Method for testing elasticity modulus of stable material of inorganic binder
By setting strain gauges on the side of the standard specimen of the inorganic binder-stabilized material for data collection, the problem of unrealistic test results and low efficiency in the existing technology is solved, and more efficient and accurate elastic modulus measurement is achieved.
Patent Information
- Application Number
- CN202410939277.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-15
- Publication Date
- 2024-10-11
AI Technical Summary
The existing elastic modulus test method of inorganic binder-stabilized materials has friction effects and end effects, which results in unrealistic test results. The test fixture assembly is complex and inefficient, making it difficult to ensure test accuracy and credibility.
Multiple test points are set on the side of the standard specimen along the circumferential direction and strain gauges are pasted. The strain gauges are connected to the data acquisition device for loading, and the strain value is directly measured to obtain the elastic modulus, which reduces the requirements for the flatness of the end face of the specimen. Improved test efficiency and accuracy.
By directly measuring the side surface strain value, the accuracy of data acquisition is improved, the work intensity of the staff is reduced, the test efficiency is improved, and the test error is reduced.
Smart Images

Figure CN118758740A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of road engineering detection, and in particular to a test method for elastic modulus of inorganic binder stabilized materials. Background Art
[0002] Asphalt pavement can be divided into flexible base asphalt pavement, semi-rigid base asphalt pavement and rigid base asphalt pavement according to the different types of base. Inorganic binder stabilized soil or granular material is usually the main material for the semi-rigid base, commonly known as semi-rigid material, and its elastic modulus is one of the core technical parameters for asphalt pavement structure design.
[0003] In previous engineering practices, the top surface method described in the "Test Procedure for Inorganic Binder Stabilized Materials for Highway Engineering" (JTGE51-2009) and the "Highway Asphalt Pavement Design Code" (JTG D50-2017) is usually used to obtain the elastic modulus of inorganic binder stabilized materials. However, due to the friction effect and end surface effect on the end surface of the specimen during the top surface test, the elastic modulus value obtained from the test is too small and not realistic. At the same time, the core sample comparison test after the specimen is cut also confirms that the material uniformity of the end surface of the specimen is worse than that at the center of the specimen. It is based on the above reasons that Appendix E of the "Highway Asphalt Pavement Design Code" (JTG D50-2017) (hereinafter referred to as the 17th edition of the code) proposes that for indoor molded specimens or core samples drilled from actual road surfaces, the middle section method (or side method) can be used to test the elastic modulus of inorganic binder stabilized materials. This method is to lock the upper and lower rigid rings to the surface of the specimen, and collect the axial deformation of the specimen through three displacement sensors or dial indicators installed at 120° on the upper rigid ring to calculate the corresponding strain, and then obtain the elastic modulus of the specimen. However, in the actual test process, in order to ensure the accuracy, reliability and credibility of the test, the horizontal planes of the two rigid rings and the two rigid rings and the end faces of the specimen must be parallel with high precision, otherwise, the specimen will be eccentric during the loading process, that is, two of the three displacement sensors will be in a compressed state, while the other one will be in a tensile state. However, this leveling process has many steps, strict technical requirements, and the assembly process of the test fixture is complicated, so the efficiency is relatively low.
[0004] In addition, since the end faces of the core samples drilled from the actual road surface are usually uneven, although a high-precision and relatively expensive double-sided saw can be used to level the end faces of the specimens, the construction site laboratories where this test is widely used often do not have this tool. Only a single-sided saw is used to cut and level the end faces of the specimens twice, so it is difficult to ensure the parallelism of the two end faces of the specimens, and the leveling of the end faces is difficult, so the test accuracy cannot be well guaranteed. At the same time, the displacement sensor used in the test has an output of displacement, which must be divided by the distance between the two rigid rings (i.e., the gauge length) to convert the axial strain of the specimen, which increases the test error.
[0005] Therefore, a test method for the elastic modulus of inorganic binder-stabilized materials is needed to improve test efficiency and test accuracy and reduce the workload of test personnel. Summary of the invention
[0006] The purpose of the present invention is to provide a test method for the elastic modulus of inorganic binder stabilized materials to solve the problems existing in the above-mentioned prior art, thereby improving the experimental efficiency and the accuracy of the elastic modulus results.
[0007] To achieve the above object, the present invention provides the following solutions:
[0008] The present invention provides a method for testing the elastic modulus of inorganic binder stabilized materials, comprising the following steps:
[0009] S1: Preparation of standard specimens of inorganic binder stabilized materials;
[0010] S2: setting a plurality of test points along the circumferential direction on the side of the standard specimen, and pasting strain gauges on the test points;
[0011] S3: placing the standard specimen with the strain gauge attached on a loading platform, connecting the strain gauge to a data acquisition device, and loading the standard specimen;
[0012] S4: Obtain the strain data of the strain gauge and perform calculation processing to obtain the elastic modulus of the standard specimen.
[0013] Preferably, in the step S1, the standard specimen is prepared on a horizontal test platform, and before the step S1, the following steps are further included:
[0014] S101: Leveling the horizontal test platform, wherein the horizontal test platform comprises a load-bearing plate and a plurality of supporting feet, wherein the plurality of supporting feet are used to support the load-bearing plate; wherein any of the supporting feet comprises a first supporting nut, a first locking nut and a first connecting stud, wherein the first connecting stud is used to support the ground, the first supporting nut is arranged on the first connecting stud and fits the bottom surface of the load-bearing plate, the first locking nut is arranged on the first connecting stud and fits the top surface of the load-bearing plate, and the first supporting nut and the first locking nut are used to lock the load-bearing plate together, and the load-bearing plate is made level by adjusting the first supporting nut;
[0015] Wherein, leveling the horizontal test platform includes rough leveling and fine leveling. When performing rough leveling, a level ruler is placed on the bearing plate and close to the supporting feet, and the bubble of the level ruler is located in the center by adjusting the first supporting nut;
[0016] When fine leveling is performed, the level ruler is converted into a digital inclinometer, and the first support nut is repeatedly adjusted to make the digital inclinometer display 0.0°.
[0017] Preferably, after step S101 and before step S1, the method further includes the following steps:
[0018] S102: placing a cylindrical specimen of an inorganic binder-stabilized material on the horizontal test platform, arranging a specimen end surface leveling device on the horizontal test platform and sleeved on the surface of the cylindrical specimen, and then leveling the specimen end surface leveling device;
[0019] The specimen end surface leveling device comprises an upper rigid ring, a lower rigid ring and a plurality of second connecting studs, the bottoms of the second connecting studs are connected to the bearing plate, and the plurality of second connecting studs are distributed around the circumference of the cylindrical specimen; the upper rigid ring and the lower rigid ring are both provided with a plurality of first through holes in the height direction for the plurality of second connecting studs to pass through, and the bearing plate is provided with first threaded holes corresponding to the plurality of first through holes for connecting the second connecting studs, wherein the second connecting studs are also provided with a second supporting nut, a third supporting nut and a second locking nut, The second supporting nut is fitted on the bottom surface of the upper steel ring, the third supporting nut is fitted on the bottom surface of the lower steel ring, the second locking nut is fitted on the top surface of the lower steel ring, and together with the third supporting nut, the lower steel ring is locked, and the upper steel ring and the lower steel ring jointly fix the cylindrical specimen; and the lower steel ring and the upper steel ring are both provided with the plum blossom handle, and the upper steel ring and the lower steel ring are locked to the cylindrical specimen by locking the plum blossom handle, and the upper steel ring and the lower steel ring are respectively made to reach a horizontal level by adjusting the second supporting nut and the third supporting nut;
[0020] Wherein, leveling the upper steel ring and the lower steel ring includes rough leveling and fine leveling. When performing rough leveling, a level ruler is placed on the upper steel ring or the lower steel ring, and the bubble of the level ruler is located in the center by adjusting the second support nut or the third support nut;
[0021] When fine leveling is performed, the level ruler is converted into a digital inclinometer, and the second supporting nut or the third supporting nut is repeatedly adjusted to make the digital inclinometer display 0.0°.
[0022] Preferably, the step S1 comprises:
[0023] S11: The specimen end surface leveling device is locked on the surface of the cylindrical specimen, the top surface height of the upper rigid ring is greater than the top surface height of the cylindrical specimen, the inner wall of the upper rigid ring and the top surface of the cylindrical specimen form a material filling space, the repair material is filled in the material filling space, and a flattening process is performed to complete the leveling process of one end surface of the cylindrical specimen;
[0024] S12: Turn the top and bottom surfaces of the cylindrical specimen upside down, and repeat steps S102 and S11 to complete the leveling process of the other end surface of the cylindrical specimen. The preparation of the standard specimen is completed.
[0025] Preferably, step S2 includes pasting two identical strain gauges on each of the test points to verify each other, wherein three test points are evenly arranged along the circumferential direction on the side of the standard specimen, and the angle between any two of the test points and the center of the circle is 120°.
[0026] Preferably, after step S1 and before step S2, the method further includes the following steps:
[0027] S201: side treatment of the standard specimen, first grinding or filling the side of the standard specimen to make the side of the standard specimen flat, then removing the covering on the surface of the standard specimen by rough grinding to reveal the body of the cement-based material of the standard specimen, and then fine grinding the grinding area into a 30° to 45° diagonal pattern with the strain gauge pasting direction to increase the friction between the strain gauge and the surface of the standard specimen. After the fine grinding is completed, clean the dust on the surface of the grinding area, and then use a specimen cleaning agent to clean the side of the standard specimen;
[0028] S202: Test point orientation marking, marking test points evenly spaced on the side of the standard test piece;
[0029] S203: Testing of strain gauges before pasting.
[0030] Preferably, the S3 step includes
[0031] S311: placing the standard specimen on a press, with the bottom surface affixed to the base plane of the press, and the top surface affixed to the specimen loading plate, wherein the specimen loading plate is connected to the loading plate of the press via a third connecting stud;
[0032] S312: Connecting a pressure sensor to a loading plate of the press;
[0033] S313: Connecting a strain data acquisition instrument to connect the strain data acquisition instrument to the strain gauge;
[0034] S314: Connect to the control computer and connect the pressure sensor and the strain data acquisition instrument to the control computer by electrical signals;
[0035] S315: Perform loading processing.
[0036] Preferably, after step S314 and before step S315, the method further includes the step
[0037] S3151: Perform stability check on the strain gauge. In an unloaded state, read the deformation of the strain gauge on the side of the standard specimen over time within the 6-minute strain data acquisition time. When the deformation of the strain gauge on the side of the standard specimen over time is between 0 and 6με, it is judged to meet the standard. Otherwise, re-paste the strain gauge.
[0038] Preferably, the pressure sensor is electrically connected to the strain data collector, and they jointly use a frequency of 50 Hz to 100 Hz to perform synchronous collection of pressure data and strain data.
[0039] Preferably, the elastic modulus is calculated by the indirect calculation method of specimen breaking: the standard specimen is loaded to be completely broken, and the control computer collects and obtains the pressure variation curve of the pressure sensor and the strain variation curve of the 6 strain gauges to obtain the maximum pressure value F max , and calculated to get 0.3F max From the pressure-time curve, we can find that 0.3F max The time t corresponding to the pressure value 0.3 Then, we can find out the relationship between t and strain from the 6 strain-time curves. 0.3 The corresponding 6 strain data ε1~ε6, calculate the strain average value Then, the elastic modulus of the specimen is obtained according to Hooke's law:
[0040] Compared with the prior art, the present invention has achieved the following technical effects:
[0041] The present invention first prepares a standard test piece of an inorganic binder-stabilized material, sets a plurality of test points along a circumferential direction on the side of the standard test piece, and pastes strain gauges on the test points. The standard test piece with the strain gauges pasted thereon is arranged on a loading table, and the strain gauges are connected to a data acquisition device to load the standard test piece. Finally, strain data of the strain gauges are obtained and calculated to obtain the elastic modulus of the standard test piece. The strain gauges are directly pasted on the side of the standard test piece, and the strain values are measured by the strain gauges, so that data acquisition is more accurate. Moreover, since the side surface is directly detected, the requirements for the flatness of the end face are relatively reduced, which greatly improves the test efficiency and reduces the work intensity of the staff. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0043] Figure 1 This is a front view of a circular standard specimen in a test in an embodiment of the present invention;
[0044] Figure 2 This is a front view of a horizontal test platform in an embodiment of the present invention;
[0045] Figure 3 is a front view of a load-bearing plate of a horizontal test platform in an embodiment of the present invention;
[0046] Figure 4 yes Figure 3 A top view of
[0047] Figure 5 is a schematic diagram of a supporting foot in an embodiment of the present invention;
[0048] Figure 6 is a front view of a standard test piece installed on a test piece end surface leveling device in an embodiment of the present invention;
[0049] Figure 7 1 is a diagram of a rigid ring device on a test piece end surface leveling device in an embodiment of the present invention;
[0050] Figure 8 1 is a diagram of a lower rigid ring device of a test piece end surface leveling device in an embodiment of the present invention;
[0051] Fig. 9 Schematic diagram of a plum blossom handle in an embodiment of the present invention;
[0052] Fig.10 is a schematic diagram of rough grinding of the surface of a standard test piece in an embodiment of the present invention;
[0053] Fig.11 Schematic diagram of surface fine grinding of a standard specimen in an embodiment of the present invention;
[0054] Fig.12 It is composed of the test piece surface marking positioning line and the strain gauge parts in the embodiment of the present invention;
[0055] Fig.13 Schematic diagram of two strain gauges pasted at the same measuring point in an embodiment of the present invention;
[0056] Fig.14 is a schematic diagram of a loading device with a strain gauge attached and placed on a testing machine according to an embodiment of the present invention;
[0057] Fig.15 yes Fig.14 Expanded diagram along the perimeter;
[0058] Fig.16 This is a functional schematic diagram of the pressure sensor data cable lead wire in an embodiment of the present invention;
[0059] Fig.17 is a functional schematic diagram of a strain gauge data cable lead in an embodiment of the present invention;
[0060] Fig.18 is a schematic diagram of a loading plate on a specimen with a third connecting stud installed in an embodiment of the present invention;
[0061] Fig.19 is a schematic diagram of a loading plate on a test piece in an embodiment of the present invention;
[0062] Fig. 20 is a schematic diagram of a third connecting stud in an embodiment of the present invention;
[0063] Fig.21 Schematic diagram of a data acquisition and control system in an embodiment of the present invention.
[0064] In the figure: 1-standard specimen, 2-bearing plate, 3-support foot, 4-support foot mounting hole, 5-first threaded hole, 6-standard specimen Φ150mm installation positioning line, 7-first locking nut, 8-first connecting stud, 9-first supporting nut, 10-anti-slip foot pad, 11-upper steel ring, 12-second supporting nut, 14-second connecting stud, 15-second locking nut, 16-lower steel ring, 17-third supporting nut, 18-third locking nut, 19-plum handle mounting threaded hole, 20-first through hole, 21-plum handle, 22-specimen surface mark Note the positioning line, 23-strain gauge base, 24-strain gauge positioning mark, 25-strain gauge wire grid, 26-strain gauge lead, 27-test piece surface measurement point, 28-measurement point strain gauge 1, 29-measurement point strain gauge 2, 30-press loading plate, 31-pressure sensor, 32-third connecting stud, 33-test piece loading plate, 34-standard test piece with strain gauge attached, 35-strain test point 1, 36-strain test point 3, 37-strain test point 2, 38-third strain gauge, 39-fourth strain gauge, 40-press base, 41-pressure sensor GX-16 Plug, 42-pressure sensor 5-core shielded signal data cable, 43-first strain gauge, 44-second strain gauge, 45-fifth strain gauge, 46-sixth strain gauge, 47-GX-16 plug of the first strain gauge, 48-GX-16 plug of the second strain gauge, 49-GX-16 plug of the third strain gauge, 50-GX-16 plug of the fourth strain gauge, 51-GX-16 plug of the fifth strain gauge, 52-GX-16 plug of the sixth strain gauge, 53-strain gauge 5-core shielded signal data cable, 54-shielded cable shielding layer, 55-pressure sensor Data line power supply of the pressure sensor is positive, 56-data line power supply of the pressure sensor is negative, 57-data line signal of the pressure sensor is positive, 58-data line signal of the pressure sensor is negative, 59-data line shielding line of the pressure sensor, 60-strain gauge data line power supply is positive, 61-strain gauge data line power supply is negative, 62-strain gauge data line shielding line, 63-strain gauge data line signal is positive, 64-strain gauge data line 1 / 4 bridge, 65-16-port strain data acquisition instrument, 66-network connection port of the strain data acquisition instrument, 67-network switch, 68-pressure testing machine network interface, 69-control computer. DETAILED DESCRIPTION
[0065] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0066] The purpose of the present invention is to provide a test method for the elastic modulus of inorganic binder stabilized materials to solve the problems existing in the prior art, improve the experimental efficiency and the accuracy of the elastic modulus results.
[0067] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0068] like Figure 1-Figure 21 As shown, the present invention provides a method for testing the elastic modulus of inorganic binder stabilized materials, comprising the following steps
[0069] S1: Preparation of standard specimens of inorganic binder stabilized materials 1;
[0070] S2: Set multiple test points along the circumferential direction on the side of the standard specimen 1, and paste strain gauges on the test points;
[0071] S3: placing the standard specimen 1 with the strain gauge on the loading platform, connecting the strain gauge to the data acquisition device, and loading the standard specimen 1;
[0072] S4: Obtain the strain data of the strain gauge and perform calculation processing to obtain the elastic modulus of the standard specimen 1. The strain gauge is pasted on the side surface of the standard specimen 1 to directly measure the strain value, making the data acquisition more accurate. In addition, since the side surface is directly tested, the requirements for the flatness of the end surface of the specimen are relatively reduced, which greatly improves the test efficiency and reduces the workload of the staff.
[0073] In this embodiment, in step S1, a standard specimen 1 is prepared on a horizontal test platform, and before step S1, the following steps are also included:
[0074] S101: Leveling the horizontal test platform, the horizontal test platform includes a plurality of supporting feet 3 and a bearing plate 2, the plurality of supporting feet 3 are used to support the bearing plate 2; wherein any supporting foot 3 includes a first supporting nut 9, a first locking nut 7 and a first connecting stud 8, the first connecting stud 8 is used to support on the ground, the first supporting nut 9 is arranged on the first connecting stud 8 and fits the bottom surface of the bearing plate 2, the first locking nut 7 is arranged on the first connecting stud 8 and fits the top surface of the bearing plate 2, and locks the bearing plate 2 together with the first supporting nut 9, and the bearing plate 2 is made horizontal by adjusting the first supporting nut 9;
[0075] The leveling test platform includes rough leveling and fine leveling. When performing rough leveling, place the level ruler on the load-bearing plate 2 and close to the supporting foot 3, and ensure that the bubble of the level ruler is located in the center by adjusting the first supporting nut 9;
[0076] When fine leveling is performed, the level ruler is converted into a digital inclinometer, and the first support nut 9 is repeatedly adjusted to ensure that the digital inclinometer displays 0.0°.
[0077] Specifically, three supporting feet 3 are provided and each of them is provided with a non-slip foot pad 10, the bearing plate 2 is a circular rigid bearing plate 2 (300 mm in diameter and 40 mm in height), the first locking nuts 7 of the three supporting feet 3 are removed, the first supporting nuts 9 of the three supporting feet 3 are kept relatively consistent at the positions of the first connecting studs 8 of the supporting feet 3, and then the three supporting feet 3 are preliminarily connected to the bearing plate 2 through the supporting foot mounting holes 4 of the bearing plate 2. Three level rulers are respectively placed near the supporting foot mounting holes 4 on the surface of the bearing plate 2 and arranged in a triangle, the first supporting nuts 9 on the three supporting feet 3 are adjusted, and the direction of the bubble deviation in the three level rulers is observed by naked eyes. If the bubble in the level ruler is biased toward a certain supporting foot 3, it means that the bearing plate 2 at the position of the supporting foot 3 is higher than that at other positions, and the first supporting nut 9 needs to be turned clockwise to reduce the height of that side. The first supporting nuts 9 of the three supporting feet 3 are adjusted in cooperation with each other until the bubbles in the three level rulers are all centered, thereby completing the horizontal adjustment of the circular rigid bearing plate 2. This process is called coarse adjustment.
[0078] Similarly, replace the level ruler in the rough adjustment process with a digital inclinometer, repeat the leveling method of the rough adjustment process, and when the three digital inclinometers all display 0.0°, the horizontal leveling of the circular rigid bearing plate 2 is completed. This process is called fine adjustment. Then install the first locking nut 7, and lock the three supporting feet with the circular rigid bearing plate 2 through the first locking nut 7. At this point, the leveling work of the horizontal test platform is completed.
[0079] In this embodiment, after step S101 and before step S1, the following steps are further included:
[0080] S102: placing a cylindrical specimen of an inorganic binder-stabilized material on a horizontal test platform, installing a specimen end surface leveling device on the horizontal test platform and sleeved on the surface of the cylindrical specimen, and then leveling the specimen end surface leveling device;
[0081] The specimen end surface leveling device includes an upper steel ring 11 and a lower steel ring 16, wherein the upper steel ring 11 and the lower steel ring 16 are both provided with a plurality of first through holes 20 for passing through the plurality of first connecting studs 8 in the height direction, and the bearing plate is provided with a first threaded hole 5 corresponding to the plurality of first through holes 20 for passing through the second connecting studs 14, wherein the through holes on the upper steel ring 11 are all used in conjunction with a second supporting nut 12, and the through holes on the lower steel ring 16 are all used in conjunction with a third supporting nut 17 and a second locking nut 15, and the second supporting nut 12 is provided on the first connecting stud 8 and fits the upper steel ring 11 The bottom surface, the third support nut 17 is arranged on the first connection stud 8 and fits the bottom surface of the lower steel ring 16, the second locking nut 15 is arranged on the first connection stud 8 and fits the top surface of the lower steel ring 16, and the lower steel ring 16 is locked together with the third support nut 17, the upper steel ring 11 and the lower steel ring 16 fix the cylindrical specimen together, and the lower steel ring 16 and the upper steel ring 11 are both provided with plum blossom handles, the upper steel ring 11 and the lower steel ring 16 are locked to the cylindrical specimen by locking the plum blossom handle 21, and the upper steel ring 11 and the lower steel ring 16 are respectively made to reach a level by the second support nut 12 and the third support nut 17;
[0082] Among them, leveling the upper steel ring 11 and the lower steel ring 16 includes rough leveling and fine leveling. When performing rough leveling, place the level ruler on the upper steel ring 11 or the lower steel ring 16, and ensure that the bubble of the level ruler is located in the center by adjusting the second support nut 12 or the third support nut 17;
[0083] When fine leveling is performed, the level ruler is converted into a digital inclinometer, and the second support nut 12 or the third support nut 17 is repeatedly adjusted to ensure that the digital inclinometer displays 0.0°.
[0084] Specifically, the non-standard specimen 1 is placed within the Φ150mm installation positioning line 6 of the standard specimen on the horizontal test platform, and a cylindrical solid rubber pad with a diameter of 1 cm and a height of 1 cm is placed at the center of the circular rigid supporting plate 2, and the non-standard specimen 1 is placed at the center of the circular rigid supporting plate 2 along the installation positioning line.
[0085] Three second connecting studs 14 are installed at the first threaded holes 5 corresponding to the horizontal test platform after leveling, and then the third locking nut 18, the third positioning nut, the lower steel ring 16, the second locking nut 15, three second positioning nuts with a thickness of 1 cm each, the upper steel ring 11 with a thickness of 2 cm and the plum blossom handle are installed in sequence from bottom to top on the three second connecting studs 14.
[0086] The second connection stud 14 is locked on the circular rigid bearing plate 2 by the third locking nut 18. The lower rigid ring 16 is leveled by adjusting the third positioning nut and according to the leveling method of the horizontal test platform, and then the lower rigid ring 16 is locked on the second connection stud 14 by the second locking nut 15. The lower rigid ring 16 is about 7 cm away from the surface of the circular rigid bearing plate 2, and then the threaded hole 19 is installed through the plum blossom handle on the lower rigid ring 16, and the lower rigid ring 16 is fixed to the surface of the non-standard specimen 1 by the plum blossom handle 21. Similarly, three second support nuts 12 with a thickness of 1 cm are screwed into the three second connection studs 14, and the top surface of the second support nut 12 is about 2.5 cm away from the top of the standard specimen 1. The upper rigid ring 11 with a thickness of 2 cm is placed on the first support nut 9 along the three second connection studs 14 through the first through hole 20. Following the leveling principle of the horizontal test platform, the horizontal leveling of the upper rigid ring 11 is completed. Here, the top surface of the upper steel ring 11 should be slightly higher than the top surface of the standard specimen 1 by 0.5 cm. Then, the upper steel ring 11 is fixed to the surface of the non-standard specimen 1 by the plum blossom handle 21 through the plum blossom handle installation threaded hole 19 on the upper steel ring 11. Then, the cylindrical solid rubber pad at the bottom of the non-standard specimen 1 is taken out.
[0087] The inner wall of the upper rigid ring 11 and the inner wall of the lower rigid ring 16 are fitted with a clearance of 0 to the outer side of the standard test piece 1 , that is, they are in close contact with the outer side of the standard test piece 1 .
[0088] In this embodiment, step S1 includes:
[0089] S11: The specimen end surface leveling device is locked on the surface of the cylindrical specimen, the top surface height of the upper rigid ring 11 is greater than the top surface height of the cylindrical specimen, the inner wall of the upper rigid ring 11 and the top surface of the cylindrical specimen form a material filling space, the repair material is filled in the material filling space, and the grinding process is performed to complete the leveling process of one end surface of the cylindrical specimen;
[0090] S12: Turn the top and bottom surfaces of the cylindrical specimen upside down, and repeat steps S102 and S11 to complete the leveling process of the other end surface of the cylindrical specimen. The preparation of the standard specimen 1 is completed.
[0091] Specifically, the leveling process of the specimen end surface is as follows:
[0092] A cement pavement repair material with certain fluidity, quick drying, ultra-high strength and strong adhesion is used to fill the space with a height of about 0.5 cm between the upper steel ring 11 and the standard specimen 1. The upper steel ring 11 is used as the support surface, and a solid round rod with a diameter of 1 cm and a length of 20 cm is repeatedly rolled along the surface of the upper steel ring 11 to remove excess filling material. After 90 minutes, the filling material can be dried and formed, and then an angle grinder equipped with a circular sandpaper with a diameter of 150 mm is used to grind the molded surface of the specimen, thereby completing the leveling of one end face of the non-standard specimen 1.
[0093] Then, the plum blossom handles 21 on the upper steel ring 11 and the lower steel ring 16 are loosened, and the non-standard test piece 1 with one end surface leveled is taken out, and the other end surface is leveled according to steps S102 and S11. Thus, the process of trimming the non-standard test piece to become the standard test piece 1 ends.
[0094] It should be noted that the test piece in the test process must be a standard test piece 1. The standard test piece 1 here refers to a test piece with a diameter D×height H of 150mm×150mm, and the parallelism of the two end faces must be less than 1°. The standard test piece 1 can be cut with a double-sided saw or obtained by using the horizontal test platform in this embodiment with an end face leveling device.
[0095] In this embodiment, step S2 includes pasting two identical strain gauges on each test point to verify each other. Three test points are evenly arranged along the side of the standard specimen 1 in the circumferential direction. The angle between any two test points and the center of the circle is 120°, and the wire grid length of the strain gauge should be greater than 30 mm.
[0096] In this embodiment, after step S1 and before step S2, the following steps are further included:
[0097] S201: Side treatment of standard specimen 1: first grind or fill the side of standard specimen 1 to make it flat, then remove the covering on the surface of standard specimen 1 by rough grinding to reveal the cement-based material of standard specimen 1, and then grind the grinding area into a 30° to 45° diagonal pattern with the strain gauge pasting direction by fine grinding to increase the friction between the strain gauge and the surface of standard specimen 1. After fine grinding, clean the dust on the surface of the grinding area, and then use the specimen cleaning agent to clean the side of standard specimen 1;
[0098] S202: Test point orientation marking, marking test points evenly spaced on the side of the standard test piece 1;
[0099] S203: Testing of strain gauges before pasting.
[0100] Specifically, the side treatment of S201 standard specimen 1 is as follows:
[0101] The processing of the adhesive surface of the strain gauge of the indoor molded specimen should be carried out according to the following process:
[0102] If there is a defect on the circumferential surface of standard specimen 1, use epoxy resin AB glue + high-strength cement (mass ratio is 1:0.5), add a small amount of 0.15-0.3mm fine sand, mix and apply it to the defect, and then scrape it flat with a scraper.
[0103] If there are protrusions on the circumferential surface of the standard specimen 1, the protrusions shall be ground.
[0104] After the circumferential surface of standard specimen 1 is roughly smooth, rough grinding and removal of the circumferential surface covering is performed:
[0105] Use a high speed (18000r / min) adjustable speed electric grinder + 60 mesh sandpaper ring (coarser) Fig.10 Grinding the area on the specimen surface where the strain gauge is attached in a single direction is referred to as rough grinding. The area of the grinding area should generally be about 3 to 5 times larger than the area of the strain gauge.
[0106] Use a low speed (8000r / min) adjustable speed electric grinder + 240 mesh sandpaper ring (fine) Fig.11 The grinding area is ground into fine diagonal lines at an angle of 45° to the strain gauge pasting direction (or measurement direction) to increase the friction between the strain gauge and the specimen surface, which is referred to as fine grinding.
[0107] After grinding, use a hair dryer or brush to clean the grinding area until there is no obvious dust on the surface. Then use an absorbent cotton ball dipped in anhydrous industrial ethanol or acetone and other solvents to wipe the surface of the grinding area until there is no obvious oil stain or blackening on the cotton ball. At this time, be careful not to touch the cleaned surface with your hands, and wipe in a single direction along the measuring point.
[0108] After cleaning the polished area, wait until the surface is dry before attaching the strain gauge.
[0109] The processing of the adhesive surface of the strain gauge of the on-site drilled specimen is as follows:
[0110] The standard test piece 1 is obtained by cutting with a double-sided saw or by using a horizontal test platform with an end surface leveling device in this embodiment. Then, the test piece with the end surface leveled is cleaned by a process similar to the surface cleaning and washing of the indoor molded test piece.
[0111] S202 and S203: Test point orientation marking, marking test points evenly spaced on the side of standard specimen 1 and the test operation before the strain gauge is attached is as follows:
[0112] Use a scriber, stylus or 2H pencil to mark the position on the surface of the specimen where the strain needs to be measured along the direction of the strain, that is, mark the positioning line.
[0113] Perform an appearance inspection and strain gauge resistance test on each strain gauge to be pasted. There should be no damage or breakage in any part of the strain gauge, and there should be no bubbles, mildew or obvious damage inside the gauge. Use a multimeter to test whether the resistance of the strain gauge to be pasted meets the technical requirement of 120±0.5Ω.
[0114] Confirm the front and back sides of the strain gauge, and apply a thin layer of 502 glue or AB glue on the adhesive surface of the strain gauge. Pinch the strain gauge lead wire 26 and gently shake off the excess glue to ensure that the glue on the adhesive surface of the strain gauge is even.
[0115] according to Fig.12 As shown, align the orientation line of the strain gauge with the positioning line drawn on the specimen in advance, and then cover the strain gauge with a layer of Teflon film. Hold the lead wire of the strain gauge with one hand, and use the fingers of the other hand to repeatedly and gently roll the surface of the Teflon film. When rolling the strain gauge, remember not to apply vertical force, and not to slide or rotate. After the glue and bubbles are completely squeezed out, keep your fingers still for about 1 minute to wait for the initial drying of the strain gauge.
[0116] After the strain gauge is dry, gently pull the strain gauge lead wire 26 to observe whether the strain gauge is loose, but be careful not to use too much force during the test to avoid the lead wire being broken. Use transparent tape or positioning stickers to fix the strain gauge lead wire.
[0117] Use a multimeter to measure whether the strain gauge has open circuit or short circuit, and the resistance of the strain gauge after pasting should meet the technical requirement of 120±0.5Ω.
[0118] according to Fig.13 As shown, two strain gauges of the same type and wire grid length should be pasted at the same measuring point. The two strain gauges are pasted adjacent to each other, but the boundary between the two strain gauges cannot be pasted together. Based on this, the pasting of the first strain gauge 43 and the second strain gauge 44 of the strain test point 1 35, the third strain gauge 38 and the fourth strain gauge 39 of the strain test point 2 37, and the fifth strain gauge 45 and the sixth strain gauge 46 of the strain test point 36, a total of 6 strain gauges, are completed in sequence.
[0119] In this embodiment, step S3 includes:
[0120] S311: The standard specimen 1 is placed on the press, with the bottom surface affixed to the base plane of the press, and the top surface affixed to the specimen loading plate 33, and the specimen loading plate is connected to the loading plate 30 of the press via the second connecting studs 14;
[0121] S312: Connect the pressure sensor 31 and connect the pressure sensor 31 to the loading plate 30 of the press;
[0122] S313: Connecting a strain data acquisition instrument to connect the strain data acquisition instrument to the strain gauge;
[0123] S314: Connect to the control computer 69, connect the pressure sensor 31 and the strain data acquisition instrument to the control computer 69, and the pressure sensor and the strain data acquisition instrument are electrically connected, and the frequency of 50Hz to 100Hz is preferably 50Hz, to synchronously collect pressure data and strain data. ;
[0124] S315: Perform loading processing.
[0125] After step S314 and before step S315, the following steps are included:
[0126] S3151: Check the stability of the strain gauge. In the unloaded state, read the value change of the strain gauge on the side of the standard specimen 1 over time during the 6-minute strain data acquisition time. When the value change of the strain gauge on the side of the standard specimen 1 over time is between 0 and 6με, it is judged to meet the standard. Otherwise, re-paste the strain gauge that does not meet the standard.
[0127] Specifically, the electrical connection between the pressure sensor and the strain data acquisition system is as follows:
[0128] The standard specimen 1 which has been leveled and pasted with strain gauges is moved to the base of the press and centered, and then the specimen loading plate 33, the third connecting stud 32 and the pressure sensor 31 are installed in sequence on the upper end surface of the standard specimen 1.
[0129] The pressure sensor GX16 aviation plug 41 (female end) is further inserted into the GX16 aviation plug male end channel Ch7 (male end) socket of the strain data acquisition instrument, that is, the pressure sensor 31 is connected to the strain data acquisition instrument in a full-bridge manner through the pressure sensor GX-16 plug 41. The cable cores of the pressure sensor 5-core shielded signal data cable 42 are the pressure sensor data line power positive 55, the pressure sensor data line power negative 56, the pressure sensor data line signal positive 57, the pressure sensor data line signal negative 58 and the pressure sensor data line shielding line 59.
[0130] Further, an electric soldering iron is used to directly weld and connect the six strain gauge leads 26 with the corresponding strain gauge 5-core shielded signal data cable 53. It is not appropriate to use connectors to connect the two, that is, a single strain gauge is electrically connected to the strain data acquisition instrument through the strain gauge 5-core shielded signal data cable 53 in a 1 / 4 bridge manner. The cable cores of the 5-core shielded signal data cable are, in sequence, the positive power supply 60 of the strain gauge data line, the negative power supply 61 of the strain gauge data line, the shielding wire 62 of the strain gauge data line, the positive signal 63 of the strain gauge data line and the signal end of the 1 / 4 bridge 64 of the strain gauge data line. Insert the GX-16 plug 47 of the first strain gauge of strain test point one 35, and then insert the GX-16 plug 48 of the second strain gauge of strain test point one 35, the GX-16 plug 49 of the third strain gauge of strain test point two 37, the GX-16 plug 50 of the fourth strain gauge of strain test point two 37, the GX-16 plug 51 of the fifth strain gauge of strain test point three 36 and the GX-16 plug 52 of the sixth strain gauge of strain test point three 36 into the GX16 aviation plug male end channel Ch1~Ch6 sockets of the strain data acquisition instrument.
[0131] Then, the network connection port 66 of the strain data acquisition instrument, the network interface of the press machine and the control computer 69 are connected to form a network through the network switch 67 .
[0132] In addition, the sensor sensitivity needs to be calculated
[0133] A sensor is a measuring device that can convert a measured non-electric quantity into a corresponding electric quantity or electrical parameter output that is easy to accurately process according to a certain rule. A pressure sensor is a detection device that converts strain changes into pressure. Its main technical parameters are sensitivity (unit: mV / V), range (unit: kN) and required excitation power supply voltage (unit: v). In the actual test process, the tester needs to clearly know the loaded pressure data, which requires the strain data acquisition instrument to convert the pressure sensor's sensitivity in mV / V to the acquisition instrument's sensitivity in mV / kN. For example: a pressure sensor with a sensitivity of 1.8mV / V, a range of 490kN, and an excitation power supply voltage of 5v is converted to the sensitivity of the strain data acquisition instrument according to formula (1), and the bridge voltage of the acquisition instrument bridge is 5v. 0.0184mV / kN means that when the pressure sensor has a pressure change of 1kN, the strain data acquisition voltage signal changes by 0.0184v.
[0134] 1.8×5 / 490(mV / kN)=0.0184 mV / kN Formula (1)
[0135] The stability of the strain gauge also needs to be verified:
[0136] When the specimen is not loaded, the signal of the strain gauge pasted on the specimen is collected. Within the sampling time of 6 minutes, when the specimen pasted with the strain gauge is not loaded, the strain fluctuation range should be controlled between 0 and 6με. Strain gauges with poor stability should be removed and re-attached.
[0137] The S315 test is loaded as follows:
[0138] Lower the loading head on the press so that it is in slight contact with the pressure sensor. Then confirm the reliability of the connection of each component again.
[0139] Further, the control computer 69 sends a loading instruction to the press, and the pressure testing machine loads at a speed of 1mm / min. During the loading process, the control computer 69 synchronously collects the pressure pi of the pressure sensor and the strain εi data of the 6 strain gauges through the port strain data acquisition instrument, thereby forming a time-continuous curve composed of time, pressure data and 6 strain data. The test stops until the standard specimen 1 is damaged. The load at this time is marked as the damage load.
[0140] In this embodiment, the elastic modulus is calculated by the indirect calculation method of specimen breaking: the standard specimen is loaded to completely break, and the control computer collects and obtains the pressure change curve of the pressure sensor over time, and the strain change curve of 6 strain gauges over time, a total of 7 curves, and the maximum pressure value F is obtained. max , and calculated to get 0.3F max , and from the pressure-time curve, it can be found that 0.3F max The time t0.3 corresponding to the pressure value can be obtained from the six strain-time curves. 0.3 The corresponding 6 strain data ε1~ε6, calculate the strain average value Then, the elastic modulus of the specimen is obtained according to Hooke's law:
[0141] Specifically, the experimental data is calculated as follows:
[0142] The indirect calculation method of specimen failure is adopted. The indirect calculation method of specimen failure means that the standard specimen is loaded until it is completely broken, and the control system collects and obtains the pressure change curve of the pressure sensor and the strain change curve of 6 strain gauges, a total of 7 curves.
[0143] From the pressure-time curve, the maximum pressure value F is obtained max , and calculated to get 0.3F max , and the curve is used to find 0.3F max The time t corresponding to the pressure value 0.3 , and then from the six strain-time curves, we can find out the relationship between t 0.3The corresponding 6 strain data ε1~ε6 are used to calculate the average strain of the 6 strain gauges according to formula (2). According to Hooke's law, the elastic modulus of the specimen is obtained as formula (3).
[0144]
[0145]
[0146] Where, ε1, ε2, ε3, ε4, ε5 and ε6 are the strains of the six strain gauges, με;
[0147] --The average value of the strain of 6 strain gauges, με;
[0148] F max --Maximum failure load, N;
[0149] D--diameter of the specimen, mm;
[0150] E--Elastic modulus of specimen, MPa.
[0151] It should also be noted that the elastic modulus test method of the inorganic binder stabilized material of this embodiment can also test the elastic modulus of the rigid base of cement concrete.
[0152] In order to compare and analyze the mechanical properties of rigid base asphalt pavement and semi-rigid base asphalt pavement or to design the pavement structure, it is a prerequisite to determine the elastic modulus of the semi-rigid base and cement concrete rigid base. Since both are composed of cement-based materials, the test method for determining the elastic modulus of the two should be the same. Comparative analysis of T0557-2005 of the "Testing Procedures for Cement and Cement Concrete in Highway Engineering" (JTG 3420-2021) and Appendix E of the "Highway Asphalt Pavement Design Code" (JTG D50-2017) shows that there are differences in the loading modes of the two tests. The elastic modulus test of cylindrical cement concrete adopts an intermittent loading mode, while the elastic modulus test of inorganic binder stabilized materials (intermediate section method) adopts a continuous uniform loading mode. It can be seen that the elastic modulus obtained by loading the same specimen by the two methods must be different. However, in China, the 17th edition of the specification is a legal document for asphalt pavement design. Therefore, the elastic modulus of cement concrete and inorganic binder stabilized materials should be determined according to its Appendix E. However, since the strength and stiffness of cement concrete are much greater than those of inorganic binder stabilized materials, in the actual test process, if the cement concrete is subjected to continuous loading test according to Appendix E of the 17th edition of the specification until it is destroyed, the required loading force is also much greater than that of inorganic binder stabilized materials. In addition, due to the high strength of cement concrete, when the test load is applied to its destruction, there is usually a phenomenon of particle splashing, which is extremely easy to cause damage to front-end data acquisition equipment such as displacement sensors. Therefore, when the elastic modulus test of cement concrete specimens is conducted according to the 17th edition of the specification, the test method in the specification needs to be improved. The device in this embodiment is also applicable to the elastic modulus of cement concrete rigid base, and the specific process is as follows:
[0153] The direct calculation method of specimen breaking is adopted. The direct calculation method of specimen breaking means that a batch of specimens are divided into two groups, each with 3 specimens. One group of specimens without strain gauges is loaded until they are completely broken, and the average value of the maximum pressure on the three specimens is calculated. Determine the 0.3 Pressure value.
[0154] For another group of specimens with strain gauges attached, the The pressure value is the limit value. A loading test is carried out on a single specimen. Finally, the single specimen and 0.3 The maximum compressive strain corresponding to the pressure value is obtained by equation (4), and the elastic modulus of the single specimen is obtained by equation (5). Then, the average value of the final elastic modulus of the batch of specimens is obtained by equation (6).
[0155]
[0156]
[0157]
[0158] Where, εij is the strain of the jth strain gauge in the i-th specimen, με;
[0159] --The average strain of the i-th specimen, με;
[0160] --average value of maximum failure load of a group of specimens, N;
[0161] D--diameter of the specimen, mm;
[0162] E i —Elastic modulus of the i-th specimen, MPa;
[0163] —Average value of elastic modulus of 3 specimens, MPa.
[0164] The inorganic binder stabilized material elastic modulus test system based on the direct strain method of this embodiment realizes the automatic collection, automatic storage and automatic calculation of test data during the test process, avoiding the complicated fixture installation and debugging of Appendix E of the 17th edition of the specification, and the verification of the strain gauge pasting process and the stability of the strain gauge on the surface of the cylindrical inorganic binder stabilized material specimen ensures the reliability of the strain gauge pasting, thereby ensuring the accuracy of the test. At the same time, the unification of the elastic modulus test of the cement concrete specimen and the inorganic binder stabilized material specimen is achieved, avoiding the possibility of particle splashing and damaging the sensor when the elastic modulus test of the cement concrete specimen is carried out using Appendix E of the 17th edition of the specification (indirect calculation method of specimen breaking). The inorganic binder stabilized material elastic modulus test method based on the direct strain method can greatly improve the test efficiency and test accuracy, and reduce the work intensity of the test personnel.
[0165] The present invention uses specific examples to illustrate the principles and implementation methods of the present invention. The above examples are only used to help understand the method and core ideas of the present invention. At the same time, for those skilled in the art, according to the ideas of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.
Claims
1. A test method for the elastic modulus of inorganic binder stabilized materials, characterized by: The following steps are included S1: Preparation of standard specimens of inorganic binder-stabilized materials; S2: setting a plurality of test points along the circumferential direction on the side of the standard specimen, and attaching strain gauges to the test points; S3: placing the standard specimen with the strain gauge attached on a loading platform, connecting the strain gauge to a data acquisition device, and loading the standard specimen; S4: Obtaining the strain data of the strain gauge and performing calculation processing to obtain the elastic modulus of the standard specimen.
2. The method for testing the elastic modulus of inorganic binder-stabilized materials according to claim 1, wherein: In the step S1, the standard specimen is prepared on a horizontal test platform, and before the step S1, the following steps are also included: S101: Leveling the horizontal test platform, wherein the horizontal test platform includes a load-bearing plate and a plurality of supporting feet, wherein the plurality of supporting feet are used to support the load-bearing plate; wherein any one of the supporting feet includes a first supporting nut, a first locking nut, and a first connecting stud, wherein the first connecting stud is used to support the ground, the first supporting nut is disposed on the first connecting stud and abuts against the bottom surface of the load-bearing plate, the first locking nut is disposed on the first connecting stud and abuts against the top surface of the load-bearing plate, and together with the first supporting nut, locks the load-bearing plate, and the load-bearing plate is leveled by adjusting the first supporting nut; Leveling the horizontal test platform includes rough leveling and fine leveling. When performing rough leveling, a spirit level is placed on the bearing plate close to the supporting feet, and the first supporting nut is adjusted so that the bubble of the spirit level is located in the center. When fine leveling is performed, the level ruler is converted into a digital inclinometer, and the first supporting nut is repeatedly adjusted to make the digital inclinometer display 0.0°.
3. The method for testing the elastic modulus of inorganic binder-stabilized materials according to claim 2, wherein: After step S101 and before step S1, the method further includes the following steps: S102: placing a cylindrical specimen of an inorganic binder-stabilized material on the horizontal test platform, setting a specimen end surface leveling device on the horizontal test platform and sleeved on the surface of the cylindrical specimen, and then leveling the specimen end surface leveling device; The specimen end surface leveling device includes an upper rigid ring, a lower rigid ring and a plurality of second connecting studs, the bottoms of the second connecting studs are connected to the supporting plate, and the plurality of second connecting studs are distributed around the circumference of the cylindrical specimen; the upper rigid ring and the lower rigid ring are both provided with a plurality of first through holes in the height direction for the plurality of second connecting studs to pass through, and the supporting plate is provided with first threaded holes corresponding to the plurality of first through holes for connecting the second connecting studs, wherein the second connecting studs are also provided with a second supporting nut, a third supporting nut and a second locking nut. The second supporting nut is fitted on the bottom surface of the upper steel ring, the third supporting nut is fitted on the bottom surface of the lower steel ring, the second locking nut is fitted on the top surface of the lower steel ring, and together with the third supporting nut, the lower steel ring is locked. The upper steel ring and the lower steel ring jointly fix the cylindrical specimen; and the lower steel ring and the upper steel ring are both provided with the plum blossom handle, and the upper steel ring and the lower steel ring are locked to the cylindrical specimen by locking the plum blossom handle. The upper steel ring and the lower steel ring are respectively made horizontal by adjusting the second supporting nut and the third supporting nut; Wherein, leveling the upper steel ring and the lower steel ring includes rough leveling and fine leveling. When performing rough leveling, a spirit level is placed on the upper steel ring or the lower steel ring, and the second support nut or the third support nut is adjusted so that the bubble of the spirit level is located in the center; When fine leveling is performed, the level ruler is converted into a digital inclinometer, and the second supporting nut or the third supporting nut is repeatedly adjusted to make the digital inclinometer display 0.0°.
4. The method for testing the elastic modulus of inorganic binder-stabilized materials according to claim 3, wherein: The step S1 comprises: S11: The specimen end surface leveling device is locked on the surface of the cylindrical specimen. The top surface height of the upper rigid ring is greater than the top surface height of the cylindrical specimen. The inner wall of the upper rigid ring and the top surface of the cylindrical specimen form a material filling space. The repair material is filled in the material filling space and then polished to complete the leveling of one end surface of the cylindrical specimen. S12: Turn the top and bottom surfaces of the cylindrical specimen upside down, and repeat steps S102 and S11 to complete the leveling process of the other end surface of the cylindrical specimen. The preparation of the standard specimen is completed.
5. The method for testing the elastic modulus of inorganic binder-stabilized materials according to claim 1, wherein: The step S2 includes pasting two identical strain gauges on each of the test points to verify each other, wherein three test points are evenly arranged along the circumferential direction on the side of the standard specimen, and the angle between any two of the test points and the center of the circle is 120°.
6. The method for testing the elastic modulus of inorganic binder-stabilized materials according to claim 1, wherein: After step S1 and before step S2, the method further includes the following steps: S201: Side treatment of the standard specimen: first, grind or fill the side of the standard specimen to make it smooth, then remove the covering on the surface of the standard specimen through rough grinding to reveal the cement-based material of the standard specimen, and then fine grind the grinding area into a diagonal pattern at an angle of 30° to 45° to the direction of strain gauge attachment to increase the friction between the strain gauge and the surface of the standard specimen. After fine grinding, clean the dust on the surface of the grinding area, and then use a specimen cleaning agent to clean the side of the standard specimen; S202: marking test points at even intervals on the side of the standard test piece; S203: Testing of strain gauges before pasting.
7. The method for testing the elastic modulus of inorganic binder-stabilized materials according to claim 5, wherein: The S3 step includes S311: placing the standard specimen on a press, with its bottom surface in contact with the base plane of the press and its top surface in contact with a specimen loading plate, wherein the specimen loading plate is connected to the loading plate of the press via a third connecting stud; S312: Connecting a pressure sensor to a loading plate of the press; S313: Connecting a strain data acquisition instrument to the strain gauge; S314: Connect to the control computer and connect the pressure sensor and strain data acquisition instrument to the control computer by electrical signals; S315: Perform loading processing.
8. The method for testing the elastic modulus of inorganic binder-stabilized materials according to claim 7, wherein: After step S314 and before step S315, the following steps are included: S3151: Perform stability check on the strain gauge. In the unloaded state, read the deformation of the strain gauge on the side of the standard specimen over time during the 6-minute strain data acquisition time. When the deformation of the strain gauge on the side of the standard specimen over time is between 0 and 6με, it is judged to meet the standard. Otherwise, re-paste the strain gauge.
9. The method for testing the elastic modulus of inorganic binder-stabilized materials according to claim 7, wherein: The pressure sensor is electrically connected to the strain data collector, and they jointly use a frequency of 50 Hz to 100 Hz to synchronously collect pressure data and strain data.
10. The method for testing the elastic modulus of inorganic binder-stabilized materials according to claim 7, wherein: The elastic modulus is calculated by the indirect calculation method of specimen breaking: the standard specimen is loaded to complete breaking, and the control computer collects the pressure change curve of the pressure sensor and the strain change curve of the 6 strain gauges to obtain the maximum pressure value F max , and calculated to be 0.3F max From the pressure-time curve, we can find that 0.3F max The time t corresponding to the pressure value 0.3 Then, we can find out the relationship between t and strain from the 6 strain-time curves. 0.3 The corresponding 6 strain data ε1~ε6, calculate the strain average Then, the elastic modulus of the specimen is obtained according to Hooke's law