Urban rainfall flood monitoring control system based on sponge city concept
By introducing the monitoring and control system of the sponge city concept into urban stormwater management, real-time analysis of rainfall and water level data, and automatic adjustment of drainage facilities have solved the problems of single monitoring and inaccurate early warning in traditional stormwater management, and improved the efficiency of stormwater management. Efficiency and precision, reducing the risk of waterlogging.
Patent Information
- Application Number
- CN202410760621.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-13
- Publication Date
- 2024-10-11
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional urban stormwater management has a single monitoring method, inaccurate early warning and forecasting, an inability to automatically and reasonably control drainage facilities, a low degree of intelligence, and difficulty in coping with the challenges brought by extreme weather and climate change.
Design an urban stormwater monitoring and control system based on the sponge city concept, including a server, rainfall monitoring module, water level monitoring module, stormwater combined analysis module, intelligent control module and control performance evaluation module to monitor and analyze rainfall and water level data in real time. Generate control strategies to automatically adjust the operating parameters of drainage facilities, and monitor and feedback the control effects through the control performance evaluation module.
It realizes real-time monitoring, early warning and forecasting and intelligent regulation of urban stormwater, improves management efficiency and accuracy, reduces the risk of waterlogging, and ensures the stability and control performance of drainage facilities.
Smart Images

Figure CN118761643A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of urban rain and flood control, and in particular to an urban rain and flood monitoring and control system based on the concept of sponge city. Background Art
[0002] Urban stormwater refers to the part of rainwater that falls to the ground under natural conditions and exceeds the natural digestion capacity of the urban underlying surface. This part of rainwater is prone to form surface runoff, which may cause disasters and pose a threat to urban health and residents' safety.
[0003] With the acceleration of urbanization, urban stormwater management faces increasing challenges. Traditional stormwater management methods have the problems of single monitoring means and inaccurate early warning and forecasting. They are unable to automatically and reasonably control the corresponding drainage facilities and accurately feedback the control status. They have a low degree of intelligence and are difficult to effectively respond to the challenges brought by extreme weather and climate change.
[0004] In view of the above technical defects, a solution is now proposed. Summary of the invention
[0005] The purpose of the present invention is to provide an urban rainwater monitoring and control system based on the concept of sponge city, which solves the problems of single monitoring means and inaccurate early warning and forecasting in the prior art, and is unable to automatically and reasonably control the corresponding drainage facilities and accurately feedback the control status, and has a low degree of intelligence.
[0006] To achieve the above object, the present invention provides the following technical solutions:
[0007] An urban rain and flood monitoring and control system based on the concept of sponge city, comprising a server, a rainfall monitoring module, a water level monitoring module, a rain and flood combined analysis module, an intelligent control module and a control performance evaluation module; the rainfall monitoring module monitors the rainfall in various areas of the city in real time, and transmits the collected rainfall data to the rain and flood combined analysis module via the server; the water level monitoring module monitors the water level changes of corresponding water bodies in the city in real time, and transmits the collected water level data to the rain and flood combined analysis module via the server;
[0008] The rain-flood combined analysis module receives data from the rainfall monitoring module and the water level monitoring module, and processes and analyzes the rainfall data and the water level data in real time, and sends the analysis results to the intelligent control module via the server; the intelligent control module determines whether corresponding regulation is required based on the analysis results of the rain-flood combined analysis module, and generates a matching control strategy if corresponding regulation is required, controls the corresponding urban drainage facilities based on the generated control strategy, and automatically adjusts the operating parameters of the corresponding urban drainage facilities to put the corresponding urban drainage facilities in the best operating condition;
[0009] The control performance evaluation module monitors the corresponding control process of the intelligent control module, generates a control meter evaluation pass signal or a control meter evaluation fail signal of the corresponding control process through analysis, and sends the control meter evaluation pass signal or the control meter evaluation fail signal to the rain and flood remote management terminal via the server. When the rain and flood remote management terminal receives the control meter evaluation fail signal, it will issue a corresponding warning.
[0010] Furthermore, the specific analysis process of the control performance evaluation module is as follows:
[0011] The urban drainage facilities required to be controlled in the corresponding control process are obtained, the time when the intelligent control module generates the corresponding control strategy is collected and marked as the control start time, and the time when the corresponding urban drainage facilities begin to be in the best operating condition is marked as the adjustment end time, the time difference between the adjustment end time and the control start time is calculated to obtain the control duration, and the control duration is numerically compared with the corresponding preset control duration threshold. If the control duration exceeds the preset control duration threshold, the corresponding control duration is marked as the over-measurement duration;
[0012] And mark the excess value of the over-measurement duration compared to the preset control duration threshold as the control timeout value, calculate the average of all control timeout values to obtain the control time analysis value, numerically calculate the proportion of the number of over-measurement durations and the control time analysis value to obtain the control condition value, numerically compare the control condition value with the preset control condition threshold, if the control condition value exceeds the preset control condition threshold, generate a control table evaluation unqualified signal; if the control condition value does not exceed the preset control condition threshold, generate a control table evaluation qualified signal.
[0013] Furthermore, the server is communicatively connected with the maintenance detection module. When the intelligent control module completes the corresponding control process, the maintenance detection module continuously monitors all the regulated urban drainage facilities, marks the corresponding urban drainage facilities as stable facilities or disordered facilities through analysis, and generates a maintenance detection error signal or a maintenance detection optimization signal, and sends the maintenance detection error signal or the maintenance detection optimization signal to the rainwater remote management terminal via the server. When the rainwater remote management terminal receives the maintenance detection error signal, it issues a corresponding warning.
[0014] Furthermore, the specific operation process of the maintenance detection module includes:
[0015] Obtain the operating parameters that need to be monitored for the corresponding urban drainage facilities, collect the real-time detection data of the corresponding operating parameters, perform variance calculation on all the real-time detection data of the corresponding operating parameters within a unit time to obtain the real-time data fluctuation value, mark the deviation value of the real-time detection data compared with the corresponding preset standard value as the deviation value, and perform mean calculation on all the deviation values of the corresponding operating parameters within a unit time to obtain the inspection value;
[0016] The real-time data fluctuation value and the inspection condition value are numerically compared with the corresponding preset real-time data fluctuation threshold value and the preset inspection condition threshold value respectively. If the real-time data fluctuation value or the inspection condition value exceeds the corresponding preset threshold value, the corresponding operating parameter is judged to be an abnormal parameter; if there is an abnormal parameter in the corresponding urban drainage facility within a unit time, the corresponding urban drainage facility is marked as a disordered facility; if there is no abnormal parameter in the corresponding urban drainage facility within a unit time, the corresponding urban drainage facility is marked as a stable facility.
[0017] Further, after marking the corresponding urban drainage facilities as stable facilities or disordered facilities, if there are no stable facilities, a maintenance error detection signal is generated; if there are no disordered facilities, a maintenance superior detection signal is generated;
[0018] If there are both stable facilities and disorderly facilities, the ratio of the number of disorderly facilities to the number of stable facilities is marked as an unstable occupancy value; and the number of abnormal parameters in the corresponding disorderly facilities is ratio-calculated to the number of operating parameters to be monitored to obtain an abnormal detection value, the abnormal detection value of all disorderly facilities is averaged to obtain an abnormal analysis value, the maintenance evaluation value is obtained by numerically calculating the unstable occupancy value and the abnormal analysis value, the maintenance evaluation value is numerically compared with the preset maintenance evaluation threshold, if the maintenance evaluation value exceeds the preset maintenance evaluation threshold, a maintenance abnormality detection signal is generated; if the maintenance evaluation value does not exceed the preset maintenance evaluation threshold, a maintenance optimization signal is generated.
[0019] Furthermore, the server is communicatively connected with the control difficulty determination module, which is used to set a determination period, determine the difficulty of urban stormwater control within the determination period through analysis, and generate a stormwater control difficulty signal or a stormwater control easy signal, and send the stormwater control difficulty signal or the stormwater control easy signal to the stormwater remote management terminal via the server, which issues a corresponding warning when receiving the stormwater control difficulty signal.
[0020] Furthermore, the specific analysis process of the control difficulty determination module is as follows:
[0021] The number of times the control meter evaluation unqualified signals and the number of times the control meter evaluation qualified signals are generated within the measurement period are collected and marked as the control evaluation abnormal frequency value and the control evaluation excellent frequency value respectively, and the ratio of the control evaluation abnormal frequency value to the control evaluation excellent frequency value is marked as the control evaluation inspection value; and the performance judgment symbols of all urban drainage facilities are retrieved from the server, and the number of urban drainage facilities corresponding to the performance judgment symbol PS-1 is marked as the performance abnormal number inspection value, the number of urban drainage facilities corresponding to the performance judgment symbol PS-1 is marked as the performance excellent number inspection value, and the ratio of the performance abnormal number inspection value to the performance excellent number inspection value is marked as the performance detection value, and the control difficulty value is obtained by numerically calculating the control difficulty value and the performance detection value, and the control difficulty value is numerically compared with the preset control difficulty threshold value. If the control difficulty value exceeds the preset control difficulty threshold value, a rainwater pipe difficulty signal is generated; if the control difficulty value does not exceed the preset control difficulty threshold, a rainwater pipe easy signal is generated.
[0022] Furthermore, the server is connected to the drainage facility classification module for communication. The drainage facility classification module collects the number of times the corresponding urban drainage facilities are marked as stable facilities and the number of times they are marked as disordered facilities within the measurement period, and defines them as drainage stability inspection value and drainage wave inspection value respectively. The ratio of the drainage wave inspection value to the drainage stability inspection value is marked as the drainage evaluation value. The drainage evaluation value is numerically compared with the preset drainage evaluation threshold. If the drainage evaluation value exceeds the preset drainage evaluation threshold, the performance judgment symbol PS-1 is allocated to the corresponding urban drainage facility.
[0023] If the drainage evaluation value does not exceed the preset drainage evaluation threshold, the production date of the corresponding urban drainage facility is collected, and the interval between the current date and the production date is marked as the production time, and the total operation time of the corresponding urban drainage facility is collected, and the number of occurrences of the single operation time of the corresponding urban drainage facility exceeding the preset single operation time threshold is collected and marked as a high continuous operation frequency value;
[0024] The drainage performance inspection value is obtained by numerically calculating the drainage evaluation value, production time, total operation time and high continuous operation frequency value, and the drainage performance inspection value is numerically compared with the preset drainage performance inspection threshold value. If the drainage performance inspection value exceeds the preset drainage performance inspection threshold value, a performance judgment symbol PS-1 is assigned to the corresponding urban drainage facility; if the drainage performance inspection value does not exceed the preset drainage performance inspection threshold value, a performance judgment symbol PS-2 is assigned to the corresponding urban drainage facility; and the performance judgment symbol of the corresponding urban drainage facility is sent to the server for storage.
[0025] Compared with the prior art, the present invention has the following beneficial effects:
[0026] 1. In the present invention, the rainfall data and water level data are processed and analyzed in real time by the rain-flood combined analysis module. The intelligent control module determines whether corresponding regulation is needed according to the analysis result of the rain-flood combined analysis module. If corresponding regulation is needed, the corresponding urban drainage facilities are controlled to realize real-time monitoring, early warning and forecasting and intelligent regulation of urban rain-flood, significantly improve the efficiency and accuracy of urban rain-flood management, reduce the risk of urban waterlogging, and monitor the corresponding control process of the intelligent control module by the control performance evaluation module, which can accurately feedback the control performance of the drainage facilities, ensure the subsequent control performance and improve the effect of rain-flood management;
[0027] 2. In the present invention, all the regulated urban drainage facilities are continuously monitored through the maintenance detection module, and the corresponding urban drainage facilities are marked as stable facilities or disordered facilities through analysis, and a maintenance detection error signal or a maintenance detection excellence signal is generated to ensure the drainage effect of each drainage facility and reduce the risk of rainwater and floods. In addition, the difficulty of urban rainwater and flood control within the measurement period is judged through the control difficulty measurement module. When the rainwater and flood control difficulty signal is generated, the supervision of drainage facilities and rainwater and flood control is strengthened to ensure the subsequent rainwater and flood control effect, with a high degree of intelligence. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] In order to facilitate understanding by those skilled in the art, the present invention is further described below in conjunction with the accompanying drawings;
[0029] Figure 1 This is a system block diagram of Embodiment 1 of the present invention;
[0030] Figure 2 This is a system block diagram of Embodiment 2 of the present invention;
[0031] Figure 3 This is a system block diagram of Embodiment 3 and Embodiment 4 of the present invention. DETAILED DESCRIPTION
[0032] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0033] Embodiment 1: Figure 1As shown, the present invention proposes an urban rainwater monitoring and control system based on the sponge city concept, including a server, a rainfall monitoring module, a water level monitoring module, a rainwater combined analysis module, an intelligent control module and a control performance evaluation module; the sponge city concept, as a new urban rainwater management concept, emphasizes the natural accumulation, infiltration and purification of urban rainwater by imitating the structure and function of the natural ecosystem, so as to improve the urban rainwater management capacity;
[0034] Among them, the rainfall monitoring module monitors the rainfall in various areas of the city in real time, and transmits the collected rainfall data to the rain-flood combined analysis module via the server. The water level monitoring module monitors the water level changes of corresponding water bodies (such as urban rivers, lakes, reservoirs, etc.) in the city in real time, and transmits the collected water level data to the rain-flood combined analysis module via the server.
[0035] The rain-flood combined analysis module receives data from the rainfall monitoring module and the water level monitoring module, and processes and analyzes the rainfall data and the water level data in real time, and sends the analysis results to the intelligent control module via the server; the intelligent control module determines whether corresponding regulation is required based on the analysis results of the rain-flood combined analysis module, and generates a matching control strategy if corresponding regulation is required, and controls the corresponding urban drainage facilities (mainly drainage pumps) based on the generated control strategy, and automatically adjusts the operating parameters of the corresponding urban drainage facilities (such as the start of the drainage pump, the power and speed of the drainage pump) to put the corresponding urban drainage facilities in the best operating condition;
[0036] It should be noted that the specific processing and analysis process of the rain-flood combined analysis module is as follows: pre-processing the received raw data, including data cleaning, formatting, denoising and standardization. The purpose of data cleaning is to remove outliers and duplicate data to ensure the quality and accuracy of the data. Data formatting is to convert the data into a unified format to facilitate subsequent analysis and processing. Denoising and standardization are to eliminate noise and dimensional differences in the data and improve the accuracy of data analysis.
[0037] After the preprocessing is completed, the real-time data will continue to be processed, including real-time monitoring and statistics of rainfall and water level data, such as calculating the average rainfall, maximum rainfall, water level change rate, etc. At the same time, the rainfall trend and water level change will be predicted based on the change trend of historical data and real-time data. For example, by using statistical methods, machine learning algorithms or deep learning models, the rainfall and rainfall intensity in the future period can be predicted, which will help remote managers to understand the rainfall situation in advance and formulate corresponding response measures; by analyzing the historical water level data and real-time water level data of rivers, lakes, reservoirs and other water bodies, and predicting the change trend of future water levels, it will help remote managers to timely understand the water storage and drainage capacity of the water body and formulate reasonable drainage scheduling plans;
[0038] After completing the rainfall trend forecast and water level change forecast, the forecast results and related statistical data and analysis reports are sent to the intelligent control module. The intelligent control module determines whether to generate a suitable control strategy based on this information and preset decision-making rules, and automatically adjusts the corresponding operating parameters of the urban drainage facilities. In this way, it provides strong decision-making support for the intelligent control module and realizes the intelligent management of urban rain and flood. By integrating rainfall monitoring, water level monitoring, data analysis and intelligent control, real-time monitoring, early warning and forecasting, and intelligent regulation of urban rain and flood are realized, aiming to improve the efficiency and accuracy of urban rain and flood management and reduce the risk of urban waterlogging.
[0039] The control performance evaluation module monitors the corresponding control process of the intelligent control module, generates a control meter evaluation pass signal or a control meter evaluation fail signal of the corresponding control process through analysis, and sends the control meter evaluation pass signal or the control meter evaluation fail signal to the rain and flood remote management terminal through the server. When the rain and flood remote management terminal receives the control meter evaluation fail signal, it issues a corresponding warning so that the remote management personnel can understand the control performance status of each time in detail and make corresponding improvement and optimization measures as needed, so as to ensure the subsequent control performance and improve the rain and flood management effect; the specific analysis process of the control performance evaluation module is as follows:
[0040] The urban drainage facilities required for the corresponding control process are obtained, the time when the intelligent control module generates the corresponding control strategy is collected and marked as the control start time, and the time when the corresponding urban drainage facilities begin to be in the best operating condition is marked as the adjustment end time, and the time difference between the adjustment end time and the control start time is calculated to obtain the control duration, wherein the larger the value of the control duration is, the lower the control efficiency of the corresponding drainage facilities is; the control duration is numerically compared with the corresponding preset control duration threshold, and if the control duration exceeds the preset control duration threshold, the corresponding control duration is marked as the over-measurement duration;
[0041] The excess value of the over-test duration compared to the preset control duration threshold is marked as the control timeout value, and the control time analysis value is obtained by averaging all the control timeout values. The control value YP is obtained by numerically calculating the proportion value YK of the over-test duration (i.e., the ratio of the number of over-test durations to the number of control durations) and the control time analysis value YS through the formula YP=qw1*YK+qw2*YS;
[0042] Among them, qw1 and qw2 are preset weight coefficients, qw1>qw2>0; and, the larger the numerical value of the control condition value YP is, the worse the control performance of the corresponding control process is overall; the control condition value YP is numerically compared with the preset control condition threshold value, if the control condition value YP exceeds the preset control condition threshold value, indicating that the control performance of the corresponding control process is overall poor, then a control table evaluation unqualified signal is generated; if the control condition value YP does not exceed the preset control condition threshold value, indicating that the control performance of the corresponding control process is overall good, then a control table evaluation qualified signal is generated.
[0043] Embodiment 2: Figure 2 As shown, the difference between this embodiment and embodiment 1 is that the server is connected to the maintenance detection module in communication. When the intelligent control module completes the corresponding control process, the maintenance detection module continuously monitors all the regulated urban drainage facilities, marks the corresponding urban drainage facilities as stable facilities or disordered facilities through analysis, and generates a maintenance detection error signal or a maintenance detection optimization signal, and sends the maintenance detection error signal or the maintenance detection optimization signal to the rain and flood remote management terminal through the server. When the rain and flood remote management terminal receives the maintenance detection error signal, it issues a corresponding warning. After receiving the warning, the remote management personnel promptly make corresponding regulation operations to ensure the drainage effect of each drainage facility, thereby reducing the risk of rain and flood. The specific operation process of the maintenance detection module is as follows:
[0044] The operating parameters required for monitoring of the corresponding urban drainage facilities are obtained, and the real-time detection data of the corresponding operating parameters are collected. The variance of all the real-time detection data of the corresponding operating parameters in a unit time is calculated to obtain the real-time data fluctuation value, wherein the larger the value of the real-time data fluctuation value is, the more unstable the performance of the corresponding operating parameter is; the deviation value of the real-time detection data compared with the corresponding preset standard value is marked as the deviation value, and the mean of all the deviation values of the corresponding operating parameters in a unit time is calculated to obtain the condition value, wherein the larger the value of the condition value is, the greater the operation deviation of the corresponding operating parameter is;
[0045] The real-time data fluctuation value and the inspection condition value are numerically compared with the corresponding preset real-time data fluctuation threshold value and the preset inspection condition threshold value respectively; if the real-time data fluctuation value or the inspection condition value exceeds the corresponding preset threshold value, the corresponding operation parameter is judged to be an abnormal parameter; if there is an abnormal parameter in the corresponding urban drainage facility within a unit time, indicating that the continuous operation performance of the corresponding drainage facility is poor, the corresponding urban drainage facility is marked as a disordered facility; if there is no abnormal parameter in the corresponding urban drainage facility within a unit time, indicating that the continuous operation performance of the corresponding drainage facility is good, the corresponding urban drainage facility is marked as a stable facility.
[0046] Further, after marking the corresponding urban drainage facilities as stable facilities or disordered facilities, if there are no stable facilities, a maintenance abnormality detection signal is generated; if there are no disordered facilities, a maintenance detection signal is generated; if there are both stable facilities and disordered facilities, the ratio of the number of disordered facilities to the number of stable facilities is marked as an unstable condition value; and the number of abnormal parameters in the corresponding disordered facilities is calculated by ratio to the number of operating parameters to be monitored to obtain an abnormality detection value, and the average of the abnormality detection values of all disordered facilities is calculated to obtain an abnormality analysis value;
[0047] The unstable occupancy value WP and the abnormality detection value WK are numerically calculated by the formula WF=kp1*WP+kp2*WK / kp1 to obtain the maintenance evaluation value WF, wherein kp1 and kp2 are preset proportional coefficients, kp1>kp2>0; and the larger the value of the maintenance evaluation value WF is, the worse the maintenance performance of the corresponding drainage process is; the maintenance evaluation value WF is numerically compared with the preset maintenance evaluation threshold value, if the maintenance evaluation value WF exceeds the preset maintenance evaluation threshold value, it indicates that the maintenance performance of the corresponding drainage process is poor, and a maintenance abnormality detection signal is generated; if the maintenance evaluation value WF does not exceed the preset maintenance evaluation threshold value, it indicates that the maintenance performance of the corresponding drainage process is good, and a maintenance optimization signal is generated.
[0048] Embodiment 3: Figure 3 As shown, the difference between this embodiment and embodiment 1 and embodiment 2 is that the server is connected to the control difficulty determination module in communication, and the control difficulty determination module is used to set a determination period, preferably, the determination period is thirty-five days; the difficulty of urban rain and flood control within the determination period is determined by analysis, and a rain and flood control difficulty signal or a rain and flood control easy signal is generated, and the rain and flood control difficulty signal or the rain and flood control easy signal is sent to the rain and flood remote management terminal via the server, and the rain and flood remote management terminal issues a corresponding warning when receiving the rain and flood control difficulty signal, and the remote management personnel strengthen the supervision of drainage facilities and rain and flood control supervision in the subsequent period when receiving the corresponding warning, so as to ensure the subsequent rain and flood control effect; the specific analysis process of the control difficulty determination module is as follows:
[0049] The number of control table evaluation unqualified signals and the number of control table evaluation qualified signals generated within the measurement period are collected and marked as control evaluation abnormal frequency value and control evaluation excellent frequency value respectively, and the ratio of the control evaluation abnormal frequency value to the control evaluation excellent frequency value is marked as the control evaluation inspection value; and the performance judgment symbols of all urban drainage facilities are retrieved from the server, and the number of urban drainage facilities corresponding to the performance judgment symbol PS-1 is marked as the abnormal inspection value, the number of urban drainage facilities corresponding to the performance judgment symbol PS-1 is marked as the excellent inspection value, and the ratio of the abnormal inspection value to the excellent inspection value is marked as the performance inspection value;
[0050] The control difficulty value GY is obtained by numerically calculating the control evaluation value GK and the condition detection value GX through the formula GY=(hp1*GK+hp2*GX) / 2, wherein hp1 and hp2 are preset proportional coefficients, and the values of hp1 and hp2 are both greater than zero; and the larger the value of the control difficulty value GY, the greater the control difficulty, and the less conducive it is to ensure the effect of rainwater control; the control difficulty value GY is numerically compared with the preset control difficulty threshold value. If the control difficulty value GY exceeds the preset control difficulty threshold value, it indicates that the control difficulty is relatively large, which is not conducive to ensuring the effect of rainwater control, and a rainwater control difficulty signal is generated; if the control difficulty value GY does not exceed the preset control difficulty threshold value, it indicates that the control difficulty is relatively small, and a rainwater control signal is generated.
[0051] Embodiment 4: Figure 3 As shown, the difference between this embodiment and embodiment 1, embodiment 2, and embodiment 3 is that the server is connected to the drainage facility classification module in communication, and the drainage facility classification module collects the number of times the corresponding urban drainage facilities are marked as stable facilities and the number of times they are marked as disordered facilities within the measurement period, and defines them as drainage stability inspection value and drainage wave inspection value respectively; the ratio of the drainage wave inspection value to the drainage stability inspection value is marked as the drainage evaluation value, wherein the larger the value of the drainage evaluation value is, the worse the drainage performance of the corresponding drainage facility within the measurement period is; the drainage evaluation value is numerically compared with the preset drainage evaluation threshold value, and if the drainage evaluation value exceeds the preset drainage evaluation threshold value, indicating that the drainage performance of the corresponding drainage facility within the measurement period is poor, then the performance judgment symbol PS-1 is allocated to the corresponding urban drainage facility;
[0052] If the drainage evaluation value does not exceed the preset drainage evaluation threshold, the production date of the corresponding urban drainage facility is collected, and the interval between the current date and the production date is marked as the production time, and the total operation time of the corresponding urban drainage facility is collected, and the single operation time of each operation process of the corresponding drainage facility in the historical stage is obtained, and the number of occurrences of the single operation time of the corresponding urban drainage facility exceeding the preset single operation time threshold is collected and marked as a high continuous operation frequency value;
[0053] By formula The drainage evaluation value FM, production time FN, total operation time FR and high continuous operation frequency value FW are numerically calculated to obtain the drainage inspection value FY, where tg1, tg2, tg3 and tg4 are preset proportional coefficients, tg1>tg4>tg3>tg2>0; and the larger the value of the drainage inspection value FY, the worse the performance of the corresponding drainage facilities is, and the more difficult it is to manage;
[0054] The drainage inspection value FY is numerically compared with the preset drainage inspection threshold value. If the drainage inspection value FY exceeds the preset drainage inspection threshold value, indicating that the performance of the corresponding drainage facility is poor, the performance judgment symbol PS-1 is assigned to the corresponding urban drainage facility; if the drainage inspection value FY does not exceed the preset drainage inspection threshold value, indicating that the performance of the corresponding drainage facility is good, the performance judgment symbol PS-2 is assigned to the corresponding urban drainage facility; and the performance judgment symbol of the corresponding urban drainage facility is sent to the server for storage, which can not only accurately feedback the performance status of each drainage facility, so as to facilitate remote management personnel to adopt appropriate management plans for different drainage facilities and reduce management difficulty, but also provide data support for the analysis process of the management and control difficulty determination module to ensure the accuracy of its analysis results.
[0055] The working principle of the present invention is as follows: when in use, the rainfall monitoring module is used to monitor the rainfall in various areas of the city in real time, the water level monitoring module is used to monitor the water level changes of the corresponding water bodies in the city in real time, the rain and flood combined analysis module is used to process and analyze the rainfall data and the water level data in real time, and the intelligent control module is used to judge whether corresponding regulation is needed according to the analysis result of the rain and flood combined analysis module. If corresponding regulation is needed, the corresponding urban drainage facilities are controlled based on the generated control strategy, and the operation parameters of the corresponding urban drainage facilities are automatically adjusted to realize real-time monitoring, early warning and forecasting and intelligent regulation of urban rain and flood, significantly improve the efficiency and accuracy of urban rain and flood management, and reduce the risk of urban waterlogging. The corresponding control process of the intelligent control module is monitored by the control performance evaluation module, and the control meter evaluation qualified signal or the control meter evaluation unqualified signal of the corresponding control process is generated by analysis. When the rain and flood remote management terminal receives the control meter evaluation unqualified signal, it issues a corresponding early warning, which can accurately feedback the control performance status of the drainage facilities, and ensure the subsequent control performance to improve the rain and flood management effect.
[0056] The above formulas are all dimensionless and numerical calculations. The formula is a formula obtained by collecting a large amount of data and performing software simulation to obtain the most recent real situation. The preset parameters in the formula are set by technicians in this field according to actual conditions. The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the contents of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that technicians in the relevant technical field can understand and use the present invention well. The present invention is only limited by the claims and their full scope and equivalents.
Claims
1. An urban rainwater monitoring and control system based on the concept of sponge city, characterized in that: It includes a server, a rainfall monitoring module, a water level monitoring module, a rain-flood combined analysis module, an intelligent control module and a control performance evaluation module; the rainfall monitoring module monitors the rainfall in various areas of the city in real time, and transmits the collected rainfall data to the rain-flood combined analysis module via the server; the water level monitoring module monitors the water level changes of the corresponding water bodies in the city in real time, and transmits the collected water level data to the rain-flood combined analysis module via the server; The rain-flood combined analysis module receives data from the rainfall monitoring module and the water level monitoring module, processes and analyzes the rainfall data and the water level data in real time, and sends the analysis results to the intelligent control module via the server; The intelligent control module determines whether corresponding regulation is needed according to the analysis results of the rain-flood combined analysis module. If corresponding regulation is needed, the intelligent control module generates a matching control strategy, controls the corresponding urban drainage facilities based on the generated control strategy, and automatically adjusts the operating parameters of the corresponding urban drainage facilities to put the corresponding urban drainage facilities in the best operating condition; The control performance evaluation module monitors the corresponding control process of the intelligent control module, generates a control meter evaluation pass signal or a control meter evaluation fail signal of the corresponding control process through analysis, and sends the control meter evaluation pass signal or the control meter evaluation fail signal to the rain and flood remote management terminal via the server. When the rain and flood remote management terminal receives the control meter evaluation fail signal, it issues a corresponding warning; The specific analysis process of the control performance evaluation module is as follows: The urban drainage facilities required to be controlled in the corresponding control process are obtained, the time when the intelligent control module generates the corresponding control strategy is collected and marked as the control start time, and the time when the corresponding urban drainage facilities begin to be in the best operating condition is marked as the adjustment end time, the time difference between the adjustment end time and the control start time is calculated to obtain the control duration, and the control duration is numerically compared with the corresponding preset control duration threshold. If the control duration exceeds the preset control duration threshold, the corresponding control duration is marked as the over-measurement duration; And the excess value of the over-test duration compared to the preset control duration threshold is marked as the control timeout value, all control timeout values are averaged to obtain the control time analysis value, and the control condition value YP is obtained by numerically calculating the proportion value YK of the over-test duration and the control time analysis value YS through the formula YP=qw1*YK+qw2*YS; Wherein, qw1 and qw2 are preset weight coefficients, qw1>qw2>0; the control condition value is numerically compared with the preset control condition threshold value, if the control condition value exceeds the preset control condition threshold value, a control table evaluation unqualified signal is generated; if the control condition value does not exceed the preset control condition threshold value, a control table evaluation qualified signal is generated; The server is connected in communication with the maintenance detection module. When the intelligent control module completes the corresponding control process, the maintenance detection module continuously monitors all the regulated urban drainage facilities, marks the corresponding urban drainage facilities as stable facilities or disordered facilities through analysis, and generates a maintenance detection error signal or a maintenance detection optimization signal, and sends the maintenance detection error signal or the maintenance detection optimization signal to the rainwater remote management terminal via the server. When the rainwater remote management terminal receives the maintenance detection error signal, it issues a corresponding warning; The specific operation process of the maintenance detection module includes: Obtain the operating parameters that need to be monitored for the corresponding urban drainage facilities, collect the real-time detection data of the corresponding operating parameters, perform variance calculation on all the real-time detection data of the corresponding operating parameters within a unit time to obtain the real-time data fluctuation value, mark the deviation value of the real-time detection data compared with the corresponding preset standard value as the deviation value, and perform mean calculation on all the deviation values of the corresponding operating parameters within a unit time to obtain the inspection value; The real-time data fluctuation value and the inspection value are numerically compared with the corresponding preset real-time data fluctuation threshold and the preset inspection threshold, respectively. If the real-time data fluctuation value or the inspection value exceeds the corresponding preset threshold, the corresponding operation parameter is judged to be an abnormal parameter; if there is an abnormal parameter in the corresponding urban drainage facility within a unit time, the corresponding urban drainage facility is marked as a disordered facility; if there is no abnormal parameter in the corresponding urban drainage facility within a unit time, the corresponding urban drainage facility is marked as a stable facility; After marking the corresponding urban drainage facilities as stable facilities or disordered facilities, if there are no stable facilities, a maintenance error detection signal is generated; if there are no disordered facilities, a maintenance superior detection signal is generated; If there are both stable facilities and disordered facilities, the ratio of the number of disordered facilities to the number of stable facilities is marked as the unstable condition value; and the number of abnormal parameters in the corresponding disordered facilities is calculated by ratio to the number of operating parameters to be monitored to obtain the abnormal detection value, and the average of the abnormal detection values of all disordered facilities is calculated to obtain the abnormal analysis value; The unstable occupancy value WP and the abnormality detection value WK are numerically calculated by the formula WF=kp1*WP+kp2*WK / kp1 to obtain the maintenance evaluation value WF, wherein kp1 and kp2 are preset proportional coefficients, kp1>kp2>0; the maintenance evaluation value is numerically compared with the preset maintenance evaluation threshold value, if the maintenance evaluation value exceeds the preset maintenance evaluation threshold value, a maintenance abnormality detection signal is generated; if the maintenance evaluation value does not exceed the preset maintenance evaluation threshold value, a maintenance superiority detection signal is generated.
2. According to claim 1, the urban rainwater monitoring and control system based on the sponge city concept is characterized in that: The server is communicatively connected with the control difficulty determination module, which is used to set a determination period, determine the difficulty of urban stormwater control within the determination period through analysis, and generate a stormwater control difficulty signal or a stormwater control easy signal, and send the stormwater control difficulty signal or the stormwater control easy signal to the stormwater remote management terminal via the server. When the stormwater remote management terminal receives the stormwater control difficulty signal, it will issue a corresponding warning.
3. According to claim 2, the urban rainwater monitoring and control system based on the sponge city concept is characterized in that: The specific analysis process of the control difficulty determination module is as follows: The number of times the control meter evaluation failed signals and the number of times the control meter evaluation passed signals were generated within the measurement period were collected and marked as the control evaluation abnormal frequency value and the control evaluation excellent frequency value respectively, and the ratio of the control evaluation abnormal frequency value to the control evaluation excellent frequency value was marked as the control evaluation inspection value; And retrieve the performance judgment symbols of all urban drainage facilities from the server, mark the number of urban drainage facilities corresponding to the performance judgment symbol PS-1 as the performance anomaly test value, mark the number of urban drainage facilities corresponding to the performance judgment symbol PS-1 as the performance excellence test value, mark the ratio of the performance anomaly test value to the performance excellence test value as the performance detection value, and obtain the control difficulty value by numerically calculating the control evaluation test value and the performance detection value. If the control difficulty value exceeds the preset control difficulty threshold, a stormwater management difficulty signal is generated; if the control difficulty value does not exceed the preset control difficulty threshold, a stormwater management easy signal is generated.
4. According to claim 2, the urban rainwater monitoring and control system based on the sponge city concept is characterized in that: The server is in communication connection with the drainage facility classification module. The drainage facility classification module collects the number of times the corresponding urban drainage facilities are marked as stable facilities and the number of times they are marked as disordered facilities within the measurement period, and defines them as drainage stability inspection value and drainage wave inspection value respectively. The ratio of the drainage wave inspection value to the drainage stability inspection value is marked as the drainage evaluation value. If the drainage evaluation value exceeds the preset drainage evaluation threshold, the performance judgment symbol PS-1 is allocated to the corresponding urban drainage facility. If the drainage evaluation value does not exceed the preset drainage evaluation threshold, the drainage performance inspection value is obtained by numerically calculating the drainage evaluation value, production time, total operation time and high continuous operation frequency value; if the drainage performance inspection value exceeds the preset drainage performance inspection threshold, a performance judgment symbol PS-1 is assigned to the corresponding urban drainage facility; if the drainage performance inspection value does not exceed the preset drainage performance inspection threshold, a performance judgment symbol PS-2 is assigned to the corresponding urban drainage facility; and the performance judgment symbol of the corresponding urban drainage facility is sent to the server for storage.
Citation Information
Patent Citations
Urban waterlogging monitoring and pre-warning system and pre-warning method
CN110533885A
Building equipment intelligent control optimization management system suitable for green low-carbon building
CN117406685A
Seabed forward-looking sonar fault monitoring system based on data analysis
CN117630895A
Rural information service management platform based on data analysis
CN118132626A
Land power generation safety intelligent supervision system based on data analysis
CN118134269A
Cited By
Urban inland inundation risk management method and system based on multi-model coupling
CN120450214A
A city waterlogging risk management method and system based on multi-model coupling
CN120450214B
Sponge city monitoring system based on intelligent sensor network
CN121462609A
