Centralized hopper loading mining method for gently inclined thin vein footwall

By dividing the gently sloping thin veins into independent ore blocks and setting up ore collection funnels, the ore can be loaded directly into trucks, solving the problems of low efficiency and high cost in the existing technology, improving mining efficiency and reducing mining costs.

CN118745896AActive Publication Date: 2024-10-08ZIJIN MINING GROUP CO LTD +1
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410982321.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-10-08
Estimated Expiration
2044-07-22

AI Technical Summary

Technical Problem

The existing technology has low efficiency and high cost in the mining of gently sloping thin veins. In particular, the electric rake extraction method has low efficiency and a large amount of work. There is no effective centralized hopper loading mining method in the footwall.

Method used

Divide the ore body into independent ore blocks, arrange stopes and vehicle transportation lanes along the direction and inclination of the ore body to form a channel, and set up an ore collecting funnel in the center of the ore block, and load the ore directly into the vehicle through a shallow hole to reduce secondary Bad luck, improve mining efficiency.

Benefits of technology

It improves mining efficiency, reduces mining costs, simplifies production organization and management, and is suitable for mining ore bodies with different inclinations and thicknesses.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118745896A_ABST
    Figure CN118745896A_ABST
Patent Text Reader

Abstract

A concentrated hopper loading mining method for a gently inclined thin vein footwall comprises the steps that an ore body is divided into ore blocks in the trend and tendency of the ore body, each ore block is an independent stoping unit, a stope vein-following roadway is arranged on the lower portion of each ore block, and an automobile transportation roadway is arranged on the footwall of the ore body; the stope vein-following roadway is communicated with the automobile haulage roadway through the ore removal transverse drift and the stope slope connection way to form a channel for personnel and equipment to enter and exit from the stope; an air return uphill is tunneled from a stope along a vein roadway in the center of an ore block in the direction opposite to the inclination direction of an ore body to penetrate through an air return roadway, an air return channel in the ore block is formed, an ore collecting hopper is arranged in the center of the bottom of the ore block to penetrate through the stope and an ore removal transverse drift, and an ore removal channel is formed. Shallow hole ore breaking is adopted, caved ore is raked to an ore collecting hopper through an electric rake, is directly loaded into an automobile located in an ore removal transverse drift through the ore collecting hopper and is conveyed to a middle section main draw shaft through the automobile for ore removal; the safety pillars and the pillars between the ore blocks are reserved around the ore blocks, the stope point pillars are reserved in the ore blocks, the stope is supported to be stable, and the method has the advantages that efficiency can be improved, and large space can be fully utilized and optimized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of underground mining of metal mines, and in particular to a concentrated hopper loading mining method for the lower plate of a gently inclined thin ore vein. Background Art

[0002] Gently inclined thin ore bodies are a type of ore body that is common in underground metal mining. Their inclination angle often exceeds the maximum climbing slope of trackless equipment when traveling, so it is difficult to use a scraper to mine. For low-value gently inclined thin ore bodies, a comprehensive method of electric rake mining is generally used. The comprehensive method of electric rake mining generally arranges ore pillars along the strike and inclination rules, or arranges two sections of electric rakes along the inclination and strike for concentrated mining, or arranges multiple chutes along the strike for partitioned mining. The two-section electric rake centralized mining requires two reverse transportations, and the mining efficiency is low. Multiple chutes for partitioned mining increase the amount of mining and cutting engineering, resulting in an increase in mining costs.

[0003] In summary, the existing comprehensive mining method for mining gently inclined thin veins has a lot of room for optimization in terms of efficiency and cost. After searching by our research team, no public reports related to the centralized funnel loading mining method at the foot of gently inclined thin veins were found.

[0004] Therefore, it is of great significance to develop a concentrated funnel loading mining method for the footwall of gently inclined thin ore veins. Summary of the invention

[0005] The task of the present invention is to overcome the shortcomings of the prior art and propose a concentrated hopper loading mining method for the footwall of a gently inclined thin ore vein, which can not only improve efficiency but also fully utilize and optimize a larger space.

[0006] 1. The concentrated funnel loading mining method for the footwall of gently inclined thin ore veins aims at the problems of low mining efficiency and high mining cost of gently inclined thin ore veins. The ore body is divided into ore blocks along the direction and inclination of the ore body. Each ore block is an independent mining unit. The vein lanes of the mining field are arranged at the bottom of the ore block, and the automobile transportation lanes are arranged at the footwall of the ore body. The vein lanes of the mining field and the automobile transportation lanes are connected through the mine vein and the mining field slope connecting road, forming a channel for personnel and equipment to enter and exit the mining field; in the center of the ore block, the mining field vein lanes are opened from the vein lanes of the mining field against the inclination direction of the ore body. At the beginning of excavation, the return air uphill passes through the return air tunnel to form a return air channel in the ore block. A collecting funnel is arranged in the center of the bottom of the ore block, which passes through the mining area and the ore-discharging vein to form a ore-discharging channel. When mining, the return air uphill is used as the free surface, and it advances from the center of the ore block to both sides of the ore block. Shallow holes are used for ore dropping, and the collapsed ore is raked to the ore collecting funnel by an electric rake, and directly loaded into the car located at the ore-discharging vein through the ore collecting funnel, and transported to the middle main chute by the car for ore discharge; safety pillars and inter-block pillars are left around the ore block, and mining point pillars are left in the ore block to support the stability of the mining area.

[0007] Compared with the prior art, the present invention has the following advantages or effects:

[0008] Because the mining operation has a ore collection chute, the ore is loaded directly into the car from the funnel, the mine raking and car loading are independent of each other and do not affect each other, so it is beneficial to improve the production capacity of the mining area; at the same time, because the development system can be interchangeable with the development system of the trolley rock drill and the ore loading by the shovel loader, it is convenient for the mine to realize mechanized operation, so it is convenient for production organization and management; in addition, since the electric rake is used to rake the ore from one section to the funnel and load it directly into the car, the mining area can reduce secondary transportation.

[0009] In summary, the technical solution of the present invention is simple and easy to design, has low technical requirements, is highly adaptable to changes in the occurrence of ore bodies, and is suitable for mining various gently inclined, inclined and different thickness ore bodies.

[0010] The slope x% mentioned in the application documents refers to the height xm occupied by a horizontal line of 100m. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 The present invention provides a top view schematic diagram of the stope layout of a concentrated hopper loading mining method for the footwall of a gently inclined thin ore vein.

[0012] Figure 2 yes Figure 1 A side view schematic diagram of the stope layout is shown.

[0013] The symbols in the accompanying drawings represent:

[0014] 1. Automobile transport tunnel 2. Security pillar 3. Mining field vein tunnel 4. Mining field slope connecting road 5. Ore out of the vein 6. Return air up the mountain 7. Mining field point pillar 8. Ore block pillar 9. Return air tunnel 10. Ore collection funnel 11. Electric rake 12. Caving ore

[0015] The present invention is further described in detail below in conjunction with the accompanying drawings. DETAILED DESCRIPTION

[0016] like Figures 1-2As shown, the concentrated funnel loading mining method for the lower plate of the gently inclined thin ore vein aims at the problems of low mining efficiency and high mining cost of the gently inclined thin ore vein. The ore body is divided into ore blocks along the direction and inclination of the ore body. Each ore block is an independent mining unit. A mining field vein tunnel 3 is arranged at the lower part of the ore block, and a car transportation tunnel 1 is arranged at the lower plate of the ore body. The mining field vein tunnel 3 and the car transportation tunnel 1 are connected through the ore-exiting vein 5 and the mining field slope connecting road 4 to form a passage for personnel and equipment to enter and exit the mining field; in the center of the ore block, the return air uphill 6 is excavated from the mining field vein tunnel 3 against the inclination direction of the ore body to penetrate the return air tunnel 9 to form a return air channel in the ore block; a ore collecting funnel 10 is arranged in the center of the bottom of the ore block to penetrate the mining field and the ore-exiting vein 5 to form a ore-exiting channel. During mining, the return air uphill 6 is used as the free surface to advance from the center of the ore block to both sides of the ore block, and shallow holes are used to drop the ore. 2 is raked by the electric rake 11 to the ore collecting hopper 10, and directly loaded into the car located at the ore-exiting vein 5 through the ore collecting hopper 10, and transported to the middle main chute by the car to exit the ore; safety pillars 2 and inter-block pillars 8 are left around the ore block, and stope point pillars 7 are left in the ore block to support the stability of the stope.

[0017] The process of the present invention may further be:

[0018] The strike length of the ore block is 80 to 100 m, and the oblique length in the inclined direction is 50 to 60 m.

[0019] The mining field vein tunnel 3 is determined based on the ore body plan and inclined profile or the ore body contour profile. Taking the mining field vein tunnel 3 as a reference, the lower plate automobile transportation tunnel 1 is arranged at a vertical height of 5.5 to 6.5 meters and a horizontal distance of about 25 meters from the mining field vein tunnel 3.

[0020] The ore-discharging vein 5 is arranged at a side distance of about 0.7m on one side of the return air uphill 6 in the center of the mining field, and a collecting funnel 10 is arranged in the ore-discharging vein 5 about 14m away from the vein tunnel 3 along the mining field. The upper part of the ore-collecting funnel 10 passes through the mining field and expands into a rectangle, which is convenient for electric rake ore discharging and collecting.

[0021] The stope slope connecting road 4 is arranged at the end of the ore-exiting vein 5 along the stope vein lane safety pillar 2, and passes through the stope vein lane 3. The stope slope connecting road 4 has a slope of about 20%.

[0022] The safety pillars 2 are located on both sides of the vein tunnel 3 in the mining area, with a width of 2.5m. The block pillars 8 are arranged in the form of point pillars with a center distance of 15m and a diameter of 5m. In order to facilitate the centralized ore discharge from the chute, the mining area point pillars 7 are arranged radially with the ore collecting funnel 10 as the center. The center distance of the mining area point pillars 7 is 6 to 10mm, the diameter is 3m, and 3m wide strips are arranged locally.

[0023] The automobile transport tunnel 1, the ore-exiting vein 5, the mining field slope connecting road 4 and the mining field vein tunnel 3 are used for personnel and equipment to enter and exit the mining field in sequence.

[0024] The automobile transport tunnel 1, the ore-exiting vein 5, the mining field slope connecting road 4 and the mining field vein tunnel 3 are provided for fresh air to flow sequentially into the mining field, and after washing the working face, the polluted air is discharged through the return air tunnel 9.

[0025] The collapsed ore 12 is raked by an electric rake 11 to a mining field collecting hopper 10, and is placed in a car located at a mining vein 5 through the collecting hopper 10, and is transported to the middle main chute for mining.

[0026] As described above, the present invention can be better implemented. The above embodiments are only the best implementation methods of the present invention, but the implementation methods of the present invention are not limited by the above embodiments. Other changes, modifications, replacements, combinations, and simplifications made without departing from the spirit and principle of the present invention should be equivalent replacement methods and are included in the protection scope of the present invention.

Claims

1. The concentrated funnel loading mining method at the foot of the gently inclined thin ore vein is aimed at the problems of low mining efficiency and high mining cost of the gently inclined thin ore vein. It is characterized by The ore body is divided into ore blocks along the strike and inclination of the ore body. Each ore block is an independent mining unit. A mining field vein tunnel (3) is arranged at the lower part of the ore block, and a vehicle transportation tunnel (1) is arranged at the lower plate of the ore body. The mining field vein tunnel (3) and the vehicle transportation tunnel (1) are connected through the ore-exiting vein (5) and the mining field slope connecting road (4), forming a passage for personnel and equipment to enter and exit the mining field; in the center of the ore block, a return air uphill (6) is excavated from the mining field vein tunnel (3) against the inclination direction of the ore body to connect the return air tunnel (9), forming a return air passage in the ore block. A collecting hopper (10) is arranged at the center of the bottom of the block, which runs through the mining area and the mining vein (5) to form a mining channel. During mining, the return air uphill (6) is used as the free surface to advance from the center of the ore block to both sides of the ore block. Shallow holes are used to drop the ore. The collapsed ore (12) is raked to the collecting hopper (10) by an electric rake (11), and directly loaded into a car located at the mining vein (5) through the collecting hopper (10). The car is then transported to the middle main chute for mining. Safety pillars (2) and inter-block pillars (8) are left around the ore block, and mining area point pillars (7) are left in the ore block to support the stability of the mining area.

2. The method according to claim 1, characterized in that The strike length of the ore block is 80 to 100 m, and the oblique length in the inclined direction is 50 to 60 m.

3. The method according to claim 1, characterized in that The mining field vein tunnel (3) is determined based on the ore body plan and inclined profile or the ore body contour profile. Taking the mining field vein tunnel (3) as a reference, the lower plate automobile transportation tunnel (1) is arranged at a vertical height of 5.5 to 6.5 meters and a horizontal distance of about 25 meters from the mining field vein tunnel (3).

4. The method according to claim 1, characterized in that The ore-discharging vein (5) is arranged at a side-to-side distance of about 0.7 m on one side of the return air uphill (6) in the center of the mining area. An ore-collecting funnel (10) is arranged about 14 m away from the mining area along the vein tunnel (3). The upper part of the ore-collecting funnel (10) passes through the mining area and expands into a rectangle, which is convenient for electric rake ore discharging and ore collection.

5. The method according to claim 1, characterized in that The stope slope connecting road (4) is arranged at the end of the ore-exiting vein (5) along the stope vein lane safety pillar (2), and passes through the stope vein lane (3). The stope slope connecting road (4) has a slope of about 20%.

6. The method according to claim 1, characterized in that The safety pillars (2) are located on both sides of the vein tunnel (3) in the mining area, with a width of 2.5m. The block inter-pillars (8) are arranged in the form of point pillars, with a center distance of 15m and a diameter of 5m. In order to facilitate the centralized discharge of ore from the chute, the mining area point pillars (7) are arranged radially with the ore collecting funnel (10) as the center. The center distance of the mining area point pillars (7) is 6-10m, the diameter is 3m, and 3m wide strips are arranged locally.

7. The method according to claim 1, characterized in that The automobile transport lane (1), the ore-exiting vein (5), the mining field slope connecting road (4) and the mining field vein lane (3) are used for personnel and equipment to enter and exit the mining field in sequence.

8. The method according to claim 1, characterized in that The automobile transport lane (1), the ore-exiting vein (5), the mining field slope connecting road (4) and the mining field vein lane (3) are used to sequentially allow fresh air to flow into the mining field, and after washing the working face, the polluted air is discharged through the return air lane (9).

9. The method according to claim 1, characterized in that The collapsed ore (12) is raked by an electric rake (11) to a mining field collecting hopper (10), and is placed in a car located at the ore-discharging vein (5) through the ore-discharging hopper (10), and is transported by the car to the middle section main chute for ore discharging.

Citation Information

Patent Citations

  • Multilayer gentle dip thin-medium ore deposit filling and mining method

    CN103628877A

  • Mining method applicable to recovery of gentle-inclined / inclined thin ore body

    CN103726848A

  • Pillar mining method for gentle dip thin ores

    CN103967493A

  • Upward cut-and-fill mining method for in-vein slope ramp of gentle dip thin vein

    CN104060991A

  • Medium-deep hole multi-stope and subsection common orepass mining method for mining hanging ore body

    CN110700833A