Machining process of pipe truss
The two-way adjustable electric slide rail and automatic lifting clamp are used to realize the simultaneous docking and positioning of the chord and web bars. Combined with CCD camera detection and CNC cutting, the problem of time-consuming welding of the chord and web bars is solved, and the processing of the pipe truss is improved. efficiency.
Patent Information
- Application Number
- CN202410929687.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-11
- Publication Date
- 2024-10-11
AI Technical Summary
In the existing pipe truss processing technology, the welding of chords and webs takes a long time, resulting in low welding efficiency and affecting the overall processing and preparation efficiency.
Two-way adjustable electric slide rails and automatic lifting clamps are used to realize the simultaneous docking and positioning of the chord and web rods, and are combined with CCD camera detection and CNC cutting machine tools to optimize the welding process.
Significantly saves the positioning time for welding chords and webs, improves welding efficiency, and improves the overall processing and preparation efficiency of the tube truss.
Smart Images

Figure CN118752182A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tube truss processing, and in particular to a tube truss processing technology. Background Art
[0002] The tube truss consists of multiple sets of parallel chords and floating rods obliquely connected between the chords. The common forms are triangular tube trusses consisting of three sets of chords and square tube trusses consisting of four sets of chords. Trusses make the truss structure economical in material and light in weight. It is easy to form various shapes to suit different uses, such as simply supported trusses, arches, frames and towers, which are commonly found in railway stations and subway stations.
[0003] When manufacturing and processing the existing tube trusses, the chord and the floating rod are first manufactured, and then the web members are welded and installed on one side of each chord in turn. After the web members on one side of each chord are connected, the other end of the web member is welded and installed on another chord to achieve the connection of two chords, and finally complete the manufacturing and processing of the overall tube truss. However, in the above-mentioned processing process, the docking and assembly of the chord and the multiple web members when welding is carried out step by step, that is, one chord is first docked and positioned with the web member, and then another chord is docked and positioned with the web member after welding, and the operation is repeated in sequence to achieve the welding of the chord and the web member. Although the welding and assembly of the chord and the web member can be achieved under the above-mentioned processing method, the step-by-step welding method will take a long time to weld the chord and the web member due to repeated welding positioning, thereby making the welding efficiency of the chord and the web member relatively low, which is not convenient for the efficient processing and preparation of the overall tube truss. Summary of the invention
[0004] The purpose of the present invention is to provide a processing technology for a tube truss in order to solve the above problems.
[0005] The present invention achieves the above-mentioned purpose through the following technical solutions: A processing technology for a pipe truss includes the following processing steps: Step 1: Pipe preparation: Place both ends of the pipe used for pipe truss welding on a rotating support that can rotate around the center of the pipe, and place a CCD camera above the pipe that can move along the center line of the pipe for detection, so as to detect the surface quality of the pipe and select the pipe that meets the requirements for standby use; Step 2: Pipe cutting: Place the selected pipe on a CNC cutting machine, cut the pipe into chords and webs of specific lengths according to design requirements, pre-open intersections for assembly on the chords, and chamfer the ends of the webs; Step 3: Clamping and positioning of pipes. Pre-arrange bidirectional adjustable electric slide rails in parallel at the pipe welding position, and install an automatic lifting clamp seat on the two built-in sliding blocks on each bidirectional adjustable electric slide rail. Then, just place the processed chord rod on one automatic lifting clamp seat on the same electric slide rail, and place the web rod to be welded on another automatic lifting clamp seat on the same electric slide rail. The chord rod and the web rod can be butt-jointed and positioned while the two sliders on the same electric slide rail are close to each other. Step 4: Pipe welding: after the chord and the web are butt-jointed and positioned, the butt joints of the chord and the web are welded one by one using a hand-held welding gun; Step 5: Component assembly: assemble the various accessories of the welded pipe truss together through connectors, and install protective covers on the exposed parts of the bolts at each connection; Step 6: Surface treatment: Clean the debris from the welding parts and connection parts of the assembled pipe truss, and then spray a protective paint layer on the pipe truss except the welding parts and connection parts to complete the processing and preparation of the pipe truss.
[0006] Furthermore, when selecting the pipe in step 1, it is necessary to ensure that the pipe has no defects such as peeling, cracking, warping, etc. When there are defects such as rust, pitting or scratches on the surface of the pipe, the depth shall not be greater than 1 / 2 of the negative allowable deviation value of the pipe thickness. By strictly controlling the surface quality of the pipe, the structural strength and service life of the pipe truss after processing can be effectively ensured. Moreover, by automatically rotating the pipe to change the surface and automatically moving the CCD camera for detection, the tedious operation of manual detection can be omitted.
[0007] Furthermore, when cutting the pipe in step 2, it is necessary to mark the cutting part on the surface of the pipe in advance, so as to control the quality of the cutting part of the pipe before and after cutting. The cutting part can be observed after the pipe is cut through the color agent. If the cutting contour and the marking contour do not completely overlap, it means that there is a cutting error in the equipment and it needs to be adjusted in time to ensure the accuracy of pipe welding.
[0008] Furthermore, the side wall of the clamping block on the automatic lifting clamp in step 3 is an arc-shaped groove structure, and its clamping distance can be flexibly adjusted according to actual clamping needs. This design facilitates clamping and fixing of pipes of different diameters.
[0009] Furthermore, the angle of the automatic lifting clamp in the horizontal direction in step 3 can be adjusted and limited as needed, so that the chord and the web can be easily fixed at different angles during welding.
[0010] Furthermore, the protective sleeve in step 5 is a rubber sleeve, which is mainly used to protect the outer part of the bolt. By protecting the bolt with the sleeve, the bolt can be prevented from rusting and damage during long-term use, ensuring that the pipe truss can be easily disassembled and repaired after long-term use.
[0011] Furthermore, the rotating support used in the step 1 for testing the pipe is a bidirectional clamping support, that is, the two ends of the pipe are clamped and fixed by bringing the bidirectional clamping plates on the rotating support close to each other. This clamping facilitates the stable rotation of the pipe and avoids the end of the pipe falling off during surface quality testing.
[0012] Furthermore, the CCD camera in step 1 moves along the center line of the pipe mainly with the help of an electric slide rail arranged along the center line of the pipe, and the CCD camera is always located directly above the pipe during detection, ensuring that the CCD camera can conveniently detect various parts of the surface of the pipe.
[0013] Furthermore, in step 4, the angles of the chord and the web can be adjusted according to actual welding requirements during the welding process to ensure uniformity of the welding width of the chord and the web during welding, thereby ensuring the welding quality of the chord and the web.
[0014] Furthermore, the portion of the bolt in step 5, namely the hexagonal end of the bolt, may include the end of the screw rod on the bolt extending out of the nut, to ensure that the outer portion of the bolt can be fully protected.
[0015] The beneficial effects of the present invention are: The present invention realizes simultaneous docking and positioning of the chord and multiple webs by means of a bidirectionally adjustable electric slide rail and an automatic lifting clamp during the processing of the tube truss, effectively saving the time consumed in repeated docking and positioning of the chord with the multiple webs when welding, making the welding efficiency between the chord and the multiple webs higher, thereby improving the overall processing and preparation efficiency of the tube truss. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 The present invention is a flow chart of a processing technology of a tube truss. DETAILED DESCRIPTION
[0017] A processing technology for a pipe truss includes the following processing steps: Step 1: Pipe preparation: Place both ends of the pipe used for pipe truss welding on a rotating support that can rotate around the center of the pipe, and place a CCD camera above the pipe that can move along the center line of the pipe for detection, so as to detect the surface quality of the pipe and select the pipe that meets the requirements for standby use; Step 2: Pipe cutting: Place the selected pipe on a CNC cutting machine, cut the pipe into chords and webs of specific lengths according to design requirements, pre-open intersections for assembly on the chords, and chamfer the ends of the webs; Step 3: Clamping and positioning of pipes. Pre-arrange bidirectional adjustable electric slide rails in parallel at the pipe welding position, and install an automatic lifting clamp seat on the two built-in sliding blocks on each bidirectional adjustable electric slide rail. Then, just place the processed chord rod on one automatic lifting clamp seat on the same electric slide rail, and place the web rod to be welded on another automatic lifting clamp seat on the same electric slide rail. The chord rod and the web rod can be butt-jointed and positioned while the two sliders on the same electric slide rail are close to each other. Step 4: Pipe welding: after the chord and the web are butt-jointed and positioned, the butt joints of the chord and the web are welded one by one using a hand-held welding gun; Step 5: Component assembly: assemble the various accessories of the welded pipe truss together through connectors, and install protective covers on the exposed parts of the bolts at each connection; Step 6: Surface treatment: Clean the debris from the welding parts and connection parts of the assembled pipe truss, and then spray a protective paint layer on the pipe truss except the welding parts and connection parts to complete the processing and preparation of the pipe truss.
[0018] In the present embodiment, when selecting the pipe in step 1, it is necessary to ensure that the pipe has no defects such as peeling, cracking, warping, etc. When there are defects such as rust, pitting or scratches on the surface of the pipe, the depth shall not be greater than 1 / 2 of the negative allowable deviation value of the pipe thickness. By strictly controlling the surface quality of the pipe, the structural strength and service life of the pipe truss after processing can be effectively ensured. Moreover, by automatically rotating the pipe to change the surface and automatically moving the CCD camera for detection, the tedious operation of manual detection can be omitted.
[0019] In this embodiment, when cutting the pipe in step 2, it is necessary to mark the cutting part on the surface of the pipe in advance, so as to control the quality of the cutting part of the pipe before and after cutting. The cutting part can be observed after the pipe is cut through the color agent. If the cutting contour and the marking contour do not completely overlap, it means that there is a cutting error in the equipment and it needs to be adjusted in time to ensure the accuracy of pipe welding.
[0020] In this embodiment, the side wall of the clamping block on the automatic lifting clamp in step 3 is an arc-shaped groove structure, and its clamping distance can be flexibly adjusted according to actual clamping needs. This design facilitates clamping and fixing of pipes of different diameters.
[0021] In this embodiment, the angle of the automatic lifting clamp in the horizontal direction in step 3 can be adjusted and limited as needed. This design facilitates the docking and fixing of the chord rod and the web rod at different angles during welding.
[0022] In this embodiment, the protective sleeve in step 5 is a rubber sleeve, which is mainly used to protect the outer part of the bolt. By protecting the bolt with the help of the sleeve, the bolt can be prevented from rusting and damage during long-term use, ensuring that the pipe truss can be easily disassembled and repaired after long-term use.
[0023] In this embodiment, the rotating support used in the step 1 for testing the pipe is a bidirectional clamping support, that is, the two ends of the pipe are clamped and fixed by bringing the bidirectional clamping plates on the rotating support close to each other. This clamping facilitates the stable rotation of the pipe and avoids the end of the pipe falling off during surface quality testing.
[0024] In this embodiment, the CCD camera in step 1 moves along the center line of the pipe mainly with the help of an electric slide rail arranged along the center line of the pipe, and the CCD camera is always located directly above the pipe during detection, ensuring that the CCD camera can conveniently detect various parts of the surface of the pipe.
[0025] In this embodiment, in step 4, the angles of the chord and the web can be adjusted according to actual welding requirements during the welding process to ensure uniformity of the welding width of the chord and the web during welding, thereby ensuring the welding quality of the chord and the web.
[0026] In this embodiment, the portion of the bolt in step 5, namely, the hexagonal end of the bolt, may include the end of the screw rod on the bolt extending out of the nut, to ensure that the outer portion of the bolt can be fully protected.
[0027] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A processing technology for a tube truss, characterized by: It includes the following processing steps: Step 1: Pipe preparation: Place both ends of the pipe used for pipe truss welding on a rotating support that can rotate around the center of the pipe, and place a CCD camera above the pipe that can move along the center line of the pipe for detection, so as to detect the surface quality of the pipe and select the pipe that meets the requirements for standby use; Step 2: Pipe cutting: Place the selected pipe on a CNC cutting machine, cut the pipe into chords and webs of specific lengths according to design requirements, pre-open intersections for assembly on the chords, and chamfer the ends of the webs; Step 3: Clamping and positioning of pipes. Pre-arrange bidirectional adjustable electric slide rails in parallel at the pipe welding position, and install an automatic lifting clamp seat on the two built-in sliding blocks on each bidirectional adjustable electric slide rail. Then, just place the processed chord rod on one automatic lifting clamp seat on the same electric slide rail, and place the web rod to be welded on another automatic lifting clamp seat on the same electric slide rail. The chord rod and the web rod can be butt-jointed and positioned while the two sliders on the same electric slide rail are close to each other. Step 4: Pipe welding: after the chord and the web are butt-jointed and positioned, the butt joints of the chord and the web are welded one by one using a hand-held welding gun; Step 5: Assemble the components, assemble the various accessories of the welded pipe truss together through the connectors, and install protective covers on the exposed parts of the bolts at each connection; Step 6: Surface treatment: Clean the debris from the welding parts and connection parts of the assembled pipe truss, and then spray a protective paint layer on the pipe truss except the welding parts and connection parts to complete the processing and preparation of the pipe truss.
2. The processing technology of a tube truss according to claim 1 is characterized in that: When selecting the pipe in step 1, it is necessary to ensure that the pipe has no defects such as peeling, cracking, warping, etc. When the surface of the pipe has defects such as rust, pitting or scratches, the depth shall not be greater than 1 / 2 of the negative allowable deviation value of the pipe thickness.
3. The processing technology of a tube truss according to claim 1 is characterized in that: The rotating support used in the step 1 for testing the pipe is a bidirectional clamping support, that is, the two ends of the pipe are clamped and fixed by bringing the bidirectional clamping plates on the rotating support closer to each other.
4. The processing technology of a tube truss according to claim 1 is characterized in that: The CCD camera in step 1 is moved along the center line of the pipe mainly by means of an electric slide rail arranged along the center line of the pipe, and the CCD camera is always located directly above the pipe during detection.
5. The processing technology of a tube truss according to claim 1 is characterized in that: When cutting the pipe in step 2, it is necessary to mark the cutting part on the surface of the pipe in advance, so as to control the quality of the cutting part of the pipe before and after cutting.
6. The processing technology of a tube truss according to claim 1 is characterized in that: The side wall of the clamping block on the automatic lifting clamp seat in step 3 is an arc-shaped groove structure, and the clamping distance can be flexibly adjusted according to actual clamping needs.
7. The processing technology of a tube truss according to claim 1 is characterized in that: In step 3, the angle of the automatic lifting clamp in the horizontal direction can be adjusted and limited as needed.
8. The processing technology of a tube truss according to claim 1, characterized in that: In step 4, during the welding process, the angles of the chord and the web can be adjusted according to actual welding requirements.
9. The processing technology of a tube truss according to claim 1, characterized in that: The protective sleeve in step 5 is a rubber sleeve, which is mainly used to protect the outer part of the bolt.
10. The processing technology of a tube truss according to claim 1, characterized in that: The portion of the bolt in step 5, namely the hexagonal end of the bolt, may include the end of the screw rod on the bolt extending out of the nut.
Citation Information
Patent Citations
Tube truss manufacture process
CN102689142A
Welding forming process for manufacturing pipe truss steel structure
CN113210914A
Manufacturing and machining technology for steel pipe truss framework
CN113211012A
Four-station rotary shrinkage truss
CN117961680A
Divide gas pipe truss welding set
CN206425736U