Crane, monitoring method and monitoring system thereof and machine readable storage medium

Through the combination of image acquisition equipment and boom parameters, high-precision, low-cost automatic real-time detection of the crane's hook height is achieved, solving the problems of poor accuracy and low reliability in the existing technology, and improving the safety and efficiency of the crane. .

CN118744933AActive Publication Date: 2024-10-08ZOOMLION HEAVY INDUSTRY SCIENCE AND TECHNOLOGY CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410966867.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-18
Publication Date
2024-10-08
Estimated Expiration
2044-07-18

AI Technical Summary

Technical Problem

Existing heavy object lifting height detection methods have problems such as poor accuracy, low reliability and high cost, which results in the failure to achieve effective real-time detection during crane operations, limiting its application in the industry.

Method used

Obtain the overhead image of the hook through the image acquisition device, and combine the boom length and luffing angle to calculate the hook height using preset parameters and real-time swing angle to achieve automatic real-time detection with high precision and high success rate, and the image acquisition device It can swing freely to adapt to the deviation of the hook from the vertical state.

Benefits of technology

It achieves high-precision, high-success-rate automatic real-time detection of the hook height, improves the crane's safe and efficient operation capabilities, reduces costs, and is basically not limited by usage scenarios and working conditions, and has broad application potential.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118744933A_ABST
    Figure CN118744933A_ABST
Patent Text Reader

Abstract

The invention relates to the field of cranes, and discloses a crane and a monitoring method and a monitoring system thereof, and a machine readable storage medium, which only need to determine a real-time arm head height, obtain a real-time swing angle of an image obtaining device, and obtain a real-time effective top view image recording a real-time hook top view image through the image obtaining device. Therefore, the real-time lifting hook height can be automatically calculated according to a series of preset parameters in combination with the real-time effective area proportion of the real-time lifting hook top view image in the real-time effective top view image, only a small amount of detection equipment is needed in the process, the cost is low, and the lifting hook height can be automatically calculated by considering that the lifting hook deviates from the vertical state when a heavy object is moved. The image acquisition equipment is set to be capable of swinging freely so as to enlarge the position where the image acquisition equipment can acquire the image, the acquisition success rate of a real-time effective top view image recording a real-time lifting hook top view image is improved, and meanwhile image information deviation caused by the fact that the lifting hook deviates from a vertical state is corrected through a real-time swinging angle. And the calculation precision of the real-time lifting hook height is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of cranes, and specifically relates to a crane and a monitoring method, a monitoring system and a machine-readable storage medium thereof. Background Art

[0002] During the operation, the crane can move the heavy objects by lifting, rotating and lowering them. In theory, in order to make the lifting operation safe and efficient, and to reasonably plan the crane operation conditions to reduce unnecessary operations, it is best to achieve real-time detection of the lifting height of the heavy objects (or the lifting height of the hook).

[0003] However, existing methods for detecting the lifting height of heavy objects generally have problems such as poor accuracy, low reliability and high cost, and are limited by usage scenarios and working conditions. Therefore, they are basically not selected. As a result, the industry generally fails to effectively realize real-time detection of the lifting height of heavy objects. Summary of the invention

[0004] The purpose of this application is to provide a crane and its monitoring method, monitoring system and machine-readable storage medium, which can realize high-precision, high-success rate automatic real-time detection of hook height at a relatively low cost, greatly improve the safe and efficient operation capability of the crane, and are basically not limited by usage scenarios and working conditions, and have great potential for wide application in the industry.

[0005] In order to achieve the above objectives, the present application provides a crane monitoring method, which includes:

[0006] Determine the real-time boom head height H of the boom head;

[0007] Acquire a real-time effective top-view image recording a real-time top-view image of the hook through an image acquisition device, and acquire a real-time swing angle θ of the image acquisition device, wherein the image acquisition device is vertically mounted on the boom head and can swing freely along the front-rear direction of the boom;

[0008] Calculate the real-time hook height h3, satisfying:

[0009] h1 is the preset height difference between the hook and the boom head when the hook is at the preset highest position;

[0010] h2 is the preset height difference between the hook at the preset highest position and the preset lowest position;

[0011] S1 is the preset effective area ratio of the preset lowest hook top view image in the preset lowest effective top view image at the preset reference focal length of the image acquisition device;

[0012] S2 is the real-time effective area ratio of the real-time hook top view image in the real-time effective top view image at the preset reference focal length;

[0013] S3 is the preset effective area ratio of the preset highest hook top view image in the preset highest effective top view image at the preset reference focal length.

[0014] In some embodiments, when a real-time effective overhead view image recording a real-time overhead view image of a hook is acquired by an image acquisition device, the image acquisition device automatically adjusts the real-time focal length according to the distance from the hook; the crane monitoring method further includes:

[0015] Before calculating the real-time hook height h3, the real-time effective top-view image acquired by the image acquisition device at the real-time focal length is first converted into the real-time effective top-view image at the preset reference focal length.

[0016] In some embodiments, the crane monitoring method further comprises:

[0017] When the real-time swing angle θ and / or the real-time effective overhead view image cannot be obtained, the lifting and lowering movement of the hook is stopped and an alarm signal is issued.

[0018] In some embodiments, the crane monitoring method further comprises:

[0019] Detecting the integrity of the real-time overhead view image of the hook;

[0020] When the integrity is greater than a first preset value, it is determined that the crane is in a normal operating state;

[0021] When the integrity is not greater than the first preset value and is greater than the second preset value for a duration of not less than the first preset time length T1, it is judged that the crane is in a warning operation state, the lifting speed of the hook is slowed down, and an alarm signal is issued; when the integrity is restored to be greater than the first preset value and the duration is not less than the second preset time length T2, it is judged that the crane has resumed a normal operation state, the lifting speed of the hook is accelerated, and the alarm signal is released;

[0022] When the integrity is not greater than the second preset value and the duration is not less than the third preset time length T3, it is judged that the crane is in a restricted operation state, the lifting and lowering movement of the hook is stopped and an alarm signal is issued; when the integrity is restored to be greater than the second preset value and the duration is not less than the fourth preset time length T4, it is judged that the crane has exited the restricted operation state, the hook resumes lifting and lowering movement and the alarm signal is released.

[0023] In some embodiments, the crane monitoring method further comprises:

[0024] When the real-time hook height h3 reaches the factory preset minimum height, the hook is prohibited from descending and an alarm signal is issued;

[0025] When the real-time hook height h3 reaches the factory preset maximum height, the crane is prohibited from moving in a dangerous direction and an alarm signal is issued.

[0026] In some embodiments, the crane monitoring method further comprises:

[0027] When the real-time hook height h3 exceeds the manually preset warning range, the lifting speed of the hook is slowed down and an alarm signal is issued;

[0028] When the real-time hook height h3 exceeds the manually preset maximum range, the crane is prohibited from moving in a dangerous direction and an alarm signal is issued, wherein the manually preset warning range is a subset of the manually preset maximum range.

[0029] In some embodiments, determining a real-time boom head height H of a boom head includes:

[0030] Obtaining a boom length l and a boom amplitude angle α of the boom;

[0031] The real-time boom head height H is determined according to the boom length l and the boom amplitude angle α, and satisfies: H=l×sinα.

[0032] The second aspect of the present application also provides a crane monitoring system, which includes a boom length detection device, a boom luffing angle detection device, an image acquisition device, a swing angle detection device installed on the image acquisition device, and a processing device that communicates with the boom length detection device, the boom luffing angle detection device, the image acquisition device, and the swing angle detection device;

[0033] Wherein, the crane monitoring system is configured to be able to execute the above-mentioned crane monitoring method through the coordinated cooperation of the boom length detection device, the boom amplitude angle detection device, the image acquisition device, the swing angle detection device and the processing device.

[0034] In some embodiments, the crane monitoring system further comprises a damping mechanism for connecting the image acquisition device to the boom head of the boom so as to buffer the free swing of the image acquisition device.

[0035] In some embodiments, the crane monitoring system further includes an alarm device in communication with the processing device.

[0036] The third aspect of the present application also provides a crane, which includes the above-mentioned crane monitoring system.

[0037] The fourth aspect of the present application also provides a machine-readable storage medium storing instructions, wherein the instructions are used to enable a machine to execute the above-mentioned crane monitoring method.

[0038] By adopting the crane monitoring technology of the present application, it is only necessary to determine the real-time boom head height H, obtain the real-time swing angle θ of the image acquisition device installed on the boom head, and obtain the real-time effective top view image with the real-time hook top view image recorded by the image acquisition device, and then the real-time hook height h3 can be automatically calculated by a series of preset parameters, combined with the real-time effective area proportion S2 of the real-time hook top view image in the real-time effective top view image. In the monitoring process, only a small amount of detection equipment is needed, the cost is low, and considering that the hook will deviate from the vertical state when moving heavy objects, the image acquisition device is set to be able to swing freely to expand the orientation of the image it can obtain, improve the success rate of obtaining the real-time effective top view image with the real-time hook top view image recorded, and at the same time, the real-time swing angle θ is used to correct the image information deviation caused by the hook deviating from the vertical state, so as to improve the calculation accuracy of the real-time hook height h3. It can be seen that the crane monitoring technology of the present application can realize high-precision, high-success rate automatic real-time detection of hook height at a relatively low cost, greatly improving the safe and efficient operation capability of the crane, and is basically not limited by usage scenarios and working conditions, and has great potential for wide application in the industry.

[0039] Other features and advantages of the embodiments of the present application will be described in detail in the subsequent detailed description. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] The accompanying drawings are used to provide a further understanding of the embodiments of the present application and constitute a part of the specification. Together with the following specific embodiments, they are used to explain the embodiments of the present application, but do not constitute a limitation on the embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without creative work. In the drawings:

[0041] Figure 1 It is a schematic diagram of a crane monitoring system in a specific implementation manner of the present application monitoring a hook in a vertical state;

[0042] Figure 2 A schematic diagram of a crane monitoring method in a specific implementation manner of the present application;

[0043] Figure 3 It is a top view image acquired by an image acquisition device in a specific implementation manner of the present application.

[0044] Description of Reference Numerals

[0045] 1 Image acquisition device 2 Swing angle detection device

[0046] 3 Processing equipment 4 Damping mechanism

[0047] 5 Boom 6 Hook

[0048] 7 Rope 8 Complete top view image

[0049] 9 Effective top view image 10 Hook top view image DETAILED DESCRIPTION

[0050] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. It should be understood that the specific implementation methods described herein are only used to illustrate and explain the embodiments of the present application, and are not used to limit the embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.

[0051] It should be noted that if the embodiments of the present application involve directional indications (such as up, down, left, right, front, back...), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0052] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present application, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or suggesting their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by this application.

[0053] Reference Figures 1 to 3 The first exemplary embodiment of the present application provides a crane monitoring method, which includes:

[0054] Determine the real-time boom head height H of the boom head 5 (the boom head 5 is connected to the hook 6 via the rope 7);

[0055] A real-time effective top-view image recording a real-time top-view image of the hook is acquired through the image acquisition device 1, and a real-time swing angle θ of the image acquisition device 1 is acquired, wherein the image acquisition device 1 is vertically mounted on the boom head 5 and can swing freely along the front-rear direction of the boom;

[0056] Calculate the real-time hook height h3, satisfying:

[0057] h1 is the preset height difference between the hook 6 and the boom head 5 when the hook 6 is at the preset highest position;

[0058] h2 is the preset height difference between the hook 6 at the preset highest position and the preset lowest position;

[0059] S1 is the preset effective area ratio of the preset lowest hook top view image in the preset lowest effective top view image at the preset reference focal length of the image acquisition device 1;

[0060] S2 is the real-time effective area ratio of the real-time hook top view image in the real-time effective top view image at the preset reference focal length;

[0061] S3 is the preset effective area ratio of the preset highest hook top view image in the preset highest effective top view image at the preset reference focal length.

[0062] It should be noted that the present application does not limit the method for determining the real-time boom head height H. For example, a distance measuring sensor may be installed on the boom head 5 for direct measurement; or, the boom length and the boom luffing angle may be detected first, and then the real-time boom head height H may be calculated based on the trigonometric function relationship, and the boom length and the boom luffing angle may be detected by the original boom length sensor and angle sensor on the crane, respectively, so that when implementing the method of the present application, there is no need to add an additional distance measuring sensor or the like to measure the real-time boom head height H.

[0063] In addition, when the image acquisition device 1 is not subjected to external force, it remains in a hanging state with the lens facing downward. The top view image acquired by the image acquisition device 1 can be referred to as Figure 3 , wherein the area enclosed by the boundary of the complete overhead image 8 is the shooting field of view of the image acquisition device 1. When executing the method of the present application, after the image acquisition device 1 captures the complete overhead image 8, it can send the complete overhead image 8 to a device with an image recognition function such as a processing device 3. The device with an image recognition function can extract the effective overhead image 9 recording the overhead image 10 of the hook from the complete overhead image 8, and can calculate the effective area ratio of the overhead image 10 of the hook in the effective overhead image 9.

[0064] Of course, the image acquisition device 1 can also directly use the acquired complete overhead view image 8 as the effective overhead view image 9. In this case, the image acquisition device 1 is required to have a certain hook recognition function. In this way, after the image acquisition device 1 sends the complete overhead view image 8 to the device with image recognition function, the device with image recognition function directly regards the complete overhead view image 8 as the effective overhead view image 9, and calculates the effective area ratio of the hook overhead view image 10 in the effective overhead view image 9.

[0065] The present application also does not limit the specific selection of the image acquisition device 1. For example, the image acquisition device 1 may be a high-speed fixed-focus camera or a high-speed zoom camera, etc. The high-speed shooting function can improve the success rate and real-time performance of acquiring images.

[0066] If a high-speed zoom camera is used, the focal length can be adjusted according to the distance between the hook 6 and the lens. When the hook 6 is close to the lens, a short focal length can be used for shooting. When the hook 6 is far from the lens, a long focal length can be used for shooting. Therefore, the clarity and effectiveness of the image can be improved, ensuring that the equipment with image recognition function can accurately capture the effective overhead image 9 that records the hook overhead image 10 from the complete overhead image 8. In particular, when the hook 6 is far away from the lens, if a short focal length is still used for shooting, the area of ​​the hook top view image 10 in the complete top view image 8 is relatively small, and the clarity may be insufficient. At the same time, considering that under the lifting operation condition, the complete top view image 8 usually also records the top view images of other objects (such as various objects placed on the ground of the construction site), at this time, the top view images of the hook 10 and the top view images of other objects in the complete top view image 8 may be difficult to distinguish in terms of outline, structure and other detailed features, thereby there is a risk of misjudgment of image recognition and mistaking the top view images of other objects for the hook top view image 10, resulting in the failure to correctly capture the valid top view image 9 that records the hook top view image 10. Therefore, when the hook 6 is far away from the lens, shooting with a long focal length can ensure that the hook top view image 10 has a larger area in the complete top view image 8, making it easier to identify and avoiding image recognition misjudgment.

[0067] Of course, in theory, as long as the computing and analysis performance of the device with image recognition function is strong enough, even if the image acquisition device 1 uses a short focal length to shoot the far hook 6, the above-mentioned image recognition misjudgment can be avoided. In other words, the use of a high-speed fixed-focus camera is also feasible in this application.

[0068] It can be seen that when the zoom shooting hook 6 is used, the functional requirements for the image acquisition device 1 are relatively high, but the performance requirements for the device with image recognition function are relatively low; and when the fixed-focus shooting hook 6 is used, the functional requirements for the image acquisition device 1 are relatively low, but the performance requirements for the device with image recognition function are relatively high. Therefore, when applying the method of the present application, the equipment can be selected according to actual needs.

[0069] In addition, refer to Figure 2, point A represents the preset highest position of the hook 6, point B represents the preset lowest position of the hook 6, point C represents the real-time position of the hook 6 when it deviates from the vertical state, and point C' represents the real-time position of the hook 6 when it is in the vertical state. The preset height difference h1 between the hook 6 and the arm head 5 when it is in the preset highest position and the preset height difference h2 between the hook 6 in the preset highest position and the preset lowest position are both manually preset values. When the above formula is used to calculate the real-time hook height h3, the preset height difference h1 and the preset height difference h2 are both regarded as fixed values ​​and substituted into the calculation. For example, the boom length and the boom amplitude angle can be adjusted to the maximum. Under this premise, the highest position that the hook 6 can reach is taken as the preset highest position A, and the position where the hook 6 just touches the ground is taken as the preset lowest position B. At this time, the preset height difference h1 and the preset height difference h2 can be directly obtained from the crane product specification, and can be directly pre-stored in the device with image recognition function.

[0070] When the hook 6 is at the preset lowest position B, the preset lowest effective top view image recording the preset lowest hook top view image can be obtained in advance through the image acquisition device 1, and the preset effective area ratio S1 of the preset lowest effective top view image of the preset lowest hook can be calculated and stored in advance through a device with an image recognition function. When the hook 6 is at the preset highest position A, the preset highest effective top view image recording the preset highest hook top view image can be obtained in advance through the image acquisition device 1, and the preset effective area ratio S3 of the preset highest effective top view image of the preset highest effective top view image can be calculated and stored in advance through a device with an image recognition function.

[0071] At the same focal length, the ratio of the height difference between the hook 6 at point A and point C' to the height difference between the hook 6 at point A and point B (i.e. h2) is equal to Therefore, in the above formula, The height difference between the hook 6 at point A and point C' is calculated.

[0072] It can be seen that in order to accurately calculate the height difference between the hook 6 at point A and point C', when obtaining the top view images of the hook 6 at the preset highest position A, the preset lowest position B and the real-time position respectively, whether fixed-focus shooting or zoom shooting is used, in the subsequent calculation When the hook 6 is photographed at different positions, the size of each overhead image must be converted to the size at the preset reference focal length in advance according to the proportional relationship between the shooting focal length corresponding to the hook 6 at different positions and the preset reference focal length (for example, assuming that the hook 6 is photographed at a long focal length of 100 mm to obtain a real-time effective overhead image recording the real-time hook overhead image, then after the area size of the real-time hook overhead image is converted to the area size at a short focal length of 20 mm, the area size of the real-time hook overhead image should be reduced to (1 / 5) of the original size). 2), and then respectively calculate the preset effective area ratio S1, the real-time effective area ratio S2 and the preset effective area ratio S3 under the preset reference focal length, and then substitute S1, S2 and S3 into These conversions and operations can be automatically performed by conversion and operation programs pre-stored in the device with image recognition function.

[0073] The present application does not limit the specific setting of the preset reference focal length. For example, the focal length used in obtaining the overhead image when the hook 6 is in the preset lowest position B can be used as the preset reference focal length.

[0074] When the crane is moving heavy objects, if the accurate real-time hook height h3 is to be calculated, it is also necessary to consider how to eliminate as much as possible the deviation in image acquisition and subsequent calculations caused by the hook 6 deviating from the vertical state.

[0075] Specifically, when the hook 6 is at point C due to deviation from the vertical state, the angle between the hook 6 and the vertical is the aforementioned real-time swing angle θ, and the distance between the hook and the arm head 5 (i.e., the length of the rope 7) does not change when the hook is at point C and point C'. If the real-time swing angle θ is not considered, the real-time hook height h3 obtained at this time is actually the height of the hook 6 at point C', which is lower than the actual height of the hook 6 at point C. If an object with a height between point C' and point C is placed on the ground, there is a risk of collision between the hook 6 and the object, and the larger the real-time swing angle θ, the greater the calculation error, and the greater the risk of collision between the hook 6 and the object. At this time, in order to reduce the risk of collision, it is required that the heavy object cannot be moved at a faster speed to limit the real-time swing angle θ, which reduces the work efficiency.

[0076] Based on the above analysis, the method of the present application takes into account the adverse effects of the real-time swing angle θ. The calculation of the real-time swing angle θ is added to ensure that the real-time hook height h3 obtained is the height of point C with higher accuracy. And obviously, when the hook 6 is in a vertical state, the real-time swing angle θ is zero, and the points C and C' are the same point at this time, which does not affect the calculation accuracy of the real-time hook height h3 when the hook 6 is in a vertical state.

[0077] The present application does not limit the specific method of detecting the real-time swing angle θ. For example, a swing angle detection device (such as an angle sensor, etc.) can be installed on the image acquisition device 1. When the image acquisition device 1 swings due to the shaking of the crane operation, the swing angle detection device can detect the real-time swing angle θ accordingly.

[0078] Finally, it should be added that in order to improve the recognition ability of the device with image recognition function to the hook 6, a large number of videos or pictures of the hook 6 in use can be taken in advance, and the image information of the hook can be transmitted to the device. The machine learning algorithm can be preset in the device, so that by learning a large number of videos and pictures of the hook 6 in use, it can be ensured that the hook 6 in various postures can be effectively identified in actual application.

[0079] In summary, by adopting the crane monitoring method of the present application, it is only necessary to determine the real-time boom head height H, obtain the real-time swing angle θ of the image acquisition device 1 installed on the boom head 5, and obtain the real-time effective top view image with the real-time hook top view image recorded by the image acquisition device 1, and then the real-time hook height h3 can be automatically calculated by a series of preset parameters (h1, h2, S1, S3), combined with the real-time effective area proportion S2 of the real-time hook top view image in the real-time effective top view image. In the monitoring process, only a small amount of detection equipment (such as swing angle detection equipment, image acquisition equipment 1) is needed, the structure is simple, the cost is low, and considering that the hook 6 will deviate from the vertical state when moving heavy objects, the image acquisition device 1 is set to be able to swing freely to expand the orientation of its own image acquisition, improve the success rate of acquiring the real-time effective top view image with the real-time hook top view image recorded, and at the same time, the real-time swing angle θ is used to correct the image information deviation caused by the hook 6 deviating from the vertical state, so as to improve the calculation accuracy of the real-time hook height h3.

[0080] For comparison, two existing hook height detection technologies (laser ranging method and rope length ranging method) will be listed below to better reflect the advantages of this application.

[0081] Let's first look at the laser distance measurement method. This existing technology uses a laser distance measurement device to detect the straight-line distance from the boom head to the top of the hook or the straight-line distance from the ground to the lower plane of the weight, and sends the detected distance information to the control system in real time. The control system calculates the height of the boom head based on the boom extension length and boom elevation angle detected by itself, and determines the distance between the weight and the boom head. When the distance is less than a certain set value, the control system limits the dangerous direction of the crane and issues an audible and visual alarm.

[0082] However, its defects are very obvious. On the one hand, the effective detection area of ​​a single laser distance measuring device is very small and cannot fully describe the actual height or position of the entire weight. As the number of laser distance measuring devices increases, the cost will increase. On the other hand, during the lifting operation, changes in the crane's posture or shaking caused by the lifting operation may cause the measured weight to be off the laser distance measurement route, making distance measurement more difficult.

[0083] Looking at the rope length ranging method, this existing technology determines the lifting height of the hook by detecting the length of the lifting wire rope. The on-board control unit detects the number of rotations of the wire rope winch, the rotation angle, the rotation speed, the wire rope diameter, the boom extension length, the boom angle, the lifting wire rope hook ratio and other information in real time, and calculates the actual lifting height of the hook. When the lifting height reaches the set value, the control system limits the dangerous direction of the crane and issues an audible and visual alarm.

[0084] However, its defects are also very obvious. First, there are many variables involved in the calculation of the rope length ranging method, which requires a large number of sensors for detection, which is costly, and the magnification currently relies mainly on manual entry, and cumulative errors or variable errors will cause the function to fail. In addition, due to the large number of sensors, the detection error of any sensor will cause the function to fail.

[0085] It can be seen that both the laser ranging method and the rope length ranging method have problems such as poor accuracy, low reliability and high cost, and are limited by the usage scenarios and working conditions. Therefore, they are basically not selected. As a result, the industry generally fails to effectively realize real-time detection of the lifting height of heavy objects.

[0086] In contrast, it can be seen that the crane monitoring method of the present application can achieve high-precision, high-success rate automatic real-time detection of the hook height at a relatively low cost, greatly improving the safe and efficient operation capability of the crane, and is basically not limited by usage scenarios and working conditions, and has great potential for wide application in the industry.

[0087] In some embodiments, when the real-time effective overhead image recording the real-time overhead image of the hook is acquired by the image acquisition device 1, the image acquisition device 1 automatically adjusts the real-time focal length according to the distance from the hook 6. Based on this, the crane monitoring method may further include:

[0088] Before calculating the real-time hook height h3, the real-time effective top-view image acquired by the image acquisition device 1 at the real-time focal length is first converted into a real-time effective top-view image at a preset reference focal length.

[0089] In other words, in this embodiment, the image acquisition device 1 adopts automatic zoom shooting, and can automatically adjust the real-time focal length according to the distance between the hook 6 and the lens. When the hook 6 is close to the lens, a short focal length is used for shooting, and when the hook 6 is far from the lens, a long focal length is used for shooting, so that a real-time effective top view image with high clarity and effectiveness can be obtained. When calculating the real-time hook height h3, the real-time effective top view image obtained by the image acquisition device 1 at the real-time focal length is converted into a real-time effective top view image at the preset reference focal length to ensure accurate calculation results.

[0090] Several embodiments of achieving safety control using the crane monitoring method of the present application are introduced below. Compared with the current method of using a lifting height limit device in the industry to limit the lifting height of heavy objects, the present application can simplify the structure of the crane, save costs, and can adjust the limit range of the real-time hook height h3 according to actual needs.

[0091] In some embodiments, the crane monitoring method further comprises:

[0092] When the real-time swing angle θ and / or the real-time effective overhead view image cannot be obtained, the lifting and lowering movement of the hook 6 is stopped and an alarm signal is issued.

[0093] For example, when the swing angle detection device 2 and / or the image acquisition device 1 are in abnormal state, the processing device 3 cannot receive effective signals from the swing angle detection device 2 and / or the image acquisition device 1, and thus cannot obtain the real-time swing angle θ and / or the real-time effective overhead image. At this time, the lifting and lowering movement of the hook 6 needs to be stopped to avoid safety accidents. At the same time, the crane will send out an alarm signal to remind the operator to stop and check. Only when the states of the swing angle detection device 2 and the image acquisition device 1 return to normal, normal operation is allowed to continue.

[0094] In some embodiments, the crane monitoring method further comprises:

[0095] Check the integrity of the real-time hook top view image;

[0096] When the integrity is greater than a first preset value, it is determined that the crane is in a normal operating state;

[0097] When the integrity is not greater than the first preset value and the duration greater than the second preset value is not less than the first preset time length T1, it is judged that the crane is in the early warning operation state, the lifting speed of the hook 6 is slowed down and an alarm signal is issued; when the integrity is restored to be greater than the first preset value and the duration is not less than the second preset time length T2, it is judged that the crane has resumed the normal operation state, the lifting speed of the hook 6 is accelerated and the alarm signal is released;

[0098] When the integrity is not greater than the second preset value and the duration is not less than the third preset time length T3, it is judged that the crane is in a restricted operation state, the lifting and lowering movement of the hook 6 is stopped and an alarm signal is issued; when the integrity is restored to be greater than the second preset value and the duration is not less than the fourth preset time length T4, it is judged that the crane has exited the restricted operation state, the hook 6 resumes lifting and lowering and the alarm signal is released.

[0099] In this embodiment, the detection of the integrity of the real-time overhead view image of the hook can be automatically executed by, for example, a program pre-stored in the processing device 3. After determining the integrity of the real-time overhead view image of the hook, the processing device 3 can control the crane to perform different actions from a safety perspective according to the above different situations, thereby greatly improving safety.

[0100] In some embodiments, the crane monitoring method further comprises:

[0101] When the real-time hook height h3 reaches the factory preset minimum height, the hook 6 is prohibited from descending and an alarm signal is issued;

[0102] When the real-time hook height h3 reaches the factory preset maximum height, the crane is prohibited from moving in the dangerous direction and an alarm signal is issued.

[0103] As the name implies, the factory preset minimum height and the factory preset maximum height are both the limit heights preset when the crane leaves the factory. In this embodiment, the real-time hook height h3 obtained by calculation is compared with the height range defined by the factory preset minimum height and the factory preset maximum height. When the real-time hook height h3 exceeds the height range, the crane is controlled to perform corresponding protection actions, thereby improving the safety of the lifting operation.

[0104] In some embodiments, the crane monitoring method further comprises:

[0105] When the real-time hook height h3 exceeds the manually preset warning range, the lifting speed of the hook 6 is slowed down and an alarm signal is issued;

[0106] When the real-time hook height h3 exceeds the manually preset maximum range, the crane is prohibited from moving in the dangerous direction and an alarm signal is issued, wherein the manually preset warning range is a subset of the manually preset maximum range.

[0107] The manually preset warning range in this embodiment is specifically defined by the manually preset warning maximum height and the manually preset warning minimum height, and the manually preset maximum range is specifically defined by the manually preset maximum height and the manually preset minimum height. Since both the manually preset warning range and the manually preset maximum range are manually preset, they can be adjusted according to actual needs. For example, the range sizes of the manually preset warning range and the manually preset maximum range can be adjusted through the human-computer interaction interface and then stored in the processing device 3. The adjustable manually preset warning range and the manually preset maximum range are conducive to improving the safety control adaptability of the crane for different operating conditions.

[0108] In some embodiments, determining the real-time boom head height H of the boom head 5 of the boom includes:

[0109] Obtain the boom length l and the boom amplitude angle α of the boom;

[0110] The real-time boom head height H is determined according to the boom length l and the boom amplitude angle α, and satisfies: H = l×sinα.

[0111] In addition, the second exemplary embodiment of the present application also provides a crane monitoring system, which includes a boom length detection device, a boom amplitude angle detection device, an image acquisition device 1, a swing angle detection device 2 installed on the image acquisition device 1, and a processing device 3 that communicates with the boom length detection device, the boom amplitude angle detection device, the image acquisition device 1 and the swing angle detection device 2.

[0112] Specifically, the boom length detection device is used to detect the boom length l, the boom amplitude angle detection device is used to detect the boom amplitude angle α, the image acquisition device 1 is used to acquire a real-time effective top view image with a real-time hook top view image recorded, and the swing angle detection device 2 is used to detect the real-time swing angle θ of the image acquisition device 1, and can be installed on the image acquisition device 1. The processing device 3 can respectively acquire the boom length l, the boom amplitude angle α, the real-time effective top view image with a real-time hook top view image recorded, and the real-time swing angle θ from these devices, and the crane monitoring system can perform the above crane monitoring method through the coordinated cooperation of the boom length detection device, the boom amplitude angle detection device, the image acquisition device 1, the swing angle detection device 2, and the processing device 3, thereby realizing real-time detection of the hook height and safe control of the crane.

[0113] In some embodiments, the crane monitoring system further includes a damping mechanism 4 for connecting the image acquisition device 1 with the boom head 5 of the boom. When the image acquisition device 1 swings freely due to the shaking of the crane operation, the damping mechanism 4 can buffer the free swing of the image acquisition device 1 to a certain extent, thereby improving the shooting stability of the image acquisition device 1.

[0114] In some embodiments, the crane monitoring system further includes an alarm device that communicates with the processing device 3. During the process of the crane monitoring system executing the above monitoring method, when a situation requiring an alarm occurs, the processing device 3 can send a trigger signal to the alarm device, thereby controlling the alarm device to alarm, such as sound and light alarm.

[0115] The third exemplary embodiment of the present application further provides a crane, which includes the above-mentioned crane monitoring system.

[0116] The fourth exemplary embodiment of the present application further provides a machine-readable storage medium, on which instructions are stored, and the instructions are used to enable a machine to execute the above-mentioned crane monitoring method.

[0117] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code.

[0118] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0119] These computer program instructions may also be stored in a computer readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0120] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process in the computer or other programmable device. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0121] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.

[0122] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.

[0123] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.

[0124] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0125] The above are only embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included within the scope of the claims of the present application.

Claims

1. A crane monitoring method, characterized in that: include: Determine the real-time boom head height H of the boom head (5); Acquiring a real-time effective overhead image recording a real-time overhead image of the hook through an image acquisition device (1), and acquiring a real-time swing angle θ of the image acquisition device (1), wherein the image acquisition device (1) is vertically mounted on the boom head (5) and can swing freely along the front-rear direction of the boom; Calculate the real-time hook height h3, satisfying: h1 is the preset height difference between the hook (6) and the boom head (5) when the hook (6) is at the preset highest position; h2 is the preset height difference between the hook (6) at the preset highest position and the preset lowest position; S1 is the preset effective area ratio of the preset lowest-level hook top view image in the preset lowest-level effective top view image at the preset reference focal length of the image acquisition device (1); S2 is the real-time effective area ratio of the real-time hook top view image in the real-time effective top view image at the preset reference focal length; S3 is the preset effective area ratio of the preset highest hook top view image in the preset highest effective top view image at the preset reference focal length.

2. The crane monitoring method according to claim 1, characterized in that: When a real-time effective overhead image recording a real-time overhead image of the hook is acquired by the image acquisition device (1), the image acquisition device (1) automatically adjusts the real-time focal length according to the distance from the hook (6); The crane monitoring method further comprises: Before calculating the real-time hook height h3, the real-time effective top-view image acquired by the image acquisition device (1) at the real-time focal length is first converted into the real-time effective top-view image at the preset reference focal length.

3. The crane monitoring method according to claim 1, characterized in that: The crane monitoring method further comprises: When the real-time swing angle θ and / or the real-time effective overhead view image cannot be obtained, the lifting and lowering movement of the hook (6) is stopped and an alarm signal is issued.

4. The crane monitoring method according to claim 1, characterized in that: The crane monitoring method further comprises: Detecting the integrity of the real-time overhead view image of the hook; When the integrity is greater than a first preset value, it is determined that the crane is in a normal operating state; When the integrity is not greater than the first preset value and is greater than the second preset value for a duration not less than the first preset time length T1, it is judged that the crane is in a warning operation state, the lifting speed of the hook (6) is slowed down and an alarm signal is issued; when the integrity is restored to be greater than the first preset value and the duration is not less than the second preset time length T2, it is judged that the crane has resumed a normal operation state, the lifting speed of the hook (6) is accelerated and the alarm signal is released; When the degree of integrity is not greater than the second preset value and the duration is not less than the third preset time length T3, it is determined that the crane is in a restricted operation state, the lifting and lowering movement of the hook (6) is stopped and an alarm signal is issued; when the degree of integrity is restored to be greater than the second preset value and the duration is not less than the fourth preset time length T4, it is determined that the crane has exited the restricted operation state, the hook (6) resumes lifting and lowering movement and the alarm signal is released.

5. The crane monitoring method according to claim 1, characterized in that: The crane monitoring method further comprises: When the real-time hook height h3 reaches the factory preset minimum height, the hook (6) is prohibited from descending and an alarm signal is issued; When the real-time hook height h3 reaches the factory preset maximum height, the crane is prohibited from moving in a dangerous direction and an alarm signal is issued.

6. The crane monitoring method according to claim 1, characterized in that: The crane monitoring method further comprises: When the real-time hook height h3 exceeds the manually preset warning range, the lifting speed of the hook (6) is slowed down and an alarm signal is issued; When the real-time hook height h3 exceeds the manually preset maximum range, the crane is prohibited from moving in a dangerous direction and an alarm signal is issued, wherein the manually preset warning range is a subset of the manually preset maximum range.

7. The crane monitoring method according to any one of claims 1 to 6, characterized in that: Determining the real-time boom head height H of the boom head (5) of the boom includes: Obtaining a boom length l and a boom amplitude angle α of the boom; The real-time boom head height H is determined according to the boom length l and the boom amplitude angle α, and satisfies: H=l×sinα.

8. A crane monitoring system, characterized in that: The invention comprises a boom length detection device, a boom amplitude angle detection device, an image acquisition device (1), a swing angle detection device (2) installed on the image acquisition device (1), and a processing device (3) communicating with the boom length detection device, the boom amplitude angle detection device, the image acquisition device (1) and the swing angle detection device (2); The crane monitoring system is configured to be able to execute the crane monitoring method according to any one of claims 1 to 7 through the coordinated cooperation of the boom length detection device, the boom amplitude angle detection device, the image acquisition device (1), the swing angle detection device (2) and the processing device (3).

9. The crane monitoring system according to claim 8, characterized in that: The crane monitoring system further comprises a damping mechanism (4) for connecting the image acquisition device (1) and the arm head (5) so as to be able to buffer the free swing of the image acquisition device (1).

10. The crane monitoring system according to claim 8, characterized in that: The crane monitoring system also includes an alarm device in communication with the processing device (3).

11. A crane, characterized in that Comprising a crane monitoring system according to any one of claims 8 to 10.

12. A machine-readable storage medium, characterized in that: The machine-readable storage medium stores instructions, and the instructions are used to enable a machine to execute the crane monitoring method according to any one of claims 1 to 7.

Citation Information

Patent Citations

  • Leveling method and system for multi-winch hoisting lifting appliance

    CN112456334A

  • Tower crane hoisting height estimation method and device based on target identification

    CN116309777A

  • Camera posture detection device

    JP2015219107A

  • Mobile crane and remote terminal device

    JP2021038086A