Distribution network diagnostic analysis and network frame planning method based on intrinsic safety

By establishing a source-network-load-storage collaborative planning model in the distribution network and applying random fault assessment intrinsic safety indicators, and using multi-objective particle swarm algorithm optimization, the problem of insufficient accident risk prevention and response capabilities of the distribution network is solved, and the power efficiency is improved. Stability and security of supply.

CN118761573AActive Publication Date: 2024-10-11STATE GRID ELECTRIC POWER ECONOMIC RES INST IN NORTHERN HEBEI TECH CO LTD +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410739251.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-07
Publication Date
2024-10-11
Estimated Expiration
2044-06-07

AI Technical Summary

Technical Problem

The existing power distribution network is weak in preventing and responding to accident risks, and cannot effectively guarantee the stability and safety of power supply, especially in the face of natural disasters or unexpected situations.

Method used

The distribution network diagnostic analysis and grid planning method based on intrinsic safety is adopted. By obtaining planning information, a source network load-storage collaborative planning model is established, and random fault assessment intrinsic safety indicators are applied, including power flow overload coefficient, cascading failure coefficient and minimum node inertia. , and uses multi-objective particle swarm optimization to optimize the model to minimize costs and maximize intrinsic safety.

Benefits of technology

It improves the distribution network's ability to prevent and respond to accident risks, ensures the stability and safety of power supply, and reduces the impact of faults on the power grid through comprehensive assessment and optimization solutions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118761573A_ABST
    Figure CN118761573A_ABST
Patent Text Reader

Abstract

The invention provides a power distribution network diagnostic analysis and network frame planning method based on intrinsic safety. The method comprises the following steps: firstly, acquiring planning information of a target power distribution network; establishing a source network load storage collaborative planning model according to the planning information; applying a random fault to the target power distribution network, and evaluating an intrinsic safety index of the target power distribution network under the fault; wherein the intrinsic safety index is determined by a power flow overload coefficient, a cascading failure coefficient and a minimum node inertia; and finally, according to the intrinsic safety index, optimizing the source network load storage collaborative planning model to obtain an optimal planning scheme of the target power distribution network. According to the method, the intrinsic safety index is comprehensively calculated through the power flow overload coefficient, the cascading failure coefficient and the minimum node inertia, on the basis of the minimum cost, planning of the target power distribution network is further optimized based on the intrinsic safety index, and it is guaranteed that the power distribution network can effectively prevent and deal with accident risks.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of power grid planning, and in particular relates to a distribution network diagnosis analysis and grid planning method based on intrinsic safety. Background Art

[0002] With the continuous growth of social economy, the demand for electricity in various industries continues to rise. In order to meet this demand, the construction of a modern power system with ultra-high voltage transmission, long-distance power transmission, and large-capacity generators as the core has become an inevitable choice for development. Such a power system can transmit electricity more efficiently and meet the growing energy demand.

[0003] However, complex climate conditions and frequent natural disasters pose additional challenges to the power system. The intensity and frequency of these disasters sometimes exceed the expectations of the power system design, causing the power system to often operate close to its limit state, thus putting the safe and stable operation of the system under great test.

[0004] In traditional distribution network planning, the main consideration is cost minimization, which often leads to the distribution network's weak ability to prevent and respond to accident risks. This planning method may not effectively guarantee the stability and security of power supply when facing natural disasters or unexpected situations. Summary of the invention

[0005] In view of this, the present invention provides a distribution network diagnosis analysis and grid planning method based on intrinsic safety, aiming to solve the problem that the existing distribution network has weak ability in preventing and responding to accident risks.

[0006] A first aspect of an embodiment of the present invention provides a distribution network diagnosis analysis and grid planning method based on intrinsic safety, comprising:

[0007] Obtain planning information of the target distribution network;

[0008] According to the planning information, a source-grid-load-storage collaborative planning model is established;

[0009] Apply random faults to the target distribution network and evaluate the intrinsic safety index of the target distribution network under the fault; the intrinsic safety index is determined by the power flow overload coefficient, the cascading failure coefficient and the minimum node inertia;

[0010] According to the intrinsic safety indicators, the source-grid-load-storage collaborative planning model is optimized to obtain the optimal planning scheme for the target distribution network.

[0011] In a possible implementation, a source-grid-load-storage collaborative planning model is established based on planning information, including:

[0012] With the goal of minimizing power generation cost, investment cost and operation and maintenance cost, a source-grid-load-storage collaborative planning model is established.

[0013] In a possible implementation, the objective function of the source-grid-load-storage collaborative planning model is:

[0014] minF=f1+f2+f3+f4

[0015] Among them, F is the total cost, f1 is the power generation cost, f2 is the investment cost, f3 is the operation and maintenance cost, and f4 is the failure cost, which is determined by the impact of the imposed random failure on the operation of the power grid.

[0016] In a possible implementation, random faults are imposed on the target distribution network, and the intrinsic safety indicators of the target distribution network under the faults are evaluated, including:

[0017] Random faults are imposed on the target distribution network; the random faults include multiple groups of Nk faults;

[0018] According to the simulation results of the power grid fault simulation model under each group of Nk faults, the cascading faults corresponding to each group of Nk faults are determined; wherein the power grid fault simulation model is constructed according to the planning information of the target distribution network;

[0019] According to each group of Nk faults and the cascading faults corresponding to each group of Nk faults, the intrinsic safety index of the target distribution network under faults is evaluated.

[0020] In a possible implementation, the method further includes:

[0021] According to each group of Nk faults and the cascading faults corresponding to each group of Nk faults, determine the load shedding amount caused by the faults and the importance of each shedding load;

[0022] Determine the loss cost based on the load shedding amount caused by the fault and the importance of each shedding load;

[0023] Calculate the recovery cost of each group of Nk failures and the cascading failures corresponding to each group of Nk failures;

[0024] The sum of the loss cost and the recovery cost is taken as the failure cost.

[0025] In a possible implementation, according to each group of Nk faults and the cascading faults corresponding to each group of Nk faults, the intrinsic safety index of the target distribution network under the fault is evaluated, including:

[0026] Divide the number of cascading failures by the number of Nk failures to obtain the cascading failure coefficient;

[0027] Calculate the power flow overload coefficient according to the cascading faults corresponding to each group of Nk faults;

[0028] Take each group of Nk faults and the cascading faults corresponding to each group of Nk faults as disturbance sources, and calculate the minimum node inertia under each group of Nk faults;

[0029] According to the cascading failure coefficient, power flow overload coefficient and minimum node inertia, the intrinsic safety index of the target distribution network under fault is evaluated.

[0030] In a possible implementation, the intrinsic safety index of the target distribution network under fault is evaluated based on the cascading failure coefficient, the power flow overload coefficient and the minimum node inertia, including:

[0031] After normalizing the cascading failure coefficient, power flow overload coefficient, and minimum node inertia, a weighted sum is performed to obtain the intrinsic safety index of the source-grid-load-storage collaborative planning model under fault conditions.

[0032] In a possible implementation, the source-grid-load-storage collaborative planning model is optimized according to the intrinsic safety index to obtain the optimal planning scheme of the target distribution network, including:

[0033] With the goal of minimizing power generation cost, investment cost, operation and maintenance cost and maximizing intrinsic safety, a multi-objective particle swarm algorithm is used to optimize the source-grid-load-storage collaborative planning model to obtain the optimal planning scheme for the target distribution network.

[0034] The distribution network diagnosis analysis and grid planning method based on intrinsic safety provided by the embodiment of the present invention first obtains the planning information of the target distribution network; then, according to the planning information, a source-grid-load-storage collaborative planning model is established; then, random faults are imposed on the target distribution network to evaluate the intrinsic safety index of the target distribution network under the fault; wherein, the intrinsic safety index is determined by the flow overload coefficient, the cascading failure coefficient and the minimum node inertia; finally, according to the intrinsic safety index, the source-grid-load-storage collaborative planning model is optimized to obtain the optimal planning scheme of the target distribution network. The intrinsic safety index is comprehensively calculated by the flow overload coefficient, the cascading failure coefficient and the minimum node inertia, and on the basis of minimizing the cost, the planning of the target distribution network is further optimized based on the intrinsic safety index to ensure that the distribution network can effectively prevent and respond to accident risks. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0036] Figure 1It is a flow chart for implementing the intrinsically safe distribution network diagnosis analysis and grid planning method provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0037] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present invention. However, it should be clear to those skilled in the art that the present invention may be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present invention.

[0038] Figure 1 FIG. 1 is a flow chart of the implementation of the intrinsically safe distribution network diagnosis and analysis and grid planning method provided by the embodiment of the present invention. Figure 1 As shown, in some embodiments, the intrinsically safe distribution network diagnosis analysis and grid planning method includes:

[0039] S110, obtaining planning information of a target distribution network;

[0040] In an embodiment of the present invention, the planning information of the target distribution network includes cost information and node information; wherein the cost information includes power generation cost, investment cost, and operation and maintenance cost. The power generation cost can be obtained by multiplying the output data of each generator set by the cost coefficient corresponding to each type of generator set. The investment cost can be obtained by adding the unit construction cost, unit transformation cost, energy storage construction cost, and line construction cost. The sum of the unit start-up and shutdown cost and the energy storage maintenance cost is taken as the operation and maintenance cost. The above costs can be simply calculated based on the planning of the distribution network such as the information of the generator set, and will not be described here.

[0041] S120, establishing a source-grid-load-storage collaborative planning model based on the planning information;

[0042] In some embodiments, S120 includes: establishing a source-grid-load-storage collaborative planning model with the goal of minimizing power generation costs, investment costs, and operation and maintenance costs.

[0043] In some embodiments, the objective function of the source-grid-load-storage collaborative planning model is:

[0044] minF=f1+f2+f3+f4 (1)

[0045] Among them, F is the total cost, f1 is the power generation cost, f2 is the investment cost, f3 is the operation and maintenance cost, and f4 is the failure cost, which is determined by the impact of the imposed random failure on the operation of the power grid.

[0046] In the embodiment of the present invention, based on the traditional cost minimization model, the fault cost is introduced, and then the minimized cost under the fault is calculated by simulating the addition of random faults.

[0047] S130, applying a random fault to the target distribution network, and evaluating the intrinsic safety index of the target distribution network under the fault; wherein the intrinsic safety index is determined by a power flow overload coefficient, a cascading failure coefficient, and a minimum node inertia;

[0048] In the embodiment of the present invention, the NK fault analysis of the power system is a common method in the planning and operation of the power system, which is used to verify whether the system operation state is within the allowable safety range after K components in the system fail to operate.

[0049] In some embodiments, S130 includes: applying random faults to the target distribution network; the random faults include multiple groups of Nk faults; determining the chain failures corresponding to each group of Nk faults according to the simulation results of the power grid fault simulation model under each group of Nk faults; wherein the power grid fault simulation model is constructed according to the planning information of the target distribution network; and evaluating the intrinsic safety indicators of the target distribution network under the faults according to each group of Nk faults and the chain failures corresponding to each group of Nk faults.

[0050] In the embodiment of the present invention, a variety of distribution network faults can be recorded in advance, such as busbar faults, line faults, circuit breaker faults, relay protection malfunctions and refusal to operate, etc. During fault simulation, the recorded faults are randomly combined to obtain multiple groups of Nk faults. Subsequently, each group of Nk faults is applied to the power grid fault simulation model for simulation, and the chain failures caused by them are calculated.

[0051] In an embodiment of the present invention, the power grid fault simulation model may specifically be a power grid node model used for power flow calculation. Specifically, it may be implemented through the following steps:

[0052] 1. System data input: First, read in the power grid network data required for power flow calculation, including line parameters, node information and initial load distribution.

[0053] 2. Fault application: Apply any fault on the corresponding line or node, and perform system power flow calculation in the power grid node model.

[0054] 3. Load data acquisition: load forecasting for faulty lines.

[0055] 4. Update of power flow calculation: Based on the results of load forecasting and the changes in line impedance (considering the four parameters of resistance, reactance, conductance and susceptance), update the power flow calculation.

[0056] 5. Overload judgment: Based on the results of the power flow calculation, determine whether the line or node where the fault is applied is overloaded.

[0057] 6. Cascading fault judgment: If a line overload is detected, and the difference between the time point of the overload and the time point of the fault is less than the preset time difference, it is considered that a cascading fault has occurred, the calculation is terminated, and it is judged that a continuous fault has occurred in the system.

[0058] 7. Handling of the non-overload situation: If there is no line overload, apply the next fault and return to step 3 until the faults of Nk components are applied and all the chain faults caused by the Nk components are obtained.

[0059] Through this algorithm flow and simulation steps, the load overload situation of the power grid during the fault period can be effectively monitored, and possible cascading failures can be identified in time, so that measures can be taken to prevent further failures and ensure the stable operation of the power grid.

[0060] In some embodiments, the method also includes: determining the load cut-out amount caused by the fault and the importance of each load cut-out according to each group of Nk faults and the chain failures corresponding to each group of Nk faults; determining the loss cost according to the load cut-out amount caused by the fault and the importance of each load cut-out; calculating the recovery cost of each group of Nk faults and the chain failures corresponding to each group of Nk faults; and taking the sum of the loss cost and the recovery cost as the fault cost.

[0061] In the embodiment of the present invention, whether it is an imposed fault or a chain failure caused, it will cause a part of the lines or nodes to be cut out, that is, part of the load loses power supply, causing certain economic losses. Therefore, the load amount on each cut-out node can be defined as the load cut-out amount caused by the fault, multiplied by the cost coefficient corresponding to the importance of the load connected to the node, which is the loss cost. At the same time, each type of fault corresponds to a fixed recovery cost, and the total recovery cost can be obtained by adding up the recovery costs of all faults.

[0062] In some embodiments, based on each group of Nk faults and the cascading faults corresponding to each group of Nk faults, the intrinsic safety index of the target distribution network under the fault is evaluated, including: dividing the number of cascading faults by the number of Nk faults to obtain a cascading fault coefficient; calculating a power flow overload coefficient based on the cascading faults corresponding to each group of Nk faults; taking each group of Nk faults and the cascading faults corresponding to each group of Nk faults as disturbance sources, and calculating the minimum node inertia under each group of Nk faults; and evaluating the intrinsic safety index of the target distribution network under the fault based on the cascading fault coefficient, the power flow overload coefficient and the minimum node inertia.

[0063] In the embodiment of the present invention, each cascading failure is caused by line overload due to the imposed fault, so it can be considered that one cascading failure corresponds to one overload, and the number of overloaded nodes divided by the total number of nodes is the power flow overload coefficient.

[0064] In an embodiment of the present invention, the change in power caused by a fault can be defined as a disturbance. In the process of fault and node cutting, other power nodes will be affected by the disturbance. The closer the electrical distance between each node and the faulty node, the greater the impact of the disturbance. Based on the results of the flow calculation in the above fault simulation process, the power change of each node can be obtained, multiplied by the preset inertia time constant to obtain the node inertia of each node. The smaller the node inertia, the more likely it is to fail after being disturbed.

[0065] In some embodiments, the intrinsic safety index of the target distribution network under fault is evaluated based on the cascading failure coefficient, the power flow overload coefficient and the minimum node inertia, including: normalizing the cascading failure coefficient, the power flow overload coefficient and the minimum node inertia, and performing weighted summation to obtain the intrinsic safety index of the source-grid-load-storage collaborative planning model under fault.

[0066] In the embodiment of the present invention, the weights of various comprehensive energy consumption indicators are preset values ​​and are not limited here.

[0067] S140, optimizing the source-grid-load-storage collaborative planning model according to the intrinsic safety index to obtain the optimal planning scheme for the target distribution network.

[0068] In some embodiments, S140 includes: optimizing the source-grid-load-storage collaborative planning model using a multi-objective particle swarm algorithm with the goal of minimizing power generation costs, investment costs, operation and maintenance costs and maximizing intrinsic safety to obtain the optimal planning scheme for the target distribution network.

[0069] In the embodiment of the present invention, the multi-objective particle swarm algorithm is an optimization algorithm based on swarm intelligence, which is used to solve problems with multiple optimization objectives. The steps are as follows:

[0070] Initialize particle swarm: Randomly initialize the positions and velocities of a group of particles. Each particle represents a potential solution to the problem.

[0071] Individual best and global best: Assign an initial individual best position (pbest) and a global best position (gbest) to each particle.

[0072] External Archive: Initialize an external archive to store non-dominated solutions found during the execution of the algorithm.

[0073] Iterative optimization: Update particle speed and position: Update the particle speed and position according to the particle's current speed, individual best position and global best position.

[0074] Update individual best: Compare the new position of each particle with its individual best position, and update the individual best if the new position is better.

[0075] Update the external archive: Add newly discovered non-dominated solutions to the external archive while maintaining the size of the archive according to some mechanism (such as crowding distance).

[0076] Select Global Best: Select a global best position for each particle from an external archive. This can be done in a variety of ways, such as random selection, selection based on crowding distance, etc.

[0077] Termination condition check: Check whether the termination condition is met, such as reaching the maximum number of iterations, the quality of the solution meets the requirements, etc. If the condition is met, the algorithm ends; otherwise, it returns to the iterative optimization step.

[0078] Output results: After the algorithm is completed, a set of approximate non-dominated solutions to the multi-objective optimization problem is saved in the external archive. These solutions can be provided to decision makers for further analysis and decision-making.

[0079] In the iterative optimization process of the multi-objective particle swarm of the present invention, cost and safety will affect each other. First, the source-grid-load-storage collaborative planning model with the minimum cost without applying a fault is calculated. After applying a fault, a safety calculation is performed. The particle swarm algorithm selects the optimization result with the highest safety to obtain a new distribution network planning scheme. On the basis of this scheme, the cost increase caused by applying the fault is considered, and the cost minimization calculation is performed again to obtain a new optimization result. The above process is continuously iterated through the particle swarm algorithm, and finally the result obtained takes into account both low cost and high safety.

[0080] It should be understood that the order of execution of the steps in the above embodiment does not necessarily mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiment of the present invention.

[0081] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0082] Those skilled in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.

[0083] In the embodiments provided by the present invention, it should be understood that the disclosed devices / electronic devices and methods can be implemented in other ways. For example, the device / electronic device embodiments described above are only schematic. For example, the division of modules or units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0084] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0085] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0086] If the integrated module / unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. Computer-readable media may include: any entity or device capable of carrying computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electrical carrier signal, telecommunication signal and software distribution medium, etc.

[0087] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should all be included in the protection scope of the present invention.

Claims

1. A distribution network diagnosis analysis and grid planning method based on intrinsic safety, It is characterized in that include: Obtain planning information of the target distribution network; According to the planning information, a source-grid-load-storage collaborative planning model is established; Applying random faults to the target distribution network, and evaluating the intrinsic safety index of the target distribution network under the fault; wherein the intrinsic safety index is determined by the power flow overload coefficient, the cascading failure coefficient and the minimum node inertia; According to the intrinsic safety index, the source-grid-load-storage collaborative planning model is optimized to obtain the optimal planning scheme for the target distribution network.

2. According to the intrinsically safe distribution network diagnosis analysis and grid planning method of claim 1, It is characterized in that According to the planning information, a source-grid-load-storage collaborative planning model is established, including: With the goal of minimizing power generation cost, investment cost and operation and maintenance cost, a source-grid-load-storage collaborative planning model is established.

3. According to the intrinsically safe distribution network diagnosis analysis and grid planning method of claim 2, It is characterized in that The objective function of the source-grid-load-storage collaborative planning model is: minF=f 1 +f 2 +f 3 +f 4 Among them, F is the total cost, f 1 is the power generation cost, f 2 is the investment cost, f 3 is the operation and maintenance cost, f 4 is the fault cost, which is determined by the impact of the imposed random fault on the grid operation.

4. According to the intrinsically safe distribution network diagnosis analysis and grid planning method of claim 3, It is characterized in that A random fault is imposed on the target distribution network, and the intrinsic safety index of the target distribution network under the fault is evaluated, including: Applying random faults to the target distribution network; the random faults include multiple groups of Nk faults; Determine the cascading failures corresponding to each group of Nk faults according to the simulation results of the power grid fault simulation model under each group of Nk faults; wherein the power grid fault simulation model is constructed according to the planning information of the target distribution network; According to each group of Nk faults and the cascading faults corresponding to each group of Nk faults, the intrinsic safety index of the target distribution network under faults is evaluated.

5. According to the intrinsically safe distribution network diagnosis analysis and grid planning method of claim 4, It is characterized in that The method further comprises: According to each group of Nk faults and the cascading faults corresponding to each group of Nk faults, determine the load shedding amount caused by the faults and the importance of each shedding load; Determine the loss cost based on the load shedding amount caused by the fault and the importance of each shedding load; Calculate the recovery cost of each group of Nk failures and the cascading failures corresponding to each group of Nk failures; The sum of the loss cost and the recovery cost is taken as the failure cost.

6. The method for diagnosis and analysis of distribution network and planning of grid structure based on intrinsic safety according to claim 4, It is characterized in that According to each group of Nk faults and the cascading faults corresponding to each group of Nk faults, the intrinsic safety indicators of the target distribution network under faults are evaluated, including: Divide the number of cascading failures by the number of Nk failures to obtain the cascading failure coefficient; Calculate the power flow overload coefficient according to the cascading faults corresponding to each group of Nk faults; Take each group of Nk faults and the cascading faults corresponding to each group of Nk faults as disturbance sources, and calculate the minimum node inertia under each group of Nk faults; According to the cascading failure coefficient, the power flow overload coefficient and the minimum node inertia, the intrinsic safety index of the target distribution network under the fault is evaluated.

7. The method for diagnosis and analysis of distribution network and planning of grid structure based on intrinsic safety according to claim 6, It is characterized in that According to the cascading failure coefficient, the power flow overload coefficient and the minimum node inertia, the intrinsic safety index of the target distribution network under the fault is evaluated, including: The cascading failure coefficient, the power flow overload coefficient, and the minimum node inertia are normalized and weighted summed to obtain the intrinsic safety index of the source-grid-load-storage collaborative planning model under fault conditions.

8. The method for diagnosis and analysis of distribution network and planning of grid structure based on intrinsic safety according to claim 1, It is characterized in that According to the intrinsic safety index, the source-grid-load-storage collaborative planning model is optimized to obtain the optimal planning scheme of the target distribution network, including: With the goal of minimizing power generation cost, investment cost, operation and maintenance cost and maximizing intrinsic safety, a multi-objective particle swarm algorithm is used to optimize the source-grid-load-storage collaborative planning model to obtain the optimal planning scheme for the target distribution network.

9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the computer program, the steps of the distribution network diagnosis analysis and grid planning method based on intrinsic safety as described in any one of claims 1 to 8 above are implemented.

10. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the distribution network diagnosis analysis and grid planning method based on intrinsic safety as described in any one of claims 1 to 8 above are implemented.

Citation Information

Patent Citations

  • Distribution network transformer substation planning method considering main transformer adjustment and utilization and safety performance cost

    CN110648079A

  • Power distribution network diagnosis analysis and network frame planning method based on intrinsic safety

    CN110852481A

  • Power grid planning method considering cascading failure risk

    CN114971943A

  • Electric power system weak link identification method, device, equipment and medium

    CN115828551A