Stiffening girder erection method of ground-anchored suspension bridge
The stiffening girder erection method for ground-anchored suspension bridges eliminates temporary cable movement, reducing costs and torsional stress by using pre-deflection clips and sequential girder installation based on measured angles, ensuring accurate alignment and structural compatibility.
Patent Information
- Application Number
- US18/762314
- Authority / Receiving Office
- US · United States
- Patent Type
- Applications(United States)
- Current Assignee / Owner
- Priority Date
- 2024-01-31
- Filing Date
- 2024-07-02
- Publication Date
- 2024-10-24
AI Technical Summary
Existing methods for erecting stiffening girders in ground-anchored suspension bridges with space main cables require temporary push or pull movements of the main cables, leading to increased costs, construction periods, and torsional issues due to torque and misalignment.
A method involving the installation of clips for hanger rods with pre-deflection angles matching the bridge's inclination, followed by sequential installation of stiffening girder sections without initial main cable movement, with adjustments based on measured azimuth angles to minimize torsion and stress.
This approach eliminates the need for temporary cable movement, reduces construction time and costs, and minimizes torsional stress on the main cable and hanger rods, ensuring accurate alignment and structural compatibility.
Smart Images

Figure US20240352688A1-D00000_ABST
Abstract
Description
CROSS-REFERENCE TO RELATED APPLICATIONS
[0001] This application claims the benefit of priority from Chinese Patent Application No. 202410141583.3, filed on Jan. 31, 2024. The content of the aforementioned application, including any intervening amendments made thereto, is incorporated herein by reference in its entirety.TECHNICAL FIELD
[0002] This application relates to connectors, and more particularly to a stiffening girder erection method of a ground-anchored suspension bridge.BACKGROUND
[0003] Ground-anchored suspension bridges using space main cables have begun to emerge in recent years to improve the wind resistance of long-span suspension bridges. In existing methods for erecting stiffening girders of ground-anchored suspension bridges with space main cables, the two main cables are first pushed (or pulled) to close to or reach the transversal position of the completed bridge, and then the stiffening girders are erected, which inevitably increases the temporary facilities and processes required to push the two main cables apart or pull the two main cables closer together, resulting in an increased cost and construction period. For bridges with large transverse inclination angles of cable systems in the completed state, a plurality of temporary pushing (or pulling) facilities are commonly arranged along the longitudinal direction of the bridge. During the process of the main cable being temporarily pushed (or pulled), torques occur since the force exerted by each temporary pushing (pulling) facility on the main cable is difficult to completely pass through the cross-sectional center of the main cable, and even the direction of torques may be reversed, thus causing a large torsion of the main cable. Moreover, the torsion angles along the main cable axis are different or even reversed, causing trouble for subsequent construction.SUMMARY
[0004] An object of the disclosure is to provide a stiffening girder erection method of a space main cable ground-anchored suspension bridge without temporary push (or pull) movement of a main cable.
[0005] In order to achieve the above object, the following technical solutions are adopted.
[0006] This application provides a stiffening girder erection method of a ground-anchored suspension bridge, comprising:
[0007] step (1) installing clips for all hanger rods of a space main cable suspension bridge such that design center lines of the clips are coincident with center lines of the hanger rods, respectively; wherein the design center lines of the clips are located in a vertical plane, such that a lateral pre-deflection angle of each of the clips is configured as a lateral inclination angle of a corresponding one of the hanger rods in a bridge complete state;
[0008] step (2) installing a first stiffening girder section at a position away from a first tower at a preset distance along a longitudinal direction, and installing a second stiffening girder section at a position away from a second tower at the preset distance along the longitudinal direction; and installing a plurality of third stiffening girder sections one by one in a direction respectively from the first stiffening girder and the second stiffening girder toward a mid-span until a mid-span closure is completed; wherein an azimuth angle of a main cable around a central axis thereof at each of the clips is measured after one or more of the plurality of third stiffening girder sections are installed; and a lateral deflection angle of each of the clips is calculated as a lateral inclination angle of each of the plurality of the hanger rods minus the azimuth angle of the main cable around the central axis thereof at each of the clips;
[0009] step (3) installing a plurality of fourth stiffening girder sections one by one respectively from the first stiffening girder section toward the first tower and from the second stiffening girder section toward the second tower until a stiffening girder is closed at mid-span; and step (4) measuring an azimuth angle of the central axis of the main cable at each of the clips.
[0010] In some embodiments, the step (4) is performed through steps of:
[0011] measuring an azimuth angle of the central axis of the main cable at a hanger rod among the hanger rods corresponding to an uninstalled fourth stiffening girder section; comparing a measured value and a theoretical value of a change of an azimuth angle of the central axis of the main cable at a certain stage; modifying a prediction model of an azimuth angle change value of the central axis of the main cable at the hanger rod corresponding to the uninstalled fourth stiffening girder section; determining an adjustment of a lateral deflection angle of a clip of the hanger rod corresponding to the uninstalled fourth stiffening girder section followed by adjustment; and installing the uninstalled fourth stiffening girder section.
[0012] In some embodiments, it is assumed that two points E and F on each of the clips in the bridge complete state are located on a tangent line of a configuration of a corresponding hanger rod at an upper endpoint thereof, an angle between an EF connection line in another state and an EF connection line in the bridge complete state is configured as a lateral deflection angle of each of the clips in the another state, and the lateral pre-deflection angle of each of the clips is a lateral deflection angle achieved during installation and adjustment.
[0013] In some embodiments, the lateral inclination angle of each of the hanger rods is an angle between a tangent line of a configuration of each of the hanger rods at an upper endpoint thereof and a vertical line in a projection of each of the hanger rods on a vertical plane perpendicular to a bridge central axis in the bridge complete state.
[0014] In some embodiments, it is assumed that an angle between a top-bottom connecting line AB of a section of the main cable in a tightened state and a line AB of a section of the main cable in a certain state is an azimuth angle of the section of the main cable around the central axis thereof in the certain state; and the azimuth angle of the section of the main cable around the central axis thereof is the azimuth angle of the main cable around the central axis thereof.
[0015] In some embodiments, in step (2), the preset distance is not less than 60 times a diameter of the main cable, and a girder section which not adjacent to the two main towers is located at the preset distance.
[0016] In some embodiments, the theoretical value of the lateral deflection angle of each of the clips is calculated through simulation analysis using a modified finite element model, a modified linear or a modified nonlinear model.
[0017] In some embodiments, in step (4), the adjustment of the lateral deflection angle of each of the clips is calculated through simulation analysis using a modified finite element model, a modified linear or a modified nonlinear model.
[0018] In some embodiments, the stiffening girder is a steel box girder, a steel truss girder or a steel-concrete composite girder.
[0019] In some embodiments, a rise-to-span ratio fh / L of a plane projection of the main cable in the bridge complete state in a transverse direction is greater than 1 / 175.
[0020] Compared to the prior art, this application has the following beneficial effects.
[0021] In the stiffening girder erection method of the present disclosure, there is no need to push (pull) the main cable before installing the stiffening girder, which eliminates a required process and device or facility for pushing (pulling) the main cable, thus saving the cost and construction period. Moreover, an additional torsion caused by the temporary push (or pull) of the main cable can be avoided. During the installation of the stiffening girder, the prediction model is modified based on an actual measurement of the change in the azimuth angle of the main cable around the central axis, so as to determine the adjustment amount of the lateral deflection angle of the clip, thereby reducing a deviation between the lateral inclination angle and a designed lateral inclination angle of the clip in the bridge complete state, resulting in favorable stress on the main cable, the clip and the hanger rod. In addition, the problem that when tower side girder sections are installed first, the large pre-deflection angle of the clip of these girder sections results in unfavorable stress on the main cable, the clip and the hanger rod can be avoided, which is caused by a large deviation between a predicted (calculated) value and an actual value of the azimuth angle change of the main cable around the central axis thereof at a clip within a certain distance along the longitudinal direction of the two main towers and at a first clip in an early installation stage of the stiffening girder. At the same time, this facilitates the avoidance of the problem of a large gap between a corresponding hanger rod installation state and the bridge complete state when first installing girder sections close to the mid-span, which leads to difficulty or inability to meet construction requirements.BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to illustrate the technical solutions in the embodiments of the present disclosure or in the prior art more clearly, the drawings needed in the description of embodiments or the prior art will be briefly introduced below. Obviously, for those of ordinary skill in the art, other drawings can be obtained based on these drawings without exerting creative efforts.
[0023] FIG. 1 is a schematic diagram of an azimuth angle β of a main cable around a central axis thereof and a lateral inclination angle α of a hanger rod in accordance with an embodiment of the present disclosure;
[0024] FIG. 2 illustrates a rise-to-span ratio of a space main cable in a transverse direction in accordance with an embodiment of the present disclosure;
[0025] FIG. 3 is a schematic diagram of a space main cable suspension bridge in accordance with an embodiment of the present disclosure;
[0026] FIG. 4 illustrates an elevation of the space main cable suspension bridge in accordance with an embodiment of the present disclosure;
[0027] FIG. 5 is a plan view of the space main cable suspension bridge in accordance with an embodiment of the present disclosure;
[0028] FIG. 6 illustrates an elevation of a main tower of a main bridge in accordance with an embodiment of the present disclosure;
[0029] FIG. 7 is a side view of the main tower in accordance with an embodiment of the present disclosure;
[0030] FIG. 8 shows a dimensional layout of a main girder in accordance with an embodiment of the present disclosure;
[0031] FIG. 9 is a cross-sectional view of a U rib and a straight plate rib of the main girder (single width) in accordance with an embodiment of the present disclosure;
[0032] FIG. 10 is a schematic diagram of a diaphragm of the main girder in accordance with an embodiment of the present disclosure;
[0033] FIG. 11 illustrates a layout of a crossbeam and the diaphragm in accordance with an embodiment of the present disclosure;
[0034] FIG. 12 is a schematic diagram of a perimeter plate of the diaphragm in accordance with an embodiment of the present disclosure;
[0035] FIG. 13 illustrates a layout of the perimeter plate, the diaphragm and a stiffeners in accordance with an embodiment of the present disclosure;
[0036] FIG. 14 illustrates a vertical component distribution of a force exerted on the hanger rod in accordance with an embodiment of the present disclosure;
[0037] FIG. 15 is a schematic diagram of a finite element model of the main bridge (hidden front view) in accordance with an embodiment of the present disclosure;
[0038] FIG. 16 illustrates a vertical displacement of the main cable at a mid-span of a main span during an entire process of hoisting the main girder from the main tower to both sides (without any temporary cross brace) in accordance with an embodiment of the present disclosure;
[0039] FIG. 17 illustrates a longitudinal displacement at a top of a left tower during the entire process of hoisting the main girder from the main tower to both sides (without any temporary cross brace) in accordance with an embodiment of the present disclosure;
[0040] FIG. 18 illustrates a stress of a tower root during the entire process of hoisting the main girder from the main tower to both sides (without any temporary cross brace) in accordance with an embodiment of the present disclosure;
[0041] FIG. 19 illustrates a structural condition to be met during an upcoming installation stage and a subsequent hoisting stage of the hanger rod in accordance with an embodiment of the present disclosure;
[0042] FIG. 20 is a schematic diagram of a test model and a loading tool in accordance with an embodiment of the present disclosure; and
[0043] FIGS. 21a-f illustrates a process of installing the stiffening girder in accordance with an embodiment of the present disclosure.US_DESCRIPTION_OF_EMBODIMENTS
[0044] The realization of the purpose, functional features and advantages of the present disclosure will be further described with reference to the embodiments and the accompanying drawings.DETAILED DESCRIPTION OF EMBODIMENTS
[0045] The technical solutions of the present disclosure will be clearly and completely described below in conjunction with the accompanying drawings and embodiments. Obviously, described below are only some embodiments of the present disclosure, instead of all embodiments of the present disclosure. Based on the embodiments in the present disclosure, all other embodiments obtained by those of ordinary skill in the art without making creative efforts shall fall within the scope of the present disclosure.
[0046] It should be noted that all directional indications (such as up, down, left, right, front, back . . . ) in the description of the embodiments are merely intended to explain a relative positional relationship, movement, etc. between components in a specific posture (as shown in the accompanying drawings). When the specific posture changes, the directional indication changes accordingly.
[0047] In addition, descriptions involving “first”, “second”, etc. in this application are only descriptive, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of indicated technical features. Therefore, features defined as “first” and “second” can explicitly or implicitly include at least one of the features. In addition, “and / or” in the entire specification includes three solutions. For example, A and / or B includes technical solution A, technical solution B, and technical solutions that satisfy both A and B. Moreover, technical solutions in the embodiments can be combined with each other, but must be based on what can be achieved by those of ordinary skill in the art. When the combination of technical solutions appears to be contradictory or cannot be realized, it should be deemed that such combination of technical solutions does not exist and is not within the scope of the present disclosure defined by the appended claims.
[0048] A space main cable suspension bridge of the present disclosure refers to a suspension bridge in which a rise-to-span ratio fh / L in a transverse direction in a plane projection of a main cable in a bridge complete state is greater than 1 / 175. When the rise-to-span ratio fh / L is 0, the space main cable suspension bridge degenerates into a planar main cable suspension bridge.
[0049] As shown in FIGS. 1-2 and 21a-f, this application provides a stiffening girder erection method of a ground-anchored suspension bridge, which includes the following steps.
[0050] (S1) Clips for all hanger rods of a space main cable suspension bridge are installed such that design center lines of the clips are coincident with center lines of the hanger rods, respectively. The design center lines of the clips are located in a vertical plane, such that a lateral pre-deflection angle of each of the clips is configured as a lateral inclination angle of a corresponding one of the hanger rods in a bridge complete state.
[0051] (S2) A first stiffening girder section is installed at a position away from a first tower at a preset distance along a longitudinal direction. A second stiffening girder section is installed at a position away from a second tower at the preset distance along the longitudinal direction. A plurality of third stiffening girder sections are installed one by one in a direction respectively from the first stiffening girder and the second stiffening girder toward a mid-span until a mid-span closure is completed. An azimuth angle of a main cable around a central axis thereof at each of the clips is measured after one or more of the plurality of third stiffening girder sections are installed. A lateral deflection angle of each of the clips is calculated as a lateral inclination angle of each of the plurality of the hanger rods minus the azimuth angle of the main cable around the central axis thereof at each of the clips.
[0052] (S3) A plurality of fourth stiffening girder sections are installed one by one respectively from the first stiffening girder section toward the first tower and from the second stiffening girder section toward the second tower until a stiffening girder is closed at mid-span.
[0053] (S4) An azimuth angle of the central axis of the main cable at each of the clips is measured.
[0054] In the stiffening girder erection method of the present disclosure, there is no need to push (pull) the main cable away before installing the stiffening girder, which eliminates the process of pushing (pulling) the main cable apart, thereby avoiding additional torsion of the main cable caused by the main cable being pushed (pulled) apart, thus reducing a deviation between a torsion angle and a preset optimal torsion angle of the main cable. In addition, when installing the stiffening girder, the azimuth angle of the main cable around the central axis thereof at the hanger rod of the upcoming installed stiffening girder section is first measured, which is the lateral deflection angle of the clip, and then the measured value of the lateral deflection angle of the clip is compared with the theoretical value to determine the adjustment amount of the lateral deflection angle of the clip. After adjustment, the stiffening girder is installed. The azimuth angle of the main cable around the central axis thereof is continuously adjusted during the installation of the stiffening girder to make it closer to the theoretical value, thereby further reducing the deviation between the torsion angle and the preset optimal torsion angle of the main cable.
[0055] In this embodiment, the process of pushing (pulling) the main cable apart in advance is omitted, thereby improving efficiency. In addition, a temporary facility required to push (pull) the main cable laterally can be eliminated, which facilitates fewer required facilities and lower cost.
[0056] The step (4) is performed through the following steps.
[0057] An azimuth angle of the central axis of the main cable at a hanger rod among the hanger rods corresponding to an uninstalled fourth stiffening girder section among the plurality of fourth stiffening girder sections is measured. A measured value and a theoretical value of a change of an azimuth angle of the central axis of the main cable at a certain stage are compared. A prediction model of an azimuth angle change value of the central axis of the main cable at the hanger rod corresponding to the uninstalled fourth stiffening girder section is modified. An adjustment of a lateral deflection angle of a clip of the hanger rod corresponding to the uninstalled fourth stiffening girder section is determined and adjusted. An uninstalled fourth stiffening girder section is installed.
[0058] Specifically, the installation of the stiffening girder sections has the same operation. During the installation of the stiffening girder section, the azimuth angle of the main cable around the central axis thereof is continuously adjusted to make it closer to the theoretical value, thereby further reducing the deviation between the torsion angle and the preset optimal torsion angle of the main cable.
[0059] As shown in FIG. 1, two points E and F on each of the clips in the bridge complete state are located on a tangent line of a configuration of a corresponding hanger rod at an upper endpoint thereof. An angle between an EF connection line in another state and an EF connection line in the bridge complete state is configured as a lateral deflection angle of each of the clips in the another state, and the lateral pre-deflection angle of each of the clips is a lateral deflection angle achieved during installation and adjustment. Specifically, relative to the bridge complete state, when the point F with a larger elevation in other states moves away from the center line of the bridge, the lateral deflection angle is positive. Otherwise, the lateral deflection angle is negative.
[0060] As shown in FIG. 1, the lateral inclination angle of each of the hanger rods is an angle α between a tangent line of a configuration of each of the hanger rods at an upper endpoint thereof and a vertical line in a projection of each of the hanger rods on a vertical plane perpendicular to a bridge central axis in the bridge complete state.
[0061] Specifically, a configuration of a hanger rod is a catenary line, which can generally be regarded as a straight line. FIG. 1 refers to a situation when the hanger rod in the bridge complete state is viewed as a straight line.
[0062] As shown in FIG. 1, an angle β between a top-bottom connecting line AB of a section of the main cable in a tightened state and a line AB of a section of the main cable in a certain state is configured as an azimuth angle of the section of the main cable around the central axis thereof in the certain state, i.e., the azimuth angle of the main cable around the central axis thereof. Specifically, a rotation of point A relative to the movement of the empty cable toward the center line of the bridge is positive, and vice versa is negative. Determination of the connection line AB: A connection between the highest point A of the section of the main cable and the lower edge point B of the section of the main cable on a plumb line passing through point A is the connection line AB.
[0063] For the space main cable suspension bridge, the empty cable is in a vertical plane under its own weight. Under an external force with horizontal and vertical components (provided by the hanger rods, a temporary cross brace, a temporary cable, etc., which are commonly difficult to completely pass through the center of the section of the tightened main cable), not only the main cable is displaced, but also each section of the main cable may be twisted. Obviously, the azimuth angle of each section of the empty cable in the vertical plane around the central axis of the main cable is 0.
[0064] In some embodiments, in step (S2), the preset distance is not less than 60 times a diameter of the main cable.
[0065] Specifically, this method uses component forces of the hanger rod generated by the weight of the stiffening girder to gradually pull the main cable apart or close, gradually forming a spatial shape of the bridge. In this way, the shortcomings of increased temporary facilities and corresponding processes for the main cable being pushed (pulled) apart laterally caused by pushing (pulling) the main cable apart first and then installing the stiffening girder can be overcome. A risk of twisting the main cable section due to an axial force not passing through the center of the main cable section in a transverse push (pull) state can be avoided. Compared to a traditional solution of first erecting the girder section at the mid-span, a maximum lifting height of the stiffening girder is reduced, leading to a reduced capacity requirement of a lifting device. Compared to a traditional solution of first erecting the girder section at the mid-span or near the mid-span (that is, not erecting the girder section near the two main towers first), this application is easier to meet a structural compatibility condition, due to a shorter distance between an upper end position of the hanger rod and a complete position when each girder section is installed, and fewer structural restrictions on a location of an anchor point of the hanger rod and a diameter of a casing of the hanger rod.
[0066] In some embodiments, the theoretical value of the lateral deflection angle of each of the clips is calculated through finite element simulation analysis. Specifically, the finite element simulation analysis is performed using an ANSYS software.
[0067] In some embodiments, in step (S4), the adjustment of the lateral deflection angle of each of the clips is calculated through finite element simulation analysis. Specifically, the finite element simulation analysis is performed using an ANSYS software.
[0068] Specifically, a finite element stiffness of a clip is calculated based on the measured value of the lateral deflection angle of the clip and the theoretical value, and the adjustment amount of the lateral deflection angle of the clip is calculated based on the finite element stiffness.
[0069] In some embodiments, the stiffening girder is a steel box girder, a steel truss girder or a steel-concrete composite girder.
[0070] An overall process of the stiffening girder installation is shown in FIGS. 21a-f. 1.1 Analysis Object1.1.1 Overall Layout of the Bridge
[0071] The analysis object is the space main cable suspension bridge of a certain passageway, Lingding Channel, as shown in FIG. 3. The space main cable suspension bridge has a span layout of 165 (left anchor span)+688 (=37+26*24+27, left side span)+1658 (=37+66*24+37, middle span)+688 (=37+26*24+27, right span)+165 m (right anchor span), a hanger rod with a spacing in a longitudinal direction of 24 m, a main girder at a mid-span with a top elevation of 88 m, a slope point set at the mid-span, a longitudinal slope from the mid-span to both sides with a gradient of 2.7% and a vertical curve radius of 56139.25 m. FIGS. 4-7 shows a bridge layout with only the span layout (the main span is only enlarged by 2 m) and the spacing of the hanger rod changed.
[0072] The stiffening girder is designed as two steel box sub-girders connected by a crossbeam, as shown in FIG. 8. Four traffic lanes with a width of 3.75 m are arranged in each side. A distance between the two steel box girders in the transverse direction is 16.6 m. A full width of each steel box girder at the main span in the transverse direction is 64 m. Each main cable is composed of 252 strands. Each strand is composed of 127 parallel steel wires Φ5.3 with a tensile strength of 1990 MPa (referring to the Nansha Bridge with a main span of 1688 m). The rise-to-span ratio of the main cable is 1 / 9.26. A main cable holder is provided above a pier at the side span to improve the stiffness of the main girder at the side span. An arc radius of a main cable saddle is 8.2 m (referring to the Xihoumen Bridge with a main span of 1650 m). A theoretical vertex elevation of the main cable at the top of the two main towers is 270.050 m. Double hanger rods are used on one side in the transverse direction. A single hanger rod is temporarily composed of 199 parallel steel wires with a diameter of 7 mm and an area of 0.007658417 m2.
[0073] Each of the two main towers has an elevation of a top of a cap platform (i.e. a bottom of a tower column) of −7.8833 m, an elevation of a top of the tower column of 265.5461 m, and a total height of the tower column of 273.4294 m. Based on the design experience of similar projects, a 5 m-section of the tower column near the cap platform within an elevation range of −7.8833 m to −2.8833 m is set as a round-end solid section, a 89.3354 m-section within an elevation range of −2.8833 m to 86.4521 m is set as a round-end hollow section with a wall thickness of 2.2 m, a 80 m-section within an elevation range of 86.4521 m to 166.4521 m is set as a round-end hollow section with a wall thickness of 1.6 m, a 80 m-section within an elevation range of 166.4521 m to 257.5461 m is set as a round-end hollow section with a wall thickness of 1.2 m, and a 8 m-section within an elevation range of 257.5461 m to 265.5461 m is set as a round-end solid section.1.1.2 Main Girder Design and Second Phase Dead Load1) Main Girder and Diaphragm Thereof
[0074] According to an overall dimension of the stiffening girder (with a height of 5 m and a width of 23.7 m, as shown in FIG. 9) and similar engineering design experience, dimensions of each plate in a cross section of the main girder is proposed, as shown in Table 1 and FIG. 10, so as to obtain the cross-sectional characteristics of the main girder (single width) shown in Table 2.TABLE 1Thickness, dimensions and spacings of each plate inthe cross section of the main girder (single width)of the main bridge of the Lingding Channel betweenShenzhen and Zhongshan Passageway (Unit: mm)Thickness of top plate16Thickness of U rib at top plate8Dimensions of U rib at top plateBottom width 300-height 280-topwidth 170-horizontal spacing 600Thickness of inclined web20Thickness of straight web20Thickness of base plate12Thickness of U rib at base plate8Dimensions of U rib at base plateBottom width 400-height 260-topwidth 250-horizontal spacing 800Dimensions of stiffeners atHeight 120-thickness 10straight plateTABLE 2Cross-sectional characteristics of the main girder (single width)Area (m2)1.105967802Distance from center ofX−12.248011.4511inertia to each end (m)Y−3.38421.6108Moment of inertia (m4):X2.7572Y53.1220Based on the experience of similar projects, a plurality of diaphragms are provided with a spacing of 3 m. A thickness of a diaphragm at a non-hanger rod area is 10 mm. A thickness of a diaphragm at the hanger rod position is 12 mm. The number of the plurality of diaphragms of each steel box girder is 8 (7 diaphragms with a thickness of 10 mm and 1 diaphragm with a thickness of 12 mm). A peripheral stiffening plate is provided on the diaphragm close to the top plate, bottom plate and web. A vertical plate stiffening rib is provided vertically in the peripheral stiffening plate, which has a spacing of 1200 mm in the transverse direction. A horizontal plate stiffening rib is provided between longer vertical plate stiffening ribs. 2 cable holes and 1 manhole are provided on each diaphragm. A layout of the stiffening rib, cable hole and manhole of the diaphragm is shown in FIG. 10. The dimensions and thickness of the peripheral stiffening plate, vertical plate, horizontal plate, manhole and cable hole are shown in Table 3.TABLE 3Thickness and width of peripheral stiffening plate, vertical plate,horizontal plate, and peripheral plate of manhole and cable holePeripheral stiffening plateWidth / mm140Thickness / mm10Vertical plateWidth / mm120Thickness / mm10Horizontal plateWidth / mm100Thickness / mm10Peripheral plate of manholeWidth / mm120Thickness / mm10and cable holeIt is calculated that a total mass of diaphragms of each steel box girder (single width) is 48879.53 kg. According to similar projects, a structural mass of a cable anchor of each steel box girder is 3000 kg. Therefore, a total mass of a single steel box girder per segment (excluding welds) is 260243.8649 kg, and a total mass of a single steel box girder per segment (including welds) is 264147.523 kg. Based on a cross-sectional area of the peripheral stiffening plate of the steel box girder, an equivalent density of each section of the single steel box girder (including welds) is calculated as 9951.597843 kg / m3.2) Crossbeam Between Main Girder
[0077] The crossbeam is provided on the main girder with a gap of 12 m. The crossbeam has a height of 5 m (as shown in FIG. 11) and a width (along the longitudinal direction) of 4 m. The stiffeners (as shown in FIG. 12) of the peripheral stiffening plate and the straight plate, and the diaphragm with a spacing of 2.1 m are used for stiffening, thereby avoiding local buckling. A horizontal straight plate stiffening rib, a vertical straight plate stiffening rib and the manhole are provided on the diaphragm (as shown in FIG. 13).
[0078] After calculation, the cross-sectional characteristics of the crossbeam are obtained, as shown in Table 4.TABLE 4Cross-sectional characteristics of the crossbeamArea (m2)0.41888Distance from center ofX−22inertia to each end (m)Y−2.52.5Moment of inertia (m4):X1.5212Y1.1833
[0079] According to statistics, a total mass of each crossbeam at the main span is 91852.324 kg. Based on the finite element simulation, the crossbeam has a length of 39.5021 m and a cross-sectional area of 0.41888 m2. A volume of the crossbeam is 16.54665523 m3, and thus a density of the crossbeam is 5551.111229 kg / m3.3) Second Phase Dead Load
[0080] A single main girder has a bridge deck pavement width of 18.75 m, a thickness of 0.075 m, a bulk density of 25000 N / m3 and a load concentration caused by the pavement of 35156.25 N / m. A total mass of a railing, a curb, an inspection vehicle track, a water pipe, etc. is initially planned to be 1300 kg per meter, corresponding to the resulting load concentration of 12747.8 N / m. Therefore, a total load concentration of the second phase dead load is 47904.05 N / m.1.1.3 Bridge Complete State1) Preliminary Determination of a Vertical Component Force of the Hanger Rod in the Bridge Complete State (Rigid Support Continuous Girder Method)
[0081] Based on the span, hanger rod layout, cross-sectional characteristics of the main girder and crossbeam, the equivalent bulk density and the second phase dead load in the previous two sections (sections 1.1.1 and 1.1.2), the ANSYS software is used to establish a finite element model of a rigid support continuous girder spatial rod system, which only include the main girder and imposed vertical constraints on a girder end, a tower-girder junction and a suspension point of the hanger rod. After calculation, the vertical component force at the lower end of each hanger rod (one side) is shown in Table 5. A distribution of the vertical component force of the hanger rod is shown in FIG. 14.TABLE 5Calculated value of the vertical component forceof the hanger rod in the bridge complete stateVertical componentVertical componentforce of the hangerforce of the hangerNumberrod (before averagingrod (after averagingNumber ofdescriptionthree hanger rodsthree hanger rodshanger rodof hanger rodat span end)at span end)1Left side span4419.74511.01#hanger rod2Left side span4786.54511.02#hanger rod3Left side span4326.74511.03#hanger rod4Left side span4433.34433.34#hanger rod5Left side span4421.84421.85#hanger rod6Left side span4435.14435.16#hanger rod7Left side span4443.34443.37#hanger rod8Left side span4452.64452.68#hanger rod9Left side span4461.74461.79#hanger rod10Left side span4470.94470.910#hanger rod11Left side span4480.04480.011#hanger rod12Left side span4489.24489.212#hanger rod13Left side span4498.34498.313#hanger rod14Left side span4507.64507.614#hanger rod15Left side span4516.74516.715#hanger rod16Left side span4525.94525.916#hanger rod17Left side span4535.14535.117#hanger rod18Left side span4544.34544.318#hanger rod19Left side span4553.64553.619#hanger rod20Left side span4562.94562.920#hanger rod21Left side span4572.04572.021#hanger rod22Left side span4582.84582.822#hanger rod23Left side span4585.44585.423#hanger rod24Left side span4628.24628.224#hanger rod25Left side span4479.44548.825#hanger rod26Left side span5250.74548.826#hanger rod27Left side span3916.34548.827#hanger rod28Main span3947.24575.41#hanger rod29Main span5266.64575.42#hanger rod30Main span4512.34575.43#hanger rod31Main span4669.04669.04#hanger rod32Main span4635.74635.75#hanger rod33Main span4642.34642.36#hanger rod34Main span4640.74640.77#hanger rod35Main span4640.84640.88#hanger rod36Main span4640.74640.79#hanger rod37Main span4640.64640.610#hanger rod38Main span4640.64640.611#hanger rod39Main span4640.54640.512#hanger rod40Main span4640.54640.513#hanger rod41Main span4640.54640.514#hanger rod42Main spar4640.44640.415#hanger rod43Main span4640.44640.416#hanger rod44Main span4640.44640.417#hanger rod45Main span4640.44640.418#hanger rod46Main span4640.34640.319#hanger rod47Main span4640.34640.320#hanger rod48Main span4640.34640.321#hanger rod49Main span4640.34640.322#hanger rod50Main span4640.34640.323#hanger rod51Main span4640.34640.324#hanger rod52Main span4640.34640.325#hanger rod53Main span4640.24640.226#hanger rod54Main span4640.24640.227#hanger rod55Main span4640.24640.228#hanger rod56Main span4640.24640.229#hanger rod57Main span4640.24640.230#hanger rod58Main span4640.24640.231#hanger rod59Main span4640.24640.232#hanger rod60Main span4640.24640.233#hanger rod61Main span4640.24640.234#hanger rod62Main span4640.24640.235#hanger rod63Main span4640.24640.236#hanger rod64Main span4640.24640.237#hanger rod65Main span4640.24640.238#hanger rod66Main span4640.24640.239#hanger rod67Main span4640.24640.240#hanger rod68Main span4640.24640.241#hanger rod69Main span4640.24640.242#hanger rod70Main span4640.34640.343#hanger rod71Main span4640.34640.344#hanger rod72Main span4640.34640.345#hanger rod73Main span4640.34640.346#hanger rod74Main span4640.34640.347#hanger rod75Main span4640.34640.348#hanger rod76Main span4640.34640.349#hanger rod77Main span4640.44640.450#hanger rod78Main span4640.44640.451#hanger rod79Main span4640.44640.452#hanger rod80Main span4640.44640.453#hanger rod81Main span4640.54640.554#hanger rod82Main span4640.54640.555#hanger rod83Main span4640.54640.556#hanger rod84Main span4640.64640.657#hanger rod85Main span4640.64640.658#hanger rod86Main span4640.74640.759#hanger rod87Main span4640.84640.860#hanger rod88Main span4640.74640.761#hanger rod89Main span4642.34642.362#hanger rod90Main span4635.74635.763#hanger rod91Main span4669.04669.064#hanger rod92Main span4512.34575.465#hanger rod93Main span5266.64575.466#hanger rod94Main span3947.24575.467#hanger rod95Right side span3916.34548.827#hanger rod96Right side span5250.74548.826#hanger rod97Right side span4479.44548.825#hanger rod98Right side span4628.24628.224#hanger rod99Right side span4585.44585.423#hanger rod100Right side span4582.84582.822#hanger rod101Right side span4572.04572.021#hanger rod102Right side span4562.94562.920#hanger rod103Right side span4553.64553.619#hanger rod104Right side span4544.34544.318#hanger rod105Right side span4535.14535.117#hanger rod106Right side span4525.94525.916#hanger rod107Right side span4516.74516.715#hanger rod108Right side span4507.64507.614#hanger rod109Right side span4498.34498.313#hanger rod110Right side span4489.24489.212#hanger rod111Right side span4480.04480.011#hanger rod112Right side span4470.94470.910#hanger rod113Right side span4461.74461.79#hanger rod114Right side span4452.64452.68#hanger rod115Right side span4443.34443.37#hanger rod116Right side span4435.14435.16#hanger rod117Right side span4421.84421.85#hanger rod118Right side span4433.34433.34#hanger rod119Right side span4326.74511.03#hanger rod120Right side span4786.54511.02#hanger rod121Right side span4419.74511.01#hanger rod2) Configuration and Tension Force of the Main Cable in the Bridge Complete State (Analytical Method)
[0082] According to main control geometric parameters of the main cable proposed in section 1.1.1, it is easy to determine a theoretical vertex mileage and an elevation of a main cable saddle and a loose cable saddle at a side pier, coordinates of an anchor point of the main cable (the theoretical vertex of the loose cable saddle is temporarily taken as the anchor point and the elevation of the main cable), a material and a cross-sectional size of the main cable, a material and a cross-sectional characteristics of the hanger rod, and the obtained vertical component force of the hanger rod. Referring to a quality of a clip of similar bridges, a numerical analysis calculation software of the space main cable suspension bridge cable system is used to perform iterative calculations, and the configuration and an internal force state of the cable system in the bridge complete state are obtained. The obtained node coordinates of the main cable, unstressed length of the main cable section (without considering the saddle arc correction), cable force of the cable segment and safety factor obtained according to an ultimate strength of 1860 MPa are shown in Table 6. It can be seen from Table 6 that the safety factor of the main cable in the dead-load state has a minimum value of 2.45 and a maximum value of 2.68, which will be reduced after considering a live load effect. It is calculated that an increment of a tension in the main cable section caused by a live load of a vehicle is approximately 10% of the dead load. Therefore, after considering the live load of the vehicle, the minimum safety factor of the main cable can reach 2.22. When using parallel steel wires with an ultimate strength of 1990 MPa, the minimum safety factor can reach 2.37.TABLE 6Node coordinates, cable section tension force and safety factor of the main cable in the bridge complete stateUnstressedlength ofmain cablesection(withoutconsideringbreakingthe arcTensionforce ofSafetycorrectionof cablemainfactor inNodeNodeTransverseat thesectioncabledead-numberdescriptionMileagedirectionElevationsaddle)NNload state1Theoretical−1682.000−28.50027.500vertex of leftloose cablesaddle2Theoretical−1517.000−24.19867.450169.2264.90E+081.313E+092.68vertex of leftcable saddle forsteering3Left side span−1490.000−23.96770.85127.1194.91E+081.313E+092.681#hanger rod4Left side span−1466.000−23.72574.17824.1464.91E+081.313E+092.672#hanger rod5Left side span−1442.000−23.44577.79624.1884.92E+081.313E+092.673#hanger rod6Left side span−1418.000−23.12981.70624.2334.93E+081.313E+092.664#hanger rod7Left side span−1394.000−22.77785.90324.2814.94E+081.313E+092.665#hanger rod8Left side span−1370.000−22.39090.38924.3334.95E+081.313E+092.656#hanger rod9Left side span−1346.000−21.96995.16424.3884.96E+081.313E+092.657#hanger rod10Left side span−1322.000−21.513100.22924.4464.97E+081.313E+092.648#hanger rod11Left side span−1298.000−21.023105.58524.5084.99E+081.313E+092.639#hanger rod12Left side span−1274.000−20.500111.23224.5735.00E+081.313E+092.6310#hanger rod13Left side span−1250.000−19.943117.17224.6425.01E+081.313E+092.6211#hanger rod14Left side span−1226.000−19.353123.40624.7155.03E+081.313E+092.6112#hanger rod15Left side span−1202.000−18.730129.93524.7915.05E+081.313E+092.6013#hanger rod16Left side span−1178.000−18.074136.75924.8705.06E+081.313E+092.5914#hanger rod17Left side span−1154.000−17.386143.88124.9535.08E+081.313E+092.5915#hanger rod18Left side span−1130.000−16.666151.30025.0405.10E+081.313E+092.5816#hanger rod19Left side span−1106.000−15.914159.01925.1305.11E+081.313E+092.5717#hanger rod20Left side span−1082.000−15.130167.03725.2245.13E+081.313E+092.5618#hanger rod21Left side span−1058.000−14.315175.35825.3215.15E+081.313E+092.5519#hanger rod22Left side span−1034.000−13.468183.98125.4225.17E+081.313E+092.5420#hanger rod23Left side span−1010.000−12.590192.90725.5275.20E+081.313E+092.5321#hanger rod24Left side span−986.000−11.681202.13925.6355.22E+081.313E+092.5222#hanger rod25Left side span−962.000−10.742211.67825.7475.24E+081.313E+092.5123#hanger rod26Left side span−938.000−9.772221.52425.8625.26E+081.313E+092.4924#hanger rod27Left side span−914.000−8.771231.68025.9825.29E+081.313E+092.4825#hanger rod28Left side span−890.000−7.740242.14426.1035.31E+081.313E+092.4726#hanger rod29Left side span−866.000−6.680252.91626.2285.34E+081.313E+092.4627#hanger rod30Closed clip−842.000−5.590263.99826.3565.37E+081.313E+092.4531Theoretical−829.000−5.000270.05014.2975.37E+081.313E+092.45vertex of leftmain tower32Closed clip−816.000−5.676264.52814.0875.29E+081.313E+092.4833Main span−792.000−6.925254.39125.9855.29E+081.313E+092.481#hanger rod34Main span−768.000−8.144244.56525.8655.26E+081.313E+092.492#hanger rod35Main span−744.000−9.333235.04725.7495.24E+081.313E+092.513#hanger rod36Main span−720.000−10.492225.83825.6375.22E+081.313E+092.524#hanger rod37Main span−696.000−11.620216.94125.5265.20E+081.313E+092.535#hanger rod38Main span−672.000−12.717208.35325.4205.17E+081.313E+092.546#hanger rod39Main span−648.000−13.783200.07425.3175.15E+081.313E+092.557#hanger rod40Main span−624.000−14.818192.10325.2185.13E+081.313E+092.568#hanger rod41Main span−600.000−15.820184.43925.1225.11E+081.313E+092.579#hanger rod42Main span−576.000−16.791177.08225.0305.09E+081.313E+092.5810#hanger rod43Main span−552.000−17.729170.03124.9425.08E+081.313E+092.5911#hanger rod44Main span−528.000−18.634163.28524.8575.06E+081.313E+092.6012#hanger rod45Main span−504.000−19.506156.84324.7765.04E+081.313E+092.6013#hanger rod46Main span−480.000−20.345150.70524.6985.03E+081.313E+092.6114#hanger rod47Main span−456.000−21.150144.87024.6245.01E+081.313E+092.6215#hanger rod48Main span−432.000−21.921139.33824.5545.00E+081.313E+092.6316#hanger rod49Main span−408.000−22.657134.10824.4874.98E+081.313E+092.6417#hanger rod50Main span−384.000−23.358129.18024.4244.97E+081.313E+092.6418#hanger rod51Main span−360.000−24.024124.55324.3654.96E+081.313E+092.6519#hanger rod52Main span−336.000−24.654120.22624.3094.95E+081.313E+092.6620#hanger rod53Main span−312.000−25.247116.19924.2574.94E+081.313E+092.6621#hanger rod54Main span−288.000−25.804112.47224.2094.93E+081.313E+092.6722#hanger rod55Main span−264.000−26.322109.04324.1644.92E+081.313E+092.6723#hanger rod56Main span−240.000−26.802105.91424.1234.91E+081.313E+092.6824#hanger rod57Main span−216.000−27.243103.08324.0864.90E+081.313E+092.6825#hanger rod58Main span−192.000−27.643100.55124.0524.89E+081.313E+092.6826#hanger rod59Main span−168.000−28.00298.31624.0234.89E+081.313E+092.6927#hanger rod60Main span−144.000−28.31996.37923.9964.88E+081.313E+092.6928#hanger rod61Main span−120.000−28.59294.73923.9744.88E+081.313E+092.6929#hanger rod62Main span−96.000−28.81993.39723.9554.87E+081.313E+092.6930#hanger rod63Main span−72.000−28.99992.35123.9404.87E+081.313E+092.7031#hanger rod64Main span−48.000−29.12991.60223.9294.87E+081.313E+092.7032#hanger rod65Main span−24.000−29.20891.15023.9214.87E+081.313E+092.7033#hanger rod66Main span0.000−29.23590.99923.9174.87E+081.313E+092.7034#hanger rod(mid- span ofMain span)67Main span24.000−29.20891.15023.9174.87E+081.313E+092.7035#hanger rod68Main span48.000−29.12991.60223.9214.87E+081.313E+092.7036#hanger rod69Main span72.000−28.99992.35123.9294.87E+081.313E+092.7037#hanger rod70Main span96.000−28.81993.39723.9404.87E+081.313E+092.7038#hanger rod71Main span120.000−28.59294.73923.9554.87E+081.313E+092.6939#hanger rod72Main span144.000−28.31996.37923.9744.88E+081.313E+092.6940#hanger rod73Main span168.000−28.00298.31623.9964.88E+081.313E+092.6941#hanger rod74Main span192.000−27.643100.55124.0234.89E+081.313E+092.6942#hanger rod75Main span216.000−27.243103.08324.0524.89E+081.313E+092.6843#hanger rod76Main span240.000−26.802105.91424.0864.90E+081.313E+092.6844#hanger rod77Main span264.000−26.322109.04324.1234.91E+081.313E+092.6845#hanger rod78Main span288.000−25.804112.47224.1644.92E+081.313E+092.6746#hanger rod79Main span312.000−25.247116.19924.2094.93E+081.313E+092.6747#hanger rod80Main span336.000−24.654120.22624.2574.94E+081.313E+092.6648#hanger rod81Main span360.000−24.024124.55324.3094.95E+081.313E+092.6549#hanger rod82Main span384.000−23.358129.18024.3654.96E+081.313E+092.6550#hanger rod83Main span408.000−22.657134.10824.4244.97E+081.313E+092.6451#hanger rod84Main span432.000−21.921139.33824.4874.98E+081.313E+092.6452#hanger rod85Main span456.000−21.150144.87024.5545.00E+081.313E+092.6353#hanger rod86Main span480.000−20.345150.70524.6245.01E+081.313E+092.6254#hanger rod87Main span504.000−19.506156.84324.6985.03E+081.313E+092.6155#hanger rod88Main span528.000−18.634163.28524.7765.04E+081.313E+092.6056#hanger rod89Main span552.000−17.729170.03124.8575.06E+081.313E+092.6057#hanger rod90Main span576.000−16.791177.08224.9425.08E+081.313E+092.5958#hanger rod91Main span600.000−15.820184.43925.0305.09E+081.313E+092.5859#hanger rod92Main span624.000−14.818192.10325.1225.11E+081.313E+092.5760#hanger rod93Main span648.000−13.783200.07425.2185.13E+081.313E+092.5661#hanger rod94Main span672.000−12.717208.35325.3175.15E+081.313E+092.5562#hanger rod95Main span696.000−11.620216.94125.4205.17E+081.313E+092.5463#hanger rod96Main span720.000−10.492225.83825.5265.20E+081.313E+092.5364#hanger rod97Main span744.000−9.333235.04725.6375.22E+081.313E+092.5265#hanger rod98Main span768.000−8.144244.56525.7495.24E+081.313E+092.5166#hanger rod99Main span792.000−6.925254.39125.8655.26E+081.313E+092.4967#hanger rod100Closed clip816.000−5.676264.52825.9855.29E+081.313E+092.48101Theoretical829.000−5.000270.05014.0875.29E+081.313E+092.48vertex of rightmain tower102Closed clip842.000−5.590263.99814.2905.37E+081.313E+092.45103Right side span866.000−6.680252.91626.3585.37E+081.313E+092.4527#hanger rod104Right side span890.000−7.740242.14426.2295.34E+081.313E+092.4626#hanger rod105Right side span914.000−8.771231.68026.1045.31E+081.313E+092.4725#hanger rod106Right side span938.000−9.772221.52425.9835.29E+081.313E+092.4824#hanger rod107Right side span962.000−10.742211.67825.8635.26E+081.313E+092.4923#hanger rod108Right side span986.000−11.681202.13925.7475.24E+081.313E+092.5122#hanger rod109Right side span1010.000−12.590192.90725.6365.22E+081.313E+092.5221#hanger rod110Right side span1034.000−13.468183.98125.5275.20E+081.313E+092.5320#hanger rod111Right side span1058.000−14.315175.35825.4235.17E+081.313E+092.5419#hanger rod112Right side span1082.000−15.130167.03725.3225.15E+081.313E+092.5518#hanger rod113Right side span1106.000−15.914159.01925.2245.13E+081.313E+092.5617#hanger rod114Right side span1130.000−16.666151.30025.1305.11E+081.313E+092.5716#hanger rod115Right side span1154.000−17.386143.88125.0405.10E+081.313E+092.5815#hanger rod116Right side span1178.000−18.074136.75924.9535.08E+081.313E+092.5914#hanger rod117Right side span1202.000−18.730129.93524.8705.06E+081.313E+092.5913#hanger rod118Right side span1226.000−19.353123.40624.7905.05E+081.313E+092.6012#hanger rod119Right side span1250.000−19.943117.17224.7145.03E+081.313E+092.6111#hanger rod120Right side span1274.000−20.500111.23224.6425.01E+081.313E+092.6210#hanger rod121Right side span1298.000−21.023105.58524.5735.00E+081.313E+092.639#hanger rod122Right side span1322.000−21.513100.22924.5084.99E+081.313E+092.638#hanger rod123Right side span1346.000−21.96995.16424.4464.97E+081.313E+092.647#hanger rod124Right side span1370.000−22.39090.38924.3874.96E+081.313E+092.656#hanger rod125Right side span1394.000−22.77785.90324.3324.95E+081.313E+092.655#hanger rod126Right side span1418.000−23.12981.70624.2814.94E+081.313E+092.664#hanger rod127Right side span1442.000−23.44577.79624.2334.93E+081.313E+092.663#hanger rod128Right side span1466.000−23.72574.17824.1874.92E+081.313E+092.672#hanger rod129Right side span1490.000−23.96770.85124.1464.91E+081.313E+092.671#hanger rod130Theoretical1517.000−24.19867.45027.1204.91E+081.313E+092.68vertex of rightcable saddle forsteering131Theoretical1682.000−28.50027.500169.2264.90E+081.313E+092.68vertex of rightloose cablesaddle3) Force, Safety Factor and Unstressed Length of the Hanger Rod (Analytical Method)
[0083] According to the designed suspension point coordinates of the main girder, the vertical component force of the hanger rod in the bridge complete state determined in Table 5, the coordinates of the upper end of the hanger rod and the material and cross-sectional size of the hanger rod are determined in Table 6 (the coordinates of the main cable), a component force in the transverse direction and a vertical component force at the lower end, the force, the safety factor and the unstressed length of the hanger rod in the bridge complete state can be calculated by the numerical analysis method, as shown in Table 7 (unstressed length is not shown).TABLE 7Force and safety factor of the hanger rod in the bridge complete stateTotalforceTransverseVerticalofsafetycomponentcomponenthangerBreakingfactor offorce offorce ofrod inforcehangerNumberhanger rodhanger roddeadofrod inofNumberin dead loadin dead loadloadhangerdeadhangerdescription ofstatestatestaterodloadrodhanger rodkNkNkNkNstate1Left side span769.84511.04576.228947.46.331#hanger rod2Left side span748.14511.04572.628947.46.332#hanger rod3Left side span736.14511.04570.728947.46.333#hanger rod4Left side span715.04433.34490.628947.46.454#hanger rod5Left side span706.84421.84477.928947.46.465#hanger rod6Left side span701.04435.14490.228947.46.456#hanger rod7Left side span696.04443.34497.528947.46.447#hanger rod8Left side span690.84452.64505.928947.46.428#hanger rod9Left side span684.84461.74514.028947.46.419#hanger rod10Left side span680.74470.94522.428947.46.4010#hanger rod11Left side span676.34480.04530.828947.46.3911#hanger rod12Left side span672.04489.24539.228947.46.3812#hanger rod13Left side span667.84498.34547.628947.46.3713#hanger rod14Left side span664.44507.64556.328947.46.3514#hanger rod15Left side span661.14516.74564.828947.46.3415#hanger rod16Left side span657.84525.94573.428947.46.3316#hanger rod17Left side span654.84535.14582.128947.46.3217#hanger rod18Left side span652.24544.34590.928947.46.3118#hanger rod19Left side span649.74553.64599.728947.46.2919#hanger rod20Left side span647.14562.94608.528947.46.2820#hanger rod21Left side span645.34572.04617.328947.46.2721#hanger rod22Left side span643.94582.84627.828947.46.2622#hanger rod23Left side span642.04585.44630.128947.46.2523#hanger rod24Left side span646.24628.24673.128947.46.1924#hanger rod25Left side span633.94548.84592.828947.46.3025#hanger rod26Left side span629.34548.84592.128947.46.3026#hanger rod27Left side span618.54548.84590.728947.46.3127#hanger rod28Main span614.64575.44616.528947.46.271#hanger rod29Main span632.24575.44618.928947.46.272#hanger rod30Main span639.24575.44619.828947.46.273#hanger rod31Main span654.34669.04714.628947.46.144#hanger rod32Main span652.04635.74681.328947.46.185#hanger rod33Main span655.04642.34688.328947.46.176#hanger rod34Main span658.04640.74687.128947.46.187#hanger rod35Main span661.94640.84687.828947.46.188#hanger rod36Main span666.44640.74688.328947.46.179#hanger rod37Main span670.94640.64688.828947.46.1710#hanger rod38Main span676.14640.64689.628947.46.1711#hanger rod39Main span681.24640.54690.228947.46.1712#hanger rod40Main span687.14640.54691.128947.46.1713#hanger rod41Main span693.44640.54692.028947.46.1714#hanger rod42Main span699.84640.44692.928947.46.1715#hanger rod43Main span707.14640.44694.028947.46.1716#hanger rod44Main span714.84640.44695.128947.46.1717#hanger rod45Main span723.04640.44696.428947.46.1618#hanger rod46Main span732.24640.34697.728947.46.1619#hanger rod47Main span742.54640.34699.328947.46.1620#hanger rod48Main span753.34640.34701.028947.46.1621#hanger rod49Main span765.64640.34703.028947.46.1622#hanger rod50Main span779.64640.34705.328947.46.1523#hanger rod51Main span794.84640.34707.928947.46.1524#hanger rod52Main span813.14640.34711.028947.46.1425#hanger rod53Main span832.54640.24714.328947.46.1426#hanger rod54Main span857.54640.24718.828947.46.1327#hanger rod55Main span883.54640.24723.628947.46.1328#hanger rod56Main span916.34640.24729.828947.46.1229#hanger rod57Main span951.94640.24736.828947.46.1130#hanger rod58Main span991.24640.24744.928947.46.1031#hanger rod59Main span1029.24640.24753.028947.46.0932#hanger rod60Main span1057.64640.24759.228947.46.0833#hanger rod61Main span1074.04640.24762.928947.46.0834#hanger rod62Main span1057.64640.24759.228947.46.0835#hanger rod63Main span1029.24640.24753.028947.16.0936#hanger rod64Main span991.34640.24744.928947.46.1037#hanger rod65Main span952.14640.24736.928947.46.1138#hanger rod66Main span916.54640.24729.828947.16.1239#hanger rod67Main span883.84640.24723.628947.46.1340#hanger rod68Main span856.94640.24718.728947.46.1341#hanger rod69Main span832.04640.24714.228947.46.1442#hanger rod70Main span813.44640.34711.028947.46.1443#hanger rod71Main span795.04640.34707.928947.46.1544#hanger rod72Main span779.74640.34705.328947.46.1545#hanger rod73Main span765.74640.34703.128947.46.1646#hanger rod74Main span753.54640.34701.128947.46.1647#hanger rod75Main span742.64640.34699.328947.46.1648#hanger rod76Main span731.84640.34697.628947.46.1649#hanger rod77Main span722.64640.44696.328947.46.1650#hanger rod78Main span714.94640.44695.228947.46.1751#hanger rod79Main span707.34640.44694.028947.46.1752#hanger rod80Main span699.94640.44692.928947.46.1753#hanger rod81Main span693.54640.54692.028947.46.1754#hanger rod82Main span687.24640.54691.128947.46.1755#hanger rod83Main span681.24640.54690.228947.46.1756#hanger rod84Main span676.14640.64689.628947.46.1757#hanger rod85Main span670.84640.64688.828947.46.1758#hanger rod86Main span666.54640.74688.328947.46.1759#hanger rod87Main span661.94640.84687.828947.46.1860#hanger rod88Main span658.14640.74687.128947.46.1861#hanger rod89Main span655.14642.34688.328947.46.1762#hanger rod90Main span652.04635.74681.328947.46.1863#hanger rod91Main span654.34669.04714.628947.46.1464#hanger rod92Main span639.24575.44619.828947.46.2765#hanger rod93Main span632.14575.44618.928947.46.2766#hanger rod94Main span614.54575.44616.528947.46.2767#hanger rod95Right side span618.54548.84590.728947.46.3127#hanger rod96Right side span629.24548.84592.128947.46.3026#hanger rod97Right side span633.94548.84592.828947.46.3025#hanger rod98Right side span646.14628.24673.128947.46.1924#hanger rod99Right side span642.04585.44630.128947.46.2523#hanger rod100Right side span643.94582.84627.828947.46.2622#hanger rod101Right side span645.34572.04617.328947.46.2721#hanger rod102Right side span647.14562.94608.528947.46.2820#hanger rod103Right side span649.74553.64599.728947.46.2919#hanger rod104Right side span652.24544.34590.928947.46.3118#hanger rod105Right side span654.84535.14582.128947.46.3217#hanger rod106Right side span657.84525.94573.528947.46.3316#hanger rod107Right side span661.14516.74564.828947.46.3415#hanger rod108Right side span664.44507.64556.328947.46.3514#hanger rod109Right side span667.84498.34547.628947.46.3713#hanger rod110Right side span672.14489.24539.228947.46.3812#hanger rod111Right side span676.34480.04530.828947.46.3911#hanger rod112Right side span680.74470.94522.428947.46.4010#hanger rod113Right side span684.84461.74514.028947.46.419#hanger rod114Right side span690.84452.64505.928947.46.428#hanger rod115Right side span696.04443.34497.528947.46.447#hanger rod116Right side span701.04435.14490.228947.46.456#hanger rod117Right side span706.84421.84477.928947.46.465#hanger rod118Right side span715.14433.34490.628947.46.454#hanger rod119Right side span736.14511.04570.728947.46.333#hanger rod120Right side span748.14511.04572.628947.46.332#hanger rod121Right side span769.94511.04576.228947.46.331#hanger rod4) Replication of Bridge Complete State Through Full Bridge Model
[0084] The main girder and main tower are divided into a beam element, the main cable is divided into a cable element (the unstressed length of each cable section is known), and the hanger rod is configured as the cable element (the unstressed length of the hanger rod is known). A geometric nonlinear finite element model of the full bridge that considers large displacement and stress stiffening effects is established using node positions in the bridge complete state, the corresponding cross-sectional characteristics of the elements, the dead load, and the second-stage dead load (the ANSYS model of full bridge is shown in FIG. 15), so as to obtain displacement results. A maximum longitudinal displacement of the whole bridge is 0.0165 m, which is located at the top of the tower. A maximum transverse displacement of the whole bridge is 0.058 m, which occurs in the main cable at a quarter of the main span. A maximum vertical displacement of the whole bridge is 0.051 m, which occurs in the main cable and main girder at the mid-span. This shows that the finite element simulated three-dimensional displacements of the whole bridge under dead-load are less than 6 cm, indicating that the resulting geometric position of the space main cable ground-anchored suspension bridge with a main span of 1658 m has a deviation of no more than 6 cm from the design. Such finite element model can be used to simulate a construction process.1.1.4 Empty Cable State and Saddle Pre-Offset
[0085] On the basis of the finite element model of the bridge complete state, (after considering the geometric nonlinear analysis of large displacement and stress stiffening), the main girder, hanger rod (and the second-stage dead load thereon), and the clip load on the main cable are removed. A saddle top of the main cable is pushed to the top of the main tower, such that an offset is basically 0, so as to obtain the empty cable state and the pre-offset of the main cable saddle. The obtained pre-offset of the empty cable saddle is 220 cm. Compared with the completed bridge, the empty cable has a displacement in the mid-span along the transverse direction of 24.235 m and a mid-span lift of 15.727 m.1.2 Comparison of Stiffening Girder Erection Technical Solution without Temporary Pushing (Pulling) of the Main Cable1.2.1 Technical Solution for First Installing Girder Section at the Mid-Span without Temporary Pushing (Pulling) of the Main Cable
[0086] When the cable is empty, a distance between two main cables in the transverse direction of the main span is 10 m, that is, a distance between the two main cables in the transverse direction is only 5 m from the center line in the longitudinal direction. A designed unstressed length of the hanger rod in the girder section at the main span is only 3.8466 m. A distance between the hanger rod on both sides of the stiffening girder in the transverse direction is 60.21 m. When the girder section at the mid-span is installed first, and no measures are taken to temporarily push (pull) the main cable laterally, even if the girder section at the mid-span is lifted until its top surface is flush with the bottom of the main cable, and a distance between the anchor point of the lower end of the hanger rod (on the girder section) on one side of the girder section at the mid-span and the anchor point of the upper end of the hanger rod (on the main cable) is the unstressed length of the hanger rod, it is impossible to make the distance between the anchor point of the lower end of the hanger rod (on the girder section) on the other side of the girder section at the mid-span and the anchor point of the upper end of the hanger rod (on the main cable) less than or equal to the unstressed length of the hanger rod. Therefore, the technical solution for first installing girder section at mid-span without temporary pushing (pulling) of the main cable is not valid.1.2.2 Technical Solution for Installing the Stiffening Girder Section by Section from the Main Tower to the Mid-Span without Temporary Pushing (Pulling) of the Main Cable
[0087] A finite element simulation calculation is performed on an entire process of hoisting the main girder from the main tower to both sides without cross braces for the main cable at the main span (that is, without using temporary cross braces to prop up the main cable first). A vertical displacement of the main cable in the main span, a deflection of a tower top and a stress of a tower root are shown in Table 8 and FIGS. 16-18. An angle between a line connecting the upper and lower suspension points of the hanger rod and a horizontal line in the transverse direction during the entire process of each hanger rod at the main span from to be installed to the completion of hoisting is obtained, as shown in Table 9.TABLE 8Vertical displacement of the main cable at the mid-span during an entireprocess of hoisting the main girder from the main tower to both sidesStressStressVerticalon sideon maindisplacementDeviationspan ofspan ofConstructionof mainof lefttowertowerphasecable at mid-tower toprootrootnumberConstruction contentspan (m)(m)(Mpa)(Mpa)1Installing clip and hanger16.494−0.098−4.82−6.03rod2Hoisting girder section16.871−0.044−4.62−6.38corresponding to main span1#, 67#hanger rod3Hoisting girder section17.4690.041−4.29−6.84corresponding to main span2#, 66#hanger rod4Pushing the main cable17.301−0.207−5.48−5.66saddle for the first time(with a pushing amount of30 cm)5Hoisting girder section18.060−0.101−5.07−6.21corresponding to main span3#, 65#hanger rod6Hoisting girder section18.9400.026−4.58−6.84corresponding to main span4#, 64#hanger rod7Pushing the main cable18.788−0.225−5.78−5.65saddle for the second time(with a pushing amount of30 cm)8Hoisting girder section19.730−0.086−5.24−6.32corresponding to main span5#, 63#hanger rod9Hoisting girder section20.6920.066−4.65−7.06corresponding to main span6#, 62#hanger rod10Pushing the main cable20.559−0.190−5.89−5.83saddle for the third time(with a pushing amount of30 cm)11Hoisting girder section21.507−0.030−5.27−6.59corresponding to main span7#, 61#hanger rod12Hoisting girder section22.3920.137−4.64−7.38corresponding to main span8#, 60#hanger rod13Hoisting girder section23.1730.306−4.00−8.18corresponding to main span9#, 59#hanger rod14Pushing the main cable22.932−0.306−6.96−5.23saddle for the fourth time(with a pushing amount of70 cm)15Hoisting girder section23.601−0.139−6.35−6.01corresponding to main span10#, 58#hanger rod16Hoisting girder section24.1120.027−5.74−6.79corresponding to main span11#, 57#hanger rod17Hoisting girder section24.4490.191−5.14−7.55corresponding to main span12#, 56#hanger rod18Pushing the main cable24.344−0.167−6.89−5.82saddle for the fifth time(with a pushing amount of40 cm)19Hoisting girder section24.502−0.010−6.33−6.55corresponding to main span13#, 55#hanger rod20Hoisting girder section24.4690.143−5.80−7.26corresponding to main span14#, 54#hanger rod21Pushing the main cable24.427−0.029−6.64−6.42saddle for the sixth time(with a pushing amount of20 cm)22Hoisting girder section24.2060.118−6.14−7.10corresponding to main span15#, 53#hanger rod23Hoisting girder section23.9990.196−5.98−7.57corresponding to left sidespan 27#, main span16#, 52#, right side span27#hanger rod24Hoisting girder section24.3180.095−6.45−7.23corresponding to left sidespan 26#, right side span26#hanger rod25Hoisting girder section24.739−0.037−7.03−6.76corresponding to left sidespan 25#, right side span25#hanger rod26Hoisting girder section25.269−0.201−7.74−6.15corresponding to left sidespan 24#, right side span24#hanger rod27Hoisting girder section25.154−0.214−7.93−6.25corresponding to left sidespan 23#, main span 17#,51#, right side span23#hanger rod28Hoisting girder section24.880−0.236−8.15−6.31corresponding to left sidespan 22#, main span 18#,50#, right side span22#hanger rod29Hoisting girder section24.457−0.265−8.40−6.34corresponding to left sidespan 21#, main span 19#,49#, right side span21#hanger rod30Hoisting girder section23.861−0.294−8.65−6.38corresponding to left sidespan 20#, main span 20#,48#, right side span20#hanger rod31Hoisting girder section23.108−0.322−8.89−6.41corresponding to left sidespan 19#, main span 21#,47#, right side span19#hanger rod32Hoisting girder section22.201−0.347−9.12−6.46corresponding to left sidespan 18#, main span 22#,46#, right side span18#hanger rod33Hoisting girder section21.145−0.367−9.33−6.52corresponding to left sidespan 17#, main span 23#,45#, right side span17#hanger rod34Hoisting girder section19.976−0.384−9.52−6.60corresponding to left sidespan 16#, main span 24#,44#, right side span16#hanger rod35Hoisting girder section18.636−0.390−9.67−6.72corresponding to left sidespan 15#, main span 25#,43#, right side span15#hanger rod36Hoisting girder section17.166−0.387−9.79−6.87corresponding to left sidespan 14#, main span 26#,42#, right side span14#hanger rod37Hoisting girder section15.562−0.374−9.86−7.05corresponding to left sidespan 13#, main span 27#,41#, right side span13#hanger rod38Hoisting girder section13.835−0.352−9.90−7.28corresponding to left sidespan 12#, main span 28#,40#, right side span12#hanger rod39Hoisting girder section12.038−0.323−9.91−7.51corresponding to left sidespan 11#, main span 29#,39#, right side span11#hanger rod40Hoisting girder section10.071−0.279−9.86−7.81corresponding to left sidespan 10#, main span 30#,38#, right side span10#hanger rod41Hoisting girder section7.991−0.223−9.77−8.14corresponding to left sidespan 9#, main span 31#,37#, right side span9#hanger rod42Hoisting girder section5.801−0.156−9.64−8.52corresponding to left sidespan 8#, main span 32#,36#, right side span8#hanger rod43Hoisting girder section3.511−0.077−9.46−8.93corresponding to left sidespan 7#, main span 33#,35#, right side span7#hanger rod44Hoisting girder section2.509−0.085−9.56−8.96corresponding to left sidespan 6#, main span 34#,right side span 6#hangerrod45Hoisting girder section2.829−0.177−9.91−8.64corresponding to left sidespan 5#, right side span5#hanger rod46Hoisting girder section3.099−0.254−10.20−8.37corresponding to left sidespan 4#, right side span4#hanger rod47Hoisting girder section3.315−0.315−10.44−8.15corresponding to left sidespan 3#, right side span3#hanger rod48Hoisting girder section3.466−0.358−10.60−8.00corresponding to left sidespan 2#, right side span2#hanger rod49Hoisting girder section3.644−0.410−10.79−7.82corresponding to left sidespan 1#, right side span1#hanger rodTABLE 9Angle between a line connecting the upper and lower suspension points of the hanger rod and a horizontal line in the transversedirection during the entire process of each hanger rod at the main span from to be installed to the completion of hoistingConstruction on phase number4Pushing7thePushing3main5the main82HoistingcableHoisting6cableHoisting9HoistinggirdersaddlegirderHoistingsaddlegirderHoistinggirdersectionfor thesectiongirderfor thesectiongirdersectioncorrespondingfirstcorrespondingsectionsecondcorrespondingsection1correspondingtotimetocorrespondingtimetocorrespondingInstallingto mainmain(with amainto main(with amainto mainclipspanspanpushingspanspanpushingspanspanand1#,2#,amount3#,4#,amount5#,6#,Constructionhanger67#hanger66#hangerof 3065#hanger64#hangerof 3063#hanger62#hangercontentrodrodrodcm)rodrodcm)rodrod 1#81.781.881.881.881.981.981.982.082.0 2#81.281.381.381.481.581.581.681.7 3#80.880.981.181.181.281.3 4#80.380.580.580.780.8 5#79.880.180.3 6#79.479.7 7# 8# 9#10#11#12#13#14#15#16#17#18#19#20#21#22#23#24#25#26#27#28#29#30#31#32#33#34#35#36#37#38#39#40#41#42#43#44#45#46#47#48#49#50#51#52#53#54#55#56#57#58#59#60#61#62#79.479.763#79.980.180.364#80.380.580.580.780.965#80.880.981.181.181.281.366#81.381.481.481.581.581.581.681.767#81.781.881.881.881.981.981.982.082.0TABLE 9Angle between the line connecting the upper and lower suspension points of the hanger rod and the horizontal line in the transverse directionduring the entire process of each hanger rod at the main span from to be installed to the completion of hoisting (continued-1)Construction phase number1014PushingPushing18the1213thePushingmain11HoistingHoistingmain151617the maincableHoistinggirdergirdercableHoistingHoistingHoistingcablesaddlegirdersectionsectionsaddlegirdergirdergirdersaddlefor thesectioncorrespondingcorrespondingfor thesectionsectionsectionfor thethirdcorrespondingtotofourthcorrespondingcorrespondingcorrespondingfifthtimetomainmaintimetotototime(with amainspanspan(with amainmainmain(with apushingspan8#,9#,pushingspanspanspanpushingamount7#,60#h59#hamount10#,11#,12#,amountConstructionof 3061#hangerangerangerof 7058#hanger57#hanger56#hangerof 40contentcm)rodrodrodcm)rodrodrodcm) 1#82.082.082.182.182.182.182.282.282.2 2#81.781.881.881.981.981.982.082.082.0 3#81.381.481.581.681.681.781.881.881.8 4#80.881.081.181.381.381.481.581.681.6 5#80.380.580.780.980.981.081.281.381.3 6#79.779.980.280.480.480.680.881.081.0 7#78.979.279.579.879.880.180.480.680.6 8#78.478.879.279.279.579.880.180.1 9#77.978.478.478.879.279.579.510#77.477.978.478.978.911#76.977.578.078.112#76.477.177.113#75.814#15#16#17#18#19#20#21#22#23#24#25#26#27#28#29#30#31#32#33#34#35#36#37#38#39#40#41#42#43#44#45#46#47#48#49#50#51#52#53#54#55#75.956#76.477.177.157#76.977.578.178.158#77.478.078.578.978.959#77.978.478.478.879.279.679.660#78.478.879.279.279.579.880.180.161#78.979.379.679.979.980.180.480.680.662#79.780.080.280.480.480.680.881.081.063#80.380.580.780.980.981.081.281.381.364#80.981.081.281.381.381.481.581.681.665#81.381.481.581.681.681.781.881.881.866#81.781.881.881.981.981.982.082.082.067#82.082.182.182.182.182.282.282.282.2TABLE 9Angle between the line connecting the upper and lower suspension points of the hanger rodand the horizontal line in the transverse direction during the entire process of each hangerrod at the main span from to be installed to the completion of hoisting (continued-2)Construction phase number2723HoistingHoistinggirdergirdersectionsection242526corres-21corres-HoistingHoistingHoistingpondingPushingpondinggirdergirdergirderto1920the22tosectionsectionsectionleft sideHoistingHoistingmainHoistingleft sidecorres-corres-corres-spangirdergirdercablegirderspanpondingpondingponding23#,sectionsectionsaddlesection27#,to leftto leftto leftmaincorre-corres-for thecorres-mainsidesidesidespanspondingpondingsixthpondingspanspanspanspan17#tototimeto16#,26#,25#,24#,51#,mainmain(with amain52#,rightrightrightrightspanspanpushingspanrightsidesidesideside13#,14#,amount15#,side spanspanspanspanspanConstruction55#hanger54#hangerof 2053#hanger27#hanger26#hanger25#hanger24#hanger23#hangercontentrodrodcm)rodrodrodrodrodrod 1#82.282.282.282.382.382.382.382.382.3 2#82.182.182.182.182.282.282.282.282.2 3#81.981.981.982.082.082.082.082.082.1 4#81.781.881.881.881.981.981.981.981.9 5#81.481.581.581.681.781.781.781.781.8 6#81.181.381.381.481.581.581.581.581.6 7#80.881.081.081.181.381.381.381.281.4 8#80.480.680.680.881.081.081.081.081.1 9#79.980.180.180.480.680.680.680.680.810#79.379.679.679.980.280.280.280.280.511#78.579.079.079.479.879.779.779.780.012#77.778.278.278.779.279.279.179.179.513#76.677.377.377.978.578.478.478.478.914#75.376.76.176.977.677.677.677.578.115#74.775.776.576.576.576.577.216#74.175.275.175.175.176.017#73.474.618#72.719#20#21#22#23#24#25#26#27#28#29#30#31#32#33#34#35#36#37#38#39#40#41#42#43#44#45#46#47#48#49#50#72.751#73.474.652#74.175.275.275.175.176.053#74.775.776.576.576.576.577.254#75.376.276.276.977.677.677.677.678.255#76.677.377.377.978.578.578.478.478.956#77.778.278.278.779.279.279.279.179.557#78.679.079.079.479.879.879.779.780.058#79.379.679.680.080.380.280.280.280.559#79.980.280.280.480.780.680.680.680.860#80.480.680.680.881.081.081.081.081.161#80.881.081.081.181.381.381.381.381.462#81.181.381.381.481.581.581.581.581.663#81.481.581.581.681.781.781.781.781.864#81.781.881.881.881.981.981.981.981.965#81.982.082.082.082.182.082.082.082.166#82.182.182.182.182.282.282.282.282.267#82.282.382.382.382.382.382.382.382.3TABLE 9Angle between the line connecting the upper and lower suspension points of the hanger rodand the horizontal line in the transverse direction during the entire process of each hangerrod at the main span from to be installed to the completion of hoisting (continued-3)Construction phase number303629Hoisting3132333435Hoisting28HoistinggirderHoistingHoistingHoistingHoistingHoistinggirderHoistinggirdersectiongirdergirdergirdergirdergirdersectiongirdersectioncorre-sectionsectionsectionsectionsectioncorre-sectioncorre-spondingcorre-corre-corre-corre-corre-spondingcorre-spondingtospondingspondingspondingspondingspondingtospondingto leftleftto leftto leftto leftto leftto leftleftto leftsidesidesidesidesidesidesidesidesidespanspanspanspanspanspanspanspanspan21#,20#,19#,18#,17#,16#,15#,14#,22#,mainmainmainmainmainmainmainmainmainspanspanspanspanspanspanspanspanspan19#,20#,21#,22#,23#,24#,25#,26#,18#,49#,48#,47#,46#,45#,44#,43#,42#,50#,rightrightrightrightrightrightrightrightrightsidesidesidesidesidesidesidesidesidespan21#hangerspanspanspanspanspanspanConstructionspan22#hanger20#hanger19#hanger18#hanger17#hanger16#hanger15#hanger14#hangercontentrodrodrodrodrodrodrodrodrod 1#82.382.382.382.382.382.382.382.382.4 2#82.282.282.282.382.382.382.382.382.3 3#82.182.182.282.282.282.282.282.282.2 4#82.082.082.182.182.182.182.282.282.2 5#81.881.981.982.082.082.182.182.182.1 6#81.781.781.881.981.982.082.082.082.1 7#81.581.681.781.781.881.981.981.982.0 8#81.381.481.581.681.781.781.881.881.9 9#81.081.181.381.481.581.681.781.781.810#80.780.981.081.281.381.481.581.681.711#80.380.680.881.081.181.381.481.581.612#79.980.280.480.780.981.181.281.381.413#79.379.780.080.380.680.881.081.181.314#78.779.179.579.980.280.580.780.981.115#77.978.478.979.479.880.180.480.780.916#76.977.678.278.879.379.780.180.480.617#75.676.577.378.078.679.279.680.080.318#74.075.176.277.177.878.579.179.680.019#72.073.474.775.876.877.778.479.079.520#71.272.874.375.576.677.578.379.021#70.372.273.875.276.477.478.222#69.571.673.474.976.377.323#68.671.073.074.776.124#67.670.472.774.525#66.669.872.426#65.769.327#64.828#29#30#31#32#33#34#35#36#37#38#39#40#41#64.842#65.769.343#66.669.872.444#67.670.472.774.645#68.671.073.074.776.246#69.571.673.475.076.377.347#70.472.273.975.276.477.478.348#71.272.874.375.576.677.578.379.049#72.073.474.775.976.877.778.479.079.550#74.075.276.277.177.878.579.179.680.051#75.676.577.378.078.679.279.680.080.352#76.977.678.278.879.379.780.180.480.653#77.978.479.079.479.880.280.480.780.954#78.779.179.679.980.280.580.780.981.155#79.379.780.080.380.680.881.081.281.356#79.980.280.480.780.981.181.281.381.457#80.380.680.881.081.181.381.481.581.658#80.780.981.181.281.381.581.681.681.759#81.081.281.381.481.581.681.781.881.860#81.381.481.581.681.781.881.881.981.961#81.581.681.781.881.881.981.982.082.062#81.781.881.881.981.982.082.082.082.163#81.981.982.082.082.082.182.182.182.164#82.082.082.182.182.182.282.282.282.265#82.182.182.282.282.282.282.282.282.366#82.282.282.382.382.382.382.382.382.367#82.382.382.382.382.382.382.382.482.4TABLE 9Angle between the line connecting the upper and lower suspension points of the hanger rodand the horizontal line in the transverse direction during the entire process of each hangerrod at the main span from to be installed to the completion of hoisting (continued-4)Construction phase number414237383940HoistingHoisting4344HoistingHoistingHoistingHoistinggirdergirderHoistingHoistinggirdergirdergirdergirdersectionsectiongirdergirdersectionsectionsectionsectioncorre-corre-sectionsection45corre-corre-corre-corre-spondingspondingcorre-corre-Hoistingspondingspondingspondingspondingtotospondingspondinggirderto leftto leftto leftto leftleftleftto lefttosectionsidesidesidesidesidesidesideleftcorre-spanspanspanspanspanspanspansidesponding13#,12#,11#,10#,9#,8#,7#,spantomainmainmainmainmainmainmain6#,leftspanspanspanspanspanspanspanmainside27#,28#,29#,30#,31#,32#,33#,spanspan41#,40#,39#,38#,37#,36#,35#,34#,5#,rightrightrightrightrightrightrightrightrightsidesidesidesidesidesidesidesidesidespanspanspanspanspanspanspanspanspanConstruction13#hanger12#hanger11#hanger10#hanger9#hanger8#hanger7#hanger6#hanger5#hangercontentrodrodrodrodrodrodrodrodrod 1#82.482.482.482.382.382.382.382.382.3 2#82.382.382.382.382.382.382.382.382.3 3#82.382.382.382.282.282.282.282.282.2 4#82.282.282.282.282.282.282.282.282.2 5#82.182.182.182.182.182.182.182.182.1 6#82.182.182.182.182.182.182.082.082.0 7#82.082.082.082.082.082.082.082.082.0 8#81.981.981.981.981.981.981.981.981.9 9#81.881.981.981.981.981.881.881.881.810#81.781.881.881.881.881.881.781.781.711#81.681.781.781.781.781.781.681.681.612#81.581.681.681.681.681.681.681.581.513#81.481.481.581.581.581.581.581.481.414#81.281.381.481.481.481.481.481.381.315#81.081.281.281.381.381.381.281.281.216#80.881.081.181.181.281.281.181.181.117#80.680.880.981.081.081.081.081.081.018#80.380.580.780.880.980.980.980.880.819#79.980.280.580.680.780.780.780.780.720#79.579.980.280.480.580.580.580.580.521#78.979.479.880.180.380.380.380.380.322#78.278.979.479.880.080.180.180.180.123#77.378.278.979.479.779.879.979.979.924#76.177.378.278.879.379.579.679.679.625#74.476.177.378.278.879.179.379.379.326#72.174.476.177.378.278.778.979.079.027#68.972.074.476.177.378.178.578.678.628#64.168.772.074.576.377.378.078.178.129#63.668.672.374.876.477.377.677.630#63.569.072.775.176.677.076.931#64.469.973.575.776.376.332#66.271.574.775.775.633#69.273.875.275.134#73.175.074.935#69.273.875.275.136#66.271.574.775.775.637#64.469.973.575.776.376.338#63.569.072.775.176.677.076.939#63.668.672.374.876.477.377.677.640#64.168.772.074.576.377.478.078.178.141#68.972.074.476.177.378.178.578.678.642#72.274.476.177.378.278.778.979.079.043#74.476.177.378.278.879.79.379.379.344#76.177.378.278.879.379.579.679.679.645#77.378.278.979.479.779.879.979.979.945#78.278.979.479.880.080.180.180.180.146#78.979.579.880.180.380.380.480.380.347#79.579.980.280.480.580.680.580.580.548#79.980.280.580.680.780.780.780.780.749#80.380.580.780.880.980.980.980.880.850#80.680.880.981.081.081.081.081.081.051#80.881.081.181.281.281.281.181.181.152#81.081.281.281.381.381.381.381.281.253#81.281.381.481.481.481.481.481.381.354#81.481.581.581.581.581.581.581.481.455#81.581.681.681.681.681.681.681.581.556#81.681.781.781.781.781.781.781.681.657#81.781.881.881.881.881.881.781.781.758#81.881.981.981.981.981.881.881.881.859#81.981.981.981.981.981.981.981.981.960#82.082.082.082.082.082.082.082.082.061#82.182.182.182.182.182.182.082.082.062#82.182.182.182.182.182.182.182.182.163#82.282.282.282.282.282.282.282.282.264#82.382.382.382.382.382.282.282.282.265#82.382.382.382.382.382.382.382.382.366#82.482.482.482.482.482.382.382.382.3(The bold items in the tables indicate a value of a to-be-installed hanger rod)TABLE 9Angle between the line connecting the upper and lower suspension pointsof the hanger rod and the horizontal line in the transverse directionduring the entire process of each hanger rod at the main span fromto be installed to the completion of hoisting (continued-5)Construction phase number46474849HoistingHoistingHoistingHoistinggirder sectiongirder sectiongirder sectiongirder sectioncorrespondingcorrespondingcorrespondingcorrespondingto left sideto left sideto left sideto left sidespan 4#, rightspan 3#, rightspan 2#, rightspan 1#, rightConstructionside spanside spanside spanside spancontent4#hanger rod3#hanger rod2#hanger rod1 #hanger rod 1#82.382.382.382.3 2#82.382.382.382.3 3#82.282.282.282.2 4#82.282.282.282.2 5#82.182.182.182.1 6#82.082.082.082.0 7#82.081.981.981.9 8#81.981.981.981.9 9#81.881.881.881.810#81.781.781.781.711#81.681.681.681.612#81.581.581.581.513#81.481.481.481.414#81.381.381.381.315#81.281.281.281.216#81.181.181.181.117#81.081.080.980.918#80.880.880.880.819#80.780.780.680.620#80.580.580.580.521#80.380.380.380.322#80.180.180.180.123#79.979.879.879.824#79.679.679.679.625#79.379.379.379.326#78.978.978.978.927#78.578.578.578.528#78.178.178.078.029#77.577.577.577.530#76.976.976.976.931#76.276.276.276.232#75.675.675.575.533#75.175.175.075.034#74.974.974.874.835#75.175.175.075.036#75.675.675.575.537#76.276.276.276.238#76.976.976.976.939#77.577.577.577.540#78.178.178.178.041#78.578.578.578.542#79.078.978.978.943#79.379.379.379.344#79.679.679.679.645#79.979.979.979.846#80.180.180.180.147#80.380.380.380.348#80.580.580.580.549#80.780.780.780.750#80.880.880.880.851#81.081.081.081.052#81.181.181.181.153#81.281.281.281.254#81.381.381.381.355#81.481.481.481.456#81.581.581.581.557#81.681.681.681.658#81.781.781.781.759#81.881.881.881.860#81.981.981.981.961#82.082.082.082.062#82.082.082.082.063#82.182.182.182.164#82.282.282.282.265#82.282.282.282.266#82.382.382.382.367#82.382.382.382.3It can be seen from the structure of the steel box girder (as shown in FIG. 19) that installation and construction conditions that the hanger rod needs to meet during the installation to the completed bridge are as follows. 1) The hanger rod must not be bent at an outer roof plate and outer anti-collision rail of the steel box girder in the transverse direction (structural compatibility condition). 2) A distance between the upper and lower suspension points before installation along the transverse direction must be less than the unstressed length of the hanger rod (the installation condition without temporary pushing or pulling of the main cable).It can be seen from Table 9 that when the stiffening girder is installed section by section from the main tower to both sides without temporary pushing or pulling of the main cable, the entire process satisfies the structural compatibility condition and the installation condition of the main cable without temporary pushing or pulling, resulting in a generally established technical solution. However, when the main cable is transformed from a vertical plane state of the empty cable to the empty cable state of the bridge, the torsion of the main cable is constrained by the cable saddle to a certain extent, where the constraint is difficult to simulate accurately. Therefore, during the installation process of the above stiffening girder, it is necessary to reasonably determine the lateral pre-deflection angle of the clip (or the azimuth angle of the installation axis) to minimize the additional stress on the steel wire caused by torsion. Therefore, it is necessary to investigate the torsional characteristics of the main cable.1.3 Conclusion on Spatial Torsion Characteristics Test of the Main CableThe test results of the torsion characteristics of the main cable are obtained through a 1:15 main cable torsion indoor model test. After analyzing the experimental results and arguments of this application, main conclusions can be summarized as follows.(1) When a final value of the hanger rod force is constant, an installation pre-deflection angle of a certain clip is changed, such that the torsion angle of the main cable changes the most at said clip, and is almost unchanged at an adjacent clip and beyond. A torsion angle between the clip and the adjacent clip changes almost linearly with a distance from the clip.(2) The torsion angle of the main cable at the clip is close to a final value under the hanger rod force at a first level, with a small later change. A torsion direction of the section of the main cable adjacent to the clip under hanger rod forces at all levels is the same, which increases as the hanger rod force increases, and a rate of increase gradually decreases.(3) Due to complex influencing factors and mechanisms of the restraint of the cable saddle on the torsion of the main cable strands, there is no rule to follow in the magnitude and even direction of the torsion angle of the main cable near the cable saddle (a range along a span direction does not exceed 80 times or less of the diameter of the main cable, with 60 times in this application).1.4 Technical Solution of this ApplicationThrough the above investigation and analysis, the stiffening girder erection method is performed as follows.
[0095] Step (1) Each hanger rod and clip are installed. The design center line of the clip (coincident with the center line of the hanger rod) is allowed to be located in the vertical plane. The lateral pre-deflection angle of the clip is the lateral inclination angle of the hanger rod in the bridge complete state (the design corresponds to the lateral inclination angle of the hanger rod).
[0096] Step (2) The stiffening girder is installed section by section from a certain distance in the longitudinal direction of the two main towers (not less than 60 times the diameter of the main cable, and not a girder section adjacent to the two main towers). The stiffening girder sections are installed one by one in the direction toward the mid-span. Each time one or several girder sections are installed, the azimuth angle of the main cable around the central axis thereof at the clip (especially at the clip near the bridge tower) until the installed stiffening girders are closed at the mid-span.
[0097] Step (3) The azimuth angle of the main cable around the central axis thereof at the hanger rod corresponding to the uninstalled girder section near the two main towers (i.e., the lateral deflection angle of the clip) is measured. The theoretical value and the measured value of the lateral deflection angle are compared to determine the adjustment amount of the lateral deflection angle of the clip of the immediately adjacent uninstalled girder section (the installed girder section in the mid-span). The lateral deflection angle of the clip of the immediately uninstalled girder section is adjusted. The stiffening girder installation is performed on the adjacent girder section.
[0098] Step (4) The step (3) is repeated until the stiffening girder erection is completed.
[0099] The embodiments described above are merely illustrative of the present disclosure, and are not intended to limit the patent scope of the present in disclosure. Any equivalent structural transformation or direct / indirect application in other related technical fields made using the description and drawings of the present disclosure without departing from the concept of the disclosure shall fall within the scope of the disclosure defined by the appended claims.
Examples
Embodiment Construction
[0045]The technical solutions of the present disclosure will be clearly and completely described below in conjunction with the accompanying drawings and embodiments. Obviously, described below are only some embodiments of the present disclosure, instead of all embodiments of the present disclosure. Based on the embodiments in the present disclosure, all other embodiments obtained by those of ordinary skill in the art without making creative efforts shall fall within the scope of the present disclosure.
[0046]It should be noted that all directional indications (such as up, down, left, right, front, back . . . ) in the description of the embodiments are merely intended to explain a relative positional relationship, movement, etc. between components in a specific posture (as shown in the accompanying drawings). When the specific posture changes, the directional indication changes accordingly.
[0047]In addition, descriptions involving “first”, “second”, etc. in this application are only d...
Claims
1. A stiffening girder erection method of a ground-anchored suspension bridge, comprising:step (1) installing clips for all hanger rods of a space main cable suspension bridge such that design center lines of the clips are coincident with center lines of the hanger rods, respectively; wherein the design center lines of the clips are located in a vertical plane, such that a lateral pre-deflection angle of each of the clips is configured as a lateral inclination angle of a corresponding one of the hanger rods in a bridge complete state;step (2) installing a first stiffening girder section at a position away from a first tower at a preset distance along a longitudinal direction, and installing a second stiffening girder section at a position away from a second tower at the preset distance along the longitudinal direction; and installing a plurality of third stiffening girder sections one by one in a direction respectively from the first stiffening girder and the second stiffening girder toward a mid-span until a mid-span closure is completed; wherein an azimuth angle of a main cable around a central axis thereof at each of the clips is measured after one or more of the plurality of third stiffening girder sections are installed; and a lateral deflection angle of each of the clips is calculated as a lateral inclination angle of each of the plurality of the hanger rods minus the azimuth angle of the main cable around the central axis thereof at each of the clips;step (3) installing a plurality of fourth stiffening girder sections one by one respectively from the first stiffening girder section toward the first tower and from the second stiffening girder section toward the second tower until a stiffening girder is closed at mid-span; andstep (4) measuring an azimuth angle of the central axis of the main cable at each of the clips.
2. The stiffening girder erection method of claim 1, wherein the step (4) is performed through steps of:measuring an azimuth angle of the central axis of the main cable at a hanger rod among the hanger rods corresponding to an uninstalled fourth stiffening girder section among the plurality of fourth stiffening girder sections; comparing a measured value and a theoretical value of a change of an azimuth angle of the central axis of the main cable at a certain stage relative to an azimuth angle before the first stiffening girder section and the second girder section are installed; modifying a prediction model of an azimuth angle change value of the central axis of the main cable at the hanger rod corresponding to the uninstalled fourth stiffening girder section; determining an adjustment of a lateral deflection angle of a clip of the hanger rod corresponding to the uninstalled fourth stiffening girder section followed by adjustment; and installing the uninstalled fourth stiffening girder section.
3. The stiffening girder erection method of claim 1, wherein assuming that two points E and F on each of the clips in the bridge complete state are located on a tangent line of a configuration of a corresponding hanger rod at an upper endpoint thereof, an angle between an EF connection line in another state and an EF connection line in the bridge complete state is configured as a lateral deflection angle of each of the clips in the another state, and the lateral pre-deflection angle of each of the clips is a lateral deflection angle achieved during installation and adjustment.
4. The stiffening girder erection method of claim 1, wherein the lateral inclination angle of each of the hanger rods is an angle between a tangent line of a configuration of each of the hanger rods at an upper endpoint thereof and a vertical line in a projection of each of the hanger rods on a vertical plane perpendicular to a bridge central axis in the bridge complete state.
5. The stiffening girder erection method of claim 1, wherein assuming that an angle between a top-bottom connecting line AB of a section of the main cable in a tightened state and a line AB of a section of the main cable in a certain state is an azimuth angle of the section of the main cable around the central axis thereof in the certain state; and the azimuth angle of the section of the main cable around the central axis thereof is the azimuth angle of the main cable around the central axis thereof.
6. The stiffening girder erection method of claim 1, wherein in step (2), the preset distance is not less than 60 times a diameter of the main cable.
7. The stiffening girder erection method of claim 2, wherein the theoretical value of the lateral deflection angle of each of the clips is calculated through simulation analysis using a modified finite element model, a modified linear model or a modified nonlinear model.
8. The stiffening girder erection method of claim 2, wherein in step (4), the adjustment of the lateral deflection angle of each of the clips is calculated through simulation analysis using a modified finite element model, a modified linear model or a modified nonlinear model.
9. The stiffening girder erection method of claim 1, wherein the stiffening girder is a steel box girder, a steel truss girder or a steel-concrete composite girder.
10. The stiffening girder erection method of claim 1, wherein a rise-to-span ratio fh / L of a plane projection of the main cable in the bridge complete state in a transverse direction is greater than 1 / 175.
Citation Information
Patent Citations
Construction method of space main cable suspension bridge
CN114592438A
Suspension bridge double-layer different-sag four-main-cable extension structure and extension method
CN120250518A
Suspension bridge four-main-cable double-layer extension structure with two newly-added half-through main cables and method
CN120683811A
Replacement method of oblique cable and temporary hanger for replacing oblique cable
JP2013249678A
Platform and the hanging thereof from a bridge main cable
US10738423B1
Cited By
Suspension bridge all-welded steel truss girder splicing method based on second-stage dead load local dynamic adjustment
CN120925428A
Finite element simulation method and system for suspension bridge tower top saddle
CN122287232A
Method for evaluating installation quality of lattice tower foundation, tower foundation and construction method
CN122863945A