Double-curvature blast furnace downcomer hoisting butt joint tool

By designing a double-curvature blast furnace downcomer hoisting and docking tool, the complex problems of hoisting and docking angle adjustment are solved by utilizing the teeth and alveolar fit and spherical fixed groove structure, improving construction efficiency and simplifying the operation process.

CN118753976APending Publication Date: 2024-10-11CHINA MCC22 GROUP CORP LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411149595.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

In steel pipe construction, the lifting angle needs to be manually adjusted during the hoisting process, and the splicing angle needs to be adjusted during docking, resulting in complex construction and low efficiency.

Method used

A hyperbolic blast furnace downpipe lifting and docking tool is designed, including a fixing component and a docking component. Through the tooth and alveolar fit and the spherical fixing groove and spherical structure, automatic docking and angle adjustment of the pipeline are realized, simplifying the construction operation.

Benefits of technology

It improves the efficiency of hoisting and splicing, simplifies construction operations, reduces the use of auxiliary supports, and greatly simplifies the disassembly and assembly process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118753976A_ABST
    Figure CN118753976A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of steel pipe construction, in particular to a double-curvature blast furnace downcomer hoisting butt joint tool which is characterized in that the ends of two pipelines are tightly hooped through a fixed inner ring and a butt joint inner ring respectively, fasteners are inserted into a fixed outer ring and a butt joint outer ring, and the inner ends of the fasteners abut against the fixed inner ring and the butt joint inner ring; the fixed inner ring and the fixed outer ring as well as the butt joint inner ring and the butt joint outer ring are fixed at a certain angle, and during butt joint, the fixed outer ring and the butt joint outer ring are spliced, clamped and fixed through the teeth and the tooth grooves, so that two pipelines are in tight butt joint, construction operation is facilitated, and the disassembly and assembly process is greatly simplified. The ball body is clamped through the spherical fixing groove, so that the ball body can freely rotate within a certain range, the angle of the lifting hook for lifting the butt joint outer ring can be adjusted, and butt joint of steel pipes is facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of steel pipe construction, in particular to a tool for hoisting and docking a hyperbolic blast furnace downcomer. Background Art

[0002] At present, most of the large blast furnaces under construction and newly built in China adopt the design method of single downcomer. In the current design process, the requirements for land occupation and space utilization are increasing day by day. According to the architectural structure design, the downcomer of the blast furnace will produce different angles and form hyperbolic curvature. Therefore, the construction accuracy requirements are constantly increasing, and the construction difficulty is also increasing.

[0003] In traditional designs, the hyperbolic downcomer is connected to the blast furnace after being bent once. The construction method is mostly to assemble the downcomer flat on the ground first, and then hoist it to the designated position for installation. For the hyperbolic downcomer, it is necessary to use tooling technical measures on the ground to first assemble the pipe at a plane angle, and then raise the tooling and adjust the vertical angle until the angle meets the structural design requirements, and then assemble the whole. Not only does it require a large amount of auxiliary support, but the tooling support also takes a long time. Therefore, the new assembly method usually involves hoisting the downcomer to the designated position and then splicing and fixing it. During the hoisting process, the hoisting angle needs to be adjusted manually, and the splicing angle also needs to be adjusted during docking, which is relatively complicated. Summary of the invention

[0004] The technical problem to be solved by the present invention is that during the hoisting process, the hoisting angle needs to be adjusted manually, and the splicing angle also needs to be adjusted during docking, which is a relatively complicated problem.

[0005] In order to solve the above problem, the present invention provides a solution that can improve the efficiency of hoisting and splicing, and the specific solution is: A tool for hoisting and docking a hyperbolic blast furnace downcomer is applied to two pipes to be spliced, including a fixing component and a docking component, the fixing component including a fixed inner ring and a fixed outer ring, the fixed inner ring hoop is arranged on one pipe end, the fixed outer ring is arranged on the periphery of the fixed inner ring, a fastener is inserted into the fixed outer ring, the inner end of the fastener abuts the fixed inner ring, and teeth are provided on the fixed outer ring; the docking component includes a docking inner ring and a docking outer ring, the docking inner ring hoop is arranged on the other pipe end, the docking outer ring is arranged on the periphery of the docking inner ring, a fastener is also inserted into the docking outer ring, and the inner end of the fastener abuts the docking inner ring; a tooth groove is provided on the docking outer ring, and when the two pipes are docked, the teeth and the tooth groove are matched and plugged; the fixed outer ring and the docking outer ring are respectively provided with a lifting component, a spherical fixing groove larger than half the volume of a sphere is provided in the lifting component, a sphere is clamped in the spherical fixing groove, and a hook is fixed on the sphere.

[0006] Compared with the prior art, the present invention using the above technical solution has the following beneficial effects: The ends of the two pipes are clamped by the fixed inner ring and the docking inner ring respectively, and fasteners are inserted on the fixed outer ring and the docking outer ring. The inner ends of the fasteners abut the fixed inner ring and the docking inner ring, so that the fixed inner ring and the fixed outer ring, as well as the docking inner ring and the docking outer ring are fixed at a certain angle. When docking, the fixed outer ring and the docking outer ring are spliced ​​and clamped by teeth and grooves, so that the two pipes are tightly docked, which is not only convenient for construction operations, but also greatly simplifies the disassembly and assembly process. The ball is clamped by the spherical fixing groove, so that the ball can rotate freely within a certain range, so that the angle of the hook hoisting docking outer ring can be adjusted, which is convenient for docking steel pipes.

[0007] Preferably, a further technical solution of the present invention is: The hoisting assembly includes a fixed push iron and a movable push iron, the fixed push iron is fixed on the fixed outer ring or the docking outer ring, the fixed push iron and the movable push iron are fastened by bolts, and the fixed push iron and the movable push iron are respectively provided with a hemispherical fixing groove larger than half the volume of the hemisphere, and when the fixed push iron and the movable push iron are fitted, the two hemispherical fixing grooves form an integral spherical fixing groove. With the above structure, it is convenient to put the sphere into the spherical fixing groove, and then fix the sphere by the fixed push iron and the movable push iron.

[0008] The fixed outer ring includes a first fixed outer half ring and a second fixed outer half ring. A docking plate is provided at the docking position of the first fixed outer half ring and the second fixed outer half ring. The corresponding docking plates are fixed by fixing bolts.

[0009] The first fixed outer half circle and the second fixed outer half circle are provided with multiple layers of fasteners, each layer of fasteners includes multiple fastening bolts, and each fastening bolt on the first fixed outer half circle and the second fixed outer half circle is equidistantly distributed in the circumferential direction. The multiple layers of fasteners facilitate adjusting the fixing angle of the fixed outer circle and the fixed inner circle by adjusting the depth of each layer of fasteners abutting against the fixed inner circle.

[0010] The fixed inner ring comprises a first fixed inner half ring and a second fixed inner half ring, and the first fixed inner half ring and the second fixed inner half ring are fastened on one end of the pipe by fastening bolts.

[0011] The docking outer ring includes a first docking outer half ring and a second docking outer half ring. The docking positions of the first docking outer half ring and the second docking outer half ring are both provided with docking plates, and the corresponding docking plates are fixed by fixing bolts.

[0012] The first butt joint outer half circle and the second butt joint outer half circle are provided with multiple layers of fasteners, each layer of fasteners includes multiple fastening bolts, and each fastening bolt on the first butt joint outer half circle and the second butt joint outer half circle is equidistantly distributed in the circumferential direction. The multiple layers of fasteners facilitate adjusting the fixing angle of the butt joint outer circle and the butt joint inner circle by adjusting the depth of each layer of fasteners abutting against the butt joint inner circle.

[0013] The butt joint inner ring comprises a first butt joint inner half ring and a second butt joint inner half ring, and the first butt joint inner half ring and the second butt joint inner half ring are fastened on the other pipe end by fastening bolts. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 is a three-dimensional schematic diagram of an embodiment of the present invention; Figure 2 is a three-dimensional schematic diagram from another viewing angle of an embodiment of the present invention; Figure 3 It is a structural schematic diagram of the hoisting assembly of the present invention; In the figure: 1. first fixed outer half circle; 2. second fixed outer half circle; 3. connecting plate; 4. fastening bolts; 5. tooth groove; 6. second fixed inner half circle; 7. first fixed inner half circle; 8. second docking outer half circle; 9. first docking outer half circle; 10. first docking inner half circle; 11. second docking inner half circle; 12. teeth; 13. lifting assembly; 131. fixed push iron; 132. movable push iron; 133. sphere; 14. hook. DETAILED DESCRIPTION

[0015] The present invention will be further described below in conjunction with embodiments, the purpose of which is only to provide a better understanding of the content of the present invention. Therefore, the examples given do not limit the protection scope of the present invention.

[0016] See attached Figure 1-3 A tool for hoisting and docking a hyperbolic blast furnace downcomer is applied to two pipes to be spliced, including a fixing component and a docking component. The fixing component includes a fixed inner ring and a fixed outer ring. The inner diameter of the fixed inner ring is equal to the outer diameter of one of the pipes. The fixed inner ring hoop is arranged on the end of one of the pipes. The fixed outer ring is arranged on the periphery of the fixed inner ring. A fastener is inserted into the fixed outer ring. The inner end of the fastener abuts against the fixed inner ring. The fixed outer ring is provided with teeth 12. The docking component includes a docking inner ring and a docking outer ring. The inner diameter of the docking inner ring is equal to the outer diameter of one of the pipes. The butt joint outer ring has an outer diameter of , the butt joint inner ring hoop is arranged on the other pipe end, the butt joint outer ring is arranged on the periphery of the butt joint inner ring, the butt joint outer ring is also inserted with a fastener, and the inner end of the fastener abuts the butt joint inner ring; the butt joint outer ring is provided with a tooth groove 5, when the two pipes are butt jointed, the teeth 12 and the tooth groove 5 are plugged in cooperation; the fixed outer ring and the butt joint outer ring are respectively provided with a hanging assembly 13, a spherical fixing groove larger than half the volume of the sphere 133 is provided in the hanging assembly 13, the sphere 133 is clamped in the spherical fixing groove, and a hook 14 is fixed on the sphere 133.

[0017] The ends of the two pipes are respectively clamped by the fixed inner ring and the docking inner ring, and fasteners are inserted on the fixed outer ring and the docking outer ring. The inner ends of the fasteners abut the fixed inner ring and the docking inner ring, so that the fixed inner ring and the fixed outer ring, as well as the docking inner ring and the docking outer ring are fixed at a certain angle. When docking, the fixed outer ring and the docking outer ring are spliced ​​and fixed by the teeth 12 and the tooth grooves 5, so that the two pipes are tightly docked, which is not only convenient for construction operations, but also greatly simplifies the disassembly and assembly process. The ball 133 is clamped by the spherical fixing groove, so that the ball 133 can rotate freely within a certain range, so that the angle of the hook 14 hoisting the docking outer ring can be adjusted, which is convenient for docking steel pipes.

[0018] In this embodiment, the fixed outer ring includes a first fixed outer half ring 1 and a second fixed outer half ring 2. The inner diameters of the first fixed outer half ring 1 and the second fixed outer half ring 2 are larger than the outer diameter of the fixed inner ring. Docking plates are provided at the docking positions of the first fixed outer half ring 1 and the second fixed outer half ring 2, and the corresponding docking plates are fixed by fixing bolts.

[0019] In this embodiment, the first fixed outer half circle 1 and the second fixed outer half circle 2 are provided with multiple layers of fasteners, each layer of fasteners includes multiple fastening bolts 4, each fastening bolt 4 on the first fixed outer half circle 1 and the second fixed outer half circle 2 is equidistantly distributed in the circumferential direction, and a plurality of threaded holes are provided on the first fixed outer half circle 1 and the second fixed outer half circle 2, and each fastening bolt 4 is threadedly connected with the threaded hole. Preferably, the first fixed outer half circle 1 and the second fixed outer half circle 2 are provided with two layers of fasteners, and the multiple layers of fasteners facilitate the adjustment of the fixing angle of the fixed outer circle and the fixed inner circle by adjusting the depth of each layer of fasteners abutting against the fixed inner circle.

[0020] In this embodiment, the fixed inner ring includes a first fixed inner half ring 7 and a second fixed inner half ring 6. The inner diameters of the first fixed inner half ring 7 and the second fixed inner half ring 6 are equal to the outer diameters of one of their pipes. The inner ends of the fastening bolts 4 abut against the outer walls of the first fixed inner half ring 7 and the second fixed inner half ring 6. The first fixed inner half ring 7 and the second fixed inner half ring 6 are tightly clamped on one of their pipe ends by the fastening bolts 4.

[0021] In this embodiment, the hoisting assembly 13 includes a fixed push iron 131 and a movable push iron 132, the fixed push iron 131 is fixed on the fixed outer ring or the docking outer ring, the fixed push iron 131 and the movable push iron 132 are fastened by bolts, and the fixed push iron 131 and the movable push iron 132 are respectively provided with a hemispherical fixing groove larger than half the volume of the hemisphere, and when the fixed push iron 131 and the movable push iron 132 are fastened, the two hemispherical fixing grooves constitute an integral spherical fixing groove. Through the above structure, it is convenient to put the sphere 133 into the spherical fixing groove, and then fix the sphere 133 by the fixed push iron 131 and the movable push iron 132.

[0022] In this embodiment, the docking outer ring includes a first docking outer half circle 9 and a second docking outer half circle 8. The inner diameters of the first docking outer half circle 9 and the second docking outer half circle 8 are larger than the outer diameter of the docking inner ring. Docking plates are provided at the docking positions of the first docking outer half circle 9 and the second docking outer half circle 8, and the corresponding docking plates are fixed by fixing bolts.

[0023] In this embodiment, the first butt joint outer half circle 9 and the second butt joint outer half circle 8 are provided with multiple layers of fasteners, each layer of fasteners includes multiple fastening bolts 4, and each fastening bolt 4 on the first butt joint outer half circle 9 and the second butt joint outer half circle 8 is equidistantly distributed in the circumferential direction; the first butt joint outer half circle 9 and the second butt joint outer half circle 8 are provided with multiple threaded holes, and each fastening bolt 4 is threadedly connected to the threaded hole. Through the multiple layers of fasteners, it is convenient to adjust the fixing angle of the butt joint outer circle and the butt joint inner circle by adjusting the depth of each layer of fasteners abutting the butt joint inner circle.

[0024] In this embodiment, the docking inner ring includes a first docking inner half ring 10 and a second docking inner half ring 11. The inner diameters of the first docking inner half ring 10 and the second docking inner half ring 11 are equal to the outer diameter of the other pipe. The inner ends of the fastening bolts 4 abut against the outer walls of the first fixed inner half ring 7 and the second fixed inner half ring 6. The first docking inner half ring 10 and the second docking inner half ring 11 are tightly clamped on the end of the other pipe by the fastening bolts 4.

[0025] In this embodiment, a high friction coefficient coating is provided on the outer walls of the first fixed inner half circle 7 and the second fixed inner half circle 6 and on the outer walls of the first docking inner half circle 10 and the second docking inner half circle 11 to increase the friction force in contact with the inner end of the fastening bolt 4, thereby making the position of the fixed inner circle and the docking inner circle more stable.

[0026] The construction method of splicing a hyperbolic downcomer by using the butt joint tool of this embodiment is as follows: S1: Construction measurement preparation stage: Measure the existing installed structural parts to obtain the precise spatial coordinates of the existing structure connected to the steel beam to be installed. Use modeling software to model the downpipe without hyperbolic curvature and its connected parts, determine the starting and ending positions of the hyperbolic curvature, set multiple sections of downpipes between the starting and ending positions of the hyperbolic curvature, and create real beveled surfaces according to the centerline direction of each section of the downpipe.

[0027] S2: Make each section of the downcomer according to the drawings of the modeling software and cut the bevel surface.

[0028] S3: On the ground, clamp the first fixed inner half circle 7 and the second fixed inner half circle 6 on one of the ends of the two pipes, connect the first fixed outer half circle 1 and the second fixed outer half circle 2, clamp them on the first fixed inner half circle 7 and the second fixed inner half circle 6, fasten the connecting plates 3 of the first fixed outer half circle 1 and the second fixed outer half circle 2 by bolts, and temporarily tighten each fastening bolt 4 so that the inner end of each fastening bolt 4 abuts against the first fixed inner half circle 7 and the second fixed inner half circle 6; when performing the above steps, pay attention to controlling the front end of the tooth groove 5 of the fixed outer circle to protrude from the end of the pipe; then hoist the pipe to a fixed position and fix the other end of the pipe.

[0029] S4: On the ground, the first butt joint inner half circle 10 and the second butt joint inner half circle 11 are clamped on the other end of the spliced ​​pipe, the first butt joint outer half circle 9 and the second butt joint outer half circle 8 are butt jointed, and the clamps are on the first butt joint inner half circle 10 and the second butt joint inner half circle 11, and the connecting plates 3 of the first butt joint outer half circle 9 and the second butt joint outer half circle 8 are fastened by bolts, and at the same time, each fastening bolt 4 is temporarily tightened, so that the inner end of each fastening bolt 4 abuts against the first butt joint inner half circle 10 and the second butt joint inner half circle 11; S5: hoist another pipeline next to the fixed pipeline, align the axial directions of the two pipelines, and adjust the fastening depth of the fastening bolts 4 on the first butt joint outer half ring 9 and the second butt joint outer half ring 8 so that the butt joint outer ring and the fixed outer ring are axially aligned; S6: Lift the other pipeline in parallel so that the chamfered surfaces of the two pipelines fit closely together. At this time, the teeth 12 on the docking outer ring are inserted into the tooth grooves 5 of the fixed outer ring to complete the docking of the two descending pipes.

[0030] The above description is only a preferred feasible embodiment of the present invention, and does not limit the scope of rights of the present invention. All equivalent changes made using the contents of the present specification and its drawings are included in the scope of rights of the present invention.

Claims

1. A tool for hoisting and docking a hyperbolic blast furnace downcomer, applied to two pipes to be spliced, characterized in that: It includes a fixed component and a docking component. The fixed component includes a fixed inner ring and a fixed outer ring. The fixed inner ring hoop is arranged on one pipe end, and the fixed outer ring is arranged on the periphery of the fixed inner ring. A fastener is inserted into the fixed outer ring, and the inner end of the fastener abuts the fixed inner ring. Teeth are provided on the fixed outer ring. The docking component includes a docking inner ring and a docking outer ring. The docking inner ring hoop is arranged on the other pipe end, and the docking outer ring is arranged on the periphery of the docking inner ring. A fastener is also inserted into the docking outer ring, and the inner end of the fastener abuts the docking inner ring. Teeth are provided on the docking outer ring. When the two pipes are docked, the teeth and the tooth grooves are plugged in. The fixed outer ring and the docking outer ring are respectively provided with lifting components. A spherical fixing groove larger than half the volume of the sphere is provided in the lifting component. A sphere is clamped in the spherical fixing groove, and a hook is fixed on the sphere.

2. The double-curvature blast furnace downcomer hoisting and docking tool according to claim 1, characterized in that: The lifting assembly includes a fixed push iron and a movable push iron. The fixed push iron is fixed on the fixed outer ring or the docking outer ring. The fixed push iron and the movable push iron are fastened by bolts. The fixed push iron and the movable push iron are respectively provided with a hemispherical fixing groove with a volume larger than half of the hemisphere. When the fixed push iron and the movable push iron are fitted together, the two hemispherical fixing grooves constitute an overall spherical fixing groove.

3. The double-curvature blast furnace downcomer hoisting and docking tool according to claim 1, characterized in that: The fixed outer ring includes a first fixed outer half ring and a second fixed outer half ring. A docking plate is provided at the docking position of the first fixed outer half ring and the second fixed outer half ring. The corresponding docking plates are fixed by fixing bolts.

4. The double-curvature blast furnace downcomer hoisting and docking tool according to claim 2, characterized in that: The first fixed outer half circle and the second fixed outer half circle are provided with multiple layers of fasteners, each layer of fasteners includes a plurality of fastening bolts, and the fastening bolts on the first fixed outer half circle and the second fixed outer half circle are equidistantly distributed in the circumferential direction.

5. The double-curvature blast furnace downcomer hoisting and docking tool according to claim 3, characterized in that: The fixed inner ring comprises a first fixed inner half ring and a second fixed inner half ring, and the first fixed inner half ring and the second fixed inner half ring are fastened on one end of the pipe by fastening bolts.

6. The double-curvature blast furnace downcomer hoisting and docking tool according to claim 1, characterized in that: The docking outer ring includes a first docking outer half ring and a second docking outer half ring. The docking positions of the first docking outer half ring and the second docking outer half ring are both provided with docking plates, and the corresponding docking plates are fixed by fixing bolts.

7. The double-curvature blast furnace downcomer hoisting and docking tool according to claim 6, characterized in that: The first butt joint outer half circle and the second butt joint outer half circle are provided with multiple layers of fasteners, each layer of fasteners comprises a plurality of fastening bolts, and the fastening bolts on the first butt joint outer half circle and the second butt joint outer half circle are equidistantly distributed in the circumferential direction.

8. The double-curvature blast furnace downcomer hoisting and docking tool according to claim 7, characterized in that: The butt joint inner ring comprises a first butt joint inner half ring and a second butt joint inner half ring, and the first butt joint inner half ring and the second butt joint inner half ring are fastened on the other pipe end by fastening bolts.