Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

314results about How to "Small impact on structure" patented technology

Novel highway embankment widened structure and construction method

The invention relates to a novel highway embankment widened structure. The original roadbed slope of the structure is trimmed into a step shape, a high pressure jet grouting pile is disposed below an original roadbed slope cushion layer, pressurized continuous grouting is employed at an original roadbed cushion layer to form a slurry solid bearing plate, parts of pore cavities of the original roadbed are recharged with fine aggregate concrete or mortar; foundation treatment piles are employed to reinforce the foundation of a widened area, a drainage cushion layer is laid throughout the top of the foundation treatment piles; an earthwork cloth is laid on the drainage cushion layer, a cement soil plate is disposed on the earthwork cloth, high strength reinforcing mesh sheets are disposed in the cement soil plate; and the widened area embankment is formed by layered filling of excavation soil and light filler in a construction process. The structure provided by the invention can reinforce the bearing capacity of roadbed soil on both sides of the widened area and the original roadbed slope strength, and enhance the integrality of the embankment structure, reduce longitudinal cracks induced by differential settlement and the like at the juncture of new and old roadbeds, thus having good technical and economic benefits. The invention also discloses a construction method of the novel highway embankment widened structure.
Owner:HANGZHOU HUASHUI MUNICIPAL ENG

Overhanging type outer scaffold and construction method

InactiveCN109779225AAvoid the problem of uncontrollable parallelismReduce construction costsScaffold accessoriesBuilding support scaffoldsFalseworkSheet steel
The invention provides an overhanging type outer scaffold which comprises an outer scaffold body, the outer scaffold body is fixed to the outer side of a building outer wall through wall connecting pieces, and the wall connecting pieces comprise a first wall connecting piece, a second wall connecting piece and a third wall connecting piece. Compared with a traditional overhanging scaffold construction technology, the construction method has the advantages that by means of the construction method of embedded connecting steel plates on beams and fixing I-shaped steel, the problems that the overhanging scaffold has large requirements for I-shaped steel materials, and an embedded wall connecting rod is difficult to control on the aspect of parallelism and construction hole residues are solved.The embedded connecting steel plates do not affect masonry construction, the hidden danger of leakage caused by the fact that holes are reserved during masonry and the potential safety hazard causedby the fact that wall connecting rods are dismantled during worker construction are reduced, and the influence on the building structure is small. An overlong I-shaped steel material does not need tobe arranged to be fixed in a building, materials are saved, and the construction cost is saved. The problem that the parallelism of the embedded wall connecting rods is difficult to control is avoided, the construction efficiency is improved, and the construction period is shortened.
Owner:CHINA MCC17 GRP

GC-MS-based plant non-targeted metabolomics sample pretreatment method

The invention discloses a GC-MS-based plant non-targeted metabolomics sample pretreatment method. The method comprises the steps of 1) mixing up a plant sample, an internal standard substance and a hydrophilic organic solvent, wherein the hydrophilic organic solvent is pre-cooled to be -20 to 4 DEG C; cooling the obtained mixture to be -80 to -10 DEG C, grinding, crushing and conducting the supersonic extraction in the ice-water bath; 2) then respectively adding a lipophilic organic solvent and water, uniformly mixing up, conducting the supersonic extraction in the ice-water bath, conducting the high-speed centrifugation at the temperature of 0 to 16 DEG C, obtaining the aqueous phase and evaporating; 3) adding an oximation reagent, and conducting the oximation reaction at the temperature of 30 to 45 DEG C; 4) finally adding a derivatization reagent and n-hexane, and conducting the derivatization reaction at the temperature of 60 to 80 DEG C. According to the technical scheme of the invention, based on the above pretreatment method, the primary metabolites of a plant sample can be fully extracted, so that the abundant metabolite spectrum data information can be obtained. Meanwhile, both the change of metabolites during the extraction process, and the pollution of liposoluble substances to a gas chromatographic column can be avoided as much as possible. Therefore, the better sample reproducibility is realized.
Owner:上海鹿明生物科技有限公司

Jacking-pushing-type final joint for immersed tunnel and butt-joint construction method thereof

The invention provides a jacking-pushing-type final joint for an immersed tunnel and a butt-joint construction method thereof, and belongs to the technical field of immersed tunnel construction. Underwater water stop and push stop of the final joint after jacking pushing can be quickly and effectively achieved, the water stop and push stop effects are good, and the safety is high. The jacking-pushing-type final joint comprises a connecting bearing opening formed in a to-be-mounted pipe segment, further comprises a jacking pushing piece, and further comprises a water stop assembly. A jacking pipe section is sleeved with the connecting bearing opening, a cavity capable of containing the jacking pushing piece is formed in the connecting bearing opening, and a grouting pipe is pre-embedded inthe cavity. The water stop assembly comprises three water stop belts; the first water stop belt is arranged at the end face of the pushed-out end of the jacking pipe section; the second water stop belt and the third water stop belt are both arranged on the periphery of the jacking pipe section; the second water stop belt can extend along with pushing out of the jacking pipe section; one end of thesecond water stop belt is fixedly connected to the jacking pipe section, and the other end of the second water stop belt is fixedly connected to the connecting bearing opening; and the third water stop belt is connected between the jacking pipe section and the connecting bearing opening in a sleeved mode.
Owner:CCCC FIRST HARBOR ENG +2

Lifting repair method for ballastless track with settled curved section

The invention belongs to the technical field of repair of high-speed railway ballastless tracks and particularly relates to a lifting repair method for a ballastless track with a settled curved section. The lifting repair method for the ballastless track with the settled curved section comprises the steps that after a lifting unit and the lifting quantity of the curved section of the ballastless track are determined, a high-pressure grouting device is adopted, grouting is conducted on a lifting hole and a filling hole in sequence according to determined equipment parameters, hole positions, a grouting sequence, a grouting rhythm and construction steps with a triangle balance lifting method at a certain pressure, grouting materials are injected into the position below the ballastless track through a grouting pipe installed in the grouting hole in advance and are rapidly cured, longitudinal displacement change, transverse displacement change and vertical displacement change of the track are monitored in real time through a measuring device, and then accurate lift, balance supporting and rapid repair are conducted on a settled ballastless track structure. According to the lifting repair method for the ballastless track with the settled curved section, construction is rapid, practicability and reliability are achieved, cost is low, and the method which is rapid and convenient to implement, practical and economical is provided for solving of the problem of settlement of the ballastless track within skylight time.
Owner:RAILWAY ENG RES INST CHINA ACADEMY OF RAILWAY SCI +2

Vertical un-bonded prestressed anti-seismic strengthening structure of masonry building

InactiveCN102704704AImprove the seismic bearing capacityImprove integrityBuilding repairsShock proofingPre stressPre stressing
The invention relates to a vertical un-bonded prestressed anti-seismic strengthening structure of a masonry building. The structure is characterized in that un-bonded prestressed ribs are vertically arranged on each of two sides of a strengthened wall, a coping beam or a wall top force transfer shim block is arranged on the top of the strengthened wall, and the tension ends of the un-bonded prestressed ribs are anchored on the coping beam or the wall top force transfer shim block; a foundation force transfer shim block is arranged on the foundation part of the strengthened wall, and the fixed ends of the un-bonded prestressed ribs are anchored on the foundation force transfer shim block; and by applying a pre-stressing force, the anti-seismic capability of the strengthened wall is greatly improved. The vertical un-bonded prestressed anti-seismic strengthening structure of the masonry building can effectively improve the anti-seismic bearing capacity of the masonry wall and enhance the integrity and the energy dissipation capability of the masonry structure, is beneficial to deformation recovery after seism, is easy and convenient to construct, low in influence and low in manufacturing cost, and belongs to a novel anti-seismic strengthening technology of masonry structures which are worthy of vigorous promotion.
Owner:BEIJING ACAD OF BUILDING ENG

Method and device for measuring contact force of pantograph and catenary

The invention discloses a method and device for measuring the contact force of a pantograph and a catenary, belonging to the technical field of the safety of an electrified railway catenary. The basicidea is that a pantograph head is viewed as a beam model, and a corresponding relation between pantograph strain and contact force is established; and according to strain and acceleration data generated by a pantograph sliding plate due to pantograph and catenary state interaction, real-time pantograph and catenary dynamic contact force and pull-out value are obtained. The device comprises a sensor unit, a signal acquisition unit and a data processing unit. The strain of the pantograph is measured to obtain contact force, related variables are few, and an error generated by an intermediate variable is reduced; while the contact force is measured, a catenary pull-out value can be measured; the equipment installation is simple; a fiber strain sensor is adopted, the size is small, the weightis light, the fiber strain sensor can be embedded into the pantograph sliding plate, and the influence on the structure of the pantograph is small; and the method and device are used for measuring catenary-pantograph system dynamic contact force and pull-out value.
Owner:SOUTHWEST JIAOTONG UNIV

Polyacrylonitrile membrane with supporting materials and preparation method thereof

The invention discloses a polyacrylonitrile membrane with supporting materials and a preparation method thereof. The preparation method is characterized by comprising the following steps: taking calcium nitrate or lithium nitrate as an oxidant, polyethylene glycol or polyvinylpyrrolidone as a pore-forming agent and one or two of N,N-dimethylacetamide and N,N-dimethylformamide to prepare a polyacrylonitrile hollow fibrous membrane by a dry-wet method, ensuring monofilaments to enter into a spinneret via other inlets and carrying out blending to prepare the polyacrylonitrile hollow fibrous composite membrane with the supporting materials, wherein the monofilament fibrous materials are polyester, spandex, nylon 6, nylon 66 or polyurethane and have diameter of 0.01-2mm. The membrane and the preparation method have the following beneficial effects: the defect that the hollow fibrous membranes without supports have insufficient physical tensile strength and are easy to suffer from filament break is overcome; the physical tensile strength of the membrane disclosed by the invention is improved by more than several times compared with that of the hollow fibrous membranes without supports; support and membrane stripping can be avoided; the water flux and manufacturing cost of the membrane disclosed by the invention are equivalent to the water flux and manufacturing cost of the hollow fibers without supports; and the membrane can replace the existing hollow fiber products and has great economic and social benefits.
Owner:ZHEJIANG CREATION ENVIRONMENT TECH

Method for enlarging range of high-precision closed loop fiber-optic gyroscope assisted by MEMS (Micro-electromechanical Systems)

The invention relates to a method for enlarging a range of a high-precision closed loop fiber-optic gyroscope assisted by MEMS (Micro-electromechanical Systems), which is particularly suitable for the high-precision closed loop fiber-optic gyroscope working in a large angular speed range and existing under a large-angle acceleration input environment. The method comprises the following steps: coaxially mounting an MEMS gyroscope and the high-precision closed loop fiber-optic gyroscope; sensitively inputting an angular speed; utilizing a closed loop digital phase step wave modulation-demodulation detection method to obtain an output angular speed of the high-precision closed loop fiber-optic gyroscope; collecting the output angular speed of the MEMS gyroscope; revising the high-precision closed loop fiber-optic gyroscope output of the fiber-optic gyroscope. According to the method provided by the invention, an output result of the high-precision closed loop fiber-optic gyroscope is revised according to a difference value so that the high-precision fiber-optic gyroscope can work normally under the condition of high angular speed, the aim of enlarging the range of the closed loop fiber-optic gyroscope is realized and the application of the high-precision fiber-optic gyroscope is expanded.
Owner:HARBIN ENG UNIV

Method for preparing high-silicon steel ribbon through using electric brush composite plating method and continuous silicon steel ribbon preparing device

The invention discloses a method for preparing a high-silicon steel ribbon through using an electric brush composite plating method. The method is characterized in that a pure iron ribbon, a low-carbon steel ribbon or a low-silicon steel ribbon is used as a cathode plating piece ribbon, an electric brush plating anode plate is used as an anode, a layer of iron-silicon iron particle composite plating layer is coated on the cathode plating piece ribbon through using an electric brush composite silicon plating process, a composite plating layer steel ribbon adopting a steel-ribbon substrate as a core part is formed, then the uniform dispersion heat treatment is carried out, silicon-contained particles in the iron-silicon iron particle composite plating layer are uniformly dispersed into the steel ribbon substrate of the core part, and the high-silicon steel ribbon can be continuously prepared. The invention also discloses a continuous silicon steel ribbon preparing device which comprises an unreeling guide device, a conveying device, an electroplating device, a dispersion heat treatment device and a rolling device. The high-silicon plating layer is electrically plated on the cathode plating piece ribbon, then the high-silicon steel ribbon with an excellent magnetic conduction performance is obtained through using a heat treatment process, the simplicity in operation can be realized, characteristics such as high efficiency and continuity in preparation can be achieved, and the preparation cost also can be greatly reduced.
Owner:SHANGHAI UNIV

Tube well used for unwatering and pressure-reducing drainage and drainage method of tube well

ActiveCN103758144AReduce land subsidenceEasy to operateFoundation engineeringTube wellWater pipe
The invention discloses a tube well used for unwatering and pressure-reducing drainage. The tube well comprises a well pipe comprising a precipitation tube, a pressure-reducing water filtering tube, a pressure-reducing well wall tube, an unwatering water filtering tube and an unwatering well wall tube which are sequentially arranged from bottom to top in a penetrating mode, and the joint of the pressure-reducing well wall tube and the unwatering water filtering tube forms a lower pressure-reducing well pipe and an upper unwatering well pipe through a seal board in a partitioning mode. The seal board is provided with a natural flow pipe comprising a water inlet pipe section and a water outlet pipe section, the water inlet pipe section is provided with a water inlet, the water outlet pipe section is sequentially provided with a plurality of water outlet pipe section bodies in the axial direction, each water outlet pipe section body is provided with a side wall water outlet and an upper water outlet, and the side wall water outlets and the upper water outlets are of opening and closing structures. The tube well simplifies drainage procedures, increases the drainage success probability, reduces engineering costs, accelerates the construction progress, increases the deep foundation pit excavation safety coefficient, and simplifies capping work. The invention further discloses a drainage method using the tube well.
Owner:ZHONGYIFENG CONSTR GRP

Reinforced concrete embedded type corrosion sensor

The invention relates to a sensor, in particular to a reinforced concrete embedded type corrosion sensor. The invention provides the reinforced concrete embedded type corrosion sensor which is provided with four pairs of corrosion galvanic couples, a hollow bar, a base and a connecting lead, wherein the corrosion galvanic couple consists of an anode and a cathode, and is fixed on the hollow bar; the hollow bar is fixed on the base; the lead firstly passes through a thread hole of the hollow bar, and then is led out from a groove of the base; and the hollow bar and the base are embedded and filled by epoxy resin. The reinforced concrete embedded type corrosion sensor has small volume, thus having less influence on concrete structure; the structure is simple and firm, so that the corrosion sensor can not be washed away when pouring concrete; the processing is convenient, and the cost-performance ratio is high; the materials are easy to obtain; the corrosion sensor is installed in the concrete before pouring the concrete, so that the corrosion sensor can conduct long-term monitoring on reinforced concrete structure from early stage, and monitoring environment is the same as reinforced concrete environment; the area ratio and distance between the anode and the cathode can be determined and adjusted according to needs or specific experiment tests; and the corrosion sensor can be installed at a pre-monitoring point and an important cross section according to the needs, with convenient installation and operation.
Owner:XIAMEN UNIV

Real-time high precision satellite structure thermal deformation measurement method

InactiveCN107883898ASolve the technical problems of real-time high-precision measurement methodsSmall impact on structureStructural/machines measurementMaterial thermal analysisFiberCarbon fibers
The invention discloses a real-time high precision satellite structure thermal deformation measurement method. The method comprises steps that radio frequency antennas of multiple radio frequency displacement labels are uniformly pasted on the surface of a measured satellite structure board, and a reception radar sensor is further mounted and fixed so that all the radio frequency displacement labels are in the visual field of a radar device; a heating plate is utilized to heat the measured satellite structure board, the position information and the displacement information of each label calculated by the radar sensor are acquired through a computer, the temperature information of a temperature sensor is further acquired, and least square fitting is utilized to calculate the deformation distribution diagram of the measured structure board surface changing along with the temperature. The method is advantaged in that thermal deformation measurement requirements of multiple types of satellite structure materials including carbon fiber materials, aluminum alloy and titanium alloy and so on can be satisfied, measurement precision is better than 0.05mm, and the measurement sampling frequency can reach 10kHZ.
Owner:BEIJING INST OF SPACECRAFT ENVIRONMENT ENG

Method for preparing high-silicon silicon steel ribbon by hot dipping silicon method and continuous preparation device of silicon steel ribbon

ActiveCN103320737AImprove purityReduce the influence of magnetismHot-dipping/immersion processesComposite plateSteel belt
The invention discloses a method for preparing a high-silicon silicon steel ribbon by a hot dipping silicon method. A standby basis ribbon is transmitted and enabled to pass through hot dipping solution in a hot dipping tank, so that a hot dipping high-silicon plating layer is covered on the surface of the standby basis ribbon, the thickness and surface evenness of the hot dipping high-silicon plating layer are modified and controlled to obtain a high-silicon composite plate steel strip blank, and then uniform radiating treatment is carried out to continuously prepare a high-silicon steel ribbon with uniformly distributed silicon elements. The invention also discloses a continuous preparation device of silicon steel ribbon, which comprises an unreeling guide device, a preheating furnace, a plating solution continuous supply device, a hot dipping device, a radiating heat treatment device and a wrapping device which are arranged according to the precedence order of the processes. According to the method, the low-silicon steel ribbon rapidly passes through the high-silicon solution to plate a high-silicon plating layer, and the high-silicon silicon steel ribbon with excellent magnetic property is obtained through heat treatment. The method is simple to operate, and has the characteristics of high efficiency and capability of preparing continuously, and the preparation cost can be greatly reduced.
Owner:SHANGHAI UNIV

Aseptic processing preparation method for allogeneic corneal grafts

The invention discloses an aseptic processing preparation method for allogeneic corneal grafts. By virtue of whole treatment on eyeballs, the method comprises the following steps: two-step virus inactivation, namely ultraviolet irradiation and sodium hypochlorite solution soaking, epithelial layer removal, two-step decellularization, namely serum soaking and an osmotic pressure method, cutting and dewatering, and glycerine solution storage. According to the preparation method disclosed by the invention, drying and terminal sterilizing steps are not needed, so that the preparation method is simple in process, short in production cycle and low in production cost; through soft decellularization treatment, the structure and components of the natural corneal stroma are kept to the maximal extent; no significant difference is formed among the transparency, the mechanical strength and the natural corneal stroma; the degradation speed is matched with the regeneration speed of newborn cornea tissues; antigen removal and virus inactivation are thorough; the biocompatibility and the biosecurity are high; the structure and performance of glycerine storage can be kept stable for a long period of time; clinical application is convenient; and corneal transplantation can be carried out instead of the allogeneic cornea.
Owner:SHAANXI BOYU REGENERATIVE MEDICINE CO LTD

Installation device for deepwater stand pipes and underwater facilities

InactiveCN102235548ASimplify the installation processRealize installation integrationPipe laying and repairUnderwaterTower
The invention discloses an installation device for deepwater stand pipes and underwater facilities, which comprises a main body tower frame. The top of the main body tower frame is provided with a top work platform. A plurality of guide pulleys are arranged on one side of the top work platform, a support work platform is arranged in the middle of the main body tower frame. A stand pipe fixing device is arranged at the front end of the support work platform. A stand pipe limiting device is arranged on a main support pin which is arranged on one side of the lower end of the main body tower frame. A limit device of a rendering winch cable is arranged on the other side of the lower end of the main body tower frame. A technical process for installing the stand pipes and the underwater facilities via an S-shaped pipe-laying ship is simplified, and the integration of pipe laying, installation of the stand pipes and the underwater producing systems via the S-shaped pipe-laying ship is realized. The installation device for the deepwater stand pipes and the underwater facilities is simply structured. The utilization maximum of the pipe-laying ship is realized and the pipe-laying ship can berepeatedly utilized on condition that the self-structure of the S-shaped pipe-laying ship is affected least.
Owner:CHINA NAT OFFSHORE OIL CORP +2

Rail wheel tread scratch detection method

The invention relates to a rail wheel tread scratch detection method. The method comprises the following steps of 1 image acquisition, wherein an imaging device is provided, the imaging device comprises multiple imaging modules, each imaging module comprises two industrial cameras, two multi-line lasers and a wheel positioning sensor; 2, image feature extraction, wherein image features are extracted according to the feature variation of each laser ray in pictures shot by the industrial cameras, and a feature curve is formed; 3, qualitative analysis of tread scratch. Accordingly, by arranging devices such as the multi-line lasers, the wheel positioning sensor and an analysis computer, tread scratch detection is conducted on wheels, the wheels do not need to be subjected to precise positioning, and the entire tread circumference of each wheel can be detected; the influence of external environment light on the detected structure is small, and the precision of detection can be guaranteed; by adopting the structure light of the multi-line lasers, the depth information of tread defects can be detected, by means of the depth information, tread dirt and scratch can be distinguished clearly, and therefore detection misinformation can be avoided.
Owner:DONGGUAN NANNAR ELECTRONICS TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products