Modularized wall pouring prefabricated formwork
By pouring the modular wall prefabricated template's inner panel, skeleton and auxiliary mechanism combined structure, it solves the problem of erecting scaffolding in the existing technology that affects the progress and increases the cost, realizes scaffolding-free construction, reduces time costs and improves construction efficiency.
Patent Information
- Application Number
- CN202411061061.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2024-10-11
AI Technical Summary
The existing wall pouring formwork requires scaffolding to be built during the construction of the upper part of the building wall, which affects the progress and increases the time cost.
A modular wall pouring prefabricated formwork is designed, which adopts a combined structure of inner panels, skeletons and auxiliary mechanisms, and is connected through pull bolts and connecting buckle components. Auxiliary brackets are arranged along the length of the skeleton to install cross bars, forming a scaffolding to avoid Additional scaffolding was erected.
It is possible to carry out construction operations on the upper part of the building wall without erecting scaffolding, reducing time costs and improving construction efficiency and safety.
Smart Images

Figure CN118756952A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building engineering, and in particular to a modular wall casting prefabricated template. Background Art
[0002] The formwork is an auxiliary tool used to fix, support and limit the shape of concrete when pouring walls. Most of the existing formworks are customized, designed according to the wall to be poured, and then assembled and installed on site.
[0003] An existing wall casting formwork includes two panels and two frames. The two frames are respectively installed on the sides of the two panels away from each other. The two panels are connected by multiple tension bolts. The frame includes multiple horizontal beams and multiple vertical beams. The multiple horizontal beams and multiple vertical beams are fixedly connected.
[0004] When the above-mentioned formwork is used for construction work on the upper part of the building wall, it is also necessary to build a scaffolding on the side of the frame away from the panel, which affects the progress of the wall pouring and increases the time cost. Summary of the invention
[0005] (I) The problem to be solved by the present invention is: how to carry out construction work on the upper part of the building wall without setting up a separate scaffolding, thereby reducing time cost.
[0006] (II) Technical solution
[0007] A modular wall casting prefabricated formwork provided by the present invention comprises a formwork assembly;
[0008] The template assembly includes two inner plates, the two inner plates are connected by a plurality of tension bolts, a frame is installed on the side of the two inner plates away from each other, and an auxiliary mechanism is installed on the side of the two frames away from the inner plates;
[0009] The auxiliary mechanism includes a cross bar and a plurality of auxiliary brackets, the plurality of auxiliary brackets are arranged along the length direction of the frame, the plurality of auxiliary brackets are used to install the cross bar, and each of the auxiliary brackets is connected to the frame.
[0010] According to one embodiment of the present invention, the frame includes a top plate, a bottom frame, a plurality of cross beams and a plurality of vertical beams, each of the cross beams is perpendicular to each of the vertical beams, and each of the cross beams and each of the vertical beams are connected by a connecting buckle assembly;
[0011] The top end of the inner plate and the top end of the vertical beam are respectively connected to the two sides of the top plate, and the bottom end of the inner plate and the bottom end of the vertical beam are respectively connected to the two sides of the bottom frame.
[0012] According to one embodiment of the present invention, the auxiliary bracket comprises a deflection bracket body, and the deflection bracket body is connected to the skeleton via a connecting assembly;
[0013] Along the height direction of the frame, a plurality of scaffolding buckles for fixing the crossbar are fixedly connected to the deflection frame.
[0014] According to one embodiment of the present invention, the connection assembly includes a concave frame, a rotating connection component, a fixing bolt, a fixing nut and two spacers;
[0015] The deflection frame comprises a vertical rod and a connecting frame, one side of the connecting frame is fixedly connected to the vertical rod, and the other side of the connecting frame is rotatably connected to the concave frame through the rotating connecting component;
[0016] The concave frame has a first side wall and a second side wall opposite to each other, and the two pads are arranged in the concave frame. After the fixing bolt passes through the first side wall of the concave frame, one of the pads, one of the vertical beams, the other pad and the second side wall of the concave frame in sequence, the fixing bolt is screwed with the fixing nut.
[0017] According to an embodiment of the present invention, the rotating connection component includes a positioning pin, and the positioning pin is used to limit the rotation of the deflection frame.
[0018] According to one embodiment of the present invention, the connecting buckle assembly includes a buckle hook portion and two connecting components;
[0019] The two connecting components are respectively arranged at two ends of the buckle hook portion and are located on the same side of the buckle hook portion;
[0020] The connecting component comprises a threaded connecting portion, a barrel portion, a hook portion and an adjusting bolt;
[0021] The threaded connection part is fixedly connected to the hook part, the barrel part is slidably connected to the threaded connection part, the adjusting bolt is screwed to the threaded connection part, and the barrel part is located between the adjusting bolt and the hook part;
[0022] The hook piece is fixedly connected to the cylinder, and the hook portion and the hook piece cooperate to be clamped on one of the cross beams;
[0023] The connecting component also includes a stopper portion, which is fixedly connected to the cylinder portion, and the two stopper portions cooperate to limit the movement of the vertical beam.
[0024] According to one embodiment of the present invention, each of the cross beams comprises two channel steels, the two channel steels are arranged in parallel, and one of the channel steels is higher than the other channel steel, the opening direction of the channel steel located on the upper side of each cross beam faces upward, and the opening direction of the channel steel located on the lower side faces downward, a gap is left between the two channel steels, and the two channel steels are fixedly connected by a plurality of connecting plates;
[0025] The modular wall casting prefabricated formwork also includes a crossbeam assembly. The formwork components are provided in multiple groups, and each two adjacent groups of the formwork components are connected by one crossbeam assembly.
[0026] According to one embodiment of the present invention, each of the vertical beams is an I-beam.
[0027] According to one embodiment of the present invention, a top plate cross bar and a bottom frame cross bar are respectively provided on the side where the top plate and the bottom frame are close to each other;
[0028] The top plate crosspiece, the bottom frame crosspiece and the vertical beam correspond to each other one by one;
[0029] Both ends of each vertical beam are provided with vertical beam connectors, and the top end of each vertical beam is fixedly connected to a top plate crosspiece through a vertical beam connector;
[0030] The bottom end of each of the vertical beams is fixedly connected to a crossbar of the chassis via a vertical beam connector;
[0031] Both ends of each vertical beam are provided with protective pieces.
[0032] According to one embodiment of the present invention, hanging rings are symmetrically arranged on the top of the top plate.
[0033] Beneficial effects of the present invention:
[0034] The two inner plates are used to pour concrete, and the crossbars can be installed by cooperating with a plurality of auxiliary brackets arranged along the length direction of the frame. There is no need to set up additional scaffolding to carry out construction on the upper part of the building wall, which does not affect the progress of wall pouring and reduces time costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0036] Figure 1A three-dimensional diagram of a prefabricated template provided by an embodiment of the present invention with a steel pipe removed;
[0037] Figure 2 A side view of a prefabricated template provided by an embodiment of the present invention;
[0038] Figure 3 A three-dimensional diagram of a deflection bracket and a steel pipe provided in an embodiment of the present invention;
[0039] Figure 4 A three-dimensional diagram of a crossbeam, a top plate, a bottom plate and a connecting buckle assembly provided in an embodiment of the present invention;
[0040] Figure 5 A three-dimensional exploded view of the top plate, bottom plate and vertical beams provided in an embodiment of the present invention;
[0041] Figure 6 A three-dimensional diagram of a connecting buckle assembly provided in an embodiment of the present invention.
[0042] Icons: 1. Inner plate; 2. Top plate; 21. Top plate crossbar; 3. Lifting ring; 4. Vertical beam; 41. Protective part; 5. Base frame; 51. Base frame crossbar; 6. Crossbeam; 7. Connecting buckle assembly; 71. Hook portion; 72. Threaded connection portion; 73. Cylinder portion; 74. Hook piece portion; 75. Abutment piece portion; 8. Crossbeam assembly; 81. Connecting screw hole; 9. Auxiliary bracket; 91. Deflection frame; 92. Concave frame; 93. Rotating connection component; 94. Reinforcing rod; 95. Pad block; 96. Scaffolding buckle; 10. Vertical beam connector. DETAILED DESCRIPTION
[0043] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0044] like Figure 1-Figure 6 As shown, one embodiment of the present invention provides a modular wall casting prefabricated formwork, including a formwork assembly;
[0045] The template assembly includes two inner plates 1, which are connected by a plurality of tension bolts, and frames are installed on the sides of the two inner plates 1 away from each other, and auxiliary mechanisms are installed on the sides of the two frames away from the inner plates 1;
[0046] The auxiliary mechanism includes a crossbar and a plurality of auxiliary brackets 9, the plurality of auxiliary brackets 9 are arranged along the length direction of the frame, the plurality of auxiliary brackets 9 are used to install the crossbar, and each auxiliary bracket 9 is connected to the frame.
[0047] The two inner panels 1 are used to pour concrete, and the multiple auxiliary brackets 9 arranged along the length direction of the frame are used to install the cross bar. There is no need to set up a separate scaffolding to carry out the construction of the upper part of the building wall. It is more convenient and quick, and while reducing the construction procedures, it does not affect the progress of wall pouring and reduces the time cost.
[0048] It should be noted that the length direction of the frame is the same as the length direction of the inner panel 1 .
[0049] Workers can climb up to the auxiliary support 9 through the skeleton to carry out construction work.
[0050] Furthermore, a plurality of crossbars may be provided, each crossbar being connected by at least two auxiliary brackets 9 to provide better stability. The crossbar may be made of steel pipes, which have high strength, are not easily deformed, and have low cost.
[0051] Optionally, a plurality of auxiliary brackets 9 are recorded as a group of auxiliary components, and a plurality of groups of auxiliary components are arranged at intervals along the vertical direction.
[0052] By providing multiple groups of auxiliary components arranged in the vertical direction, multiple cross bars are installed in the vertical direction, which makes it easier for workers to climb. The length direction of the cross bar is the same as the length direction of the frame.
[0053] A plurality of auxiliary brackets 9 are installed on the outside of the frame for installing the scaffolding crossbars and supporting the springboard, so as to realize the upper operation of pouring the wall without building a separate scaffolding, which is more convenient and quicker while reducing the construction operation procedures.
[0054] Specifically, the skeleton includes a top plate 2, a bottom frame 5, multiple cross beams 6 and multiple vertical beams 4, each cross beam 6 is perpendicular to each vertical beam 4, and each cross beam 6 and each vertical beam 4 are connected by a connecting buckle assembly 7. It should be noted that a cross beam 6 and a vertical beam 4 are connected by a connecting buckle assembly 7.
[0055] Among them, a plurality of cross beams 6 are arranged at intervals along the vertical direction, and the plurality of cross beams 6 are parallel to each other, and a plurality of vertical beams 4 are arranged at intervals along the length direction of the cross beams 6, and the plurality of vertical beams 4 are parallel to each other;
[0056] The top of the inner plate 1 and the top of the vertical beam 4 are respectively connected to the two sides of the top plate 2, and the bottom of the inner plate 1 and the bottom of the vertical beam 4 are respectively connected to the two sides of the bottom frame 5. It should be noted that the plurality of vertical beams 4 are located on the same side of the top plate 2, and the inner plate 1 is located on the other side of the top plate 2.
[0057] The length direction of the cross beam 6 and the length direction of the frame are the same as the length direction of the inner plate 1, the length direction of the vertical beam 4, the height direction of the frame and the height direction of the inner plate 1 are the same, and when in use, the length direction of the frame is parallel to the horizontal plane, and the height direction of the frame is the same as the vertical direction.
[0058] Multiple cross beams 6 are arranged on the side of the vertical beam 4 away from the inner plate 1. When workers perform upper construction work, they buckle the safety buckle on the cross beam 6 close to the top plate 2, and climb the cross beam 6 to the top row of auxiliary supports 9 to perform construction work.
[0059] By providing the top plate 2 and the bottom frame 5, the inner plate 1 and the frame can be connected to improve the overall strength of the formwork.
[0060] According to one embodiment of the present invention, Figure 6 As shown, the connecting buckle assembly 7 includes a buckle hook portion 71 and two connecting components;
[0061] The two connecting components are respectively arranged at two ends of the buckle hook portion 71 and are located on the same side of the buckle hook portion 71;
[0062] The connecting component includes a threaded connection portion 72, a barrel portion 73, a hook portion 74 and an adjusting bolt;
[0063] The threaded connection part 72 is fixedly connected to the hook part 71, the barrel part 73 is slidably connected to the threaded connection part 72, the adjusting bolt is screwed to the threaded connection part 72, and the barrel part 73 is located between the adjusting bolt and the hook part 71;
[0064] The hook portion 74 is fixedly connected to the barrel portion 73, and the hook portion 71 and the hook portion 74 cooperate to be clamped on one of the cross beams 6;
[0065] The connecting component also includes a stopper portion 75 , which is fixedly connected to the cylinder portion 73 . The two stopper portions 75 cooperate to limit the movement of the vertical beam 4 .
[0066] The hook portion 71 is a concave rod having a make way area for accommodating the vertical beam 4. The hook portion 74 is in the shape of a barbed hook and has an arc groove for hanging the horizontal beam 6. When producing the hook portion 74, one end thereof is bent by a bending machine, and the bent area is the arc groove for hanging the horizontal beam 6.
[0067] According to one embodiment of the present invention, Figure 4 As shown, each cross beam 6 includes two channel steels, the two channel steels are arranged in parallel, and one channel steel is higher than the other channel steel. The opening direction of the channel steel located on the upper side of each cross beam 6 faces upward, and the opening direction of the channel steel located on the lower side faces downward. A gap is left between the two channel steels, and the two channel steels are fixedly connected by a plurality of connecting plates.
[0068] The modular wall casting prefabricated formwork further includes a crossbeam assembly 8, and the formwork components are provided with multiple groups, and each two adjacent groups of formwork components are connected by a crossbeam assembly 8;
[0069] The crossbeam assembly 8 includes a plurality of crossbeam connectors, one end of each crossbeam connector is inserted into the gap between two channel steels of a crossbeam 6 in one of the formwork assemblies, and the other end thereof is inserted into the gap between two channel steels of a crossbeam 6 in an adjacent formwork assembly. The crossbeam assembly 8 is used to fix and connect each two adjacent formwork assemblies.
[0070] Specifically, the crossbeam connector is a strip plate with connecting screw holes 81, and two channel steels with mounting holes. After the fastening bolt passes through the mounting hole of one channel steel, the connecting screw hole 81 and the mounting hole of the other channel steel, a fastening nut is screwed onto the fastening bolt.
[0071] The cross beam connector is connected to the cross beam 6 by fastening bolts, and is easy to assemble and disassemble. Moreover, since the cross beam connector is installed in the gap between the two channel steels, it can limit the position of the cross beam connector in the vertical direction.
[0072] By setting the crossbeam assembly 8, multiple sets of formwork components can be assembled, realizing the transition from a single construction environment to a complex environment. It is suitable for the operation of longer walls and has great advantages in the controllability of the progress and the flexibility of the construction method.
[0073] According to one embodiment of the present invention, each vertical beam 4 is an I-beam, which includes a first beam, a second beam and a third beam connected in sequence, the first beam is in contact with the cross beam 6, the height of the first beam, the height of the second beam and the height of the third beam are equal, and the length of the second beam is smaller than the first beam and the third beam.
[0074] The length direction of the second beam is the same as the length direction of the frame.
[0075] Specifically, take a horizontal beam 6 and a vertical beam 4 installed and fixed by a connecting buckle assembly 7 as an example: the two sides of the two abutment portions 75 close to each other are in contact with the two side walls opposite to the second beam in the vertical beam 4, so that the relative positions between the vertical beam 4 and the two abutment portions 75 do not shift, and the two hook portions 74 are located on both sides of the vertical beam 4. The hand is against the buckle hook portion 71, so that the buckle hook portion 71 is hooked on the side wall of the channel steel with the opening facing downward on the lower side, and the two hook portions 74 pass through the barrel portion 73 along the threaded connection portion 72 close to the buckle hook portion One end of 71 slides and hooks on the side wall of the channel steel with the opening facing upward on the upper side, and the two adjusting bolts are turned so that the hook portion 71 and the hook piece portion 74 are fixed on the cross beam 6 in cooperation. When the cylinder portion 73 slides toward the threaded connection portion 72 close to one end of the hook portion 71, the distance between the two retaining pieces 75 and the cross beam 6 is reduced. Therefore, the first beam of the vertical beam 4 can be fastened between the retaining piece portion 75 and the cross beam 6, thereby realizing the fixed installation of the cross beam 6 and the vertical beam 4, which is convenient for disassembly and assembly, stable connection and simple operation.
[0076] Among them, the two abutment parts 75 in each connecting buckle assembly 7 have their sides close to each other abut against two opposite side walls of the second beam, and the sides of the two abutment parts 75 close to the beam 6 fit against the side of the first beam away from the beam 6.
[0077] Of course, in this embodiment, the connecting buckle assembly 7 can also be in other forms, for example, the connecting buckle assembly 7 includes a first mounting plate, four L-shaped clips and a second mounting plate, the first mounting plate is arranged on the side of the cross beam 6 away from the vertical beam 4, the second mounting plate is arranged on the side of the vertical beam 4 away from the cross beam 6, the four L-shaped clips are fixedly connected to the second mounting plate, the two sides of each L-shaped clip are respectively fitted with the cross beam 6 and the vertical beam 4, thereby limiting the cross beam 6 and the vertical beam 4, and the first mounting plate and the second mounting plate are screwed together by multiple bolts to achieve the connection between the cross beam 6 and the vertical beam 4. Its purpose does not deviate from the design concept of the present invention, and therefore, it should belong to the protection scope of the present invention.
[0078] According to one embodiment of the present invention, Figure 5 As shown, a top plate cross piece 21 and a bottom frame cross piece 51 are respectively provided on the side where the top plate 2 and the bottom frame 5 are close to each other;
[0079] The top plate crosspiece 21, the bottom frame crosspiece 51 and the vertical beam 4 correspond one to one;
[0080] Both ends of each vertical beam 4 are provided with vertical beam connectors 10, and the top end of each vertical beam 4 is fixedly connected to a top plate crosspiece 21 through a vertical beam connector 10;
[0081] The bottom end of each vertical beam 4 is fixedly connected to a chassis cross piece 51 via a vertical beam connector 10 .
[0082] By providing the top plate cross piece 21 and the bottom frame cross piece 51, the main frame composed of the top plate 2, the bottom frame 5 and the vertical beam 4 is made more stable and durable, thereby increasing its service life.
[0083] Protective members 41 are provided at both ends of each vertical beam 4 .
[0084] By providing protective members 41 at both ends of each vertical beam 4, the end portions of the vertical beam 4 can be protected.
[0085] According to one embodiment of the present invention, Figure 4 As shown, the auxiliary bracket 9 includes a deflection frame body 91, and the deflection frame body 91 is connected to the frame through a connecting assembly;
[0086] Along the height direction of the frame, a plurality of scaffolding buckles 96 for fixing the crossbar are fixedly connected to the deflection frame 91. In the height direction of the frame, the plurality of scaffolding buckles 96 are arranged in sequence and spaced apart.
[0087] By arranging scaffolding clips 96 capable of fixing the cross bar on the deflection frame 91, the cross bar can be easily disassembled and assembled. In the vertical direction, multiple groups of scaffolding clips 96 are arranged, which can facilitate the installation of multiple groups of steel pipes and carry out construction work on the upper part of the wall at a higher height, which is more practical.
[0088] The scaffolding buckle 96 includes a fixed block, a first arc block and a second arc block. The fixed block is fixedly connected to the deflection frame 91, the first arc block and the fixed block are fixedly connected, the second arc block and the first arc block are connected by multiple bolts, the cross bar is inserted between the first arc block and the second arc block, the bolts are turned to adjust the distance from the second arc block to the first arc block, thereby achieving the fixation of the cross bar.
[0089] Further, the connection assembly includes a concave frame 92, a rotating connection member 93, a fixing bolt, a fixing nut and two spacers 95;
[0090] The deflection frame 91 includes a vertical rod and a connecting frame, one side of the connecting frame is fixedly connected to the vertical rod, and the other side of the connecting frame is rotatably connected to the concave frame 92 through a rotating connecting component 93;
[0091] The concave frame 92 has a first side wall and a second side wall opposite to each other, and two pads 95 are arranged in the concave frame 92. After the fixing bolt passes through the first side wall of the concave frame 92, one of the pads 95, one of the vertical beams 4, the other pad 95 and the second side wall of the concave frame 92 in sequence, the fixing bolt is screwed with the fixing nut.
[0092] Furthermore, the connecting frame includes two connecting rods and a reinforcing rod 94, the two connecting rods are arranged at intervals along the length direction of the vertical rod, the length direction of the vertical rod is the same as the length direction of the vertical beam 4, and the two connecting rods are perpendicular to the vertical rod, and two concave frames 92 and rotating connecting parts 93 are each provided with two, and the concave frames 92, connecting rods and rotating connecting parts 93 correspond one to one, so that the deflection frame 91 is smoother and more stable when rotating.
[0093] A reinforcing rod 94 is fixedly connected between the two connecting rods to reinforce the deflection frame 91 .
[0094] When two concave frames 92 are provided, the top ends of the two cushion blocks 95 are located in one of the concave frames 92 , and the bottom ends of the two cushion blocks 95 are located in the other concave frame 92 .
[0095] The deflection frame 91 and the concave frame 92 are rotatably connected via a rotatable connecting component 93 . Therefore, the deflection frame 91 can be deflected, which is more flexible to use and more convenient to store.
[0096] When the workers climb onto the auxiliary support 9 above, they can step on the horizontal bar and hold the vertical bar to perform construction work, which is safer.
[0097] According to an embodiment of the present invention, the rotation connection component 93 includes a positioning pin, and the positioning pin is used to limit the rotation of the deflection frame 91.
[0098] In order to prevent the deflection frame 91 from randomly deflecting and causing potential safety hazards when used by construction workers, a positioning pin is provided to limit the rotation of the deflection frame 91.
[0099] Specifically, the rotating connecting component 93 includes two fixed plates and a rotating shaft. The two fixed plates are fixedly connected to the two ends of the two rotating shafts. One side of the two fixed plates is fixedly connected to the concave frame 92. An axial hole is provided on the connecting frame. The rotating shaft is rotatably connected in the axial hole. There is an overlapping area between the connecting frame and the fixed plate. In the overlapping area, a first positioning groove is provided on the connecting frame, and a first positioning hole is provided on one of the fixed plates. Preferably, the positioning pin passes through the first positioning hole and is screwed to the first positioning groove to limit the rotation of the deflection frame 91.
[0100] Optionally, when the positioning pin is square in shape, the first positioning groove and the positioning pin are slidably connected, and the positioning pin only needs to be inserted into the first positioning groove and partially located in the first positioning hole.
[0101] According to one embodiment of the present invention, a hanging ring 3 is symmetrically arranged on the top of the top plate 2 .
[0102] By providing the lifting ring 3, the prefabricated template can be easily lifted and transported.
[0103] Specific, modular wall casting prefabricated formwork assembly process:
[0104] Step 1: First, install the top plate 2 and the bottom frame 5 at the upper and lower ends of the inner plate 1, and the top plate 2 and the bottom frame 5 are located on the same side of the inner plate 1;
[0105] Step 2: Install multiple connecting buckle assemblies 7 on each vertical beam 4, and install the connecting buckle assembly 7 from one end of the vertical beam 4. At this time, the two abutment parts 75 in each connecting buckle assembly 7 are located on both sides of the second beam in the vertical beam 4, and the two ends of the vertical beam 4 are fixed to the top plate 2 and the bottom frame 5 respectively through the vertical beam connector 10;
[0106] Step 3: Place the cross beam 6 at the designated position, hook the hook portion 71 in the connecting buckle assembly 7 to hook the side wall of the channel steel with the opening facing downward in the cross beam 6, hook the hook sheet portion 74 to hook the side wall of the channel steel with the opening facing upward in the cross beam 6, and turn the adjusting bolt to fix the relative position between the hook sheet portion 74 and the hook portion 71, so that the relative position of the connecting buckle assembly 7 on the cross beam 6 does not change, and because the two abutting pieces 75 are located on both sides of the second beam, when the barrel portion 73 moves at one end of the threaded connection portion 72 close to the hook portion 71, the distance between the abutting piece portion 75 and the cross beam 6 is reduced, thereby fixing the cross beam 6 and the vertical beam 4;
[0107] Step 4: Rotate the deflection frame 91, pass the positioning pin portion through the first positioning hole and connect it to the first positioning groove, and limit the deflection frame 91 to prevent it from rotating;
[0108] Step 5: Insert the crossbar into the scaffolding buckle 96 and secure it.
[0109] Step 6: Install the crossbeam assemblies 8 on both sides of one formwork assembly and assemble it with another formwork assembly.
[0110] Among them, when the construction work can be completed using one formwork assembly, there is no need to perform step six.
[0111] In the description of the present invention, it should be noted that the terms "upper", "lower", etc., indicating the orientation or positional relationship are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0112] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the inside of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances. In addition, in the description of the present invention, unless otherwise specified, "plurality" means two or more.
[0113] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A modular wall casting prefabricated formwork, characterized in that: Includes template components; The template assembly comprises two inner plates (1), the two inner plates (1) are connected by a plurality of tension bolts, a frame is installed on the side of the two inner plates (1) away from each other, and an auxiliary mechanism is installed on the side of the two frames away from the inner plates (1); The auxiliary mechanism comprises a crossbar and a plurality of auxiliary brackets (9), wherein the plurality of auxiliary brackets (9) are arranged along the length direction of the frame, and the plurality of auxiliary brackets (9) are used to mount the crossbar, and each of the auxiliary brackets (9) is connected to the frame.
2. A modular wall casting prefabricated formwork according to claim 1, characterized in that: The frame comprises a top plate (2), a bottom frame (5), a plurality of cross beams (6) and a plurality of vertical beams (4); each of the cross beams (6) is perpendicular to each of the vertical beams (4); each of the cross beams (6) and each of the vertical beams (4) are connected via a connecting buckle assembly (7); The top end of the inner plate (1) and the top end of the vertical beam (4) are respectively connected to the two sides of the top plate (2), and the bottom end of the inner plate (1) and the bottom end of the vertical beam (4) are respectively connected to the two sides of the bottom frame (5).
3. A modular wall casting prefabricated formwork according to claim 2, characterized in that: The auxiliary support (9) comprises a deflection frame body (91), and the deflection frame body (91) is connected to the frame via a connecting assembly; Along the height direction of the frame, a plurality of scaffolding buckles (96) for fixing the crossbars are fixedly connected to the deflection frame (91).
4. A modular wall casting prefabricated formwork according to claim 3, characterized in that: The connection assembly comprises a concave frame (92), a rotating connection component (93), a fixing bolt, a fixing nut and two spacers (95); The deflection frame (91) comprises a vertical rod and a connecting frame, one side of the connecting frame is fixedly connected to the vertical rod, and the other side of the connecting frame is rotatably connected to the concave frame (92) via the rotating connecting component (93); The concave frame (92) has a first side wall and a second side wall opposite to each other. The two cushion blocks (95) are arranged in the concave frame (92). After the fixing bolt passes through the first side wall of the concave frame (92), one of the cushion blocks (95), one of the vertical beams (4), the other cushion block (95) and the second side wall of the concave frame (92) in sequence, the fixing bolt is screwed with the fixing nut.
5. A modular wall casting prefabricated formwork according to claim 4, characterized in that: The rotating connection component (93) comprises a positioning pin, and the positioning pin is used to limit the rotation of the deflection frame (91).
6. A modular wall casting prefabricated formwork according to claim 2, characterized in that: The connecting buckle assembly (7) comprises a buckle hook portion (71) and two connecting components; The two connecting components are respectively arranged at two ends of the buckle hook portion (71) and are located on the same side of the buckle hook portion (71); The connecting component comprises a threaded connecting portion (72), a cylindrical portion (73), a hook portion (74) and an adjusting bolt; The threaded connection part (72) is fixedly connected to the hook part (71), the barrel part (73) is slidably connected to the threaded connection part (72), the adjusting bolt is screwed to the threaded connection part (72), and the barrel part (73) is located between the adjusting bolt and the hook part (71); The hook portion (74) is fixedly connected to the cylinder portion (73), and the buckle hook portion (71) and the hook portion (74) are used to be clamped on one of the cross beams (6); The connecting component also includes a stopper portion (75), the stopper portion (75) is fixedly connected to the cylinder portion (73), and the two stopper portions (75) cooperate to limit the movement of the vertical beam (4).
7. A modular wall casting prefabricated formwork according to claim 2, characterized in that: Each of the cross beams (6) comprises two channel steels, the two channel steels are arranged in parallel, and one of the channel steels is higher than the other channel steel, the opening direction of the channel steel located on the upper side of each cross beam (6) faces upward, and the opening direction of the channel steel located on the lower side faces downward, a gap is left between the two channel steels, and the two channel steels are fixedly connected by a plurality of connecting plates; The modular wall casting prefabricated formwork further comprises a crossbeam assembly (8), and the formwork components are provided in a plurality of groups, and each two adjacent groups of the formwork components are connected via one crossbeam assembly (8).
8. The modular wall casting prefabricated formwork according to claim 2, characterized in that: Each of the vertical beams (4) is an I-beam.
9. The modular wall casting prefabricated formwork according to claim 2, characterized in that: A top plate crosspiece (21) and a bottom frame crosspiece (51) are respectively provided on the side where the top plate (2) and the bottom frame (5) are close to each other; The top plate crosspiece (21), the bottom frame crosspiece (51) and the vertical beam (4) correspond to each other one by one; Both ends of each of the vertical beams (4) are provided with vertical beam connectors (10), and the top end of each of the vertical beams (4) is fixedly connected to a top plate crosspiece (21) via a vertical beam connector (10); The bottom end of each vertical beam (4) is fixedly connected to a bottom frame crossbar (51) via a vertical beam connector (10); Both ends of each vertical beam (4) are provided with protective pieces (41).
10. A modular wall casting prefabricated formwork according to claim 2, characterized in that: The top of the top plate (2) is symmetrically provided with hanging rings (3).