Prefabricated double-faced overlapped sandwich integrated shear wall L-shaped connecting joint and construction method
Through prefabricated double-sided sandwich integrated shear wall L-shaped connection nodes, using the combination of horizontal prefabricated cavity shear wall and vertical plane cavity shear wall and a straight cast-in-place connection section, the existing technology is solved. In order to solve the problems of dense steel bars and complicated construction, the density of concrete and the strength of wall connection are improved.
Patent Information
- Application Number
- CN202411123796.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-10-11
AI Technical Summary
The L-shaped connection nodes of the existing prefabricated double-sided composite walls have problems such as dense steel bars, difficulty in binding, and high formwork requirements, resulting in loose concrete pouring and complicated construction.
Prefabricated double-sided sandwich integrated shear wall L-shaped connection nodes are used. Through the combination of horizontal prefabricated cavity shear walls and vertical plane cavity shear walls, a straight cast-in-place connection section is used to reduce the number of steel bars. Waterstops are also installed at corners to simplify construction steps and material requirements.
It reduces the density of steel bars, simplifies the construction process, improves the density of concrete and the strength of wall connections, and reduces the technical and operational experience requirements for workers.
Smart Images

Figure CN118756852A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of prefabricated double-sided laminated cavity shear wall connection, and specifically relates to a prefabricated double-sided laminated sandwich integrated shear wall L-shaped connection node and a construction method. Background Art
[0002] like Figure 3-Figure 4 As shown in the figure, the existing L-shaped structure connection node diagram is used between the prefabricated double-sided composite walls. The hidden column segment needs to be connected as a whole by a hoop to connect the longitudinal steel bars of the hidden column segment. The existing connection node has the following problems and disadvantages: 1. The L-shaped cross-section of the hidden column section is very small, and the wall thickness is 200mm. There are 6 cross-sections of steel bars in both directions at the corners. After binding, the steel bars at the corners are too dense and the concrete pouring is not dense.
[0003] 2. The construction surface of the L-shaped section of the concealed column is very small. When tying the steel bars, there are two hoops in each direction. When tying the hoops and the vertical force-bearing steel bars, the tying is difficult due to the small working surface, thus placing high requirements on the steel bar tying operators.
[0004] 3. It is necessary to support L-shaped formwork. Compared with the I-shaped cast-in-place section, the L-shaped cast-in-place section has higher requirements on the formwork rigidity and construction measures to prevent the formwork from expanding. Therefore, it has high requirements on materials and workers' skills and operating experience. Summary of the invention
[0005] In view of the problems existing in the prior art, the present invention proposes an L-shaped connection node and construction method for a prefabricated double-sided laminated sandwich integrated shear wall. The present invention eliminates the L-shaped cast-in-place section, prefabricates the wall of the L-shaped hidden column section together with one side wall, and connects the two prefabricated double-sided laminated cavity shear walls by making a straight-line cast-in-place connection section in the other side wall, thereby reducing the number of steel bars, avoiding the problem of too dense steel bars at the corners and loose concrete pouring, and at the same time being more conducive to force bearing.
[0006] In order to achieve the above object, the present invention is implemented by the following technical scheme: a prefabricated double-sided laminated sandwich integrated shear wall L-shaped connection node, comprising: The horizontal prefabricated cavity shear wall is composed of an L-shaped hidden column section and a plane shear wall, which are integrally formed to form an L-shaped structure; Vertical plane cavity shear wall, which is a plane-shaped double-sided composite cavity shear plate; The cast-in-place connection section is used to connect the horizontal prefabricated cavity shear wall and the vertical plane cavity shear wall. Longitudinal connection bars are arranged in the cast-in-place connection section, and the two ends of the longitudinal connection bars extend into the horizontal prefabricated cavity shear wall and the vertical plane cavity shear wall respectively.
[0007] Furthermore, the horizontal prefabricated cavity shear wall comprises an L-shaped upper page plate and an L-shaped lower page plate, and a cast-in-place concrete layer is arranged in the cavity formed between the L-shaped upper page plate and the L-shaped lower page plate.
[0008] Furthermore, the vertical plane cavity shear wall includes a horizontal upper page plate and a horizontal lower page plate, and a cast-in-place concrete layer is arranged in the cavity formed between the horizontal upper page plate and the horizontal lower page plate.
[0009] Furthermore, a waterstop is provided at the joint between the horizontal prefabricated cavity shear wall and the cast-in-place connection section, so as to achieve the waterproof effect required by the structure.
[0010] Another technical solution protected by the present invention is a construction method of a prefabricated double-sided laminated sandwich integrated shear wall L-shaped connection node, which is carried out according to the following steps: Step 1) Prepare the base layer at the location to be installed and lay out the wires; Step 2) Use the hoist to lift the horizontal prefabricated cavity shear wall, align it with the outer contour of the cast-in-place wall, gradually lift it into place, install temporary supports to fix the horizontal prefabricated cavity shear wall and correct the position, and then unhook the hoist; Step 3) Use the hoist to hoist the vertical plane cavity shear wall to the top of the cast-in-place connection section, and gradually hoist it into place; install temporary supports to fix the vertical plane cavity shear wall and correct the position, and then unhook the hoist; Step 4) Tie horizontal reinforcement and annular stirrups above the L-shaped concealed column segment; set longitudinal connecting reinforcement, with one end of the longitudinal connecting reinforcement reserved to extend to the outside and the other end extending into the cavity; Step 5) Setting a casting template for the cast-in-place connection section outside the tied horizontal reinforcement and the annular stirrups; Step 6) Seal the horizontal prefabricated cavity shear wall and the vertical plane cavity shear wall, and pour the mixed concrete material with the completed proportion into the cavity of the prefabricated wall and the concrete of the cast-in-place connection section. After the strength of the poured mixed concrete material reaches the requirement, complete the construction of the L-shaped connection node of the prefabricated double-sided laminated sandwich integrated shear wall.
[0011] Compared with the prior art, the present invention has the following beneficial effects.
[0012] 1. The present invention can realize the prefabricated double-sided composite cavity shear wall without L-shaped connection nodes, and can avoid the complicated and multi-operation construction of L-shaped hidden columns after multi-layer steel bar binding and formwork support on site, and then pouring concrete to connect with the prefabricated double-sided composite cavity shear wall.
[0013] 2. The present invention changes the L-shaped cast-in-place section into a straight-line cast-in-place connecting section, which simplifies the node shape and steel bar binding, reduces the requirements for construction site materials and workers' skills and operating experience, and facilitates on-site construction. Moreover, the straight-line cast-in-place connecting section plays the role of a horizontal beam, which improves the connection strength of the entire wall.
[0014] 3. According to the specification, the L-shaped cast-in-place section is cancelled, and the wall of the L-shaped hidden column section is prefabricated together with one side wall. In the other side wall, a one-line cast-in-place section is constructed to connect the two prefabricated double-sided composite cavity shear walls, and the working surface at the corner is moved to a position away from the corner to facilitate construction for workers. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the structure of the present invention.
[0016] Figure 2 Another structural schematic diagram of the present invention.
[0017] Figure 3 Schematic diagram of the existing L-shaped structure connection nodes.
[0018] Figure 4 Structural diagram of existing L-shaped structure connection nodes.
[0019] In the figure, 1 is a horizontal prefabricated cavity shear wall, 2 is a vertical plane cavity shear wall, 3 is a cast-in-place connecting section, 4 is a longitudinal connecting reinforcement, 5 is an L-shaped upper page plate and 6 is an L-shaped lower page plate, 7 is a cast-in-place concrete layer, 8 is a horizontal upper page plate, and 9 is a horizontal lower page plate. DETAILED DESCRIPTION
[0020] The present invention is further described in detail below with reference to the accompanying drawings and implementation examples. In order to better understand the prefabricated double-sided laminated sandwich integrated shear wall L-shaped connection node and construction method of the present invention, the prefabricated double-sided laminated sandwich integrated shear wall L-shaped connection node is briefly introduced first.
[0021] like Figure 1-Figure 2 As shown, the prefabricated double-sided composite sandwich integrated shear wall L-shaped connection node includes: a horizontal prefabricated cavity shear wall 1, a vertical plane cavity shear wall 2 and a cast-in-place connection section 3.
[0022] The present invention moves the L-shaped hidden column section in the existing structure to the horizontal prefabricated cavity shear wall 1, and forms it with the plane shear wall as an integral unit, thus forming the horizontal prefabricated cavity shear wall 1 of the L-shaped structure. The horizontal prefabricated cavity shear wall 1 includes an L-shaped upper page plate 5 and an L-shaped lower page plate 6, and a steel truss and a cast-in-place concrete layer 7 are arranged in the cavity formed between the L-shaped upper page plate 5 and the L-shaped lower page plate 6.
[0023] Horizontal prefabricated cavity shear wall 1 Figure 1and Figure 2 There are two structural forms. The difference between them lies in the different reinforcement forms of the horizontal sections, which can be selected according to different strength requirements.
[0024] The vertical plane cavity shear wall 2 is a plane double-sided composite cavity shear plate. The main structure includes a horizontal upper plate 8 and a horizontal lower plate 9. A steel truss and a cast-in-place concrete layer 7 are arranged in the cavity formed between the horizontal upper plate 8 and the horizontal lower plate 9.
[0025] The cast-in-place connecting section 3 is used to connect the horizontal prefabricated cavity shear wall 1 and the vertical plane cavity shear wall 2. A longitudinal connecting bar 4 is arranged in the cast-in-place connecting section 3, and both ends of the longitudinal connecting bar 4 extend into the horizontal prefabricated cavity shear wall 1 and the vertical plane cavity shear wall 2 respectively.
[0026] The present invention uses a straight cast-in-place connection section 3 to connect the horizontal prefabricated cavity shear wall 1 and the vertical plane cavity shear wall 2, and moves the working surface originally located at the corner to a position away from the corner, which is convenient for workers to tie steel bars and cast molds, greatly improving work efficiency. In addition, a water stop is provided at the joint between the flat prefabricated cavity shear wall and the cast-in-place connection section 3, which can achieve the waterproof effect required by the structure.
[0027] Another technical solution protected by the present invention is a construction method of a prefabricated double-sided laminated sandwich integrated shear wall L-shaped connection node, which is carried out according to the following steps: Step 1) Prepare the base layer at the location to be installed and lay out the wires; Step 2) Use a hoist to lift the horizontal prefabricated cavity shear wall 1, align it with the outer contour of the cast-in-place wall, gradually lift it into place, install temporary supports to fix the horizontal prefabricated cavity shear wall 1 and correct the position, and then unhook the hoist; Step 3) Use a hoist to hoist the vertical plane cavity shear wall 2 to the top of the cast-in-place connection section 3, and gradually hoist it into place; install a temporary support to fix the vertical plane cavity shear wall 2 and correct the position, and then unhook the hoist; Step 4) Tie horizontal reinforcement and annular stirrups above the L-shaped concealed column segment; set longitudinal connecting reinforcement 4, with one end of the longitudinal connecting reinforcement 4 extending to the outside and the other end extending into the cavity; Step 5) setting a casting template for the cast-in-place connection section 3 outside the tied horizontal reinforcement and the annular stirrups; Step 6) The horizontal prefabricated cavity shear wall 1 and the vertical plane cavity shear wall 2 are sealed, and the cavity of the prefabricated wall and the concrete of the cast-in-place connection section 3 are poured with the mixed concrete material with the completed proportion. After the strength of the poured mixed concrete material reaches the requirement, the construction of the L-shaped connection node of the prefabricated double-sided overlapping sandwich integrated shear wall is completed.
[0028] The present invention uses a mixed concrete material with a certain proportion to simultaneously cast a horizontal prefabricated cavity shear wall 1, a vertical plane cavity shear wall 2 and a cast-in-place connecting section 3. After the casting is completed, the three are connected as a whole. Compared with the existing method, the connection strength is greater, thereby improving the connection strength of the entire wall.
[0029] The structure and construction method of the present invention are applicable to multi-story and high-rise buildings, including industrial and civil buildings. In addition to the ground, because the joints in the technical structure system have pre-buried waterstops and have good waterproof properties, they are also applicable to underground projects, including basements, underground garages, and underground comprehensive pipeline corridors.
[0030] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.
Claims
1. Prefabricated double-sided laminated sandwich integrated shear wall L-shaped connection node, It is characterized in that include: A horizontal prefabricated cavity shear wall (1), which is composed of an L-shaped concealed column section and a plane shear wall, the two being integrally formed to form an L-shaped structure; A vertical plane cavity shear wall (2), which is a plane-shaped double-sided composite cavity shear plate; A cast-in-place connection section (3) is used to connect a horizontal prefabricated cavity shear wall (1) and a vertical plane cavity shear wall (2); longitudinal connection bars (4) are arranged in the cast-in-place connection section (3); two ends of the longitudinal connection bars (4) extend into the horizontal prefabricated cavity shear wall (1) and the vertical plane cavity shear wall (2), respectively.
2. According to the prefabricated double-sided laminated sandwich integrated shear wall L-shaped connection node of claim 1, Features: The horizontal prefabricated cavity shear wall 1 comprises an L-shaped upper plate (5) and an L-shaped lower plate (6), and a cast-in-place concrete layer (7) is arranged in the cavity formed between the L-shaped upper plate (5) and the L-shaped lower plate (6).
3. According to claim 2, the prefabricated double-sided laminated integrated shear wall L-shaped connection node, Features: The vertical plane cavity shear wall (2) comprises a horizontal upper plate (8) and a horizontal lower plate (9), and a cast-in-place concrete layer (7) is arranged in the cavity formed between the horizontal upper plate (8) and the horizontal lower plate (9).
4. The prefabricated double-sided laminated sandwich integrated shear wall L-shaped connection node according to claim 3, Features: A water stop strip is provided at the joint between the horizontal prefabricated cavity shear wall (1) and the cast-in-place connecting section (3).
5. A construction method for a prefabricated double-sided laminated sandwich integrated shear wall L-shaped connection node, Features: Follow these steps: Step 1) Prepare the base layer at the location to be installed and lay out the wires; Step 2) using a lifting device to lift the horizontal prefabricated cavity shear wall (1), align it with the outer contour of the cast-in-place wall, gradually lift it into place, install temporary supports to fix the horizontal prefabricated cavity shear wall (1) and correct its position, and then unhook the lifting device; Step 3) using a hoist to hoist the vertical plane cavity shear wall (2) to the top of the cast-in-place connection section (3), and gradually hoisting it into place; installing a temporary support to fix the vertical plane cavity shear wall (2) and correct the position, and then unhooking the hoist; Step 4) tying horizontal reinforcement and annular stirrups above the L-shaped concealed column segment; providing longitudinal connecting reinforcement (4), with one end of the longitudinal connecting reinforcement (4) extending to the outside and the other end extending into the cavity; Step 5) setting a casting template for the cast-in-place connection section (3) outside the tied horizontal reinforcement and the annular stirrups; Step 6) The horizontal prefabricated cavity shear wall (1) and the vertical plane cavity shear wall (2) are sealed, and the cavity of the prefabricated wall and the concrete of the cast-in-place connection section (3) are poured with a mixed concrete material with a complete mix ratio. After the strength of the poured mixed concrete material reaches the required level, the construction of the L-shaped connection node of the prefabricated double-sided composite sandwich integrated shear wall is completed.