Ship berthing judgment method

Through model simulation and flow velocity distribution analysis, the problem of ship berthing evaluation in the lateral inflow flood discharge channel project was solved, the safe navigation and berthing evaluation of ships during flood discharge was realized, and the risk was reduced.

CN118761131AInactive Publication Date: 2024-10-11PINGLU CANAL GRP CO LTD +1

Patent Information

Application Number
CN202410861855.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-28
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing technology makes it difficult to accurately judge the berthing status of ships during flood discharge in a flood discharge channel project with lateral inflow, and cannot effectively judge whether the ship can safely navigate and berth.

Method used

Use a model to simulate the main channel, determine multiple inlet flows during flood diversion, observe the flow velocity distribution of the upper and lower approach channels, including longitudinal and transverse flow velocities, measure the maximum longitudinal and transverse forces of the ship under different inlet flow rates, and determine whether the ship meets the Safe navigation and berthing requirements.

Benefits of technology

Provides a method that can accurately judge the berthing status of ships when discharging water in a lateral inflow flood discharge channel project, ensuring safe navigation and berthing of ships under oblique impact, and reducing actual navigation and ship berthing risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118761131A_ABST
    Figure CN118761131A_ABST
Patent Text Reader

Abstract

The invention relates to a ship berthing judgment method, which is applied to a main channel provided with a ship lock and a flood discharge flow channel, and comprises the following steps: simulating the main channel by adopting a model; determining a plurality of inlet flows during flood diversion; observing the flow velocity distribution of each parking section; judging whether the flow velocity of the upper approach channel and the lower approach channel berthing section under different inlet flows meets the safe navigation requirement of the ship or not; under different inlet flows, the ship is berthed at the berthing sections of the upper approach channel and the lower approach channel, the berthing stress of the ship is measured, and the maximum longitudinal stress and the maximum transverse stress of the ship are obtained; and whether the maximum longitudinal stress and the maximum transverse stress of the ship under different inlet flows meet the safety berthing requirement of the ship or not is judged. According to the method, the ship berthing condition can be judged during flood discharge of a project with a flood discharge flow channel with lateral inflow, and support is provided for the project with the flood discharge flow channel with lateral inflow.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of ship berthing, and in particular to a ship berthing evaluation method. Background Art

[0002] There are often multiple hubs with ship locks on a main channel. Some hubs also need to have the function of flood diversion, that is, a flood discharge channel with a flood discharge gate is added on one side outside the main channel. Different from the conventional flood discharge channel with positive water inflow, there are also projects with lateral inflow of flood discharge channels, and the inlet and outlet of the flood discharge channel are obliquely intersected with the main channel.

[0003] Among them, in conventional forward water inflow projects, when judging whether ships can berth during flood discharge, the judgment is mainly based on the impact generated in the forward direction of the flood discharge process. However, for projects with flood discharge channels with lateral inflow, this judgment method is not applicable, and it is difficult to accurately judge the berthing status of the project. Therefore, in order to judge the berthing status of ships in projects with flood discharge channels with lateral inflow during flood discharge, a new ship berthing judgment method can be proposed to provide support for projects with flood discharge channels with lateral inflow. Summary of the invention

[0004] The purpose of the present invention is to overcome the above-mentioned deficiencies in the prior art and to provide a method for evaluating ship berthing.

[0005] In order to achieve the above object, the technical solution adopted by the present invention is:

[0006] The present invention provides a ship berthing evaluation method, which is applied to a main channel provided with a ship lock and a flood discharge channel, wherein a section of the main channel located upstream of the ship lock is an upper approach channel, a section of the main channel located downstream of the ship lock is a lower approach channel, the flood discharge channel is located on a first side of the main channel, the inlet of the flood discharge channel is connected to the upper approach channel, and the outlet of the flood discharge channel is connected to the lower approach channel;

[0007] Includes steps:

[0008] Using a model to simulate the main channel;

[0009] Determine multiple inlet flows upstream of the main channel during flood diversion;

[0010] Observe the flow velocity distribution of the upper approach channel mooring section and the lower approach channel mooring section under different inlet flow rates, wherein the flow velocity includes the longitudinal flow velocity and the lateral flow velocity;

[0011] Determine whether the flow rates in the upper and lower approach channels meet the requirements for safe navigation of ships under different inlet flows;

[0012] Under different inlet flows, the ship is moored at the berthing sections of the upper and lower fairways, and the berthing forces of the ship are measured to obtain the maximum longitudinal and transverse forces of the ship.

[0013] Determine whether the maximum longitudinal force and maximum lateral force of the ship under different inlet flows meet the requirements for safe berthing of the ship.

[0014] As a preferred embodiment of the present invention, the step of observing the flow velocity distribution of the upper approach channel mooring section and the lower approach channel mooring section under different inlet flow rates includes the following steps:

[0015] The multiple sections of the upper approach channel mooring section distributed along its flow direction are regarded as the upper approach channel observation sections, and the flow velocity distribution of multiple upper approach channel observation sections under different inlet flows is observed;

[0016] The multiple cross-sectional positions distributed along the flow direction of the lower approach channel berthing section are regarded as the observation sections of the lower approach channel, and the flow velocity distribution of multiple upper approach channel observation sections under different inlet flows during flood diversion is observed.

[0017] As a preferred embodiment of the present invention, the longitudinal spacing between the observation sections of the upper approach channel is 50 to 130 m.

[0018] As a preferred embodiment of the present invention, the longitudinal spacing between the observation sections of the lower navigation channel is 50 to 130 m.

[0019] As a preferred embodiment of the present invention, the flow velocity also includes the backflow velocity. When the backflow velocity is large, it will also interfere with the navigation. Therefore, the backflow velocity can also be used as a basis for judging whether the requirements for safe navigation of ships are met.

[0020] As a preferred solution of the present invention, the safe navigation requirements for ships are: the maximum longitudinal velocity of the mooring section is less than or equal to 0.5 m / s, and the maximum transverse velocity is less than or equal to 0.15 m / s. When the velocity of the mooring section meets the safe navigation requirements for ships, it is considered that the ship can safely navigate under the corresponding flow rate.

[0021] As a preferred embodiment of the present invention, the safe berthing requirements for ships are: the maximum longitudinal force and the maximum lateral force of a 5000t ship are not greater than 58kN; the maximum longitudinal force and the maximum lateral force of an 8000t ship are not greater than 75kN; the maximum longitudinal force and the maximum lateral force of a 10000t ship are not greater than 90kN.

[0022] As a preferred embodiment of the present invention, the upper waterway berthing section at least includes a connecting area between the entrance of the flood discharge channel and the upper waterway, and a plurality of mooring piers are distributed in the connecting area.

[0023] As a preferred embodiment of the present invention, the lower fairway mooring section at least includes a connecting area between the outlet of the flood discharge channel and the lower fairway, and a plurality of mooring piers are distributed in the connecting area.

[0024] Among them, the above-mentioned connected areas are the areas with the greatest risk in the corresponding pilot channel. Using the connected areas as a reference for whether the requirements for safe navigation of ships and / or safe berthing of ships are met can greatly reduce the risks of actual navigation and / or ships.

[0025] As a preferred solution of the present invention, after the step of determining multiple inlet flows upstream of the main channel during flood diversion, the following steps are further included:

[0026] The maximum wave heights of the plurality of mooring piers under different inlet flow rates are observed, thereby taking the wave heights into consideration and reducing the impact of waves on the navigation and berthing of the ship.

[0027] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:

[0028] The present invention provides a ship berthing evaluation method, which can judge whether a ship can safely navigate when subjected to an oblique impact based on the longitudinal flow velocity and the transverse flow velocity of the upper and lower pilot channels for a main channel provided with a ship lock and a flood discharge channel, and judge whether a ship can safely berth when subjected to an oblique impact based on the maximum longitudinal force and the maximum transverse force of the upper and lower pilot channels. Therefore, the present invention can judge the berthing conditions of a ship in a flood discharge channel with a lateral inflow during flood discharge, and provide support for projects with a flood discharge channel with a lateral inflow. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 This is the main channel model layout diagram described in Example 1 of the present invention.

[0030] Figure 2 The diversion volume of Example 2 of the present invention is 1000m 3 / s flow velocity distribution diagram of the upper approach channel mooring section.

[0031] Figure 3 The diversion capacity of Example 2 of the present invention is 1600m 3 / s flow velocity distribution diagram of the upper approach channel mooring section.

[0032] Figure 4 The diversion volume of Example 2 of the present invention is 1000m 3 / s. The force process diagram of a 5000t ship moored in the upper approach channel.

[0033] Figure 5 The diversion capacity of Example 2 of the present invention is 1600m 3 / s. The force process diagram of a 5000t ship moored in the upper approach channel.

[0034] Figure 6 The diversion volume of Example 2 of the present invention is 1000m 3 / s flow velocity distribution diagram of the lower pilot channel berthing section.

[0035] Figure 7 The diversion capacity of Example 2 of the present invention is 1600m 3 / s flow velocity distribution diagram of the lower pilot channel berthing section.

[0036] Figure 8 The diversion volume of Example 2 of the present invention is 1000m 3 / s. The force process diagram of a 5000t ship moored in the lower approach channel.

[0037] Fig. 9 The diversion capacity of Example 2 of the present invention is 1600m 3 / s. The force process diagram of a 5000t ship moored in the lower approach channel.

[0038] Markings in the figure: 1-upper navigation channel, 2-lower navigation channel, 3-ship lock, 4-flood discharge channel. DETAILED DESCRIPTION

[0039] The present invention is further described in detail below in conjunction with test examples and specific implementation methods. However, this should not be understood as the scope of the above subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.

[0040] Unless otherwise specified, in the description of the specific embodiments of the present invention, the terms indicating the orientation or position relationship such as "up", "down", "left", "right", "center", "inside", "outside", etc. are all expressions based on the orientation or position relationship shown in the drawings, or the orientation or position relationship when the invented product / equipment / device is usually used. These terms of orientation or position relationship are only for the convenience of describing the scheme of the present invention or simplifying the description in the specific embodiments, so as to facilitate the technicians to quickly understand the scheme, rather than indicating or implying that a specific device / component / element must have a specific orientation, or be constructed and operated in a specific position relationship, and therefore cannot be understood as a limitation on the present invention.

[0041] In addition, if the terms "horizontal", "vertical", "overhanging", "parallel" and the like appear, it does not mean that the corresponding devices / components / elements are required to be absolutely horizontal or vertical or overhanging or parallel, but may be slightly tilted or have deviations. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but may be slightly tilted. Alternatively, it can be simplified to mean that the corresponding devices / components / elements are set in directions such as "horizontal", "vertical", "overhanging", "parallel", etc., and can have an error / deviation of ±10% relative to the corresponding direction setting, more preferably an error / deviation within ±8%, more preferably an error / deviation within ±6%, more preferably an error / deviation within ±5%, and more preferably an error / deviation within ±4%. As long as the corresponding device / component / element is within the error / deviation range, it can still achieve its role in the scheme of the present invention.

[0042] In addition, the expressions “first”, “second”, “third”, etc. that appear in the terms are merely descriptions used to distinguish the same or similar components and should not be understood as emphasizing or implying the relative importance of specific components.

[0043] In addition, in the description of the embodiments of the present invention, "several", "plurality" and "a number" represent at least 2. It can be any number such as 2, 3, 4, 5, 6, 7, 8, 9, and even more than 9.

[0044] In addition, in the description of the technical solution of the present invention, unless otherwise clearly specified / defined / restricted, the terms "set", "install", "connect", "connected", "provided with", "laid", and "arranged" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection, and can be welding, riveting, bolting, threading, and other commonly used connection means in the field. This connection can be a mechanical connection, an electrical connection, or a communication connection; it can be a direct connection, or an indirect connection through an intermediate medium, and it can be the internal connection of two elements.

[0045] Example 1

[0046] A ship berthing evaluation method is provided, which is applied to a main channel provided with a ship lock 3 and a flood discharge channel 4, wherein Figure 1As shown, a section of the main channel located upstream of the ship lock 3 is the upper approach channel 1, a section of the main channel located downstream of the ship lock 3 is the lower approach channel 2, the spillway 4 is located on one side of the main channel, and the side is defined as the first side, the inlet of the spillway 4 is connected to the upper approach channel 1, the outlet of the spillway 4 is connected to the lower approach channel 2, and the upper approach channel 1 has a mooring section located at the connecting area between the inlet of the spillway 4 and the upper approach channel 1, and a plurality of mooring piers are distributed in the connecting area; the lower approach channel 2 has a mooring section located at the connecting area between the outlet of the spillway 4 and the lower approach channel 2, and a plurality of mooring piers are distributed in the connecting area;

[0047] Includes steps:

[0048] S1. Using a model to simulate the main channel;

[0049] S2. Determine multiple inlet flows upstream of the main channel during flood diversion;

[0050] S3, observing the flow velocity distribution of the upper approach channel berthing section under different inlet flow rates, wherein the flow velocity includes the backflow velocity, the longitudinal velocity and the lateral velocity;

[0051] Specifically, multiple sections of the upper approach channel mooring section distributed along its flow direction are regarded as upper approach channel observation sections, and the flow velocity distribution of multiple upper approach channel observation sections under different inlet flows is observed;

[0052] The longitudinal spacing between the observation sections of the upper approach channel is 50 to 130 m.

[0053] S4. Determine whether the flow velocity of the upper approach channel berthing section under different inlet flow rates meets the requirements for safe navigation of ships;

[0054] Among them, the requirements for safe navigation of ships are: the maximum longitudinal flow velocity in the berthing section is less than or equal to 0.5m / s, and the maximum lateral flow velocity is less than or equal to 0.15m / s.

[0055] S5. Under different inlet flows, the ship is moored at the berthing section of the upper pilot channel, and the berthing force of the ship is measured to obtain the maximum longitudinal force and the maximum transverse force of the ship in the berthing section of the upper pilot channel;

[0056] S6. Determine whether the maximum longitudinal force and maximum transverse force of the ship in the berthing section of the upper approach channel under different inlet flow rates meet the requirements for safe berthing of the ship.

[0057] Among them, the requirements for safe berthing of ships are: the maximum longitudinal force and maximum transverse force of a 5000t ship are not more than 58kN; the maximum longitudinal force and maximum transverse force of an 8000t ship are not more than 75kN; the maximum longitudinal force and maximum transverse force of a 10000t ship are not more than 90kN.

[0058] S7, observing the flow velocity distribution of the lower pilot channel berthing section under different inlet flow rates, wherein the flow velocity includes the backflow velocity, the longitudinal velocity and the lateral velocity;

[0059] Specifically, multiple sections distributed along the flow direction of the mooring section of the lower approach channel are regarded as observation sections of the lower approach channel, and the flow velocity distribution of multiple observation sections of the lower approach channel under different inlet flows is observed;

[0060] The longitudinal spacing between the observation sections of the lower navigation channel is 50 to 130 m.

[0061] S8. Determine whether the flow velocity of the lower pilot channel berthing section under different inlet flow rates meets the requirements for safe navigation of ships;

[0062] Among them, the requirements for safe navigation of ships are: the maximum longitudinal flow velocity in the berthing section is less than or equal to 0.5m / s, and the maximum lateral flow velocity is less than or equal to 0.15m / s.

[0063] S9. Under different inlet flow rates, the ship is moored at the lower pilot channel berthing section, and the berthing force of the ship is measured to obtain the maximum longitudinal force and the maximum transverse force of the ship in the lower pilot channel berthing section;

[0064] S10. Determine whether the maximum longitudinal force and the maximum transverse force of the ship in the berthing section of the lower pilot channel under different inlet flow rates meet the requirements for safe berthing of the ship.

[0065] Among them, the requirements for safe berthing of ships are: the maximum longitudinal force and maximum transverse force of a 5000t ship are not more than 58kN; the maximum longitudinal force and maximum transverse force of an 8000t ship are not more than 75kN; the maximum longitudinal force and maximum transverse force of a 10000t ship are not more than 90kN.

[0066] S11, observing the maximum wave heights of the plurality of mooring piers at different inlet flow rates.

[0067] Example 2

[0068] On the basis of Example 1, a project of a main channel provided with a ship lock 3 and a flood discharge channel 4 was actually applied, wherein the project has a ship lock 3, a flood discharge channel 4 and a main channel, and the flood discharge channel 4 is located on the left side of the main channel, and the upper navigation channel 1 has a left-side mooring section upstream of the ship lock 3 located at the connecting area between the entrance of the flood discharge channel 4 and the upper navigation channel 1, and the upper navigation channel 1 has a left-side mooring section downstream of the ship lock 3 located at the connecting area between the exit of the flood discharge channel 4 and the lower navigation channel 2.

[0069] Specifically, the steps include:

[0070] S1. According to the design requirements of the main channel, a model is constructed for the hub part of the main channel with ship locks and flood discharge channels, and the model is made to meet the similarity of gravity, similarity of gradient, similarity of resistance, similarity of water flow movement and similarity of water flow continuity, so that the model is used to simulate the hub part corresponding to the main channel.

[0071] Among them, those skilled in the art can know how to build a model based on the design requirements of the main channel, and will not go into details here.

[0072] S2. According to the dispatching and operation mode of the hub part, when the main channel encounters a flood that occurs once in many years, it will undertake part of the flood diversion task. At this time, it can be determined that when diverting floods of different degrees, there are multiple import flows corresponding to floods of different degrees in the upstream of the main channel.

[0073] Specifically, when a flood of 20-years or above occurs in the main channel, the hub will undertake part of the flood diversion task of the main channel, with a diversion flow of 1000m 3 / s (20-year flood) and 1600m 3 / s(50-year flood).

[0074] S3, treating multiple sections of the upper navigation channel mooring section distributed along its flow direction as upper navigation channel observation sections, and observing the flow velocity distribution of multiple upper navigation channel observation sections under different inlet flow rates, wherein the flow velocity includes longitudinal flow velocity, transverse flow velocity and return flow velocity;

[0075] Among them, the longitudinal spacing between the observation sections of the upper navigation channel is 50 to 130m.

[0076] Specifically, at least 5 section positions are arranged at different longitudinal distances between the upper navigation channel and the navigation wall head, which serve as 5 upper navigation channel observation sections, including: VU1 (33m above the navigation wall head), VU2 (83m above the navigation wall head), VU3 (133m above the navigation wall head), VU4 (183m above the navigation wall head), and VU5 (303m above the navigation wall head).

[0077] The test observed that the main channel flood diversion volume was 1000m 3 / s and 1600m 3 / s, the water flow conditions of the upper approach channel berthing section. As shown in Table 1 and Figure 2 , Figure 3 As shown, VU1, VU2, VU3, VU4, and VU5 are distributed from right to left.

[0078] Table 1- Maximum flow velocity in the left berthing section of the upper approach channel of the ship lock during flood diversion

[0079]

[0080] From Table 1 and Figure 2 , Figure 3 It can be seen that when the flood diversion volume is 1000m 3 / s (gate control opening) and 1600m 3 / s (full gate open discharge), since the left mooring section of the upper approach channel is located at the inlet of the spillway, affected by the flood diversion of the spillway, the maximum longitudinal flow velocities of the upstream mooring section are 0.66m / s and 1.17m / s, and the maximum lateral flow velocities are 0.26m / s and 0.36m / s respectively.

[0081] S4. Based on the velocity distribution of multiple observation sections of the upper pilot channel under different inlet flow rates, determine whether the velocity of the berthing section of the upper pilot channel under different inlet flow rates meets the requirements for safe navigation of ships;

[0082] Specifically, based on the requirements for safe navigation of ships: the maximum longitudinal velocity of the mooring section is less than or equal to 0.5m / s, and the maximum transverse velocity is less than or equal to 0.15m / s. 3 / s and 1600m 3 / s, the maximum longitudinal and transverse flow velocities exceeded the allowable limits of the specification. Therefore, during flood diversion, the navigation channel on the ship lock could not meet the requirements for safe navigation of ships.

[0083] S5. Under different inlet flows, the ship is moored at the berthing section of the upper pilot channel, and the berthing force of the ship is measured to obtain the maximum longitudinal force and the maximum transverse force of the ship in the berthing section of the upper pilot channel;

[0084] Specifically, the diversion volume is 1000m 3 / s and 1600m 3 The stress condition of a 5000t ship moored at the left berthing section upstream of the lock was measured at 2000 rpm. The ship stress is shown in Table 2 and the ship stress change process is shown in Table 2. Figure 4 and Figure 5 .

[0085] Table 2- Maximum forces on ships in the left mooring section of the upper approach channel

[0086]

[0087] According to experimental observation data, when the flood diversion volume is 1000m 3 / s, when the ship is fully loaded, the maximum longitudinal force of a 5000t ship is 62.2kN, and the maximum transverse force is 74.5kN. The flood diversion volume is 1600m 3 / s, the maximum longitudinal force of a 5000t ship is 89.8kN, and the maximum lateral force is 116.5kN.

[0088] S6. Determine whether the maximum longitudinal force and maximum transverse force of the ship in the berthing section of the upper approach channel under different inlet flow rates meet the requirements for safe berthing of the ship.

[0089] Specifically, based on the requirements for safe berthing of ships, the maximum longitudinal and transverse forces of 5000t ships are not more than 58kN; the maximum longitudinal and transverse forces of 8000t ships are not more than 75kN; the maximum longitudinal and transverse forces of 10000t ships are not more than 90kN. It can be seen that the measured longitudinal and transverse forces of the ship are both greater than the safe allowable values, and the ship forces do not meet the requirements for safe berthing.

[0090] S7, treating multiple sections of the lower pilot channel mooring section distributed along its flow direction as lower pilot channel observation sections, and observing the flow velocity distribution of multiple lower pilot channel observation sections under different inlet flow rates, wherein the flow velocity includes longitudinal flow velocity, transverse flow velocity and return flow velocity;

[0091] Among them, the longitudinal spacing between the observation sections of the lower navigation channel is 50 to 130 meters.

[0092] Specifically, at least 6 section positions are arranged at different longitudinal distances between the lower navigation channel and the navigation wall head, which serve as 6 lower navigation channel observation sections, including: VD1 (41m below the navigation wall head), VD2 (91m below the navigation wall head), VD3 (141m below the navigation wall head), VD4 (191m below the navigation wall head), VD5 (231m below the navigation wall head), and VD6 (281m below the navigation wall head).

[0093] The test observed that the main channel flood diversion volume was 1000m 3 / s and 1600m 3 / s, the water flow conditions in the lower approach channel berthing section. Figure 6 , Figure 7 As shown, VD1, VD2, VD3, VD4, VD5, and VD6 are distributed from left to right.

[0094] Table 3- Maximum flow velocity in the left berthing section of the upper approach channel of the ship lock during flood diversion in the upper approach channel

[0095]

[0096]

[0097] From Table 3 and Figure 6 , Figure 7 It can be seen that when the flood diversion volume is 1000m 3 / s (gate control opening) and 1600m 3 / s (full gate open discharge), because the left mooring section of the lower approach channel is located at the entrance of the sluice gate inlet channel, affected by the flood diversion of the sluice gate, the maximum longitudinal flow velocity of the downstream mooring section is 1.19m / s and 1.80m / s, and the maximum transverse flow velocity is 1.02m / s and 1.51m / s. Due to the turbulence of the water flow, a certain amount of waves are generated, and the upper section of the left mooring section of the lower approach channel (about 150m long) is a return flow area, and the return flow velocity is 0.35m / s and 0.45m / s.

[0098] S8. Based on the velocity distribution of multiple observation sections of the lower pilot channel under different inlet flow rates, determine whether the velocity of the berthing section of the lower pilot channel under different inlet flow rates meets the requirements for safe navigation of ships;

[0099] Specifically, based on the requirements for safe navigation of ships: the maximum longitudinal velocity of the mooring section is less than or equal to 0.5m / s, and the maximum transverse velocity is less than or equal to 0.15m / s. 3 / s and 1600m 3 / s, the maximum longitudinal and lateral flow velocities and backflow velocity exceeded the allowable limits of the specifications, and the water around the piers was highly turbulent and the flow pattern was poor. Therefore, the pilot channel under the lock could not meet the requirements for safe navigation of ships during flood diversion.

[0100] S9. Under different inlet flow rates, the ship is moored at the lower pilot channel berthing section, and the berthing force of the ship is measured to obtain the maximum longitudinal force and the maximum transverse force of the ship in the lower pilot channel berthing section;

[0101] Specifically, the diversion volume is 1000m 3 / s and 1600m 3 The stress condition of a 5000t ship moored at the left berthing section downstream of the lock was measured at 2000 rpm. The ship stress is shown in Table 4, and the ship stress change process is shown in Table 5. Figure 8 and Fig. 9 .

[0102] Table 4- Maximum forces on ships in the left mooring section of the lower approach channel

[0103]

[0104] According to experimental observation data, when the flood diversion volume is 1000m 3 / s, when the ship is fully loaded, the maximum longitudinal force of a 5000t ship is 274.3kN, and the maximum transverse force is 678.5kN. The flood diversion volume is 1600m 3 / s, the maximum longitudinal force of a 5000t ship is 726.8kN, and the maximum lateral force is 699.0kN.

[0105] S10. Determine whether the maximum longitudinal force and the maximum transverse force of the ship in the berthing section of the lower pilot channel under different inlet flow rates meet the requirements for safe berthing of the ship.

[0106] Specifically, based on the requirements for safe berthing of ships, the maximum longitudinal and transverse forces of 5000t ships are not more than 58kN; the maximum longitudinal and transverse forces of 8000t ships are not more than 75kN; the maximum longitudinal and transverse forces of 10000t ships are not more than 90kN. It can be seen that the measured longitudinal and transverse forces of the ship are both greater than the safe allowable values, and the ship forces do not meet the requirements for safe berthing.

[0107] S11. Experimental observations revealed that after the water discharged from the flood discharge channel dissipated energy through the energy dissipation pool, relatively large waves were generated. Since the outlet of the flood discharge channel was adjacent to the downstream pilot channel and the mooring section on the left downstream of the ship lock was located at the outlet of the flood discharge channel, certain surges were generated around the piers of the mooring section on the left downstream of the ship lock, which had an adverse effect on the stability of the ship.

[0108] The maximum wave heights of the piers at different inlet flows were observed: 3 / s, the maximum wave height in the waters of the left mooring section downstream of the ship lock is about 0.3-0.4m; 3 / s, the maximum wave height in the waters of the left mooring section downstream of the lock is about 0.4-0.6m.

[0109] In summary, during flood diversion, all parameters of 5000t ships in the left mooring section upstream and downstream of the ship lock do not meet the requirements for safe navigation and berthing of ships. In addition, the water surface in the mooring section downstream of the ship lock has certain fluctuations, with the maximum wave height of about 0.6m, which also has a certain impact on the navigation and berthing of ships.

[0110] In summary, it is recommended that the project move the ships at each berthing section to the outside of the upper and lower pilot channels for berthing before flood diversion to ensure safety.

[0111] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for judging ship berthing, It is characterized in that Applicable to a main channel provided with a ship lock (3) and a flood discharge channel (4), wherein a section of the main channel located upstream of the ship lock (3) is an upper approach channel (1), a section of the main channel located downstream of the ship lock (3) is a lower approach channel (2), the flood discharge channel (4) is located on a first side of the main channel, an inlet of the flood discharge channel (4) is connected to the upper approach channel (1), and an outlet of the flood discharge channel (4) is connected to the lower approach channel (2); Includes steps: Using a model to simulate the main channel; Determine multiple inlet flows upstream of the main channel during flood diversion; Observe the flow velocity distribution of the upper approach channel mooring section and the lower approach channel mooring section under different inlet flow rates, wherein the flow velocity includes the longitudinal flow velocity and the lateral flow velocity; Determine whether the flow rates in the upper and lower pilot channels meet the requirements for safe navigation of ships under different inlet flows; Under different inlet flows, the ship is moored at the berthing sections of the upper and lower pilot channels, and the berthing forces of the ship are measured to obtain the maximum longitudinal and transverse forces of the ship. Determine whether the maximum longitudinal force and maximum lateral force of the ship under different inlet flows meet the requirements for safe berthing of the ship.

2. A ship berthing evaluation method according to claim 1, It is characterized in that The step of observing the flow velocity distribution of the upper approach channel mooring section and the lower approach channel mooring section under different inlet flow rates includes the following steps: The multiple sections of the upper approach channel mooring section distributed along its flow direction are regarded as the upper approach channel observation sections, and the flow velocity distribution of multiple upper approach channel observation sections under different inlet flows is observed; The multiple cross-sectional positions distributed along the flow direction of the lower approach channel berthing section are regarded as the observation sections of the lower approach channel, and the flow velocity distribution of multiple upper approach channel observation sections under different inlet flows during flood diversion is observed.

3. A ship berthing evaluation method according to claim 2, It is characterized in that The longitudinal spacing between the observation sections of the upper approach channel is 50 to 130 m.

4. A ship berthing evaluation method according to claim 2, It is characterized in that The longitudinal spacing between the observation sections of the lower navigation channel is 50 to 130 m.

5. A ship berthing evaluation method according to claim 1, It is characterized in that The flow rate also includes the reflux flow rate.

6. A ship berthing evaluation method according to claim 1, It is characterized in that The requirements for safe navigation of ships are: the maximum longitudinal flow velocity in the berthing section is less than or equal to 0.5m / s, and the maximum lateral flow velocity is less than or equal to 0.15m / s.

7. A ship berthing evaluation method according to claim 1, It is characterized in that The requirements for safe berthing of ships are as follows: the maximum longitudinal force and maximum transverse force of a 5000t ship shall not exceed 58kN; the maximum longitudinal force and maximum transverse force of an 8000t ship shall not exceed 75kN; the maximum longitudinal force and maximum transverse force of a 10000t ship shall not exceed 90kN.

8. A ship berthing evaluation method according to claim 1, It is characterized in that The upper approach channel berthing section at least includes a connecting area between the entrance of the flood discharge channel and the upper approach channel, and a plurality of mooring piers are distributed in the connecting area.

9. A ship berthing evaluation method according to claim 1, It is characterized in that The lower fairway mooring section at least includes a connecting area between the outlet of the flood discharge channel and the lower fairway, and a plurality of mooring piers are distributed in the connecting area.

10. A ship berthing evaluation method according to claim 9, It is characterized in that After the step of determining a plurality of inlet flows upstream of the main channel during flood diversion, the method further includes the following steps: The maximum wave heights of a plurality of the mooring piers at different inlet flow rates were observed.

Citation Information

Patent Citations

  • Method and system for judging operation state safety of berthed ship in harbor district

    CN111444624A

  • Navigation and hydropower hub with emergency navigation facility

    CN112878293A

  • Method for arranging approach channel

    WO2024021314A1

Cited By

  • Simulation analysis method and analysis system for water flow condition of approach channel of double-line ship lock

    CN119940175A