Seabed immersed tunnel and construction method thereof

By setting rubber belts and reinforcing plates on the outside of the pipe sections of the submarine immersed tunnel, a spacing structure is formed, which solves the problems of overturning, cracking and leakage of the immersed tunnel under mud and earthquake loads, and improves the waterproof performance and safety of use.

CN118756748APending Publication Date: 2024-10-11WUHAN UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410940821.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-12
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

Undersea immersed tube tunnels are prone to overturning, cracking and leaking under silt and seismic loads, affecting their safety.

Method used

By setting a rubber belt on the outside of the pipe section of the submarine immersed tunnel, and setting a reinforcing plate on the outside of the rubber belt, a spacing structure is formed to provide waterproof reinforcement and axial stretching and relative deformation buffering medium, thereby reducing the axial stress of the pipe section. Deformation and bending distortion probabilities.

Benefits of technology

It improves the waterproof performance and safety of use of submarine immersed tube tunnels, enhances structural stability and waterproof capabilities, and reduces the risk of overturning and water leakage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118756748A_ABST
    Figure CN118756748A_ABST
Patent Text Reader

Abstract

The invention discloses a seabed immersed tube tunnel and a construction method of the seabed immersed tube tunnel, and relates to the field of immersed tube tunnels, a rubber belt comprises a first part and a second part, the first part is arranged on the outer side of a first tube section in a sleeving mode, and the second part is arranged on the outer side of a second tube section in a sleeving mode; the first reinforcing plate sleeves the outer side of the first part, the second reinforcing plate sleeves the outer side of the second part, and a spacing distance is formed between the first reinforcing plate and the second reinforcing plate. Therefore, the rubber belt is arranged on the outer side of the first pipe joint and the outer side of the second pipe joint in a sleeving mode, the first reinforcing plate and the second reinforcing plate are arranged on the outer side of the rubber belt in a sleeving mode, and the first reinforcing plate and the second reinforcing plate are arranged at intervals, so that waterproof reinforcement can be conducted on the seabed immersed tunnel, and a buffering medium can be provided for axial stretching and relative deformation between the pipe joints; the probability of axial deformation, bending and distortion of the first pipe joint and the second pipe joint is reduced, the waterproof performance of the seabed immersed tunnel is improved, and the use safety of the seabed immersed tunnel is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of immersed tube tunnels, and in particular to a submarine immersed tube tunnel and a construction method of the submarine immersed tube tunnel. Background Art

[0002] In the related technology, a submarine immersed tube tunnel is an underwater transportation facility that is constructed by prefabricating pipe sections into segments and then floating and sinking them to a specific location on the bottom of the water. However, due to the unstable environment in which some of the pipe sections of the immersed tube tunnel are located, under loads such as silt and earthquakes, the submarine immersed tube tunnel is very prone to overturning, cracking and leaking, affecting the safety of the submarine immersed tube tunnel. Summary of the invention

[0003] The present invention aims to solve at least one of the technical problems existing in the prior art. To this end, one object of the present invention is to provide a submarine immersed tube tunnel, which has good waterproof performance and high safety in use.

[0004] The present invention further proposes a method for constructing a submarine immersed tube tunnel.

[0005] The submarine immersed tube tunnel according to the present invention comprises: a first pipe segment, a second pipe segment and a rubber belt, the rubber belt comprises a first part and a second part, the first part is sleeved on the outside of the first pipe segment, and the second part is sleeved on the outside of the second pipe segment; a first reinforcing plate and a second reinforcing plate, the first reinforcing plate is sleeved on the outside of the first part, and the second reinforcing plate is sleeved on the outside of the second part, and there is a spacing distance between the first reinforcing plate and the second reinforcing plate.

[0006] According to the submarine immersed tube tunnel of the present invention, by sleeveing ​​the rubber belt on the outside of the first pipe section and the second pipe section, and sleeved the first reinforcing plate and the second reinforcing plate on the outside of the rubber belt, and spacing the first reinforcing plate and the second reinforcing plate, not only can the submarine immersed tube tunnel be waterproofed and reinforced, but also a buffer medium can be provided for the axial stretching and relative deformation between the pipe sections, thereby reducing the probability of axial deformation, bending and twisting deformation of the first pipe section and the second pipe section, improving the waterproof performance of the submarine immersed tube tunnel, and being beneficial to improving the safety of the submarine immersed tube tunnel.

[0007] In some examples of the present invention, the rubber belt is connected to the first pipe section, the second pipe section, the first reinforcing plate, and the second reinforcing plate.

[0008] In some examples of the present invention, the submarine immersed tube tunnel further includes: a wall, wherein the wall is provided on both sides of the first reinforcing plate, and the wall is connected to the first reinforcing plate via a connecting piece.

[0009] In some examples of the present invention, the thickness of the rubber belt is A, satisfying the relationship: 0.5m≤A≤2.5m; and / or, along the extension direction of the first pipe section, the size of the second part is B, satisfying the relationship: 2m≤B≤5m.

[0010] In some examples of the present invention, the second reinforcing plate is connected to the second pipe section, and a gap for accommodating the second portion is provided between the second reinforcing plate and the second pipe section.

[0011] In some examples of the present invention, the second reinforcing plate is welded to the second pipe section, and the welding point between the second reinforcing plate and the second pipe section is a first welding point; along the extension direction of the second pipe section, the distance between the first welding point and the end face of the second pipe section close to the first pipe section is C, satisfying the relationship: 5m≤C≤7m, and / or the welding thickness of the first welding point is D, satisfying the relationship: 0.2m≤D≤0.6m.

[0012] In some examples of the present invention, along the extension direction of the second pipe segment, the distance between the end surface of the second reinforcing plate close to the first pipe segment and the end surface of the second pipe segment close to the first pipe segment is E, satisfying the relationship: 0.5m≤E≤1.5m.

[0013] In some examples of the present invention, the lateral width of the first reinforcing plate is F, and the lateral width of the first pipe section is G, satisfying the relationship: 1.3≤F / G≤2.2; and / or, the lateral width of the second reinforcing plate is H, and the lateral width of the second pipe section is I, satisfying the relationship: 1.3≤H / I≤2.2.

[0014] In some examples of the present invention, the first pipe section is the second to last pipe section, and the second pipe section is the final pipe section.

[0015] The method for constructing a submarine immersed tube tunnel according to the present invention comprises: sequentially sleeve a rubber belt and a first reinforcing plate on the outside of a first pipe segment, and extend the rubber belt out of the first pipe segment along the extension direction of the first pipe segment; arrange a second reinforcing plate on the outside of a second pipe segment, and provide a gap between the second reinforcing plate and the second pipe segment for accommodating the rubber belt; dock the first pipe segment and the second pipe segment, and insert the portion of the rubber belt extending out of the first pipe segment into the gap between the second reinforcing plate and the second pipe segment.

[0016] According to the construction method of the submarine immersed tube tunnel of the present invention, by sleeveing ​​the rubber belt on the outside of the first pipe section and the second pipe section, and sleeved the first reinforcing plate and the second reinforcing plate on the outside of the rubber belt, and spacing the first reinforcing plate and the second reinforcing plate, not only can the submarine immersed tube tunnel be waterproofed and reinforced, but also a buffer medium can be provided for the axial stretching and relative deformation between the pipe sections, reducing the probability of axial deformation, bending and twisting deformation of the first pipe section and the second pipe section, improving the waterproof performance of the submarine immersed tube tunnel, and being beneficial to improving the safety of the submarine immersed tube tunnel.

[0017] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:

[0019] Figure 1 is a schematic diagram of a submarine immersed tube tunnel according to an embodiment of the present invention;

[0020] Figure 2 is a schematic diagram of a partial structure according to an embodiment of the present invention (at the first pipe section);

[0021] Figure 3 is a schematic diagram of a partial structure according to an embodiment of the present invention (at the second pipe section);

[0022] Figure 4 is a flow chart of a method for constructing a submarine immersed tube tunnel according to an embodiment of the present invention;

[0023] Figure 5 It is a flow chart of a specific embodiment of the method for constructing a submarine immersed tube tunnel according to an embodiment of the present invention.

[0024] Reference numerals:

[0025] Submarine immersed tube tunnel 100;

[0026] The first pipe section 1 ; the second pipe section 2 ; the rubber belt 3 ; the first reinforcing plate 41 ; the second reinforcing plate 42 ; the wall 50 ; and the connecting member 60 . DETAILED DESCRIPTION

[0027] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0028] Reference below Figure 1-Figure 3 A submarine immersed tube tunnel 100 according to an embodiment of the present invention is described.

[0029] like Figure 1-Figure 3 As shown, a submarine immersed tube tunnel 100 according to an embodiment of the present invention includes: a first pipe segment 1 , a second pipe segment 2 , a rubber belt 3 , a first reinforcement plate 41 and a second reinforcement plate 42 .

[0030] The rubber belt 3 includes a first part and a second part, the first part is sleeved on the outside of the first pipe section 1, and the second part is sleeved on the outside of the second pipe section 2; the first reinforcing plate 41 is sleeved on the outside of the first part, and the second reinforcing plate 42 is sleeved on the outside of the second part, and there is a spacing distance between the first reinforcing plate 41 and the second reinforcing plate 42.

[0031] The rubber belt 3 includes a first part and a second part, the first part is sleeved on the outside of the first pipe section 1, and the second part is sleeved on the outside of the second pipe section 2. The rubber belt 3 is constructed as an annular structure. The material of the rubber belt 3 can be but not limited to natural rubber, styrene-butadiene rubber, etc. As some embodiments of the present application, the material of the rubber belt 3 is styrene-butadiene rubber. As some embodiments of the present application, the first part is sleeved on the outside of the end of the first pipe section 1 close to the second pipe section 2, and as some embodiments of the present application, the second part is sleeved on the outside of the end of the second pipe section 2 close to the first pipe section 1.

[0032] The first reinforcing plate 41 and the second reinforcing plate 42 are both constructed as a four-sided plate structure (i.e., an annular structure). The first reinforcing plate 41 is sleeved on the outside of the first part to reinforce and protect the first part of the rubber belt 3, and the second reinforcing plate 42 is sleeved on the outside of the second part to reinforce and protect the second part of the rubber belt 3. As some embodiments of the present application, the first reinforcing plate 41 and the second reinforcing plate 42 are formed by steel mesh and concrete casting. As some embodiments of the present application, the first reinforcing plate 41 is connected to the first pipe section 1 by welding, and the second reinforcing plate 42 is connected to the second pipe section 2 by welding. There is a spacing distance between the first reinforcing plate 41 and the second reinforcing plate 42. It can be understood that there is a spacing distance between the first reinforcing plate 41 and the second reinforcing plate 42, which can make the first reinforcing plate 41 and / or the second reinforcing plate 42 not be provided on the outside of part of the rubber belt 3, that is, it can make part of the rubber belt 3 exposed, so that the first pipe section 1 and the second pipe section 2 can be stretched and twisted to a certain extent, thereby improving the stability of the submarine immersed tube tunnel 100.

[0033] As some embodiments of the present application, crushed stone and block rock backfill layers can be filled on both sides and above the submarine immersed tube tunnel 100 .

[0034] As some embodiments of the present application, the rubber belt 3, the first reinforcing plate 41 and the second reinforcing plate 42 can provide secondary waterproofing for the submarine immersed tube tunnel 100. Once the initial waterproofing system and the waterstops between the pipe sections (such as the GINA waterstop and the OMEGA waterstop) are excessively deformed and leak, the rubber belt 3, the first reinforcing plate 41 and the second reinforcing plate 42 can provide secondary waterproofing protection to improve the waterproofing performance of the submarine immersed tube tunnel 100.

[0035] Therefore, by sleeved the rubber belt 3 on the outside of the first pipe section 1 and the second pipe section 2, and sleeved the first reinforcing plate 41 and the second reinforcing plate 42 on the outside of the rubber belt, and spacing the first reinforcing plate 41 and the second reinforcing plate 42 apart, not only can the submarine immersed tube tunnel 100 be waterproofed and reinforced, but also a buffer medium can be provided for the axial stretching and relative deformation between the pipe sections, thereby reducing the probability of axial deformation, bending and twisting deformation of the first pipe section 1 and the second pipe section 2, thereby improving the waterproof performance of the submarine immersed tube tunnel 100, and being beneficial to improving the safety of use of the submarine immersed tube tunnel 100.

[0036] In some embodiments of the present invention, the rubber belt 3 is connected to the first pipe section 1 , the second pipe section 2 , the first reinforcing plate 41 , and the second reinforcing plate 42 .

[0037] The rubber belt 3 is connected to the first pipe section 1 and the second pipe section 2. As some embodiments of the present application, the rubber belt 3 is connected to the first pipe section 1 and the second pipe section 2 by welding. The rubber belt 3 is connected to the first reinforcing plate 41 and the second reinforcing plate 42. As some embodiments of the present application, the rubber belt 3 is connected to the first reinforcing plate 41 and the second reinforcing plate 42 by welding.

[0038] By connecting the rubber belt 3 with the first pipe section 1, the second pipe section 2, the first reinforcing plate 41, and the second reinforcing plate 42, the structural strength and stability of the submarine immersed tube tunnel 100 can be improved, which is beneficial to reducing the probability of separation of the rubber belt 3 from the first pipe section 1, the second pipe section 2, the first reinforcing plate 41, and the second reinforcing plate 42.

[0039] In some embodiments of the present invention, Figure 1 and Figure 2 As shown, the submarine immersed tube tunnel 100 further includes: a wall 50 , with walls 50 provided on both sides of the first reinforcement plate 41 , and the wall 50 and the first reinforcement plate 41 are connected via a connector 60 .

[0040] The submarine immersed tube tunnel 100 further includes a wall 50, which is provided along the width direction of the first tube section 1 (i.e. Figure 1The first reinforcing plate 41 is provided with walls 50 on both sides, and the walls 50 are connected to the first reinforcing plate 41 through a connecting piece 60. Specifically, the wall 50 is connected to the connecting piece 60, and the connecting piece 60 is connected to the first reinforcing plate 41. The number of the connecting pieces 60 is multiple, and the number of the connecting pieces 60 can be but is not limited to two, three, four, etc. As some embodiments of the present application, along the width direction of the first pipe section 1 (i.e. Figure 1 The first reinforcing plate 41 is provided with two connecting pieces 60 on both sides. The two connecting pieces 60 are arranged along the height direction of the first pipe section 1 (i.e. Figure 1 Z direction as shown) spacing setting.

[0041] As some embodiments of the present application, the connector 60 is connected to the wall 50 and the first reinforcing plate 41 by welding. As some embodiments of the present application, the two walls 50 are vertically buried in the seabed foundation. As some embodiments of the present application, the wall 50 can be a reinforced concrete wall. As some embodiments of the present application, the connector 60 can be a tie steel bar, which is horizontally arranged. The tie steel bar has a tie effect, which can further prevent the submarine immersed tube tunnel 100 from floating, sinking or moving laterally under the action of strong earthquakes or silt, which is conducive to improving the stability of the submarine immersed tube tunnel 100.

[0042] As some embodiments of the present application, a steel cylinder is provided on the top of the wall 50 , the steel cylinder is fixedly connected to the wall 50 , and a plurality of steel sleeves are welded one by one to the outer sides of the steel cylinder and the first reinforcing plate 41 .

[0043] As some embodiments of the present application, the tie reinforcement is a threaded steel bar, which is fixed between a steel sleeve outside the wall 50 and a steel sleeve outside the first reinforcement plate 41 .

[0044] As some embodiments of the present application, the height of the wall 50 can be any value between 25m and 35m.

[0045] As some embodiments of the present application, the depth of the lower end of the wall 50 is deeper than the soft soil foundation on the seabed to reach the solid stratum, which can play a role in reinforcing the foundation and prevent the lateral deformation of sand or soft soil. The upper end of the wall 50 extends to the backfill layer, which can prevent the lateral displacement of the submarine immersed tube tunnel 100.

[0046] By providing walls 50 on both sides of the first reinforcing plate 41 and connecting the wall 50 to the first reinforcing plate 41 via a connector 60, the submarine immersed tube tunnel 100 can be further reinforced to improve the stability of the submarine immersed tube tunnel 100, which is beneficial to improving the service life of the submarine immersed tube tunnel 100.

[0047] In some embodiments of the present invention, the thickness of the rubber belt 3 is A, which satisfies the relationship: 0.5m≤A≤2.5m; and / or, along the extension direction of the first pipe section 1 (i.e. Figure 1 The dimension of the second part is B, which satisfies the relationship: 2m≤B≤5m.

[0048] The thickness of the rubber belt 3 is A, and A can satisfy the relationship: 0.5m≤A≤2.5m, that is, the thickness A of the rubber belt 3 can be any value between 0.5m and 2.5m, for example, the thickness A of the rubber belt 3 can be but not limited to 0.5m, 1m, 2m, etc. As some embodiments of the present application, the thickness A of the rubber belt 3 can be 2m.

[0049] Along the extension direction of the first pipe segment 1 (i.e. Figure 1 The size of the second part is B, and B can satisfy the relationship: 2m≤B≤5m, that is, along the extension direction of the first pipe section 1 (i.e. Figure 1 The size B of the second portion may be any value between 2m and 5m, for example, the size B of the second portion may be but is not limited to 2m, 3m, 4m, etc. In some embodiments of the present application, the size B of the second portion may be 3m.

[0050] By making the thickness A of the rubber belt 3 any value between 0.5m and 2.5m, and ... Figure 1 The dimension B of the second part can be any value between 2m and 5m, which can make the size of the rubber belt 3 reasonable, meet the strength requirements, provide a buffer medium for the axial stretching and relative deformation between the pipe segments, improve the waterproof performance of the submarine immersed tube tunnel 100, and is beneficial to improving the safety and stability of the submarine immersed tube tunnel 100.

[0051] In some embodiments of the present invention, Figure 3 As shown, the second reinforcing plate 42 is connected to the second pipe section 2, and there is a gap between the second reinforcing plate 42 and the second pipe section 2 for accommodating the second part.

[0052] The second reinforcing plate 42 is connected to the second pipe section 2. In some embodiments of the present application, the second reinforcing plate 42 is connected to the second pipe section 2 by welding. In addition, there is a gap between the second reinforcing plate 42 and the second pipe section 2 so that the second portion can be accommodated between the second reinforcing plate 42 and the second pipe section 2.

[0053] It should be noted that the second reinforcing plate 42 is sleeved on the outside of the second part. When assembling the first pipe section 1 and the second pipe section 2, the second part of the rubber belt 3 can be inserted into the gap between the second reinforcing plate 42 and the second pipe section 2 to complete the assembly of the first pipe section 1 and the second pipe section 2.

[0054] By providing a gap between the second reinforcing plate 42 and the second pipe section 2 for accommodating the second part, the rubber belt 3 can gradually enter the gap between the second reinforcing plate 42 and the second pipe section 2 when assembling the submarine immersed tube tunnel 100. This arrangement is conducive to reducing the difficulty of docking the submarine immersed tube tunnel 100 and improving the assembly efficiency of the submarine immersed tube tunnel 100.

[0055] In some embodiments of the present invention, Figure 1 and Figure 3 As shown, the second reinforcing plate 42 is welded to the second pipe segment 2, and the welding point between the second reinforcing plate 42 and the second pipe segment 2 is the first welding point; along the extension direction of the second pipe segment 2, the distance between the first welding point and the end face of the second pipe segment 2 close to the first pipe segment 1 is C, satisfying the relationship: 5m≤C≤7m, and / or the welding thickness of the first welding point is D, satisfying the relationship: 0.2m≤D≤0.6m.

[0056] The second reinforcing plate 42 is connected to the second pipe section 2 by welding, and the welding point between the second reinforcing plate 42 and the second pipe section 2 is the first welding point, along the extension direction of the second pipe section 2 (i.e. Figure 1 In the X direction shown in the figure, the distance C between the first welding point and the end face of the second pipe segment 2 close to the first pipe segment 1 is C, and C can satisfy the relationship: 5m≤C≤7m, that is, the distance C between the first welding point and the end face of the second pipe segment 2 close to the first pipe segment 1 can be any value between 5m and 7m. For example, the distance C between the first welding point and the end face of the second pipe segment 2 close to the first pipe segment 1 can be but not limited to 5m, 6m, 7m, etc. As some embodiments of the present application, the distance C between the first welding point and the end face of the second pipe segment 2 close to the first pipe segment 1 can be 6m.

[0057] The welding thickness of the first welding point is D, and D can satisfy the relationship: 0.2m≤D≤0.6m, that is, the welding thickness D of the first welding point can be any value between 0.2m and 0.6m. For example, the welding thickness D of the first welding point can be but not limited to 0.3m, 0.4m, 0.5m, etc. As some embodiments of the present application, the welding thickness D of the first welding point can be 0.4m.

[0058] Such a configuration can make the size of the second reinforcing plate 42 reasonable, which is beneficial to improving the structural strength of the second reinforcing plate 42, and can make the welding thickness of the first welding point reasonable, which can ensure the connection strength between the second reinforcing plate 42 and the second pipe section 2, and is beneficial to improving the safety and stability of the submarine immersed tube tunnel 100.

[0059] In some embodiments of the present invention, Figure 1 and Figure 3 As shown, along the extension direction of the second pipe section 2 (i.e. Figure 1 In the X direction shown in the figure), the distance between the end surface of the second reinforcing plate 42 close to the first pipe segment 1 and the end surface of the second pipe segment 2 close to the first pipe segment 1 is E, which satisfies the relationship: 0.5m≤E≤1.5m.

[0060] Among them, along the extension direction of the second pipe section 2 (i.e. Figure 1 The X direction shown in the figure), the distance E between the end face of the second reinforcing plate 42 close to the first pipe section 1 and the end face of the second pipe section 2 close to the first pipe section 1 is, and E can satisfy the relationship: 0.5m≤E≤1.5m, that is, the distance E between the end face of the second reinforcing plate 42 close to the first pipe section 1 and the end face of the second pipe section 2 close to the first pipe section 1 can be any value between 0.5m and 1.5m. For example, the distance E between the end face of the second reinforcing plate 42 close to the first pipe section 1 and the end face of the second pipe section 2 close to the first pipe section 1 can be but not limited to 0.5m, 1m, 1.5m, etc. As some embodiments of the present application, the distance E between the end face of the second reinforcing plate 42 close to the first pipe section 1 and the end face of the second pipe section 2 close to the first pipe section 1 can be 1m.

[0061] Such an arrangement can partially expose the rubber belt 3 outside the second pipe section 2, and can cause a certain degree of stretching and twisting of the first pipe section 1 and the second pipe section 2, thereby improving the stability of the submarine immersed tube tunnel 100.

[0062] In some embodiments of the present invention, Figure 2 and Figure 3 As shown, the lateral width of the first reinforcing plate 41 is F, and the lateral width of the first pipe section 1 is G, satisfying the relationship: 1.3≤F / G≤2.2; and / or, the lateral width of the second reinforcing plate 42 is H, and the lateral width of the second pipe section 2 is I, satisfying the relationship: 1.3≤H / I≤2.2.

[0063] Among them, the lateral width of the first reinforcing plate 41 is F, and the lateral width of the first pipe section 1 is G, and F and G can satisfy the relationship: 1.3≤F / G≤2.2, that is, the ratio of the lateral width F of the first reinforcing plate 41 to the lateral width G of the first pipe section 1 can be any value between 1.3 and 2.2. For example, the ratio of the lateral width F of the first reinforcing plate 41 to the lateral width G of the first pipe section 1 can be but not limited to 1.3, 1.5, 2, etc. As some embodiments of the present application, the ratio of the lateral width F of the first reinforcing plate 41 to the lateral width G of the first pipe section 1 can be 1.5.

[0064] The lateral width of the second reinforcing plate 42 is H, and the lateral width of the second pipe section 2 is I. H and I can satisfy the relationship: 1.3≤H / I≤2.2, that is, the ratio of the lateral width H of the second reinforcing plate 42 to the lateral width I of the second pipe section 2 can be any value between 1.3 and 2.2. For example, the ratio of the lateral width H of the second reinforcing plate 42 to the lateral width I of the second pipe section 2 can be but not limited to 1.3, 1.5, 2, etc. As some embodiments of the present application, the ratio of the lateral width H of the second reinforcing plate 42 to the lateral width I of the second pipe section 2 can be 1.5.

[0065] This arrangement can make the lateral width ratios of the first reinforcing plate 41 and the first pipe section 1, and the lateral width ratios of the second reinforcing plate 42 and the second pipe section 2 reasonable, so that space is left between the first reinforcing plate 41 and the second reinforcing plate 42, allowing the rubber belt 3 of a certain thickness to undergo axial deformation and bending-torsion deformation, which has a certain energy consumption effect.

[0066] In some embodiments of the present invention, Figure 1 As shown, the first pipe segment 1 is the second to last pipe segment, and the second pipe segment 2 is the final pipe segment.

[0067] It is understandable that the second-to-last pipe section in the submarine immersed tube tunnel 100 is the first pipe section 1, and the last-to-last pipe section (the final pipe section) in the submarine immersed tube tunnel 100 is the second pipe section 2. That is, the first pipe section 1 and the second pipe section 2 are the final connection points.

[0068] It should be noted that the environment of the final connection of the submarine immersed tube tunnel 100 is less stable than that of other connections. By making the first pipe section 1 the second to last pipe section and the second pipe section 2 the final pipe section, the waterproof performance of the submarine immersed tube tunnel 100 can be further improved, and the probability of capsizing of the submarine immersed tube tunnel 100 can be reduced, which is beneficial to improving the safety and stability of the submarine immersed tube tunnel 100.

[0069] Refer to the following Figure 4The invention provides a method for constructing a submarine immersed tube tunnel, wherein the method for constructing a submarine immersed tube tunnel can be used to construct the above-mentioned submarine immersed tube tunnel, and the method for constructing a submarine immersed tube tunnel comprises the following steps:

[0070] S1, sequentially sleeve a rubber belt and a first reinforcing plate on the outside of the first pipe section, and make the rubber belt extend out of the first pipe section along the extension direction of the first pipe section;

[0071] The positions of the rubber belt, the first reinforcing plate, and the second reinforcing plate need to be marked on the first pipe section and the second pipe section in advance, and the rubber belt and the first reinforcing plate are sequentially sleeved on the outside of the first pipe section according to the marked positions. Specifically, the first pipe section, the rubber belt, and the first reinforcing plate are welded respectively, and the rubber belt is extended along the extension direction of the first pipe section (i.e. Figure 1 The second portion of the rubber belt extends out of the first pipe section (in the X direction shown in the figure) so that the second portion of the rubber belt gradually enters the gap between the second pipe section and the second reinforcing plate, and then is sunk onto the gravel cushion layer.

[0072] S2, a second reinforcing plate is arranged outside the second pipe section, and a gap for accommodating the rubber belt is provided between the second reinforcing plate and the second pipe section;

[0073] Among them, the second reinforcing plate is sleeved on the outside of the second pipe section according to the marked position. Specifically, the second pipe section and the second reinforcing plate are welded so that there is a gap between the second reinforcing plate and the second pipe section for accommodating the rubber belt, and then it is sunk onto the gravel cushion layer.

[0074] S3, docking the first pipe section with the second pipe section, and inserting the part of the rubber belt extending out of the first pipe section into the gap between the second reinforcing plate and the second pipe section.

[0075] When the first pipe section and the second pipe section are butt-jointed, the rubber belt extends in the extension direction of the first pipe section (i.e. Figure 1 The first pipe section is extended in the X direction as shown, and the second pipe section is positioned and moved so that the portion of the rubber belt extending out of the first pipe section can gradually enter into the gap between the second pipe section and the second reinforcing plate to complete the docking of the first pipe section and the second pipe section.

[0076] As some embodiments of the present application, the first pipe section and the second pipe section may be butt-jointed first and second pipe sections first, and then the butt-jointed first and second pipe sections may be sunk onto the gravel cushion layer.

[0077] Therefore, through the construction method of the submarine immersed tube tunnel of the present application, not only can the submarine immersed tube tunnel be waterproofed and reinforced, but also a buffer medium can be provided for the axial stretching and relative deformation between the pipe sections, thereby reducing the probability of axial deformation, bending and twisting deformation of the first pipe section and the second pipe section, thereby improving the waterproof performance of the submarine immersed tube tunnel and facilitating the improvement of the safety of use of the submarine immersed tube tunnel.

[0078] Specifically, Figure 5 As shown, as a specific embodiment of the present invention, the above-mentioned method for constructing a submarine immersed tube tunnel may include the following steps:

[0079] S01, marking the positions of the rubber belt, the first reinforcing plate and the second reinforcing plate on the first pipe section and the second pipe section in advance;

[0080] S02, welding the rubber belt, the first reinforcing plate and the second reinforcing plate to the penultimate pipe section and the second pipe section in advance for prefabrication;

[0081] S03, excavation of foundation trench, rough excavation to the bottom mark, the width of the foundation trench is slightly larger than the width of the submarine immersed tube tunnel, and both sides of the foundation trench are excavated to the seabed surface at a certain slope;

[0082] S04, pre-marking the positions of the first pipe section, the second pipe section and the wall on the seabed foundation below the foundation trench according to the design drawings;

[0083] S05, constructing a wall on the seabed foundation and fixing a steel sleeve on the top of the wall;

[0084] S06, hoisting the first pipe segment and the second pipe segment, and connecting the steel sleeve outside the first reinforcing plate at the outer periphery of the pipe segment end by tie steel bars;

[0085] S07, backfill crushed stone and boulders on both sides and on top of the immersed tube tunnel to form a backfill layer.

[0086] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0087] In the description of the present invention, "first feature" or "second feature" may include one or more of the features.

[0088] In the description of the present invention, "plurality" means two or more.

[0089] In the description of the present invention, a first feature being “on” or “under” a second feature may include that the first and second features are directly in contact with each other, or may include that the first and second features are not in direct contact with each other but are in contact with each other via another feature therebetween.

[0090] In the description of the present invention, “on”, “over” and “above” a first feature from a second feature includes the first feature being directly above and obliquely above the second feature, or simply means that the first feature is horizontally higher than the second feature.

[0091] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0092] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.

Claims

1. A submarine immersed tube tunnel, characterized in that: include: A first pipe section, a second pipe section and a rubber belt, wherein the rubber belt comprises a first part and a second part, wherein the first part is sleeved on the outside of the first pipe section, and the second part is sleeved on the outside of the second pipe section; A first reinforcing plate and a second reinforcing plate, wherein the first reinforcing plate is sleeved on the outside of the first portion, and the second reinforcing plate is sleeved on the outside of the second portion, and there is a spacing distance between the first reinforcing plate and the second reinforcing plate.

2. The submarine immersed tube tunnel according to claim 1, characterized in that: The rubber belt is connected to the first pipe section, the second pipe section, the first reinforcing plate, and the second reinforcing plate.

3. The submarine immersed tube tunnel according to claim 1, characterized in that: Also includes: A wall body is provided on both sides of the first reinforcing plate, and the wall body is connected to the first reinforcing plate via a connecting piece.

4. The submarine immersed tube tunnel according to claim 1, characterized in that: The thickness of the rubber belt is A, which satisfies the relationship: 0.5m≤A≤2.5m; And / or, along the extension direction of the first pipe section, the size of the second part is B, satisfying the relationship: 2m≤B≤5m.

5. The submarine immersed tube tunnel according to claim 1, characterized in that: The second reinforcing plate is connected to the second pipe section, and a gap for accommodating the second part is provided between the second reinforcing plate and the second pipe section.

6. The submarine immersed tube tunnel according to claim 5, characterized in that: The second reinforcing plate is connected to the second pipe section by welding, and a welding point between the second reinforcing plate and the second pipe section is a first welding point; Along the extension direction of the second pipe section, the distance between the first welding point and the end face of the second pipe section close to the first pipe section is C, satisfying the relationship: 5m≤C≤7m, and / or the welding thickness of the first welding point is D, satisfying the relationship: 0.2m≤D≤0.6m.

7. The submarine immersed tube tunnel according to claim 5, characterized in that: Along the extension direction of the second pipe segment, the distance between the end surface of the second reinforcing plate close to the first pipe segment and the end surface of the second pipe segment close to the first pipe segment is E, satisfying the relationship: 0.5m≤E≤1.5m.

8. The submarine immersed tube tunnel according to claim 1, characterized in that: The transverse width of the first reinforcing plate is F, and the transverse width of the first pipe section is G, which satisfies the relationship: 1.3≤F / G≤2.2; And / or, the transverse width of the second reinforcing plate is H, and the transverse width of the second pipe section is I, satisfying the relationship: 1.3≤H / I≤2.

2.

9. The submarine immersed tube tunnel according to any one of claims 1 to 8, characterized in that: The first pipe section is the second to last pipe section, and the second pipe section is the final pipe section.

10. A method for constructing a submarine immersed tube tunnel, characterized in that: include: A rubber belt and a first reinforcing plate are sequentially sleeved on the outer side of the first pipe section, and the rubber belt is extended out of the first pipe section along the extension direction of the first pipe section; A second reinforcing plate is arranged outside the second pipe section, and a gap for accommodating the rubber belt is provided between the second reinforcing plate and the second pipe section; The first pipe section and the second pipe section are butt-jointed, and a portion of the rubber belt extending out of the first pipe section is inserted into a gap between the second reinforcing plate and the second pipe section.