Intelligent engineering monitoring method and system based on multi-sensing information correction
Through the multi-sensor information correction method, combined with sensor information and prediction neural network, the problem of poor monitoring effect of single sensor information in the existing technology is solved, and efficient and accurate prediction and analysis of construction engineering hazard information are achieved, providing construction More accurate data support.
Patent Information
- Application Number
- CN202410905479.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-08
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-07-08
AI Technical Summary
The existing technology only uses a single sensor information in construction project monitoring, resulting in poor monitoring effects. It lacks mutual correction and cooperation between multiple sensor information, and cannot predict and analyze project hazard information efficiently and accurately.
The multi-sensory information correction method is adopted to obtain a variety of sensing information (such as temperature, humidity, light intensity, precipitation, infrared sensing information) of the target engineering area through multiple sensors, and is carried out according to the correction rules between the sensing information values. Calibrate and determine the prediction neural network according to the project type to achieve accurate prediction of project hazard information.
It improves the efficiency and accuracy of engineering hazard monitoring, provides more accurate data guidance for engineering construction, and enhances the ability to predict and analyze engineering hazard information.
Smart Images

Figure CN118761629A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of data processing technology, and in particular to a smart engineering monitoring method and system based on multi-sensor information correction. Background Art
[0002] With the rapid development of my country's national economy, the demand for construction is getting higher and higher, and the number of construction projects is also increasing. In particular, construction projects involve many factors such as personnel, machinery, materials, and environment, which are difficult to monitor. Existing manufacturers have begun to try to introduce the concept of smart engineering to achieve intelligent monitoring, but the existing technology generally only uses a single sensor information for monitoring, and does not realize engineering monitoring based on the mutual correction and joint action between multiple sensor information, and its monitoring effect is poor. It can be seen that the existing technology has defects that need to be solved urgently. Summary of the invention
[0003] The technical problem to be solved by the present invention is to provide an intelligent engineering monitoring method and system based on multi-sensor information correction, which can more efficiently and accurately predict and analyze engineering hazard information, improve the engineering hazard monitoring effect, and provide more accurate data guidance for engineering construction.
[0004] In order to solve the above technical problems, the first aspect of the present invention discloses a smart engineering monitoring method based on multi-sensor information correction, the method comprising: Acquire multiple sensing information of the target engineering area through multiple sensors; According to the correction rule between the sensor information values, each of the sensor information is corrected to obtain the corresponding corrected sensor information; Determining a corresponding prediction neural network according to the project type corresponding to the target project area; The engineering hazard information corresponding to the target engineering area is predicted based on the prediction neural network and all the corrected sensor information.
[0005] As an optional implementation, in the first aspect of the present invention, the sensing information is temperature sensing information, humidity sensing information, light intensity sensing information, precipitation sensing information, infrared sensing information or image sensing information.
[0006] As an optional embodiment, in the first aspect of the present invention, the project type is an electric power project, a waterway project, a decoration project, a wall project or a main building project.
[0007] As an optional implementation, in the first aspect of the present invention, the step of correcting each of the sensor information according to the correction rule between the sensor information values to obtain the corresponding corrected sensor information includes: For any two pieces of the sensing information, determining a correlation parameter between the information types of the two pieces of the sensing information according to a preset correlation relationship between the information types; Establishing a mathematical relationship model of information values of the two sensor information according to historical data corresponding to the information types of the two sensor information; According to the information value mathematical relationship model and the correlation parameter, the corrected sensing information corresponding to the two sensing information is determined.
[0008] As an optional implementation, in the first aspect of the present invention, determining the corrected sensing information corresponding to the two sensing information according to the information value mathematical relationship model and the correlation parameter includes: Inputting the information value of one of the two sensor information into the information value mathematical relationship model to obtain the information correction value of the other sensor information; Calculating a correction weight proportional to the correlation parameter; Calculating the product of the information correction value and the correction weight to obtain a correction parameter; The average value between the information value of each sensing information and the corresponding correction parameter is calculated to obtain the corrected sensing information corresponding to another sensing information.
[0009] As an optional implementation, in the first aspect of the present invention, determining the corresponding prediction neural network according to the project type corresponding to the target project area includes: Determine the project type corresponding to the target project area; For each candidate neural network, calculating the similarity between the engineering type label in the training data set of the candidate neural network and the engineering type; The candidate neural network with the highest similarity is determined as the prediction neural network corresponding to the target engineering area; the prediction neural network is trained by a training data set including multiple training sensor data and corresponding engineering risk type annotations.
[0010] As an optional implementation, in the first aspect of the present invention, determining the project type corresponding to the target project area includes: Input each of the corrected sensor information into a trained engineering type classifier network to obtain a corresponding engineering type prediction result; the engineering type classifier network is trained by a training data set including a plurality of training sensor information and corresponding engineering type annotations; The mode item of all the prediction results of the engineering types is calculated to obtain the engineering type corresponding to the target engineering area.
[0011] As an optional implementation, in the first aspect of the present invention, predicting the engineering hazard information corresponding to the target engineering area based on the prediction neural network and all the corrected sensor information includes: Inputting each of the corrected sensor information into the prediction neural network to obtain a risk prediction value and a risk type corresponding to each of the corrected sensor information; For each of the corrected sensor information, determining whether the risk prediction value corresponding to the corrected sensor information is greater than a preset threshold, and if so, determining the corrected sensor information as dangerous sensor information; The area location corresponding to each of the hazard sensor information and the corresponding risk type are determined as the engineering hazard information corresponding to the target engineering area.
[0012] A second aspect of an embodiment of the present invention discloses a smart engineering monitoring system based on multi-sensor information correction, the system comprising: An acquisition module, used for acquiring multiple sensing information of a target engineering area through multiple sensors; A correction module, used for correcting each of the sensor information according to a correction rule between the sensor information values to obtain corresponding corrected sensor information; A determination module, used to determine a corresponding prediction neural network according to the project type corresponding to the target project area; A prediction module is used to predict the engineering hazard information corresponding to the target engineering area based on the prediction neural network and all the corrected sensor information.
[0013] As an optional implementation, in the second aspect of the present invention, the sensing information is temperature sensing information, humidity sensing information, light intensity sensing information, precipitation sensing information, infrared sensing information or image sensing information.
[0014] As an optional embodiment, in the second aspect of the present invention, the project type is an electric power project, a waterway project, a decoration project, a wall project or a main building project.
[0015] As an optional implementation, in the second aspect of the present invention, the step of correcting each of the sensor information according to the correction rule between the sensor information values to obtain the corresponding corrected sensor information includes: For any two pieces of the sensing information, determining a correlation parameter between the information types of the two pieces of the sensing information according to a preset correlation relationship between the information types; Establishing a mathematical relationship model of information values of the two sensor information according to historical data corresponding to the information types of the two sensor information; According to the information value mathematical relationship model and the correlation parameter, the corrected sensing information corresponding to the two sensing information is determined.
[0016] As an optional implementation, in the second aspect of the present invention, the correction module determines the specific manner of correcting the sensor information corresponding to the two sensor information according to the information value mathematical relationship model and the correlation parameter, including: Inputting the information value of one of the two sensor information into the information value mathematical relationship model to obtain the information correction value of the other sensor information; Calculating a correction weight proportional to the correlation parameter; Calculating the product of the information correction value and the correction weight to obtain a correction parameter; The average value between the information value of each sensing information and the corresponding correction parameter is calculated to obtain the corrected sensing information corresponding to another sensing information.
[0017] As an optional implementation, in the second aspect of the present invention, the determination module determines the specific method of the corresponding prediction neural network according to the project type corresponding to the target project area, including: Determine the project type corresponding to the target project area; For each candidate neural network, calculating the similarity between the engineering type label in the training data set of the candidate neural network and the engineering type; The candidate neural network with the highest similarity is determined as the prediction neural network corresponding to the target engineering area; the prediction neural network is trained by a training data set including multiple training sensor data and corresponding engineering risk type annotations.
[0018] As an optional implementation, in the second aspect of the present invention, the specific manner in which the determination module determines the project type corresponding to the target project area includes: Input each of the corrected sensor information into a trained engineering type classifier network to obtain a corresponding engineering type prediction result; the engineering type classifier network is trained by a training data set including a plurality of training sensor information and corresponding engineering type annotations; The mode item of all the prediction results of the engineering types is calculated to obtain the engineering type corresponding to the target engineering area.
[0019] As an optional embodiment, in the second aspect of the present invention, the prediction module predicts the specific manner of the engineering hazard information corresponding to the target engineering area according to the prediction neural network and all the corrected sensor information, including: Inputting each of the corrected sensor information into the prediction neural network to obtain a risk prediction value and a risk type corresponding to each of the corrected sensor information; For each of the corrected sensor information, determining whether the risk prediction value corresponding to the corrected sensor information is greater than a preset threshold, and if so, determining the corrected sensor information as dangerous sensor information; The area location corresponding to each of the hazard sensor information and the corresponding risk type are determined as the engineering hazard information corresponding to the target engineering area.
[0020] The third aspect of the present invention discloses another intelligent engineering monitoring system based on multi-sensor information correction, the system comprising: A memory storing executable program code; a processor coupled to the memory; The processor calls the executable program code stored in the memory to execute part or all of the steps in the smart engineering monitoring method based on multi-sensor information correction disclosed in the first aspect of the present invention.
[0021] The fourth aspect of the present invention discloses a computer storage medium, which stores computer instructions. When the computer instructions are called, they are used to execute some or all of the steps in the intelligent engineering monitoring method based on multi-sensor information correction disclosed in the first aspect of the present invention.
[0022] Compared with the prior art, the embodiments of the present invention have the following beneficial effects: The present invention can correct multiple sensor information of a target engineering area of a target mouse obtained by multiple sensors based on correction rules, and then determine the corresponding prediction neural network according to the engineering type corresponding to the target engineering area, so as to achieve accurate engineering hazard prediction based on the corrected sensor information, thereby being able to predict and analyze engineering hazard information more efficiently and accurately, improving the engineering hazard monitoring effect, and providing more accurate data guidance for engineering construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0024] Figure 1 It is a flow chart of a smart engineering monitoring method based on multi-sensor information correction disclosed in an embodiment of the present invention.
[0025] Figure 2It is a structural schematic diagram of a smart engineering monitoring system based on multi-sensor information correction disclosed in an embodiment of the present invention.
[0026] Figure 3 It is a structural schematic diagram of another intelligent engineering monitoring system based on multi-sensor information correction disclosed in an embodiment of the present invention. DETAILED DESCRIPTION
[0027] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0028] The terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish different objects, rather than to describe a specific order. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, device, product or equipment that includes a series of steps or units is not limited to the listed steps or units, but may optionally include steps or units that are not listed, or may optionally include other steps or units that are inherent to these processes, methods, products or equipment.
[0029] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present invention. The appearance of the phrase in various places in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.
[0030] The present invention discloses a smart engineering monitoring method and system based on multi-sensor information correction, which can correct multiple sensor information of a target engineering area of a target mouse obtained by multiple sensors based on correction rules, and then determine the corresponding prediction neural network according to the engineering type corresponding to the target engineering area, so as to achieve accurate engineering hazard prediction based on the corrected sensor information, thereby being able to more efficiently and accurately predict and analyze engineering hazard information, improve engineering hazard monitoring effects, and provide more accurate data guidance for engineering construction. The following are detailed descriptions.
[0031] Embodiment 1 See also Figure 1 , Figure 1: is a flow chart of a smart engineering monitoring method based on multi-sensor information correction disclosed in an embodiment of the present invention. Figure 1 The described intelligent engineering monitoring method based on multi-sensor information correction can be applied to a data processing system / data processing device / data processing server (wherein the server includes a local processing server or a cloud processing server). Figure 1 As shown, the smart engineering monitoring method based on multi-sensor information correction may include the following operations: 101. Acquire multiple sensing information of the target engineering area through multiple sensors.
[0032] 102. According to the correction rule between the sensor information values, correct each sensor information to obtain corresponding corrected sensor information. 103. Determine the corresponding prediction neural network according to the project type corresponding to the target project area. 104. Based on the prediction neural network and all corrected sensor information, the engineering hazard information corresponding to the target engineering area is predicted.
[0033] It can be seen that the above-mentioned embodiment of the invention can correct the multiple sensor information of the target engineering area of the target mouse obtained by multiple sensors based on the correction rules, and then determine the corresponding prediction neural network according to the engineering type corresponding to the target engineering area, so as to achieve accurate engineering hazard prediction based on the corrected sensor information, thereby being able to predict and analyze the engineering hazard information more efficiently and accurately, improve the engineering hazard monitoring effect, and provide more accurate data guidance for engineering construction.
[0034] As an optional embodiment, in the above steps, the sensing information is temperature sensing information, humidity sensing information, light intensity sensing information, precipitation sensing information, infrared sensing information or image sensing information.
[0035] It can be seen that through the above optional embodiments, the content of the sensor information is clarified, which can more comprehensively characterize the various aspects of the project, so as to facilitate the subsequent accurate prediction of engineering hazards, assist in more efficient and accurate prediction and analysis of engineering hazard information, improve the effect of engineering hazard monitoring, and provide more accurate data guidance for engineering construction.
[0036] As an optional embodiment, in the above steps, the project type is an electric power project, a waterway project, a decoration project, a wall project or a main building project.
[0037] It can be seen that through the above optional embodiments, the project type is clarified, and the characteristics of different projects can be more comprehensively characterized, so as to facilitate the subsequent accurate prediction of project hazards, assist in more efficient and accurate prediction and analysis of project hazard information, improve the effect of project hazard monitoring, and provide more accurate data guidance for project construction.
[0038] As an optional embodiment, in the above steps, correcting each sensor information according to the correction rule between sensor information values to obtain corresponding corrected sensor information includes: For any two pieces of sensor information, determining a correlation parameter between the information types of the two pieces of sensor information according to a preset correlation relationship between the information types; Establishing a mathematical relationship model of information values of the two sensor information according to historical data corresponding to the information types of the two sensor information; According to the information value mathematical relationship model and the correlation parameter, the corrected sensing information corresponding to the two sensing information is determined.
[0039] It can be seen that through the above-mentioned optional embodiments, it is possible to determine the correlation parameters between the information types of the two sensor information and the information value mathematical relationship model, so as to realize the correction of the two sensor information to obtain sensor data with more reference value, so as to facilitate the subsequent accurate prediction of engineering hazards, assist in realizing more efficient and accurate prediction and analysis of engineering hazard information, improve the engineering hazard monitoring effect, and provide more accurate data guidance for engineering construction.
[0040] As an optional embodiment, in the above step, determining the corrected sensing information corresponding to the two sensing information according to the information value mathematical relationship model and the correlation parameter includes: Inputting the information value of one of the two sensing information into the information value mathematical relationship model to obtain the information correction value of the other sensing information; Calculate a correction weight proportional to the correlation parameter; Calculate the product of the information correction value and the correction weight to obtain the correction parameter; The average value between the information value of each sensing information and the corresponding correction parameter is calculated to obtain the corrected sensing information corresponding to another sensing information.
[0041] It can be seen that through the above-mentioned optional embodiments, it is possible to accurately calculate the correction weight based on the correlation parameter, and determine the reasonable corresponding value of the information value through the information value mathematical relationship model, and finally obtain more valuable reference sensor data based on the average calculation, so as to facilitate the subsequent accurate prediction of engineering hazards, assist in more efficient and accurate prediction and analysis of engineering hazard information, improve the engineering hazard monitoring effect, and provide more accurate data guidance for engineering construction.
[0042] As an optional embodiment, in the above step, determining the corresponding prediction neural network according to the project type corresponding to the target project area includes: Determine the project type corresponding to the target project area; For each candidate neural network, calculate the similarity between the engineering type label in the training data set of the candidate neural network and the engineering type; The candidate neural network with the highest similarity is determined as the prediction neural network corresponding to the target engineering area; the prediction neural network is trained by a training data set including multiple training sensor data and corresponding engineering risk type annotations.
[0043] It can be seen that through the above-mentioned optional embodiments, it is possible to screen out a predictive neural network that is closer to the engineering type in the training data set according to the engineering type of the engineering area, so as to facilitate the subsequent accurate prediction of engineering hazards, assist in more efficient and accurate prediction and analysis of engineering hazard information, improve the engineering hazard monitoring effect, and provide more accurate data guidance for engineering construction.
[0044] As an optional embodiment, in the above step, determining the project type corresponding to the target project area includes: Input each corrected sensor information into a trained engineering type classifier network to obtain a corresponding engineering type prediction result; optionally, the engineering type classifier network is trained by a training data set including a plurality of training sensor information and corresponding engineering type annotations; Calculate the mode of the prediction results of all engineering types to obtain the engineering type corresponding to the target engineering area.
[0045] It can be seen that through the above optional embodiments, the engineering type corresponding to each sensor information can be predicted through the trained engineering type classifier network and a more accurate engineering type corresponding to the engineering area can be obtained through the majority calculation, so as to facilitate the subsequent accurate engineering hazard prediction, assist in achieving more efficient and accurate prediction and analysis of engineering hazard information, improve the engineering hazard monitoring effect, and provide more accurate data guidance for engineering construction.
[0046] As an optional embodiment, in the above steps, predicting the engineering hazard information corresponding to the target engineering area based on the prediction neural network and all corrected sensor information includes: Input each corrected sensor information into the prediction neural network to obtain the risk prediction value and risk type corresponding to each corrected sensor information; For each corrected sensor information, determining whether the risk prediction value corresponding to the corrected sensor information is greater than a preset threshold, and if so, determining the corrected sensor information as dangerous sensor information; The area location and the corresponding risk type corresponding to each hazard sensor information are determined as the engineering hazard information corresponding to the target engineering area.
[0047] It can be seen that through the above-mentioned optional embodiments, the risk prediction value and risk type corresponding to each corrected sensor information can be predicted through the predictive neural network to screen out the dangerous area location and risk type, thereby achieving accurate engineering hazard prediction, and being able to predict and analyze engineering hazard information more efficiently and accurately, thereby improving the engineering hazard monitoring effect and providing more accurate data guidance for engineering construction.
[0048] Embodiment 2 See also Figure 2 , Figure 2 : is a schematic diagram of a structure of a smart engineering monitoring system based on multi-sensor information correction disclosed in an embodiment of the present invention. Figure 2 The described intelligent engineering monitoring system based on multi-sensor information correction can be applied to a data processing system / data processing device / data processing server (wherein the server includes a local processing server or a cloud processing server). Figure 2 As shown, the intelligent engineering monitoring system based on multi-sensor information correction may include: The acquisition module 201 is used to acquire a plurality of sensing information of a target engineering area through a plurality of sensors.
[0049] The correction module 202 is used to correct each sensor information according to the correction rule between the sensor information values to obtain the corresponding corrected sensor information. The determination module 203 is used to determine the corresponding prediction neural network according to the project type corresponding to the target project area. The prediction module 204 is used to predict the engineering hazard information corresponding to the target engineering area based on the prediction neural network and all the corrected sensor information.
[0050] It can be seen that the above-mentioned embodiment of the invention can correct the multiple sensor information of the target engineering area of the target mouse obtained by multiple sensors based on the correction rules, and then determine the corresponding prediction neural network according to the engineering type corresponding to the target engineering area, so as to achieve accurate engineering hazard prediction based on the corrected sensor information, thereby being able to predict and analyze the engineering hazard information more efficiently and accurately, improve the engineering hazard monitoring effect, and provide more accurate data guidance for engineering construction.
[0051] As an optional embodiment, the sensing information is temperature sensing information, humidity sensing information, light intensity sensing information, precipitation sensing information, infrared sensing information or image sensing information.
[0052] It can be seen that through the above optional embodiments, the content of the sensor information is clarified, which can more comprehensively characterize the various aspects of the project, so as to facilitate the subsequent accurate prediction of engineering hazards, assist in more efficient and accurate prediction and analysis of engineering hazard information, improve the effect of engineering hazard monitoring, and provide more accurate data guidance for engineering construction.
[0053] As an optional embodiment, the project type is an electric power project, a waterway project, a decoration project, a wall project or a main building project.
[0054] It can be seen that through the above optional embodiments, the project type is clarified, and the characteristics of different projects can be more comprehensively characterized, so as to facilitate the subsequent accurate prediction of project hazards, assist in more efficient and accurate prediction and analysis of project hazard information, improve the effect of project hazard monitoring, and provide more accurate data guidance for project construction.
[0055] As an optional embodiment, according to the correction rule between the sensor information values, each sensor information is corrected to obtain the corresponding corrected sensor information, including: For any two pieces of sensor information, determining a correlation parameter between the information types of the two pieces of sensor information according to a preset correlation relationship between the information types; Establishing a mathematical relationship model of information values of the two sensor information according to historical data corresponding to the information types of the two sensor information; According to the information value mathematical relationship model and the correlation parameter, the corrected sensing information corresponding to the two sensing information is determined.
[0056] It can be seen that through the above-mentioned optional embodiments, it is possible to determine the correlation parameters between the information types of the two sensor information and the information value mathematical relationship model, so as to realize the correction of the two sensor information to obtain sensor data with more reference value, so as to facilitate the subsequent accurate prediction of engineering hazards, assist in realizing more efficient and accurate prediction and analysis of engineering hazard information, improve the engineering hazard monitoring effect, and provide more accurate data guidance for engineering construction.
[0057] As an optional embodiment, the correction module determines the specific manner of correcting the sensor information corresponding to the two sensor information according to the information value mathematical relationship model and the correlation parameter, including: Inputting the information value of one of the two sensing information into the information value mathematical relationship model to obtain the information correction value of the other sensing information; Calculate a correction weight proportional to the correlation parameter; Calculate the product of the information correction value and the correction weight to obtain the correction parameter; The average value between the information value of each sensing information and the corresponding correction parameter is calculated to obtain the corrected sensing information corresponding to another sensing information.
[0058] It can be seen that through the above-mentioned optional embodiments, it is possible to accurately calculate the correction weight based on the correlation parameter, and determine the reasonable corresponding value of the information value through the information value mathematical relationship model, and finally obtain more valuable reference sensor data based on the average calculation, so as to facilitate the subsequent accurate prediction of engineering hazards, assist in more efficient and accurate prediction and analysis of engineering hazard information, improve the engineering hazard monitoring effect, and provide more accurate data guidance for engineering construction.
[0059] As an optional embodiment, the determination module determines the specific method of the corresponding prediction neural network according to the project type corresponding to the target project area, including: Determine the project type corresponding to the target project area; For each candidate neural network, calculate the similarity between the engineering type label in the training data set of the candidate neural network and the engineering type; The candidate neural network with the highest similarity is determined as the prediction neural network corresponding to the target engineering area; the prediction neural network is trained by a training data set including multiple training sensor data and corresponding engineering risk type annotations.
[0060] It can be seen that through the above-mentioned optional embodiments, it is possible to screen out a predictive neural network that is closer to the engineering type in the training data set according to the engineering type of the engineering area, so as to facilitate the subsequent accurate prediction of engineering hazards, assist in more efficient and accurate prediction and analysis of engineering hazard information, improve the engineering hazard monitoring effect, and provide more accurate data guidance for engineering construction.
[0061] As an optional embodiment, the specific manner in which the determination module determines the project type corresponding to the target project area includes: Input each corrected sensor information into a trained engineering type classifier network to obtain a corresponding engineering type prediction result; optionally, the engineering type classifier network is trained by a training data set including a plurality of training sensor information and corresponding engineering type annotations; Calculate the mode of the prediction results of all engineering types to obtain the engineering type corresponding to the target engineering area.
[0062] It can be seen that through the above optional embodiments, the engineering type corresponding to each sensor information can be predicted through the trained engineering type classifier network and a more accurate engineering type corresponding to the engineering area can be obtained through the majority calculation, so as to facilitate the subsequent accurate engineering hazard prediction, assist in achieving more efficient and accurate prediction and analysis of engineering hazard information, improve the engineering hazard monitoring effect, and provide more accurate data guidance for engineering construction.
[0063] As an optional embodiment, the prediction module predicts the specific manner of the engineering hazard information corresponding to the target engineering area according to the prediction neural network and all the corrected sensor information, including: Input each corrected sensor information into the prediction neural network to obtain the risk prediction value and risk type corresponding to each corrected sensor information; For each corrected sensor information, determining whether the risk prediction value corresponding to the corrected sensor information is greater than a preset threshold, and if so, determining the corrected sensor information as dangerous sensor information; The area location and the corresponding risk type corresponding to each hazard sensor information are determined as the engineering hazard information corresponding to the target engineering area.
[0064] It can be seen that through the above-mentioned optional embodiments, the risk prediction value and risk type corresponding to each corrected sensor information can be predicted through the predictive neural network to screen out the dangerous area location and risk type, thereby achieving accurate engineering hazard prediction, and being able to predict and analyze engineering hazard information more efficiently and accurately, thereby improving the engineering hazard monitoring effect and providing more accurate data guidance for engineering construction.
[0065] Embodiment 3 See also Figure 3 , Figure 3 It is another intelligent engineering monitoring system based on multi-sensor information correction disclosed in an embodiment of the present invention. Figure 3 The described intelligent engineering monitoring system based on multi-sensor information correction is applied to a data processing system / data processing device / data processing server (wherein the server includes a local processing server or a cloud processing server). Figure 3 As shown, the intelligent engineering monitoring system based on multi-sensor information correction may include: A memory 301 storing executable program codes; a processor 302 coupled to the memory 301; The processor 302 calls the executable program code stored in the memory 301 to execute the steps of the smart engineering monitoring method based on multi-sensor information correction described in the first embodiment.
[0066] Embodiment 4 An embodiment of the present invention discloses a computer-readable storage medium storing a computer program for electronic data exchange, wherein the computer program enables a computer to execute the steps of the smart engineering monitoring method based on multi-sensor information correction described in the first embodiment.
[0067] Embodiment 5 An embodiment of the present invention discloses a computer program product, which includes a non-transitory computer-readable storage medium storing a computer program, and the computer program is operable to enable a computer to execute the steps of the smart engineering monitoring method based on multi-sensor information correction described in Example 1.
[0068] The above describes specific embodiments of the present specification, and other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the processes depicted in the accompanying drawings do not necessarily have to be performed in the specific order or sequential order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.
[0069] The systems, devices, modules or units described in the above embodiments may be implemented by computer chips or entities, or by products with certain functions. A typical implementation device is a computer. Specifically, the computer may be, for example, a personal computer, a laptop computer, a cellular phone, a camera phone, a smart phone, a personal digital assistant, a media player, a navigation device, an email device, a game console, a tablet computer, a wearable device, or a combination of any of these devices.
[0070] For the convenience of description, the above device is described in various units according to their functions. Of course, when implementing this specification, the functions of each unit can be implemented in the same or multiple software and / or hardware.
[0071] Those skilled in the art will appreciate that the embodiments of this specification may be provided as methods, systems, or computer program products. Therefore, the embodiments of this specification may be in the form of complete hardware embodiments, complete software embodiments, or embodiments in combination with software and hardware. Moreover, the embodiments of this specification may be in the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code.
[0072] This specification is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of this specification. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0073] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0074] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0075] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.
[0076] The memory may include non-permanent storage in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.
[0077] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.
[0078] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.
[0079] This specification may be described in the general context of computer-executable instructions executed by a computer, such as program modules. Generally, program modules include routines, programs, objects, components, data structures, etc. that perform specific tasks or implement specific abstract data types. This specification may also be practiced in distributed computing environments where tasks are performed by remote processing devices connected through a communication network. In a distributed computing environment, program modules may be located in local and remote computer storage media including storage devices.
[0080] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.
[0081] Finally, it should be noted that the intelligent engineering monitoring method and system based on multi-sensor information correction disclosed in the embodiment of the present invention discloses only the preferred embodiment of the present invention, which is only used to illustrate the technical solution of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, ordinary technicians in this field should understand that it is still possible to modify the technical solutions recorded in the aforementioned embodiments, or to replace some of the technical features therein by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the various embodiments of the present invention.
Claims
1. A smart engineering monitoring method based on multi-sensor information correction, characterized in that: The method comprises: Acquire multiple sensing information of the target engineering area through multiple sensors; According to the correction rule between the sensor information values, each of the sensor information is corrected to obtain the corresponding corrected sensor information; Determining a corresponding prediction neural network according to the project type corresponding to the target project area; The engineering hazard information corresponding to the target engineering area is predicted based on the prediction neural network and all the corrected sensor information.
2. The intelligent engineering monitoring method based on multi-sensor information correction according to claim 1 is characterized in that: The sensing information is temperature sensing information, humidity sensing information, light intensity sensing information, precipitation sensing information, infrared sensing information or image sensing information.
3. The intelligent engineering monitoring method based on multi-sensor information correction according to claim 1 is characterized in that: The types of projects are power projects, water projects, decoration projects, wall projects or main building projects.
4. The intelligent engineering monitoring method based on multi-sensor information correction according to claim 1 is characterized in that: The step of correcting each of the sensor information according to the correction rule between the sensor information values to obtain corresponding corrected sensor information includes: For any two pieces of the sensing information, determining a correlation parameter between the information types of the two pieces of the sensing information according to a preset correlation relationship between the information types; Establishing a mathematical relationship model of information values of the two sensor information according to historical data corresponding to the information types of the two sensor information; According to the information value mathematical relationship model and the correlation parameter, the corrected sensing information corresponding to the two sensing information is determined.
5. The intelligent engineering monitoring method based on multi-sensor information correction according to claim 4 is characterized in that: The step of determining the corrected sensor information corresponding to the two sensor information according to the information value mathematical relationship model and the correlation parameter includes: Inputting the information value of one of the two sensor information into the information value mathematical relationship model to obtain the information correction value of the other sensor information; Calculating a correction weight proportional to the correlation parameter; Calculating the product of the information correction value and the correction weight to obtain a correction parameter; The average value between the information value of each sensing information and the corresponding correction parameter is calculated to obtain the corrected sensing information corresponding to another sensing information.
6. The intelligent engineering monitoring method based on multi-sensor information correction according to claim 1 is characterized in that: Determining the corresponding prediction neural network according to the project type corresponding to the target project area includes: Determine the project type corresponding to the target project area; For each candidate neural network, calculating the similarity between the engineering type label in the training data set of the candidate neural network and the engineering type; The candidate neural network with the highest similarity is determined as the prediction neural network corresponding to the target engineering area; the prediction neural network is trained by a training data set including multiple training sensor data and corresponding engineering risk type annotations.
7. The intelligent engineering monitoring method based on multi-sensor information correction according to claim 6 is characterized in that: Determining the project type corresponding to the target project area includes: Input each of the corrected sensor information into a trained engineering type classifier network to obtain a corresponding engineering type prediction result; the engineering type classifier network is trained by a training data set including a plurality of training sensor information and corresponding engineering type annotations; The mode item of all the prediction results of the engineering types is calculated to obtain the engineering type corresponding to the target engineering area.
8. The intelligent engineering monitoring method based on multi-sensor information correction according to claim 1 is characterized in that: The predicting of engineering hazard information corresponding to the target engineering area based on the predictive neural network and all the corrected sensor information includes: Inputting each of the corrected sensor information into the prediction neural network to obtain a risk prediction value and a risk type corresponding to each of the corrected sensor information; For each of the corrected sensor information, determining whether the risk prediction value corresponding to the corrected sensor information is greater than a preset threshold, and if so, determining the corrected sensor information as dangerous sensor information; The area location corresponding to each of the hazard sensor information and the corresponding risk type are determined as the engineering hazard information corresponding to the target engineering area.
9. A smart engineering monitoring system based on multi-sensor information correction, characterized in that: The system comprises: An acquisition module, used for acquiring multiple sensing information of a target engineering area through multiple sensors; A correction module, used for correcting each of the sensor information according to a correction rule between the sensor information values to obtain corresponding corrected sensor information; A determination module, used to determine a corresponding prediction neural network according to the project type corresponding to the target project area; A prediction module is used to predict the engineering hazard information corresponding to the target engineering area based on the prediction neural network and all the corrected sensor information.
10. A smart engineering monitoring system based on multi-sensor information correction, characterized in that: The system comprises: A memory storing executable program code; a processor coupled to the memory; The processor calls the executable program code stored in the memory to execute the intelligent engineering monitoring method based on multi-sensor information correction as described in any one of claims 1-8.
Citation Information
Patent Citations
Data processing method and device for tracking project progress
CN116245492A
Building engineering safety monitoring method and equipment based on machine vision and medium
CN116612440A
Target early warning method and device, electronic equipment and computer readable storage medium
CN116844339A
Intelligent building vertical deviation monitoring system and method
CN117436033A
Intelligent construction site safety risk evaluation method based on adaptive weighted fusion
CN117893010A
Cited By
Air conditioning equipment optimizing control method and system based on artificial intelligence
CN119245192A
Power distribution room safety sensing method and system based on multi-sensing information
CN119420047A
Distribution Substation Safety Perception Method and System Based on Multi-Sensor Information
CN119420047B
IT asset data processing method and system based on intelligent identification
CN119647729A