A method and system for selecting installation points of a transmission line dynamic capacity increase monitoring terminal
By calculating the safety margin of each section of the transmission line and determining the installation location of the dynamic capacity-enhancing monitoring terminal, the safety risk problem of uniformly distributed installation methods in the existing technology is solved, and the safe and economical operation of the transmission line is achieved.
Patent Information
- Application Number
- CN202411230817.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-09-04
AI Technical Summary
The prior art lacks effective and reasonable methods to determine the installation location of the dynamic capacity-enhancing monitoring terminal of the transmission line, resulting in a huge safety risk in the evenly distributed installation method and the risk area cannot be accurately identified.
By obtaining the wire temperature and sag values of the entire transmission line, calculate the relative safety margin of temperature, relative safety margin of sag and relative safety margin of life loss of each conductor segment, combine these indicators for weighted calculations to determine dynamic capacity increase monitoring The installation location of the terminal.
The reasonable and effective installation of dynamic capacity-enhancing monitoring terminals is achieved, ensuring the safe and economical operation of transmission lines, and avoiding the safety risks of traditional uniformly distributed installation methods.
Smart Images

Figure CN118739619B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electric power grids, and in particular to a method and system for selecting installation sites for a dynamic capacity increase monitoring terminal of a power transmission line. Background Art
[0002] Electricity supply is an essential infrastructure to support economic development and people's lives. With the continuous development of the economy and the continuous growth of the population, the demand for electricity is also showing a rapid growth trend. Under this trend, the capacity of traditional transmission lines may not be able to meet the growing demand for electricity. Therefore, it is very important to achieve dynamic capacity expansion of transmission lines. By installing dynamic capacity expansion monitoring terminals, the transmission capacity of the lines can be improved without large-scale reconstruction or new construction of transmission lines, and the risks and costs of power supply can be reduced.
[0003] The installation site selection of the dynamic capacity increase monitoring terminal of the transmission line is the key to ensure the normal operation of the dynamic capacity increase. The accurate installation site selection of the dynamic capacity increase monitoring terminal becomes crucial. Only by choosing a reasonable installation location can the monitoring system be able to accurately and timely obtain the operating status and load characteristics of the line, thereby providing a scientific basis and effective data support for dynamic capacity increase, and ensuring the safe and economical operation of dynamic capacity increase.
[0004] Due to the limitation of engineering cost, it is impossible to install dynamic capacity increase monitoring terminal for each conductor section of the transmission line. Usually, only a few representative dynamic capacity increase bottleneck points can be selected to install monitoring terminals. Therefore, dynamic capacity increase monitoring terminals are distributedly installed on the transmission line. They should be installed in the area with the highest risk during the dynamic capacity increase operation, that is, the bottleneck point, that is, the section where line faults are prone to occur (such as excessive conductor temperature and excessive conductor sag). In this way, the risk position can be monitored in real time to prevent accidents and major power outages on the transmission line.
[0005] At present, the installation and distribution of dynamic capacity increase monitoring terminals on transmission lines is usually done in an evenly distributed manner, that is, a set of monitoring terminals is installed at a fixed distance (such as 10 kilometers). This evenly distributed distribution method is a last resort and is actually unreasonable and will bring great safety risks. At present, there is still a lack of effective and reasonable guidance methods, it is impossible to identify risk areas, and there is a lack of risk characterization methods and means. Summary of the invention
[0006] In order to solve the above technical problems, the present invention provides a method and system for selecting installation sites for a dynamic capacity increase monitoring terminal for a power transmission line.
[0007] The technical problem solved by the present invention can be implemented by the following technical solution: A method for selecting an installation point for a dynamic capacity increase monitoring terminal of a transmission line, comprising: step S1, obtaining a first temperature value and a first sag value of each conductor segment in the entire transmission line; step S2, calculating the life loss value of each conductor segment based on a transmission line design parameter table and the first temperature value and the first sag value obtained in step S1; step S3, calculating the life loss value of each conductor segment based on the transmission line design parameter table and the first temperature value and the first sag value obtained in step S1. The sag conversion value at the highest allowable temperature; step S4, calculating the temperature relative safety margin of each conductor segment according to the first temperature value and the highest allowable temperature of the conductor; calculating the sag relative safety margin of each conductor segment according to the sag conversion value at the highest allowable temperature of the conductor segment and the maximum allowable sag value; and calculating the life loss relative safety margin of each conductor segment according to the life loss value; step S5, determining the installation point of the monitoring terminal according to the temperature relative safety margin, the sag relative safety margin and the life loss relative safety margin.
[0008] Preferably, the step S2 includes: step S21, based on the first temperature value and the first sag value, converting the first temperature value to the completion ambient temperature value corresponding to the completion sag value measured at the time of completion, and calculating the first sag conversion value of each of the conductor segments; step S22, calculating the completion arc length of each of the conductor segments based on the completion sag value of each of the conductor segments, and calculating the arc length conversion value of each of the conductor segments based on the first sag conversion value of each of the conductor segments; step S23, calculating the life loss value of each of the conductor segments based on the completion arc length and the arc length conversion value of each of the conductor segments.
[0009] Preferably, in step S21, the first sag conversion value is calculated by:
[0010]
[0011] in, q represents the mass per unit length of the conductor in the transmission line; W Indicates the horizontal distance between two adjacent towers; A represents the cross-sectional area of the wire; β Represents the angle formed by the line connecting the two adjacent towers and the horizontal plane; E represents the elastic modulus of the wire; α represents the temperature expansion coefficient of the wire; Indicates i The completed ambient temperature value of each conductor segment; Indicates i a first temperature value of a conductor segment; Indicates i The first sag value of the conductor segment; Indicates i The first sag conversion value of the conductor segment; in the step S22, the calculation method of the completed arc length and the arc length conversion value is:
[0012]
[0013] in, Indicates the i The completed sag value of each conductor segment; Indicates the i The completed arc length of the conductor segment; Indicates the i The arc length conversion value of each conductor segment;
[0014] In step S23, the life loss value is:
[0015]
[0016] in, Indicates the i The life loss value of each wire segment.
[0017] Preferably, the step S3 comprises: based on the first temperature value and the first sag value, converting the first temperature value to the maximum allowable temperature of the conductor, and calculating the sag conversion value of each conductor segment at the maximum allowable temperature; the calculation method of the sag conversion value of the conductor segment at the maximum allowable temperature is:
[0018]
[0019] in, q represents the mass per unit length of the conductor in the transmission line; W Indicates the horizontal distance between two adjacent towers; A represents the cross-sectional area of the wire; β Represents the angle formed by the line connecting the two adjacent towers and the horizontal plane; E represents the elastic modulus of the wire; α represents the temperature expansion coefficient of the wire; Indicates i The maximum allowable temperature of a conductor segment; Indicates i a first temperature value of a conductor segment; Indicates i The first sag value of the conductor segment; Indicates i The sag conversion value of a conductor segment at the maximum allowable temperature.
[0020] Preferably, the temperature relative safety margin is calculated as follows:
[0021]
[0022] in, Indicates i The maximum allowable temperature of a conductor segment; Indicates the i a first temperature value of a conductor segment; Indicates the i Relative safety margin of temperature of each conductor segment;
[0023] The calculation method of the relative safety margin of sag is:
[0024]
[0025] in, Indicates i The sag conversion value of each conductor segment at the maximum allowable temperature; Indicates i The maximum allowable sag value of a conductor segment; Indicates the i The relative safety margin of the sag of each conductor segment; the calculation method of the relative safety margin of life loss is:
[0026]
[0027] in, Indicates the i The life loss value of each conductor segment; Indicates the i The life loss of each conductor segment is relative to the safety margin.
[0028] Preferably, the step S5 includes: step S51, dividing the transmission line into intervals according to the number of installed monitoring terminals to obtain a first preset number of intervals, each interval having a number of the conductor segments; wherein the first preset number is the number of installed monitoring terminals; step S52, performing weighted calculation based on the temperature relative safety margin, the sag relative safety margin and the life loss relative safety margin of the conductor segments in each of the intervals to obtain a comprehensive relative safety margin for each interval; step S53, determining the conductor segment corresponding to the minimum comprehensive relative safety margin in each of the intervals as the installation point of the monitoring terminal.
[0029] Preferably, the comprehensive relative safety margin calculation method is:
[0030]
[0031] in, Indicates the i Relative safety margin of temperature of each conductor segment; Indicates the i The relative safety margin for the life loss of each conductor segment; Indicates the i The relative safety margin of sag of each conductor segment; k 1. k 2. k 3 represent the corresponding weight coefficients respectively; Indicates j Interval i The comprehensive relative safety margin of each conductor segment.
[0032] Preferably, the number of installed monitoring terminals is not less than 2 and is less than the number of conductor segments of the entire transmission line.
[0033] Preferably, the number of installed monitoring terminals satisfies the following relationship:
[0034]
[0035] in, L all represents the total length of the transmission line; g represents the preset installation interval distance; M Indicates the number of installed monitoring terminals.
[0036] The present invention also provides an installation point selection system for a transmission line dynamic capacity increase monitoring terminal, which is used to implement the installation point selection method for the transmission line dynamic capacity increase monitoring terminal as described above. The system includes: a master station system and a conductor temperature acquisition module, a conductor sag acquisition module, a conductor sag conversion calculation module, a life loss calculation module, a safety margin calculation module and an installation point selection evaluation module that are connected to the master station system in communication; the conductor temperature acquisition module is used to collect the first temperature value of each conductor segment in the entire transmission line; the conductor sag acquisition module is used to collect the first sag value of each conductor segment in the entire transmission line; the conductor sag conversion calculation module is used to calculate the maximum allowable temperature of each conductor segment based on the transmission line design parameter table, the first temperature value and the first sag value. The sag conversion value at the temperature; the life loss calculation module is used to calculate the life loss value of each conductor segment based on the transmission line design parameter table, the first temperature value and the first sag value; the safety margin calculation module is used to calculate the temperature relative safety margin of each conductor segment according to the first temperature value and the maximum allowable temperature of the conductor; the sag relative safety margin of each conductor segment is calculated according to the sag conversion value of the conductor segment at the maximum allowable temperature and the maximum allowable sag value; and the life loss relative safety margin of each conductor segment is calculated according to the life loss value; the installation point selection evaluation module is used to determine the installation point of the monitoring terminal according to the temperature relative safety margin, the sag relative safety margin and the life loss relative safety margin.
[0037] The advantages or beneficial effects of the technical solution of the present invention are as follows: the present invention obtains the relative safety margin of temperature, relative safety margin of sag, and relative safety margin of life loss of each conductor segment by pre-acquiring the conductor temperature and conductor sag of the entire transmission line, and comprehensively considers the selection of conductor segments to install the dynamic capacity increase monitoring terminal, thereby achieving reasonable and effective guidance on the installation location of the dynamic capacity increase monitoring terminal, and effectively ensuring the safe and economical application of the dynamic capacity increase technology of the transmission line. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 A schematic diagram of a flow chart of a method for selecting a site for installing a transmission line dynamic capacity increase monitoring terminal in a preferred embodiment of the present invention;
[0039] Figure 2 This is a flow chart of step S2 in a preferred embodiment of the present invention;
[0040] Figure 3 This is a flow chart of step S5 in a preferred embodiment of the present invention;
[0041] Figure 4 The structure block diagram of the installation point selection system of the transmission line dynamic capacity increase monitoring terminal in the preferred embodiment of the present invention. DETAILED DESCRIPTION
[0042] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0043] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.
[0044] The present invention will be further described below with reference to the accompanying drawings and specific embodiments, but they are not intended to limit the present invention.
[0045] See also Figure 1 In a preferred embodiment of the present invention, based on the above-mentioned problems existing in the prior art, a method for selecting an installation point for a dynamic capacity increase monitoring terminal of a power transmission line is provided, comprising: step S1, obtaining a first temperature value and a first sag value of each conductor segment in the entire power transmission line; wherein the power transmission line refers to a target power transmission line that needs to be dynamically increased in capacity, and the target power transmission line can be any built power transmission line. A plurality of iron towers are arranged in the power transmission line as supporting points for overhead lines, used to support and overhead conductors, lightning arresters and other accessories, and ensure that the conductors maintain a prescribed safety distance from the ground, buildings, trees, etc.
[0046] There is a conductor segment between every two adjacent towers. The transmission line is divided into N conductor segments, and the length of each conductor segment can be the same or different. From the starting point to the end point, the conductor segments are numbered 1, 2, 3, ..., N.
[0047] The basic information of the target transmission line can be obtained through the transmission line design parameter table, which includes the geographical location of the line, conductor model, material information and other necessary information.
[0048] Along the entire transmission line, measure the conductor temperature value of each conductor segment (No. 1, No. 2, No. 3, ..., No. N) and record it as the first temperature value (Unit: °C), where i = 1, 2, …, N, corresponding to wire segments 1 to N.
[0049] Measure the conductor sag value of each conductor segment (No. 1, No. 2, No. 3, ..., No. N) along the entire transmission line and record it as the first sag value. (Unit: m).
[0050] The above conductor temperature value and sag value can be collected by using portable inspection equipment. Portable inspection equipment.
[0051] Step S2, based on the transmission line design parameter table and the first temperature value and the first sag value obtained in step S1, calculate the life loss value of each conductor segment; as a preferred embodiment, wherein, Figure 2 As shown, step S2 includes: step S21, based on the first temperature value and the first sag value, converting the first temperature value to the completion ambient temperature value corresponding to the completion sag value measured at the time of completion, and calculating the first sag conversion value of each conductor segment; step S22, based on the completion sag value of each conductor segment, calculating the completion arc length of each conductor segment, and based on the first sag conversion value of each conductor segment, calculating the arc length conversion value of each conductor segment; step S23, based on the completion arc length of each conductor segment and the arc length conversion value, calculating the life loss value of each conductor segment.
[0052] As a preferred implementation, in step S21, the calculation method of the first sag conversion value is:
[0053] (1)
[0054] in, q It represents the mass per unit length of the conductor in the transmission line; W Indicates the horizontal distance between two adjacent towers; A Indicates the cross-sectional area of the conductor; β It indicates the angle between the line connecting two adjacent towers and the horizontal plane; E It represents the elastic modulus of the conductor; α Indicates the temperature expansion coefficient of the conductor; Indicates i The completed ambient temperature value of each conductor segment, i = 1, 2, ..., N, where N represents the total number of conductor segments; Indicates i a first temperature value of a conductor segment; Indicates i The first sag value of the conductor segment; Indicates i The first sag conversion value of a conductor segment.
[0055] Among them, the above parameters q , W , A , β , , E , α , and The value of can be obtained from the transmission line design parameter table. As an example but not a limitation, for example, in the transmission line design parameter table, for a two-stage tower with a horizontal distance of 400m and a vertical distance of 30m, and a conductor segment of model LGJ-400 / 50, there are W =400m 、β =4.29° 、α =19.6×10 -6 1 / ℃ 、E =69000×10 6 Pa 、q =1.5105kg / m 、A =452×10 -6 m 2 Therefore, in formula (1), only is an unknown number, so we can solve The value of .
[0056] In step S22, the calculation method of the completed arc length is:
[0057] (2)
[0058] in, Indicates i The completed sag value of each conductor segment; Indicates i The completed arc length of the conductor segment.
[0059] In formula (2), the above parameters W , β and The value of can be obtained from the transmission line design parameter table.
[0060] The calculation method of arc length conversion value is:
[0061] (3)
[0062] in, Indicates i The converted value of the arc length of a conductor segment.
[0063] In formula (3), the above parameters W , β The value of can be obtained from the transmission line design parameter table. The value of can be calculated using the above formula (1).
[0064] In step S23, the life loss value is:
[0065] (4)
[0066] in, Indicates i The life loss value of each wire segment.
[0067] In formula (4), the above parameters The above formula (2) is used to calculate the parameters It is calculated using the above formula (3).
[0068] Specifically, by calculating the arc length conversion value Completion arc length The difference between the completed arc length The ratio of the lifespan is the lifespan loss value. i Life loss value of each conductor segment For the i The arc length conversion value of the conductor segment With i The completed arc length of the conductor segment After calculating the difference between i The completed arc length of the conductor segment ratio.
[0069] in, To convert the first temperature value to the completed ambient temperature value After that, i The converted value of the wire arc length of a wire segment.
[0070] Step S3, based on the transmission line design parameter table and the first temperature value and the first sag value obtained in step S1, calculate the sag conversion value of each conductor segment at the maximum allowable temperature; as a preferred embodiment, wherein step S3 includes: based on the first temperature value and the first sag value, converting the first temperature value to the maximum allowable temperature of the conductor, and calculating the sag conversion value of each conductor segment at the maximum allowable temperature; the calculation method of the sag conversion value of the conductor segment at the maximum allowable temperature is:
[0071] (5)
[0072] in, q It represents the mass per unit length of the conductor in the transmission line; W Indicates the horizontal distance between two adjacent towers; A Indicates the cross-sectional area of the conductor; β It indicates the angle between the line connecting two adjacent towers and the horizontal plane; E It represents the elastic modulus of the conductor; α Indicates the temperature expansion coefficient of the conductor; Indicates i The maximum allowable temperature of a conductor segment; Indicates ia first temperature value of a conductor segment; Indicates i The first sag value of the conductor segment; Indicates i The sag conversion value of a conductor segment at the maximum allowable temperature.
[0073] In formula (5), the parameters The value of can also be obtained from the transmission line design parameter table. For example, for LGJ-400 / 35 type conductor, is 70℃ or 80℃. Other known parameters are obtained from the transmission line design parameter table and substituted into formula (5), thus the solution is obtained. The value of .
[0074] Step S4, calculate the temperature relative safety margin of each conductor segment according to the first temperature value and the maximum allowable temperature of the conductor; calculate the sag relative safety margin of each conductor segment according to the sag conversion value of the conductor segment at the maximum allowable temperature and the maximum allowable sag value; and calculate the life loss relative safety margin of each conductor segment according to the life loss value; as a preferred embodiment, the calculation method of the temperature relative safety margin is:
[0075] (6)
[0076] in, Indicates i The maximum allowable temperature of each conductor segment, i = 1, 2, ..., N, where N represents the total number of conductor segments; Indicates i a first temperature value of a conductor segment; Indicates i The relative safety margin of the temperature of each wire segment.
[0077] Specifically, the maximum allowable temperature +273.15 represents the maximum permissible temperature converted to the Kelvin scale.
[0078] Specifically, the temperature relative safety margin is the maximum allowable temperature With the first temperature value The difference between the maximum allowable temperature The ratio after conversion to Kelvin temperature scale. The first temperature value collected by the wire segment The larger the value, the closer the conductor temperature is to the maximum allowable temperature. , the relative safety margin of the wire temperature is smaller.
[0079] The calculation method of sag relative safety margin is:
[0080] (7)
[0081] in, Indicates i The sag conversion value of each conductor segment at the maximum allowable temperature; Indicates i The maximum allowable sag value of a conductor segment; Indicates i The relative safety margin of the sag of a conductor segment.
[0082] In formula (7), the maximum allowable sag value is The value of can be obtained from the transmission line design parameter table.
[0083] Specifically, the relative safety margin of sag is the maximum allowable sag value The sag conversion value of the conductor segment at the maximum allowable temperature The difference between the maximum allowable sag value The sag value converted to the maximum allowable temperature of the conductor The larger the value, the closer the conductor sag is to the maximum allowable sag value. , relative safety margin of conductor sag The smaller it is.
[0084] The calculation method of relative safety margin of life loss is:
[0085] (8)
[0086] in, Indicates i The life loss value of each conductor segment; Indicates i The relative safety margin for the life loss of a conductor segment; exp(x) represents the natural exponential function.
[0087] In formula (8), the life loss value is It is calculated by formula (4).
[0088] Specifically, the life loss relative safety margin For base e Power. Life loss value of each wire segment The larger the value, the more serious the loss of wire life. The relative safety margin of wire life loss is The smaller it is.
[0089] Step S5, determining the installation point of the monitoring terminal according to the relative safety margin of temperature, the relative safety margin of sag and the relative safety margin of life loss.
[0090] As a preferred embodiment, wherein Figure 3As shown, step S5 includes: step S51, dividing the transmission line into sections according to the number of installed monitoring terminals to obtain a first preset number of sections, each section having a number of conductor segments; wherein the first preset number is the number of installed monitoring terminals; specifically, determining the total number M of installed dynamic capacity-increasing monitoring terminals according to the total length Lall (unit: kilometer) of the transmission line, that is, selecting M conductor segments in the entire line to install monitoring terminals.
[0091] As a preferred implementation, the number M of installed monitoring terminals is not less than 2 and is less than the number of conductor segments of the entire transmission line.
[0092] As a preferred implementation, the transmission line is divided into M intervals from the starting point to the ending point, M is less than N, and the number of installed monitoring terminals M satisfies the following relationship:
[0093] (10)
[0094] Among them, ceil represents the upward rounding function; L all Indicates the total length of the transmission line (unit: km); g indicates the preset installation interval distance; M Indicates the number of installed monitoring terminals.
[0095] Specifically, the number of monitoring terminals installed M is at least ≥ 2. L all When the ratio to the preset installation interval is greater than 2, the ratio is the number of monitoring terminals to be installed, M; otherwise, M is 2. The preset installation interval is the optimal average interval for installing monitoring terminals, which is generally between 5 and 10 kilometers and can be set according to actual needs.
[0096] Step S52, perform weighted calculation based on the temperature relative safety margin, sag relative safety margin and life loss relative safety margin of the conductor segment in each interval to obtain the comprehensive relative safety margin of each interval; Step S53, determine the conductor segment corresponding to the minimum comprehensive relative safety margin in each interval as the monitoring terminal installation point.
[0097] As a preferred implementation, the comprehensive relative safety margin calculation method is:
[0098] (9)
[0099] in, Indicates i Relative safety margin of temperature of each conductor segment; Indicates i The relative safety margin for the life loss of each conductor segment; Indicates i The relative safety margin of sag of each conductor segment; k 1. k 2. k 3 represent the corresponding weight coefficients, satisfying k 1+ k 2+ k 3=1, as an example but not a limitation, preferably set k 1=0.4, k 2=0.4, k 3=0.2; Indicates j Interval i The relative safety margin of each conductor segment is as follows; i = 1, 2, ..., N, where N represents the total number of conductor segments; j = 1, 2, ..., M, where M represents the first preset number.
[0100] Specifically, by obtaining the relative safety margin of temperature, sag and life loss of each section of the transmission line in advance, the conductor section with the smallest comprehensive safety margin is selected to install the dynamic capacity increase monitoring terminal. That is, the installation point selection is based on installing the monitoring terminal on the conductor section with the highest dynamic capacity increase operation risk (i.e., the smallest relative safety margin) in each section.
[0101] Specifically, for M intervals, a set of monitoring terminals is installed in each interval.
[0102] Furthermore, for the first, second, ..., M intervals, each interval has a number of wire segments. The number of wire segments in different intervals can be the same or different. Each wire segment belongs to only one interval, and the total number of wire segments in all intervals is N.
[0103] Furthermore, for the j interval, calculate the interval j Inner conductor segment i The comprehensive relative safety margin of j The comprehensive relative safety margin of all conductor segments within the interval j The conductor segment with the smallest comprehensive relative safety margin is numbered as the monitoring terminal installation point.
[0104] For M intervals, record the number of the conductor segment with the smallest comprehensive relative safety margin in each interval, denoted as Therefore, the monitoring terminal installation point is numbered of wire segments.
[0105] See also Figure 4The present invention also provides an installation point selection system for a transmission line dynamic capacity increase monitoring terminal, which is used to implement the installation point selection method for the transmission line dynamic capacity increase monitoring terminal as described above. The system includes: a master station system 1 and a conductor temperature acquisition module 2, a conductor sag acquisition module 3, a conductor sag conversion calculation module 4, a life loss calculation module 5, a safety margin calculation module 6 and an installation point selection evaluation module 7 that are connected to the master station system 1 in communication; the conductor temperature acquisition module 2 is used to collect the first temperature value of each conductor segment in the entire transmission line; the conductor sag acquisition module 3 is used to collect the first sag value of each conductor segment in the entire transmission line; the conductor sag conversion calculation module 4 is used to calculate based on the transmission line design parameter table, the first temperature value and the first sag value The sag conversion value of each conductor segment at the highest allowable temperature; the life loss calculation module 5 is used to calculate the life loss value of each conductor segment based on the transmission line design parameter table, the first temperature value and the first sag value; the safety margin calculation module 6 is used to calculate the temperature relative safety margin of each conductor segment according to the first temperature value and the maximum allowable temperature of the conductor; the sag relative safety margin of each conductor segment is calculated according to the sag conversion value of the conductor segment at the highest allowable temperature and the maximum allowable sag value; and the life loss relative safety margin of each conductor segment is calculated according to the life loss value; the installation point selection evaluation module 7 is used to determine the installation point of the monitoring terminal according to the temperature relative safety margin, the sag relative safety margin and the life loss relative safety margin.
[0106] Specifically, the system of the present invention includes a main station system 1, and a conductor temperature acquisition module 2 connected to the main station system 1, a conductor sag acquisition module 3, a line design parameter interface 8, a conductor sag conversion calculation module 4, a life loss calculation module 5, a safety margin calculation module 6, an installation point selection evaluation module 7, and an external interaction management module 9.
[0107] The wire temperature acquisition module 2 is connected to an infrared temperature sensor 10 for collecting the wire temperature (i.e., the first temperature value) of each wire segment. The sensor has a measurement range of -20 to 100°C and an accuracy of ±1°C. The wire temperature acquisition module 2 is connected and communicates with the master station system 1 through a data interface.
[0108] The conductor sag collection module 3 is connected to a level 11, which is used to collect the conductor sag (i.e., the first sag value) of each conductor section. The sag measurement range is 0-200m, and the accuracy is ±1%. The conductor sag collection module 3 is connected and communicated with the master station system 1 through a data interface.
[0109] The line design parameter interface 8 is connected and communicated with the master station system 1 through the interface calling program. The master station system 1 can read the transmission line design parameter table from the line design parameter interface 8, and obtain the parameter information of the transmission line from the transmission line design parameter table, such as line construction parameters, conductor material parameters, and line completion parameters. The line length, span, height difference, conductor cross-sectional area, temperature expansion coefficient, elastic coefficient, completion sag and other parameters used in the above method can all be obtained from this interface.
[0110] The conductor sag conversion calculation module 4 is connected and communicated with the master station system 1 through a data interface, and is used to calculate the conversion value of the sag of each conductor segment when the conductor temperature is the completed ambient temperature and the maximum allowable temperature. It receives the transmission line design parameter table, conductor temperature collection data (i.e., the first temperature value) and sag collection data (i.e., the first sag value) from the master station system 1, and outputs the sag conversion result to the master station system 1.
[0111] The life loss calculation module 5 is connected and communicated with the master station system 1 through a data interface to calculate the mechanical life loss of each conductor segment. It receives the line design parameters and conductor temperature and sag collection data from the master station system 1, and outputs the life loss calculation result to the master station system 1.
[0112] The safety margin calculation module 6 is connected and communicated with the master station system 1 through a data interface to calculate the relative safety margin of the conductor temperature, the relative safety margin of the conductor sag, and the relative safety margin of the conductor life loss of each conductor segment. It receives the conductor temperature, sag, and life loss data from the master station system 1, and outputs the relative safety margin calculation result to the master station system 1.
[0113] The installation point selection evaluation module 7 is connected and communicated with the master station system 1 through a data interface to comprehensively evaluate the relative safety margin of each wire segment and determine the final installation point selection location of the monitoring terminal. It receives the safety margin calculation result data from the master station system 1 and outputs the installation point selection location result to the master station system 1.
[0114] The external interaction management module 9 is connected and communicated with the main station system 1 through a data interface to store, output and display the installation point location information. It receives the installation point location data from the main station system 1, and stores and displays the installation point location information for users to consult.
[0115] Furthermore, the master station system 1 is a computer-controlled device, and the carrier can be a microcomputer or a microprocessor single-chip system, which is responsible for the overall control and coordination of the system. The conductor temperature acquisition module 2 and the conductor sag acquisition module 3 can both be implemented using hardware circuits. The conductor sag conversion calculation module 4, the life loss calculation module 5, the safety margin calculation module 6, the installation point selection evaluation module 7, and the line design parameter interface 8 can all be implemented using software programs, and the carrier can be a hard disk or flash memory. The external interaction management module 9 can be implemented using hardware peripherals to exchange data with other systems or devices, such as receiving external commands or sending monitoring results.
[0116] The advantages or beneficial effects of adopting the above technical solution are: the present invention provides a method for determining the installation position of the dynamic capacity increase monitoring terminal of the transmission line, changing the traditional uniform installation point distribution method, and determining the installation position of the monitoring terminal based on the temperature, sag, and life loss accident risk of each section of the conductor of the entire transmission line. This method has the advantages of simple implementation, good effect, and no impact on the normal operation of the line. This method can effectively determine the reasonable installation position of the dynamic capacity increase monitoring terminal, fully ensure the safe and economical and efficient operation of the dynamic capacity increase of the transmission line, and effectively promote the scientific application and development of the dynamic capacity increase technology of the transmission line.
[0117] The above are only preferred embodiments of the present invention, and are not intended to limit the implementation methods and protection scope of the present invention. Those skilled in the art should be aware that all solutions obtained by equivalent substitutions and obvious changes made using the contents of this specification and illustrations should be included in the protection scope of the present invention.
Claims
1. A method for selecting a site for installing a dynamic capacity increase monitoring terminal for a power transmission line, characterized in that: include: Step S1, obtaining a first temperature value and a first sag value of each conductor segment in the entire transmission line; There is one conductor segment between every two adjacent towers; Step S2, calculating the life loss value of each of the conductor segments based on the transmission line design parameter table and the first temperature value and the first sag value obtained in step S1; Step S3, calculating the sag conversion value of each conductor segment at the maximum allowable temperature based on the transmission line design parameter table and the first temperature value and the first sag value obtained in step S1; Step S4, calculating the temperature relative safety margin of each conductor segment according to the first temperature value and the maximum allowable temperature of the conductor; calculating the sag relative safety margin of each conductor segment according to the sag conversion value of the conductor segment at the maximum allowable temperature and the maximum allowable sag value; and calculating the relative safety margin of life loss of each conductor segment according to the life loss value; Step S5, determining the installation point of the monitoring terminal according to the relative safety margin of temperature, the relative safety margin of sag and the relative safety margin of life loss; The step S2 comprises: Step S21, based on the first temperature value and the first sag value, converting the first temperature value to a completion environment temperature value corresponding to when the completion sag value is measured at completion, and calculating a first sag conversion value of each of the conductor segments; Step S22, calculating the completed arc length of each conductor segment based on the completed sag value of each conductor segment, and calculating the arc length conversion value of each conductor segment based on the first sag conversion value of each conductor segment; Step S23, calculating the life loss value of each conductor segment based on the completed arc length and the arc length conversion value of each conductor segment; The calculation method of the temperature relative safety margin is: ; Wherein, Tcm(i) represents the maximum allowable temperature of the i-th conductor segment; Tc(i) represents the first temperature value of the i-th conductor segment; ΔTcR(i) represents the temperature relative safety margin of the i-th conductor segment; The calculation method of the relative safety margin of sag is: ; Wherein, Sgh(i) represents the sag conversion value of the i-th conductor segment at the highest allowable temperature; Sgm(i) represents the maximum allowable sag value of the i-th conductor segment; ΔSgR(i) represents the relative safety margin of the sag of the i-th conductor segment; The calculation method of the relative safety margin of life loss is: ; Wherein, Ds(i) represents the life loss value of the i-th conductor segment; ΔDsR(i) represents the relative safety margin of the life loss of the i-th conductor segment.
2. The installation site selection method for the dynamic capacity increase monitoring terminal of the power transmission line according to claim 1 is characterized in that: In step S21, the first sag conversion value is calculated by: ; Wherein, q represents the mass per unit length of the conductor in the transmission line; W represents the horizontal distance between two adjacent pole towers; A represents the cross-sectional area of the conductor; β represents the angle formed by the line connecting the two adjacent pole towers and the horizontal plane; E represents the elastic coefficient of the conductor; α represents the temperature expansion coefficient of the conductor; Taj(i) represents the completed ambient temperature value of the i-th conductor segment; Tc(i) represents the first temperature value of the i-th conductor segment; Sg(i) represents the first sag value of the i-th conductor segment; Sga(i) represents the first sag converted value of the i-th conductor segment; in step S22, the calculation method of the completed arc length and the arc length converted value is: ; Wherein, Sgj(i) represents the completed sag value of the i-th conductor segment; lgj(i) represents the completed arc length of the i-th conductor segment; lga(i) represents the arc length conversion value of the i-th conductor segment; In step S23, the life loss value is: ; Wherein, Ds(i) represents the life loss value of the i-th conductor segment.
3. The installation site selection method for the dynamic capacity increase monitoring terminal of the power transmission line according to claim 1 is characterized in that: The step S3 comprises: Based on the first temperature value and the first sag value, converting the first temperature value to the maximum allowable temperature of the conductor, and calculating the sag conversion value of each conductor segment at the maximum allowable temperature; The calculation method of the sag conversion value of the conductor segment at the maximum allowable temperature is: ; Wherein, q represents the mass per unit length of the conductor in the transmission line; W represents the horizontal distance between two adjacent towers; A represents the cross-sectional area of the conductor; β represents the angle formed by the line connecting the two adjacent towers and the horizontal plane; E represents the elastic coefficient of the conductor; α represents the temperature expansion coefficient of the conductor; Tcm(i) represents the maximum allowable temperature of the i-th conductor segment; Tc(i) represents the first temperature value of the i-th conductor segment; Sg(i) represents the first sag value of the i-th conductor segment; Sgh(i) represents the sag conversion value of the i-th conductor segment at the maximum allowable temperature.
4. The installation site selection method for the dynamic capacity increase monitoring terminal of the power transmission line according to claim 1 is characterized in that: The step S5 comprises: Step S51, dividing the transmission line into sections according to the number of installed monitoring terminals to obtain a first preset number of sections, each section having a number of the conductor segments; wherein the first preset number is the number of installed monitoring terminals; Step S52, performing weighted calculation according to the temperature relative safety margin, the sag relative safety margin and the life loss relative safety margin of the conductor segment in each of the intervals, to obtain a comprehensive relative safety margin for each interval; Step S53, determining the wire segment corresponding to the minimum comprehensive relative safety margin in each of the intervals as the monitoring terminal installation point.
5. The installation site selection method for the dynamic capacity increase monitoring terminal of the power transmission line according to claim 4 is characterized in that: The calculation method of the comprehensive relative safety margin is: ; Among them, ΔTcR(i) represents the relative safety margin of temperature of the i-th conductor segment; ΔDsR(i) represents the relative safety margin of life loss of the i-th conductor segment; ΔSgR(i) represents the relative safety margin of sag of the i-th conductor segment; k1, k2, k3 represent the corresponding weight coefficients respectively; ΔR(j, i) represents the comprehensive relative safety margin of the i-th conductor segment in the j-th interval.
6. The installation site selection method for the dynamic capacity increase monitoring terminal of the power transmission line according to claim 4 is characterized in that: The number of installed monitoring terminals is not less than 2 and is less than the number of conductor segments of the entire transmission line.
7. The installation site selection method for the transmission line dynamic capacity increase monitoring terminal according to claim 6 is characterized in that: The number of monitoring terminals installed satisfies the following relationship: ; Among them, Lall represents the full length of the transmission line; g represents the preset installation interval distance; and M represents the number of installed monitoring terminals.
8. A system for selecting installation points for a dynamic capacity increase monitoring terminal of a power transmission line, characterized in that: A method for selecting a site for installing a transmission line dynamic capacity increase monitoring terminal according to any one of claims 1 to 7, the system comprising: A master station system and a conductor temperature acquisition module, a conductor sag acquisition module, a conductor sag conversion calculation module, a life loss calculation module, a safety margin calculation module and an installation point selection assessment module that are communicatively connected to the master station system; The conductor temperature acquisition module is used to acquire the first temperature value of each conductor segment in the entire transmission line; The conductor sag collection module is used to collect the first sag value of each conductor segment in the entire transmission line; The conductor sag conversion calculation module is used to calculate the sag conversion value of each conductor segment at the maximum allowable temperature based on the transmission line design parameter table, the first temperature value and the first sag value; The life loss calculation module is used to calculate the life loss value of each of the conductor segments based on the transmission line design parameter table, the first temperature value and the first sag value; The safety margin calculation module is used to calculate the temperature relative safety margin of each conductor segment according to the first temperature value and the maximum allowable temperature of the conductor; calculate the sag relative safety margin of each conductor segment according to the sag conversion value of the conductor segment at the maximum allowable temperature and the maximum allowable sag value; and calculate the life loss relative safety margin of each conductor segment according to the life loss value; The installation point selection evaluation module is used to determine the installation point of the monitoring terminal according to the relative safety margin of temperature, the relative safety margin of sag and the relative safety margin of life loss.