Slab length optimization method and system based on order requirements
By calculating the optimal size of the slab, the problem of inconsistent slab lengths in the steelmaking unit is solved, automatic generation and execution are realized, the process and order requirements are met, and production efficiency and material utilization efficiency are improved.
Patent Information
- Application Number
- CN202410857946.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-06-28
AI Technical Summary
Due to the complexity of contracts and batch requirements during steelmaking and production, the existing technology results in inconsistent slab lengths, which cannot meet the personalized needs of customer orders, and manual calculations cannot meet production optimization requirements.
Adopt a slab length optimization method based on order requirements to ensure the slab length by calculating the optimal size of the slab, including determining the upper and lower limits of roll weight, slab width, thickness and density, calculating the number of rolls and the final slab weight Meet process and order requirements, and achieve automatic generation and execution through the steelmaking planning module.
It is possible to calculate the optimal slab size that meets process and order requirements during production, improves the guidance of calculation results, ensures material utilization efficiency, avoids the generation of residual material caused by inconsistent roll weights, and improves production efficiency and costs. save.
Smart Images

Figure CN118761499A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of steel manufacturing, and in particular relates to a slab length optimization method and system based on order requirements. Background Art
[0002] As competition in the steel market becomes increasingly fierce, customer order customization requirements are becoming more and more complex. One of the requirements is that the finished product coil weight is more complex. In addition, since the coil weight ranges of hot-rolled and cold-rolled products in plate production vary greatly, if the billet length is set unreasonably during steelmaking production, the final product will not fall within the range required by the customer when it is divided into coils. In particular, if the previous process has special process requirements for the length and width of the slab, the problem will become more complicated. Manual calculations cannot meet the requirements of production optimization, so it must be automatically implemented in the information system through program algorithms.
[0003] Existing patent 1 "A process design method for plate rolling" (application number: 202010202960.1) calculates the target length range of the slab according to the process settings, sets the target length of the slab as the maximum target length, and calculates the target number of finished product rolls based on this.
[0004] Existing patent 22, "A material design optimization method and system for maximizing hot-rolled strip capacity" (application publication number: CN 115608776 A), calculates the target width and thickness of the steel coil based on the order requirements, and then calculates the width and thickness of the slab based on the process regulations. According to the process settings, multiple available slab shapes are obtained, and then through multiple comparisons, the available slab shapes that meet the contract conditions are selected, where the maximum length of the slab is determined based on the weight of the hot coil and the optimal width and thickness of the slab.
[0005] The methods of the above two existing patents are both delivered for production after calculations are completed in the order design stage. However, during steelmaking production, due to the complexity of a large number of contracts and the batch requirements of steelmaking production, the corresponding slab widths may be different when different batches of the same contract are produced, resulting in different slab lengths. The calculation results during order design are not very instructive for production. Summary of the invention
[0006] The purpose of the present invention is to address the shortcomings of the above-mentioned background technology and to provide a slab length optimization method and system based on order requirements, which can directly calculate the optimal slab size that meets the process regulations and order requirements, and through integration with the steelmaking planning module, it can realize the automatic generation and issuance of slab size.
[0007] The technical solution adopted by the present invention is: a slab length optimization method based on order requirements, comprising the following steps:
[0008] Determine the upper and lower limits of coil weight, maximum and minimum process values of slab width, slab density, slab thickness and comprehensive yield rate according to order requirements;
[0009] Determine the slab width for pouring plan according to order requirements;
[0010] Based on the initial slab weight calculated based on the maximum slab length and the slab width of the casting plan, the upper and lower limits of the coil weight are calculated to calculate the corresponding number of coils;
[0011] Determine the calculation method of the slab weight according to the calculation result of the number of rolls and calculate the final slab weight;
[0012] The slab length for the casting plan is calculated based on the final slab weight.
[0013] The above technical solution also includes the following steps:
[0014] According to the actual process raw material weight of each process, the upper and lower limits of the roll weight are calculated to calculate the corresponding number of rolls, and based on the calculation result of the number of rolls, it is judged whether the actual process raw material weight meets the preset roll weight requirement.
[0015] The above technical solution also includes the following steps:
[0016] Determine the maximum and minimum slab lengths according to the order requirements, and determine whether the calculated slab lengths of the pouring plan meet the maximum and minimum slab length requirements; if so, release the pouring plan; otherwise, report an error.
[0017] In the above technical solution, the process of determining the maximum and minimum process values of slab width, slab density, maximum and minimum slab length, slab thickness and comprehensive yield rate according to order requirements includes:
[0018] The process design is completed according to the finished product information required by the order, and then the width and thickness of the hot coil corresponding to the order are calculated. Considering the capacity of the side press, heating furnace and hot rolling mill, the corresponding maximum and minimum slab width process values, slab length and minimum length values, as well as slab density, slab thickness and comprehensive yield rate are calculated.
[0019] In the above technical solution, the process of determining the slab width of the casting plan according to order requirements includes: according to the order requirements, setting the orders with overlapping slab width ranges in the same casting, and the slab width of the casting must be between the maximum and minimum slab widths of each order in the casting plan.
[0020] In the above technical solution, the initial slab weight W0 is calculated using the following formula:
[0021] W0=Width_set*L_max*H*ρ
[0022] Among them, Width_set represents the slab width of the pouring plan, L_max represents the maximum slab length, ρ represents the slab density, and H represents the slab thickness.
[0023] In the above technical solution, the following formula is used to calculate the number of sub-rolls N corresponding to the upper limit of the coil weight obtained based on the initial slab weight, and the number of sub-rolls n corresponding to the lower limit of the coil weight obtained based on the initial slab weight;
[0024] N=roundup(W0*C / Wt_order_max);
[0025] n=rounddown(W0*C / Wt_order_min);
[0026] Among them, Wt_order_max represents the upper limit of the roll weight, Wt_order_min represents the lower limit of the roll weight; C represents the comprehensive yield rate; roundup() represents the result is rounded up; rounddown() represents the result is rounded down.
[0027] In the above technical solution, the process of determining the calculation method of the slab weight according to the calculation result of the number of rolls and calculating the final slab weight includes:
[0028] If N≦n, the final slab weight is calculated using the following formula: We=Width_set*L_max*H*ρ;
[0029] Otherwise, the final slab weight is calculated using the following formula:
[0030] We = n*Wt_order_min / C.
[0031] In the above technical solution, the following formula is used to calculate the slab length L of the pouring plan:
[0032] L = We / (Width_set*H*ρ).
[0033] In the above technical solution, the following formula is used to calculate the number of sub-rolls N' corresponding to the upper limit of the roll weight according to the actual process raw material weight of each process:
[0034] N'=roundup(Wm*C / Wt_order_max)
[0035] The following formula is used to calculate the lower limit of the roll weight and the corresponding number of rolls n' according to the actual raw material weight of each process:
[0036] n'=rounddown(Wm*C / Wt_order_min)
[0037] Wherein, Wm represents the actual weight of the process raw material, C represents the成材率; Wt_order_max represents the upper limit of the coil weight, Wt_order_min represents the lower limit of the order coil weight; roundup() represents rounding up the result; rounddown() represents rounding down the result;
[0038] If n < N, it is determined that the actual weight of the process raw material does not meet the preset coil weight requirement; otherwise, it is determined that the actual weight of the process raw material meets the preset coil weight requirement.
[0039] The present invention also provides a slab length optimization system based on order requirements, which is used for the slab length optimization method based on order requirements described in the above technical solution.
[0040] The present invention also provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, it implements the slab length optimization method based on order requirements described in the above technical solution.
[0041] The present invention provides an electronic device, including: a memory and a processor, which are communicatively connected to each other. The memory stores computer instructions, and the processor executes the computer instructions to execute the slab length optimization method based on order requirements described in the above technical solution.
[0042] The beneficial effects of the present invention are: The present invention proposes a method for calculating the optimal size of a slab, which can directly calculate the optimal slab size that meets the process regulations and order requirements. In the order-based production mode, considering the range of the finished coil weight requirements of customer orders under the conditions of meeting process restrictions and maximizing production capacity, the optimal length of the steel billet that meets the finished coil weight of the order is calculated. By combining with the issuance of the steelmaking plan, the present invention can realize the automatic generation and verification of the slab size. The present invention also deploys the proposed optimal calculation method for the slab length in the stage of compiling the steelmaking plan to improve the guidance of the calculation results to production.
[0043] Furthermore, by combining with the production plans of other units, the present invention proposes to check the compliance of the raw material weight with the order requirements in subsequent processes, ensuring that the coil weights of the final units can meet the coil weight range of the contract, improving the material utilization efficiency, ensuring that the coil weights required by customer orders can be met, and avoiding the generation of surplus materials due to inconsistent coil weights.
[0044] Furthermore, the present invention is applicable to the determination of the consistency between the raw material weight and the order requirements in the subsequent processes. When operations such as trimming, cutting the head and tail, or transferring contracts occur during production, it can be determined whether the raw material weight can meet the range of the finished coil weight required by the contract after the finished product unit divides the coil.
[0045] Furthermore, the present invention performs process design based on order requirements and considers equipment properties to obtain parameters required for subsequent calculation of slab length, fully considering the actual production environment and scenarios, ensuring calculation accuracy while further improving production efficiency.
[0046] Furthermore, the present invention selects appropriate multiple orders to prepare casting plans, which can effectively improve production efficiency. Therefore, it requires that the steel type is allowed to be produced in the same casting, and the slab width of the casting plan is set through the order overlapping interval to cover the needs of different orders. Under the premise of meeting the order requirements, the production efficiency is improved as much as possible to save production costs.
[0047] Furthermore, the calculation method of the initial slab weight and its corresponding number of rolls proposed in the present invention fully reflects the production plan requirements and actual production scenarios, while providing strong data support and basis for subsequent calculation parameter adjustments, thereby ensuring subsequent calculation accuracy.
[0048] Furthermore, the calculation method of the slab weight proposed in the present invention fully reflects the mutual influence between the production plan requirements and the actual production process, provides strong data support and basis for the subsequent adjustment of calculation parameters, and ensures the subsequent calculation accuracy. BRIEF DESCRIPTION OF THE DRAWINGS
[0049] Figure 1 It is a schematic diagram of the method flow of the present invention;
[0050] Figure 2 It is a schematic diagram of an application scenario of the present invention. DETAILED DESCRIPTION
[0051] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments to facilitate a clear understanding of the present invention, but they do not constitute a limitation on the present invention.
[0052] Example 1
[0053] Under the order-based production model, production needs to be organized starting from steelmaking according to the requirements of each sales order. Since the varieties, specifications and finished coil weight ranges required by the orders are different, and the production process also has corresponding limitations, in order to ensure that the slabs produced by continuous casting can meet the requirements of the final finished coil weight, the optimal length must be calculated based on the order and process constraints.
[0054] Based on the above technical objectives, the present invention provides a slab length optimization method based on order requirements, such as Figure 1 As shown, the following steps are included:
[0055] S1, determine the upper and lower limits of coil weight, maximum and minimum process values of slab width, slab density, slab thickness and comprehensive yield rate according to order requirements;
[0056] S2, determine the slab width of the pouring plan according to the order requirements;
[0057] S3, based on the initial slab weight calculated by the maximum slab length and the slab width of the casting plan, calculate the upper and lower limits of the coil weight and the corresponding number of coils;
[0058] S4, determining a calculation method for the slab weight according to the calculation result of the number of rolls and calculating the final slab weight;
[0059] S5 calculates the slab length of the pouring plan according to the final slab weight.
[0060] Specifically, the following steps are also included:
[0061] S6, according to the actual process raw material weight of each process, calculate the upper and lower limits of the roll weight and the corresponding number of sub-rolls, and judge whether the actual process raw material weight reaches the preset roll weight requirement according to the calculation result of the number of sub-rolls.
[0062] Specifically, the following steps are also included:
[0063] S7, determine the maximum and minimum slab lengths according to the order requirements, and judge whether the calculated slab lengths of the pouring plan meet the maximum and minimum slab length requirements; if so, release the pouring plan; otherwise, report an error.
[0064] Preferably, in step S1, the roll weight range of the customer order is obtained from the sales system, that is, the order roll weight upper limit Wt_order_max and the order roll weight lower limit Wt_order_min. When the roll weight of the final product falls between the upper and lower limits, the customer's order is met.
[0065] In step S1, the maximum and minimum process values of the slab width, the slab density, the maximum and minimum slab length, the slab thickness and the comprehensive yield rate are determined according to the order requirements. The process includes:
[0066] The process design is completed according to the finished product information required by the order, and then the width and thickness of the hot coil corresponding to the order are calculated. Considering the capacity of the side press, heating furnace and hot rolling mill, the corresponding maximum and minimum process values of the slab width, the slab length and the minimum length, as well as the slab density, slab thickness and comprehensive yield rate are calculated. The subsequent calculation results of the optimized slab length and width must be between their corresponding upper and lower limits.
[0067] The present invention performs process design based on order requirements and considers equipment properties to obtain parameters required for subsequent calculation of slab length, fully considering the actual production environment and scenarios, ensuring calculation accuracy while further improving production efficiency.
[0068] In step S2, the process of determining the slab width of the casting plan according to the order requirements includes: according to the order requirements, setting the orders with overlapping slab width ranges in the same casting, and the slab width of the casting must be between the maximum and minimum slab widths of each order in the casting plan.
[0069] Since the current production order structure will also change in real time in the manufacturing system, selecting appropriate multiple orders to compile a pouring plan can effectively improve production efficiency, so it is required that steel types can be produced in the same pouring. Since the billet width ranges of different orders often overlap, the slab width Width_set of the pouring plan can be set. This set width must be between the maximum slab width W_slab_max and the minimum W_slab_min of each order in the pouring to cover the needs of different orders, and to improve production efficiency as much as possible while meeting order requirements to save production costs.
[0070] In step S3, the initial slab weight W0 is calculated using the following formula:
[0071] W0=Width_set*L_max*H*ρ
[0072] Among them, Width_set represents the slab width of the pouring plan, L_max represents the maximum slab length, ρ represents the slab density, and H represents the slab thickness.
[0073] The following formula is used to calculate the number of rolls N corresponding to the upper limit of the coil weight obtained based on the initial slab weight, and the number of rolls n corresponding to the lower limit of the coil weight obtained based on the initial slab weight;
[0074] N=roundup(W0*C / Wt_order_max);
[0075] n=rounddown(W0*C / Wt_order_min);
[0076] Among them, Wt_order_max represents the upper limit of the coil weight, Wt_order_min represents the lower limit of the coil weight; C represents the comprehensive yield rate; roundup() represents the result is rounded up; rounddown() represents the result is rounded down.
[0077] The initial slab weight proposed by the present invention and its corresponding calculation method for the number of split coils fully reflect the production plan requirements and the actual production scenario, and at the same time provide strong data support and basis for subsequent calculation parameter adjustment, ensuring the subsequent calculation accuracy.
[0078] In step S4, the process of determining the calculation method of the slab weight according to the calculation result of the number of split coils and calculating the final slab weight includes:
[0079] If N≦n, the following formula is used to calculate the final slab weight We = Width_set * L_max * H * ρ;
[0080] Conversely, the following formula is used to calculate the final slab weight:
[0081] We = n * Wt_order_min / C.
[0082] The calculation method of the slab weight proposed by the present invention fully reflects the production plan requirements and the changes of various factors and their mutual influences in the actual production process, provides strong data support and basis for subsequent calculation parameter adjustment, and ensures the subsequent calculation accuracy.
[0083] In step S5, the following formula is used to calculate the slab length L of the casting plan:
[0084] L = We / (Width_set * H * ρ).
[0085] In step S6, the following formula is used to calculate the number of split coils N' corresponding to the upper limit of the coil weight according to the actual weight of the process raw material for each process:
[0086] N' = roundup(Wm * C / Wt_order_max)
[0087] The following formula is used to calculate the number of split coils n' corresponding to the lower limit of the coil weight calculation according to the actual weight of the process raw material for each process:
[0088] n' = rounddown(Wm * C / Wt_order_min)
[0089] Wherein, Wm represents the actual weight of the process raw material, C represents the成材率; Wt_order_max represents the upper limit of the coil weight, Wt_order_min represents the lower limit of the order coil weight; roundup() means rounding up the result; rounddown() means rounding down the result;
[0090] If n < N, it is determined that the actual weight of the process raw material does not meet the preset coil weight requirement; conversely, it is determined that the actual weight of the process raw material meets the preset coil weight requirement.
[0091] According to the above judgment process, if it is determined that the roll weight will be left over when the rolls are divided according to the order roll weight range in the finished product process, the order transfer process needs to be considered. The actual produced roll weight and the relevant parameters such as the slab width and length determined based on the above process are matched with other order requirements; and the number of rolls N' corresponding to the upper limit of the weight and the number of rolls n' corresponding to the lower limit of the roll weight corresponding to the newly matched order requirements are recalculated to determine whether the roll weight requirements of the new contract are met.
[0092] Example 2
[0093] The present invention provides a slab length optimization system based on order requirements, which is used for the slab length optimization method based on order requirements described in the above technical invention.
[0094] Example 3
[0095] The present invention provides a computer-readable storage medium having a computer program stored thereon, characterized in that when the computer program is executed by a processor, the method for optimizing the length of a slab based on order requirements as described in the above technical solution is implemented.
[0096] Example 4
[0097] The present invention provides an electronic device, comprising: a memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the slab length optimization method based on order requirements described in the above technical solution by executing the computer instructions.
[0098] By applying the present invention to the steelmaking continuous casting plan, material order and each unit operation plan compilation module of the existing manufacturing system, the slab length that meets the requirements can be obtained in the pouring planning stage to ensure that the subsequent pouring tasks can meet the order requirements, solve the problems of slab length optimization calculation and raw material weight matching, and play a good role in optimizing the production plan. Figure 2 As shown, the display device of the manufacturing system displays the number of rolls corresponding to the upper and lower limits of the roll weight calculated based on the actual process raw material weight of each process. The red color is an alarm prompt caused by weight mismatch.
[0099] The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.
Claims
1. A method for optimizing slab length based on order requirements, Features: The following steps are involved: Determine the upper and lower limits of coil weight, maximum and minimum process values of slab width, slab density, slab thickness and comprehensive yield rate according to order requirements; Determine the slab width for pouring plan according to order requirements; Based on the initial slab weight calculated based on the maximum slab length and the slab width of the casting plan, the upper and lower limits of the coil weight are calculated to calculate the corresponding number of coils; Determine the calculation method of the slab weight according to the calculation result of the number of rolls and calculate the final slab weight; The slab length for the casting plan is calculated based on the final slab weight.
2. A method for optimizing slab length based on order requirements according to claim 1, Features: The following steps are also included: According to the actual process raw material weight of each process, the upper and lower limits of the roll weight are calculated to calculate the corresponding number of rolls, and based on the calculation result of the number of rolls, it is judged whether the actual process raw material weight meets the preset roll weight requirement.
3. A method for optimizing slab length based on order requirements according to claim 1, Features: The following steps are also included: Determine the maximum and minimum slab lengths according to the order requirements, and determine whether the calculated slab lengths of the pouring plan meet the maximum and minimum slab length requirements; if so, release the pouring plan; otherwise, report an error.
4. A method for optimizing slab length based on order requirements according to claim 3, Features: According to the order requirements, the maximum and minimum values of the slab width, slab density, maximum and minimum slab length, slab thickness and comprehensive yield rate are determined. The process includes: The process design is completed according to the finished product information required by the order, and then the width and thickness of the hot coil corresponding to the order are calculated. Considering the capacity of the side press, heating furnace and hot rolling mill, the corresponding maximum and minimum slab width process values, slab length and minimum length values, as well as slab density, slab thickness and comprehensive yield rate are calculated.
5. A method for optimizing slab length based on order requirements according to claim 3, Features: The process of determining the slab width of the casting plan according to the order requirements includes: according to the order requirements, setting the orders with overlapping slab width ranges in the same casting, and the slab width of the casting must be between the maximum and minimum slab widths of each order in the casting plan.
6. A method for optimizing slab length based on order requirements according to claim 1, Features: The initial slab weight W0 is calculated using the following formula: W0=Width_set*L_max*H*ρ Among them, Width_set represents the slab width of the pouring plan, L_max represents the maximum slab length, ρ represents the slab density, and H represents the slab thickness.
7. A method for optimizing slab length based on order requirements according to claim 6, Features: The following formula is used to calculate the number of rolls N corresponding to the upper limit of the coil weight obtained based on the initial slab weight, and the number of rolls n corresponding to the lower limit of the coil weight obtained based on the initial slab weight; N=roundup(W0*C / Wt_order_max); n = rounddown(W0 * C / Wt_order_min); Wherein, Wt_order_max represents the upper limit of coil weight, Wt_order_min represents the lower limit of coil weight; C represents the comprehensive成材率; roundup() represents rounding up the result; rounddown() represents rounding down the result.
8. A slab length optimization method based on order requirements according to claim 7, characterized in that: The process of determining the calculation method of slab weight according to the calculation result of the number of split coils and calculating the final slab weight includes: If N ≤ n, the following formula is used to calculate the final slab weight We = Width_set * L_max * H * ρ; Otherwise, the following formula is used to calculate the final slab weight: We = n * Wt_order_min / C.
9. A slab length optimization method based on order requirements according to claim 8, characterized in that: The following formula is used to calculate the slab length L of the casting plan: L = We / (Width_set * H * ρ).
10. A slab length optimization method based on order requirements according to claim 2, characterized in that: The following formula is used to calculate the number of split coils N' corresponding to the upper limit of coil weight according to the actual process raw material weight of each process: N' = roundup(Wm * C / Wt_order_max) The following formula is used to calculate the number of split coils n' corresponding to the lower limit of coil weight according to the actual process raw material weight of each process: n' = rounddown(Wm * C / Wt_order_min) Wherein, Wm represents the actual process raw material weight, C represents the成材率; Wt_order_max represents the upper limit of coil weight, Wt_order_min represents the lower limit of order coil weight; roundup() represents rounding up the result; rounddown() represents rounding down the result; If n < N, it is determined that the actual process raw material weight does not meet the preset coil weight requirement; otherwise, it is determined that the actual process raw material weight meets the preset coil weight requirement.
11. A slab length optimization system based on order requirements, characterized in that: This system is used to implement the slab length optimization method based on order requirements described in any one of claims 1-10.
12. A computer-readable storage medium, on which a computer program is stored, characterized in that, When this computer program is executed by a processor, it implements the slab length optimization method based on order requirements described in any one of claims 1-10.
13. An electronic device, characterized in that, including: A memory and a processor, the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the computer instructions to execute the slab length optimization method based on order requirements described in any one of claims 1-10.
Citation Information
Patent Citations
Steelmaking-continuous casting-hot rolling integrated scheduling method and system
CN106779220A
Process design method for plate rolling
CN111352403A
Hot conveying and hot charging method optimally matched with casting blank quality
CN111570525A
Material lifting method and device for producing open slab
CN113112122A
Method of batching and scheduling for steelmaking production with plant-wide process consideration