Intelligent control system based on cement steady flow bin numerical simulation

Through real-time monitoring and analysis of the operating parameters of the cement flow stabilizing silo through the intelligent control system, the safety and stability issues of the cement flow stabilizing silo when supplying materials are solved, energy waste is reduced, and the safety and service life of the equipment are improved.

CN118759929AInactive Publication Date: 2024-10-11NANJING AOBO IND INTELLIGENCE TECH RES INST CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410841657.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-27
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The safety of the cement flow silo when supplying materials is insufficient, energy is wasted seriously, and the location is not suitable, which affects the stability and continuity of the material. The lack of targeted research on the existing technology leads to a decrease in stability and safety.

Method used

An intelligent control system based on the numerical simulation of the cement flow stabilization bin is adopted, including a data acquisition module, a data analysis module, a position detection module, a position analysis module and a safety emergency response module to collect and analyze the horizontal pressure value, humidity, temperature and volume of the storage material in real time. Density, vibration frequency and material flow speed, calculate the operation safety performance index and position compliance index, and issue early warning in time.

Benefits of technology

It improves the safety and stability of the cement flow silo when supplying materials, reduces energy waste, and extends the service life of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118759929A_ABST
    Figure CN118759929A_ABST
Patent Text Reader

Abstract

The invention discloses an intelligent control system based on cement steady flow bin numerical simulation, which relates to the technical field of cement steady flow bins and comprises a data acquisition module, a data analysis module, a position detection module, a position analysis module and a safety emergency response module. According to the invention, the position analysis module analyzes the position compliance index of the cement steady-flow bin based on the blanking stability index and the stock column density index when the cement steady-flow bin supplies materials, so that the attention degree of position detection in the cement steady-flow bin is improved, the safety of the cement steady-flow bin when the cement steady-flow bin supplies the materials is enhanced, and the working efficiency of the cement steady-flow bin is improved. The problem that the stability effect is not ideal when the cement steady-flow bin supplies materials is found in time, the stability and safety of the cement steady-flow bin are improved, and follow-up use of the cement steady-flow bin is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of cement flow stabilization bins, and in particular to an intelligent control system based on numerical simulation of cement flow stabilization bins. Background Art

[0002] ·The cement stabilizing bin is a device used in the cement pre-grinding system to provide a continuous and stable material column for the roller press, thereby improving the stability of material feeding and increasing the grinding efficiency. However, due to the lack of a stable material feeding environment in the cement stabilizing bin, the industrial furnace is not safe enough when supplying materials, and energy is wasted seriously, affecting the continuity of material supply. In a high temperature or humid environment, the material in the stabilizing bin may be affected, thereby reducing the durability and service life of the equipment. It is necessary to diagnose the operation of the industrial furnace.

[0003] The existing technologies for defect detection of industrial furnaces can meet the basic requirements, but there are also some potential defects and challenges, which are specifically reflected in the following aspects:

[0004] 1. The research on the safety performance of cement stabilizing silos in the prior art is not in-depth enough. The storage level pressure value and the humidity in the silo when supplying materials have a crucial impact on its safety performance. The unsatisfactory temperature effect of the cement stabilizing silo when supplying materials increases the safety risk of the cement stabilizing silo, resulting in a decrease in the operating safety of the cement stabilizing silo when supplying materials, and increases the energy waste problem when supplying materials.

[0005] 2. In the prior art, little attention is paid to the position of the cement stabilizing bin. If the position of the cement stabilizing bin is inappropriate, it will affect the feeding stability index, material column density index and feeding continuity index of the cement when supplying materials. At present, the stability effect of the cement stabilizing bin when supplying materials is not ideal. The lack of targeted research limits the stability of the cement stabilizing bin when supplying materials, resulting in a decrease in the stability of the cement stabilizing bin and affecting the safety of the cement stabilizing bin. Summary of the invention

[0006] The purpose of the present invention is to provide an intelligent control system based on numerical simulation of cement stabilizing bin, which solves the problems existing in the background technology.

[0007] To solve the above technical problems, the present invention adopts the following technical solution: The present invention provides an intelligent control system based on numerical simulation of cement stabilizing bin, including a data acquisition module, a data analysis module, a position detection module, a position analysis module, a safety emergency response module and a database.

[0008] Data acquisition module: used to collect the horizontal pressure value of the cement stabilizing bin at each time point when supplying materials, the humidity, temperature in the bin and the liquid pressure value of the stored materials.

[0009] Data analysis module: used to analyze the operation safety performance index of the cement stabilizing flow bin when supplying materials based on the collected storage horizontal pressure values, humidity, temperature and storage liquid pressure values ​​at various time points when the cement stabilizing flow bin is supplying materials.

[0010] Position detection module: used to detect the material supply process of the cement stabilizing flow bin, and then obtain the volume density, interstitial void ratio, vibration frequency value, and material flow speed at the input and output ends at each time point when the cement stabilizing flow bin is supplying materials.

[0011] Position analysis module: Based on the volume density, interstitial void ratio, vibration frequency value, material flow speed at the input and output ends at each time point when the cement stabilizing flow bin supplies materials, the position compliance index of the cement stabilizing flow bin when supplying materials is analyzed.

[0012] Safety emergency response module: used to issue corresponding warnings to cement stabilizing flow bin managers based on the operation safety performance index of the cement stabilizing flow bin when supplying materials and the position compliance index of the cement stabilizing flow bin when supplying materials.

[0013] Furthermore, the analysis of the operational safety performance index of the cement stabilizing silo is specifically performed by obtaining historical operational data of the cement stabilizing silo from a database, wherein the historical operational data includes horizontal pressure values ​​of stored materials, humidity in the silo, temperature, and liquid pressure values ​​of stored materials at various time points when the cement stabilizing silo is supplying materials.

[0014] The storage level pressure value of the cement stabilizing flow bin at each time point when supplying materials is obtained from historical data, the maximum storage level pressure value and the minimum storage level pressure value of the cement stabilizing flow bin when supplying materials are screened, and then the storage level pressure safety detection value range of the cement stabilizing flow bin at each historical time point is constructed.

[0015] The storage level pressure value of the cement stabilizing bin at each time point when supplying materials is compared with the storage level pressure safety detection value interval of the cement stabilizing bin at each historical time point. If the storage level pressure value of the cement stabilizing bin at a certain time point when supplying materials is within the storage level pressure safety detection value interval, the storage level pressure safety value of the cement stabilizing bin at that time point when supplying materials is recorded as M, otherwise, it is recorded as M', and the storage level pressure safety value β of the cement stabilizing bin at each time point when supplying materials is obtained. p , where β p is M or M', p is the number of each time point of the cement stabilizing bin when supplying materials, p = 1, 2, ..., m.

[0016] Similarly, the humidity in the cement steady flow bin at each time point when supplying materials meets the value α p and temperature safety value ε p .

[0017] The standard storage liquid pressure value of the cement stabilizing silo when supplying materials is extracted from the database, and the storage liquid pressure compliance value of the cement stabilizing silo when supplying materials is detected by the liquid pressure detector. The specific formula is: W represents the standard storage liquid pressure value of cement stabilizing bin when supplying materials, W p 'It is the liquid pressure value of the cement stabilizing bin at the pth time point when the material is supplied;

[0018] Analyze the operation safety performance index of cement flow stabilization bin, the specific formula is:

[0019]

[0020] Furthermore, the analysis of the cement stabilizing bin position compliance index is specifically performed by extracting the standard flow rate values ​​at the input and output ends of the cement stabilizing bin and the standard density of the materials when the cement stabilizing bin supplies materials from the historical data of the cement stabilizing bin supply process, and analyzing the material discharge stability index, material column density index and material discharge continuity index when the cement stabilizing bin supplies materials.

[0021] The compliance index of the cement stabilizing flow bin position is analyzed, and the specific formula is: T=U+A+R, where U represents the material column density index when the cement stabilizing flow bin supplies materials, A represents the material unloading stability index when the cement stabilizing flow bin supplies materials, and R represents the material unloading continuity index when the cement stabilizing flow bin supplies materials.

[0022] Furthermore, the material column compaction index when the cement stabilizing flow bin supplies materials is analyzed by a specific analysis method: the material mass and volume at each time point when the cement stabilizing flow bin supplies materials are measured by a three-dimensional scanner, and then the volume density at each time point when the cement stabilizing flow bin supplies materials is obtained. Based on the standard density of the material when the cement stabilizing flow bin supplies materials, the material column compaction index at the current time point when the cement stabilizing flow bin supplies materials is analyzed, and the specific formula is: Where D p It represents the volume density of the material at the pth time point when the cement stabilizing flow bin supplies the material, and D' represents the standard density of the material when the cement stabilizing flow bin supplies the material.

[0023] Furthermore, the material stability index when the cement stabilizing flow bin supplies materials is analyzed by a specific analysis method: the material mass and volume at each time point when the cement stabilizing flow bin supplies materials are measured by a three-dimensional scanner, and then the volume density at each time point when the cement stabilizing flow bin supplies materials is obtained. Based on the standard density of the material when the cement stabilizing flow bin supplies materials, the material column compaction index at the current time point when the cement stabilizing flow bin supplies materials is analyzed, and the specific formula is: Where D pIt represents the volume density of the material at the pth time point when the cement stabilizing flow bin supplies the material, and D' represents the standard density of the material when the cement stabilizing flow bin supplies the material.

[0024] Furthermore, the material discharge continuity index when the cement stabilizing flow bin is supplied with materials is analyzed, and its specific analysis method is: extracting the input end material flow velocity and the output end material flow velocity at each time point when the cement stabilizing flow bin is supplying materials from the historical data of the cement stabilizing flow bin supply process, and subtracting the output end material flow velocity from the input end material flow velocity at each time point when the cement stabilizing flow bin is supplying materials, to obtain the difference in flow velocity between the input end and the output end at each time point when the cement stabilizing flow bin is supplying materials, and after removing the extreme value, performing mean processing, to obtain the reference input end and output end flow velocity difference of the cement stabilizing flow bin.

[0025] The material flow rate of the input end material and the material flow rate of the output end at the current time point when the cement stabilizing flow bin supplies materials are obtained through the material flow monitor, and the material flow rate of the input end material at the current time point when the cement stabilizing flow bin supplies materials is subtracted from the material flow rate of the output end to obtain the difference in flow rates between the input end and the output end at the current time point when the cement stabilizing flow bin supplies materials, and the extreme value is removed and the mean value is processed to obtain the difference in flow rates between the input end and the output end of the cement stabilizing flow bin at the current time point.

[0026] The flow velocity difference between the input and output ends of the cement stabilizing flow bin at the current time point is compared with the flow velocity difference between the reference input and output ends of the cement stabilizing flow bin. If the flow velocity difference between the input and output ends of the cement stabilizing flow bin at the current time point is less than or equal to the flow velocity difference between the reference input and output ends of the cement stabilizing flow bin, the material unloading continuity index at the current time point when the cement stabilizing flow bin supplies materials is recorded as g, otherwise, it is recorded as g', and the material unloading continuity index R at the current time point when the cement stabilizing flow bin supplies materials is obtained, where R is g or g'.

[0027] Furthermore, a corresponding warning is issued to the management personnel of the cement stabilizing flow bin, and the specific analysis method is: comparing the operation safety performance index of the cement stabilizing flow bin when adding materials with a predefined operation safety performance index threshold of the cement stabilizing flow bin when adding materials; if the operation safety performance index of the cement stabilizing flow bin when adding materials is less than the operation safety performance index threshold of the cement stabilizing flow bin when adding materials, an early warning reminder is issued to the staff.

[0028] The cement flow stabilization bin position compliance index is compared with a predefined cement flow stabilization bin position compliance index threshold. If the cement flow stabilization bin position compliance index is less than the cement flow stabilization bin position compliance index threshold, an early warning reminder is issued to the staff.

[0029] The beneficial effects of the present invention are as follows: the present invention is used in a data analysis module to analyze the operating safety performance index of the cement stabilizing flow bin when adding materials based on the collected storage horizontal pressure value, humidity index in the bin, temperature and liquid pressure value when the cement stabilizing flow bin is supplying materials, so as to timely discover safety problems of the cement stabilizing flow bin in the process of supplying materials, ensure the safety of the cement stabilizing flow bin when supplying materials, improve the operating safety of the cement stabilizing flow bin when supplying materials, and reduce energy waste when supplying materials.

[0030] The position analysis module of the present invention is used to analyze the position compliance index of the cement stabilizing flow bin based on the material discharge stability and material column density when the cement stabilizing flow bin supplies materials, thereby increasing attention to the position compliance in the cement stabilizing flow bin, improving the stability and safety of the cement stabilizing flow bin when supplying materials, and ensuring the subsequent use of the cement stabilizing flow bin. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0032] Figure 1 It is a schematic diagram of the system structure connection of the present invention. DETAILED DESCRIPTION

[0033] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0034] Reference Figure 1 As shown, the present invention provides an intelligent control system based on numerical simulation of cement stabilizing bin, including: a data acquisition module, a data analysis module, a position detection module, a position analysis module, and a safety emergency response module.

[0035] The data acquisition module is used to collect the storage material horizontal pressure value, the humidity and temperature in the cement stabilizing bin and the storage material liquid pressure value at each time point when the cement stabilizing bin is supplying materials.

[0036] It should be noted that the horizontal pressure value of the storage material, the humidity, temperature in the storage material and the liquid pressure value of the storage material at each time point when the cement stabilizing silo is supplying materials are detected by pressure sensors, hygrometers, temperature sensors and hydraulic pressure gauges respectively.

[0037] The data analysis module is used to analyze the operation safety performance index of the cement stabilizing flow bin when supplying materials based on the collected storage horizontal pressure values, humidity, temperature and storage liquid pressure values ​​at various time points when the cement stabilizing flow bin is supplying materials.

[0038] In the above embodiment, the operation safety performance index of the cement stabilizing silo is analyzed by a specific analysis method of obtaining historical operation data of the cement stabilizing silo from a database, wherein the historical operation data includes the storage horizontal pressure value, humidity in the silo, temperature and storage liquid pressure value at each time point when the cement stabilizing silo is supplying materials.

[0039] The storage level pressure value of the cement stabilizing flow bin at each time point when supplying materials is obtained from historical data, the maximum storage level pressure value and the minimum storage level pressure value of the cement stabilizing flow bin when supplying materials are screened, and then the storage level pressure safety detection value range of the cement stabilizing flow bin at each historical time point is constructed.

[0040] The storage level pressure value of the cement stabilizing bin at each time point when supplying materials is compared with the storage level pressure safety detection value interval of the cement stabilizing bin at each historical time point. If the storage level pressure value of the cement stabilizing bin at a certain time point when supplying materials is within the storage level pressure safety detection value interval, the storage level pressure safety value of the cement stabilizing bin at that time point when supplying materials is recorded as M, otherwise, it is recorded as M', and the storage level pressure safety value β of the cement stabilizing bin at each time point when supplying materials is obtained. p , where β p is M or M', p is the number of each time point of the cement stabilizing bin when supplying materials, p = 1, 2, ..., m.

[0041] Similarly, the humidity in the cement steady flow bin at each time point when supplying materials meets the value α p and temperature safety value ε p .

[0042] The standard storage liquid pressure value of the cement stabilizing silo when supplying materials is extracted from the database, and the storage liquid pressure compliance value of the cement stabilizing silo when supplying materials is detected by the liquid pressure detector. The specific formula is: W represents the standard storage liquid pressure value of cement stabilizing bin when supplying materials, W p 'It is the liquid pressure value of the cement storage at the pth time point when the cement stabilizing bin is supplying materials.

[0043] It should be noted that the standard storage liquid pressure value of the cement stabilizing silo when supplying materials is obtained by the following specific method: the storage liquid pressure value of the cement stabilizing silo at each time point when supplying materials is obtained from historical data, and averaged to obtain the standard storage liquid pressure value of the cement stabilizing silo when supplying materials.

[0044] Analyze the operation safety performance index of cement flow stabilization bin, the specific formula is:

[0045]

[0046] The position detection module is used to detect the material supply process of the cement stabilizing flow bin, and then obtain the volume density, interstitial void ratio, vibration frequency value, and material flow speed of the input and output ends at each time point when the cement stabilizing flow bin is supplying materials.

[0047] The position analysis module analyzes the position compliance index of the cement stabilizing flow bin when supplying materials based on the volume density, interstitial void ratio, vibration frequency value, and material flow speed at the input and output ends at each time point when the cement stabilizing flow bin supplies materials.

[0048] In the above embodiment, the specific analysis method for analyzing the compliance index of the cement stabilizing flow bin position is as follows: extracting the standard flow rate values ​​at the input and output ends of the cement stabilizing flow bin and the standard density of the material when the cement stabilizing flow bin supplies the material from the historical data of the cement stabilizing flow bin supply process, and analyzing the material discharge stability index, material column density index and material discharge continuity index when the cement stabilizing flow bin supplies the material.

[0049] The compliance index of the cement stabilizing flow bin position is analyzed, and the specific formula is: T=U+A+R, where U represents the material column density index when the cement stabilizing flow bin supplies materials, A represents the material unloading stability index when the cement stabilizing flow bin supplies materials, and R represents the material unloading continuity index when the cement stabilizing flow bin supplies materials.

[0050] In the above embodiment, the material column compaction index when the cement stabilizing flow bin supplies materials is analyzed by a specific analysis method: the material mass and volume at each time point when the cement stabilizing flow bin supplies materials are measured by a three-dimensional scanner, and then the volume density at each time point when the cement stabilizing flow bin supplies materials is obtained. Based on the standard density of the material when the cement stabilizing flow bin supplies materials, the material column compaction index at the current time point when the cement stabilizing flow bin supplies materials is analyzed, and the specific formula is: Where D p It represents the volume density of the material at the pth time point when the cement stabilizing flow bin supplies the material, and D' represents the standard density of the material when the cement stabilizing flow bin supplies the material.

[0051] In the above embodiment, the material feeding stability index of the cement stabilizing bin when supplying materials is analyzed, and the specific analysis method is: obtaining the standard inter-space ratio when the cement stabilizing bin supplies materials from the database, and based on the inter-space ratio at each time point when the cement stabilizing bin supplies materials, further analyzing the inter-space ratio compliance index at the current time point when the cement stabilizing bin supplies materials, and the specific formula is: Where G represents the standard void ratio when cement flow stabilization bin supplies materials, V p It is expressed as the void ratio at the pth time point when the cement stabilizing bin is supplying materials.

[0052] It should be noted that the standard inter-space ratio when the cement stabilizing bin supplies materials refers to the ratio of the standard inter-space volume between solid particles to the volume of the entire material.

[0053] It should be noted that the specific analysis method for the interstitial void ratio at each time point when the cement stabilizing flow bin supplies materials is as follows: use a laser beam to scan the material surface, and measure the height and gap of the material by analyzing the changes in the reflected light when the cement stabilizing flow bin supplies materials at each time point, thereby obtaining the interstitial void ratio at each time point.

[0054] The vibration frequency value at each time point when the cement stabilizing flow bin supplies materials is detected by a vibration sensor, and the vibration frequency value at the current time point when the cement stabilizing flow bin supplies materials is averaged to obtain the mean vibration frequency when the cement stabilizing flow bin supplies materials. If the mean vibration frequency when the cement stabilizing flow bin supplies materials is within the predefined suitable mean vibration frequency interval when the cement stabilizing flow bin supplies materials, the qualified vibration frequency index when the cement stabilizing flow bin supplies materials is recorded as i, otherwise, it is recorded as i', and then the material unloading stability index L of the current node when the cement stabilizing flow bin supplies materials is obtained, where L is i or i'.

[0055] The material unloading stability index when the cement stabilizing flow bin supplies materials is analyzed, and the specific formula is: A=K+L, where K represents the inter-node void ratio compliance index when the cement stabilizing flow bin supplies materials, and L represents the qualified vibration frequency index of the current node when the cement stabilizing flow bin supplies materials.

[0056] In the above embodiment, the material discharge continuity index when the cement stabilizing flow bin supplies materials is analyzed, and its specific analysis method is: extracting the input end material flow velocity and the output end material flow velocity at each time point when the cement stabilizing flow bin supplies materials from the historical data of the cement stabilizing flow bin supply process, and subtracting the output end material flow velocity from the input end material flow velocity at each time point when the cement stabilizing flow bin supplies materials, to obtain the difference between the input end and the output end flow velocity at each time point when the cement stabilizing flow bin supplies materials, and removing the extreme value and performing mean processing to obtain the reference input end and output end flow velocity difference of the cement stabilizing flow bin.

[0057] The material flow rate of the input end material and the material flow rate of the output end at the current time point when the cement stabilizing flow bin supplies materials are obtained through the material flow monitor, and the material flow rate of the input end material at the current time point when the cement stabilizing flow bin supplies materials is subtracted from the material flow rate of the output end to obtain the difference in flow rates between the input end and the output end at the current time point when the cement stabilizing flow bin supplies materials, and the extreme value is removed and the mean value is processed to obtain the difference in flow rates between the input end and the output end of the cement stabilizing flow bin at the current time point.

[0058] The flow velocity difference between the input and output ends of the cement stabilizing flow bin at the current time point is compared with the flow velocity difference between the reference input and output ends of the cement stabilizing flow bin. If the flow velocity difference between the input and output ends of the cement stabilizing flow bin at the current time point is less than or equal to the flow velocity difference between the reference input and output ends of the cement stabilizing flow bin, the material unloading continuity index at the current time point when the cement stabilizing flow bin supplies materials is recorded as g, otherwise, it is recorded as g', and the material unloading continuity index R at the current time point when the cement stabilizing flow bin supplies materials is obtained, where R is g or g'.

[0059] The safety emergency response module is used to issue corresponding warnings to cement stabilizing flow bin managers based on the operation safety performance index of the cement stabilizing flow bin when supplying materials and the position compliance index of the cement stabilizing flow bin when supplying materials.

[0060] In the above embodiment, the corresponding warning is issued to the cement stabilizing silo management personnel, and the specific analysis method is: comparing the operating safety performance index of the cement stabilizing silo when adding materials with the predefined operating safety performance index threshold of the cement stabilizing silo when adding materials; if the operating safety performance index of the cement stabilizing silo when adding materials is less than the operating safety performance index threshold of the cement stabilizing silo when adding materials, a warning reminder is issued to the staff.

[0061] The cement flow stabilization bin position compliance index is compared with a predefined cement flow stabilization bin position compliance index threshold. If the cement flow stabilization bin position compliance index is less than the cement flow stabilization bin position compliance index threshold, an early warning reminder is issued to the staff.

[0062] It should be noted that: the data acquisition module is connected to the data analysis module, the data analysis module is connected to the safety emergency response module, the location analysis module is connected to the safety emergency response module, the location analysis module is connected to the location detection module, the data analysis module is connected to the database, and the location detection module is connected to the database.

[0063] It should also be noted that the database is used to store historical operation data of the cement stabilizing bin, standard storage liquid pressure value of the cement stabilizing bin when supplying materials, and standard interspace ratio of the cement stabilizing bin when supplying materials.

[0064] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined by the present invention, they shall all fall within the protection scope of the present invention.

Claims

1. An intelligent control system based on numerical simulation of cement flow stabilization bin, It is characterized in that include: Data acquisition module: used to collect the horizontal pressure value of the cement stabilizing silo at each time point when the material is supplied, the humidity, temperature in the silo and the liquid pressure value of the stored material; Data analysis module: used to analyze the operational safety performance index of the cement stabilizing flow bin when supplying materials based on the collected material horizontal pressure values, humidity, temperature and liquid pressure values ​​of the cement stabilizing flow bin at various time points when supplying materials; Position detection module: used to detect the material supply process of the cement stabilizing flow bin, and then obtain the volume density, interstitial void ratio, vibration frequency value, and material flow speed at the input and output ends at each time point when the cement stabilizing flow bin supplies materials; Position analysis module: Based on the volume density, interstitial void ratio, vibration frequency value, material flow speed at the input and output ends at each time point when the cement stabilizing flow bin supplies materials, the position compliance index of the cement stabilizing flow bin when supplying materials is analyzed; Safety emergency response module: used to issue corresponding warnings to cement stabilizing flow bin managers based on the operation safety performance index of the cement stabilizing flow bin when supplying materials and the position compliance index of the cement stabilizing flow bin when supplying materials.

2. According to claim 1, the intelligent control system based on numerical simulation of cement flow stabilization bin, It is characterized in that The specific analysis method for analyzing the operation safety performance index of the cement stabilizing bin is as follows: Acquire historical operation data of the cement stabilizing silo from the database, the historical operation data including the storage material horizontal pressure value, humidity, temperature and storage material liquid pressure value at each time point when the cement stabilizing silo is supplying materials; Obtain the storage level pressure value of the cement stabilizing flow bin at each time point when supplying materials from historical data, select the maximum storage level pressure value and the minimum storage level pressure value of the cement stabilizing flow bin when supplying materials, and then construct the storage level pressure safety detection value interval of the cement stabilizing flow bin at each historical time point; The storage level pressure value of the cement stabilizing bin at each time point when supplying materials is compared with the storage level pressure safety detection value interval of the cement stabilizing bin at each historical time point. If the storage level pressure value of the cement stabilizing bin at a certain time point when supplying materials is within the storage level pressure safety detection value interval, the storage level pressure safety value of the cement stabilizing bin at that time point when supplying materials is recorded as M, otherwise, it is recorded as M', and the storage level pressure safety value β of the cement stabilizing bin at each time point when supplying materials is obtained. p , where β p is M or M', p is the number of each time point when the cement stabilizing bin is supplying materials, p = 1, 2, ..., m; Similarly, the humidity in the cement steady flow bin at each time point when supplying materials meets the value α p and temperature safety value ε p ; The standard storage liquid pressure value of the cement stabilizing silo when supplying materials is extracted from the database, and the storage liquid pressure compliance value of the cement stabilizing silo when supplying materials is detected by the liquid pressure detector. The specific formula is: W represents the standard storage liquid pressure value of cement stabilizing bin when supplying materials, W p 'It is the liquid pressure value of the cement stabilizing bin at the pth time point when the material is supplied; Analyze the operation safety performance index of cement flow stabilization bin, the specific formula is:

3. According to claim 1, an intelligent control system based on numerical simulation of cement flow stabilization bin, It is characterized in that The specific analysis method for analyzing the compliance index of the cement stabilizing bin position is as follows: The standard flow rate values ​​at the input and output ends of the cement stabilizing flow bin and the standard density of materials when the cement stabilizing flow bin supplies materials are extracted from the historical data of the cement stabilizing flow bin supply process, and the material discharge stability index, material column compaction index and material discharge continuity index when the cement stabilizing flow bin supplies materials are analyzed; The compliance index of the cement stabilizing flow bin position is analyzed, and the specific formula is: T=U+A+R, where U represents the material column density index when the cement stabilizing flow bin supplies materials, A represents the material unloading stability index when the cement stabilizing flow bin supplies materials, and R represents the material unloading continuity index when the cement stabilizing flow bin supplies materials.

4. According to claim 3, an intelligent control system based on numerical simulation of cement flow stabilization bin, It is characterized in that The specific analysis method for analyzing the material column compaction index when the cement steady flow bin supplies materials is as follows: The material mass and volume at each time point when the cement stabilizing flow bin supplies materials are measured by a three-dimensional scanner, and then the volume density at each time point when the cement stabilizing flow bin supplies materials is obtained. Based on the standard density of the material when the cement stabilizing flow bin supplies materials, the material column compaction index at the current time point when the cement stabilizing flow bin supplies materials is analyzed. The specific formula is: Where D p It represents the volume density of the material at the pth time point when the cement stabilizing flow bin supplies the material, and D' represents the standard density of the material when the cement stabilizing flow bin supplies the material.

5. According to claim 3, an intelligent control system based on numerical simulation of cement flow stabilization bin, It is characterized in that The specific analysis method for analyzing the material feeding stability index when the cement stabilizing bin supplies materials is as follows: The standard interstitial void ratio when the cement stabilizing flow bin supplies materials is obtained from the database, and based on the interstitial void ratio at each time point when the cement stabilizing flow bin supplies materials, the interstitial void ratio compliance index at the current time point when the cement stabilizing flow bin supplies materials is analyzed. The specific formula is: Where G represents the standard void ratio when cement flow stabilization bin supplies materials, V p It is expressed as the interstitial void ratio at the pth time point when the cement stabilizing bin supplies materials; The vibration frequency value at each time point when the cement stabilizing flow bin supplies materials is detected by a vibration sensor, and the vibration frequency value at the current time point when the cement stabilizing flow bin supplies materials is averaged to obtain the average vibration frequency when the cement stabilizing flow bin supplies materials. If the average vibration frequency when the cement stabilizing flow bin supplies materials is within the predefined suitable average vibration frequency interval when the cement stabilizing flow bin supplies materials, the qualified vibration frequency index when the cement stabilizing flow bin supplies materials is recorded as i, otherwise, it is recorded as i', and then the material unloading stability index L of the current node when the cement stabilizing flow bin supplies materials is obtained, where L is i or i'; The material unloading stability index when the cement stabilizing flow bin supplies materials is analyzed, and the specific formula is: A=K+L, where K represents the inter-node void ratio compliance index when the cement stabilizing flow bin supplies materials, and L represents the qualified vibration frequency index of the current node when the cement stabilizing flow bin supplies materials.

6. An intelligent control system based on numerical simulation of cement flow stabilization bin according to claim 1, It is characterized in that The specific analysis method of analyzing the material feeding continuity index when the cement steady flow bin supplies materials is as follows: Extract the input-end material flow velocity and output-end material flow velocity at each time point when the cement stabilizing flow bin supplies materials from the historical data of the cement stabilizing flow bin supply process, and subtract the output-end material flow velocity from the input-end material flow velocity at each time point when the cement stabilizing flow bin supplies materials, to obtain the input-end and output-end flow velocity difference at each time point when the cement stabilizing flow bin supplies materials, and remove the extreme value and perform mean processing to obtain the reference input-end and output-end flow velocity difference of the cement stabilizing flow bin; The material flow rate of the input end material and the material flow rate of the output end material at the current time point when the cement stabilizing flow bin supplies materials are obtained by using a material flow monitor, and the material flow rate of the input end material at the current time point when the cement stabilizing flow bin supplies materials is subtracted from the material flow rate of the output end material to obtain the flow rate difference between the input end and the output end at the current time point when the cement stabilizing flow bin supplies materials, and the extreme value is removed and the mean value is processed to obtain the flow rate difference between the input end and the output end of the cement stabilizing flow bin at the current time point; The flow velocity difference between the input and output ends of the cement stabilizing flow bin at the current time point is compared with the flow velocity difference between the reference input and output ends of the cement stabilizing flow bin. If the flow velocity difference between the input and output ends of the cement stabilizing flow bin at the current time point is less than or equal to the flow velocity difference between the reference input and output ends of the cement stabilizing flow bin, the material unloading continuity index at the current time point when the cement stabilizing flow bin supplies materials is recorded as g, otherwise, it is recorded as g', and the material unloading continuity index R at the current time point when the cement stabilizing flow bin supplies materials is obtained, where R is g or g'.

7. The intelligent control system based on numerical simulation of cement flow stabilization bin according to claim 1, It is characterized in that The specific analysis method for issuing corresponding warnings to the cement flow stabilization bin management personnel is as follows: The operation safety performance index of the cement stabilizing flow bin when adding materials is compared with a predefined threshold value of the operation safety performance index of the cement stabilizing flow bin when adding materials. If the operation safety performance index of the cement stabilizing flow bin when adding materials is less than the threshold value of the operation safety performance index of the cement stabilizing flow bin when adding materials, an early warning reminder is given to the staff; The cement flow stabilization bin position compliance index is compared with a predefined cement flow stabilization bin position compliance index threshold. If the cement flow stabilization bin position compliance index is less than the cement flow stabilization bin position compliance index threshold, an early warning reminder is issued to the staff.

Citation Information

Patent Citations

  • Intelligent control system for cement raw material grinding

    CN117696226A

  • Mining sump liquid sludge double-position monitoring system and monitoring method

    CN117890462A

  • Batcher plant

    JP2021053922A