Method for reinforcing saturated soft loess overlying tunnel through gravel compaction piles

By setting up sand and gravel piles in the area around the tunnel for pre-reinforcement, the stability problem of the tunnel in saturated soft loess was solved, the seismic resistance and overall stability were enhanced, and the safety and sustainability of the tunnel were ensured.

CN118757166APending Publication Date: 2024-10-11XIAN UNIV OF TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411010634.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

The existing technology cannot effectively ensure the stability of the tunnel in saturated soft loess under long-term use conditions, especially when the groundwater level changes and the load changes, resulting in threats to the safety of the tunnel.

Method used

By setting up sand and gravel piles in the area around the tunnel, the diameter, spacing and depth of the pile holes are determined according to the geological conditions and engineering requirements of different soft loess soils, and pre-reinforcement is performed on the top and sides of the tunnel to form a support system and enhance the earthquake resistance of the tunnel. Ability and overall stability.

Benefits of technology

It effectively avoids vertical compression deformation and lateral extrusion deformation caused by water softening of saturated loess, improves the seismic resistance and stability of the tunnel, and ensures the effectiveness, economy and sustainability of reinforcement measures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118757166A_ABST
    Figure CN118757166A_ABST
Patent Text Reader

Abstract

The invention provides a method for reinforcing saturated soft loess overlying a tunnel through gravel compaction piles, and the method comprises the steps that according to the geological conditions and engineering requirements of different soft loess, the diameter, interval and depth of pile holes of gravel piles in the surrounding area of the tunnel and the number of the pile holes of the gravel piles in the surrounding area of the tunnel are determined; pile holes are formed based on the diameter, the distance and the depth of the pile holes of the gravel piles in the surrounding area of the tunnel and the number of the pile holes of the gravel piles in the surrounding area of the tunnel, and the gravel piles are formed in the pile holes through tamping; and the top and the two sides of the tunnel are tamped to form gravel piles or lime soil piles for pre-reinforcement treatment. According to the tunnel, soil bodies on the upper layer and the two sides are saturated soft loess, the soil body below is dense, the soil quality is good, and the structure is stable. The gravel piles are arranged around the tunnel burial depth area to form a certain supporting system, meanwhile, gravel pile or lime soil pile pre-reinforcement treatment is conducted on loess on the two sides of the tunnel, and it is avoided that the elastic resistance of the side wall is reduced, and lateral extrusion deformation of the tunnel structure occurs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of tunnel reinforcement, and in particular relates to a method for reinforcing a tunnel with saturated soft loess covered by sand and gravel compaction piles. Background Art

[0002] In recent years, tunnels have played a vital role in the construction of transportation infrastructure. However, tunnel projects often face difficulties such as complex geological types and changeable terrain conditions. In the process of natural sedimentation, loess forms a typical large-pore structure. Once soaked in water, its strength drops sharply and its deformation increases suddenly. Saturated soft loess is a kind of soil that is unstable after being soaked in water. It has the characteristics of high compressibility, low bearing capacity and high sensitivity. It is very easy to collapse and roof fall during tunnel excavation, and the deformation is difficult to control. It has a great impact on the safety and stability of the tunnel during the construction process and the operation stage.

[0003] At present, many scholars have studied and analyzed the causes of the formation of saturated soft loess. According to the characteristics of saturated soft loess, comprehensive control measures such as open precipitation, curtain precipitation and grouting water-stopping measures in the tunnel have been proposed. At the same time, through experiments and theoretical analysis, a variety of reinforcement technologies for saturated soft loess have been explored, including soil nail walls, high-pressure grouting, etc., to improve the mechanical properties of soft loess and enhance its stability.

[0004] Although current research results show that reinforcement measures can improve the mechanical properties of soft loess, its stability under long-term use conditions still needs to be further verified. For example, changes in groundwater levels and soil creep may weaken the reinforcement effect over time. At the same time, due to factors such as environmental changes and load changes, the effectiveness of reinforcement measures may change, threatening the safety of the tunnel. Summary of the invention

[0005] In order to overcome the shortcomings of the above-mentioned existing technologies in order to solve the problem of softening of the loess overlying the shield tunnel, increased vertical earth pressure and reduced lateral elastic resistance caused by rising groundwater levels or ground water infiltration, the characteristics of the soil, tunnel size, etc. are comprehensively considered to improve the reinforcement performance and adaptability after reinforcement to meet the needs of different engineering requirements and geological conditions, and ensure the effectiveness, economy and sustainability of the reinforcement measures.

[0006] The present invention application proposes a method for reinforcing a tunnel with saturated soft loess covered by gravel compaction piles, including determining the diameter, spacing and depth of the pile holes of the gravel piles in the area around the tunnel and the number of the gravel pile holes in the area around the tunnel according to the geological conditions and engineering requirements of different soft loess;

[0007] Based on the diameter, spacing and depth of the pile holes of the gravel piles in the area around the tunnel and the number of pile holes of the gravel piles in the area around the tunnel, pile holes are opened and compacted to form gravel piles;

[0008] The top and both sides of the tunnel are compacted to form gravel piles or lime soil piles for pre-reinforcement.

[0009] Preferably, before determining the diameter, spacing and depth of the pile holes of the gravel piles in the area around the tunnel and the number of the pile holes of the gravel piles in the area around the tunnel according to the geological conditions and engineering requirements of different soft loess, the method comprises:

[0010] Conduct tests on gravel piles or lime soil piles to confirm that the performance of gravel piles or lime soil piles meets the requirements;

[0011] The pile hole is processed and formed by a drilling rig or a pile driver, and the hole diameter and depth setting of the drilling rig or the pile driver are controlled.

[0012] Preferably, the loess covering the top of the tunnel is pre-reinforced by compacting to form gravel piles or lime soil piles.

[0013] Preferably, it also includes, after pre-reinforcement of the loess overlying the tunnel, determining the diameter, spacing and depth of the gravel pile holes in the area around the tunnel based on the gravel piles in the area around the tunnel, opening pile holes and compacting them to form gravel piles, and pre-reinforcement of the loess on both sides of the tunnel.

[0014] Preferably, the tunnel is provided with drainage, and the drainage is connected to the pile holes.

[0015] Compared with the closest prior art, the present invention has the following beneficial effects:

[0016] By setting up gravel piles in the area around the tunnel, a certain support system is formed to enhance the seismic resistance of the tunnel structure. Before the tunnel construction, the loess covering the tunnel is pre-reinforced. During the formation process, the pile body exerts an extrusion effect on the surrounding loess, increases the density of the soil, maintains the soil arch effect, and avoids the vertical compression deformation of the tunnel due to the softening of saturated loess and the increase of soil pressure. At the same time, the loess on both sides of the tunnel is also pre-reinforced with gravel piles or lime soil piles to avoid the reduction of the elastic resistance of the side wall and the lateral extrusion deformation of the tunnel structure. This method is used to improve the seismic resistance and overall stability of the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 A method for reinforcing a tunnel covered with saturated soft loess by using gravel compaction piles proposed by the present invention. A schematic diagram of the deformation of the tunnel lining structure when the tunnel is covered with saturated soft loess;

[0018] Figure 2It is a structural schematic diagram of a method for reinforcing a tunnel covered with saturated soft loess by using sand and gravel compaction piles proposed by the present invention;

[0019] Figure 3 It is a plan view of a method for reinforcing a tunnel covered with saturated soft loess by using sand and gravel compaction piles proposed by the present invention;

[0020] Figure 4 It is a flow chart of Example 2 of a method for reinforcing a tunnel covered with saturated soft loess by using sand and gravel compaction piles proposed by the present invention. DETAILED DESCRIPTION

[0021] The following is combined with Figure 1-4 The specific implementation methods of the present invention are further described in detail.

[0022] Embodiment 1:

[0023] A method for reinforcing a tunnel with saturated soft loess by using sand and gravel compaction piles, comprising:

[0024] Step 1: According to the geological conditions and engineering requirements of different soft loess, determine the diameter, spacing and depth of the gravel pile holes in the area around the tunnel, and the number of gravel pile holes in the area around the tunnel;

[0025] Step 2: based on the diameter, spacing and depth of the pile holes of the gravel piles in the area around the tunnel and the number of pile holes of the gravel piles in the area around the tunnel, pile holes are opened and compacted to form gravel piles;

[0026] Step 3: Tamp the top and both sides of the tunnel to form gravel piles or lime soil piles for pre-reinforcement.

[0027] In step 1: before determining the diameter, spacing and depth of the pile holes of the gravel piles in the area around the tunnel and the number of the pile holes of the gravel piles in the area around the tunnel according to the geological conditions and engineering requirements of different soft loess, it includes:

[0028] Conduct tests on gravel piles or lime soil piles to confirm that the performance of gravel piles or lime soil piles meets the requirements;

[0029] The pile hole is processed and formed by a drilling rig or a pile driver, and the hole diameter and depth setting of the drilling rig or the pile driver are controlled.

[0030] Furthermore, the loess covering the top of the tunnel is pre-reinforced by compacting it to form sandstone piles or lime soil piles.

[0031] Furthermore, it also includes, after pre-reinforcement of the loess overlying the tunnel, determining the diameter, spacing and depth of the gravel pile holes in the area around the tunnel based on the gravel piles in the area around the tunnel, opening pile holes and compacting them to form gravel piles, and pre-reinforcement of the loess on both sides of the tunnel.

[0032] Furthermore, drainage is provided for the tunnel, and the drainage is connected to the pile holes.

[0033] The present invention performs pre-reinforcement treatment on the loess overlying the tunnel by using gravel piles or lime soil piles before construction, thereby maintaining the soil arch effect and avoiding a significant increase in soil pressure; adopts gravel piles or lime soil piles for pre-reinforcement treatment on both sides of the tunnel to avoid a reduction in the elastic resistance of the side walls; and reinforces the saturated soft loess overlying the tunnel by using gravel compaction piles, thereby effectively solving the problem of increased vertical compression deformation and lateral extrusion deformation of the tunnel caused by softening of the saturated loess by water immersion, reducing the stress on the lining structure and preventing the tunnel from being damaged. The present invention is a reasonable and effective reinforcement method.

[0034] Embodiment 2:

[0035] The method for reinforcing a tunnel covered with saturated soft loess by using a sand and gravel compaction pile of the present invention is as follows:

[0036] Sand and gravel compaction piles are set up in the area around the tunnel to form a certain support system, thereby enhancing the earthquake resistance of the tunnel structure. According to the geological conditions and engineering requirements of different soft loess, the diameter, spacing and depth of the pile holes are determined, and sand and gravel piles or lime soil piles are driven into the top and both sides of the tunnel for pre-reinforcement.

[0037] Furthermore, before the formal construction, a trial pile test is carried out to confirm the construction parameters and material ratio; a drilling rig or a pile driver is used to drill holes, and the hole diameter and depth are controlled to meet the design requirements.

[0038] Furthermore, the rise of groundwater level or the infiltration of ground water softens the loess overlying the shield tunnel, increases the vertical soil pressure, and increases the surrounding rock pressure on the tunnel lining structure, resulting in vertical compression deformation. The loess overlying the tunnel is pre-reinforced by sandstone piles or lime soil piles. During the formation process, the pile body exerts a squeezing effect on the surrounding saturated soft loess, increases the soil density, maintains the soil arch effect, and avoids the tunnel structure from being subjected to greater pressure due to the softening of the overlying loess, resulting in deformation and damage.

[0039] Furthermore, the rising groundwater level or ground water infiltration makes the lateral loess of the shield tunnel soft and the elastic resistance is reduced. The loess on both sides of the tunnel is pre-reinforced to avoid lateral extrusion deformation of the tunnel structure due to the softening of the loess on both sides.

[0040] Furthermore, during the construction process, appropriate drainage measures are adopted to promote the discharge of pore water and improve the compaction effect.

[0041] like Figure 1After the saturated loess overlying the tunnel is softened by water, the vertical soil pressure increases, the self-bearing capacity of the soil decreases, and the vertical surrounding rock pressure acting on the tunnel vault increases, causing the tunnel vault lining to produce vertical compression deformation. The lateral loess of the tunnel is softened by water, the elastic resistance decreases, the lateral extrusion deformation of the lining structure increases, and the overall structure of the tunnel changes.

[0042] like Figure 2-4 The loess on the top and both sides of the tunnel is pre-reinforced with sandstone piles or lime soil piles to form a certain support system, thereby enhancing the seismic resistance of the tunnel structure. This prevents the groundwater level from rising or the ground from infiltrating, which causes the loess overlying the shield tunnel to soften, increase the vertical soil pressure, and reduce the lateral elastic resistance.

[0043] The present invention proposes a technology for reinforcing the saturated soft loess overlying the tunnel with gravel compaction piles. By setting gravel compaction piles in the area around the tunnel, a certain support system is formed, thereby enhancing the seismic resistance of the tunnel structure. Before the tunnel construction, the loess overlying the tunnel is pre-reinforced. During the formation process of the pile body, the surrounding loess is squeezed to increase the density of the soil body, maintain the soil arch effect, and avoid the vertical compression deformation of the tunnel due to the softening of the saturated loess due to water immersion, the increase of soil pressure; at the same time, the loess on both sides of the tunnel is also pre-reinforced with gravel piles or gray soil piles to avoid the reduction of the elastic resistance of the side wall and the lateral extrusion deformation of the tunnel structure. This method is used to improve the seismic resistance and overall stability of the tunnel.

[0044] Those skilled in the art should know that:

[0045] Saturated soft loess has the characteristics of high compressibility, low bearing capacity and high sensitivity, which generally increases the risks of the project itself and the surrounding environment. In order to solve the problem that the loess overlying the shield tunnel softens due to rising groundwater levels or ground water infiltration, the vertical soil pressure increases, and the lateral elastic resistance decreases.

[0046] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention application rather than to limit its protection scope. Although the present invention application is described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that after reading the present invention application, those skilled in the art can still make various changes, modifications or equivalent substitutions to the specific implementation methods of the application, but these changes, modifications or equivalent substitutions are all within the protection scope of the claims to be approved.

Claims

1. A method for reinforcing a tunnel with gravel compaction piles covered with saturated soft loess, characterized in that: include: According to the geological conditions and engineering requirements of different soft loess, determine the diameter, spacing and depth of the gravel pile holes in the area around the tunnel, as well as the number of gravel pile holes in the area around the tunnel; Based on the diameter, spacing and depth of the pile holes of the gravel piles in the area around the tunnel and the number of pile holes of the gravel piles in the area around the tunnel, pile holes are opened and compacted to form gravel piles; The top and both sides of the tunnel are compacted to form gravel piles or lime soil piles for pre-reinforcement.

2. The method according to claim 1, characterized in that: Before determining the diameter, spacing and depth of the pile holes of the gravel piles in the area around the tunnel and the number of the gravel pile holes in the area around the tunnel according to the geological conditions and engineering requirements of different soft loess, the method includes: Conduct tests on gravel piles or lime soil piles to confirm that the performance of gravel piles or lime soil piles meets the requirements; The pile hole is processed and formed by a drilling rig or a pile driver, and the hole diameter and depth setting of the drilling rig or the pile driver are controlled.

3. The method according to claim 1, characterized in that It also includes pre-reinforcement of the loess covering the top of the tunnel by compacting it to form sandstone piles or lime soil piles.

4. The method according to claim 1, characterized in that: It also includes, based on the diameter, spacing and depth of the gravel pile holes in the area around the tunnel and the number of gravel pile holes in the area around the tunnel, opening pile holes and tamping the gravel piles therein to form gravel piles, and pre-reinforcement of the loess on both sides of the tunnel.

5. The method according to any one of the preceding claims, characterized in that: The tunnel is provided with drainage, which is connected to the pile holes.