Level crossing signal control system and method

By setting up beacon devices and automated signal control systems at level crossings, the problem of manual protection being unable to achieve all-weather and all-round monitoring is solved, automated coordinated control of rail transit and highway traffic is realized, and passing efficiency and safety are improved.

CN118744751APending Publication Date: 2024-10-08CRSC URBAN RAIL TRANSIT TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410803109.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-20
Publication Date
2024-10-08

AI Technical Summary

Technical Problem

At level crossings, when relying on human protection to control the intersection of rail transit trains and highway traffic, it is impossible to achieve all-weather and all-round monitoring, which affects the train passing efficiency.

Method used

A level crossing signal control system is designed, including the train's on-board controller (VOBC), beacon device, automatic train monitoring (ATS) subsystem, level crossing control subsystem and road traffic signal subsystem. Through the beacon Information collection, transmission and feedback automatically coordinate signal status to ensure safe and efficient passage of trains.

Benefits of technology

It reduces human protection, realizes automated collaborative control of trains and road traffic, improves passing efficiency and safety, and ensures all-weather, all-round monitoring and management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118744751A_ABST
    Figure CN118744751A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of rail traffic management, and provides a level crossing signal control system and method.The system is characterized in that a VOBC of a train is used for collecting beacon information of a beacon device and sending the beacon information to an ATS subsystem, and the beacon information is used for indicating the position state between the train and a level crossing; the ATS subsystem is used for sending the beacon information to the level crossing control subsystem and displaying the state of a train crossing signal machine, and the state of a lane crossing signal machine is controlled based on the level crossing control subsystem; the level crossing control subsystem is used for sending the beacon information to the road traffic signal subsystem and controlling the state of a train crossing signal machine according to a feedback signal sent by the road traffic signal subsystem; and the road traffic signal subsystem is used for generating a feedback signal matched with the beacon information and sending the feedback signal to the level crossing control subsystem. Manual protection is reduced, automatic control is achieved, and it is guaranteed that the train efficiently passes through the intersection.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of rail transit management, and in particular to a level crossing signal control system and method. Background Art

[0002] At present, there are situations where rail transit lines and highways share the right of way at some crossings, that is, level crossings. Level crossings refer to the intersections where railway tracks and roads (including highways, urban roads, etc.) intersect on the same plane. At level crossings, the railway tracks intersect with the road plane without ups and downs or three-dimensional intersection structures, so pedestrians and vehicles need to cross the railway tracks to pass through the road.

[0003] The current practice is mostly to rely on manual protection to control the normal passage of rail transit trains and cars. However, manual protection usually only covers a limited area and time, and cannot achieve all-weather, all-round monitoring, resulting in delays in the passage of rail transit trains, thereby affecting the passing efficiency of trains. Summary of the invention

[0004] The present invention provides a level crossing signal control system and method, which are used to solve the defect in the related art that when a rail transit line shares the right of way with a highway, relying on human protection will affect the passing efficiency of trains.

[0005] The present invention provides a level crossing signal control system, comprising: a train onboard controller VOBC, a beacon device, an automatic train monitoring ATS subsystem, a level crossing control subsystem and a road traffic signal subsystem, wherein: The VOBC of the train is used to collect the beacon information of the beacon device and send the beacon information to the ATS subsystem, wherein the beacon information is used to indicate the position status between the train and the level crossing; The ATS subsystem is used to send the beacon information to the level crossing control subsystem and display the status of the train crossing signal, the status of the train crossing signal is based on the control of the level crossing control subsystem; The level crossing control subsystem is used to send the beacon information to the road traffic signal subsystem, and control the state of the train crossing signal according to the feedback signal sent by the road traffic signal subsystem; The road traffic signal subsystem is used to generate a feedback signal matching the beacon information, and send the feedback signal to the level crossing control subsystem.

[0006] According to the above-mentioned level crossing signal control system provided by the present invention, the beacon device includes a first beacon device, and the beacon information of the first beacon device includes first beacon information, and the first beacon information is used to indicate that the train starts to drive towards the road area controlled by the level crossing; Among them, the road traffic signal subsystem is used to determine whether the train meets the priority passing conditions when receiving the first beacon information; and when it is determined that the train meets the priority passing conditions, control the road signal on the level crossing where the train is heading to switch to the green light open countdown state.

[0007] According to the above-mentioned level crossing signal control system provided by the present invention, the beacon device includes a second beacon device, and the beacon information of the second beacon device includes second beacon information, and the second beacon information is used to indicate that the distance between the train and the level crossing in the direction of the train is less than a distance threshold; The road traffic signal subsystem is used to control the road signal on the level crossing where the train is heading to switch to a green light state when receiving the second beacon information, and send a first feedback signal to the level crossing control subsystem, wherein the first feedback signal is used to indicate that the train is allowed to pass; The level crossing control subsystem is used to control the train crossing signal in the direction of the train to light up the green light when receiving the first feedback signal.

[0008] According to the above-mentioned level crossing signal control system provided by the present invention, the beacon device includes a third beacon device, and the beacon information of the third beacon device includes third beacon information, and the third beacon information is used to indicate that the train has arrived at the level crossing in the direction of the train; The road traffic signal subsystem is used to send a second feedback signal to the level crossing control subsystem when receiving the third beacon information, and the second feedback signal is used to indicate that the train is allowed to pass; The level crossing control subsystem is used to control the train crossing signal in the direction of the train to light up the green light when receiving the second feedback signal.

[0009] According to the above-mentioned level crossing signal control system provided by the present invention, the beacon device includes a fourth beacon device, and the beacon information of the fourth beacon device includes fourth beacon information, and the fourth beacon information is used to indicate that the train leaves the level crossing; Wherein, the road traffic signal subsystem is used to send the third feedback signal to the level crossing control subsystem when receiving the fourth beacon information, and the third feedback signal is used to indicate that trains are prohibited from passing; The level crossing control subsystem is used to control the train crossing signal in the train departure direction to light up a red light when receiving the third feedback signal.

[0010] The present invention also provides a level crossing signal control method based on the level crossing signal control system, comprising: a train's VOBC collects beacon information of a beacon device, and sends the beacon information to an ATS subsystem, wherein the beacon information is used to indicate the position status between the train and the level crossing; The ATS subsystem sends the beacon information to the level crossing control subsystem and displays the status of the train crossing signal, the status of the train crossing signal being controlled based on the level crossing control subsystem; The level crossing control subsystem sends the beacon information to the road traffic signal subsystem, and controls the state of the train crossing signal according to the feedback signal sent by the road traffic signal subsystem; The road traffic signal subsystem generates a feedback signal matching the beacon information, and sends the feedback signal to the level crossing control subsystem.

[0011] According to a level crossing signal control method provided by the present invention, the beacon device includes a first beacon device, the beacon information of the first beacon device includes first beacon information, and the first beacon information is used to indicate that the train starts to drive towards a road area controlled by the level crossing. The method includes: When receiving the first beacon information, the road traffic signal subsystem determines whether the train meets the priority passing conditions; and if it is determined that the train meets the priority passing conditions, the road traffic signal on the level crossing where the train is heading is switched to the green light open countdown state.

[0012] According to a level crossing signal control method provided by the present invention, the beacon device includes a second beacon device, the beacon information of the second beacon device includes second beacon information, and the second beacon information is used to indicate that the distance between the train and the level crossing in the train driving direction is less than a distance threshold. The method includes: The road traffic signal subsystem is used to control the road signal on the level crossing where the train is heading to switch to the green light state when receiving the second beacon information, and send a first feedback signal to the level crossing control subsystem, wherein the first feedback signal is used to indicate that the train is allowed to pass.

[0013] According to a level crossing signal control method provided by the present invention, the beacon device includes a third beacon device, the beacon information of the third beacon device includes third beacon information, and the third beacon information is used to indicate that the train has arrived at the level crossing in the train driving direction. The method includes: When receiving the third beacon information, the road traffic signal subsystem sends a second feedback signal to the level crossing control subsystem, wherein the second feedback signal is used to indicate that a train is allowed to pass; The level crossing control subsystem controls the train crossing signal in the direction of the train to light up green when receiving the second feedback signal.

[0014] According to a level crossing signal control method provided by the present invention, the beacon device includes a fourth beacon device, the beacon information of the fourth beacon device includes fourth beacon information, and the fourth beacon information is used to indicate that the train leaves the level crossing. The method includes: When receiving the fourth beacon information, the road traffic signal subsystem sends the third feedback signal to the level crossing control subsystem, wherein the third feedback signal is used to indicate that trains are prohibited from passing; The level crossing control subsystem controls the train crossing signal in the train departure direction to light up a red light when receiving the third feedback signal.

[0015] The present invention also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the level crossing signal control method is implemented when the processor executes the program.

[0016] The present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, and the computer program implements the level crossing signal control method when executed by a processor.

[0017] The present invention also provides a computer program product, comprising a computer program, wherein the computer program implements the level crossing signal control method when executed by a processor.

[0018] The level crossing signal control system and method provided by the present invention collects beacon information of the beacon device through the VOBC of the train, and sends the beacon information to the ATS subsystem. The beacon information is used to indicate the position status between the train and the level crossing. In this way, the system can obtain the position information of the train in real time and provide a data basis for subsequent signal control. The ATS subsystem is used to send the beacon information to the level crossing control subsystem and display the status of the train crossing signal. The status of the road crossing signal is based on the control of the level crossing control subsystem; the level crossing control subsystem is used to send the beacon information to the road traffic signal subsystem, and control the status of the train crossing signal according to the feedback signal sent by the road traffic signal subsystem; the road traffic signal subsystem is used to generate a feedback signal matching the beacon information and send the feedback signal to the level crossing control subsystem. The present invention reduces human protection, realizes the automated coordinated control of trains and road traffic, and ensures safe and efficient passage through the intersection by collecting beacon information through the train VOBC, transmitting and displaying by the ATS subsystem, coordinating signals by the level crossing control subsystem, and providing feedback by the road traffic signal subsystem. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the technical solutions in the present invention or related technologies, the following briefly introduces the drawings required for use in the embodiments or related technical descriptions. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0020] Figure 1 It is a structural schematic diagram of a level crossing signal control system provided by the present invention; Figure 2 It is a scene schematic diagram of the level crossing signal control system provided by the present invention; Figure 3 It is a flow chart of the level crossing signal control method provided by the present invention; Figure 4 It is a structural schematic diagram of the electronic device provided by the present invention. DETAILED DESCRIPTION

[0021] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0022] The technical solution of the present invention will be described in detail below with reference to the accompanying drawings. Figure 1 Schematic diagram of the structure of the level crossing signal control system provided by the present invention. Figure 1 As shown, the level crossing signal control system includes a train onboard controller VOBC10, a beacon device 20, an automatic train monitoring ATS subsystem 30, a level crossing control subsystem 40 and a road traffic signal subsystem 50.

[0023] The VOBC 10 of the train is used to collect the beacon information of the beacon device 20 and send the beacon information to the ATS subsystem 30, wherein the beacon information is used to indicate the position status between the train and the level crossing; The ATS subsystem 30 is used to send the beacon information to the level crossing control subsystem 40 and display the status of the train crossing signal, and the status of the train crossing signal is based on the control of the level crossing control subsystem 40; The level crossing control subsystem 40 is used to send the beacon information to the road traffic signal subsystem 50, and control the state of the train crossing signal according to the feedback signal sent by the road traffic signal subsystem 50; The road traffic signal subsystem 50 is used to generate a feedback signal matching the beacon information, and send the feedback signal to the level crossing control subsystem.

[0024] Here, the beacon device 20 is deployed on the track at the level crossing. The beacon device 20 provides its own position in the form of a specific signal. When the train passes through the beacon device 20, the train's VOBC 10 will detect the beacon information continuously sent by the beacon device 20. This beacon information carries the position information of the beacon device 20, which is used to indicate the current position relationship between the train and the level crossing, such as whether the train is approaching, passing or has moved away from the level crossing.

[0025] VOBC 10 sends the collected beacon information to ATS subsystem 30. ATS subsystem 30 receives the beacon information sent by VOBC 10 and forwards the beacon information to level crossing control subsystem 40, so that level crossing control subsystem 40 can send a train passage request to road traffic signal subsystem 50 according to the beacon information and visualize the result of the train passage request of level crossing control subsystem 40. In other words, level crossing control subsystem 40 will adjust the status of the train crossing signal according to the result of the train passage request, including red light (no passage), green light (allow passage), etc.

[0026] Specifically, the level crossing control subsystem 40 will send the beacon information to the road traffic signal subsystem 50. After receiving the beacon information, the road traffic signal subsystem 50 determines whether the train is allowed to pass at present and sends a corresponding feedback signal to the level crossing control subsystem 40. The feedback signal here is used to indicate the status of the lane crossing signal.

[0027] In this embodiment, the level crossing signal control system realizes automated coordinated control of trains and road traffic at level crossings through the collaborative work among beacon devices, VOBC, ATS, level crossing control subsystem and road traffic signal subsystem, ensuring safe and efficient passage through the intersection.

[0028] In some embodiments, the beacon device 20 includes a first beacon device, and the beacon information of the first beacon device includes first beacon information, and the first beacon information is used to indicate that the train starts to drive towards the road area controlled by the level crossing; Among them, the road traffic signal subsystem 50 is used to determine whether the train has the priority passing conditions when receiving the first beacon information; and when it is determined that the train has the priority passing conditions, control the road signal on the level crossing where the train is heading to switch to the green light open countdown state.

[0029] Here, the first beacon information transmitted by the first beacon device is used to indicate that the train starts to drive towards the road area controlled by the level crossing. In other words, the first beacon information is used to notify the train in advance that it is about to cross the level crossing.

[0030] After receiving the first beacon information, the road traffic signal subsystem 50 will determine whether the train has the conditions for priority passage, which may include the urgency of the train's passage, the traffic flow on the public road, etc.

[0031] If it is determined that the train has priority passing conditions (for example, there is little traffic on the public road in the direction of the train), the road traffic signal subsystem 50 will control the road signal (i.e., traffic light) on the level crossing to switch to the green light open countdown state.

[0032] Here, the green light opening countdown state refers to switching to the set green light opening countdown state. For example, if the green light opening countdown state is 30s, the road signal will display 30s from the current time to the green light opening.

[0033] In this embodiment, after receiving the first beacon information, the road traffic signal subsystem determines whether the train meets the priority passing conditions, and controls the road signal to switch to the green light open countdown state when the conditions are met, effectively improving the safety and efficiency of train and road traffic through signal transmission and logical judgment.

[0034] In some embodiments, the beacon device includes a second beacon device, the beacon information of the second beacon device includes second beacon information, and the second beacon information is used to indicate that the distance between the train and the level crossing in the direction of the train is less than a distance threshold; Among them, the road traffic signal subsystem 50 is used to control the road signal on the level crossing where the train is heading to switch to the green light state when receiving the second beacon information, and send a first feedback signal to the level crossing control subsystem 40, wherein the first feedback signal is used to indicate that the train is allowed to pass.

[0035] The level crossing control subsystem 40 is used to control the train crossing signal in the direction of the train to turn on the green light when receiving the first feedback signal.

[0036] Here, the second beacon information transmitted by the second beacon device is used to indicate that the distance between the train and the level crossing in the direction of the train is less than a preset distance threshold. In other words, when the train approaches the level crossing and reaches a certain distance range, the VOBC 10 of the train will detect the second beacon information transmitted by the second beacon device to inform the road traffic signal subsystem 50 that the train is about to arrive.

[0037] The road traffic signal subsystem 50 controls the road signal on the level crossing where the train is heading to switch to the green light state, so as to allow vehicles in the same direction as the train to pass through the level crossing, and prohibit vehicles in different directions from the train from passing through the level crossing. At the same time, the road traffic signal subsystem 50 sends a first feedback signal to the level crossing control subsystem 40 to notify the level crossing control subsystem 40 that the road traffic signal subsystem has allowed the train to pass, and the road signal in the same direction as the train has switched to the green light state. After receiving the first feedback signal, the level crossing control subsystem 40 controls the train crossing signal in the direction where the train is heading to turn on the green light.

[0038] In this embodiment, when a train approaches a level crossing, the road traffic signal subsystem controls the road signal to give way to the train through the second beacon information sent by the second beacon device, and notifies the level crossing control subsystem through the first feedback signal. Then, the level crossing control subsystem controls the train crossing signal to turn on the green light, allowing the train to pass through the level crossing. This effectively avoids conflicts between trains and road traffic, and improves traffic efficiency.

[0039] In some embodiments, the beacon device includes a third beacon device, and the beacon information of the third beacon device includes third beacon information, and the third beacon information is used to indicate that the train has arrived at the level crossing in the direction of the train; wherein the road traffic signal subsystem 50 is used to send a second feedback signal to the level crossing control subsystem 40 upon receiving the third beacon information, and the second feedback signal is used to indicate that the train is allowed to pass; The level crossing control subsystem 40 is used to control the train crossing signal in the direction where the train is heading to turn on the green light when receiving the second feedback signal.

[0040] Here, the third beacon information transmitted by the third beacon device is used to indicate that the train has arrived at the level crossing in the direction of the train. This means that when the train completely arrives at the level crossing position, the VOBC 10 of the train will detect the third beacon information transmitted by the third beacon device to inform the road traffic signal subsystem 50 that the train has arrived.

[0041] After receiving the third beacon information, the road traffic signal subsystem 50 will send a second feedback signal to the level crossing control subsystem 40 to notify the level crossing control subsystem 40 that the road traffic signal subsystem 50 has confirmed the arrival of the train and allows the train to pass. After receiving the second feedback signal, the level crossing control subsystem 40 will control the train crossing signal in the direction of the train to turn on the green light.

[0042] In this embodiment, through the third beacon information sent by the third beacon device, the road traffic signal subsystem 50 can confirm the arrival of the train, and control the train crossing signal to light up the green light through the second feedback signal, allowing the train to pass through the crossing, thus ensuring the smooth passage of the train.

[0043] In some embodiments, the beacon device includes a fourth beacon device, and the beacon information of the fourth beacon device includes fourth beacon information, and the fourth beacon information is used to indicate that the train leaves the level crossing; The road traffic signal subsystem 50 is used to send the third feedback signal to the level crossing control subsystem 40 when receiving the fourth beacon information, and the third feedback signal is used to indicate that trains are prohibited from passing; The level crossing control subsystem 40 is used to control the train crossing signal in the train departure direction to light up a red light when receiving the third feedback signal.

[0044] Here, the fourth beacon information transmitted by the fourth beacon device is used to indicate that the train has left the level crossing. When the train completely passes the level crossing and leaves a certain distance, the VOBC 10 of the train will detect the fourth beacon information transmitted by the fourth beacon device and notify the road traffic signal subsystem 50 that the train has left.

[0045] After receiving the fourth beacon information, the road traffic signal subsystem 50 sends a third feedback signal to the level crossing control subsystem 40 to notify the level crossing control subsystem 40 that the current train has left the level crossing. After receiving the third feedback signal, the level crossing control subsystem 40 controls the train crossing signal in the train departure direction to light up a red light. That is, the level crossing is currently closed to new trains, and trains are prohibited from passing through to ensure the safety of the crossing area.

[0046] For ease of understanding, this embodiment illustrates this by way of example. Figure 2As shown, a warning beacon device, an approach beacon device, and an arrival beacon device are sequentially arranged in front of the intersection, and a departure beacon device is arranged behind the intersection. After the on-board controller VOBC collects the beacon information, it sends the intersection request carrying the corresponding beacon information to the automatic train monitoring ATS subsystem via wireless, and then the automatic train monitoring ATS subsystem sends it to the level crossing control subsystem; after receiving the information, the level crossing control subsystem sends an application carrying the corresponding beacon information to the road traffic signal subsystem; the road traffic signal subsystem determines whether the conditions for opening the priority passage of the train are met according to this application, and if the conditions are met, the road traffic signal machine in the direction of the train running will be controlled to end the red light in advance, open the green light, and open the red light after detecting the train passing, and at the same time send a corresponding feedback signal to the level crossing control subsystem, and the level crossing control subsystem controls the display state of the train crossing signal machine in the direction of the train running according to this feedback signal.

[0047] The embodiment of the present invention further provides a level crossing signal control method based on the level crossing signal control system provided by the above embodiment of the invention. Figure 3 FIG. 1 is a flow chart of a level crossing signal control method provided by the present invention, such as Figure 3 As shown, the level crossing signal control method includes: step 310, step 320, step 330 and step 340.

[0048] Step 310: The VOBC of the train collects beacon information of the beacon device and sends the beacon information to the ATS subsystem, where the beacon information is used to indicate the position status between the train and the level crossing. Step 320: The ATS subsystem sends the beacon information to the level crossing control subsystem and displays the status of the train crossing signal, where the status of the train crossing signal is controlled by the level crossing control subsystem. Step 330: the level crossing control subsystem sends the beacon information to the road traffic signal subsystem, and controls the state of the train crossing signal according to the feedback signal sent by the road traffic signal subsystem; Step 340: The road traffic signal subsystem generates a feedback signal matching the beacon information, and sends the feedback signal to the level crossing control subsystem.

[0049] Here, a beacon device is deployed on the track at the level crossing. The beacon device provides its own position in the form of a specific signal. When a train passes through the beacon device, the train's VOBC will detect the beacon information continuously sent by the beacon device. This beacon information carries the position information of the beacon device, which is used to indicate the current position relationship between the train and the level crossing, such as whether the train is approaching, passing or has moved away from the level crossing.

[0050] VOBC sends the collected beacon information to the ATS subsystem. The ATS subsystem receives the beacon information sent by VOBC and forwards the beacon information to the level crossing control subsystem, so that the level crossing control subsystem can send a train passage request to the road traffic signal subsystem based on the beacon information and visualize the train passage request result of the level crossing control subsystem. In other words, the level crossing control subsystem will adjust the status of the train crossing signal according to the train passage request result, including red light (no passage), green light (allow passage), etc.

[0051] Specifically, the level crossing control subsystem will send the beacon information to the road traffic signal subsystem. After receiving the beacon information, the road traffic signal subsystem determines whether the train is allowed to pass at present and sends a corresponding feedback signal to the level crossing control subsystem. The feedback signal here is used to indicate the status of the lane intersection signal.

[0052] In this embodiment, the level crossing signal control system realizes automated coordinated control of trains and road traffic at level crossings through the collaborative work among beacon devices, VOBC, ATS, level crossing control subsystem and road traffic signal subsystem, ensuring safe and efficient passage through the intersection.

[0053] In some embodiments, the beacon device includes a first beacon device, the beacon information of the first beacon device includes first beacon information, and the first beacon information is used to indicate that the train starts to drive towards a road area controlled by a level crossing, and the method includes: When receiving the first beacon information, the road traffic signal subsystem determines whether the train meets the priority passing conditions; and if it is determined that the train meets the priority passing conditions, the road traffic signal on the level crossing where the train is heading is switched to the green light open countdown state.

[0054] In some embodiments, the beacon device includes a second beacon device, the beacon information of the second beacon device includes second beacon information, and the second beacon information is used to indicate that the distance between the train and the level crossing in the direction of the train is less than a distance threshold, and the method includes: When receiving the second beacon information, the road traffic signal subsystem controls the road signal on the level crossing where the train is heading to switch to a green light state, and sends a first feedback signal to the level crossing control subsystem, where the first feedback signal is used to indicate that the train is allowed to pass; The level crossing control subsystem controls the train crossing signal in the direction of the train to light up green when receiving the first feedback signal.

[0055] In some embodiments, the beacon device includes a third beacon device, the beacon information of the third beacon device includes third beacon information, and the third beacon information is used to indicate that the train has arrived at a level crossing in the direction in which the train is heading, and the method includes: When receiving the third beacon information, the road traffic signal subsystem sends a second feedback signal to the level crossing control subsystem, wherein the second feedback signal is used to indicate that a train is allowed to pass; The level crossing control subsystem controls the train crossing signal in the direction of the train to light up green when receiving the second feedback signal.

[0056] In some embodiments, the beacon device includes a fourth beacon device, the beacon information of the fourth beacon device includes fourth beacon information, and the fourth beacon information is used to indicate that the train leaves the level crossing, and the method includes: When receiving the fourth beacon information, the road traffic signal subsystem sends the third feedback signal to the level crossing control subsystem, wherein the third feedback signal is used to indicate that trains are prohibited from passing; The level crossing control subsystem controls the train crossing signal in the train departure direction to light up a red light when receiving the third feedback signal.

[0057] The level crossing signal control method described in this embodiment and the level crossing signal control system provided by the above-described embodiment of the present invention may refer to each other, and will not be described in detail here.

[0058] Figure 4 An example of a physical structure diagram of an electronic device is shown in FIG. Figure 4 As shown, the electronic device may include: a processor 410, a communications interface 420, a memory 430 and a communication bus 440, wherein the processor 410, the communications interface 420 and the memory 430 communicate with each other via the communication bus 440. The processor 410 may call the logic instructions in the memory 430 to execute the level crossing signal control method, the method comprising: the VOBC of the train collects the beacon information of the beacon device, and sends the beacon information to the ATS subsystem, wherein the beacon information is used to indicate the position status between the train and the level crossing; The ATS subsystem sends the beacon information to the level crossing control subsystem and displays the status of the train crossing signal, the status of the train crossing signal being controlled based on the level crossing control subsystem; The level crossing control subsystem sends the beacon information to the road traffic signal subsystem, and controls the state of the train crossing signal according to the feedback signal sent by the road traffic signal subsystem; The road traffic signal subsystem generates a feedback signal matching the beacon information, and sends the feedback signal to the level crossing control subsystem.

[0059] In addition, the logic instructions in the above-mentioned memory 430 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on such an understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk and other media that can store program codes.

[0060] On the other hand, the present invention further provides a computer program product, the computer program product comprising a computer program, the computer program may be stored on a non-transitory computer-readable storage medium, and when the computer program is executed by a processor, the computer can execute the level crossing signal control method provided in the above embodiments, the method comprising: The VOBC of the train collects beacon information of the beacon device and sends the beacon information to the ATS subsystem, wherein the beacon information is used to indicate the position status between the train and the level crossing; The ATS subsystem sends the beacon information to the level crossing control subsystem and displays the status of the train crossing signal, the status of the train crossing signal being controlled based on the level crossing control subsystem; The level crossing control subsystem sends the beacon information to the road traffic signal subsystem, and controls the state of the train crossing signal according to the feedback signal sent by the road traffic signal subsystem; The road traffic signal subsystem generates a feedback signal matching the beacon information, and sends the feedback signal to the level crossing control subsystem.

[0061] In another aspect, the present invention further provides a non-transitory computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the method for executing the level crossing signal control method provided in the above embodiments is implemented, and the method includes: The VOBC of the train collects beacon information of the beacon device and sends the beacon information to the ATS subsystem, wherein the beacon information is used to indicate the position status between the train and the level crossing; The ATS subsystem sends the beacon information to the level crossing control subsystem and displays the status of the train crossing signal, the status of the train crossing signal being controlled based on the level crossing control subsystem; The level crossing control subsystem sends the beacon information to the road traffic signal subsystem, and controls the state of the train crossing signal according to the feedback signal sent by the road traffic signal subsystem; The road traffic signal subsystem generates a feedback signal matching the beacon information, and sends the feedback signal to the level crossing control subsystem.

[0062] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.

[0063] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.

[0064] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A level crossing signal control system, characterized in that: include: The train's onboard controller VOBC, beacon device, automatic train monitoring ATS subsystem, level crossing control subsystem and road traffic signal subsystem, including: The VOBC of the train is used to collect beacon information from the beacon device and send the beacon information to the ATS subsystem, wherein the beacon information is used to indicate the position status between the train and the level crossing; The ATS subsystem is used to send the beacon information to the level crossing control subsystem and display the status of the train crossing signal, where the status of the train crossing signal is controlled by the level crossing control subsystem; The level crossing control subsystem is used to send the beacon information to the road traffic signal subsystem, and control the state of the train crossing signal according to the feedback signal sent by the road traffic signal subsystem; The road traffic signal subsystem is used to generate a feedback signal matching the beacon information and send the feedback signal to the level crossing control subsystem.

2. The level crossing signal control system according to claim 1, characterized in that: The beacon device includes a first beacon device, the beacon information of the first beacon device includes first beacon information, and the first beacon information is used to indicate that the train starts to drive towards the road area controlled by the level crossing; Among them, the road traffic signal subsystem is used to determine whether the train meets the priority passing conditions when receiving the first beacon information; and if it is determined that the train meets the priority passing conditions, control the road signal on the level crossing where the train is heading to switch to the green light open countdown state.

3. The level crossing signal control system according to claim 1, characterized in that: The beacon device includes a second beacon device, the beacon information of the second beacon device includes second beacon information, and the second beacon information is used to indicate that the distance between the train and the level crossing in the train driving direction is less than a distance threshold; The road traffic signal subsystem is configured to, upon receiving the second beacon information, control the road traffic signal at the level crossing toward which the train is traveling to switch to a green light state, and send a first feedback signal to the level crossing control subsystem, wherein the first feedback signal is configured to indicate that the train is allowed to pass; The level crossing control subsystem is used to control the train crossing signal in the direction of the train to light up green when receiving the first feedback signal.

4. The level crossing signal control system according to claim 1, characterized in that: The beacon device includes a third beacon device, the beacon information of the third beacon device includes third beacon information, and the third beacon information is used to indicate that the train has arrived at a level crossing in the direction of the train; The road traffic signal subsystem is configured to send a second feedback signal to the level crossing control subsystem upon receiving the third beacon information, wherein the second feedback signal is configured to indicate that a train is allowed to pass; The level crossing control subsystem is used to control the train crossing signal in the direction of the train to light up green when receiving the second feedback signal.

5. The level crossing signal control system according to claim 1, characterized in that: The beacon device includes a fourth beacon device, the beacon information of the fourth beacon device includes fourth beacon information, and the fourth beacon information is used to indicate that the train has left the level crossing; The road traffic signal subsystem is configured to send the third feedback signal to the level crossing control subsystem upon receiving the fourth beacon information, wherein the third feedback signal is configured to indicate that trains are prohibited from passing; The level crossing control subsystem is configured to control the train crossing signal in the train departure direction to light up red when receiving the third feedback signal.

6. A level crossing signal control method of a level crossing signal control system according to any one of claims 1 to 5, characterized in that: include: The VOBC of the train collects beacon information from the beacon device and sends the beacon information to the ATS subsystem. The beacon information is used to indicate the position status between the train and the level crossing; The ATS subsystem sends the beacon information to the level crossing control subsystem and displays the status of the train crossing signal, where the status of the train crossing signal is controlled by the level crossing control subsystem; The level crossing control subsystem sends the beacon information to the road traffic signal subsystem, and controls the state of the train crossing signal according to the feedback signal sent by the road traffic signal subsystem; The road traffic signal subsystem generates a feedback signal matching the beacon information, and sends the feedback signal to the level crossing control subsystem.

7. The level crossing signal control method according to claim 6, characterized in that: The beacon device includes a first beacon device, the beacon information of the first beacon device includes first beacon information, and the first beacon information is used to indicate that the train starts to drive towards a road area controlled by a level crossing. The method includes: When receiving the first beacon information, the road traffic signal subsystem determines whether the train meets the priority passing conditions; and if it is determined that the train meets the priority passing conditions, the road traffic signal on the level crossing where the train is heading is controlled to switch to the green light open countdown state.

8. The level crossing signal control method according to claim 6, characterized in that: The beacon device includes a second beacon device, the beacon information of the second beacon device includes second beacon information, and the second beacon information is used to indicate that the distance between the train and the level crossing in the train's direction is less than a distance threshold. The method includes: Upon receiving the second beacon information, the road traffic signal subsystem controls the road traffic signal at the level crossing where the train is heading to switch to a green light state, and sends a first feedback signal to the level crossing control subsystem, where the first feedback signal is used to indicate that the train is allowed to pass; The level crossing control subsystem controls the train crossing signal in the direction of the train to turn on the green light when receiving the first feedback signal.

9. The level crossing signal control method according to claim 6, characterized in that: The beacon device includes a third beacon device, the beacon information of the third beacon device includes third beacon information, and the third beacon information is used to indicate that the train has arrived at a level crossing in a train heading direction. The method includes: Upon receiving the third beacon information, the road traffic signal subsystem sends a second feedback signal to the level crossing control subsystem, wherein the second feedback signal is used to indicate that a train is allowed to pass; The level crossing control subsystem controls the train crossing signal in the direction of the train to turn on the green light when receiving the second feedback signal.

10. The level crossing signal control method according to claim 6, characterized in that: The beacon device includes a fourth beacon device, the beacon information of the fourth beacon device includes fourth beacon information, and the fourth beacon information is used to indicate that the train has left the level crossing. The method includes: Upon receiving the fourth beacon information, the road traffic signal subsystem sends the third feedback signal to the level crossing control subsystem, wherein the third feedback signal is used to indicate that trains are prohibited from passing; The level crossing control subsystem controls the train crossing signal in the train departure direction to light up red when receiving the third feedback signal.