is generated according to the project cost comparison table, which specifically includes: S41: Analyze the cost comparison results and determine the specific items and amounts of cost deviations.

[0048] Specifically, by analyzing the engineering cost comparison table, we can determine which specific projects' actual costs deviate from the budgeted costs, as well as the amount of the deviation. These projects involve material costs, labor costs, equipment rentals, etc.

[0049] S42: Generate a project budget adjustment plan based on the specific items and amounts of cost deviations, combined with market conditions and construction environment data.

[0050] Specifically, based on the cost deviation of specific projects and amounts, combined with market conditions and construction environment data, and taking into account the actual market conditions and construction environment, such as fluctuations in raw material prices, labor supply and demand, weather conditions and other factors, formulate an engineering budget adjustment plan, including adjusting material procurement strategies, optimizing labor allocation plans, re-evaluating equipment usage plans and other measures to minimize cost deviations and ensure the smooth progress of the project.

[0051] In one embodiment, if Figure 6 As shown, in step S50, the project budget management method for engineering supervision further includes: S51: Adjust the trained decision tree model according to the progress and actual cost of the project.

[0052] Specifically, based on the actual progress and actual cost data of the engineering project, the previously trained decision tree model is adjusted, including updating the model's input parameters and weights, so that it can more accurately predict future project costs, thereby better guiding project management and budget control.

[0053] S52: Obtain user feedback information, adjust the project budget adjustment plan according to the user's authority level, and transmit the adjusted project budget adjustment plan to the user end.

[0054] Specifically, collect user feedback on the current project budget adjustment plan, such as feedback on the effectiveness of the plan, the feasibility of implementation, and the degree of compliance with project goals. Adjust the project budget adjustment plan based on the user's authority level and feedback information. Users with different authority levels may have different needs and concerns, so the adjusted plan needs to take these differences into account to meet the specific needs of users. The adjusted project budget adjustment plan will be transmitted to the user end for relevant personnel to review and use.

[0055] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.

[0056] In one embodiment, a project budget management system for engineering supervision is provided, and the project budget management system for engineering supervision corresponds one-to-one with the project budget management method for engineering supervision in the above embodiment. Figure 7 As shown, the project budget management system for engineering supervision includes a budget acquisition module, a budget cost calculation module, a cost table generation module and an adjustment plan generation module. The detailed description of each functional module is as follows: The module for obtaining the budget is used to obtain the budget of the engineering project; The budget cost calculation module is used to transfer the budget to the trained decision tree model for analysis and calculation to obtain the corresponding budget cost; Generate cost table module, which is used to obtain actual cost and generate engineering cost comparison table based on budget cost and actual cost; The adjustment plan generation module is used to generate a project budget adjustment plan based on the project cost comparison table.

[0057] Optionally, the project budget management system for engineering supervision also includes: The model adjustment module is used to adjust the trained decision tree model according to the progress and actual cost of the engineering project; The display module is used to obtain user feedback information, adjust the project budget adjustment plan according to the user's authority level, and transmit the adjusted project budget adjustment plan to the user end.

[0058] The historical data acquisition module is used to acquire historical project data, including historical budget costs, historical project scales, historical project regions, historical project industry types, and other information, and clean the historical project data to obtain the initial data set; The training model module is used to build a basic model using a decision tree algorithm, and train the basic model using an initial data set to obtain a decision tree model learned by the data; The model optimization module is used to optimize the decision tree model learned through data using a genetic algorithm to obtain a trained decision tree model.

[0059] Optional, calculate budget cost module includes: The submodule for obtaining project parameters is used to transfer the budget to the trained decision tree model and obtain project parameters from the budget. The project parameters include project quantity, project cost, project type and the region where the project is located. The report generation submodule is used to use the trained decision tree model to query and analyze project parameters, obtain the corresponding budget cost, and generate a budget cost analysis report.

[0060] Optionally, the module for generating cost tables includes: The comparison submodule is used to compare the actual cost with the budgeted cost, analyze the deviation value of each cost, and obtain the cost comparison result; The table generation submodule is used to use data visualization tools to form the cost comparison results into a table, namely, the engineering cost comparison table.

[0061] Optionally, the module for generating an adjustment plan includes: The deviation determination submodule is used to analyze the cost comparison results and determine the specific items and amounts of cost deviations; The adjustment plan determination submodule is used to generate a project budget adjustment plan based on the specific items and amounts of cost deviations, combined with market conditions and construction environment data.

[0062] For the specific definition of the project budget management system for engineering supervision, please refer to the definition of the project budget management method for engineering supervision mentioned above, which will not be repeated here. Each module in the above-mentioned project budget management system for engineering supervision can be implemented in whole or in part by software, hardware and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.

[0063] In one embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Figure 8 As shown. The computer device includes a processor, a memory, a network interface and a database connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a project budget management method for engineering supervision is implemented.

[0064] In one embodiment, a computer device is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the following steps when executing the computer program: Obtain budget for engineering projects; The budget is transferred to the trained decision tree model for analysis and calculation to obtain the corresponding budget cost; Obtain actual costs and generate a project cost comparison table based on budget costs and actual costs; Generate a project budget adjustment plan based on the project cost comparison table.

[0065] In one embodiment, a computer readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented: Obtain budget for engineering projects; The budget is transferred to the trained decision tree model for analysis and calculation to obtain the corresponding budget cost; Obtain actual costs and generate a project cost comparison table based on budget costs and actual costs; Generate a project budget adjustment plan based on the project cost comparison table.

[0066] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application may include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in various forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).

[0067] Those skilled in the art will clearly understand that for the sake of convenience and brevity of description, only the division of the above-mentioned functional units and modules is used as an example. In actual applications, the above-mentioned functions can be distributed and completed by different functional units and modules as needed, that is, the internal structure of the system can be divided into different functional units or modules to complete all or part of the functions described above.

[0068] The above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. These modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. A project budget management method for engineering supervision, characterized in that: Project budget management methods used for engineering supervision include: Obtain budget for the project; The budget is transferred to the trained decision tree model for analysis and calculation to obtain the corresponding budget cost; Acquire the actual cost, and generate a project cost comparison table based on the budget cost and the actual cost; A project budget adjustment plan is generated based on the project cost comparison table.

2. The project budget management method for engineering supervision according to claim 1, characterized in that: Before transmitting the budget to the trained decision tree model for analysis and calculation to obtain the corresponding budget cost, obtaining the trained decision tree model includes: Acquire historical project data, the historical project data including information such as historical budget cost, historical project scale, historical project region, historical project industry type, etc., and clean the historical project data to obtain an initial data set; Using a decision tree algorithm to build a basic model, using the initial data set to train the basic model, to obtain a decision tree model learned by the data; The decision tree model learned through data is optimized by using a genetic algorithm to obtain the trained decision tree model.

3. The project budget management method for engineering supervision according to claim 2 is characterized in that: The budget is transferred to the trained decision tree model for analysis and calculation to obtain the corresponding budget cost, including: The budget is transmitted to the trained decision tree model, and project parameters are obtained from the budget, wherein the project parameters include project engineering quantity, project cost, project type and the region where the project is located; The trained decision tree model is used to query and analyze the project parameters to obtain the corresponding budget cost and generate a budget cost analysis report.

4. The project budget management method for engineering supervision according to claim 3 is characterized in that: The obtaining of the actual cost and generating a project cost comparison table based on the budget cost and the actual cost include: Compare the actual cost with the budgeted cost, analyze the deviation value of each cost, and obtain the cost comparison result; The cost comparison results are formed into a table using a data visualization tool, namely the engineering cost comparison table.

5. The project budget management method for engineering supervision according to claim 4 is characterized in that: Generating a project budget adjustment plan according to the project cost comparison table includes: Analyze the cost comparison results and determine the specific items and amounts of cost deviations; The project budget adjustment plan is generated based on the specific items and amounts of the cost deviation, combined with market conditions and construction environment data.

6. The project budget management method for engineering supervision according to claim 1, characterized in that: The project budget management method for engineering supervision also includes: Adjusting the trained decision tree model according to the progress of the engineering project and the actual cost; Acquire user feedback information, adjust the project budget adjustment plan according to the user's authority level, and transmit the adjusted project budget adjustment plan to the user end.

7. A project budget management system for engineering supervision, characterized in that: The project budget management system for engineering supervision includes: The module for obtaining the budget is used to obtain the budget of the engineering project; A budget cost calculation module is used to transfer the budget to a trained decision tree model for analysis and calculation to obtain the corresponding budget cost; A cost table generation module is used to obtain the actual cost and generate a project cost comparison table based on the budget cost and the actual cost; The adjustment plan generation module is used to generate a project budget adjustment plan based on the project cost comparison table.

8. The project budget management system for engineering supervision according to claim 7, characterized in that: The project budget management system for engineering supervision also includes: A model adjustment module is used to adjust the trained decision tree model according to the progress of the engineering project and the actual cost; The display module is used to obtain user feedback information, adjust the project budget adjustment plan according to the user's authority level, and transmit the adjusted project budget adjustment plan to the user end.

9. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the project budget management method for engineering supervision as described in any one of claims 1 to 6 are implemented.

10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the project budget management method for engineering supervision as claimed in any one of claims 1 to 6 are implemented.